Electricity meter error analysis system based on edge computing
By deploying edge computing nodes near the electricity meter to process the meter data in real time, and combining this with the connection layout of the internal components of the electricity meter, potential errors can be identified and predicted. This solves the problems of response delay and data transmission delay in the electricity metering system, and achieves real-time and accurate electricity metering.
Patent Information
- Application Number
- CN202411089996.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-09
AI Technical Summary
The existing electricity metering system suffers from response delays, making it difficult to accurately identify electricity meter errors in real time. This is especially true when large-scale electricity meter deployments are implemented, which puts significant pressure on the network and leads to serious data transmission delays and losses.
An edge computing-based electricity meter error analysis system is adopted. By deploying edge computing nodes near the electricity meter, parameters such as voltage, current, and power are collected and processed in real time. Combined with the connection layout sequence of the internal components of the electricity meter, potential errors are identified and predicted, and an error early warning mechanism is configured.
It achieves real-time and accurate electricity metering, reduces data transmission delay and energy consumption, improves the operating efficiency and reliability of the power system, and can identify and predict electricity meter errors in a timely manner.
Smart Images

Figure CN118707432B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field related to electric variable measurement and analysis, and in particular to an electric energy meter error analysis system based on edge computing. Background Art
[0002] The error monitoring and management of electricity meters mainly rely on centralized data processing, that is, the data is first collected from each electricity meter to a central server, and then the server performs unified analysis and processing.
[0003] When faced with large-scale deployment of electricity meters, especially in the context of the increasing popularity of smart grids and Internet of Things technologies, there are certain limitations. For example, since data needs to be transmitted over long distances to the central server and then wait for the processing results to be returned, the identification and response speed of electricity meter errors is slow. In addition, with the increase in the number of electricity meters in smart grids, the amount of data transmission has increased dramatically, which has put tremendous pressure on network infrastructure, leading to network congestion and data loss.
[0004] In summary, in the prior art, there is a technical problem that the conventional electric energy metering system has a certain response delay, and it is difficult to accurately identify the electric energy meter error in real time during the electric energy metering. Summary of the invention
[0005] The present application provides an electric energy meter error analysis system based on edge computing, aiming to solve the technical problem that the conventional electric energy metering system in the prior art has a certain response delay and is difficult to accurately identify the electric energy meter errors in real time during electric energy metering.
[0006] In view of the above problems, the technical solution to implement this application is:
[0007] The present application provides an electric energy meter error analysis system based on edge computing, which includes: a parameter acquisition module, which is used to connect M electric energy meters and collect real-time operating parameters, wherein the real-time operating parameters include voltage, current, and power; an initial error determination module, which is used to determine the initial error characteristics through the real-time operating parameters and the corresponding timing information; a sequence acquisition module, which is used to set a first connection layout sequence of each element corresponding to the first electric energy meter in the M electric energy meters, wherein the connection layout characteristics corresponding to the first connection layout sequence include the position and model information of the mutual inductor, the metering chip, and the communication unit; a parameter upload module, which is used to set N edge computing nodes in a power transmission and distribution topology diagram and upload the real-time operating parameters, wherein the N edge computing nodes are optimized with the goal of minimizing carbon emissions and energy consumption; a potential error identification module, which is used to traverse the M connection layout sequences of each element corresponding to the M electric energy meters based on the first connection layout sequence, and use the N edge computing nodes to identify potential error characteristics; an error response judgment module, which is used to merge the initial error characteristics with the potential error characteristics, and use the error prediction model to perform error response judgment, and configure an error early warning mechanism.
[0008] In summary, one or more technical solutions provided in the present application solve the technical problem that conventional electric energy metering systems have certain response delays and are difficult to accurately identify electric energy meter errors in real time during electric energy metering. It realizes more precise identification and prediction of potential metering errors based on initial error characteristics and combined with connection layout sequence analysis of internal components of the electric energy meter, thereby ensuring high accuracy of electric energy metering. It also achieves the technical effect of reducing energy consumption and delay in data transmission by performing data processing close to the data source through edge computing. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 A structural schematic diagram of an electric energy meter error analysis system based on edge computing is provided for this application;
[0010] Figure 2 This application provides a flowchart of the execution steps of searching for the optimal node layout of the parameter upload module in the electric energy meter error analysis system based on edge computing.
[0011] Description of reference numerals: parameter acquisition module M100, initial error determination module M200, sequence acquisition module M300, parameter upload module M400, potential error identification module M500, error response judgment module M600. DETAILED DESCRIPTION
[0012] Example
[0013] The present application is described in detail below in conjunction with the accompanying drawings. Figure 1As shown, the present application provides an electric energy meter error analysis system based on edge computing, which includes:
[0014] The parameter acquisition module M100 is used to connect M electric energy meters to collect real-time operating parameters, which include voltage, current, and power; the initial error determination module M200 is used to determine the initial error characteristics through the real-time operating parameters and corresponding timing information.
[0015] The data is first collected from each electricity meter to the central server, and then uniformly analyzed and processed by the server. Specifically, through online detection, the operating status of the electricity meter is continuously monitored, and the output data of the electricity meter is analyzed in real time to identify anomalies and errors.
[0016] Long-term research has found that although conventional electricity meter error analysis methods can achieve online detection and real-time monitoring, they have exposed a series of technical problems in actual applications, such as data transmission delays, heavy burden on central servers, untimely responses, excessive dependence on the network, and difficulty in adapting to large-scale electricity meter deployment.
[0017] Based on this, the edge computing of this application performs data preprocessing and analysis at edge nodes close to the data source. On the one hand, it significantly shortens the data processing path and reduces the round-trip time of data from the electricity meter to the central server, thereby reducing data transmission delays and realizing true real-time monitoring and abnormal response; on the other hand, the instant processing capability enables the system to quickly identify operating anomalies and errors of the electricity meter, and immediately trigger response mechanisms, such as automatic correction or early warning, avoiding the accumulation of metering errors caused by data transmission and processing delays in conventional methods, and ensuring the real-time and accuracy of electricity metering.
[0018] Specifically, clarify the project goals, including the number of electric energy meters M that need to be connected, the frequency of data collection, the accuracy requirements of error analysis, etc.; select edge computing nodes based on the distribution of electric energy meters and data processing requirements to ensure sufficient computing power, storage space and network communication capabilities. Furthermore, configure or upgrade each electric energy meter with an interface that supports real-time data output, such as RS485, Modbus or wireless communication modules (such as Wi-Fi, LoRa, etc.), and determine the data transmission protocol.
[0019] Preferably, edge computing nodes are deployed at appropriate locations close to the electricity meters to ensure network coverage and data transmission stability; M electricity meters are connected to the edge computing nodes one by one using corresponding communication cables or wireless methods to ensure smooth data transmission channels.
[0020] Preferably, data acquisition parameters, such as sampling frequency, communication protocol parameters, etc., are configured on the edge computing node to ensure that real-time operating parameters such as voltage, current, and power can be accurately collected; ensure that all devices participating in the system (including electricity meters and edge computing nodes) are time synchronized to accurately record timing information.
[0021] In a feasible implementation, data acquisition software or services are run on edge computing nodes to obtain real-time data from each electric energy meter on a regular basis or on demand; the collected raw data is preliminarily cleaned and formatted, abnormal values are removed, and converted into a unified data format; the real-time operating parameters (voltage, current, power) are paired with the corresponding timing information to form a data set with a timestamp; the theoretical voltage, current, and power values are calculated according to the power system standards or known conditions; the real-time measured values are compared with the theoretical values, and the errors of each electric energy meter are calculated, including absolute errors, relative errors, etc.; features are extracted from the error data, such as error distribution, trend, periodicity, etc., and the extracted features are the initial error features.
[0022] In actual application, it also includes storing the processed data (including original data, error values, features, etc.) in the local database of the edge computing node or in the cloud to ensure data security and backup, and prepare for the subsequent use of machine learning or other analysis methods to further refine error characteristics and establish a prediction model.
[0023] Through the above steps, real-time operating parameters are effectively collected from the connected M electric energy meters, and the initial error characteristics of each electric energy meter are determined in combination with the time information, providing a basis for subsequent error analysis and optimization.
[0024] The sequence acquisition module M300 is used to set the first connection layout sequence of each component corresponding to the first electric energy meter in the M electric energy meters. The connection layout characteristics corresponding to the first connection layout sequence include the location and model information of the mutual inductor, the metering chip, and the communication unit; the parameter upload module M400 is used to set N edge computing nodes in the power transmission and distribution topology diagram, and upload the real-time operating parameters. The N edge computing nodes are optimized and configured with the goal of minimizing carbon emissions and energy consumption.
[0025] Specifically, consult the installation manual and technical specification of the first electric energy meter to understand the type, model and basic layout of its internal components (such as mutual inductors, metering chips, and communication units), and record the actual installation positions and model information of the mutual inductors, metering chips, and communication units to ensure that the data is accurate. Furthermore, based on the collected information, make a connection layout diagram of the internal components of the electric energy meter to clarify the physical and electrical connection relationships between the components; convert the components and their connection relationships into an ordered layout sequence, including component names, position numbers, models, etc.
[0026] In a feasible implementation, based on the grid structure, a transmission and distribution network topology diagram containing M electricity meters is drawn, and the specific locations of the electricity meters are marked; according to the distribution of electricity meters, data flow prediction and network coverage requirements, the locations of N edge computing nodes are reasonably set in the topology diagram to ensure efficient data transmission and comprehensive coverage. Furthermore, a data transmission protocol is configured between each electricity meter and the edge computing node to ensure that the real-time operating parameters (voltage, current, power) can be stably uploaded to the corresponding edge node; the edge computing node receives the data from the electricity meter, performs preliminary processing and caching, and prepares for optimization configuration analysis.
[0027] Preferably, the existing energy consumption and carbon emission assessment model is applied, taking into account factors such as data processing volume, network transmission distance, and computing resource utilization; minimizing carbon emissions and energy consumption is used as the objective function, taking into account factors such as the computing power of edge nodes, data processing strategies, and network bandwidth usage; using algorithms such as genetic algorithms and particle swarm optimization to optimize the computing task allocation and data processing strategies of N edge computing nodes to ensure that the best balance between energy conservation and emission reduction is achieved while meeting data processing requirements; adjusting the configuration parameters of the edge computing nodes according to the optimization results, implementing the optimization strategy, and monitoring and verifying the actual operating results, and making fine adjustments when necessary.
[0028] Through the above steps, by comparing the layout characteristics of the internal components of the electricity meter, the intelligent edge computing nodes are configured to effectively reduce the overall energy consumption and carbon emissions of the power transmission and distribution system, and realize green and efficient data processing and management.
[0029] The potential error identification module M500 is used to traverse the M connection layout sequences of each component corresponding to the M electric energy meters based on the first connection layout sequence, and use the N edge computing nodes to identify potential error characteristics; the error response judgment module M600 is used to merge the initial error characteristics with the potential error characteristics, and use the error prediction model to perform error response judgment, and configure an error warning mechanism.
[0030] Specifically, the real-time operating parameters uploaded from the first electric energy meter to the first edge computing node through the communication unit include but are not limited to voltage, current, power factor, etc.; the connection layout sequence information of the first electric energy meter (the location and model of the mutual inductor, the metering chip, and the communication unit) is integrated into the data processing flow, and metadata related to the component layout is attached to each data. Furthermore, based on the component layout information, the factors affecting the measurement accuracy are analyzed, such as the saturation of the mutual inductor, the temperature sensitivity of the metering chip, communication interference, etc., to extract potential error characteristics.
[0031] In a feasible implementation, the initial error features extracted from historical data or known problems (such as common measurement deviation patterns) are combined with the newly identified potential error features to form a comprehensive error feature set; based on the characteristics of the error features, suitable error prediction models are selected or customized, such as neural networks, support vector machines, random forests, etc. These models should be able to handle multi-dimensional feature inputs. Furthermore, the selected model is trained using historical data sets (including known error cases and normal operation data) to ensure that the model can learn the relationship between different error features and actual error responses; the trained model is used to predict the integrated error features to determine whether an error response will occur, that is, whether there is a risk of inaccurate measurement.
[0032] Configure the error warning mechanism. Specifically, determine the warning threshold. Based on the model prediction results, set the warning to be triggered when the prediction error exceeds a certain range or the probability reaches a certain threshold. Deploy the warning logic on the first edge computing node. Once the model predicts an error response, immediately send the warning information to the relevant personnel or system through system notification and other means. Collect the warning response and the actual error situation, continuously feed back to the model, continuously optimize the model, and improve the accuracy and timeliness of the warning.
[0033] Through the above steps, edge computing capabilities are effectively utilized, combined with the component layout information of the electricity meter, potential measurement errors are identified and predicted, and an efficient error warning mechanism is configured, thereby improving the operating efficiency and reliability of the power system.
[0034] Furthermore, the parameter upload module M400 is used to execute the following method:
[0035] In the power transmission and distribution topology diagram, the node layout is optimized by minimizing energy consumption to obtain a first error assessment node set; based on the first error assessment node set, combined with fuzzy logic reasoning, the carbon emission factor is continuously evaluated, and the node is selected to minimize carbon emissions to determine the second error assessment node set, which includes N edge computing nodes.
[0036] In the power transmission and distribution topology diagram, N edge computing nodes are set. Specifically, the structure of the power transmission and distribution topology diagram is analyzed, including the layout and connection relationship of key components such as power supply points, substations, distribution lines, and load points; based on the analysis of the topology diagram, key nodes are identified. Key nodes are usually bottlenecks for data transmission and processing, such as high-load areas and communication bottlenecks; edge computing nodes are preliminarily deployed on key nodes to form an initial node layout; energy consumption of each preliminarily laid out node is evaluated, considering factors such as its processing capacity, communication load, and hardware power consumption; based on the energy consumption evaluation results, the node layout is adjusted through iterative algorithms (such as genetic algorithms, particle swarm optimization algorithms, etc.) to minimize the overall energy consumption; after multiple rounds of iterative optimization, an optimized node layout with the goal of minimizing energy consumption is obtained, that is, the first error evaluation node set.
[0037] Preferably, the parameters to be evaluated are determined based on the factors affecting carbon emissions, such as energy type, energy efficiency, node distance, load level, etc.; a membership function is defined for each evaluation parameter, and a fuzzy logic rule base is constructed to describe the fuzzy relationship between the parameter and the carbon emissions; real-time data related to the first error evaluation node set, such as energy usage, load changes, etc., are collected, and necessary preprocessing is performed; fuzzy logic operations are used to perform inference evaluation on the carbon emissions of each node based on the real-time data and the fuzzy logic rule base; the carbon emissions evaluation results of each node are integrated to obtain the carbon emissions evaluation results of the entire system.
[0038] In a feasible implementation, the optimization goal is to minimize the carbon emissions of the entire system; a suitable optimization algorithm (such as a multi-criteria optimization algorithm, a genetic algorithm, etc.) is selected to screen the optimal node in the first error evaluation node set; based on the optimization algorithm and in combination with the carbon emissions assessment result, the optimal control node is iteratively screened in the first error evaluation node set; after optimization and screening, an optimized node set with the goal of minimizing carbon emissions is obtained, namely, the second error evaluation node set, which includes N edge computing nodes.
[0039] In the actual application process, it also includes, according to the second error evaluation node set, actually deploying N edge computing nodes in the power transmission and distribution topology map; verifying and testing the deployed system to ensure that the node layout is reasonable and the energy consumption and carbon emissions meet the expected goals. Through the above steps, N edge computing nodes are set in the power transmission and distribution topology map to achieve an optimized layout with the goal of minimizing energy consumption and carbon emissions.
[0040] Furthermore, the parameter upload module M400 is used to execute the following method:
[0041] Based on the power transmission and distribution topology diagram, key nodes are connected and deployed to establish a primary distribution architecture, wherein the key nodes include urban traffic intersection nodes and park venue nodes; the error characteristics of peak hours and valley hours are identified through the traffic data corresponding to the key nodes; based on the primary distribution architecture, the node layout is iterated in combination with the error characteristics of the peak hours and valley hours to determine the first error evaluation node set.
[0042] In the power transmission and distribution topology map, the node layout is optimized to minimize energy consumption and the first error evaluation node set is obtained. Specifically, key nodes are identified in the power transmission and distribution topology map. For example, power supply nodes in important traffic intersections, parks or large venues are regarded as key nodes because of the importance of power supply demand corresponding to their geographical locations. Based on the identified key nodes, preliminary connection deployment is carried out to establish a primary distribution architecture, which will serve as the basis for subsequent optimization iterations.
[0043] In a feasible implementation, flow data of each key node is collected to reflect the power supply demand and load conditions of the node; by analyzing the flow data, the peak and off-peak periods of power supply are identified; the peak period is usually a period of high power consumption and heavy load, while the off-peak period is the opposite; during the peak and off-peak periods, features related to the error of the electricity meter, such as voltage fluctuations, current changes, etc., are extracted respectively for subsequent node layout optimization.
[0044] Preferably, the goal is to minimize energy consumption while considering minimizing the error of the electricity meter; based on the primary distribution architecture, combined with the error characteristics of peak and valley periods, the node layout is optimized through an iterative algorithm (such as a genetic algorithm, a simulated annealing algorithm, etc.), and in each iteration, the position and connection method of the node are adjusted to seek to minimize energy consumption and error; after each iteration, the energy consumption and error of the current node layout are evaluated; if the preset optimization goal or the iteration number limit is reached, the iteration is stopped; otherwise, the optimization continues.
[0045] The node layout with the lowest energy consumption and the smallest error is selected from all iterative results as the optimal layout; based on the optimal layout, the first error evaluation node set is determined, and the nodes in the first error evaluation node set are the optimal node layout obtained after considering energy consumption and error minimization. Through the above steps, the node layout is optimized in the power transmission and distribution topology diagram with minimized energy consumption, and the first error evaluation node set is obtained, considering the minimization of energy consumption, combined with the error characteristics of the electric energy meter, so as to achieve a more comprehensive optimization.
[0046] Furthermore, if Figure 2 As shown, the parameter upload module M400 is also used to execute the following method:
[0047] The error characteristics of the peak period include high load error characteristics, voltage fluctuation error characteristics, and communication congestion error characteristics; the error characteristics of the valley period include low load error characteristics, system maintenance error characteristics, and environmental factor error characteristics; the effective sampling frequency is determined through the error characteristics of the peak period and the error characteristics of the valley period; based on the effective sampling frequency, a multi-objective optimization algorithm is used to select the connection method that minimizes energy consumption and search for the optimal node layout.
[0048] In a feasible implementation, under high load conditions, errors occur in the electric energy meter and transmission line due to overload, and the characteristics corresponding to the errors are analyzed, such as the size, direction and change trend of the errors; during peak hours, voltage fluctuations are large, resulting in inaccurate measurement by the electric energy meter, and the patterns and impacts of these fluctuations are identified.
[0049] On the one hand, due to the large amount of data transmission, the communication channel is congested, which affects the real-time and accuracy of the data. The impact of congestion on the error is analyzed. Specifically, the error characteristics during the peak period include high load error characteristics (due to the surge in electricity demand during the peak period, the grid load is close to or reaches the peak value, resulting in an increase in the metering error of the energy meter, especially the metering deviation caused by the saturation of the transformer when the instantaneous current is too large), voltage fluctuation error characteristics (the grid voltage fluctuates greatly during the peak period due to power supply shortage, affecting the accuracy of the energy meter), communication congestion error characteristics (the data transmission demand increases sharply, resulting in communication network congestion, affecting the timeliness and completeness of data upload, and thus affecting the accuracy of error analysis).
[0050] On the other hand, the error characteristics of the off-peak period include low-load error characteristics (the energy demand is small during the off-peak period, and the low current causes the electricity meter to be more sensitive to small errors, especially the metering accuracy problem of low-power devices is more prominent), system maintenance error characteristics (grid maintenance is often carried out during the off-peak period, and maintenance activities temporarily change the energy flow pattern, or transient errors are generated during maintenance operations), and environmental factor error characteristics (such as temperature changes affect the performance of electronic components, indirectly affecting the metering accuracy of the electricity meter).
[0051] Preferably, a sampling frequency that can effectively capture these error changes is determined based on the error characteristics of peak and trough periods. For example, a higher sampling frequency is required during peak periods to capture rapid voltage fluctuations and communication congestion. During trough periods, the sampling frequency can be appropriately reduced, but it is still necessary to ensure that errors caused by system maintenance and environmental factors can be detected. Furthermore, actual testing or simulation is performed to verify whether the selected sampling frequency can accurately capture the error characteristics; the sampling frequency is adjusted according to the verification results until the best balance is found.
[0052] Define the optimization goal, i.e., minimizing energy consumption, while considering minimizing the error. The two goals of minimizing energy consumption and minimizing the error conflict with each other to a certain extent, so a multi-objective optimization method is needed; select an algorithm suitable for handling multi-objective optimization problems, such as genetic algorithm, particle swarm optimization algorithm or ant colony algorithm; make necessary adjustments and improvements to the algorithm according to the specific characteristics of the problem.
[0053] In a feasible implementation, specifically, a mathematical model of the optimization problem is constructed based on data collected at an effective sampling frequency; the optimal solution set (i.e., the optimal node layout) is searched in the solution space using a selected multi-objective optimization algorithm; during the search process, the energy consumption and error indicators corresponding to different node layouts are continuously evaluated, and the search direction is adjusted according to the evaluation results.
[0054] Preferably, a node layout that achieves the best balance between energy consumption and error is selected from the searched optimal solution set as the final result; if necessary, the selected layout is further fine-tuned to meet specific engineering requirements or constraints. Through the above steps, the effective sampling frequency is determined based on the error characteristics of the peak and valley periods, and a multi-objective optimization algorithm is used to search for the optimal node layout with minimized energy consumption and acceptable error.
[0055] Furthermore, the parameter upload module M400 is also used to execute the following method:
[0056] Set up energy consumption anomaly identification strategies and manage energy consumption based on energy consumption benchmark values; at the same time, obtain scheduled production plans and optimize production scheduling.
[0057] Select the connection method that minimizes energy consumption and search for the optimal node layout. Specifically, select key nodes in the transmission and distribution system as energy consumption monitoring points, which can be high-energy consumption equipment, important transmission lines or key power supply areas; set a reasonable energy consumption threshold for each monitoring point based on historical data and industry standards, and the threshold will be used as a benchmark for identifying energy consumption anomalies; collect energy consumption data of each monitoring point in real time through sensors and smart meters and other equipment; use data analysis tools to process real-time data and identify abnormal energy consumption that exceeds the set threshold. Furthermore, when abnormal energy consumption is detected, the system automatically triggers the alarm mechanism and notifies the management personnel in time; at the same time, the system records the abnormal energy consumption for subsequent analysis and processing.
[0058] Preferably, energy consumption benchmarks are set for each production unit or equipment with reference to industry standards, historical data and best practices. These benchmarks will serve as the basis for evaluating energy efficiency and formulating energy-saving measures. Regularly compare actual energy consumption data with the benchmarks to analyze energy consumption differences and their causes, identify links with excessive energy consumption and potential energy-saving space. Based on the results of energy consumption analysis, formulate targeted energy-saving measures, such as optimizing equipment operation modes, replacing high-efficiency equipment, etc. Set energy-saving targets and track implementation results to ensure the effectiveness of energy-saving measures.
[0059] In a feasible implementation method, the predetermined production plan information is obtained from the production management system or ERP system to understand key information such as the production tasks, schedules and output requirements of each production unit; the demand and impact of the production plan on energy consumption are evaluated, and the peak and valley periods of energy consumption are predicted. According to the energy consumption prediction results, the production plan is adjusted to balance the energy consumption load and production costs; in combination with energy consumption management and production planning, an optimized production scheduling plan is formulated, and on the premise of ensuring the completion of production tasks, the equipment operation time and sequence are reasonably arranged to reduce the overall energy consumption, and the difference in peak and valley electricity prices is considered to reasonably arrange the production time period to reduce the electricity cost; in the production process, the energy consumption data and production progress are monitored in real time, and the production scheduling plan is adjusted in time according to the actual situation to ensure the balance between energy consumption control and production efficiency.
[0060] Through the above steps, a strategy for identifying energy consumption anomalies is systematically set up, energy consumption management is performed in combination with energy consumption benchmark values, and production scheduling is optimized at the same time to reduce overall energy consumption and improve production efficiency.
[0061] Furthermore, the parameter upload module M400 is used to execute the following method:
[0062] Based on the first error assessment node set, a membership degree between 0 and 1 is assigned to each parameter through a membership function to construct a fuzzy logic rule base; based on the fuzzy logic rule base, fuzzy logic operations are used to reason about carbon emissions and configure assessment carbon emission factors; after the assessment carbon emission factors corresponding to the fuzzy logic rule base are configured, node optimization is performed based on minimizing carbon emissions to determine the second error assessment node set.
[0063] In a feasible implementation, based on the first error evaluation node set, combined with fuzzy logic reasoning, the carbon emission factor is continuously evaluated to minimize the carbon emissions for node optimization, and the second error evaluation node set is determined. Specifically, the evaluation parameters are determined: it is necessary to clarify the evaluation parameters related to carbon emissions, such as node energy consumption, load conditions, operating efficiency, etc., and set a suitable membership function for each evaluation parameter to map the parameter value to a membership degree between 0 and 1. The selection of the membership function should be able to reflect the logical relationship between the parameter value and the carbon emissions; based on the evaluation parameters and the membership function, a fuzzy logic rule base is constructed, and each rule in the fuzzy logic rule base defines the relationship between the combination of parameter values and carbon emissions.
[0064] Preferably, the relevant parameter value of each node in the first error assessment node set is taken as input and fuzzified to obtain the corresponding membership degree; fuzzy logic operations (such as AND, OR, NOT, etc.) are used to infer and calculate the input parameters according to the rules in the rule base; through fuzzy logic operations, the carbon emission assessment value corresponding to each node is obtained, and the assessment value is a fuzzy set that reflects the probability of the node at different carbon emission levels.
[0065] Preferably, the fuzzy set is clarified (such as the maximum membership method, the center of gravity method, etc.) to obtain a specific carbon emission assessment value; according to the carbon emission assessment value obtained after the clarification process, a corresponding assessment factor is configured for each node. The assessment factor can be a weight value or a score used to represent the potential or priority of the node in reducing carbon emissions.
[0066] Furthermore, it is clearly defined that minimizing carbon emissions is the optimization goal, that is, under the premise of satisfying system stability and reliability, those nodes that can significantly reduce carbon emissions are selected, and the nodes are sorted and selected according to the configured evaluation factors, with priority given to nodes with higher evaluation factors, which have higher potential or priority in reducing carbon emissions; after node selection, the second error evaluation node set is determined, and the nodes in the second error evaluation node set are the optimal node combination obtained after considering the minimization of carbon emissions.
[0067] In actual application, it also includes continuously monitoring the system's operating status and carbon emission data to ensure the accuracy and effectiveness of the evaluation results; regularly evaluating and adjusting nodes to adapt to changes in the system's operating status and external environment. For example, when the system load increases or environmental conditions change, it is necessary to re-evaluate the node's carbon emissions and select the best results.
[0068] Through the above steps, based on the first error evaluation node set, combined with fuzzy logic reasoning to continuously evaluate the carbon emission factor, and to select the nodes to minimize carbon emissions, the second error evaluation node set is determined, which can comprehensively consider multiple factors and provide effective decision support for the optimized operation of the transmission and distribution system and carbon emission reduction.
[0069] Furthermore, the parameter upload module M400 is also used to execute the following method:
[0070] The carbon emission evaluation factors include energy type, energy efficiency, distance and load; a multi-criteria optimization algorithm is used to iteratively select the optimal control node in the first error evaluation node set.
[0071] In a feasible implementation method, different energy types have different carbon emission factors, such as coal, natural gas, renewable energy, etc., and the carbon emission coefficient of each energy type needs to be determined; energy used efficiently will produce less carbon emissions, and the energy utilization efficiency of each node is evaluated, such as equipment efficiency, transmission efficiency, etc.; long-distance transmission leads to energy loss and additional carbon emissions, and the distance between nodes and transmission losses are evaluated; load levels affect energy consumption and carbon emissions, and the load pattern and load level of each node are evaluated.
[0072] Preferably, the objective function is constructed with the goal of minimizing carbon emissions; constraints such as system stability, reliability, and safety are considered to ensure that the optimization process is feasible in actual operation; the decision variables are the control strategy or switch state of each node; further, relevant data on energy type, energy efficiency, distance, and load are collected; since the data units and ranges of different criteria are different, they need to be standardized for comparison and calculation.
[0073] Set the initial parameters of the algorithm, such as the number of iterations, step size, etc.; in each iteration, evaluate the carbon emissions of each node according to the objective function and constraints; use a multi-criteria optimization algorithm (such as weighted sum method, component analysis method, genetic algorithm, etc.) to sort or filter the nodes; update the value of the decision variable according to the result of the optimization algorithm, that is, adjust the control strategy or switch state of the node; stop the iteration when the preset number of iterations is reached or other termination conditions are met (such as the change in the objective function value is less than a certain threshold); further, analyze the results of the last iteration to determine the carbon emissions and comprehensive evaluation value of each node; according to the comprehensive evaluation value, select the node with the lowest carbon emissions and that meets the system constraints as the optimal control node, and the selected optimal control nodes form the second error evaluation node set.
[0074] In the actual application process, it also includes verifying the effectiveness of the second error evaluation node set in the actual system to ensure that it can reduce carbon emissions and meet system requirements; according to the verification results, the multi-criteria optimization model or algorithm parameters are adjusted to further optimize the node selection and control strategy. Through the above steps, considering multiple factors such as energy type, energy efficiency, distance and load, the multi-criteria optimization algorithm is used to iteratively select the optimal control node in the first error evaluation node set to form the second error evaluation node set to minimize carbon emissions.
[0075] Furthermore, the parameter upload module M400 is also used to execute the following method:
[0076] Set up fuzzy logic control strategy and adjust the load in combination with the best energy efficiency ratio; at the same time, obtain predicted capacity demand and optimize dynamic load balance.
[0077] Iteratively screen the optimal control node in the first error evaluation node set. Specifically, define fuzzy sets and membership functions, identify key factors affecting load adjustment, such as system load, energy efficiency, etc., define fuzzy sets for each key factor, such as "low", "medium", "high", etc., define membership functions for each fuzzy set, and clarify the fuzzy set memberships corresponding to different values; build a fuzzy rule base based on expert experience or historical data; the rules in the rule base should describe how to adjust the load to achieve the best energy efficiency ratio under different system loads and energy efficiency.
[0078] In a feasible implementation, the optimal energy efficiency ratio is calculated according to system characteristics and operating data; the optimal energy efficiency ratio is a fixed value, and can also change dynamically according to the system load; the optimal control node is iteratively screened, specifically, each node in the first error evaluation node set is traversed; for each node, the load adjustment amount is calculated through fuzzy reasoning according to the fuzzy logic control strategy and the current system state (such as load, energy efficiency); the load adjustment amount is applied to the node, and the adjusted system state is simulated; the adjusted system energy efficiency ratio is calculated and compared with the optimal energy efficiency ratio; the node that can make the system energy efficiency ratio closest to the optimal energy efficiency ratio is selected as the optimal control node of the current iteration.
[0079] Preferably, collect data such as system load and energy consumption in historical periods; use trend analysis, time series analysis and other methods to predict system capacity requirements in the future based on historical data; calculate the load that needs to be adjusted based on the predicted capacity requirements and the current system load status; comprehensively consider factors such as the load capacity and energy efficiency ratio of all nodes, and determine the load distribution plan for each node through iteration or optimization algorithms (such as genetic algorithms, particle swarm algorithms, etc.); apply the load distribution plan to the system to achieve dynamic balance optimization of the load; further, continuously iterate and select the optimal control node and adjust the load distribution plan, set appropriate convergence conditions (such as the number of iterations, energy efficiency ratio improvement threshold, etc.), and stop iteration when the convergence conditions are met.
[0080] In the actual application process, it also includes verifying the effectiveness of the selected optimal control nodes and load distribution schemes; adjusting and optimizing the fuzzy logic control strategy, energy efficiency ratio calculation method, etc. according to the verification results. Through the above steps, the optimal control node is iteratively selected in the first error evaluation node set, and the load dynamic balance optimization is performed in combination with the predicted capacity demand, thereby improving the energy efficiency ratio and stability of the system.
[0081] In summary, the beneficial effects of the embodiments of the present application are:
[0082] 1. The distributed nature of edge computing nodes enhances the system's ability to adapt to changes in the network environment. Even when the network is unstable or some links are interrupted, the error analysis of electric energy meters in the local area can still be carried out normally, thus improving the reliability and resilience of the entire system.
[0083] 2. The edge computing-based platform integrates more complex data analysis algorithms and machine learning models, which can not only accurately identify the current error characteristics, but also predict future error trends based on historical data and real-time monitoring information, deploy preventive measures in advance, and reduce potential measurement deviations.
[0084] 3. Through intelligent scheduling and optimization of edge computing, metering errors can be discovered and processed in a timely manner, and resource allocation can be dynamically adjusted according to the actual usage of each meter. For example, data processing capacity can be increased during peak hours, and resource consumption can be reduced during off-peak hours, thereby improving the accuracy and reliability of energy metering and maximizing resource utilization.
[0085] 4. Based on the first error evaluation node set, the membership degree between 0 and 1 is assigned to each parameter through the membership function to build a fuzzy logic rule base; based on the fuzzy logic rule base, fuzzy logic operation is used to reason about carbon emissions and configure the evaluation carbon emission factors; after the configuration of the evaluation carbon emission factors corresponding to the fuzzy logic rule base is completed, the node optimization is carried out to minimize carbon emissions and determine the second error evaluation node set, which can comprehensively consider multiple factors and provide effective decision support for the optimized operation and carbon emission reduction of the transmission and distribution system.
[0086] In summary, any step can be stored as a computer instruction or program in an unlimited computer memory, and can be called and recognized by an unlimited computer processor, and no unnecessary restrictions are made here.
[0087] Furthermore, the above-mentioned technical scheme only reflects the preferred technical scheme of the technical scheme of the embodiment of the present application. Some changes that may be made to some parts thereof by technicians in this technical field all reflect the novel principles of the embodiment of the present application. Obviously, technicians in this field can make various changes and modifications to the present application without departing from the scope of the present application.
Claims
1. The electric energy meter error analysis system based on edge computing is characterized by: include: A parameter acquisition module, used to connect to M electric energy meters to acquire real-time operating parameters, including voltage, current, and power; An initial error determination module is used to determine initial error characteristics through the real-time operation parameters and corresponding timing information; A sequence acquisition module, used to set a first connection layout sequence of each element corresponding to a first electric energy meter in the M electric energy meters, wherein the connection layout features corresponding to the first connection layout sequence include the position and model information of a mutual inductor, a metering chip, and a communication unit; A parameter uploading module is used to set N edge computing nodes in the power transmission and distribution topology diagram and upload the real-time operation parameters, wherein the N edge computing nodes are optimized to minimize carbon emissions and energy consumption; a potential error identification module, configured to traverse the M connection layout sequences of the components corresponding to the M electric energy meters based on the first connection layout sequence, and identify potential error features using the N edge computing nodes; The error response judgment module is used to merge the initial error characteristics with the potential error characteristics, use the error prediction model to make error response judgment, and configure an error early warning mechanism.
2. The electric energy meter error analysis system based on edge computing according to claim 1, characterized in that: The parameter upload module includes: In the power transmission and distribution topology diagram, the node layout is optimized to minimize energy consumption, and a first error evaluation node set is obtained; Based on the first error assessment node set, combined with fuzzy logic reasoning, the carbon emission factor is continuously evaluated to minimize carbon emissions to perform node optimization and determine the second error assessment node set, which includes N edge computing nodes.
3. The electric energy meter error analysis system based on edge computing according to claim 2, characterized in that: The parameter upload module includes: Based on the power transmission and distribution topology diagram, key nodes are connected and deployed to establish a primary distribution architecture, wherein the key nodes include urban traffic intersection nodes and park venue nodes; Identify the error characteristics of peak hours and valley hours through the traffic data corresponding to the key nodes; Based on the primary distribution architecture and in combination with the error characteristics of the peak period and the error characteristics of the valley period, node layout iteration is performed to determine a first error evaluation node set.
4. The electric energy meter error analysis system based on edge computing according to claim 3, characterized in that: The error characteristics of the peak period include high load error characteristics, voltage fluctuation error characteristics, and communication congestion error characteristics, and the error characteristics of the valley period include low load error characteristics, system maintenance error characteristics, and environmental factor error characteristics; Determine the effective sampling frequency according to the error characteristics of the peak period and the error characteristics of the valley period; Based on the effective sampling frequency, a multi-objective optimization algorithm is adopted to select a connection method that minimizes energy consumption and search for an optimal node layout.
5. The electric energy meter error analysis system based on edge computing according to claim 4, characterized in that: The parameter upload module also includes: Set up energy consumption anomaly identification strategies and manage energy consumption in combination with energy consumption benchmark values; At the same time, obtain the scheduled production plan and optimize production scheduling.
6. The electric energy meter error analysis system based on edge computing according to claim 2, characterized in that: The parameter upload module includes: Based on the first error evaluation node set, a membership degree between 0 and 1 is assigned to each parameter through a membership function to construct a fuzzy logic rule base; Based on the fuzzy logic rule base, fuzzy logic operations are used to perform carbon emission reasoning and configure evaluation carbon emission factors; After the configuration of the carbon emission assessment factors corresponding to the fuzzy logic rule base is completed, node optimization is performed to minimize carbon emissions to determine a second error assessment node set.
7. The electric energy meter error analysis system based on edge computing according to claim 6, characterized in that: The carbon emission factors for evaluation include energy type, energy efficiency, and distance and load; A multi-criteria optimization algorithm is used to iteratively select the optimal control node in the first error evaluation node set.
8. The electric energy meter error analysis system based on edge computing according to claim 7, characterized in that: The parameter upload module also includes: Set up fuzzy logic control strategy and adjust load in combination with optimal energy efficiency ratio; At the same time, the predicted capacity demand is obtained and dynamic load balancing optimization is performed.