Substation measures inspection method and device based on electronic signboard
By adopting the measures and inspection methods based on electronic signs in the substation, the task information in the work ticket is analyzed and the induction interaction is carried out through electronic signs, the problems of time-consuming and unclear instructions are solved, and the work is achieved Improve efficiency and accurate management of work measures.
Patent Information
- Application Number
- CN202411191467.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2044-08-28
AI Technical Summary
In the prior art, the signs of substations are time-consuming and labor-intensive, and the instructions are unclear, which affects work efficiency and is difficult to effectively monitor and verify work measures.
The substation measures inspection method based on electronic signboards is adopted, and the task information in the work ticket is obtained and analyzed, and the electronic signboards are used for induction interaction, monitoring and displaying the task status of the work equipment is realized to realize the automated management of inspection and acceptance tasks.
It reduces the time and energy of staff on hanging and checking signs, improves work efficiency, and ensures the accuracy and consistency of work measures.
Smart Images

Figure CN118710226B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of substation inspection, and in particular to a substation measures inspection method and device based on an electronic signboard. Background Art
[0002] In the existing technical solution, before the substation staff is allowed to issue the current work ticket, they need to go to the on-site work site to hang a "Work Here" sign. When the work is completed, they need to remove the "Work Here" sign. This working method has the following problems:
[0003] 1) For current work tickets with many work locations, a large number of "Work Here" signs are required, and it is troublesome to take and put the work signs;
[0004] 2) The work location instructions on the work card are often disordered, especially in the protection room. For example, 11P and 31P screen cabinets need to be hung before and after the screen, while 21P screens only need to be hung behind the screen. The positions of different screen cabinets are not necessarily placed according to the screen cabinet numbers. Before issuing permits, the licensee needs to walk back and forth to hang the cards, which is prone to the risk of mishanging cards and missing cards. Mishanging cards can easily cause staff to go to the wrong interval. In order to avoid risks, they can only check multiple times, which is time-consuming;
[0005] 3) For current work tickets with cross-working locations, currently, in order to prevent staff from going to the wrong interval, it is necessary to post labels of work tasks and work supervisors on the "Work Here" signboard at each work location. When a current work ticket is closed, the operator needs to collect the measures. In the case of cross-working, some measures need to be collected, while others do not. It is also necessary to recheck the closed work measures and the unclosed work measures, which is extremely time-consuming and labor-intensive.
[0006] 4) For the protection room, a sign indicating that the equipment is in operation needs to be hung on the operating screen cabinet. When working, the sign indicating that the equipment is in operation needs to be turned over. Too many signs are meaningless, and the usual way of sticking with adhesives is also easy to fall off;
[0007] 5) For substation managers, they are not clear about the actual on-site inspection measures of the operators who issued the permit tickets, and whether there are any omissions when checking the measures. If they need to understand the situation, they can only go to the site to check it themselves;
[0008] 6) The meaning of the commonly used "Work Here" signs is unclear. There are only four words "Work Here" on the sign, and there is no clear information about the work location. Especially for high-voltage sites, the work location indicated by the sign may be the base, the knife switch, or the entire interval. The place where the work permit holder hangs the sign may be the same, and the indication of the work location is unclear.
[0009] Based on the above analysis, the existing technology has the following limitations regarding the hanging, removing, checking and indicating of signboards in substations: 1) It takes a lot of time to terminate the hanging, removing and sorting of the current work ticket; 2) There are current work tickets with cross-work locations. The hanging needs to post the work supervisor information label, and the closing needs to check the measures of all tickets to prevent over-collection and omission of work measures. Repeated checking is time-consuming; 3) It is difficult for substation managers to understand the arrangement of the personnel measures of the current work ticket on site. If they need to understand, they can only go to the site to check in person; 4) The location instructions of the traditional "Work Here" signboard are unclear.
[0010] With regard to the problem that the hanging and removing of the substation signboards in the above-mentioned time-consuming related technologies is time-consuming and labor-intensive, and the instructions are unclear, which affects the work efficiency of the substation staff, no effective solution has been proposed yet. Summary of the invention
[0011] The embodiment of the present invention provides a substation measures inspection method and device based on electronic signboards, so as to at least solve the technical problems in the related technology that the hanging and removing of substation signboards is time-consuming and labor-intensive, and the instructions are unclear, which affects the work efficiency of substation staff.
[0012] According to one aspect of an embodiment of the present invention, there is provided a method for inspecting substation measures based on electronic signboards, comprising: obtaining a current work ticket of the substation, wherein the current work ticket includes at least: a work task, work equipment, and a work object for performing the work task; parsing the current work ticket to obtain task information; determining, based on the task information, that the work equipment to be performed on the work task is the target work equipment, and counting the number of devices of the target work equipment; obtaining the number of first interaction information for first inductive interaction with the electronic signboards mounted at each of the target work equipments, and determining the inspection task for the substation when the number of the first interaction information is the same as the number of devices. The execution of the task is completed, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the execution of the inspection task of the target working equipment is completed, and the inspection task is the task of inspecting the target working equipment before executing the work task; the number of second interaction information for the second inductive interaction with each of the electronic signboards is obtained, and when the number of the second interaction information is the same as the number of the equipment, it is determined that the execution of the acceptance task of the substation is completed, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the execution of the acceptance task of the target working equipment is completed, and the acceptance task is the task of accepting the target working equipment after executing the work task.
[0013] Optionally, the current work ticket is parsed to obtain a parsing result, including: parsing the current work ticket to obtain the work task, the work equipment and the work object that executes the work task; when the number of the work task, the work equipment and the work object is one, obtaining the task information according to the work task, the work equipment and the work object; when the number of any one of the work task, the work equipment and the work object is multiple, determining multiple correspondences between the work task, the work equipment and the work object; and determining multiple pieces of task information according to the multiple correspondences.
[0014] Optionally, determining the working device required to perform the working task as the target working device based on the task information includes: obtaining a device identifier of the working device in the task information; and determining that the working device corresponding to the device identifier is the target working device.
[0015] Optionally, the substation measures inspection method based on electronic signboard also includes: after a first inductive interaction with the electronic signboard, switching the status mark of the target working equipment from a first mark to a second mark, so that the electronic signboard displays the words "working here" and the task information in the current work ticket that needs to be performed at the target working equipment, wherein the status mark is used to mark whether the inspection task for the target working equipment has been completed, the first mark indicates that the inspection task for the target working equipment has not been completed, the second mark indicates that the inspection task for the target working equipment has been completed, and the words "working here" indicate that the target working equipment is in operation and needs to execute the work task.
[0016] Optionally, the substation measures inspection method based on electronic signboards also includes: after a second inductive interaction with the electronic signboard, switching the status mark of the target working equipment from the second mark to the first mark so that the electronic signboard does not display the words "working here" and the task information in the current work ticket that needs to be performed at the target working equipment.
[0017] Optionally, the substation measures inspection method based on electronic signboards also includes: after determining that the inspection task of the substation is completed, generating a first pop-up window information indicating that the inspection of all the target working equipment in the substation is completed, so as to prompt the work object to perform the work task at the target working equipment; after determining that the acceptance task of the substation is completed, generating a second pop-up window information indicating that the acceptance of all the target working equipment in the substation is completed, so as to prompt the settlement of the current work ticket.
[0018] Optionally, the display screen of the electronic signboard adopts an ink screen.
[0019] According to another aspect of an embodiment of the present invention, a substation measures inspection device based on electronic signs is also provided, including: a first acquisition unit, used to obtain a current work ticket of the substation, wherein the current work ticket includes at least: a work task, a work equipment, and a work object for performing the work task; a second acquisition unit, used to parse the current work ticket to obtain task information; a determination unit, used to determine, based on the task information, that the work equipment to be performed on the work task is the target work equipment, and to count the number of devices of the target work equipment; a third acquisition unit, used to obtain the number of first interaction information for the first inductive interaction with the electronic signs installed at each of the target work equipment, and when the number of the first interaction information is the same as the number of devices , determine that the inspection task of the substation is completed, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the inspection task of the target working equipment is completed, and the inspection task is the task of inspecting the target working equipment before executing the working task; a fourth acquisition unit is used to obtain the number of second interaction information for the second inductive interaction with each of the electronic signboards, and determine that the acceptance task of the substation is completed when the number of the second interaction information is the same as the number of the equipment, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the acceptance task of the target working equipment is completed, and the acceptance task is the task of accepting the target working equipment after executing the working task.
[0020] Optionally, the second acquisition unit includes: a first acquisition module, used to parse the current work ticket to obtain the work task, the work equipment and the work object that executes the work task; a second acquisition module, used to obtain the task information according to the work task, the work equipment and the work object when the number of the work task, the work equipment and the work object is one; a first determination module, used to determine multiple correspondences between the work task, the work equipment and the work object when the number of any one of the work task, the work equipment and the work object is multiple; a second determination module, used to determine multiple pieces of task information according to the multiple correspondences.
[0021] Optionally, the determination unit includes: a third acquisition module, used to obtain the device identification of the working device in the task information; and a third determination module, used to determine that the working device corresponding to the device identification is the target working device.
[0022] Optionally, the substation measures inspection device based on electronic signboard also includes: a first switching unit, used to switch the status mark of the target working equipment from a first mark to a second mark after a first inductive interaction with the electronic signboard, so that the electronic signboard displays the words "working here" and the task information that needs to be performed at the target working equipment in the current work ticket, wherein the status mark is used to mark whether the inspection task for the target working equipment has been completed, the first mark indicates that the inspection task for the target working equipment has not been completed, the second mark indicates that the inspection task for the target working equipment has been completed, and the words "working here" indicate that the target working equipment is in operation and needs to execute the work task.
[0023] Optionally, the substation measures inspection device based on electronic signboard also includes: a second switching unit, which is used to switch the status mark of the target working equipment from the second mark to the first mark after a second inductive interaction with the electronic signboard, so that the electronic signboard does not display the words "working here" and the task information that needs to be performed at the target working equipment in the current work ticket.
[0024] Optionally, the substation measures inspection device based on electronic signboard also includes: a first generating unit, which is used to generate a first pop-up window information indicating that the inspection of all the target working equipment in the substation is completed after determining that the inspection task of the substation is completed, so as to prompt the work object to perform the work task at the target working equipment; a second generating unit, which is used to generate a second pop-up window information indicating that the acceptance of all the target working equipment in the substation is completed after determining that the acceptance task of the substation is completed, so as to prompt the settlement of the current work ticket.
[0025] Optionally, the display screen of the electronic signboard adopts an ink screen.
[0026] According to another aspect of an embodiment of the present invention, a substation measures inspection system based on an electronic signboard is further provided, wherein the substation measures inspection system based on an electronic signboard uses any of the above-mentioned substation measures inspection methods based on an electronic signboard.
[0027] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is further provided, the computer-readable storage medium comprising a stored program, wherein the program executes any one of the above-mentioned substation measures inspection methods based on electronic signboards.
[0028] According to another aspect of an embodiment of the present invention, a processor is further provided, the processor being used to run a program, wherein the program, when running, executes any one of the above-mentioned methods for inspecting substation measures based on electronic signboards.
[0029] According to another aspect of an embodiment of the present invention, a computer program product is further provided, comprising computer instructions, wherein when the computer instructions are executed by a processor, any one of the above-mentioned substation measures inspection methods based on electronic signboards is executed.
[0030] In an embodiment of the present invention, a current work ticket of a substation is obtained, wherein the current work ticket includes at least: a work task, work equipment, and a work object for performing the work task; the current work ticket is parsed to obtain task information; based on the task information, the work equipment to be performed on the work task is determined to be the target work equipment, and the number of devices of the target work equipment is counted; the number of first interaction information for the first inductive interaction with the electronic signboard mounted at each target work equipment is obtained, and when the number of the first interaction information is the same as the number of devices, it is determined that the execution of the inspection task of the substation is completed, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the execution of the inspection task of the target work equipment is completed, and the inspection task is the task of inspecting the target work equipment before performing the work task; the number of second interaction information for the second inductive interaction with each electronic signboard is obtained, and when the number of the second interaction information is the same as the number of devices, it is determined that the execution of the acceptance task of the substation is completed, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the execution of the acceptance task of the target work equipment is completed, and the acceptance task is the task of accepting the target work equipment after performing the work task. Through the above technical scheme, the purpose of transmitting the task information parsed from the work ticket to the electronic signboard for display and monitoring the inspection through interactive information with the electronic signboard is achieved, and the technical effect of using the electronic signboard to display the task information of the working equipment and monitoring the progress status of the working equipment inspection by interactive punching with the electronic signboard is realized, which reduces the workload and complexity of the staff and improves the work efficiency of the staff, thereby solving the technical problem in the time-consuming related technology that the hanging and removing of the substation signboard is time-consuming and labor-intensive, and the instructions are unclear, affecting the work efficiency of the substation staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0032] Figure 1 It is a hardware structure block diagram of a mobile terminal of a substation measures inspection method based on an electronic signboard according to an embodiment of the present invention;
[0033] Figure 2 is a flow chart of a substation measures inspection method based on an electronic signboard according to an embodiment of the present invention;
[0034] Figure 3 is a schematic diagram of a work ticket permission start interface according to an embodiment of the present invention;
[0035] Figure 4 is a schematic diagram of an electronic sign display interface according to an embodiment of the present invention;
[0036] FIG5 (a) is a schematic diagram of an electronic sign hanging rope in an extended state according to an embodiment of the present invention;
[0037] FIG5( b ) is a schematic diagram of the electronic sign hanging rope in a storage state according to an embodiment of the present invention;
[0038] FIG5( c ) is a schematic diagram of a charging port on the side of an electronic sign according to an embodiment of the present invention;
[0039] FIG5( d ) is a schematic diagram of a side switch of an electronic sign according to an embodiment of the present invention;
[0040] FIG5( e ) is a schematic diagram of a magnet on the back of an electronic sign according to an embodiment of the present invention;
[0041] Figure 6 is a schematic diagram of an interface for controlling an electronic sign according to an embodiment of the present invention;
[0042] FIG. 7 ( a ) is a schematic diagram of an electronic signboard displaying the words “operating equipment” according to an embodiment of the present invention;
[0043] FIG7( b ) is a schematic diagram of an electronic signboard displaying words “return equipment” according to an embodiment of the present invention;
[0044] Figure 8 is a flow chart of performing inspection tasks on a work ticket before permitting the issuance of a ticket according to an embodiment of the present invention;
[0045] Fig. 9 is a flow chart of performing acceptance tasks before closing a work ticket according to an embodiment of the present invention;
[0046] Fig.10 is a schematic diagram of a work ticket settlement interface according to an embodiment of the present invention;
[0047] Fig.11 is a schematic diagram of a substation measures inspection device based on an electronic signboard according to an embodiment of the present invention. DETAILED DESCRIPTION
[0048] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0049] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0050] As introduced in the background technology, the hanging and removing of substation signboards in the related technology is time-consuming and labor-intensive, and the instructions are unclear, which affects the work efficiency of substation staff. In view of the above defects, a substation measure inspection method and device based on electronic signboards are provided in an embodiment of the present invention.
[0051] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0052] The method embodiments provided in the embodiments of the present invention can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a substation measures inspection method based on an electronic signboard according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is for illustration only and does not limit the structure of the mobile terminal. Figure 1More or fewer components as shown, or with Figure 1 Different configurations are shown.
[0053] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the substation measures inspection method based on electronic signboards in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0054] According to an embodiment of the present invention, a method embodiment of a substation measures inspection method based on electronic signboards is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0055] Figure 2 is a flow chart of a substation measures inspection method based on an electronic signboard according to an embodiment of the present invention, such as Figure 2 As shown, the method comprises the following steps:
[0056] Step S202, obtaining the current work ticket of the substation, wherein the current work ticket at least includes: work tasks, work equipment, and work objects for executing the work tasks.
[0057] In this embodiment, a system software may be used to obtain and parse the work ticket of the substation.
[0058] Combine the following Figure 3The above embodiments of the present invention are described in detail. Figure 3 It is a schematic diagram of a work ticket permission start interface according to an embodiment of the present invention.
[0059] like Figure 3 As shown, the work ticket of the substation can be input into the pasteable area to obtain the task information of the work ticket.
[0060] Step S204, parse the current work ticket to obtain task information.
[0061] In this embodiment, after the work ticket is input into the software, the software can be used to parse the work ticket to obtain corresponding task information.
[0062] According to the above embodiment of the present invention, in the above step S204, the current work ticket is parsed to obtain the parsing result, including: parsing the current work ticket to obtain the work task, work equipment and work object for performing the work task; when the number of the work task, work equipment and work object is one, obtaining task information based on the work task, work equipment and work object; when the number of any one of the work tasks, work equipment and work objects is multiple, determining multiple correspondences between the work tasks, work equipment and work objects; determining multiple pieces of task information based on the multiple correspondences.
[0063] In the specific implementation process, as above Figure 3 As shown, for example, assuming that the content of the work ticket is: Tan XX performs regular inspection on the 110kV XX line protection device, the corresponding task information can be obtained by analyzing it as follows: the working equipment is the 110kV XX line protection device, the working task is to perform regular inspection, and the working object performing the working task is Tan XX; and when it is analyzed that there are multiple working tasks, working equipment and working objects. In the case where there are multiple of any one of the working tasks, working equipment and working objects, multiple task information can be obtained according to the corresponding relationship between the working tasks, working equipment and working objects.
[0064] Step S206: determining the working equipment to be executed for the working task as the target working equipment based on the task information, and counting the number of the target working equipment.
[0065] In this embodiment, after the task information is parsed, all the working devices included in the task information can be determined as target working devices that are about to perform work there, and the number of the target working devices can be counted.
[0066] According to the above embodiment of the present invention, in the above step S206, the working device required to perform the working task is determined as the target working device based on the task information, including: obtaining the device identification of the working device in the task information; and determining the working device corresponding to the device identification as the target working device.
[0067] During the specific implementation process, the equipment identification can be used as the unique identification of the working equipment, and the working equipment, the electronic signboard hung on the working equipment, and the working equipment parsed in the work ticket can be matched one by one with this identification.
[0068] Step S208, obtain the first number of interactive information for the first inductive interaction with the electronic signboard installed at each target working device, and when the number of first interactive information is the same as the number of devices, determine that the inspection task for the substation is completed, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the inspection task of the target working equipment is completed, and the inspection task is the task of inspecting the target working equipment before executing the work task.
[0069] In this embodiment, whether the staff has completed the inspection of all target work equipment can be determined by monitoring whether the number of first induction interactive check-ins by the staff using a mobile phone (it can also be a watch, bracelet, etc., without specific limitation) and the electronic signboard hung at the device after the safety inspection of the target work equipment is consistent with the number of target work equipment. The first induction interaction here refers to the interactive check-in after the staff performs a safety inspection on the device before completing the work task at the target work equipment.
[0070] It should be noted that when interacting with the electronic signboards, each electronic signboard is interacted with only once, and the number counted here refers to the total number of electronic signboards with which the sensing interaction was performed.
[0071] In a specific embodiment of the present invention, the substation measures inspection method based on the electronic signboard also includes: after a first inductive interaction with the electronic signboard, switching the status mark of the target working equipment from a first mark to a second mark, so that the electronic signboard displays the words "working here" and the task information that needs to be performed at the target working equipment in the current work ticket, wherein the status mark is used to mark whether the inspection task for the target working equipment has been completed, the first mark indicates that the inspection task for the target working equipment has not been completed, the second mark indicates that the inspection task for the target working equipment has been completed, and the words "working here" indicate that the target working equipment is in operation and needs to execute the work task.
[0072] As above Figure 3As shown, when the work task content column (i.e., the pasting area) contains the work task content corresponding to the work ticket, and the work location (i.e., the work equipment) content column contains the work location content, click the confirmation button, and the verification area will begin to display all the work locations, and the displayed background color is gray. When the work permit holder verifies the on-site measures, he touches the NFC sensing area of the corresponding work location sign with the NFC area of the mobile phone, and the corresponding work location background color in the display area changes from gray to green. It should be noted that in the above-mentioned embodiment of the present invention, color is used as a status mark to mark the status of the target work equipment, with gray representing the first mark and green representing the second mark. Of course, only one marking method is provided here, and other methods (including but not limited to graphic marks, picture frame marks, etc.) can also be used for marking, and no specific restrictions are made here.
[0073] First, combine Figure 4 The above embodiments of the present invention are described in detail. Figure 4 is a schematic diagram of an electronic sign display interface according to an embodiment of the present invention.
[0074] In this embodiment, after the staff conducts a safety inspection on the target work equipment, they use a mobile phone (other devices such as a wristband can also be used here, without specific restrictions) to interact with the electronic signboard, and the electronic signboard hung at the target work equipment will display the task information to be performed at the target work equipment where it is hung and the words "Working here"; Figure 4 As shown, the electronic signboard shows that there are two work tasks to be performed at the XX line switch mechanism box, namely, Tan XX conducts regular inspection of the 110kV XX line protection device and Xie XX conducts preliminary testing of the 110kV XX line.
[0075] It should be noted that the fields regarding work tasks, work equipment and work objects in the software and the electronic signboard also correspond one to one, so that the content parsed by the software can be correctly displayed in the electronic signboard.
[0076] In particular, in an optional embodiment, the display screen of the electronic signboard adopts an ink screen.
[0077] The structure of the above-mentioned electronic signboard is described in detail below in combination with Figures 5(a), 5(b), 5(c), 5(d) and 5(e). Figure 5(a) is a schematic diagram of the electronic signboard hanging rope in an extended state according to an embodiment of the present invention; Figure 5(b) is a schematic diagram of the electronic signboard hanging rope in a stored state according to an embodiment of the present invention; Figure 5(c) is a schematic diagram of the charging port on the side of the electronic signboard according to an embodiment of the present invention; Figure 5(d) is a schematic diagram of the side switch of the electronic signboard according to an embodiment of the present invention; Figure 5(e) is a schematic diagram of the magnet on the back of the electronic signboard according to an embodiment of the present invention.
[0078] As shown in Figure 5 (a) and Figure 5 (b), the top is a retractable built-in lanyard. When not in use, there is a spring inside the device to stretch it. When not in use, it can be retracted into the device. When it is needed, it can be stretched out; the upper left corner is the NFC sensing area, which has a built-in NFC sensing module. The device exchanges information with the outside world through the NFC sensing module; the display area is a color ink screen with a display resolution greater than 360P. The ink screen does not have a touch screen interaction function and has a transparent plastic protective shell on the outside; the ink screen is used as an electronic signboard here because the electronic ink screen consumes power only when the screen content changes. It does not consume power under normal circumstances. Usually, the number of times a place changes its signboard in a year rarely exceeds 100 times, so a charge can be used for several years. As shown in Figure 5 (c) and Figure 5 (d), the ink screen can be charged through the charging port, or the ink screen can be physically turned on and off by toggling the power switch. This process is not controlled by software. As shown in Figure 5 (e), there are two permanent magnets on the back of the device to provide adsorption force, as well as a built-in hanging rope that can be pulled out; it can be installed by mounting or hanging. For the screen cabinets in the protection room and the local control cabinet, the front of the screen is a metal screen cabinet, and the sign can be adsorbed on the metal protection screen cabinet by magnets. For outdoor venues, such as cable trenches where there is no place to hang this working sign, the sign is usually hung on a bracket, and the retractable rope behind the sign can be pulled out for hanging.
[0079] The electronic signboard can be displayed when needed and turned off when not needed, avoiding the need for staff to frequently hang up and take off work badges, and also avoiding the situation where mistakes, confusion or even rechecking are caused by unclear instructions or too many signboards when there is cross-working equipment in the task information of multiple work tickets, thereby improving the work efficiency of staff.
[0080] Then, combine Figure 6 How to control the display content of the electronic sign in the above embodiment of the present invention is described in detail. Figure 6 is a schematic diagram of an interface for controlling an electronic sign according to an embodiment of the present invention; Figure 6As shown, click the setting button to enter the setting interface of the software, and each signboard can be matched one by one with the working equipment it is hung on based on the equipment identification, so as to better control the signboard in the future; for example, for a certain signboard, after writing the current working equipment, the working equipment of the current signboard will be displayed on the signboard; when writing is empty, the written information is cleared; when the current signboard already has working equipment information, when writing new working equipment information, the information data of the current working equipment will be automatically overwritten; in addition, when writing information, it is necessary to select whether the current working equipment is a running equipment or a returned equipment. When the current working equipment is not working, if the working equipment is in operation, the signboard will display the words "running equipment" shown in Figure 7 (a), and Figure 7 (a) is a schematic diagram of the electronic signboard displaying the words of the running equipment according to an embodiment of the present invention; if the working equipment is not in operation, the signboard will display the words "returned equipment" shown in Figure 7 (b), and Figure 7 (b) is a schematic diagram of the electronic signboard displaying the words of the returned equipment according to an embodiment of the present invention.
[0081] Finally, combine Figure 8 The complete process of performing the inspection task on the work ticket before the permitting of the work ticket in the above embodiment of the present invention is further summarized and described in detail. Figure 8 1 is a flowchart of performing inspection tasks before permitting the issuance of a work ticket according to an embodiment of the present invention; Figure 8 As shown, the work permit issuer needs to confirm all work locations. For work locations such as protection rooms, which already have signboards, no new signboards are needed. For places without signboards, such as high-voltage cable trenches, the work locations need to be manually written into the electronic signboards. After confirming that the signboards for all work locations are ready, the work permit issuer and the work supervisor have completed all work measures, and then checked all the clock-in measures at all work locations one by one to see whether they have been implemented. That is, the software can obtain the interaction information of the first interaction between the staff and the NFC sensing area of the electronic signboard through devices such as mobile phones, bracelets, and watches, and determine whether the number of interactions obtained is consistent with the number of target work equipment to determine whether all work equipment involved in the current work ticket has been inspected.
[0082] According to the above embodiment of the present invention, after the above step S208, that is, after determining that the inspection task of the substation is completed, a first pop-up window information indicating that the inspection of all target working equipment in the substation is completed is generated to prompt the work object to perform the work task at the target working equipment.
[0083] During the specific implementation process, after confirming that all target work equipment has been inspected, the software pops up the "All work locations have been checked and can start work" interface, and also adds the information of the person who checked the measures and the time of the check. The work ticket permitter can take a screenshot of the interface and report it to the work group of the operation and maintenance center. The operation center managers can also clearly know the completion status of the on-site work measures, reducing the workload of the staff.
[0084] Step S210, obtain the number of second interaction information for the second inductive interaction with each electronic signboard, and when the number of second interaction information is the same as the number of devices, determine that the acceptance task of the substation is completed, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the acceptance task of the target working equipment is completed, and the acceptance task is the task of accepting the target working equipment after the execution of the working task.
[0085] In this embodiment, whether the staff has completed the inspection of all target work equipment can be determined by monitoring whether the number of second induction interactive check-ins by the staff using a mobile phone (it can also be a watch, bracelet, etc., without specific limitation) and the electronic signboard hung at the device after the safety inspection of the target work equipment is consistent with the number of target work equipment. The second induction interaction here refers to the interactive check-in after the staff inspects the device again after completing the work task at the target work equipment.
[0086] It should be noted that when interacting with the electronic signboards, each electronic signboard is interacted with only once, and the number counted here refers to the total number of electronic signboards with which the sensing interaction was performed.
[0087] Combine the following Fig. 9 The above embodiments of the present invention are described in detail. Fig. 9 1 is a flowchart of performing acceptance tasks before closing a work ticket according to an embodiment of the present invention; Fig. 9 As shown, when the current work ticket task has been completed, the work permit holder and the work supervisor will check the work status of all work locations together and clock in one by one to implement. When all work tickets at the current work location have been terminated, the electronic signboard will no longer display "Working Here", but will display "Equipment in Operation" or "Equipment Returned". At this time, all work measures at the current work location can be put away. If there is still work at the current work location, the electronic signboard will only delete the current work ticket information to be terminated, and will still display "Working Here" and the work information of the remaining work tickets. This is because there may be other work tickets that overlap with the current work ticket, so only the task information corresponding to the current work ticket needs to be deleted.
[0088] In a specific embodiment of the present invention, the substation measures inspection method based on the electronic signboard also includes: after a second inductive interaction with the electronic signboard, switching the status mark of the target working equipment from the second mark to the first mark so that the electronic signboard does not display the words "this work" and the task information that needs to be performed at the target working equipment in the current work ticket.
[0089] Combine the following Fig.10 The above embodiments of the present invention are described in detail. Fig.10 It is a schematic diagram of the work ticket settlement interface according to an embodiment of the present invention; when there is work task content in the work task content column and there is work location content in the work location content column, click the confirmation button and the display area will start to display all work locations, and the displayed background color is green. When the work permit holder terminates the work ticket, he needs to go to the work location one by one, and then use the NFC of the mobile phone to touch the NFC sensing area of the work location, and the background color of the corresponding work location in the display area will turn gray.
[0090] According to the above embodiment of the present invention, after the above step S210, that is, after determining that the acceptance task of the substation is completed, a second pop-up window information is generated to indicate that the acceptance of all target working equipment in the substation is completed, to prompt the current work ticket to be settled.
[0091] In the specific implementation process, after confirming that all target work equipment has been accepted, the software pops up the "All work sites have been checked and can start work" interface, and adds the information of the person who checked the measures and the time of the check. The work ticket permitter can take a screenshot of the interface and report it to the work group of the operation and maintenance center, and the operation center managers can also clearly know the completion status of the on-site work measures.
[0092] Through the technical solution provided by the above-mentioned embodiment of the present invention, the safety inspection process of the target work equipment can be monitored before the work ticket is allowed to be issued and before the work ticket is settled, and the inspection results can be clearly displayed.
[0093] From the above, it can be seen that through the technical solution provided by the above embodiment of the present invention, the current work ticket of the substation is obtained, wherein the current work ticket at least includes: work tasks, work equipment, and work objects that perform the work tasks; the current work ticket is parsed to obtain task information; based on the task information, the work equipment that needs to perform the work task is determined to be the target work equipment, and the number of devices of the target work equipment is counted; the number of first interaction information for the first inductive interaction with the electronic signboard installed at each target work equipment is obtained, and when the number of first interaction information is the same as the number of devices, it is determined that the execution of the inspection task of the substation is completed, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the execution of the inspection task of the target work equipment is completed, and the inspection task is the task of inspecting the target work equipment before executing the work task; The number of second interactive information for the second inductive interaction with each electronic signboard is obtained, and when the number of second interactive information is the same as the number of equipment, it is determined that the acceptance task of the substation is completed, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the acceptance task of the target working equipment is completed, and the acceptance task is the task of accepting the target working equipment after the work task is executed. The task information parsed from the work ticket is transmitted to the electronic signboard for display, and the inspection is monitored through the interactive information with the electronic signboard. The technical effect of using the electronic signboard to display the task information of the working equipment and monitoring the progress status of the working equipment inspection by interactively punching in with the electronic signboard is realized, which reduces the workload and complexity of the staff and improves the work efficiency of the staff.
[0094] Therefore, the technical solution provided by the above-mentioned embodiment of the present invention solves the technical problem that the hanging and removing of the substation signboard in the related technology is time-consuming and labor-intensive, and the instructions are unclear, which affects the work efficiency of the substation staff.
[0095] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.
[0096] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course it can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, disk, CD), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods of each embodiment of the present application.
[0097] According to an embodiment of the present invention, there is also provided a substation measures inspection device based on an electronic signboard for implementing the above-mentioned substation measures inspection method based on an electronic signboard. Fig.11 is a schematic diagram of a substation measures inspection device based on an electronic signboard according to an embodiment of the present invention, such as Fig.11 As shown, the device includes: a first acquisition unit 1101, a second acquisition unit 1103, a determination unit 1105, a third acquisition unit 1107 and a fourth acquisition unit 1109. The substation measures inspection device based on the electronic signboard is described in detail below.
[0098] The first acquisition unit 1101 is used to acquire the current work ticket of the substation, wherein the current work ticket at least includes: work tasks, work equipment, and work objects for executing the work tasks.
[0099] The second acquisition unit 1103 is used to parse the current work ticket to obtain task information.
[0100] The determining unit 1105 is used to determine the working equipment that needs to perform the working task as the target working equipment based on the task information, and count the number of the target working equipment.
[0101] The third acquisition unit 1107 is used to obtain the number of first interaction information for the first inductive interaction with the electronic signboard installed at each target working device, and determine that the inspection task of the substation is completed when the number of first interaction information is the same as the number of devices, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the inspection task of the target working device is completed, and the inspection task is the task of inspecting the target working equipment before executing the work task.
[0102] The fourth acquisition unit 1109 is used to obtain the number of second interaction information for the second inductive interaction with each electronic signboard, and when the number of second interaction information is the same as the number of devices, determine that the acceptance task of the substation is completed, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the acceptance task of the target working equipment is completed, and the acceptance task is the task of accepting the target working equipment after executing the working task.
[0103] It should be noted here that the above-mentioned first acquisition unit 1101, second acquisition unit 1103, determination unit 1105, third acquisition unit 1107 and fourth acquisition unit 1109 correspond to steps S202 to S210 in the above-mentioned embodiments, and the five units are the same as the instances and application scenarios implemented by the corresponding steps, but are not limited to the contents disclosed in the above-mentioned embodiments.
[0104] As can be seen from the above, in the scheme recorded in the above-mentioned embodiment of the present invention, the first acquisition unit can be used to acquire the current work ticket of the substation, wherein the current work ticket includes at least: work tasks, work equipment, and work objects for performing the work tasks; then the second acquisition unit is used to parse the current work ticket to obtain task information; then the determination unit is used to determine that the work equipment to perform the work task is the target work equipment based on the task information, and the number of devices of the target work equipment is counted; finally, the third acquisition unit can be used to acquire the number of first interaction information for the first inductive interaction with the electronic signboard installed at each target work equipment, and when the number of first interaction information is the same as the number of devices, it is determined that the execution of the inspection task for the substation is completed, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the execution of the inspection task of the target work equipment is completed, and the inspection task is the inductive interaction with the target work equipment before executing the work task. The task of inspecting working equipment; the fourth acquisition unit can also be used to obtain the number of second interactive information for the second inductive interaction with each electronic signboard, and when the number of second interactive information is the same as the number of equipment, it is determined that the execution of the acceptance task of the substation is completed, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the acceptance task of the target working equipment is completed, and the acceptance task is the task of accepting the target working equipment after the execution of the work task, which achieves the purpose of transmitting the task information parsed from the work ticket to the electronic signboard for display, and monitoring the inspection progress through the interactive information with the electronic signboard, realizing the technical effect of using the electronic signboard to display the task information of the working equipment, and monitoring the process status of the working equipment inspection by interactively punching in with the electronic signboard, reducing the workload and complexity of the staff and improving the work efficiency of the staff.
[0105] Therefore, the technical solution provided by the above-mentioned embodiment of the present invention solves the technical problem that the hanging and removing of the substation signboard in the related technology is time-consuming and labor-intensive, and the instructions are unclear, which affects the work efficiency of the substation staff.
[0106] Optionally, the second acquisition unit includes: a first acquisition module, used to parse the current work ticket to obtain work tasks, work equipment and work objects for executing the work tasks; a second acquisition module, used to obtain task information based on the work tasks, work equipment and work objects when the number of work tasks, work equipment and work objects are all one; a first determination module, used to determine multiple correspondences between work tasks, work equipment and work objects when the number of any one of the work tasks, work equipment and work objects is multiple; a second determination module, used to determine multiple pieces of task information based on multiple correspondences.
[0107] Optionally, the determination unit includes: a third acquisition module, used to obtain the device identification of the working device in the task information; and a third determination module, used to determine that the working device corresponding to the device identification is the target working device.
[0108] Optionally, the substation measures inspection device based on the electronic signboard also includes: a first switching unit, which is used to switch the status mark of the target working equipment from the first mark to the second mark after a first inductive interaction with the electronic signboard, so that the electronic signboard displays the words "working here" and the task information that needs to be performed at the target working equipment in the current work ticket, wherein the status mark is used to mark whether the inspection task of the target working equipment has been completed, the first mark indicates that the inspection task of the target working equipment has not been completed, the second mark indicates that the inspection task of the target working equipment has been completed, and the words "working here" indicate that the target working equipment is in operation and needs to execute the work task.
[0109] Optionally, the substation measures inspection device based on the electronic signboard also includes: a second switching unit, which is used to switch the status mark of the target working equipment from the second mark to the first mark after a second inductive interaction with the electronic signboard, so that the electronic signboard does not display the words "this work" and the task information that needs to be performed at the target working equipment in the current work ticket.
[0110] Optionally, the substation measures inspection device based on electronic signboard also includes: a first generating unit, which is used to generate a first pop-up window information indicating that the inspection of all target working equipment in the substation is completed after determining that the inspection task of the substation is completed, so as to prompt the work object to go to the target working equipment to perform the work task; a second generating unit, which is used to generate a second pop-up window information indicating that the acceptance of all target working equipment in the substation is completed after determining that the acceptance task of the substation is completed, so as to prompt the current work ticket to be settled.
[0111] Optionally, the display screen of the electronic signboard adopts an ink screen.
[0112] According to another aspect of an embodiment of the present invention, a substation measures inspection system based on an electronic signboard is further provided. The substation measures inspection system based on an electronic signboard uses any of the above-mentioned substation measures inspection methods based on an electronic signboard.
[0113] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is further provided, the computer-readable storage medium comprising a stored program, wherein the program executes any one of the above-mentioned substation measures inspection methods based on electronic signboards.
[0114] Optionally, in this embodiment, the computer-readable storage medium may be located in any one of the computer terminals in a computer terminal group in a computer network, or in any one of the communication devices in a communication device group.
[0115] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: obtaining a current work ticket of the substation, wherein the current work ticket includes at least: a work task, work equipment, and a work object for performing the work task; parsing the current work ticket to obtain task information; determining that the work equipment to perform the work task is the target work equipment based on the task information, and counting the number of devices of the target work equipment; obtaining the number of first interaction information for the first inductive interaction with the electronic signboard mounted at each target work equipment, and determining that the inspection task of the substation is completed when the number of first interaction information is the same as the number of devices, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the inspection task of the target work equipment is completed, and the inspection task is the task of inspecting the target work equipment before performing the work task; obtaining the number of second interaction information for the second inductive interaction with each electronic signboard, and determining that the acceptance task of the substation is completed when the number of second interaction information is the same as the number of devices, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the acceptance task of the target work equipment is completed, and the acceptance task is the task of accepting the target work equipment after performing the work task.
[0116] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: parsing the current work ticket to obtain work tasks, work equipment, and work objects for performing the work tasks; when the number of work tasks, work equipment, and work objects is one, obtaining task information based on the work tasks, work equipment, and work objects; when the number of any one of the work tasks, work equipment, and work objects is multiple, determining multiple correspondences between the work tasks, work equipment, and work objects; and determining multiple pieces of task information based on the multiple correspondences.
[0117] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: obtaining a device identification of a working device in the task information; and determining that a working device corresponding to the device identification is a target working device.
[0118] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: after a first inductive interaction with the electronic signboard, switching the status mark of the target working equipment from a first mark to a second mark, so that the electronic signboard displays the words "working here" and the task information that needs to be performed at the target working equipment in the current work ticket, wherein the status mark is used to mark whether the inspection task for the target working equipment has been completed, the first mark indicates that the inspection task for the target working equipment has not been completed, the second mark indicates that the inspection task for the target working equipment has been completed, and the words "working here" indicate that the target working equipment is in operation and needs to perform a work task.
[0119] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for performing the following steps: after a second inductive interaction with the electronic signboard, switching the status mark of the target work equipment from the second mark to the first mark so that the electronic signboard does not display the words "this work" and the task information that needs to be performed at the target work equipment in the current work ticket.
[0120] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: after determining that the inspection task of the substation is completed, generating a first pop-up window information indicating that the inspection of all target working equipment in the substation is completed, so as to prompt the work object to perform the work task at the target working equipment; after determining that the acceptance task of the substation is completed, generating a second pop-up window information indicating that the acceptance of all target working equipment in the substation is completed, so as to prompt the current work ticket to be settled.
[0121] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: the display screen of the electronic signboard adopts an ink screen.
[0122] According to another aspect of an embodiment of the present invention, a processor is further provided, and the processor is used to run a program, wherein when the program is run, any one of the above-mentioned substation measure inspection methods based on electronic signboards is executed.
[0123] According to another aspect of an embodiment of the present invention, a computer program product is provided, comprising computer instructions, which, when executed by a processor, execute any one of the above-mentioned substation measures inspection methods based on electronic signboards.
[0124] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0125] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0126] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0127] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0128] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0129] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk, etc. Various media that can store program codes.
[0130] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A substation measures inspection method based on electronic signboards, characterized in that: include: Obtaining a current work ticket of the substation, wherein the current work ticket at least includes: a work task, work equipment, and a work object for performing the work task; Parse the current work ticket to obtain task information; Determine the working device required to perform the working task as the target working device based on the task information, and count the number of the target working devices; Obtain the number of first interaction information for the first inductive interaction with the electronic signboard installed at each of the target working devices, and when the number of the first interaction information is the same as the number of the devices, determine that the execution of the inspection task for the substation is completed, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the execution of the inspection task of the target working device is completed, and the inspection task is a task of inspecting the target working device before executing the working task; Obtaining the number of second interaction information for the second inductive interaction with each of the electronic signboards, and determining that the execution of the acceptance task for the substation is completed when the number of the second interaction information is the same as the number of the devices, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the execution of the acceptance task of the target working equipment is completed, and the acceptance task is the task of accepting the target working equipment after executing the working task; The substation measures inspection method also includes: after a first inductive interaction with the electronic signboard, switching the status mark of the target working equipment from the first mark to the second mark, so that the electronic signboard displays the words "working here" and the task information to be performed at the target working equipment in the current work ticket, wherein the status mark is used to mark whether the inspection task for the target working equipment has been completed, the first mark indicates that the inspection task for the target working equipment has not been completed, the second mark indicates that the inspection task for the target working equipment has been completed, and the words "working here" indicate that the target working equipment is in operation and needs to perform the work task; After a second inductive interaction with the electronic signboard, the status mark of the target work equipment is switched from the second mark to the first mark so that the electronic signboard does not display the words "Working Here" and the task information in the current work ticket that needs to be performed at the target work equipment.
2. The substation measures inspection method based on electronic signboard according to claim 1 is characterized in that: The current work ticket is parsed to obtain parsing results, including: Parse the current work ticket to obtain the work task, the work equipment and the work object for executing the work task; In a case where the number of the work task, the work equipment and the work object is one, obtaining the task information according to the work task, the work equipment and the work object; In the case where the number of any one of the work tasks, the work equipment and the work objects is plural, determining multiple corresponding relationships among the work tasks, the work equipment and the work objects; A plurality of pieces of the task information are determined according to the plurality of corresponding relationships.
3. The substation measures inspection method based on electronic signboard according to claim 1 is characterized in that: Determining the working device that needs to perform the working task as the target working device based on the task information includes: Obtaining the device identification of the working device in the task information; The working device corresponding to the device identifier is determined to be the target working device.
4. The substation measures inspection method based on electronic signboard according to claim 1 is characterized in that: After determining that the inspection task of the substation is completed, the method further includes: Generate a first pop-up window message indicating that the inspection of all the target working equipment in the substation is completed, so as to prompt the working object to perform the working task at the target working equipment; After determining that the acceptance task of the substation is completed, the method further includes: Generate a second pop-up window message indicating that the acceptance of all the target working equipment in the substation is completed, so as to prompt the closing of the current work ticket.
5. The substation measures inspection method based on electronic signboard according to any one of claims 1 to 4, characterized in that: The display screen of the electronic signboard adopts an ink screen.
6. A substation measures inspection device based on electronic signboard, characterized in that: include: A first acquisition unit is used to acquire a current work ticket of the substation, wherein the current work ticket at least includes: a work task, a work equipment, and a work object for executing the work task; A second acquisition unit is used to parse the current work ticket to obtain task information; a determination unit, configured to determine, based on the task information, the working device required to perform the working task as a target working device, and to count the number of the target working devices; A third acquisition unit is used to acquire the number of first interaction information for the first inductive interaction with the electronic signboard installed at each of the target working devices, and determine that the inspection task of the substation is completed when the number of the first interaction information is the same as the number of the devices, wherein the first inductive interaction is the inductive interaction with the electronic signboard after the inspection task of the target working device is completed, and the inspection task is the task of inspecting the target working device before executing the working task; A fourth acquisition unit is used to acquire the number of second interaction information for the second inductive interaction with each of the electronic signboards, and determine that the execution of the acceptance task for the substation is completed when the number of the second interaction information is the same as the number of the devices, wherein the second inductive interaction is the inductive interaction with the electronic signboard after the execution of the acceptance task of the target working equipment is completed, and the acceptance task is the task of accepting the target working equipment after executing the working task; The substation measures inspection device also includes: a first switching unit, which is used to switch the status mark of the target working equipment from the first mark to the second mark after a first inductive interaction with the electronic signboard, so that the electronic signboard displays the words "working here" and the task information to be performed at the target working equipment in the current work ticket, wherein the status mark is used to mark whether the inspection task for the target working equipment has been completed, the first mark indicates that the inspection task for the target working equipment has not been completed, the second mark indicates that the inspection task for the target working equipment has been completed, and the words "working here" indicate that the target working equipment is in operation and needs to execute the work task; A second switching unit is used to switch the status mark of the target working equipment from the second mark to the first mark after a second inductive interaction with the electronic signboard, so that the electronic signboard does not display the words "working here" and the task information in the current work ticket that needs to be performed at the target working equipment.
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein the program executes the substation measures inspection method based on electronic signboards as described in any one of claims 1 to 5.
8. A computer program product comprising computer instructions, characterized in that: When the computer instructions are executed by the processor, the substation measures inspection method based on electronic signboards as described in any one of claims 1 to 5 is performed.
Citation Information
Patent Citations
A system and method of wind farm safety management
CN112054599A
Smart screen linkage method, device and system for reducing cross operation risk
CN114266543A
Wind power plant work ticket point inspection method and system based on image text recognition
CN114708597A