Coke transfer chute operation mounting structure convenient to disassemble and assemble
By using a cement fixation and locking mechanism between the cast stone plate and the wall plate in the coke transfer chute, combined with a backing plate and a buffer column to protect the belt, the wear problem caused by hard contact and high-speed erosion in the chute is solved, and the life of the cast stone plate is extended. , reducing maintenance frequency and dust pollution.
Patent Information
- Application Number
- CN202410908365.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Due to hard contact and high-speed erosion in the coke transfer chute, the cast stone slabs are severely worn and the maintenance cycle is short, which affects product quality and employee health, and also generates dust pollution.
A coke transfer chute operation and installation structure is designed that is easy to disassemble and assemble. It uses cement fixation between the cast stone plate and the wall plate and a locking mechanism to increase the impact resistance. The coke falling speed is reduced through the backing plate and buffer column to protect the belt. and chute.
It extends the service life of the cast stone slab, reduces the maintenance frequency of the chute, reduces dust generation, and improves product quality and employee safety.
Smart Images

Figure CN118723402A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coke transfer chutes, and in particular to an operation and installation structure of a coke transfer chute which is easy to disassemble and assemble. Background Art
[0002] The coke transfer chute is mainly installed in a straight line with an inclined installation. Wear-resistant plates and cast stone bricks are laid inside. The coke enters the next belt for transportation through the chute. The greater the drop, the faster the sliding speed. The rapid friction and impact will break the large coke, produce coke particles and coke dust, reduce the metallurgical coke rate, bring certain losses to product quality and economic benefits, and generate a large amount of dust, which not only pollutes the surrounding environment, but also brings certain harm to the physical and mental health of employees.
[0003] In addition, due to the high-speed scouring of coke, the inner wall of the chute is aggravated, which greatly shortens the maintenance cycle of the chute. After the new chute is installed, it is often damaged by the scouring in less than 2 months, requiring frequent maintenance. It is difficult to repair the chute and replace the cast stone bricks, which increases the labor intensity of employees.
[0004] To this end, we propose a coke transfer chute operation and installation structure that is easy to disassemble and assemble. Summary of the invention
[0005] The object of the present invention is to provide an easy-to-disassemble and assemble coke transfer chute operation and installation structure to solve the problem of hard contact between the cast stone plate and the wall plate in the chute, uneven and unreal contact, and increased wear and damage between the coke and the cast stone plate proposed in the above background technology.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a coke transfer chute operation installation structure that is easy to disassemble and assemble, comprising a wall plate, an inclined chute cavity 1, an inclined chute cavity 2 and a belt, wherein the wall plate is provided with an inclined chute cavity 1 and an inclined chute cavity 2, and the inclined chute cavity 1 is connected with the inclined chute cavity 2, a belt is installed at the bottom of the inclined chute cavity 1, the top of the inclined chute cavity 1 and the inner side of the bottom wall plate are evenly coated with glue, and a partition is evenly fixed on the bottom wall plate of the inclined chute cavity 1 by spot welding;
[0007] A cast stone plate is evenly laid on the outer side of the cement on the inclined cavity, and the opposite surface of the cast stone plate and the partition is evenly filled with epoxy resin, and a locking bolt mechanism is evenly installed on the top of the outer wall of the wall panel.
[0008] Furthermore, the locking bolt mechanism includes a column, a pressing column, a locking sleeve, a top block, a spring and a side support. The outer wall of the wall panel is evenly installed with the column, the outer wall of the column is threadedly sleeved with a locking sleeve, the column is slidably connected with a pressing column, the column is slidably connected with a top block, a spring is installed between the top block and the inner wall of the column, the two sides of the top block are symmetrically connected to the side supports, and one side of the side support passes through the outer groove of the column and extends to the outside of the column, and one side of the pressing column abuts against the top block.
[0009] Furthermore, a lock hole is symmetrically provided on one side of the cast stone plate, and one end of the upper column of the locking bolt mechanism penetrates the wall plate and the cement and is engaged with the lock hole on the cast stone plate.
[0010] Furthermore, a mesh plate is installed on the connecting surface between the oblique cavity 1 and the oblique cavity 2, and the bottom of the oblique cavity 1 is connected with the belt cavity.
[0011] Furthermore, a pad is installed in the belt cavity, and buffer columns are fixedly connected to the bottom of the belt cavity and located on both sides of the belt, and a rotating drum is movably connected in the buffer column. One side of the pad passes through the belt cavity and the buffer column respectively and is slidably connected to the rotating drum. A fixed gear is sleeved on the outer wall of the rotating drum and is meshed with a gear on a power mechanism on one side of the belt. A spring 2 is sleeved on the inner and outer walls of the buffer column of the pad, and a discharge fan blade is fixedly sleeved on the pad in the belt cavity.
[0012] The present invention also provides a working method for a coke transfer chute operation installation structure that is easy to disassemble and assemble, including the following contents: installing a cast stone plate located on the inclined chute chamber 1, applying glue mud evenly on the inner wall of the inclined chute chamber 1, wherein the upper partition plate located on the bottom of the inner wall of the inclined chute chamber 1 is fixed by spot welding, and the glue mud is applied to the wall plate along the partition plate, while paying attention to the holes left on the entire wall plate;
[0013] Then, the locking holes on the cast stone slab are connected according to the holes on the glue, and the entire locking bolt mechanism is inserted after pressing. The pressing column on the column needs to be pressed in advance, and the pressing column abuts against the top block to achieve the inward retraction of the side support on the outside of the column. After the entire column is inserted into the hole on the wall panel, the side support at the front end of the column enters the locking hole on the cast stone slab. At this time, the pressing column is released, and the inner support of the lock hole is expanded under the push of spring 1. Finally, the locking sleeve on the outer wall of the column is rotated to complete the fixation of the cast stone slab in the wall panel by the entire locking bolt mechanism.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] 1. In the present invention, by improving the installation of the cast stone plate on the inner wall of the inclined chute cavity, when the cast stone plate is damaged and needs to be replaced during daily use of the chute, the locking sleeve on the column on the outer side of the wall plate is rotated, and the pressing column at the end of the column is pressed, so that the top block in the column moves to one side to squeeze the spring, and at the same time drives the side support to close, and the entire locking bolt mechanism is taken out from the wall plate, so that the cast stone plate can be replaced in the chute. Compared with the rigid connection of bolts, the connection mode of the cast stone plate and the cement with the locking bolt makes the cast stone plate and the wall plate stick together, which increases the impact resistance of the cast stone plate;
[0016] 2. In the present invention, the installation of the pad can protect the coke and the cavity along the belt during the descent process, and at the same time reduce the speed of the coke after it falls, so that the kinetic energy of the coke when it contacts the belt is reduced, thereby protecting the belt. The normal rotation of the belt drives the bottom support of the single-sided pad to rotate, and the scattered coke is pushed out by the rotation of the discharge fan blades mounted on the support, thereby ensuring the normal movement of the entire pad. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the overall structure of the coke transfer chute that is easy to disassemble and assemble;
[0018] Figure 2 The present invention is a schematic diagram of the main cross-sectional structure of the coke transfer chute which is easy to disassemble and assemble during operation and installation.
[0019] Figure 3 It is a schematic diagram of the structure of fixing the cast stone slab on the wall panel through the locking bolt mechanism of the present invention;
[0020] Figure 4 This is a schematic diagram of the installation structure of the cast stone plate on the inner wall of the bottom of the inclined chute of the present invention;
[0021] Figure 5 It is a schematic diagram of the overall structure of the locking bolt mechanism of the present invention;
[0022] Figure 6 It is a schematic diagram of the cross-sectional structure of the locking mechanism of the present invention;
[0023] Figure 7 It is a schematic diagram of the overall structure of the cast stone plate of the present invention;
[0024] Figure 8 This is a schematic diagram of the structure of the buffer column connected to the pad of the present invention.
[0025] In the figure: 1. oblique slide cavity 1; 2. wall panel; 3. oblique slide cavity 2; 4. along-belt cavity; 5. buffer column; 6. cast stone plate; 7. cement; 8. lock hole; 9. locking bolt mechanism; 901. column; 902. pressing column; 903. locking sleeve; 904. top block; 905. spring 1; 906. side support; 10. mesh plate; 11. partition; 12. epoxy resin; 13. pad; 14. discharge fan blade; 15. spring 2; 16. rotating drum; 17. belt. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] See also Figure 1-8 , the present invention provides a technical solution:
[0028] Embodiment 1: The present invention improves the original inclined chute, wherein the cast stone plate 6 fixed on the inner wall of the inclined chute cavity 1 is fixed by bonding instead of the original bolts, and the outer side of the wall plate 2 is fixed by a locking bolt mechanism 9. For the cast stone plate 6 at the bottom of the inclined chute cavity 1, a partition plate 11 is welded on the original wall plate 2 to separate the cast stone plates 6, so as to prevent the cast stone plates 6 from falling off after a long period of coke collision, and then a buffer mechanism is installed at the bottom of the entire belt cavity 4 to protect the belt 17;
[0029] like Figure 1 As shown in FIG. 1 , the entire inclined chute is divided into inclined chute chamber 1 and inclined chute chamber 2 3, which are separated by a mesh plate 10. When the top coke enters from the funnel and contacts the cast stone plate 6 installed on the inner wall of the inclined chute chamber 1, as shown in FIG. Figure 3 As shown, the cast stone plate 6 is installed on the entire wall plate 2, and the inner side of the wall plate 2 is smeared with a glue 7, and the entire cast stone plate 6 is attached to the glue 7. At the same time, a fixing hole is opened on the outer side of the entire wall plate 2, and the locking bolt mechanism 9 is inserted into the fixing hole and penetrates the glue 7, and then the locking hole 8 on the cast stone plate 6 is clamped with the locking bolt mechanism 9 protruding from the surface of the glue 7, and finally the locking sleeve 903 on the locking bolt mechanism 9 is rotated to complete the fixing of the entire cast stone plate 6 on the glue 7;
[0030] like Figure 5 and Figure 6As shown, the main body of the entire locking bolt mechanism 9 is composed of a stainless steel column 901, and the outer wall of the column 901 is provided with a thread, and a locking sleeve 903 is sleeved with the thread, a pressing column 902 and a top block 904 are slidably connected in the column 901, and side supports 906 are symmetrically rotatably connected on both sides of the top block 904, and the side supports 906 extend through the outer groove of the column 901, and are located on one side of the top block 904 and abut against a spring 905. Under normal conditions, through the abutment of the spring 905, the entire top block 904 abuts against the pressing column 902, resulting in the top block The side supports 906 on the outer periphery of 904 are unfolded on the column 901, and when the operator presses the pressing column 902 at the end of the column 901, the pressing column 902 abuts against the top block 904, and the top block 904 squeezes the spring 1 905, and at the same time causes the side supports 906 on both sides of the entire top block 904 to rotate toward the column 901 side, and finally get stuck in the outer wall groove of the column 901, that is, when installing the locking bolt mechanism 9, it is necessary to manually contact the pressing column 902 at the end of the main body to close the side supports 906, and then insert the entire column 901 into the outer fixing hole of the wall plate 2;
[0031] When the front end of the entire column 901 enters the locking hole 8 in the cast stone plate 6, the pressing column 902 is released, and the side support 906 is now unfolded in the locking hole 8 in the cast stone plate 6. The overall structure of the cast stone plate 6 is as follows Figure 7 As shown, a limited groove is provided between the plates, and the wall panels 2 can be rotated at different angles. In order to fix the locking mechanism 9 on the wall panel 2 as a whole, the locking sleeve 903 located on the outside of the column 901 is rotated so that the locking sleeve 903 abuts against the outside of the wall panel 2, and the entire locking mechanism 9 tightens the cast stone plate 6 on the inner side of the wall panel 2, so that the cast stone plate 6 and the glue 7 on the inner side of the wall panel 2 fit more closely;
[0032] By adding cement 7 between the wallboard 2 and the cast stone plate 6, and cooperating with the clamping of the locking mechanism 9, the cast stone plate 6 and the wallboard 2 are bonded together, the impact resistance of the cast stone plate 6 is increased, the good wear resistance of the cast stone plate 6 is brought into play, and the service life of the cast stone plate 6 is doubled;
[0033] The falling coke goes along the inner side of the wall plate 2 onto the mesh plate 10, and is initially screened by the mesh plate 10. The fine slag enters the inclined chute chamber 1 from the inclined chute chamber 1 to the inclined chute chamber 2 3, and the remaining coke begins to contact the cast stone plate 6 with the partition plate 11. Figure 4 As shown, the quick-drying mud masonry cast stone plate 6 designed on the bottom inner wall of the original inclined chute cavity 1 is easy to fall off. For this reason, a partition 11 with a thickness of 4 mm and a height of 50 mm is welded on the bottom wall plate 2 of the entire inclined chute cavity 1. The partition 11 is used to isolate the cast stone plate 6. At the same time, the gap between the partition 11 and the cast stone plate 6 is filled with epoxy resin 12 to enhance the impact resistance and adhesion effect of the cast stone plate 6.
[0034] Example 2: Figure 1As shown, a belt chamber 4 is fixed at the bottom of the inclined chute chamber 1, and the belt chamber 4 is made of wear-resistant composite steel plate. At the same time, a pad 13 is installed on the inner wall of the bottom of the belt chamber 4 to receive the coke descending in the inclined chute chamber 1 and reduce the impact force between the coke and the belt 17;
[0035] At the same time, the bottom of the entire pad 13 passes through the belt cavity 4 and extends into the buffer column 5. Figure 8 As shown, a spring 15 is installed in the buffer column 5, and the impact force of the coke on the pad 13 is buffered by the vibration of the spring 15. At the same time, the bottom support of the pad 13 in the single buffer column 5 passes through the rotating drum 16 and is slidably connected to the rotating drum 16. The outer wall of the rotating drum 16 movable in the buffer column 5 is sleeved with a gear, and a belt 17 is installed along the bottom of the belt cavity 4. The transmission mechanism on the belt 17 drives the gear on the entire rotating drum 16 to rotate, so that the entire rotating drum 16 drives the single-side support at the bottom of the pad 13 to rotate. The single-sided support at the bottom of the pad 13 is also sleeved and fixed with a discharge fan blade 14. When the coke falling from the inclined chute chamber 1 contacts the pad 13, some of the debris will also fall into the gap between the pad 13 and the belt chamber 4. If it is not cleaned for a long time, it will affect the normal up and down movement of the entire pad 13. Therefore, the normal rotation of the belt 17 drives the bottom support of the single-sided pad 13 to rotate, and the discharge fan blade 14 sleeved on the support rotates to push the scattered coke out, ensuring the normal movement of the entire pad 13;
[0036] The installation of the pad 13 protects the coke and the belt cavity 4 during the descent process, and reduces the speed of the coke after it falls, so that the kinetic energy of the coke when it contacts the belt 17 is reduced, thereby protecting the belt 17.
[0037] The working process and principle of the present invention are as follows:
[0038] Installation of cast stone plate 6 on inclined cavity 1, apply glue 7 evenly on the inner wall of inclined cavity 1, wherein the upper partition 11 is fixed on the bottom of the inner wall of inclined cavity 1 by spot welding, and glue 7 is applied on wall plate 2 along the partition 11, while paying attention to the holes left on the entire wall plate 2;
[0039] Then, the locking holes 8 on the cast stone plate 6 are correspondingly connected according to the holes on the glue 7. After pressing, the entire locking bolt mechanism 9 is inserted. It is necessary to press the pressing column 902 on the column 901 in advance, and the pressing column 902 abuts against the top block 904 to achieve the inward retraction of the side support 906 on the outer side of the column 901. After the entire column 901 is inserted into the hole on the wall panel 2, the side support 906 at the front end of the column 901 enters the locking hole 8 on the cast stone plate 6. At this time, the pressing column 902 is released, and the inner side support 906 of the locking hole 8 is expanded under the push of the spring 905. Finally, the locking sleeve 903 on the outer wall of the column 901 is rotated to complete the fixation of the entire locking bolt mechanism 9 to the cast stone plate 6 in the wall panel 2.
[0040] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
[0041] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0042] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A coke transfer chute operation installation structure that is easy to disassemble and assemble, comprising a wall plate (2), an inclined chute chamber 1 (1), an inclined chute chamber 2 (3) and a belt (17), wherein the wall plate (2) is provided with the inclined chute chamber 1 (1) and the inclined chute chamber 2 (3), and the inclined chute chamber 1 (1) is connected with the inclined chute chamber 2 (3), and a belt (17) is installed at the bottom of the inclined chute chamber 1 (1), characterized in that: The top of the oblique cavity (1) and the inner side of the bottom wall plate (2) are evenly coated with glue (7), and a partition plate (11) is evenly fixed on the bottom wall plate (2) of the oblique cavity (1) by spot welding; A cast stone plate (6) is evenly laid on the outside of the cement (7) on the inclined cavity (1), and the opposite surface of the cast stone plate (6) and the partition (11) is evenly filled with epoxy resin (12), and a locking mechanism (9) is evenly installed on the top of the outer wall of the wall panel (2).
2. The coke transfer chute operation and installation structure that is easy to disassemble and assemble according to claim 1 is characterized in that: The locking bolt mechanism (9) comprises a column (901), a pressing column (902), a locking sleeve (903), a top block (904), a spring (905) and a side support (906); the column (901) is evenly mounted on the outer wall of the wall plate (2); the locking sleeve (903) is threadedly sleeved on the outer wall of the column (901); the pressing column (902) is slidably connected inside the column (901); the top block (904) is slidably connected inside the column (901); a spring (905) is mounted between the top block (904) and the inner wall of the column (901); the two sides of the top block (904) are symmetrically rotatably connected to the side supports (906); one side of the side support (906) passes through the outer groove of the column (901) and extends to the outside of the column (901); one side of the pressing column (902) is in contact with the top block (904).
3. The coke transfer chute operation and installation structure that is easy to disassemble and assemble according to claim 2 is characterized in that: A locking hole (8) is symmetrically provided on one side of the cast stone plate (6), and one end of the upper column (901) of the locking bolt mechanism (9) penetrates the wall plate (2) and the cement (7) and is engaged with the locking hole (8) on the cast stone plate (6).
4. The coke transfer chute operation and installation structure that is easy to disassemble and assemble according to claim 3 is characterized in that: A mesh plate (10) is installed on the connecting surface between the oblique slidable cavity 1 (1) and the oblique slidable cavity 2 (3), and the bottom of the oblique slidable cavity 1 (1) is connected with the belt cavity (4).
5. The coke transfer chute operation and installation structure that is easy to disassemble and assemble according to claim 4 is characterized in that: A pad (13) is installed in the belt cavity (4), and a buffer column (5) is fixedly connected to the bottom of the belt cavity (4) and located on both sides of the belt (17). A rotating drum (16) is movably connected in the buffer column (5). One side of the pad (13) passes through the belt cavity (4) and the buffer column (5) respectively and is slidably connected to the rotating drum (16). The outer wall of the rotating drum (16) is sleeved with a fixed gear that meshes with the gear on the power mechanism on one side of the belt (17). The pad (13) is sleeved with a spring 2 (15) on the inner and outer walls of the buffer column (5), and the pad (13) is sleeved with a discharge fan blade (14) fixed in the belt cavity (4).
6. A method for operating the easily disassembled coke transfer chute operation installation structure according to any one of claims 1 to 5, characterized in that: The method comprises the following contents: installing a cast stone plate (6) on the upper surface of the inclined chute cavity (1), applying glue (7) evenly on the inner wall of the inclined chute cavity (1), fixing an upper partition (11) on the bottom of the inner wall of the inclined chute cavity (1) by spot welding, applying glue on the wall plate (2) along the partition (11), and paying attention to the holes left on the entire wall plate (2); Then, the locking hole (8) on the cast stone plate (6) is connected to the corresponding hole on the cement, and the entire locking bolt mechanism (9) is inserted after the pressing is completed. It is necessary to press the pressing column (902) on the column (901) in advance, and the pressing column (902) abuts against the top block (904) to achieve the inward retraction of the side support (906) on the outside of the column (901). After the entire column (901) is inserted into the hole on the wall plate (2), the side support (906) at the front end of the column (901) enters the locking hole (8) on the cast stone plate (6). At this time, the pressing column (902) is released, and the inner side support (906) of the locking hole (8) is expanded under the push of the spring 1 (905). Finally, the locking sleeve (903) on the outer wall of the column (901) is rotated to complete the fixing of the entire locking bolt mechanism (9) to the cast stone plate (6) in the wall plate (2).
