A method and system for predicting cable production capacity in a digital factory

By acquiring and analyzing current and historical production parameters, calculating the remaining efficiency and decay factor of the equipment, and optimizing production time and parameters, the problem of the lack of accuracy in the prediction model in the existing technology is solved, and efficient and flexible production management is achieved.

CN118709863BActive Publication Date: 2024-11-19SICHUAN WEIPENG CABLE MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411189182.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-19
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

The lack of detailed analysis of the parameters of each piece of equipment in the production process in the existing technology leads to the lack of accuracy and practicality of the prediction model, making it impossible to fully control and update.

Method used

By acquiring current and historical production parameters, the remaining efficiency and overall efficiency of the equipment are calculated. The production line attenuation factor is used to perform a weighted calculation to compensate for production time, thereby optimizing production parameters and time prediction.

Benefits of technology

It improves production efficiency, reduces waste, enhances the flexibility and stability of the production line, enables rapid response to market changes, and provides scientific production planning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118709863B_ABST
    Figure CN118709863B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for predicting the production capacity of cable production in a digital factory, which relates to the technical field of intelligent prediction, and includes the following steps: matching the first optimal production parameter corresponding to the first optimal production time, calculating the residual efficiency of the corresponding numbered equipment, calculating the first comprehensive efficiency, matching the second optimal production time corresponding to any historical cable model, calculating the predicted production time, analyzing the comprehensive efficiency to obtain the production line attenuation factor, calculating the compensation production time according to the attenuation factor, and calculating the final production time. The present invention improves the production capacity by accurately predicting the production time and optimizing the production parameters, and improves the scientific nature of the decision-making by combining the historical production data and the real-time production parameters, obtains the current production parameters in real time, and compares them with the historical data, and has the ability of dynamic adjustment, and improves the continuity and stability of the overall production by analyzing the comprehensive efficiency and the attenuation factor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent prediction, and in particular to a method and system for predicting the production capacity of cable in a digital factory. Background Art

[0002] In recent years, with the growth of global energy demand and the development of renewable energy, the demand for power transmission and distribution has continued to increase to support urbanization and industrialization, which has promoted the rapid development of the cable market. With the explosive growth of data generation, machine prediction is increasingly dependent on big data technology, which can process and analyze massive data to improve the accuracy and reliability of predictions.

[0003] At present, a Chinese invention patent with publication number CN 113325696 B discloses a hybrid control method combining single neuron PID and model prediction for cross-linked cable production equipment. This method obtains the general trend of changes in the system in the future through model analysis, model parameter feedback correction, PID parameter adjustment, and finally PID output. The PID parameters are adjusted accordingly based on the principle of minimizing the sum of squared errors in the future. However, the relevant technology does not conduct a detailed analysis of the parameters of each device in the production process, lacks comprehensiveness of control and analysis, does not update the prediction model according to objective laws, and lacks accuracy and practicality of the prediction. Summary of the invention

[0004] The technical problem solved by the present invention is that the related technology does not conduct a detailed analysis of the parameters of each device in the production process, lacks comprehensiveness of control and analysis, does not update the prediction model according to objective laws, and lacks prediction accuracy and practicality.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: In the first aspect, a method for predicting the production capacity of cable in a digital factory comprises the following steps:

[0006] Step S1, obtaining the current cable model, numbering the equipment, respectively obtaining the current production parameters corresponding to each numbered equipment, preprocessing the current production parameters, and counting the current production time;

[0007] Step S2, traversing the historical production time corresponding to the current cable model, selecting the historical production time with the smallest value, setting the historical production time with the smallest value as the first optimal production time, matching the first historical production parameter corresponding to the first optimal production time, and setting the first historical production parameter corresponding to the first historical production parameter as the first optimal production parameter;

[0008] Step S3, calculating the residual efficiency of the corresponding numbered equipment according to the first optimal production parameter and the corresponding preprocessed current production parameter, calculating the average value of the residual efficiency, and setting the average value of the residual efficiency as the first comprehensive efficiency;

[0009] Step S4, obtaining any cable model, traversing the historical production time corresponding to the any cable model, matching the second optimal production time corresponding to any historical cable model, and calculating the predicted production time according to the first comprehensive efficiency;

[0010] Step S5, taking the first time period as a cycle, repeating steps S1 to S3 to obtain the second to Nth comprehensive efficiencies, analyzing the comprehensive efficiencies to obtain the production line attenuation factor, calculating the compensated production time according to the attenuation factor, weighting the compensated production time and the predicted production time to obtain the final production time.

[0011] As a preferred solution of the method for predicting the production capacity of cable in a digital factory described in the present invention, step S1 includes the following sub-steps:

[0012] Step S11, obtaining the current cable model, numbering the equipment, the numbering being a natural number, and the equipment including a wire drawing machine, an extruder, a cabling machine, a braiding machine, a fork twisting machine, a wire rewinding machine, a wire measuring machine and a wire bundling machine;

[0013] Step S12, respectively obtaining the current production parameters corresponding to the numbered wire drawing machine, the current production parameters corresponding to the extruder, the current production parameters corresponding to the cabling machine, the current production parameters corresponding to the braiding machine, the current production parameters corresponding to the fork twisting machine, the current production parameters corresponding to the wire rewinding machine, the current production parameters corresponding to the wire measuring machine and the current production parameters corresponding to the wire bundling machine;

[0014] Step S13, preprocessing each current production parameter, the preprocessing includes outlier elimination and missing value filling, and counting the current production time, the current production time is represented by the total time to complete the production steps of the production line, and is obtained through a timer.

[0015] As a preferred scheme of the digital factory cable production capacity prediction method described in the present invention, wherein: the current production parameters corresponding to the wire drawing machine include drawing speed, wire drawing diameter, pulling force and wire drawing machine power, the current production parameters corresponding to the extruder include extrusion rate, extrusion temperature and nozzle diameter, the current production parameters corresponding to the cabling machine include cabling machine power, twisting diameter and winding speed, the current production parameters corresponding to the braiding machine include braiding speed, braiding density, braiding width and braiding machine power, the current production parameters corresponding to the fork twisting machine include twisting speed, number of twisting layers and fork twisting machine power, the current production parameters corresponding to the wire rewinding machine include wire rewinding speed, output rate and wire rewinding machine power, the current production parameters corresponding to the wire measuring machine include metering accuracy and wire measuring machine power, and the current production parameters corresponding to the wire bundling machine include wire bundling speed, wire bundling diameter, number of wire bundling layers and wire bundling machine power.

[0016] As a preferred solution of the method for predicting the production capacity of cable in a digital factory described in the present invention, step S2 includes the following sub-steps:

[0017] Step S21, calling the production database, inputting the current cable model into the production database, and matching the historical production time and historical production parameters corresponding to the current cable model;

[0018] Step S22, traverse the historical production time corresponding to the current cable model, select the historical production time with the smallest value, set the historical production time with the smallest value as the first optimal production time, and match the first historical production parameter corresponding to the first optimal production time, and set the first historical production parameter corresponding to the first historical production parameter as the first optimal production parameter.

[0019] As a preferred solution of the method for predicting the production capacity of cable in a digital factory described in the present invention, step S3 includes the following sub-steps:

[0020] Step S31, calculating the ratio of the preprocessed current production parameter and the corresponding first optimal production parameter to obtain a first ratio, obtaining various first ratios of the same device, calculating the average value of various first ratios of the same device, and setting the average value of various first ratios of the same device as the residual efficiency of the device;

[0021] Step S32, calculating the average value of the residual efficiencies of the various devices, and setting the average value of the residual efficiencies of the various devices as the first comprehensive efficiency.

[0022] As a preferred solution of the method for predicting the production capacity of cable in a digital factory described in the present invention, step S4 includes the following sub-steps:

[0023] Step S41, obtaining any cable model, calling a production database, inputting any cable model into the production database, and matching the historical production time and historical production parameters corresponding to the any cable model;

[0024] Step S42, traversing the historical production time corresponding to any of the cable models, selecting the historical production time corresponding to any of the cable models with the smallest value, and setting the historical production time corresponding to any of the cable models with the smallest value as the second optimal production time;

[0025] Step S43, calculating the ratio of the second optimal production time to the first comprehensive efficiency, and setting the ratio of the second optimal production time to the first comprehensive efficiency as the predicted production time.

[0026] As a preferred solution of the method for predicting the production capacity of cable in a digital factory described in the present invention, step S5 includes the following sub-steps:

[0027] Step S51, setting the first time period as a cycle, repeating steps S1 to S3, and obtaining the second comprehensive efficiency to the Nth comprehensive efficiency;

[0028] Step S52, obtaining a calculation expression of the cycle time and the comprehensive efficiency by least square fitting through the comprehensive efficiency and the corresponding cycle time, and setting the coefficient of the calculation expression of the cycle time and the comprehensive efficiency as the production line attenuation factor;

[0029] Step S53, calculating the product of the production line attenuation factor and the predicted production time, and setting the product of the production line attenuation factor and the predicted production time as the compensation production time;

[0030] Step S54, performing weighted calculation on the compensated production time and the predicted production time to obtain a final production time.

[0031] In a second aspect, a digital factory cable production capacity prediction system includes an acquisition module, an analysis module and a prediction module;

[0032] The acquisition module is used to acquire the current cable model, number the equipment, respectively acquire the current production parameters corresponding to each numbered equipment, pre-process the current production parameters, and count the current production time;

[0033] The analysis module traverses the historical production time corresponding to the current cable model, selects the historical production time with the smallest value, sets the historical production time with the smallest value as the first optimal production time, matches the first historical production parameter corresponding to the first optimal production time, sets the first historical production parameter corresponding to the first historical production parameter as the first optimal production parameter, calculates the residual efficiency of the corresponding numbered equipment according to the first optimal production parameter and the corresponding pre-processed current production parameter, calculates the average value of the residual efficiency, and sets the average value of the residual efficiency as the first comprehensive efficiency;

[0034] The prediction module obtains any cable model, traverses the historical production time corresponding to any cable model, matches the second optimal production time corresponding to any historical cable model, calculates the predicted production time according to the first comprehensive efficiency, takes the first time period as a cycle, repeats steps S1 to S3, obtains the second comprehensive efficiency to the Nth comprehensive efficiency, analyzes the comprehensive efficiency to obtain the production line attenuation factor, calculates the compensated production time according to the attenuation factor, and weights the compensated production time and the predicted production time to obtain the final production time.

[0035] In a third aspect, the present invention provides an electronic device comprising a memory, a processor and storage in the memory, wherein the memory stores computer-readable instructions, and when the computer-readable instructions are executed by the processor, the steps in any one of the methods described above are executed.

[0036] In a fourth aspect, the present invention provides a storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the steps in any one of the methods described above are executed.

[0037] The beneficial effects of the present invention are as follows: by accurately predicting production time and optimizing production parameters, the production efficiency of equipment is effectively improved, waste is reduced, and production capacity is increased; the combination of historical production data and real-time production parameters is used to provide reliable data support for production line adjustment, thereby improving the scientific nature of decision-making; current production parameters are obtained in real time and compared with historical data; it has the ability to dynamically adjust and can adapt to changes and challenges arising in the production process; by analyzing the comprehensive efficiency and attenuation factor, potential problems of the production line can be identified in advance, unexpected downtime can be reduced, and the continuity and stability of the overall production can be improved; through the comprehensive prediction of production time, the production plan can be effectively arranged, the allocation of human and material resources can be optimized, and the utilization rate of production resources can be improved; it can be applied to the production of different types of cables, enhance the flexibility of the production line, and can quickly respond to market changes and the diversity of customer needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1A basic flow chart of a method for predicting cable production capacity in a digital factory provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0039] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings. It is obvious that the described embodiments are only part of the embodiments of the present invention, but not all of the embodiments.

[0040] Example 1, reference Figure 1 , as an embodiment of the present invention, provides a method for predicting the production capacity of cable in a digital factory, comprising the following steps:

[0041] Step S1, obtaining the current cable model, numbering the equipment, respectively obtaining the current production parameters corresponding to each numbered equipment, preprocessing the current production parameters, and counting the current production time;

[0042] Step S2, traversing the historical production time corresponding to the current cable model, selecting the historical production time with the smallest value, setting the historical production time with the smallest value as the first optimal production time, matching the first historical production parameter corresponding to the first optimal production time, and setting the first historical production parameter corresponding to the first historical production parameter as the first optimal production parameter;

[0043] Step S3, calculating the residual efficiency of the corresponding numbered equipment according to the first optimal production parameter and the corresponding preprocessed current production parameter, calculating the average value of the residual efficiency, and setting the average value of the residual efficiency as the first comprehensive efficiency;

[0044] Step S4, obtaining any cable model, traversing the historical production time corresponding to the any cable model, matching the second optimal production time corresponding to any historical cable model, and calculating the predicted production time according to the first comprehensive efficiency;

[0045] Step S5, taking the first time period as a cycle, repeating steps S1 to S3 to obtain the second to Nth comprehensive efficiencies, analyzing the comprehensive efficiencies to obtain the production line attenuation factor, calculating the compensated production time according to the attenuation factor, weighting the compensated production time and the predicted production time to obtain the final production time.

[0046] The present invention effectively improves the production efficiency of equipment, reduces waste, and increases production capacity by accurately predicting production time and optimizing production parameters. It uses a combination of historical production data and real-time production parameters to provide reliable data support for production line adjustment, thereby improving the scientific nature of decision-making. It obtains current production parameters in real time and compares them with historical data. It has the ability to dynamically adjust and can adapt to changes and challenges in the production process. By analyzing the overall efficiency and attenuation factor, it can identify potential problems of the production line in advance, reduce unexpected downtime, and improve the continuity and stability of the overall production. Through the comprehensive prediction of production time, the production plan can be effectively arranged, the allocation of human and material resources can be optimized, and the utilization rate of production resources can be improved. It can be applied to the production of cables of different models, enhance the flexibility of the production line, and can quickly respond to market changes and the diversity of customer needs.

[0047] The step S1 includes the following sub-steps:

[0048] Step S11, obtaining the current cable model, numbering the equipment, the numbering being a natural number, and the equipment including a wire drawing machine, an extruder, a cabling machine, a braiding machine, a fork twisting machine, a wire rewinding machine, a wire measuring machine and a wire bundling machine;

[0049] Step S12, respectively obtaining the current production parameters corresponding to the numbered wire drawing machine, the current production parameters corresponding to the extruder, the current production parameters corresponding to the cabling machine, the current production parameters corresponding to the braiding machine, the current production parameters corresponding to the fork twisting machine, the current production parameters corresponding to the wire rewinding machine, the current production parameters corresponding to the wire measuring machine and the current production parameters corresponding to the wire bundling machine;

[0050] Step S13, preprocessing each current production parameter, the preprocessing includes outlier elimination and missing value filling, and counting the current production time, the current production time is represented by the total time to complete the production steps of the production line, and is obtained through a timer.

[0051] In specific implementation, by accurately predicting production time and optimizing production parameters, the production efficiency of equipment can be effectively improved, waste can be reduced, and production capacity can be increased.

[0052] The current production parameters corresponding to the wire drawing machine include drawing speed, wire drawing diameter, pulling force and wire drawing machine power; the current production parameters corresponding to the extruder include extrusion rate, extrusion temperature and nozzle diameter; the current production parameters corresponding to the cabling machine include cabling machine power, twisting diameter and winding speed; the current production parameters corresponding to the braiding machine include braiding speed, braiding density, braiding width and braiding machine power; the current production parameters corresponding to the fork twisting machine include twisting speed, twisting layer number and fork twisting machine power; the current production parameters corresponding to the wire rewinding machine include wire rewinding speed, output rate and wire rewinding machine power; the current production parameters corresponding to the wire measuring machine include metering accuracy and wire measuring machine power; the current production parameters corresponding to the wire bundling machine include wire bundling speed, wire bundling diameter, wire bundling layer number and wire bundling machine power.

[0053] In specific implementation, the detection data is more comprehensive, which improves the objectivity and comprehensiveness of data analysis.

[0054] The step S2 includes the following sub-steps:

[0055] Step S21, calling the production database, inputting the current cable model into the production database, and matching the historical production time and historical production parameters corresponding to the current cable model;

[0056] Step S22, traverse the historical production time corresponding to the current cable model, select the historical production time with the smallest value, set the historical production time with the smallest value as the first optimal production time, and match the first historical production parameter corresponding to the first optimal production time, and set the first historical production parameter corresponding to the first historical production parameter as the first optimal production parameter.

[0057] In specific implementation, the combination of historical production data and real-time production parameters provides reliable data support for production line adjustments, improving the scientific nature of decision-making.

[0058] The step S3 includes the following sub-steps:

[0059] Step S31, calculating the ratio of the preprocessed current production parameter and the corresponding first optimal production parameter to obtain a first ratio, obtaining various first ratios of the same device, calculating the average value of various first ratios of the same device, and setting the average value of various first ratios of the same device as the residual efficiency of the device;

[0060] Step S32, calculating the average value of the residual efficiencies of the various devices, and setting the average value of the residual efficiencies of the various devices as the first comprehensive efficiency.

[0061] In specific implementation, current production parameters are obtained in real time and compared with historical data. It has the ability to make dynamic adjustments and can adapt to changes and challenges in the production process.

[0062] The step S4 includes the following sub-steps:

[0063] Step S41, obtaining any cable model, calling a production database, inputting any cable model into the production database, and matching the historical production time and historical production parameters corresponding to the any cable model;

[0064] Step S42, traversing the historical production time corresponding to any of the cable models, selecting the historical production time corresponding to any of the cable models with the smallest value, and setting the historical production time corresponding to any of the cable models with the smallest value as the second optimal production time;

[0065] Step S43, calculating the ratio of the second optimal production time to the first comprehensive efficiency, and setting the ratio of the second optimal production time to the first comprehensive efficiency as the predicted production time.

[0066] In specific implementation, it can be applied to the production of cables of different models, enhance the flexibility of the production line, and be able to quickly respond to market changes and diverse customer needs.

[0067] The step S5 comprises the following sub-steps:

[0068] Step S51, setting the first time period as a cycle, repeating steps S1 to S3, and obtaining the second comprehensive efficiency to the Nth comprehensive efficiency;

[0069] Step S52, obtaining a calculation expression of the cycle time and the comprehensive efficiency by least square fitting through the comprehensive efficiency and the corresponding cycle time, and setting the coefficient of the calculation expression of the cycle time and the comprehensive efficiency as the production line attenuation factor;

[0070] Step S53, calculating the product of the production line attenuation factor and the predicted production time, and setting the product of the production line attenuation factor and the predicted production time as the compensation production time;

[0071] Step S54, performing weighted calculation on the compensated production time and the predicted production time to obtain a final production time.

[0072] In specific implementation, by analyzing the comprehensive efficiency and attenuation factor, potential problems of the production line can be identified in advance, unexpected downtime can be reduced, and the continuity and stability of overall production can be improved.

[0073] The present invention effectively improves the production efficiency of equipment, reduces waste, and increases production capacity by accurately predicting production time and optimizing production parameters. It uses a combination of historical production data and real-time production parameters to provide reliable data support for production line adjustment, thereby improving the scientific nature of decision-making. It obtains current production parameters in real time and compares them with historical data. It has the ability to dynamically adjust and can adapt to changes and challenges in the production process. By analyzing the overall efficiency and attenuation factor, it can identify potential problems of the production line in advance, reduce unexpected downtime, and improve the continuity and stability of the overall production. Through the comprehensive prediction of production time, the production plan can be effectively arranged, the allocation of human and material resources can be optimized, and the utilization rate of production resources can be improved. It can be applied to the production of cables of different models, enhance the flexibility of the production line, and can quickly respond to market changes and the diversity of customer needs.

[0074] It should be understood by those skilled in the art that the embodiments of the present invention may be provided as methods, systems or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment or an embodiment combining software and hardware aspects. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media containing computer-usable program codes. Among them, the storage medium may be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read Only Memory, referred to as EPROM), programmable read-only memory (Programmable Red-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, magnetic disk or optical disk. These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0075] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for predicting the production capacity of cable in a digital factory, characterized in that: The following steps are involved: Step S1, obtaining the current cable model, numbering the equipment, respectively obtaining the current production parameters corresponding to each numbered equipment, preprocessing the current production parameters, and counting the current production time; Step S2, traversing the historical production time corresponding to the current cable model, selecting the historical production time with the smallest value, setting the historical production time with the smallest value as the first optimal production time, matching the first historical production parameter corresponding to the first optimal production time, and setting the first historical production parameter corresponding to the first historical production parameter as the first optimal production parameter; Step S3, calculating the residual efficiency of the corresponding numbered equipment according to the first optimal production parameter and the corresponding preprocessed current production parameter, calculating the average value of the residual efficiency, and setting the average value of the residual efficiency as the first comprehensive efficiency; Step S4, obtaining any cable model, traversing the historical production time corresponding to the any cable model, matching the second optimal production time corresponding to any historical cable model, and calculating the predicted production time according to the first comprehensive efficiency; Step S5, taking the first time period as a cycle, repeating steps S1 to S3 to obtain the second to Nth comprehensive efficiencies, analyzing the comprehensive efficiencies to obtain the production line attenuation factor, calculating the compensated production time according to the attenuation factor, and weighting the compensated production time and the predicted production time to obtain the final production time; The step S2 includes the following sub-steps: Step S21, calling the production database, inputting the current cable model into the production database, and matching the historical production time and historical production parameters corresponding to the current cable model; Step S22, traversing the historical production time corresponding to the current cable model, selecting the historical production time with the smallest value, setting the historical production time with the smallest value as the first optimal production time, and matching the first historical production parameter corresponding to the first optimal production time, and setting the first historical production parameter corresponding to the first historical production parameter as the first optimal production parameter; The step S3 includes the following sub-steps: Step S31, calculating the ratio of the preprocessed current production parameter and the corresponding first optimal production parameter to obtain a first ratio, obtaining various first ratios of the same device, calculating the average value of various first ratios of the same device, and setting the average value of various first ratios of the same device as the residual efficiency of the device; Step S32, calculating the average value of the residual efficiency of each device, and setting the average value of the residual efficiency of each device as the first comprehensive efficiency; The step S4 includes the following sub-steps: Step S41, obtaining any cable model, calling a production database, inputting any cable model into the production database, and matching the historical production time and historical production parameters corresponding to the any cable model; Step S42, traversing the historical production time corresponding to any of the cable models, selecting the historical production time corresponding to any of the cable models with the smallest value, and setting the historical production time corresponding to any of the cable models with the smallest value as the second optimal production time; Step S43, calculating the ratio of the second optimal production time to the first comprehensive efficiency, and setting the ratio of the second optimal production time to the first comprehensive efficiency as the predicted production time; The step S5 comprises the following sub-steps: Step S51, setting the first time period as a cycle, repeating steps S1 to S3, and obtaining the second comprehensive efficiency to the Nth comprehensive efficiency; Step S52, obtaining a calculation expression of the cycle time and the comprehensive efficiency by least square fitting through the comprehensive efficiency and the corresponding cycle time, and setting the coefficient of the calculation expression of the cycle time and the comprehensive efficiency as the production line attenuation factor; Step S53, calculating the product of the production line attenuation factor and the predicted production time, and setting the product of the production line attenuation factor and the predicted production time as the compensation production time; Step S54, performing weighted calculation on the compensated production time and the predicted production time to obtain a final production time.

2. A method for predicting the production capacity of digital factory cables according to claim 1, characterized in that: The step S1 includes the following sub-steps: Step S11, obtaining the current cable model, numbering the equipment, the numbering being a natural number, and the equipment including a wire drawing machine, an extruder, a cabling machine, a braiding machine, a fork twisting machine, a wire rewinding machine, a wire measuring machine and a wire bundling machine; Step S12, respectively obtaining the current production parameters corresponding to the numbered wire drawing machine, the current production parameters corresponding to the extruder, the current production parameters corresponding to the cabling machine, the current production parameters corresponding to the braiding machine, the current production parameters corresponding to the fork twisting machine, the current production parameters corresponding to the wire rewinding machine, the current production parameters corresponding to the wire measuring machine and the current production parameters corresponding to the wire bundling machine; Step S13, preprocessing each current production parameter, the preprocessing includes outlier elimination and missing value filling, and counting the current production time, the current production time is represented by the total time to complete the production steps of the production line, and is obtained through a timer.

3. A method for predicting the production capacity of digital factory cables according to claim 2, characterized in that: The current production parameters corresponding to the wire drawing machine include drawing speed, wire drawing diameter, pulling force and wire drawing machine power; the current production parameters corresponding to the extruder include extrusion rate, extrusion temperature and nozzle diameter; the current production parameters corresponding to the cabling machine include cabling machine power, twisting diameter and winding speed; the current production parameters corresponding to the braiding machine include braiding speed, braiding density, braiding width and braiding machine power; the current production parameters corresponding to the fork twisting machine include twisting speed, twisting layer number and fork twisting machine power; the current production parameters corresponding to the wire rewinding machine include wire rewinding speed, output rate and wire rewinding machine power; the current production parameters corresponding to the wire measuring machine include metering accuracy and wire measuring machine power; the current production parameters corresponding to the wire bundling machine include wire bundling speed, wire bundling diameter, wire bundling layer number and wire bundling machine power.

4. A digital factory cable production capacity prediction system, the system is used to execute the digital factory cable production capacity prediction method according to claim 1, characterized in that: It includes acquisition module, analysis module and prediction module; The acquisition module is used to acquire the current cable model, number the equipment, respectively acquire the current production parameters corresponding to each numbered equipment, pre-process the current production parameters, and count the current production time; The analysis module traverses the historical production time corresponding to the current cable model, selects the historical production time with the smallest value, sets the historical production time with the smallest value as the first optimal production time, matches the first historical production parameter corresponding to the first optimal production time, sets the first historical production parameter corresponding to the first historical production parameter as the first optimal production parameter, calculates the residual efficiency of the corresponding numbered equipment according to the first optimal production parameter and the corresponding pre-processed current production parameter, calculates the average value of the residual efficiency, and sets the average value of the residual efficiency as the first comprehensive efficiency; The prediction module obtains any cable model, traverses the historical production time corresponding to any cable model, matches the second optimal production time corresponding to any historical cable model, calculates the predicted production time according to the first comprehensive efficiency, takes the first time period as a cycle, repeats steps S1 to S3, obtains the second comprehensive efficiency to the Nth comprehensive efficiency, analyzes the comprehensive efficiency to obtain the production line attenuation factor, calculates the compensated production time according to the attenuation factor, and weights the compensated production time and the predicted production time to obtain the final production time.