Manufacturing process of light-weight ball neck connecting arm
Through the multi-step process, including the use of three-axis machining centers, CNC lathes and other equipment, the problem of high difficulty and high cost in the manufacturing process of lightweight ball neck joint arms has been solved, an efficient manufacturing process has been achieved, production costs have been reduced and Filled the market gap.
Patent Information
- Application Number
- CN202411023367.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-10-01
AI Technical Summary
In the existing technology, the manufacturing process of lightweight ball neck joint arms is difficult and costly, and there is a lack of effective production process solutions in China.
Adopting a multi-step process, including three-axis machining center, CNC lathe, welding machine, quenching machine tool, tempering machine tool, flaw detector, demagnetization machine, electroplating process, through milling large planes, punching surfaces, small planes, turning ball heads, Specific steps such as drilling pin holes are followed by step-by-step processing and processing of the workpiece to form a ball neck joint arm that meets technical requirements.
It effectively reduces the manufacturing difficulty and production cost of lightweight ball neck joint arms, fills the technical gap in the domestic market, and provides a set of efficient manufacturing processes.
Smart Images

Figure CN118720658A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vehicle parts manufacturing, and in particular to a manufacturing process for a lightweight ball neck connecting arm. Background Art
[0002] The ball-joint arm is a key component of the rear trailer system of SUV series passenger cars, and is mainly used to tow yachts, RVs, mountain bikes and other outdoor equipment. Compared with the symmetrical structure of traditional connecting rod products, the ball-joint arm has a special-shaped structure, which has higher technical content and production process difficulty.
[0003] There are relatively few manufacturing processes for this part in China. During the production process, our company has continuously explored and tested and developed the invention of this case, which reduces the difficulty of lightweight ball neck connecting arm and also reduces production costs. Summary of the invention
[0004] Based on the above description, the present invention provides a lightweight ball neck arm manufacturing process to solve the problems mentioned in the background technology.
[0005] The technical solution of the present invention to solve the above technical problems is as follows:
[0006] A lightweight ball neck arm manufacturing process comprises the following steps:
[0007] S1: Place the workpiece into the three-axis machining center and mill the large plane, typing surface, and small plane in sequence;
[0008] S2: Put the workpiece into the CNC lathe to turn the end face and ball head;
[0009] S3: Place the workpiece into a three-axis machining center and drill a pin hole;
[0010] S4: clamp the workpiece on the marking machine and engrave the QR code;
[0011] S5: Move the workpiece to the welding machine and weld the screws;
[0012] S6: moving the workpiece to a CNC quenching machine for surface quenching;
[0013] S7: moving the workpiece to a tempering machine for tempering heat treatment;
[0014] S8: clamp the workpiece on the flaw detector to magnetize and detect flaws;
[0015] S9: Place the workpiece on a demagnetizing machine for demagnetization and inspection;
[0016] S10: Pack the workpieces for rust prevention;
[0017] S11: Electroplate the workpiece and conduct appearance inspection;
[0018] S12: Pack the workpieces for rust prevention and store them in the warehouse.
[0019] Based on the above technical solution, the present invention can also be improved as follows.
[0020] Furthermore, the large plane milling in S1 includes the following steps:
[0021] A1: Used on three-axis machining centers Four-edge end mills for large planes and rough milling of large holes; center distance 142.4±1.5, parallelism 0.5 / D;
[0022] A2: Change Four-edge end mill for rough milling inner hole, size Hole depth 18.4±0.1, 27.7±0.1, bottom through hole
[0023] A3: Change Milling cutter milling large hole bottom surface Hole depth 29.7 (+0.07 / 0), bottom R2;
[0024] A4: Change Milling cutter rough milling large holes and inner holes, size Hole depth 18.4±0.1, 27.7±0.1, bottom through hole
[0025] A5: Change the chamfer of the hole of the 20×45° forming tool to 2.5±0.15×45°, 0.5±0.1×45°, and 1.2±0.1×45°;
[0026] A6: Change Twist drill and Twist drill bit for M4 and Chamfering of hole;
[0027] A7: Change The milling cutter mills two grooves on the large plane, with a depth of 1.7±0.05;
[0028] A8: Replace the ball-end milling cutter to fine-mill the water drop;
[0029] A9: Change Face milling cutter for fine milling of large flat surfaces;
[0030] A10: Change boring tool to fine bore the lower through hole size (+0.105 / +0.085);
[0031] A11: Change boring tool to fine bore the lower part of the large hole (+0.06 / +0.045);
[0032] A12: Change boring tool to fine bore the upper size of large hole (+0.09 / +0.07);
[0033] A13: Change Carbide drill bits for drilling through holes;
[0034] A14: Change Carbide reamer Through hole;
[0035] A15: Remove the workpiece, remove the burrs with a file, and check the processing dimensions.
[0036] Further, the milling of the typeface in S2 includes the following steps:
[0037] B1: For use on three-axis machining centers The milling cutter mills the typing surface, the distance from the typing surface to the center of the large hole is 56.5±0.3, the shortest distance between the inner wall of the large hole and the typing surface is 26.15±0.2, the angle is 40°±0.5°, and the roughness is Rz16;
[0038] B2: Remove the workpiece and remove the machining burrs with a file.
[0039] Further, the milling of the small surface in S1 includes the following steps:
[0040] C1: Used on three-axis machining centers The milling cutter roughly mills the small plane, thickness size: 38.05±0.1;
[0041] C2. Change The milling cutter mills the small plane, the theoretical thickness is 37.85, the small plane The range of surface profile is +0.01 / -0.04 / A.
[0042] C3: Change The chamfer size of the forming tool hole is 1±0.2×45°;
[0043] C4: Change Carbide drill bits for drilling through holes;
[0044] C5: Change Use carbide milling cutter to mill the countersunk hole with a depth of 1.85 (0 / -0.1);
[0045] C6: Change Carbide reamer Through hole;
[0046] C7: Change Carbide milling cutter mills elliptical holes with a depth of 4.35±0.05;
[0047] C8: Change Use carbide drill bit to drill 4-M4 thread bottom hole;
[0048] C9: Change Carbide drill for 4-M4 thread bottom hole, and Hole chamfer, chamfer size 0.5±0.2×45°, 0.2±0.1×45°;
[0049] C10: Change to M4 extrusion tap to tap 4-M4 threaded hole;
[0050] C11: Remove the workpiece, remove the burrs on the outer circle with a file, and check the processing dimensions.
[0051] Further, the ball head car in S2 includes the following steps:
[0052] D1: Use a tool to turn the end face and rough turn the front of the ball head on a CNC lathe. The top face diameter size and
[0053] D2: Tool change rough turning ball head rear dimensions: Ball neck size: 15.6±0.1, 32(+0.5 / 0), R4.2±0.1, R14.4±0.1;
[0054] D3: Tool change ball head size: (-0.05 / -0.39) SCS;
[0055] D4: Tool change and finishing ball neck size: (-0.05 / -0.2) SCS, theoretical size 15, min. 32, R4.8 (+0.2 / -0.18), R15 ± 0.5, roughness Rt16 SCS, Rz16, center distance 142.2 ± 1.5 SCFF, 143 ± 1.5 SCFF, center difference 14.7 ± 1.5 SCFF, ball center to end face 17.5 ± 1.5;
[0056] D5: Remove the workpiece, remove the burrs with a file, and check the processing dimensions.
[0057] Further, drilling the pin hole in S3 includes the following steps:
[0058] E1, used on three-axis machining center Use carbide drill to drill the pin hole on the back, depth 13.5 (+0.5 / 0);
[0059] E2, Change Chamfering of carbide drill pin holes;
[0060] E3. Change Carbide reamer (+0.075 / +0.03) pin hole, hole depth 12±1, roughness Rz25;
[0061] E4. Remove the workpiece and check the processing size and position Position angle 15°±1°.
[0062] Compared with the prior art, the technical solution of this application has the following beneficial technical effects:
[0063] This solution provides a set of manufacturing process flows and methods. By using existing three-axis machining tools, a ball neck joint that meets technical requirements can be quickly produced, effectively reducing the difficulty of lightweight ball neck joints and production costs, thus filling the gap in the domestic market. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Figure 1 A schematic structural diagram of a lightweight ball neck joint provided by an embodiment of the present invention;
[0065] Figure 2 for Figure 1 A schematic diagram of the structure from the back perspective;
[0066] Figure 3 for Figure 1 Schematic diagram of a cross-section diagram;
[0067] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0068] 1. Large plane; 2. Typing surface; 3. Small plane; 4. Ball head; 5. Water drop; 6. Large hole; 7. Inner hole; 8. Bottom through hole; 9. Groove. DETAILED DESCRIPTION
[0069] In order to facilitate understanding of the present application, the present application will be described more fully below with reference to the relevant drawings. Embodiments of the present application are provided in the drawings. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thorough and comprehensive.
[0070] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application.
[0071] It will be appreciated that spatial relationship terms such as "under," "beneath," "below," "under," "above," "above," etc., may be used herein to describe the relationship of an element or feature shown in the figures to other elements or features. It will be appreciated that, in addition to the orientations shown in the figures, spatial relationship terms also include different orientations of the device in use and operation. For example, if the device in the accompanying drawings is flipped, an element or feature described as "under other elements" or "under it" or "under it" will be oriented as being "above" the other elements or features. Thus, the exemplary terms "under" and "under" may include both upper and lower orientations. In addition, the device may also include additional orientations (e.g., rotated 90 degrees or other orientations), and the spatial descriptors used herein are interpreted accordingly.
[0072] It should be noted that when an element is considered to be "connected" to another element, it can be directly connected to the other element, or connected to the other element through an intermediate element. The "connection" in the following embodiments should be understood as "electrical connection", "communication connection", etc. if the connected circuits, modules, units, etc. have electrical signals or data transmission between each other.
[0073] When used herein, the singular forms "a", "an", and "said / the" may also include plural forms, unless the context clearly indicates otherwise. It should also be understood that the terms "include / comprise" or "have" etc. specify the presence of stated features, wholes, steps, operations, components, parts or combinations thereof, but do not exclude the possibility of the presence or addition of one or more other features, wholes, steps, operations, components, parts or combinations thereof.
[0074] A lightweight ball neck arm manufacturing process, such as Figure 1-3 The ball neck joint arm shown includes the following steps:
[0075] The following dimensions are in mm:
[0076] S1: Use a cart to move the workpiece to the three-axis machining center, put the workpiece into the three-axis machining center, and mill the large surface 1, the typing surface 2, and the small surface 3 in sequence;
[0077] S2: Put the workpiece into the CNC lathe, turn the end face and the ball head 4;
[0078] S3: Place the workpiece in a three-axis machining center to drill a pin hole, then move the workpiece to the burr area for further deburring, and use a file, a homemade scraper, sandpaper and other tools to remove the burrs on the workpiece surface;
[0079] S4: Move the workpiece to the laser marking machine, clamp the workpiece on the marking machine and engrave the QR code. The QR code position is correct, clear and identifiable without interference;
[0080] S5: Move the workpiece to the side of the welding machine and weld the screws; remove the workpiece and check the center distance dimensions 160±3, 59±3, 17±3 and the firmness of the welding;
[0081] S6: Move the workpiece to the CNC quenching machine for surface quenching, remove the workpiece, and check the quenching size and hardness;
[0082] S7: Move the workpiece to the tempering machine for tempering heat treatment, using an industrial baking oven and a special tempering carrier according to the tempering heat treatment operation standard requirements;
[0083] S8: Inspect the product according to the flaw detection inspection standard, clamp the workpiece on the flaw detector, magnetize it, and spray the flaw detection fluid for flaw detection to check the surface cracks of the workpiece;
[0084] S9: Place the workpiece on a demagnetizing machine for demagnetization and check the residual magnetism and cleanliness of the workpiece;
[0085] S10: transport the workpiece to the anti-rust packing area and perform anti-rust packing according to the anti-rust packing operation standards;
[0086] S11: transport the workpiece to the electroplating plant for electroplating and conduct appearance inspection;
[0087] S12: The workpieces are packaged for rust prevention and stored in the warehouse according to the rust prevention packing operation standards.
[0088] The milling of the large plane 1 in step S1 includes the following steps:
[0089] A1: Used on three-axis machining centers Four-edge end milling cutter mills large plane 1, rough mills large hole 6, center distance 142.4±1.5, parallelism 0.5 / D;
[0090] A2: Change Four-edge end mill rough milling inner hole 7, size Hole depth 18.4±0.1, 27.7±0.1, bottom through hole
[0091] A3: Change Milling cutter mills large hole 6 bottom plane Hole depth 29.7 (+0.07 / 0), bottom R2;
[0092] A4: Change The milling cutter roughly mills the large hole 6 and the inner hole 7, the size Hole depth 18.4±0.1, 27.7±0.1, bottom through hole
[0093] A5: Change the chamfer of the hole of the 20×45° forming tool to 2.5±0.15×45°, 0.5±0.1×45°, and 1.2±0.1×45°;
[0094] A6: Change Twist drill and Twist drill bit for M4 and Chamfering of hole;
[0095] A7: Change The milling cutter mills two grooves 9 on the large plane 1, with a depth of 1.7±0.05;
[0096] A8: Replace the ball head 4 milling cutter to fine mill the water drop 5;
[0097] A9: Change The face milling cutter fine mills the large plane 1;
[0098] A10: Boring tool replacement for fine boring of lower through hole 8 size (+0.105+0.085);
[0099] A11: Change boring tool to fine bore large hole 6 lower size (+0.06 / +0.045);
[0100] A12: Change boring tool to fine bore large hole 6 upper size (+0.09 / +0.07);
[0101] A13: Change Carbide drill bits for drilling through holes;
[0102] A14: Change Carbide reamer Through hole;
[0103] A15: Remove the workpiece, remove the burrs with a file, and check the processing dimensions.
[0104] The milling of the typeface 2 in step S1 includes the following steps:
[0105] B1: For use on three-axis machining centers The milling cutter mills the typing surface 2, the distance from the typing surface 2 to the center of the large hole 6 is 56.5±0.3, the shortest distance between the inner wall of the large hole 6 and the typing surface 2 is 26.15±0.2, the angle is 40°±0.5°, and the roughness is Rz16;
[0106] B2: Remove the workpiece and remove the machining burrs with a file.
[0107] The milling of the small surface 3 in step S1 includes the following steps:
[0108] C1: Used on three-axis machining centers The milling cutter roughly mills the small plane 3, thickness dimension: 38.05±0.1;
[0109] C2. Change The milling cutter mills the small plane 3, the theoretical thickness is 37.85, the small plane The range of surface profile is +0.01 / -0.04 / A.
[0110] C3: Change The chamfer size of the forming tool hole is 1±0.2×45°;
[0111] C4: Change Carbide drill bits for drilling through holes;
[0112] C5: Change Use carbide milling cutter to mill the countersunk hole with a depth of 1.85 (0 / -0.1);
[0113] C6: Change Carbide reamer Through hole;
[0114] C7: Change Carbide milling cutter mills elliptical holes with a depth of 4.35±0.05;
[0115] C8: Change Use carbide drill bit to drill 4-M4 thread bottom hole;
[0116] C9: Change Carbide drill for 4-M4 thread bottom hole, and Hole chamfer, chamfer size 0.5±0.2×45°, 0.2±0.1×45°;
[0117] C10: Change to M4 extrusion tap to tap 4-M4 threaded hole;
[0118] C11: Remove the workpiece, remove the burrs on the outer circle with a file, and check the processing dimensions.
[0119] Wherein, the step S2 of turning the ball head 4 includes the following steps:
[0120] D1: Use a tool to turn the end face and the front part of the ball head 4 on a CNC lathe. The top surface diameter size and
[0121] D2: Tool change rough turning ball head 4 rear dimensions: Ball neck size: 15.6±0.1, 32(+0.5 / 0), R4.2±0.1, R14.4±0.1;
[0122] D3: Tool change ball head 4 size: (-0.05 / -0.39) SCS;
[0123] D4: Tool change and finishing ball neck size: (-0.05 / -0.2) SCS, theoretical size 15, min. 32, R4.8 (+0.2 / -0.18), R15 ± 0.5, roughness Rt16 SCS, Rz16, center distance 142.2 ± 1.5 SCFF, 143 ± 1.5 SCFF, center difference 14.7 ± 1.5 SCFF, ball center to end face 17.5 ± 1.5;
[0124] D5: Remove the workpiece, remove the burrs with a file, and check the processing dimensions.
[0125] Wherein, drilling the pin hole in step S3 includes the following steps:
[0126] E1, used on three-axis machining center Use carbide drill to drill the pin hole on the back, depth 13.5 (+0.5 / 0);
[0127] E2, Change Chamfering of carbide drill pin holes;
[0128] E3. Change Carbide reamer (+0.075 / +0.03) pin hole, hole depth 12±1, roughness Rz25;
[0129] E4. Remove the workpiece and check the processing size and position Position angle 15°±1°
[0130] In order to improve efficiency, multiple three-axis machining centers can be prepared, corresponding to the tasks of milling large plane 1, milling type surface 2, and milling small plane 3. After completing a small step, the workpiece is moved to the three-axis machining center for the next step.
[0131] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A lightweight ball neck arm manufacturing process, It is characterized in that The following steps are involved: S1: Place the workpiece into the three-axis machining center and mill the large plane, typing surface, and small plane in sequence; S2: Put the workpiece into the CNC lathe to turn the end face and ball head; S3: Place the workpiece into a three-axis machining center and drill a pin hole; S4: clamp the workpiece on the marking machine and engrave the QR code; S5: Move the workpiece to the welding machine and weld the screws; S6: moving the workpiece to a CNC quenching machine for surface quenching; S7: moving the workpiece to a tempering machine for tempering heat treatment; S8: clamp the workpiece on the flaw detector to magnetize and detect flaws; S9: Place the workpiece on a demagnetizing machine for demagnetization and inspection; S10: Pack the workpieces for rust prevention; S11: Electroplate the workpiece and conduct appearance inspection; S12: Pack the workpieces for rust prevention and store them in the warehouse.
2. A lightweight ball neck joint manufacturing process according to claim 1, It is characterized in that Milling of large surface in S1 includes the following steps: A1: Used on three-axis machining centers Four-edge end mills for large planes and rough milling of large holes; center distance 142.4±1.5, parallelism 0.5 / D; A2: Change Four-edge end mill for rough milling inner hole, size Hole depth 18.4±0.1, 27.7±0.1, bottom through hole A3: Change Milling cutter milling large hole bottom surface Hole depth 29.7 (+0.07 / 0), bottom R2; A4: Change Milling cutter rough milling large holes and inner holes, size Hole depth 18.4±0.1, 27.7±0.1, bottom through hole A5: Change the chamfer of the hole of the 20×45° forming tool to 2.5±0.15×45°, 0.5±0.1×45°, and 1.2±0.1×45°; A6: Change Twist drill and Twist drill bit for M4 and Chamfering of hole; A7: Change The milling cutter mills two grooves on the large plane, with a depth of 1.7±0.05; A8: Replace the ball-end milling cutter to fine-mill the water drop; A9: Change Face milling cutter for fine milling of large flat surfaces; A10: Change boring tool to fine bore the lower through hole size (+0.105 / +0.085); A11: Change boring tool to fine bore the lower part of the large hole (+0.06 / +0.045); A12: Change boring tool to fine bore the upper size of large hole (+0.09 / +0.07); A13: Change Carbide drill bits for drilling through holes; A14: Change Carbide reamer Through hole; A15: Remove the workpiece, remove the burrs with a file, and check the processing dimensions.
3. A lightweight ball neck joint manufacturing process according to claim 1, It is characterized in that The milling of the typeface in S2 includes the following steps: B1: For use on three-axis machining centers The milling cutter mills the typing surface, the distance from the typing surface to the center of the large hole is 56.5±0.3, the shortest distance between the inner wall of the large hole and the typing surface is 26.15±0.2, the angle is 40°±0.5°, and the roughness is Rz16; B2: Remove the workpiece and remove the machining burrs with a file.
4. A lightweight ball neck joint manufacturing process according to claim 1, It is characterized in that The milling of the facet in S1 includes the following steps: C1: Used on three-axis machining centers The milling cutter roughly mills the small plane, thickness size: 38.05±0.1; C2. Change The milling cutter mills the small plane, the theoretical thickness is 37.85, the small plane The range of surface profile is +0.01 / -0.04 / A. C3: Change The chamfer size of the forming tool hole is 1±0.2×45°; C4: Change Carbide drill bits for drilling through holes; C5: Change Use carbide milling cutter to mill the countersunk hole with a depth of 1.85 (0 / -0.1); C6: Change Carbide reamer Through hole; C7: Change Carbide milling cutter mills elliptical holes with a depth of 4.35±0.05; C8: Change Use carbide drill bit to drill 4-M4 thread bottom hole; C9: Change Carbide drill for 4-M4 thread bottom hole, and Hole chamfer, chamfer size 0.5±0.2×45°, 0.2±0.1×45°; C10: Change to M4 extrusion tap to tap 4-M4 threaded hole; C11: Remove the workpiece, remove the burrs on the outer circle with a file, and check the processing dimensions.
5. A lightweight ball neck joint manufacturing process according to claim 1, It is characterized in that The S2 car ball head includes the following steps: D1: Use a tool to turn the end face and rough turn the front of the ball head on a CNC lathe. The top face diameter size and D2: Tool change rough turning ball head rear dimensions: Ball neck size: 15.6±0.1, 32(+0.5 / 0), R4.2±0.1, R14.4±0.1; D3: Tool change ball head size: D4: Tool change and finishing ball neck size: Theoretical size 15, min.32, R4.8 (+0.2 / -0.18), R15±0.5, roughness Rt16 SCS, Rz16, center distance 142.2±1.5SCFF, 143±1.5SCFF, center difference 14.7±1.5SCFF, center to end face 17.5±1.5; D5: Remove the workpiece, remove the burrs with a file, and check the processing dimensions.
6. A lightweight ball neck joint manufacturing process according to claim 1, It is characterized in that Drilling the pin holes in S3 includes the following steps: E1, used on three-axis machining center Use carbide drill to drill the pin hole on the back, depth 13.5 (+0.5 / 0); E2, Change Chamfering of carbide drill pin holes; E3. Change Carbide reamer (+0.075 / +0.03) pin hole, hole depth 12±1, roughness Rz25; E4. Remove the workpiece and check the processing size and position Position angle 15°±1°.
Citation Information
Patent Citations
Processing technology for whole spherical iron piston
CN102213313A
Milling method for orifice inside-outside fillet of irregular hole on conical shell surface
CN103949704A
Processing technology for upper arm shaft of swing arm assembly of automobile
CN111195805A
Preparation process of quenched and tempered spring steel wire with tensile strength of 2300-2400 MPa
CN112143869A
Cylindrical table finish-milling machining device for hidden traction device of automobile
CN213379482U