Wet treatment process for purifying fluoride tail gas of electroslag furnace

Through the wet treatment process, including the combination of cyclone dust collector, cartridge dust collector and spray tower, the problems of poor hydrogen fluoride treatment effect and difficulty in cleaning the filter plate in the purification of electroslag furnace tail gas are solved, achieving efficient purification of tail gas and reducing noise reduce.

CN118718633AInactive Publication Date: 2024-10-01BOTOU XINKE ENVIRONMENTAL PROTECTION EQUIP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410885567.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing electroslag furnace exhaust gas purification technology has poor mixing effect of hydrogen fluoride and clarified lime water, resulting in poor reaction effect, and the lack of cleaning structure of the filter plate leads to inconvenient clogging. Especially when the exhaust gas volume is large, the hydrogen fluoride treatment effect is poor, and the absorption after impact is The stability of the reaction tower.

Method used

Wet treatment process is adopted, including cyclone dust collector, cartridge dust collector and spray tower. Through two particle filtration and spray absorption treatments, the stability in the spray tower is ensured, and through multi-layer packing layers and spray racks To achieve effective absorption of fluoride, combine the collection tank and absorbent tank for cleaning.

Benefits of technology

It achieves near-complete purification of the electroslag furnace exhaust gas, reduces noise, ensures the stability of the spray tower, and simplifies the equipment cleaning process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118718633A_ABST
    Figure CN118718633A_ABST
Patent Text Reader

Abstract

The invention discloses a wet treatment process for purifying fluoride tail gas of an electroslag furnace, which comprises the following steps: firstly, introducing tail gas generated in the electroslag furnace into a cyclone dust collector through a flue gas inlet pipe to filter particulate matters for the first time; then, the tail gas treated by the cyclone dust collector is guided into a filter cartridge dust collector through a primary filtering gas guide pipe for secondary particulate matter filtering; and then the tail gas of which the particulate matters are separated by the filter cartridge dust remover is conveyed into a spray tower through a fan and a pipeline, the tail gas containing fluoride is subjected to spray absorption treatment, and finally clean gas of which the fluoride is removed is discharged into the atmosphere. When the fluoride tail gas of the electroslag furnace is absorbed and removed, firstly, particulate matters are removed twice, so that the stability of a subsequent spray tower is ensured, and impurities introduced into the spray tower are prevented from being difficult to clean; in addition, through a wet spraying mode, the fluoride tail gas of the electroslag furnace is effectively absorbed, and the treatment effect of almost complete absorption is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electroslag furnace tail gas treatment, and in particular to a wet treatment process for purifying fluoride tail gas from an electroslag furnace. Background Art

[0002] The electroslag furnace is a special smelting equipment that uses the heat energy generated by the remelting current to melt the consumable electrode inserted into the slag pool. After the molten metal droplets are cleaned by the slag liquid, they are crystallized into electroslag ingots in a water-cooled crystallizer. Due to the de-inclusion effect of the slag liquid and good crystallization conditions, the electroslag remelted metal has good purity, fine and uniform cast structure, no white spots and annual ring-shaped segregation, extremely low sulfur content, fine and dispersed inclusions and other excellent properties. The electroslag furnace is needed for refining mold steel. The large amount of fluorine-containing flue gas generated during the production process of the electroslag furnace will pollute the atmospheric environment.

[0003] The existing patent document CN216935452U discloses an exhaust gas treatment device for an electroslag furnace, in which dust particles in the flue gas are filtered through a filter plate, and the fluorine gas enters the inner cavity of a water storage tank through a connecting pipe, reacts with the water flow in the inner cavity of the water storage tank to form hydrogen fluoride, and the treated hydrogen fluoride enters the inner cavity of a liquid storage tank through a guide pipe, reacts with the clarified lime water in the inner cavity of the liquid storage tank to generate non-toxic calcium fluoride precipitate, and the fluorine gas is discharged after being treated to reduce pollution to the environment.

[0004] Based on the search of the above patents and in combination with the electric slag furnace in the prior art, it was found that although the above electric slag furnace can purify the exhaust gas when in use, its mixing effect on hydrogen fluoride and clarified lime water is poor, resulting in poor reaction effect, and the filter plate lacks a cleaning structure, which makes it inconvenient to clean it when blockage occurs.

[0005] Based on this, patent application No. CN202321513934.6 discloses an electric slag furnace, including a furnace body, a filter box, a water tank, a mixing box, a filter component for filtering impurities in exhaust gas, and a mixing component for purifying exhaust gas, the filter component including a filter plate arranged in the filter box, movable grooves respectively opened on both sides of the filter box, a movable block arranged in the movable groove, a cleaning brush arranged between the two movable blocks, a screw connected to the movable block, and a driving component for moving the cleaning brush. The utility model solves the problem that although the existing electric slag furnace can purify the exhausted gas, it has a poor mixing effect on hydrogen fluoride and clarified lime water, resulting in poor reaction effect, and the filter plate lacks a cleaning structure, which is inconvenient to clean when blockage occurs.

[0006] However, in the prior art, in actual applications, when the amount of tail gas from the electroslag furnace is large, the conventional treatment method for hydrogen fluoride is less effective, and a large amount of hydrogen fluoride gas still escapes; in addition, there are more particulate matter in the tail gas of the electroslag furnace. If the tail gas is not treated first and directly absorbed, it will also affect the stability of the post-absorption reaction tower. Summary of the invention

[0007] The purpose of the present invention is to provide a wet treatment process for purifying fluoride tail gas from an electroslag furnace, so as to solve the problem that the conventional treatment effect for purifying fluoride tail gas from an electroslag furnace is not ideal.

[0008] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0009] The present invention provides a wet treatment process for purifying fluoride tail gas from an electroslag furnace, comprising the following steps:

[0010] First, the tail gas generated in the electroslag furnace is introduced into the cyclone dust collector through the flue gas inlet pipe for the first particulate matter filtration;

[0011] Then, the exhaust gas treated by the cyclone dust collector is introduced into the cartridge dust collector through a primary filter air duct for a second particulate matter filtration;

[0012] Then, the tail gas separated from the particles by the cartridge dust collector is transported to the spray tower through the fan and pipeline, and the tail gas containing fluoride is sprayed and absorbed, and finally the clean gas without fluoride is discharged into the atmosphere;

[0013] The spray tower comprises a tower body, multiple packing layers arranged in the tower body, spray racks respectively located above the packing layers, and an absorbent box, a delivery pump and a delivery pipe for providing absorbent to the spray rack.

[0014] Furthermore, a primary filtering discharge valve is provided at the bottom of the discharge bin of the cyclone dust collector.

[0015] Furthermore, a secondary filtration discharge valve is provided at the bottom of the discharge bin of the cartridge dust collector.

[0016] Furthermore, the air outlet of the cartridge dust collector is connected to the fan through a secondary filtration air duct, and the air outlet of the fan is transported to the spray tower through a delivery pipe.

[0017] Furthermore, the tail gas containing fluoride enters the spray tower from below the bottom packing layer.

[0018] Furthermore, a plurality of manholes are provided on the side wall of the tower body, and the manholes are located between the packing layer and the spray rack.

[0019] Furthermore, the bottom of the tower body is a liquid collecting tank, and the liquid collecting tank is connected to the absorbent box.

[0020] Compared with the prior art, the beneficial technical effects of the present invention are:

[0021] In the present invention, when absorbing and removing the fluoride tail gas of the electroslag furnace, the particulate matter is first removed twice, thereby ensuring the stability of the subsequent spray tower and preventing the introduction of impurities into the spray tower, which is difficult to clean; in addition, the present application uses a wet spraying method to effectively absorb and treat the fluoride tail gas of the electroslag furnace, achieving a nearly complete treatment effect; and the operating noise of the equipment of the present invention is significantly reduced compared with the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention will be further described below in conjunction with the accompanying drawings.

[0023] Figure 1 It is a schematic diagram of the main process equipment of the wet treatment process for purifying fluoride tail gas from an electroslag furnace according to the present invention;

[0024] Figure 2 The present invention is a schematic diagram of a spray tower for a wet treatment process for purifying fluoride tail gas from an electroslag furnace.

[0025] Explanation of the reference numerals: 1. Cyclone dust collector; 101. Flue gas inlet pipe; 102. Primary filter discharge valve; 103. Primary filter air duct; 2. Cartridge dust collector; 201. Secondary filter discharge valve; 3. Fan; 301. Secondary filter air duct; 302. Delivery pipe; 4. Spray tower; 401. Inlet pipe; 402. Packing layer; 403. Manhole; 404. Spray rack; 405. Exhaust port; 406. Absorbent box; 407. Delivery pump; 408. Delivery pipe; 5. Chimney. DETAILED DESCRIPTION

[0026] This embodiment discloses a wet treatment process for purifying fluoride tail gas from an electroslag furnace, comprising the following steps:

[0027] First, the tail gas generated in the electroslag furnace is introduced into the cyclone dust collector 1 through the flue gas inlet pipe 101 for the first particulate matter filtration;

[0028] Then, the exhaust gas treated by the cyclone dust collector 1 is introduced into the cartridge dust collector 2 through the primary filter air guide pipe 103 for secondary particulate matter filtration;

[0029] The tail gas from which particulate matter is separated by the cartridge dust collector 2 is then transported to the spray tower 4 through the fan 3 and the pipeline, where the tail gas containing fluoride is sprayed and absorbed, and finally the clean gas without fluoride is discharged into the atmosphere. Specifically, the clean air is discharged through the chimney.

[0030] In this embodiment, the spray tower 4 includes a tower body, two packing layers 402 installed in the tower body, spray racks 404 respectively located above the packing layers 402, and an absorbent box 406, a delivery pump 407 and a delivery pipe 408 for providing absorbent to the spray racks 404; wherein the packing layer is a porous structure, and the specific type of packing is not limited.

[0031] In this embodiment, a primary filtration discharge valve 102 is installed at the bottom of the discharge bin of the cyclone dust collector 1 for regularly discharging the first filtered particulate matter.

[0032] In this embodiment, a secondary filtration discharge valve 201 is installed at the bottom of the discharge bin of the cartridge dust collector 2, which is used to regularly discharge the second filtered particulate matter.

[0033] In the present embodiment, the air outlet of the cartridge dust collector 2 is connected to the fan 3 via the secondary filtration air duct 301, and the air outlet of the fan 3 is transported to the spray tower 4 via the delivery pipe 302; specifically, the fluoride-containing exhaust gas enters the spray tower 4 from below the bottom packing layer 402, so as to facilitate sufficient absorption treatment with the absorbent in the spray tower 4.

[0034] Specific absorption principle:

[0035] HF+XOH=XF+H2O

[0036] Wherein XF is a water-soluble salt.

[0037] In this embodiment, a plurality of manholes 403 are provided on the side wall of the tower body, and the manholes 403 are located between the packing layer 402 and the spray rack 404;

[0038] The bottom of the tower body can be entered through the manhole 403 at the lowest level to clean the precipitated XF crystals at the bottom.

[0039] In this embodiment, the bottom of the tower body is a liquid collecting tank, which is connected to the absorbent tank 406 or recycled through a pipeline and a pump;

[0040] It is necessary to regularly replenish the XOH solution to the absorbent tank 406;

[0041] In this embodiment, the absorbent box 406 , the delivery pump 407 and the delivery pipe 408 are all made of corrosion-resistant materials.

[0042] In this embodiment, the AVIC Equipment Testing Center also conducted a comparison of the test data before and after installation:

[0043] Among them, the existing equipment is used for the detection of electroslag furnace tail gas treatment:

[0044] Fluoride: 0.35 mg / m 3 ; Particles: 1.9mg / m 3 ; The noise is 71.5dB(A).

[0045] The equipment of the present invention detects the tail gas treatment of the electroslag furnace:

[0046] Fluoride: 0.07 mg / m 3 ; Particles: 1.9mg / m 3 ; The noise is 62.6dB(A).

[0047] The above embodiments are only descriptions of the preferred methods of the invention, and are not intended to limit the scope of the invention. Without departing from the design spirit of the invention, various modifications and improvements made to the technical solutions of the invention by ordinary technicians in this field should fall within the protection scope of the claims of the invention.

Claims

1. A wet treatment process for purifying fluoride tail gas from an electroslag furnace, characterized in that: The steps include: First, the tail gas generated in the electroslag furnace is introduced into the cyclone dust collector (1) through the flue gas inlet pipe (101) for the first particulate matter filtration; Then, the exhaust gas treated by the cyclone dust collector (1) is introduced into the cartridge dust collector (2) through the primary filtering air guide pipe (103) for secondary particulate matter filtration; The tail gas from which the particles are separated by the filter cartridge dust collector (2) is then transported to a spray tower (4) through a fan (3) and a pipeline, where the tail gas containing fluoride is sprayed and absorbed, and finally the clean gas without fluoride is discharged into the atmosphere; The spray tower (4) comprises a tower body, a plurality of packing layers (402) arranged in the tower body, spray racks (404) respectively located above the packing layers (402), and an absorbent box (406) for providing absorbent to the spray rack (404), a delivery pump (407) and a delivery pipe (408).

2. The wet treatment process for purifying fluoride tail gas from an electroslag furnace according to claim 1, characterized in that: A primary filtering discharge valve (102) is provided at the bottom of the discharge bin of the cyclone dust collector (1).

3. The wet treatment process for purifying fluoride tail gas from an electroslag furnace according to claim 1, characterized in that: A secondary filtration discharge valve (201) is provided at the bottom of the discharge bin of the cartridge dust collector (2).

4. The wet treatment process for purifying fluoride tail gas from an electroslag furnace according to claim 3, characterized in that: The air outlet of the cartridge dust collector (2) is connected to the fan (3) via a secondary filtration air guide pipe (301), and the air outlet of the fan (3) is transported to the spray tower (4) via a transport pipe (302).

5. The wet treatment process for purifying fluoride tail gas from an electroslag furnace according to claim 4, characterized in that: The tail gas containing fluoride enters the spray tower (4) from below the bottom packing layer (402).

6. The wet treatment process for purifying fluoride tail gas from an electroslag furnace according to claim 1, characterized in that: A plurality of manholes (403) are provided on the side wall of the tower body, and the manholes (403) are located between the packing layer (402) and the spray rack (404).

7. The wet treatment process for purifying fluoride tail gas from an electroslag furnace according to claim 1, characterized in that: The bottom of the tower body is a liquid collecting tank, and the liquid collecting tank is connected to the absorbent box (406).

Citation Information

Patent Citations

  • Exhaust treatment device for electroslag furnace

    CN216935452U

  • Electroslag furnace

    CN220116629U

  • Combined type package unit and method for treating solid waste incineration waste gas

    CN106621748A

  • Rare earth molten salt electrolysis tail gas treatment system

    CN216856165U

  • Graphite purification tail gas treatment device

    CN219744423U