Steel pipe welding processing technology
Through the use of docking auxiliary parts and adjustment components, the concentric alignment of the steel pipe and multiple welding adjustments are achieved, the problem of joint tilt during the steel pipe welding process is solved, fast and high-quality welding is achieved, and the welding quality is ensured through subsequent processing. and time efficiency.
Patent Information
- Application Number
- CN202411070131.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the welding process of existing steel pipes, due to the heavy weight of the pipes and uneven support, the joints tilt, which affects the welding quality, makes it impossible to achieve fast and convenient butt welding, and makes it difficult to shorten the welding time.
Use docking auxiliary parts to align the steel pipe concentrically through the docking snap ring and adjustment assembly, perform cutting, drying, first and second welding, and ensure welding quality through rotational adjustment and non-destructive testing, and finally perform anti-corrosion through electroplating or hot plating deal with.
It realizes fast and convenient steel pipe butt welding, ensures the welding quality, greatly shortens the welding time, avoids welding quality problems caused by joint tilt, and facilitates the steel pipe welding work.
Smart Images

Figure CN118720499A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel pipe welding, in particular to a steel pipe welding process. Background Art
[0002] Steel pipe is a steel material with a hollow cross section, whose length is much greater than the diameter or circumference. According to the cross-sectional shape, it is divided into round, square, rectangular and special-shaped steel pipes; according to the material, it is divided into carbon structural steel pipe, low alloy structural steel pipe, alloy steel pipe and composite steel pipe; according to the use, it is divided into steel pipes for pipelines, engineering structures, thermal equipment, petrochemical industry, machinery manufacturing, geological drilling, high-pressure equipment, etc. Welded steel pipe refers to a steel pipe with seams on the surface after steel strips or steel plates are bent and deformed into round, square and other shapes and then welded. Welded steel pipes have lower costs and higher production efficiency than seamless steel pipes, and the blanks used are steel plates or strips. Welded steel pipes have strong corrosion resistance in acidic environments. Steel pipes are divided into seamless steel pipes and welded steel pipes according to the production process. Seamless steel pipes have standard diameters and lengths during production, and their scope of application is not large. The length of the steel pipe cannot be adjusted according to actual needs. Generally, several seamless steel pipes are welded to customize the steel pipes required for the project.
[0003] In the existing steel pipe welding process, due to the heavy pipe and uneven support, the two pipe joints are tilted, which affects the welding quality. It is not possible to use butt-jointing auxiliary equipment to first assist the two pipes to be concentrically aligned horizontally during the welding process and then perform stable welding. It is impossible to achieve the purpose of fast and convenient pipe butt welding. It is impossible to ensure the welding quality of the steel pipe and greatly shorten the welding time, which brings great inconvenience to people's steel pipe welding work. Summary of the invention
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies in the prior art, the present invention provides a steel pipe welding processing technology, which solves the problem that in the prior steel pipe welding process, the two pipe joints are tilted due to the heavy pipe and uneven support, thereby affecting the welding quality. It is impossible to use butt-joint auxiliary equipment to first assist the two pipes to be concentrically horizontally aligned during the welding process and then perform stable welding, which cannot achieve the purpose of quickly and conveniently performing pipe butt welding, and it is impossible to achieve the problem that the welding quality of the steel pipe can be ensured while greatly shortening the welding time.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: A steel pipe welding process, specifically comprising the following steps:
[0008] S1. Pretreatment: Cut the groove of the steel pipe to be welded, remove dust and iron chips from the groove, and grind the concave and convex surface of the groove to keep the welding surface of the groove smooth and tidy, and the overall concave and convex error does not exceed 0.5-1mm. Heat it to 80-100℃ for drying, and then cool it naturally;
[0009] S2. Installation of butt joint auxiliary parts: The two butt joint clamps of the butt joint auxiliary parts are respectively mounted and clamped on the outer surfaces of the two steel pipes to be welded, and the butt joint clamps are fixed to the steel pipes through the fixing units on the butt joint clamps. Then, the adjustment components are operated to drive the two butt joint clamps to adjust the concentricity of the two steel pipes, and the grooves of the two steel pipes are fitted. By reading the horizontality display unit on the adjustment component, the concentricity adjustment of the two steel pipes is completed.
[0010] S3, first welding: weld the gap between the two pipes exposed from the butt joint auxiliary parts, weld back and forth 3-4 times;
[0011] S4, rotation adjustment: After the first welding is completed, release the fixing unit on the docking clamp, rotate the entire docking auxiliary component until the gap between the two steel pipes that are not welded is exposed, and then adjust the horizontal concentricity again. After the adjustment is completed, fix and lock it;
[0012] S5. Second welding: The second welding is to weld the unwelded gap of the pipeline, and weld back and forth 1-3 times. After welding, check the appearance, size and defects of the weld, and remove excess welding beads and spatters through a less turbine to avoid uneven welding. Then, perform non-destructive testing on the steel pipe;
[0013] S6. Post-treatment: The surface of the steel pipe is treated for corrosion by electroplating or hot-dip galvanizing to obtain the finished product.
[0014] Preferably, in step S1, the inclination of the groove of the steel pipe to be welded is maintained at 50-60°.
[0015] Preferably, the docking auxiliary parts in step S2 include two docking clips and an adjustment component, the adjustment component is installed between the two docking clips, and the adjustment component contains an adjustment structure capable of adjusting the height of the two docking clips, and the adjustment structure is also provided with a levelness detection display unit.
[0016] Preferably, when positioning and clamping the steel pipe to be welded in step S2, the gap between the grooves is maintained at 1-2 mm.
[0017] Preferably, in step S5, the flatness error of the welding point is made to be no more than 0.5-1 mm.
[0018] Preferably, the preheating temperature of the first welding in step S3 is 330-360° C., and the welding speed is 0.5-1 m / min.
[0019] Preferably, the preheating temperature of the second welding in step S5 is 250-330° C., and the welding speed is 0.5-1 m / min.
[0020] (III) Beneficial effects
[0021] The present invention provides a steel pipe welding process. Compared with the prior art, the present invention has the following beneficial effects: the steel pipe welding process specifically includes the following steps: S1, pre-treatment, S2, installation of butt joint auxiliary parts, S3, first welding, S4, rotation adjustment, S5, second welding, S6, post-treatment, which can achieve the purpose of quickly and conveniently butt welding of pipes by using butt joint auxiliary equipment, and then perform stable welding, and achieve the goal of greatly shortening the welding time while ensuring the welding quality of steel pipes, and well avoid the situation that the two pipe joints are tilted due to the heavy pipes and uneven support during the welding process of steel pipes, thereby affecting the welding quality, thereby greatly facilitating people's steel pipe welding work. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] See also Figure 1 The embodiment of the present invention provides four technical solutions: a steel pipe welding process, specifically including the following embodiments:
[0025] Example 1
[0026] A steel pipe welding process, specifically comprising the following steps:
[0027] S1. Pretreatment: Cut the groove of the steel pipe to be welded, remove dust and iron chips from the groove, and grind the concave and convex surface of the groove to keep the welding surface of the groove smooth and tidy, and the overall concave and convex error does not exceed 0.7mm. Heat it to 90℃ for drying, and then cool it naturally. The inclination of the groove of the steel pipe to be welded is maintained at 55°;
[0028] S2. Installation of docking auxiliary parts: The two docking clamps of the docking auxiliary parts are respectively sleeved and clamped on the outer surfaces of the two steel pipes to be welded, and the docking clamps are fixed to the steel pipes through the fixing units on the docking clamps, and then the adjustment components are operated to drive the two docking clamps to adjust the concentricity of the two steel pipes, and the grooves of the two steel pipes are fitted, and the concentricity adjustment of the two steel pipes is completed by reading the level display unit on the adjustment component. The docking auxiliary parts include two docking clamps and an adjustment component, the adjustment component is installed between the two docking clamps, and the adjustment component contains an adjustment structure capable of adjusting the height of the two docking clamps, and the adjustment structure is also provided with a level detection display unit, so that the gap between the grooves is maintained at 1.5 mm when the steel pipes to be welded are positioned and clamped;
[0029] S3, first welding: welding the gaps between the two pipes exposed from the butt joint auxiliary parts, welding back and forth 3 times, the preheating temperature of the first welding is 350℃, and the welding speed is 0.7m / min;
[0030] S4, rotation adjustment: After the first welding is completed, release the fixing unit on the docking clamp, rotate the entire docking auxiliary component until the gap between the two steel pipes that are not welded is exposed, and then adjust the horizontal concentricity again. After the adjustment is completed, fix and lock it;
[0031] S5. Second welding: The second welding is to weld the unwelded gap of the pipeline, and weld back and forth twice. After welding, check the appearance, size and defects of the weld, and remove excess welding beads and spatters through a less turbine to avoid uneven welding. Then, non-destructive testing is performed on the steel pipe to ensure that the flatness error of the welding point does not exceed 0.7mm. The preheating temperature for the second welding is 300℃, and the welding speed is 0.7m / min.
[0032] S6. Post-treatment: The surface of the steel pipe is treated for corrosion by electroplating or hot-dip galvanizing to obtain the finished product.
[0033] Example 2
[0034] A steel pipe welding process, specifically comprising the following steps:
[0035] S1. Pretreatment: Cut the groove of the steel pipe to be welded, remove dust and iron chips from the groove, and grind the concave and convex surface of the groove to keep the welding surface of the groove smooth and tidy, and the overall concave and convex error does not exceed 0.5mm. Heat it to 80℃ for drying, and then cool it naturally. The inclination of the groove of the steel pipe to be welded is kept at 50°;
[0036] S2. Installation of docking auxiliary parts: The two docking clamps of the docking auxiliary parts are respectively mounted and clamped on the outer surfaces of the two steel pipes to be welded, and the docking clamps are fixed to the steel pipes through the fixing units on the docking clamps, and then the adjustment components are operated to drive the two docking clamps to adjust the concentricity of the two steel pipes, and the grooves of the two steel pipes are fitted, and the concentricity adjustment of the two steel pipes is completed by reading the level display unit on the adjustment component. The docking auxiliary parts include two docking clamps and an adjustment component, and the adjustment component is installed between the two docking clamps, and the adjustment component contains an adjustment structure capable of adjusting the height of the two docking clamps, and the adjustment structure is also provided with a level detection display unit, so that the gap between the grooves is kept at 1mm when positioning and clamping the steel pipes to be welded;
[0037] S3, the first welding: welding the gaps between the two pipes exposed from the butt joint auxiliary parts, welding back and forth 4 times, the preheating temperature of the first welding is 330℃, and the welding speed is 0.5m / min;
[0038] S4, rotation adjustment: After the first welding is completed, release the fixing unit on the docking clamp, rotate the entire docking auxiliary component until the gap between the two steel pipes that are not welded is exposed, and then adjust the horizontal concentricity again. After the adjustment is completed, fix and lock it;
[0039] S5. Second welding: The second welding is to weld the unwelded gap of the pipeline, and weld back and forth once. After welding, check the appearance, size and defects of the weld, and remove excess welding beads and spatters through a less turbine to avoid uneven welding. Then, non-destructive testing is performed on the steel pipe to ensure that the flatness error of the welding point does not exceed 0.5mm. The preheating temperature for the second welding is 250℃, and the welding speed is 0.5m / min.
[0040] S6. Post-treatment: The surface of the steel pipe is treated for corrosion by electroplating or hot-dip galvanizing to obtain the finished product.
[0041] Example 3
[0042] A steel pipe welding process, specifically comprising the following steps:
[0043] S1. Pretreatment: Cut the groove of the steel pipe to be welded, remove the dust and iron filings on the groove, and grind the concave and convex surface of the groove to keep the welding surface of the groove smooth and tidy, and the overall concave and convex error does not exceed 1mm. Heat it to 100℃ for drying, and then cool it naturally. The inclination of the groove of the steel pipe to be welded is maintained at 60°;
[0044] S2. Installation of docking auxiliary parts: The two docking clamps of the docking auxiliary parts are respectively mounted and clamped on the outer surfaces of the two steel pipes to be welded, and the docking clamps are fixed to the steel pipes through the fixing units on the docking clamps, and then the adjustment components are operated to drive the two docking clamps to adjust the concentricity of the two steel pipes, and the grooves of the two steel pipes are fitted, and the concentricity adjustment of the two steel pipes is completed by reading the level display unit on the adjustment component. The docking auxiliary parts include two docking clamps and an adjustment component, and the adjustment component is installed between the two docking clamps, and the adjustment component contains an adjustment structure capable of adjusting the height of the two docking clamps, and the adjustment structure is also provided with a level detection display unit, so that the gap between the grooves is kept at 2mm when positioning and clamping the steel pipes to be welded;
[0045] S3, first welding: welding the gaps between the two pipes exposed from the butt joint auxiliary parts, welding back and forth 4 times, the preheating temperature of the first welding is 360℃, and the welding speed is 1m / min;
[0046] S4, rotation adjustment: After the first welding is completed, release the fixing unit on the docking clamp, rotate the entire docking auxiliary component until the gap between the two steel pipes that are not welded is exposed, and then adjust the horizontal concentricity again. After the adjustment is completed, fix and lock it;
[0047] S5. Second welding: The second welding is to weld the unwelded gap of the pipeline, and weld back and forth 3 times. After welding, check the appearance, size and defects of the weld, and remove excess welding beads and spatters through a less turbine to avoid uneven welding. Then, non-destructive testing is performed on the steel pipe to ensure that the flatness error of the welding point does not exceed 1mm. The preheating temperature for the second welding is 330℃ and the welding speed is 1m / min.
[0048] S6. Post-treatment: The surface of the steel pipe is treated for corrosion by electroplating or hot-dip galvanizing to obtain the finished product.
[0049] Example 4
[0050] A steel pipe welding process, specifically comprising the following steps:
[0051] S1. Pretreatment: Cut the groove of the steel pipe to be welded to remove dust and iron chips, and grind the concave and convex surface of the groove to keep the welding surface of the groove smooth and tidy, and the overall concave and convex error does not exceed 0.6mm. Heat it to 85℃ for drying, and then cool it naturally. The inclination of the groove of the steel pipe to be welded is maintained at 53°;
[0052] S2. Installation of docking auxiliary parts: The two docking clamps of the docking auxiliary parts are respectively sleeved and clamped on the outer surfaces of the two steel pipes to be welded, and the docking clamps are fixed to the steel pipes through the fixing units on the docking clamps, and then the adjustment components are operated to drive the two docking clamps to adjust the concentricity of the two steel pipes, and the grooves of the two steel pipes are fitted, and the concentricity adjustment of the two steel pipes is completed by reading the level display unit on the adjustment component. The docking auxiliary parts include two docking clamps and an adjustment component, the adjustment component is installed between the two docking clamps, and the adjustment component contains an adjustment structure capable of adjusting the height of the two docking clamps, and the adjustment structure is also provided with a level detection display unit, so that the gap between the grooves is maintained at 1.3 mm when the steel pipes to be welded are positioned and clamped;
[0053] S3, first welding: welding the gaps between the two pipes exposed from the butt joint auxiliary parts, welding back and forth 3 times, the preheating temperature for the first welding is 340℃, and the welding speed is 0.6m / min;
[0054] S4, rotation adjustment: After the first welding is completed, release the fixing unit on the docking clamp, rotate the entire docking auxiliary component until the gap between the two steel pipes that are not welded is exposed, and then adjust the horizontal concentricity again. After the adjustment is completed, fix and lock it;
[0055] S5. Second welding: The second welding is to weld the unwelded gap of the pipeline, and weld back and forth once. After welding, check the appearance, size and defects of the weld, and remove excess welding beads and spatters through a less turbine to avoid uneven welding. Then, non-destructive testing is performed on the steel pipe to ensure that the flatness error of the welding point does not exceed 0.6mm. The preheating temperature of the second welding is 280℃, and the welding speed is 0.6m / min.
[0056] S6. Post-treatment: The surface of the steel pipe is treated for corrosion by electroplating or hot-dip galvanizing to obtain the finished product.
[0057] In summary, the present invention can achieve the purpose of quickly and conveniently butting the pipelines by first assisting the two pipelines to be concentrically aligned horizontally during the welding process by adopting the butt-jointing auxiliary equipment, and then performing stable welding. It can ensure the welding quality of the steel pipes while greatly shortening the welding time, and can effectively avoid the situation in which the two pipeline joints are tilted due to the heavy pipelines and uneven support during the steel pipe welding process, thereby affecting the welding quality, thereby greatly facilitating people's steel pipe welding work.
[0058] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0059] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0060] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A steel pipe welding process, characterized in that: The specific steps include: S1. Pretreatment: Cut the groove of the steel pipe to be welded, remove dust and iron chips from the groove, and grind the concave and convex surface of the groove to keep the welding surface of the groove smooth and tidy, and the overall concave and convex error does not exceed 0.5-1mm. Heat it to 80-100℃ for drying, and then cool it naturally; S2. Installation of butt joint auxiliary parts: The two butt joint clamps of the butt joint auxiliary parts are respectively mounted and clamped on the outer surfaces of the two steel pipes to be welded, and the butt joint clamps are fixed to the steel pipes through the fixing units on the butt joint clamps. Then, the adjustment components are operated to drive the two butt joint clamps to adjust the concentricity of the two steel pipes, and the grooves of the two steel pipes are fitted. By reading the horizontality display unit on the adjustment component, the concentricity adjustment of the two steel pipes is completed. S3, first welding: weld the gap between the two pipes exposed from the butt joint auxiliary parts, weld back and forth 3-4 times; S4, rotation adjustment: After the first welding is completed, release the fixing unit on the docking clamp, rotate the entire docking auxiliary component until the gap between the two steel pipes that are not welded is exposed, and then adjust the horizontal concentricity again. After the adjustment is completed, fix and lock it; S5. Second welding: The second welding is to weld the unwelded gap of the pipeline, and weld back and forth 1-3 times. After welding, check the appearance, size and defects of the weld, and remove excess welding beads and spatters through a less turbine to avoid uneven welding. Then, perform non-destructive testing on the steel pipe; S6. Post-treatment: The surface of the steel pipe is treated for corrosion by electroplating or hot-dip galvanizing to obtain the finished product.
2. A steel pipe welding process according to claim 1, characterized in that: In the step S1, the inclination of the groove of the steel pipe to be welded is maintained at 50-60°.
3. A steel pipe welding process according to claim 1, characterized in that: In step S2, the docking auxiliary parts include two docking clasps and an adjustment component, the adjustment component is installed between the two docking clasps, and the adjustment component contains an adjustment structure capable of adjusting the height of the two docking clasps, and the adjustment structure is also provided with a levelness detection display unit.
4. A steel pipe welding process according to claim 1, characterized in that: When positioning and clamping the steel pipe to be welded in step S2, the gap between the grooves is maintained at 1-2 mm.
5. The steel pipe welding process according to claim 1, characterized in that: In step S5, the flatness error of the welding point is made to be no more than 0.5-1 mm.
6. A steel pipe welding process according to claim 1, characterized in that: The preheating temperature of the first welding in step S3 is 330-360° C., and the welding speed is 0.5-1 m / min.
7. The steel pipe welding process according to claim 1, characterized in that: The preheating temperature of the second welding in step S5 is 250-330° C., and the welding speed is 0.5-1 m / min.