A comprehensive grounding construction method and system for rock geological buildings
Through drilling piles and galvanized anchors, the problem that the existing technology cannot meet the comprehensive grounding design standards of stone geological buildings is solved, the grounding effect and foundation stability are improved, and the risk of lightning strikes is reduced. and construction costs.
Patent Information
- Application Number
- CN202411125092.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-16
AI Technical Summary
The existing technology is difficult to achieve a comprehensive building grounding design of no more than 1Ω in Shifang geological buildings. Direct burying conductive lines cannot meet this standard, resulting in buildings being susceptible to lightning strikes in lightning weather, which may cause fires and equipment damage.
Comprehensive grounding of drilled piles and foundation raft slabs, and assisted grounding with galvanized anchors, including calculating the grounding resistance of the foundation, setting up steel mesh, punching galvanized anchors, increasing soil layer density, and using a variety of equipment for monitoring and Construction support.
It improves the grounding area and depth, reduces ground resistance, enhances foundation stability and load-bearing capacity, reduces foundation settlement and deformation, improves equipment and personnel safety, and reduces construction costs and time.
Smart Images

Figure CN118693539B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building grounding, and in particular relates to a comprehensive grounding construction method and system for stone geological buildings. Background Art
[0002] Since modern buildings are usually high and exposed to the atmosphere, they are extremely vulnerable to lightning in thunderstorms; if lightning strikes a building, and the building does not have any lightning protection measures, it will cause damage to the building, fire, and even casualties, and damage the power and telecommunications equipment in the building. And because high-rise buildings are more susceptible to lightning strikes, and high-rise buildings are usually office or teaching buildings, with a large number of electrical equipment stored inside, a large number of electrical equipment and network systems will suffer serious losses once they are struck by lightning, so the reliability of the lightning protection system is extremely important.
[0003] In the Chinese patent with the publication number CN115693191A, a comprehensive grounding construction method is mentioned, which involves the field of grounding technology, including the following steps: S1: using electromagnetic field simulation calculation software to simulate the planned electromagnetic field model; S2: laying the ground grid outdoors according to the planned electromagnetic field model; S3: laying indoor conductive lines, which are divided into working grounding busbars, logic grounding busbars, signal grounding busbars and shielding grounding busbars; S4: connecting indoor conductive lines to the ground grid; S5: acceptance and performance testing; This solution solves the grounding process problem of the single building of the experimental large scientific device, making the grounding reliable and ensuring the functional grounding requirements of the single building of the experimental large scientific device such as working grounding, logic grounding, signal grounding and shielding grounding. Although the above scheme has many beneficial effects, the scope of application of this scheme is limited. For example, in the riverbanks with full stone geological conditions on both sides of the river, directly burying conductive lines in the stone foundation geology cannot meet the building comprehensive grounding design standard of no more than 1Ω.
[0004] In view of this, the inventor proposes a comprehensive grounding construction method and system for rock geological buildings to solve the above problems. Summary of the invention
[0005] The object of the present invention is to provide a method and system for comprehensive grounding construction of rock geological buildings to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above object, the present invention provides the following technical solutions: a method for comprehensive grounding construction of rock geological buildings, comprising comprehensive grounding using bored cast-in-place piles and foundation rafts, and auxiliary grounding using galvanized anchor rods; the construction of galvanized anchor rods comprises the following steps:
[0007] S1. Strengthen the foundation of the building according to the properties of the soil layer;
[0008] S2. Calculate the grounding resistance of the foundation;
[0009] S3. After the steel mesh of the underground part of the building is tied, a horizontal galvanized anchor rod is driven toward the inner side of the Yellow River Highway. One end of the galvanized anchor rod is connected to the steel mesh of the underground part of the building, and the other end passes through the Yellow River Highway and enters the soil layer of the mountain.
[0010] S4. Use a water pump to inject water into the soil layer of the mountain to increase the density of the soil layer of the mountain.
[0011] Further, in step S3, every 6 galvanized anchor rods form a group, and the 6 galvanized anchor rods in the same group are distributed at the vertices of a regular hexagon; the top ends of the 6 galvanized anchor rods in the same group are connected in sequence through the first-level galvanized flat steel; the galvanized anchor rod groups are connected in series through the second-level galvanized flat steel; the second-level galvanized flat steel is connected to the steel mesh of the underground part of the building through the third-level galvanized flat steel.
[0012] Furthermore, in step S1, the soil layer properties of the foundation include soft soil layers on the surface, deep soil layers and rocky geological layers;
[0013] Inject freezing liquid around the soft soil layer to make the soft soil layer form a frozen body;
[0014] Deep anchors or steel bars are set in deep soil layers.
[0015] Furthermore, in step S2, calculating the grounding resistance of the foundation includes measuring the resistivity of the underground soil, the length and diameter of the grounding electrode; the calculation formula is as follows:
[0016]
[0017] Where R is the grounding resistance; ρ is the resistivity of the soil; L is the vertical burial length of the grounding electrode; r1 and r2 are the inner and outer radii of the grounding electrode, respectively.
[0018] Furthermore, in step S3, the spacing between the galvanized anchor rod groups is 5m.
[0019] Furthermore, in step S3, the length of the galvanized anchor rod entering the soil layer of the mountain is greater than or equal to 6m.
[0020] A comprehensive grounding construction system for rocky geological buildings, used to implement the above-mentioned comprehensive grounding construction method for rocky geological buildings, comprising:
[0021] Drilling rig: used to drill holes into the ground and install grounding electrodes or galvanized anchors;
[0022] Grouting equipment: used for pouring grouting materials;
[0023] Crane: used to transport and install grounding electrodes and galvanized anchor rods;
[0024] Measurement equipment: including soil resistivity meters and geological survey instruments to determine underground soil characteristics and determine grounding solutions;
[0025] Auxiliary equipment: including vibrators and concrete mixers;
[0026] Ventilation equipment: including fans and ventilation ducts, used for ventilation of underground construction spaces;
[0027] Monitoring equipment: including seismic monitors and deformation monitors, used to monitor the stability and performance of the ground structure, including bored piles and foundation rafts.
[0028] Compared with the prior art, the advantages of the present invention are:
[0029] The present invention can increase the grounding area and grounding depth, improve the grounding effect, and reduce the grounding resistance by comprehensively adopting different grounding methods, such as bored cast-in-place piles, foundation rafts, and galvanized anchor rods, so as to better protect equipment and personnel from dangers such as electric shock; bored cast-in-place piles and foundation rafts are not only used for grounding, but also can reinforce the foundation to a certain extent, increase the stability and bearing capacity of the foundation, and help reduce foundation settlement and deformation.
[0030] The rocky geology targeted by the present invention usually has a high rock content and complex geological structure, and traditional grounding methods may be difficult to adapt to. The comprehensive construction of multiple grounding facilities can increase the stability and reliability of the grounding system, reduce the safety risks caused by the failure of a single grounding facility, and improve the safety of equipment and personnel. The comprehensive grounding construction method can more effectively utilize existing resources, reduce duplication of work during the construction process, improve engineering construction efficiency, and save construction costs and time. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a structural schematic diagram of the present invention;
[0032] Figure 2 Schematic diagram of the distribution of galvanized anchor rods.
[0033] In the figure: 1- Yellow River; 2- foundation; 3- building; 4- galvanized anchor rod; 5- highway along the Yellow River; 6- mountain peak; 7- first-level galvanized flat steel; 8- second-level galvanized flat steel; 9- third-level galvanized flat steel; 10- steel mesh. DETAILED DESCRIPTION
[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0035] Example 1
[0036] A method for comprehensive grounding construction of rock geological buildings includes comprehensive grounding using bored cast-in-place piles and foundation rafts, and auxiliary grounding using galvanized anchor rods 4; construction of the galvanized anchor rods 4 includes the following steps:
[0037] S1. Reinforce the foundation 2 of the building 3 accordingly according to the properties of the soil layer;
[0038] S2, calculate the grounding resistance of foundation 2;
[0039] S3. After the steel mesh 10 of the underground part of the building 3 is tied, a horizontal galvanized anchor rod 4 is driven toward the inner side of the Yellow River Highway 5. One end of the galvanized anchor rod 4 is connected to the steel mesh 10 of the underground part of the building 3, and the other end passes through the Yellow River Highway 5 and enters the soil layer of the mountain 6;
[0040] S4. Use a water pump to inject water into the soil layer of the peak 6 to increase the density of the soil layer of the peak 6.
[0041] In step S3, every 6 galvanized anchor rods 4 form a group, and the 6 galvanized anchor rods 4 in the same group are distributed at the vertices of a regular hexagon; the top ends of the 6 galvanized anchor rods 4 in the same group are connected in sequence through the first-level galvanized flat steel 7; the galvanized anchor rods 4 groups are connected in series through the second-level galvanized flat steel 8; the second-level galvanized flat steel 8 is connected to the steel mesh 10 of the underground part of the building 3 through the third-level galvanized flat steel 9.
[0042] The spacing between the groups of galvanized anchor rods 4 is 5 m. The length of the galvanized anchor rods 4 entering the soil layer of the mountain peak 6 is greater than or equal to 6 m.
[0043] In step S1, the soil properties of the foundation 2 include a soft soil layer on the surface, a deep soil layer and a rock geological layer; a freezing liquid is injected around the soft soil layer to form a frozen body of the soft soil layer; deep anchor rods or steel bars are set in the deep soil layer; and the bearing capacity and stability of the soil layer are increased.
[0044] In step S2, calculating the grounding resistance of the foundation 2 includes measuring the resistivity of the underground soil, the length and diameter of the grounding electrode; the calculation formula is as follows:
[0045]
[0046] Where R is the grounding resistance; ρ is the resistivity of the soil; L is the vertical burial length of the grounding electrode; r1 and r2 are the inner and outer radii of the grounding electrode, respectively.
[0047] In actual installation, a copper rod is buried vertically underground as a grounding electrode with a depth of 3m. The inner radius of the grounding electrode is 1.25cm and the outer radius is 3.75cm. The average resistivity of the soil at multiple locations measured by a soil resistivity meter is 16.7Ω·m. The grounding resistance is calculated as:
[0048]
[0049] Its grounding resistance is less than 1Ω, which meets the requirements.
[0050] Example 2
[0051] A comprehensive grounding construction system for rocky geological buildings, used to implement a comprehensive grounding construction method for rocky geological buildings of Example 1, comprising:
[0052] Drilling rig: used to drill holes into the ground and install grounding electrodes or galvanized anchors 4;
[0053] Grouting equipment: used for pouring grouting materials;
[0054] Crane: used to transport and install grounding electrodes and galvanized anchor rods 4;
[0055] Measurement equipment: including soil resistivity meters and geological survey instruments to determine underground soil characteristics and determine grounding solutions;
[0056] Auxiliary equipment: including vibrators and concrete mixers;
[0057] Ventilation equipment: including fans and ventilation ducts, used for ventilation of underground construction spaces;
[0058] Monitoring equipment: including seismic monitors and deformation monitors, used to monitor the stability and performance of the ground structure, including bored piles and foundation rafts.
[0059] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A comprehensive grounding construction method for rock geological buildings, characterized in that: The method comprises using bored cast-in-place piles and foundation raft for comprehensive grounding, and using galvanized anchor rods (4) for auxiliary grounding; the construction of the galvanized anchor rods (4) comprises the following steps: S1. Reinforce the foundation (2) of the building (3) accordingly according to the properties of the soil layer; The soil properties of the foundation (2) include soft soil layers on the surface, deep soil layers and rocky geological layers; Inject freezing liquid around the soft soil layer to make the soft soil layer form a frozen body; Setting deep anchors or steel bars in deep soil layers; S2. Calculate the ground resistance of the foundation (2); Calculating the ground resistance of the foundation (2) involves measuring the resistivity of the underground soil, the length and diameter of the grounding electrode; the calculation formula is as follows: Where R is the grounding resistance; ρ is the resistivity of the soil; L is the vertical buried length of the grounding electrode; r1 and r2 are the inner and outer radii of the grounding electrode respectively; S3. After the steel mesh (10) of the underground part of the building (3) is tied, a galvanized anchor rod (4) is driven horizontally toward the inner side of the Yellow River Highway (5). One end of the galvanized anchor rod (4) is connected to the steel mesh (10) of the underground part of the building (3), and the other end passes through the Yellow River Highway (5) and enters the soil layer of the mountain (6); Every six galvanized anchor rods (4) form a group, and the six galvanized anchor rods (4) in the same group are distributed at the vertices of a regular hexagon; the top ends of the six galvanized anchor rods (4) in the same group are connected in sequence through the first-level galvanized flat steel (7); the groups of galvanized anchor rods (4) are connected in series through the second-level galvanized flat steel (8); the second-level galvanized flat steel (8) is connected to the steel mesh (10) of the underground part of the building body (3) through the third-level galvanized flat steel (9); S4. Use a water pump to inject water into the soil layer of the mountain peak (6) to increase the density of the soil layer of the mountain peak (6).
2. A comprehensive grounding construction method for rocky geological buildings according to claim 1, characterized in that: In step S3, the spacing between groups of galvanized anchor rods (4) is 5 m.
3. A comprehensive grounding construction method for rocky geological buildings according to claim 2, characterized in that: In step S3, the length of the galvanized anchor rod (4) entering the soil layer of the mountain peak (6) is greater than or equal to 6 m.
4. A comprehensive grounding construction system for rocky geological buildings, used to implement the comprehensive grounding construction method for rocky geological buildings according to claim 1, characterized in that: include: Drilling rig: used to drill holes into the ground and install grounding electrodes or galvanized anchors (4); Grouting equipment: used for pouring grouting materials; Crane: used to transport and install grounding electrodes and galvanized anchor rods (4); Measurement equipment: including soil resistivity meters and geological survey instruments to determine underground soil characteristics and determine grounding solutions; Auxiliary equipment: including vibrators and concrete mixers; Ventilation equipment: including fans and ventilation ducts, used for ventilation of underground construction spaces; Monitoring equipment: including seismic monitors and deformation monitors, used to monitor the stability and performance of the ground structure, including bored piles and foundation rafts.
