A kind of injection molding equipment for producing PU skateboard wheels
By designing a power control and reverse-push sealing mechanism for the injection molding equipment used in the production of PU skateboard wheels, the problem that existing equipment cannot simultaneously meet the molding requirements of different sizes has been solved, achieving efficient skateboard wheel production and quality assurance.
Patent Information
- Application Number
- CN202411230046.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-09-04
AI Technical Summary
Existing injection equipment for PU skateboard wheel production cannot simultaneously meet the injection molding needs of different sizes, resulting in low production efficiency.
A PU skateboard wheel production injection molding equipment was designed, including a power control mechanism, an injection molding structure, and a reverse-push sealing mechanism. The power control mechanism enables continuous delivery of the injection slurry and spatial control of the molding cavity, while the reverse-push sealing mechanism enables slurry isolation and demolding, thus meeting the molding requirements of skateboard wheels of different sizes.
It enables the simultaneous molding and production of both large and small skateboard wheels, improving production efficiency and ensuring molding quality and applicability, thus meeting the production needs of skateboard wheels of different sizes.
Smart Images

Figure CN118721558B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of skateboard wheel production, and in particular relates to a perfusion molding device for producing PU skateboard wheels. Background Art
[0002] Skateboarding can be regarded as the ancestor of extreme sports history. Many extreme sports are derived from skateboarding. The left and right movement control of a skateboard is mainly achieved by the deformation of the shock absorbers of the skateboard wheels. The deformation of the shock absorbers on the skateboard bracket is controlled by the left and right center of gravity of a person on the skateboard, thereby achieving control of the skateboard wheels.
[0003] In the prior art, PU skateboard wheels are generally produced by injection molding through molds, but the existing injection molding equipment for skateboard wheel production can only complete the molding production of a single PU skateboard wheel at a time, and cannot simultaneously meet the injection molding of PU skateboard wheels of different sizes, which leads to low molding production efficiency of PU skateboard wheels. To this end, we provide a PU skateboard wheel production injection molding equipment to solve the above problems. Summary of the invention
[0004] The object of the present invention is to provide an injection molding device for producing PU skateboard wheels, which solves the problems in the above-mentioned background technology through the specific structural design of the power control mechanism, the injection molding structure and the reverse thrust sealing mechanism.
[0005] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:
[0006] The present invention is a perfusion molding device for producing PU skateboard wheels, comprising a power control mechanism, the power control mechanism comprising a U-shaped frame, the interior of the U-shaped frame being provided with a perfusion molding structure that reciprocates up and down; wherein the perfusion molding structure comprises a bearing mechanism, the bearing mechanism being slidably mounted on the inner side of the U-shaped frame, the bearing mechanism comprising a central mold tube, the top of the central mold tube being provided with a demoulding control disk coaxial therewith; a molding bottom mold, the molding bottom mold being slidably sleeved on the central mold tube, the molding bottom mold being arranged directly below the demoulding control disk; a molding inner mold group, the molding inner mold group It is sleeved on the outside of the central mold tube and the two are coaxially arranged, the molding inner mold group and the demoulding control disk are longitudinally slidably matched, the bottom of the molding inner mold group is tightly fitted on the top of the molding bottom mold, and an inner molding cavity is formed between the molding inner mold group and the central mold tube; and a molding outer mold group, the molding outer mold group is sleeved on the outside of the molding inner mold group and the two are coaxially arranged, the molding outer mold group and the demoulding control disk are longitudinally slidably matched, the bottom of the molding outer mold group is tightly fitted on the top of the molding bottom mold, and an outer molding cavity is formed between the molding outer mold group and the molding inner mold.
[0007] The outer molding die set comprises a hollow pouring ring, on which a pouring joint for connecting with an external pouring device is installed, the hollow pouring ring is connected with the outer molding cavity through a plurality of first flow guide holes arranged in an annular array, and the outer molding cavity is connected with the inner molding cavity through a plurality of second flow guide holes arranged in an annular array; when the pouring slurry is transported into the hollow pouring ring and pressurized, the pouring slurry in the hollow pouring ring enters the outer molding cavity through the first flow guide holes, and when the pouring slurry in the outer molding cavity is After the grouting liquid reaches a certain amount, it overflows into the inner molding cavity through the second guide hole. After the inner molding cavity is filled with the grouting slurry, it flows back into the outer molding cavity through the second guide hole until the outer molding cavity is filled with the grouting slurry. At this time, the delivery of the grouting slurry inside the hollow grouting ring is stopped. After the slurry in the inner molding cavity and the outer molding cavity is formed, the demoulding control plate and the molding bottom mold are controlled to move upward to the demoulding position synchronously. At this time, the position lock of the molding bottom mold is released, and the molding skateboard wheels in the inner molding cavity and the outer molding cavity fall down to complete the collection.
[0008] The present invention is further configured such that a motor base is fixedly provided near the top position of the outer side wall of the U-shaped frame, a reciprocating control motor is installed on the top of the motor base, a support plate is fixedly provided near the bottom position of the outer side wall of the U-shaped frame, a control shaft is rotatably provided between the motor base and the support plate, the output end of the reciprocating control motor is connected to the control shaft, and a limiting slide extending up and down is provided on the outer side wall of the U-shaped frame.
[0009] The present invention is further configured as follows: the bearing mechanism also includes a bearing base coaxial with the demoulding control disk, the peripheral side of the bearing base is fixedly provided with an internal threaded frame slidably matched with the limiting slide, and the internal threaded frame is threadedly matched with the control shaft; the central mold tube is fixedly arranged at the top center position of the bearing base, the external sliding sleeve of the central mold tube is provided with an inner capping ring coaxial with the central mold tube, the inner capping ring and the demoulding control disk are connected by an axial fixing rod, the outer side of the inner capping ring is provided with an outer capping ring coaxial with the central mold tube, the outer capping ring and the demoulding control disk are connected by an axial fixing rod, a mounting seat is provided inside the central mold tube near the bottom, and the output end of the demoulding cylinder installed on the top of the mounting seat is connected to the bottom of the demoulding control disk.
[0010] The present invention is further configured as follows: the molding inner mold group includes a molding inner mold plate of an annular structure, the bottom of the molding inner mold plate is tightly fitted on the top of the molding bottom mold, the inner surface of the inner capping ring is fitted on the outer surface of the central mold tube, and the outer surface of the inner capping ring is fitted on the inner surface of the molding inner mold plate; a plurality of guide rods that are longitudinally slidably matched with the demoulding control disk are fixedly arranged on the top of the molding inner mold plate, a fixing ring coaxial with the demoulding control disk is arranged above the demoulding control disk, the fixing ring is fixedly connected to each guide rod below it, and the second guide holes are arranged in an annular array on the circumferential side of the molding inner mold plate; a first annular cavity coaxial with the molding inner mold plate is arranged inside the molding inner mold plate, the first annular cavity is connected with each second guide hole, a second annular cavity coaxial with the molding inner mold plate is arranged at the bottom, and the second annular cavity is connected with the first annular cavity above it through a plurality of axial slideways.
[0011] The present invention is further configured such that the molding inner mold group also includes a first opening and closing component; wherein, the first opening and closing component includes an opening and closing control ring that is slidably fitted in the first annular cavity on the molding inner template, the circumferential side of the opening and closing control ring is provided with first infusion holes that correspond one to one with the second guide holes, a linkage ring is slidably fitted in the second annular cavity on the molding inner template, a support rod that is slidably fitted in the corresponding axial slideway is fixedly provided between the linkage ring and the opening and closing control ring, and a plurality of linkage screw grooves are provided in an annular array at the bottom of the linkage ring.
[0012] The present invention is further configured as follows: the molding outer mold group also includes a molding outer mold plate of an annular structure, the hollow infusion ring is fixedly arranged on the outer wall of the molding outer mold plate, the bottom of the molding outer mold plate is tightly fitted on the top of the molding bottom mold, the inner surface of the outer capping ring is fitted on the outer surface of the molding inner mold plate, and the outer surface of the outer capping ring is fitted on the inner surface of the molding outer mold plate; a plurality of guide rods that are longitudinally slidably matched with the demoulding control disk are fixedly arranged on the top of the molding outer mold plate, a fixing ring coaxial with the demoulding control disk is arranged above the demoulding control disk, the fixing ring is fixedly connected to each guide rod below it, and the first guide holes are arranged in an annular array on the peripheral side of the molding outer mold plate; a first annular cavity coaxial with the molding outer mold plate is arranged inside the molding outer mold plate, the first annular cavity is connected with each first guide hole, a second annular cavity coaxial with the molding outer mold plate is arranged at the bottom, and the second annular cavity is connected with the first annular cavity above it through a plurality of axial slideways.
[0013] The present invention is further configured such that the molding outer mold group also includes a second opening and closing component; wherein, the second opening and closing component includes an opening and closing control ring that is slidably fitted in the first annular cavity on the molding outer template, and the circumferential side of the opening and closing control ring is provided with second infusion holes that correspond one to one with the first guide holes, and a linkage ring is slidably fitted in the second annular cavity on the molding outer template, and a support rod that is slidably fitted in the corresponding axial slideway is fixedly provided between the linkage ring and the opening and closing control ring, and a plurality of linkage screw grooves are provided in an annular array at the bottom of the linkage ring.
[0014] The present invention is further configured such that a first extension seat is fixedly provided on the peripheral side of the demoulding control disk, a second extension seat corresponding to the first extension seat is fixedly provided on the peripheral side of the molding bottom mold, and a demoulding control rod is rotatably provided on the first extension seat and is threadedly matched with the corresponding second extension seat.
[0015] The present invention is further configured as follows: the present invention also includes a reverse thrust sealing mechanism; wherein, the reverse thrust sealing mechanism includes a first reverse thrust rod rotatably arranged at the inner bottom of the U-shaped frame, an internal gear is fixedly arranged on the peripheral side surface of the first reverse thrust rod, and the first reverse thrust rod is arranged in a one-to-one correspondence with the linkage screw groove on the first opening and closing component; a second reverse thrust rod corresponding to the first reverse thrust rod is rotatably arranged at the inner bottom of the U-shaped frame, an external gear is fixedly arranged on the peripheral side surface of the second reverse thrust rod, and the second reverse thrust rod is arranged in a one-to-one correspondence with the linkage screw groove on the second opening and closing component.
[0016] The present invention is further configured such that a coaxial inner gear ring and an outer gear ring are provided between the first reverse thrust rod and the second reverse thrust rod, the inner gear ring is meshed with each inner gear on its inner side, and the outer gear ring is meshed with each outer gear on its outer side, the inner gear ring and the outer gear ring are fixedly connected by a plurality of connecting plates, two support trays are fixedly provided on the peripheral side surface of the second reverse thrust rod, the outer gear ring is slidably fitted between the upper and lower support trays, and the output end of the reset control motor installed on the U-shaped frame is connected to a reset gear meshed with the external gear.
[0017] The present invention has the following beneficial effects:
[0018] 1. When the perfusion slurry is transported into the hollow perfusion ring and pressurized, the perfusion slurry in the hollow perfusion ring enters the outer molding cavity through the first guide hole. When the perfusion slurry in the outer molding cavity reaches a certain amount, it overflows into the inner molding cavity through the second guide hole. After the inner molding cavity is filled with the perfusion slurry, it flows back into the outer molding cavity through the second guide hole until the outer molding cavity is filled with the perfusion slurry. At this time, the transportation of the perfusion slurry in the hollow perfusion ring is stopped. After the slurry in the inner molding cavity and the outer molding cavity is formed, the demoulding control plate and the molding bottom mold are controlled to move upward to the demoulding position synchronously. At this time, the position lock of the molding bottom mold is released, and the molded skateboard wheels in the inner molding cavity and the outer molding cavity fall down to complete the collection, so that the molding production of large-sized skateboard wheels and small-sized skateboard wheels can be completed at the same time, which greatly improves the production efficiency of the skateboard wheels.
[0019] 2. The present invention controls the simultaneous rotation of each demoulding control rod. Under the action of the threaded cooperation between the demoulding control rod and the second extension seat, the axial distance between the molding bottom mold and the inner capping ring can be adjusted. At the same time, the axial distance between the molding bottom mold and the outer capping ring is also adjusted. In this way, the size of the inner molding cavity and the outer molding cavity space can be regulated, which can simultaneously meet the injection molding production of PU skateboard wheels of different sizes, thereby greatly improving the scope of application of the present application.
[0020] 3. After the pouring is completed, the present invention controls the open-close control ring to slide upward until the first pouring hole is separated from the corresponding second guide hole. At this time, the top of the linkage ring is attached to the top of the corresponding second annular cavity, thereby realizing the blocking of the left and right sides of the first pouring hole by the open-close control ring, so that the pouring slurry in the inner molding cavity and the pouring slurry in the outer molding cavity are completely isolated, ensuring that the small-sized skateboard wheel and the large-sized skateboard wheel after molding will not be fixed together and be unfavorable for demoulding, and controlling the open-close control ring to slide upward until the second pouring hole is separated from the corresponding first guide hole. At this time, the top of the linkage ring is attached to the top of the corresponding second annular cavity, thereby realizing the blocking of the left and right sides of the second pouring hole by the open-close control ring, so that the pouring slurry in the hollow pouring ring and the pouring slurry in the outer molding cavity are completely isolated, ensuring that the pouring slurry in the inner molding cavity and the outer molding cavity are in a filled state, which is beneficial to the quality of the skateboard wheels molded and produced in the inner molding cavity and the outer molding cavity.
[0021] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0023] Figure 1 This is a schematic diagram of the structure of an injection molding device for producing PU skateboard wheels.
[0024] Figure 2 It is a structural schematic diagram of the injection molding structure in the present invention.
[0025] Figure 3 It is a schematic diagram of the internal structure of the injection molding structure in the present invention.
[0026] Figure 4 for Figure 3 The structural front view.
[0027] Figure 5 It is a structural schematic diagram of the bearing mechanism in the present invention.
[0028] Figure 6 It is a schematic diagram of the internal structure of the bearing mechanism in the present invention.
[0029] Figure 7 It is a longitudinal structural cross-sectional view of the inner molding die set in the present invention.
[0030] Figure 8 for Figure 7 Schematic diagram of part of the structure.
[0031] Fig. 9 for Figure 7 Schematic diagram of the structure of the first closing component.
[0032] Fig.10 It is a longitudinal structural cross-sectional view of the outer molding die set in the present invention.
[0033] Fig.11 for Fig.10 Schematic diagram of part of the structure.
[0034] Fig.12 for Fig.10 Schematic diagram of the structure of the second closing component.
[0035] Fig.13 It is a structural schematic diagram of the molding bottom mold in the present invention.
[0036] Fig.14 It is a structural schematic diagram of the reverse thrust sealing mechanism in the present invention.
[0037] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0038] 1-power control mechanism, 101-U-shaped frame, 102-motor base, 103-reciprocating control motor, 104-support plate, 105-control shaft, 106-limit slide, 2-injection molding structure, 3-bearing mechanism, 301-center mold tube, 302-demolding control disk, 303-bearing base, 304-internal thread frame, 305-inner capping ring, 306-axial fixing rod, 307-outer capping ring, 308-mounting seat, 309-demolding cylinder, 310-first extension seat, 4-molding bottom mold, 401-second extension seat, 402-demolding control rod, 5-molding inner mold group, 501-molding inner template, 502-guide rod, 503-fixing ring, 504-first Two guide holes, 505-first annular cavity, 506-second annular cavity, 507-axial slideway, 6-molding outer mold group, 601-hollow pouring ring, 602-first guide hole, 603-molding outer mold plate, 7-first opening and closing component, 701-opening and closing control ring, 702-first pouring hole, 703-linkage ring, 704-support rod, 705-linkage screw groove, 8-second opening and closing component, 801-second pouring hole, 9-reverse thrust sealing mechanism, 901-first reverse thrust rod, 902-internal gear, 903-second reverse thrust rod, 904-external gear, 905-internal gear ring, 906-external gear ring, 907-connecting plate, 908-support tray, 10-inner molding cavity, 11-external molding cavity. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] For specific embodiment 1, please refer to Figure 1-14 The present invention is a perfusion molding device for producing PU skateboard wheels, comprising a power control mechanism 1, the power control mechanism 1 comprising a U-shaped frame 101, and a perfusion molding structure 2 for reciprocating up and down motion is arranged inside the U-shaped frame 101;
[0041] Among them, the injection molding structure 2 includes a bearing mechanism 3, a molding bottom mold 4, a molding inner mold group 5 and a molding outer mold group 6; the bearing mechanism 3 is slidably installed on the inner side of the U-shaped frame 101, and the bearing mechanism 3 includes a central mold tube 301, and a demolding control disk 302 coaxially therewith is installed on the top of the central mold tube 301; the molding bottom mold 4 is slidably sleeved on the central mold tube 301, and the molding bottom mold 4 is arranged directly below the demolding control disk 302; the molding inner mold group 5 is sleeved on the outside of the central mold tube 301 and the two are coaxially arranged, and the molding inner mold group 5 and the demolding control disk 302 are longitudinally slidably matched, and the bottom of the molding inner mold group 5 is tightly fitted on the top of the molding bottom mold 4, and an inner molding cavity 10 is formed between the molding inner mold group 5 and the central mold tube 301, and the injection molding of the small-sized PU skateboard wheel is realized in the inner molding cavity 10;
[0042] The outer molding module 6 is sleeved on the outside of the inner molding module 5 and the two are coaxially arranged. The outer molding module 6 and the demoulding control disk 302 are longitudinally slidably matched. The bottom of the outer molding module 6 is tightly fitted on the top of the molding bottom mold 4. An outer molding cavity 11 is formed between the outer molding module 6 and the inner molding module 5. The injection molding of the large-size PU skateboard wheel is realized in the outer molding cavity 11; the outer molding module 6 includes a hollow injection ring 601, and a injection joint for connecting to an external injection device is installed on the hollow injection ring 601. The hollow injection ring 601 is connected to the outer molding cavity 11 through a plurality of first guide holes 602 arranged in an annular array, and the outer molding cavity 11 is connected to the inner molding cavity 10 through a plurality of second guide holes 504 arranged in an annular array. Through the coordinated use of the first guide holes 602 and the second guide holes 504, the injection slurry can be continuously transported to the outer molding cavity 11 and the inner molding cavity 10.
[0043] When the perfusion slurry is transported into the hollow perfusion ring 601 and pressurized, the perfusion slurry in the hollow perfusion ring 601 enters the outer molding cavity 11 through the first guide hole 602. When the perfusion slurry in the outer molding cavity 11 reaches a certain amount, it overflows into the inner molding cavity 10 through the second guide hole 504. After the inner molding cavity 10 is filled with the perfusion slurry, it flows back to the outer molding cavity 11 through the second guide hole 504 until the outer molding cavity 11 is filled with the perfusion slurry. At this time, the transportation of the perfusion slurry inside the hollow perfusion ring 601 is stopped. After the slurry in the inner molding cavity 10 and the outer molding cavity 11 is formed, the demoulding control disk 302 and the molding bottom mold 4 are controlled to move upward to the demoulding position synchronously. At this time, the position lock of the molding bottom mold 4 is released, and the molding skateboard wheels in the inner molding cavity 10 and the outer molding cavity 11 fall down to complete the collection.
[0044] In this embodiment of the present invention, a motor base 102 is fixedly provided on the outer wall of the U-shaped frame 101 near the top, a reciprocating control motor 103 is installed on the top of the motor base 102, a support plate 104 is fixedly provided on the outer wall of the U-shaped frame 101 near the bottom, a control shaft 105 is rotatably provided between the motor base 102 and the support plate 104, the output end of the reciprocating control motor 103 is connected to the control shaft 105, and a limiting slide 106 extending up and down is provided on the outer wall of the U-shaped frame 101, and the up and down reciprocating motion of the injection molding structure 2 can be realized by the forward and reverse rotation of the control shaft 105.
[0045] In this embodiment of the present invention, the bearing mechanism 3 further includes a bearing base 303 coaxial with the demoulding control disk 302, and an internal thread frame 304 that is slidably matched with the limiting slide 106 is fixedly arranged on the peripheral side of the bearing base 303, and the internal thread frame 304 is threadedly matched with the control shaft 105. When the reciprocating control motor 103 is started to drive the control shaft 105 to rotate, the up and down reciprocating motion of the bearing mechanism 3 can be achieved through the threaded matching between the internal thread frame 304 and the control shaft 105;
[0046] The central mold tube 301 is fixedly arranged at the top center position of the bearing base 303, and the outer sliding sleeve of the central mold tube 301 is provided with an inner capping ring 305 coaxial with the central mold tube 301 (an inner molding cavity 10 is formed by the inner capping ring 305, the central mold tube 301, the molding inner mold group 5 and the molding bottom mold 4), and the inner capping ring 305 is connected to the demoulding control disk 302 through an axial fixing rod 306, and the outer capping ring 307 coaxial with the inner capping ring 305 is arranged outside (an outer molding cavity 11 is formed by the outer capping ring 307, the molding inner mold group 5, the molding outer mold group 6 and the molding bottom mold 4), The outer capping ring 307 is connected to the demoulding control disk 302 by an axial fixing rod 306. A detachable mounting seat 308 is arranged near the bottom inside the central mold tube 301. The output end of the demoulding cylinder 309 installed on the top of the mounting seat 308 is connected to the bottom of the demoulding control disk 302. The demoulding control disk 302 can be moved up and down by the telescopic movement of the demoulding cylinder 309. When the demoulding cylinder 309 is in a silent state, the position of the demoulding control disk 302 can be kept fixed, that is, the position of the demoulding control disk 302 is limited by the demoulding cylinder 309 during the injection molding process.
[0047] The control shaft 105 is driven to rotate by the reciprocating control motor 103 so that the entire perfusion molding structure 2 moves, and the entire perfusion molding structure 2 is adjusted to the middle position inside the U-shaped frame 101. At this time, this position is set as the initial position of the perfusion molding structure 2;
[0048] After starting the reciprocating control motor 103, the positive rotation of the control shaft 105 is used to make the entire injection molding structure 2 slide upward along the limiting slide 106 until the tops of the molding inner mold group 5 and the molding outer mold group 6 are both pressed against the top of the U-shaped frame 101. At this time, the bottoms of the molding inner mold group 5 and the molding outer mold group 6 are tightly pressed against the top of the molding bottom mold 4. The position of the injection molding structure 2 is at the injection station. Then, the injection slurry is transported to the inside of the hollow injection ring 601 and pressurized, so that the injection slurry in the hollow injection ring 601 enters the outer molding cavity 11 through the first guide hole 602. When the injection slurry in the outer molding cavity 11 reaches a certain amount, it overflows to the inner molding cavity 11 through the second guide hole 504. In the mold cavity 10, after the inner molding cavity 10 is filled with the pouring slurry, it flows back to the outer molding cavity 11 through the second guide hole 504 until the outer molding cavity 11 is filled with the pouring slurry. At this time, the delivery of the pouring slurry inside the hollow pouring ring 601 is stopped, and then the reciprocating control motor 103 is started to control the control shaft 105 to rotate in the opposite direction, so that the entire pouring molding structure 2 slides down along the limiting slide 106 to the molding station. After the slurry in the inner molding cavity 10 and the outer molding cavity 11 is formed, the demolding control disk 302 and the molding bottom mold 4 are controlled to move upward to the demolding position synchronously. At this time, the position lock of the molding bottom mold 4 is released, and the molding skateboard wheels in the inner molding cavity 10 and the outer molding cavity 11 fall down to complete the collection.
[0049] Specific embodiment two, on the basis of specific embodiment one, a first extension seat 310 is fixedly arranged on the side surface of the demoulding control disk 302, a second extension seat 401 corresponding to the first extension seat 310 is fixedly arranged on the side surface of the molding bottom mold 4, and a demoulding control rod 402 which is threadedly matched with the corresponding second extension seat 401 is rotatably arranged on the first extension seat 310; by controlling the simultaneous rotation of each demoulding control rod 402, under the action of the threaded cooperation between the demoulding control rod 402 and the second extension seat 401, the axial spacing between the molding bottom mold 4 and the inner capping ring 305 can be adjusted, and the axial spacing between the molding bottom mold 4 and the outer capping ring 307 is also adjusted, thereby realizing the regulation of the spatial size of the inner molding cavity 10 and the outer molding cavity 11, and can simultaneously meet the injection molding production of PU skateboard wheels of different sizes, thereby greatly improving the scope of application of the present application.
[0050] Specific embodiment three, on the basis of specific embodiment one and embodiment two, the molding inner mold group 5 includes a molding inner mold plate 501 with an annular structure, the bottom of the molding inner mold plate 501 is tightly fitted on the top of the molding bottom mold 4, the inner surface of the inner sealing ring 305 is fitted on the outer surface of the central mold tube 301, and the outer surface of the inner sealing ring 305 is fitted on the inner surface of the molding inner mold plate 501; a plurality of guide rods 502 that are longitudinally slidably matched with the demoulding control disk 302 are fixedly arranged on the top of the molding inner mold plate 501, and a fixing ring 503 coaxial with the demoulding control disk 302 is arranged above the demoulding control disk 302, and the fixing ring 503 is fixed to the inner surface of the demoulding control disk 302. The guide rods 502 below are fixedly connected, and this structure can ensure that the forming inner template 501 can move up and down smoothly without rotating. The second guide holes 504 are arranged in an annular array on the peripheral side of the forming inner template 501; a first annular cavity 505 coaxial with the forming inner template 501 is provided inside, and the first annular cavity 505 is connected with each second guide hole 504. A second annular cavity 506 coaxial with the forming inner template 501 is provided at the bottom, and the second annular cavity 506 is connected to the first annular cavity 505 above it through a plurality of axial slideways 507.
[0051] In this embodiment of the present invention, the molding inner mold group 5 also includes a first opening and closing component 7; wherein the first opening and closing component 7 includes an opening and closing control ring 701 that is slidably fitted in the first annular cavity 505 on the molding inner template 501, and the circumferential side of the opening and closing control ring 701 is provided with first perfusion holes 702 that correspond one to one with the second guide holes 504 (that is, in the initial state, the opening and closing control ring 701 is attached to the inner bottom of the corresponding first annular cavity 505, and the first perfusion hole 702 at this time is coaxial with the corresponding second guide hole 504), and a linkage ring 703 is slidably fitted in the second annular cavity 506 on the molding inner template 501 (the bottom of the linkage ring 703 in the initial state is flush with the bottom of the molding inner template 501), and the linkage ring A support rod 704 is fixedly arranged between 703 and the opening and closing control ring 701, and a plurality of linkage screw grooves 705 are arranged in an annular array at the bottom of the linkage ring 703. After the infusion is completed, the opening and closing control ring 701 is controlled to slide upward until the first infusion hole 702 is separated from the corresponding second guide hole 504. At this time, the top of the linkage ring 703 is attached to the top of the corresponding second annular cavity 506, thereby realizing the blocking of the left and right sides of the first infusion hole 702 by the opening and closing control ring 701, so that the infusion slurry in the inner molding cavity 10 and the infusion slurry in the outer molding cavity 11 are completely isolated, ensuring that the small-sized skateboard wheel and the large-sized skateboard wheel after molding will not be fixed together, which is not conducive to demolding.
[0052] In this embodiment of the present invention, the molding outer mold group 6 also includes a molding outer mold plate 603 with an annular structure, a hollow infusion ring 601 is fixedly arranged on the outer wall of the molding outer mold plate 603, the bottom of the molding outer mold plate 603 is tightly fitted on the top of the molding bottom mold 4, the inner surface of the outer capping ring 307 is fitted on the outer surface of the molding inner mold plate 501, and the outer surface of the outer capping ring 307 is fitted on the inner surface of the molding outer mold plate 603; a plurality of guide rods 502 that are longitudinally slidably matched with the demoulding control disk 302 are fixedly arranged on the top of the molding outer mold plate 603, and a fixing ring 503 coaxial with the demoulding control disk 302 is arranged above the demoulding control disk 302, and fixed The ring 503 is fixedly connected to each guide rod 502 below it. This structure can ensure that the forming outer template 603 can move up and down smoothly without rotating. The first guide holes 602 are arranged in an annular array on the peripheral side of the forming outer template 603; a first annular cavity 505 coaxial with the forming outer template 603 is provided inside the forming outer template 603, and the first annular cavity 505 is connected with each first guide hole 602. A second annular cavity 506 coaxial with the forming outer template 603 is provided at the bottom, and the second annular cavity 506 is connected to the first annular cavity 505 above it through a plurality of axial slideways 507.
[0053] In this embodiment of the present invention, the molding outer mold group 6 also includes a second opening and closing component 8; wherein the second opening and closing component 8 includes an opening and closing control ring 701 that is slidably fitted in the first annular cavity 505 on the molding outer template 603, and the circumferential side of the opening and closing control ring 701 is provided with second perfusion holes 801 that correspond one to one with the first guide holes 602 (that is, in the initial state, the opening and closing control ring 701 is attached to the inner bottom of the corresponding first annular cavity 505, and the second perfusion hole 801 at this time is coaxial with the corresponding first guide hole 602), and a linkage ring 703 is slidably fitted in the second annular cavity 506 on the molding outer template 603 (the bottom of the linkage ring 703 in the initial state is flush with the bottom of the molding outer template 603), and the linkage ring 703 and the opening and closing control ring 701 are connected. A support rod 704 is fixedly arranged in the middle and slides in the corresponding axial slideway 507. A plurality of linkage screw grooves 705 are arranged in an annular array at the bottom of the linkage ring 703. After the filling is completed, the through-and-close control ring 701 is controlled to slide upward until the second filling hole 801 is separated from the corresponding first guide hole 602. At this time, the top of the linkage ring 703 is attached to the top of the corresponding second annular cavity 506, thereby realizing the blocking of the left and right sides of the second filling hole 801 by the through-and-close control ring 701, so that the filling slurry in the hollow filling ring 601 and the filling slurry in the outer molding cavity 11 are completely isolated, ensuring that the filling slurry in the inner molding cavity 10 and the outer molding cavity 11 is in a filled state, which is beneficial to the quality of the skateboard wheels formed and produced in the inner molding cavity 10 and the outer molding cavity 11.
[0054] In this embodiment of the present invention, the present invention also includes a reverse thrust sealing mechanism 9; wherein, the reverse thrust sealing mechanism 9 includes a first reverse thrust rod 901 rotatably arranged at the inner bottom of the U-shaped frame 101, an internal gear 902 is fixedly arranged on the peripheral side of the first reverse thrust rod 901, and the first reverse thrust rod 901 is arranged in a one-to-one correspondence with the linkage screw groove 705 on the first through-and-close component 7; a second reverse thrust rod 903 corresponding to the first reverse thrust rod 901 is rotatably arranged at the inner bottom of the U-shaped frame 101, an external gear 904 is fixedly arranged on the peripheral side of the second reverse thrust rod 903, and the second reverse thrust rod 903 is arranged in a one-to-one correspondence with the linkage screw groove 705 on the second through-and-close component 8.
[0055] In this embodiment of the present invention, a coaxial inner tooth ring 905 and an outer tooth ring 906 are arranged between the first reverse thrust rod 901 and the second reverse thrust rod 903 (axial through holes for the first reverse thrust rod 901 and the second reverse thrust rod 903 to be inserted are provided on the bearing base 303 and the molding bottom mold 4), the inner tooth ring 905 is meshed with each inner gear 902 on its inner side, and the outer tooth ring 906 is meshed with each outer gear 904 on its outer side. The inner tooth ring 905 and the outer tooth ring 906 are fixedly connected by a plurality of connecting plates 907, thereby ensuring that the outer tooth ring 906 and the inner tooth ring 90 5, two support trays 908 are fixedly arranged on the side surfaces of the second reverse thrust rod 903, and the outer gear ring 906 is slidably matched between the upper and lower support trays 908 to ensure that the outer gear ring 906 can be stably maintained in the original position for rotation, and the output end of the reset control motor installed on the U-shaped frame 101 is connected with a reset gear meshing with the outer gear 904. The reset control motor drives the reset gear to rotate, which can drive the outer gear ring 906 and the inner gear ring 905 to rotate synchronously, thereby realizing the synchronous rotation between the first reverse thrust rod 901 and the second reverse thrust rod 903.
[0056] After stopping the delivery of the grout inside the hollow perfusion ring 601, the reciprocating control motor 103 is started to control the control shaft 105 to rotate in the opposite direction, so that the entire perfusion molding structure 2 slides downward along the limiting slide 106. When the top of the first reverse push rod 901 abuts against the linkage screw groove 705 on the first through-and-through component 7, the second reverse push rod 903 just abuts against the linkage screw groove 705 on the second through-and-through component 8. As the perfusion molding structure 2 continues to move downward, the through-and-through control ring 701 on the first through-and-through component 7 slides upward under the thrust of the first reverse push rod 901 until the first perfusion hole 702 is separated from the corresponding second guide hole 504. At this time, the top of the linkage ring 703 is attached to the top of the corresponding second annular cavity 506, thereby achieving The opening and closing control ring 701 blocks the left and right sides of the first perfusion hole 702, so that the perfusion slurry in the inner molding cavity 10 and the perfusion slurry in the outer molding cavity 11 are completely isolated; at the same time, under the thrust of the second reverse thrust rod 903, the opening and closing control ring 701 on the second opening and closing component 8 slides upward until the second perfusion hole 801 is separated from the corresponding first guide hole 602, and the top of the linkage ring 703 is now attached to the top of the corresponding second annular cavity 506, thereby achieving the opening and closing control ring 701 Blocking the left and right sides of the second perfusion hole 801, so that the perfusion slurry in the hollow perfusion ring 601 and the perfusion slurry in the outer molding cavity 11 are completely isolated, and the slurry molding in the molding cavity 10 and the outer molding cavity 11 is completed at this molding station;
[0057] After the slurry in the inner molding cavity 10 and the outer molding cavity 11 is formed, the reset control motor is first started to control the synchronous rotation between the outer gear ring 906 and the inner gear ring 905, so as to realize the synchronous rotation between the first reverse thrust rod 901 and the second reverse thrust rod 903, so that the tops of the first reverse thrust rod 901 and the second reverse thrust rod 903 are both threadedly engaged with the corresponding linkage screw groove 705, and then the reciprocating control motor 103 is started again, and the positive rotation of the control shaft 105 is used to make the entire injection molding structure 2 slide upward along the limiting slideway 106 until the first through-and-close component 7 and the second through-and-close component 8 are reset (that is, the bottom of the first through-and-close component 7 is flush with the bottom of the molding inner template 501 again, and the bottom of the second through-and-close component 8 is flush with the bottom of the molding outer template 603 again), and the reset control motor is started to control the synchronous reverse rotation between the outer gear ring 906 and the inner gear ring 905 so that the tops of the first reverse thrust rod 901 and the second reverse thrust rod 903 are both separated from the corresponding linkage screw groove 705;
[0058] After that, the mold release cylinder 309 is started to make it move upward and forward, and the mold release control plate 302 moves upward to drive the molding bottom mold 4 to move synchronously to the demolding station. At this time, the mold release control rods 402 are rotated to disengage the molding bottom mold 4, and the unlocked molding bottom mold 4 slides downward along the central mold tube 301 to the supporting base 303. At this time, the molded small-sized skateboard wheels and large-sized skateboard wheels can be taken out from the molding cavity 10 and the outer molding cavity 11 to complete the collection. Then, the mold release agent is applied to the inside of the molding cavity 10 and the outer molding cavity 11, and the molding bottom mold 4 is reinstalled on the mold release control rod 402, so that the molding bottom mold 4 is re-attached to the bottom of the molding inner template 501 and the molding outer template 603. The downward movement and reset of the molding bottom mold 4 and the mold release control plate 302 are completed by the retraction movement of the mold release cylinder 309, and then the entire injection molding structure 2 is continued to be controlled to slide upward along the limiting slide 106 to the initial position, and the injection molding production of the next batch of skateboard wheels is carried out in the same way.
[0059] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0060] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A PU skateboard wheel production injection molding equipment, It is characterized in that The invention comprises a power control mechanism (1), wherein the power control mechanism (1) comprises a U-shaped frame (101), wherein a perfusion molding structure (2) capable of reciprocating up and down is arranged inside the U-shaped frame (101); Wherein, the injection molding structure (2) comprises: A bearing mechanism (3), the bearing mechanism (3) being slidably mounted on the inner side of the U-shaped frame (101), the bearing mechanism (3) comprising a central mold tube (301), a demoulding control plate (302) coaxial with the central mold tube (301) being mounted on the top of the central mold tube (301); A molding bottom mold (4), the molding bottom mold (4) being slidably sleeved on the central mold tube (301), and the molding bottom mold (4) being arranged directly below the demoulding control disk (302); A molding inner mold group (5), the molding inner mold group (5) is sleeved on the outside of the central mold tube (301) and the two are coaxially arranged, the molding inner mold group (5) and the demoulding control plate (302) are longitudinally slidably matched, the bottom of the molding inner mold group (5) is tightly fitted on the top of the molding bottom mold (4), and an inner molding cavity (10) is formed between the molding inner mold group (5) and the central mold tube (301); and a molding outer mold group (6), wherein the molding outer mold group (6) is sleeved on the outside of the molding inner mold group (5) and the two are arranged coaxially, the molding outer mold group (6) and the demoulding control plate (302) are longitudinally slidably matched, the bottom of the molding outer mold group (6) is tightly fitted on the top of the molding bottom mold (4), and an outer molding cavity (11) is formed between the molding outer mold group (6) and the molding inner mold group (5); The outer molding die set (6) comprises a hollow perfusion ring (601), on which a perfusion joint for connecting to an external perfusion device is mounted, the hollow perfusion ring (601) is connected to the outer molding cavity (11) via a plurality of first flow guide holes (602) arranged in an annular array, and the outer molding cavity (11) is connected to the inner molding cavity (10) via a plurality of second flow guide holes (504) arranged in an annular array; A motor base (102) is fixedly arranged near the top of the outer wall of the U-shaped frame (101); a reciprocating control motor (103) is installed on the top of the motor base (102); a support plate (104) is fixedly arranged near the bottom of the outer wall of the U-shaped frame (101); a control shaft (105) is rotatably arranged between the motor base (102) and the support plate (104); an output end of the reciprocating control motor (103) is connected to the control shaft (105); and a limit slideway (106) extending up and down is provided on the outer wall of the U-shaped frame (101); The bearing mechanism (3) further comprises a bearing base (303) coaxial with the demoulding control disk (302); an internal thread frame (304) slidably engaged with the limiting slideway (106) is fixedly arranged on the peripheral side of the bearing base (303); the internal thread frame (304) is threadedly engaged with the control shaft (105); The central mold tube (301) is fixedly arranged at the top center position of the bearing base (303); the outer sliding sleeve of the central mold tube (301) is provided with an inner capping ring (305) coaxial with the central mold tube; the inner capping ring (305) is connected to the demoulding control disk (302) via an axial fixing rod (306); the outer portion of the inner capping ring (305) is provided with an outer capping ring (307) coaxial with the central mold tube; the outer capping ring (307) is connected to the demoulding control disk (302) via an axial fixing rod (306); a mounting seat (308) is arranged near the bottom of the central mold tube (301); the output end of the demoulding cylinder (309) installed on the top of the mounting seat (308) is connected to the bottom of the demoulding control disk (302); The molding inner mold assembly (5) comprises a molding inner mold plate (501) of an annular structure, the bottom of the molding inner mold plate (501) is tightly fitted on the top of the molding bottom mold (4), the inner surface of the inner sealing ring (305) is fitted on the outer surface of the central mold tube (301), and the outer surface of the inner sealing ring (305) is fitted on the inner surface of the molding inner mold plate (501); A plurality of guide rods (502) that are longitudinally slidably matched with the demoulding control plate (302) are fixedly arranged on the top of the molding inner template (501); a fixing ring (503) coaxial with the demoulding control plate (302) is arranged above the demoulding control plate (302); the fixing ring (503) is fixedly connected to each guide rod (502) below the fixing ring (503); and the second guide holes (504) are arranged in an annular array on the peripheral side surface of the molding inner template (501); A first annular cavity (505) coaxial with the inner molding template (501) is provided inside the inner molding template (501), the first annular cavity (505) is connected with each second guide hole (504), a second annular cavity (506) coaxial with the inner molding template (501) is provided at the bottom, the second annular cavity (506) is connected with the first annular cavity (505) above it via a plurality of axial slideways (507); When the pouring slurry is transported into the hollow pouring ring (601) and pressurized, the pouring slurry in the hollow pouring ring (601) enters the outer molding cavity (11) through the first guide hole (602). When the pouring slurry in the outer molding cavity (11) reaches a certain amount, it overflows into the inner molding cavity (10) through the second guide hole (504). After the inner molding cavity (10) is filled with the pouring slurry, it flows back to the outer molding cavity (10) through the second guide hole (504). 1) until the outer molding cavity (11) is filled with the pouring slurry, at which time the delivery of the pouring slurry inside the hollow pouring ring (601) is stopped, and after the slurry in the inner molding cavity (10) and the outer molding cavity (11) is formed, the demoulding control plate (302) and the molding bottom mold (4) are controlled to move upward to the demoulding position synchronously, at which time the position lock of the molding bottom mold (4) is released, and the molding slide wheels in the inner molding cavity (10) and the outer molding cavity (11) fall down to complete the collection.
2. The injection molding equipment for producing PU skateboard wheels according to claim 1, It is characterized in that The inner molding die set (5) further comprises a first opening and closing component (7); The first opening and closing component (7) comprises an opening and closing control ring (701) which is slidably fitted in a first annular cavity (505) on the molding inner template (501); a first infusion hole (702) which corresponds one to one with the second guide hole (504) is arranged on the peripheral side surface of the opening and closing control ring (701); a linkage ring (703) is slidably fitted in the second annular cavity (506) on the molding inner template (501); a support rod (704) which is slidably fitted in a corresponding axial slideway (507) is fixedly arranged between the linkage ring (703) and the opening and closing control ring (701); and a plurality of linkage screw grooves (705) are arranged in an annular array at the bottom of the linkage ring (703).
3. The injection molding equipment for producing PU skateboard wheels according to claim 2, It is characterized in that The molding outer mold assembly (6) further comprises a molding outer mold plate (603) of an annular structure, the hollow infusion ring (601) is fixedly arranged on the outer wall of the molding outer mold plate (603), the bottom of the molding outer mold plate (603) is tightly fitted on the top of the molding bottom mold (4), the inner surface of the outer capping ring (307) is fitted on the outer surface of the molding inner mold plate (501), and the outer surface of the outer capping ring (307) is fitted on the inner surface of the molding outer mold plate (603); A plurality of guide rods (502) that are longitudinally slidably matched with the demoulding control plate (302) are fixedly arranged on the top of the molding outer template (603); a fixing ring (503) coaxial with the demoulding control plate (302) is arranged above the demoulding control plate (302); the fixing ring (503) is fixedly connected to each guide rod (502) below the fixing ring (503); and the first guide holes (602) are arranged in an annular array on the peripheral side surface of the molding outer template (603); A first annular cavity (505) coaxial with the outer molding template (603) is provided inside the outer molding template (603), the first annular cavity (505) is connected with each first guide hole (602), and a second annular cavity (506) coaxial with the outer molding template (603) is provided at the bottom, the second annular cavity (506) is connected with the first annular cavity (505) above it via a plurality of axial slideways (507).
4. The injection molding equipment for producing PU skateboard wheels according to claim 3, It is characterized in that The outer molding die set (6) further comprises a second opening and closing component (8); The second opening and closing component (8) comprises an opening and closing control ring (701) which is slidably fitted in a first annular cavity (505) on the molding outer template (603); a peripheral side surface of the opening and closing control ring (701) is provided with second injection holes (801) which correspond one to one with the first flow guide holes (602); a linkage ring (703) is slidably fitted in a second annular cavity (506) on the molding outer template (603); a support rod (704) which is slidably fitted in a corresponding axial slideway (507) is fixedly provided between the linkage ring (703) and the opening and closing control ring (701); and a plurality of linkage screw grooves (705) are provided in an annular array at the bottom of the linkage ring (703).
5. The injection molding equipment for producing PU skateboard wheels according to claim 4, It is characterized in that A first extension seat (310) is fixedly arranged on the peripheral side of the demoulding control disk (302), a second extension seat (401) corresponding to the first extension seat (310) is fixedly arranged on the peripheral side of the molding bottom mold (4), and a demoulding control rod (402) threadably matched with the corresponding second extension seat (401) is rotatably arranged on the first extension seat (310).
6. The injection molding equipment for producing PU skateboard wheels according to claim 5, It is characterized in that It also includes a reverse thrust sealing mechanism (9); The reverse thrust sealing mechanism (9) comprises a first reverse thrust rod (901) rotatably arranged at the inner bottom of the U-shaped frame (101), an internal gear (902) being fixedly arranged on the peripheral side surface of the first reverse thrust rod (901), and the first reverse thrust rod (901) and the linkage screw groove (705) on the first opening and closing component (7) are arranged in a one-to-one correspondence; A second reverse thrust rod (903) corresponding one-to-one to the first reverse thrust rod (901) is rotatably arranged at the bottom of the U-shaped frame (101), an external gear (904) is fixedly arranged on the peripheral side of the second reverse thrust rod (903), and the second reverse thrust rod (903) and the linkage screw groove (705) on the second opening and closing component (8) are arranged one-to-one.
7. The injection molding equipment for producing PU skateboard wheels according to claim 6, It is characterized in that An inner gear ring (905) and an outer gear ring (906) are coaxially arranged between the first reverse thrust rod (901) and the second reverse thrust rod (903); the inner gear ring (905) meshes with each inner gear (902) on its inner side, and the outer gear ring (906) meshes with each outer gear (904) on its outer side; the inner gear ring (905) and the outer gear ring (906) are fixedly connected via a plurality of connecting plates (907); two supporting trays (908) are fixedly arranged on the peripheral side of the second reverse thrust rod (903); the outer gear ring (906) is slidably fitted between the upper and lower supporting trays (908); and the output end of the reset control motor installed on the U-shaped frame (101) is connected to a reset gear meshing with the outer gear (904).