Railway bulk cargo reloading device and reloading method
By designing the railway bulk material changing device, including the conveying material foundation pit group, auger assembly and filling machine, the problem of low automation of railway bulk material changing is solved, efficient material transportation and packaging is achieved, and labor intensity is reduced. .
Patent Information
- Application Number
- CN202410931315.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-10-01
AI Technical Summary
Railway bulk material reloading has a low degree of automation and low reloading efficiency, resulting in high labor intensity and requiring a large number of people to participate in manual labor.
A railway bulk cargo changing device is designed, including a conveying material foundation pit group, an auger assembly and a filling machine. The auger assembly transports bulk materials to the filling machine for quantitative filling and packaging. The loading and unloading integrated machine will package the materials. Good material bags are transported to railway freight caravans to improve automation and loading efficiency.
It achieves high automation of cross-rail bulk cargo changing operations, reduces the number of operators and labor intensity, and improves the efficiency of changing goods.
Smart Images

Figure CN118723620A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bulk cargo loading and unloading, and in particular to a railway bulk cargo transshipment device and a transshipment method. Background Art
[0002] With the development of railway transportation and the deepening of the globalized economy, the trade demand between my country and border countries is gradually expanding. The growth of border trade can not only enrich the domestic market supply and meet the diversified consumption needs of the people, but also bring more employment opportunities and economic growth points to border areas.
[0003] Most of the bulk materials from border countries are transported to China by rail, and the rail transport of bulk materials requires the bulk materials to be transferred from freight trains to railway freight wagons, which are then transported to the destination. The current railway bulk material transfer has a low degree of automation, low transfer efficiency, and requires a large number of people to engage in physical labor, resulting in high labor intensity. Summary of the invention
[0004] In view of this, an embodiment of the present invention provides a railway bulk cargo transshipment device and a transshipment method, which improves the automation level and transshipment efficiency of cross-track bulk cargo transshipment operations, reduces the number of operators and reduces the labor intensity of operators.
[0005] In the first aspect, an embodiment of the present invention provides a railway bulk cargo transshipment device, the transshipment device includes a conveyor pit group, an auger assembly, a filling machine and a loading and unloading machine, one end of the auger assembly is arranged in the conveyor pit group, and the other end of the auger assembly is arranged in the filling machine, the conveyor pit group is used to receive bulk materials transported by freight trains, the auger assembly is used to transport the bulk materials from the conveyor pit group to the filling machine, the filling machine is used to fill the bulk materials into rated material bags for clamping and packaging, and the loading and unloading machine is used to transport the packaged rated material bags to the railway freight car.
[0006] Optionally, the conveying material foundation pit group includes:
[0007] A plurality of first material conveying pits, each of which is arranged between adjacent sleepers, and the plurality of first material conveying pits are arranged side by side in sequence along the sleeper arrangement direction;
[0008] A second material conveying pit is extended along the track direction and arranged below the ends of the plurality of first material conveying pits, and the second material conveying pit is communicated with the plurality of first material conveying pits;
[0009] The third conveying material foundation pit is arranged at one end of the second conveying material foundation pit, and the third conveying material foundation pit is connected with the second conveying material foundation pit. Optionally, the auger assembly includes:
[0010] A plurality of first augers, one of which is installed in each of the first conveying material foundation pits, the discharge port of the first augers is located at one end of the first conveying material foundation pit communicating with the second conveying material foundation pit, and the first augers are used to convey bulk materials from the first conveying material foundation pit to the second conveying material foundation pit;
[0011] A second auger is installed in the second conveying material foundation pit, the discharge port of the second auger is located at one end where the second conveying material foundation pit is connected to the third conveying material foundation pit, and the second auger is used to transport bulk materials from the second conveying material foundation pit to the third conveying material foundation pit;
[0012] A third auger, wherein the feed port of the third auger is installed in the third conveying material pit, the discharge port of the third auger is located on the filling machine, and the third auger is used to lift and transport bulk materials from the third conveying material pit to the filling machine.
[0013] Optionally, the conveying material foundation pit group further includes:
[0014] A plurality of baffles are respectively arranged above the plurality of the first conveying material foundation pits, each of the baffles is located between two adjacent sleepers and below the rails, the tops of adjacent baffles are in contact, and the baffles include a middle baffle located between the two rails and an end baffle located outside the two rails;
[0015] A plurality of auger cover plates are detachably mounted on the corresponding first material conveying pit.
[0016] Optionally, the dimensions of the first conveying material pit include a length of 3600mm, a width of 180mm or 200mm, and a depth of 180mm or 200mm; the dimensions of the second conveying material pit include a length of 3500mm, a width of 400mm, and a depth of 400mm; the dimensions of the third conveying material pit include a length of 500mm, a width of 500mm, and a depth of 1100mm; the dimensions of the first augers include a diameter of 165mm and a length of 3500mm; the dimensions of the second augers include a diameter of 340mm and a length of 2850mm; and the dimensions of the third augers include a diameter of 340mm and a length of 5600mm.
[0017] Optionally, the filling machine comprises:
[0018] Support frame;
[0019] A quantitative filling hopper is fixed on the supporting frame, and is used to quantitatively fill the received bulk materials into a rated material bag;
[0020] A packing machine, fixed on the supporting frame, located on one side of the quantitative filling hopper, and used for packing the filled rated material bags;
[0021] A bag clamping machine is installed on the supporting frame, the bag clamping machine moves between the lower side of the quantitative filling hopper and the bag sealing machine, and the bag clamping machine is used to clamp the filled rated material bag;
[0022] A conveyor belt is installed on the support frame and is located below the quantitative filling hopper, the bag clamping machine and the packaging machine, and the conveyor belt is used to transport the filled rated material bags from below the quantitative filling hopper to the bag clamping machine and the packaging machine in sequence;
[0023] A control module is installed on the support frame, and the control module is electrically connected to the quantitative filling hopper, the packaging machine, the bag clamping machine, and the conveyor belt.
[0024] Optionally, a running wheel is installed at the bottom of the support frame, a control cabinet is arranged on the outside of the control module, an automatic heating device and an automatic heat dissipation device are arranged in the control cabinet, and the loading and unloading integrated machine is located at one end of the conveyor belt.
[0025] Optionally, the changing device further comprises a controller electrically connected to the auger assembly, the filling machine and the loading and unloading machine, wherein the controller is used to control and monitor the operating status of the auger assembly, the filling machine and the loading and unloading machine.
[0026] In a second aspect, an embodiment of the present invention further provides a railway bulk cargo transshipment method, using the railway bulk cargo transshipment device described in the first aspect, the transshipment method comprising:
[0027] Control the unloading port of the freight train to move to the top of the conveying material foundation pit group, and open the auger cover;
[0028] Control the input end of the loading and unloading machine to be aligned with the output end of the conveyor belt of the filling machine, and move the output end of the loading and unloading machine to one end of the railway freight caravan;
[0029] Control the opening of the unloading port of the freight train, and the bulk materials are unloaded into the conveying material foundation pit group;
[0030] The auger assembly transports and lifts the bulk materials in the conveying material foundation pit group to the quantitative filling hopper of the filling machine;
[0031] The quantitative filling hopper quantitatively fills the bulk material into the rated material bag, and the bag clamping machine clamps the filled rated material bag and transports it to the packaging machine for packaging under the drive of the conveyor belt;
[0032] The packaged rated material bags are transported to the loading and unloading machine via a conveyor belt. The loading and unloading machine delivers the packaged rated material bags to the railway freight car, and the operator assists in stacking them.
[0033] Optionally, the refitting method further includes:
[0034] When one end of the railway freight car is filled with rated material bags, the output end of the loading and unloading machine is moved to the other end of the railway freight car for bagging;
[0035] After completing the replacement of all bulk materials, retract the conveying arm of the loading and unloading machine, park the loading and unloading machine in a safe position, and cover the auger cover plate on the conveying material pit group.
[0036] The embodiment of the present invention provides a railway bulk cargo transshipment device and transshipment method, the transshipment device includes a conveying material foundation pit group, an auger assembly, a filling machine and a loading and unloading integrated machine, one end of the auger assembly is arranged in the conveying material foundation pit group, and the other end of the auger assembly is arranged in the filling machine, the conveying material foundation pit group is used to carry bulk materials transported by freight trains, the auger assembly transports the bulk materials from the conveying material foundation pit group to the filling machine, the filling machine fills the bulk materials into the rated material bags and clamps and packages them, and the loading and unloading integrated machine transports the packaged rated material bags to the railway freight car. The railway bulk cargo transshipment device has a high degree of automation and high transshipment efficiency for cross-track bulk cargo transshipment operations, reduces the number of operators and reduces the labor intensity of operators. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The above and other objects, features and advantages of the present invention will become more apparent through the following description of the embodiments of the present invention with reference to the accompanying drawings, in which:
[0038] Figure 1 is a schematic structural diagram of a railway bulk cargo transshipment device according to an embodiment of the present invention;
[0039] Figure 2 It is a structural schematic diagram of an auger assembly according to an embodiment of the present invention arranged in a material conveying foundation pit group;
[0040] Figure 3 2. It is a top view of the auger assembly of the embodiment of the present invention arranged in the material conveying pit group;
[0041] Figure 4 is a structural schematic diagram of a filling machine according to an embodiment of the present invention;
[0042] Figure 5is a side view of a filling machine according to an embodiment of the present invention;
[0043] Figure 6 It is a structural schematic diagram of a loading and unloading integrated machine according to an embodiment of the present invention;
[0044] Figure 7 It is a flow chart of a railway bulk cargo transshipment method according to an embodiment of the present invention.
[0045] Reference numerals:
[0046] 1- conveying material foundation pit group; 11- first conveying material foundation pit; 12- second conveying material foundation pit; 13- third conveying material foundation pit; 14- baffle; 141- middle baffle; 142- end baffle; 15- auger cover plate;
[0047] 2-auger assembly; 21-first auger; 22-second auger; 23-third auger;
[0048] 3-filling machine; 31-support frame; 32-quantitative filling hopper; 33-packing machine; 34-bag clamping machine; 35-conveyor belt; 36-conveying wheel; 37-control cabinet;
[0049] 4-loading and unloading machine; 5-sleeper; 6-track; 7-railway freight wagon; 8-freight train. DETAILED DESCRIPTION
[0050] The present application is described below based on embodiments, but the present application is not limited to these embodiments. In the detailed description of the present application below, some specific details are described in detail. It is possible for those skilled in the art to fully understand the present application without the description of these details. In order to avoid confusing the essence of the present application, known methods, processes, flows, components and circuits are not described in detail.
[0051] In addition, persons of ordinary skill in the art will appreciate that the drawings provided herein are for illustration purposes and are not necessarily drawn to scale.
[0052] Unless otherwise clearly defined and specified, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0053] Unless the context clearly requires otherwise, the words "include", "comprising" and similar words throughout the application should be interpreted as including rather than exclusive or exhaustive; that is, the meaning is "including but not limited to".
[0054] In the description of this application, it should be understood that the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of this application, unless otherwise specified, the meaning of "plurality" is two or more.
[0055] Generally speaking, for long distances and large amounts of cargo, based on convenience and cost considerations, rail freight is usually chosen to transport bulk materials to a train station closer to the destination, and then the bulk materials are transferred to a railway freight wagon through a railway bulk cargo transshipment device, and then the railway freight wagon transports the bulk materials to the destination to complete the transportation.
[0056] Figure 1 The schematic diagram of the structure of the railway bulk cargo transfer device of the embodiment of the present application is shown in FIG. The railway bulk cargo transfer device is used to transfer bulk materials transported by a freight train 8 from the freight train 8 to a railway freight wagon 7, and then the railway freight wagon 7 transports the bulk materials to the destination. The railway bulk cargo transfer device has the advantages of high automation, high transfer efficiency and low labor intensity.
[0057] like Figure 1 As shown, the loading and unloading device includes a conveying material pit group 1, an auger assembly 2, a filling machine 3, and a loading and unloading integrated machine 4. One end of the auger assembly 2 is arranged in the conveying material pit group 1, and the other end of the auger assembly 2 is arranged in the filling machine 3. The input end of the loading and unloading integrated machine 4 is aligned with the output end of the filling machine 3, and the output end of the loading and unloading integrated machine 4 is moved and placed in the railway freight car 7. Thus, the freight train 8 is transported along the track to the top of the conveying material pit group 1, and when the discharge port is opened, the bulk materials in it are directly discharged into the conveying material pit group 1, and the auger assembly 2 transports the bulk materials from the conveying material pit group 1 to the filling machine 3, and then the filling machine 3 fills the bulk materials into the rated material bag for clamping and packaging, and finally transported to the railway freight car 7 by the loading and unloading integrated machine 4, and stacked with the assistance of the staff. The conveying material pit group 1 is arranged below and near the track 6. The arrangement position of the conveying material pit group 1 does not affect the normal operation of the track line. During the unloading process of different carriages of the freight train, it is not necessary to move other equipment of the railway bulk cargo transshipment device. It is only necessary to move the unloading port of the carriage to the top of the conveying material pit group 1 to receive the bulk materials, thereby improving the unloading efficiency and transshipment efficiency. The track 6 of the present application is a railway track.
[0058] like Figure 2 and Figure 3As shown, the conveying material foundation pit group 1 includes a plurality of first conveying material foundation pits 11, a second conveying material foundation pit 12 and a third conveying material foundation pit 13. The auger assembly 2 includes a plurality of first auger 21, a second auger 22 and a third auger 23. The number of the first auger 21 is consistent with the number of the first conveying material foundation pits 11, so that a first auger 21 is installed in each first conveying material foundation pit 11. The second auger 22 is installed in the second conveying material foundation pit 12, and the third auger 23 is installed in the third conveying material foundation pit 13.
[0059] Each first conveying material pit 11 is arranged between adjacent sleepers 5, and multiple first conveying material pits 11 are arranged side by side in sequence along the arrangement direction of the sleepers 5. The length and width of multiple first conveying material pits 11 are greater than the length and width of the unloading port of the carriage, so that when the unloading port is opened, the bulk materials can be directly unloaded into the first conveying material pit 11, avoiding the bulk materials at the edge from falling onto the track and the outside of the pit. That is, the number of first conveying material pits 11 needs to be set according to actual needs, which can meet the unloading use needs and not affect the track line work.
[0060] Furthermore, each first conveyor pit 11 is also located below the sleeper 5, which connects the parts on both sides of the track 6, so that bulk materials can be moved from one side of the first conveyor pit 11 to the other side of the first conveyor pit 11 through the first auger 21.
[0061] The second conveying material pit 12 is extended along the track 6 and is arranged below the ends of the plurality of first conveying material pits 11. The second conveying material pit 12 is connected with the plurality of first conveying material pits 11, so that the first auger 21 can convey the bulk materials in the first conveying material pit 11 to the second conveying material pit 12, thereby realizing the collection of the bulk materials. The second conveying material pit 12 is located outside the track 6, so that the filling machine 3 and the loading and unloading machine 4 do not affect the normal operation of the freight train 8.
[0062] The third conveying material foundation pit 13 is arranged at one end of the second conveying material foundation pit 12, and the third conveying material foundation pit 13 is connected with the second conveying material foundation pit 12. After the bulk material in the first conveying material foundation pit 11 is conveyed to the second conveying material foundation pit 12, the second auger 22 can convey the bulk material to the third conveying material foundation pit 13, so as to realize the collection and movement of the bulk material.
[0063] Specifically, the discharge port of the first auger 21 is located at one end where the first conveying material pit 11 is connected to the second conveying material pit 12, so that the first auger 21 can transport bulk materials from the first conveying material pit 11 to the second conveying material pit 12. The discharge port of the second auger 22 is located at one end where the second conveying material pit 12 is connected to the third conveying material pit 13, so that the second auger 22 can transport bulk materials from the second conveying material pit 12 to the third conveying material pit 13. The feed port of the third auger 23 is installed in the third conveying material pit 13, and the discharge port of the third auger 23 is located on the filling machine 3 (i.e., the quantitative filling hopper 32). The third auger 23 is used to lift and transport bulk materials from the third conveying material pit 13 to the filling machine 3, thereby completing the replacement of the conveying material pit group 1 to the filling machine 3.
[0064] In the embodiment of the present application, the first auger 21, the second auger 22 and the third auger 23 can adopt the auger structure or conveyor in the prior art to realize the transfer and transportation of materials. The embodiment of the present application selects auger to convey bulk materials, which can adapt to the transportation of bulk materials by different types of tank trucks.
[0065] In one example, the dimensions of the first conveying material pit 11 include a length of 3600mm, a width of 180mm, and a depth of 180mm, and the dimensions of the first auger 21 include a diameter of 165mm and a length of 3500mm. The dimensions of the second conveying material pit 12 include a length of 3500mm, a width of 400mm, and a depth of 400mm, and the dimensions of the second auger 22 include a diameter of 340mm and a length of 2850mm. The dimensions of the third conveying material pit 13 include a length of 500mm, a width of 500mm, and a depth of 1100mm, and the dimensions of the third auger 23 include a diameter of 340mm and a length of 5600mm. That is, the dimensions of the first auger 21 are smaller than the dimensions of the first conveying material pit 11, and the dimensions of the second auger 22 are smaller than the dimensions of the second conveying material pit 12, so that the first auger 21 can be installed in the first conveying material pit 11, and the second auger 22 can be installed in the second conveying material pit 12. The diameter of the third auger 23 is smaller than the transverse dimension of the third conveying material pit 13, and the length of the third auger 23 is greater than the depth of the third conveying material pit 13, so that one end of the third auger 23 is installed in the third conveying material pit 13, and the other end extends into the filling machine 3. In another example, the dimensions of the first conveying material pit 11 include a length of 3600 mm, a width of 200 mm, and a depth of 200 mm.
[0066] like Figure 2As shown, the conveyor pit group 1 also includes a plurality of baffles 14. The number of baffles 14 is consistent with the number of first conveyor pits 11. That is, each first conveyor pit 11 is provided with a baffle 14 for guiding the bulk material to flow into the first conveyor pit 11. Each baffle 14 is located between two adjacent sleepers 5 and below the track 6, and this arrangement will not affect the operation of the freight train. The baffle 14 has a conical or funnel-shaped cross-section to facilitate guiding the bulk material to flow into the first conveyor pit 11. Preferably, the tops of adjacent baffles 14 are in contact, which allows all the bulk material to be drained into the first conveyor pit 11 to prevent the bulk material from flowing to the outside of the track.
[0067] In the embodiment of the present application, the baffle 14 includes a middle baffle 141 located between the two tracks 6 and two end baffles 142 located outside the two tracks 6. Figure 2 The baffle plate 14 can cover the entire first conveying material pit 11, so that all bulk materials can flow into the first conveying material pit 11, avoiding flowing to the outside and causing losses.
[0068] Furthermore, the material conveying pit group 1 also includes a plurality of auger covers 15, such as Figure 2 As shown. The number of auger covers 15 is consistent with the number of first conveyor pits 11, and the auger covers 15 can be detachably covered on the first conveyor pit 11. When the railway bulk cargo transfer device is working, the auger covers 15 need to be opened so that the bulk material can flow into the first conveyor pit 11. After the railway bulk cargo transfer device is completed, the auger covers 15 are covered above the first conveyor pit 11 to prevent debris from falling into the first auger and the first conveyor pit 11, which can reduce the cleaning work of the staff and ensure the cleanliness of the materials.
[0069] like Figure 4 and Figure 5 As shown, the filling machine 3 includes a support frame 31, a quantitative filling hopper 32, a bagging machine 33, a bag clamping machine 34 and a conveyor belt 35. The quantitative filling hopper 32, the bagging machine 33, the bag clamping machine 34 and the conveyor belt 35 are installed on the support frame 31. The bagging machine 33 and the bag clamping machine 34 are respectively arranged on one side of the quantitative filling hopper 32, and the bag clamping machine 34 is located between the bagging machine 33 and the quantitative filling hopper 32. The conveyor belt 35 is located below the quantitative filling hopper 32, the bagging machine 33 and the bag clamping machine 34. After the bulk material enters the quantitative filling hopper 32, it is weighed and metered to be quantitatively filled into the rated material bag. Under the drive of the conveyor belt 35, the rated material bag is tightened by the bag clamping machine 34 and sent to the bagging machine 33 for packaging under the drive of the conveyor belt 35.
[0070] The support frame 31 is a frame structure welded with profiles, which has the advantages of low cost and simple structure. Optionally, a running wheel 36 is installed at the bottom of the support frame 31 to facilitate the movement of the filling machine 3.
[0071] The quantitative filling hopper 32 is used to quantitatively fill the bulk materials received into the rated material bag. The quantitative filling hopper 32 adopts a double-hopper structure to increase the filling speed. The quantitative filling hopper 32 is equipped with two filling modes: automatic filling and semi-automatic filling. Different filling conditions are adjusted on site according to the situation. The quantitative filling hopper 32 is equipped with an automatic weighing device, which can be set to fill bulk materials of different weights as needed.
[0072] The bag clamping machine 34 is installed on the supporting frame 31. The bag clamping machine 34 has a clamping claw, which can be opened and clamped, and can also move as a whole between the bottom of the quantitative filling hopper 32 and the packaging machine 33. When the rated material bag is filled under the quantitative filling hopper 32, the clamping claw is in an open state and moves to both sides of the rated material bag; when the filling is completed, the clamping claw is controlled to clamp the rated material bag, and under the control of the bag clamping machine 34 itself and the drive of the conveyor belt 35, the clamping claw clamps the rated material bag and sends it to the packaging machine 33, and the packaging machine 33 packages the rated material bag.
[0073] In the embodiment of the present application, the conveyor belt 35 is a belt transmission, which is used to transport the filled rated material bags from the bottom of the quantitative filling hopper 32 through the bag clamping machine 34 and the packaging machine 33 in sequence, and then transport them to the loading and unloading integrated machine 4.
[0074] The filling machine 3 also includes a control module installed on the support frame 31. The control module is electrically connected to the quantitative filling hopper 32, the bag closing machine 33, the bag clamping machine 34, and the conveyor belt 35, and is used to control the filling speed, the bag clamping speed, the bag closing speed, and the rotation speed of the conveyor belt 35. Figure 4 and Figure 5 As shown, a control cabinet 37 is arranged on the outside of the control module, and an automatic heating device and an automatic heat dissipation device are arranged inside the control cabinet 37. The automatic heating device and the automatic heat dissipation device are connected to the control module, and can heat or dissipate heat at extreme temperatures to adapt to the transshipment of railway bulk cargo under extreme working conditions of -40OC to 60OC.
[0075] Among them, the filling machine can automatically adjust the filling speed according to the operator's proficiency, and the bag clamping machine, packaging machine, conveyor belt and loading and unloading machine adjust the speed according to the filling speed, achieving a maximum filling speed of 20 bags / min, and achieving the goal of increasing the filling speed by 1 times.
[0076] The loading and unloading machine 4 is located at one end of the conveyor belt 35. Specifically, the input end of the loading and unloading machine 4 is aligned with the output end of the conveyor belt 35 of the filling machine 3, and the output end of the loading and unloading machine 4 moves to one side of the railway freight car 7. After the packing machine 33 packs the rated material bags, the rated material bags are directly transported to the loading and unloading machine 4 under the drive of the conveyor belt 35, and then the loading and unloading machine 4 directly transports the packaged rated material bags to the railway freight car 7, and the operator assists in stacking, thereby completing the cross-track bulk cargo transfer process. Among them, Figure 6 As shown, the loading and unloading machine 4 can automatically shrink the length of the conveying arm according to the loading status, eliminating the need for operators to carry rated material bags. The loading and unloading machine can save manpower and reduce labor intensity by loading and unloading bagged goods.
[0077] In the embodiment of the present application, the filling machine 3 can adopt the existing quantitative filling equipment, which needs to meet the functions of quantitative filling, material bag clamping, and packaging. The loading and unloading integrated machine 4 can adopt the existing loading and unloading integrated machine structure, specifically the functions of automatically retracting the conveying arm and adjusting the conveying angle of the conveying arm. In addition, the filling machine 3 can be used as an independent structure in other fields, such as a filling factory.
[0078] In the embodiment of the present application, the railway bulk cargo transshipment device further includes a controller, which is electrically connected to the auger assembly 2, the filling machine 3 and the loading and unloading integrated machine 4, and the controller is used to control and monitor the operating status of the auger assembly 2, the filling machine 3 and the loading and unloading integrated machine 4. Specifically, it includes monitoring the operating status of the motors of each structure, monitoring various data during the transshipment process (such as filling speed, filling time, filling times, etc.), and can track the equipment filling error rate and statistics of transshipment information.
[0079] The railway bulk cargo transshipment device of the present embodiment does not affect the operation of the track line and has the smallest modification workload. It can realize the unloading, lifting, weighing, packaging, transportation and railway freight car loading of bulk materials in freight trains without moving equipment or affecting the safety of train operation, thereby improving the automation level of cross-track bulk cargo transshipment operations and reducing the number of operators and labor intensity.
[0080] Figure 7 1 is a flow chart of the railway bulk cargo transshipment method according to an embodiment of the present application, and the railway bulk cargo transshipment method is implemented based on the railway bulk cargo transshipment device according to the above embodiment. Figure 7 As shown, the railway bulk cargo transshipment methods include:
[0081] Step S10, control the unloading port of the freight train to move to the top of the conveying material foundation pit group, and open the auger cover.
[0082] Step S20: Control the input end of the integrated loading and unloading machine to be aligned with the output end of the conveyor belt of the filling machine, and move the output end of the integrated loading and unloading machine to one end of the railway freight caravan.
[0083] In step S10 and step S20, the controller can control and adjust the bag clamp height, packaging machine height, conveyor belt speed, filling speed, conveying speed of the loading and unloading machine, speed of the auger assembly, etc. according to the total weight of the freight train and the model of the railway freight car that needs to be replaced.
[0084] Step S30, controlling the opening of the unloading port of the freight train, and unloading the bulk materials into the conveying material foundation pit group.
[0085] Start the bulk material replacement. When one unloading port of the freight train has been unloaded, personnel are required to move the freight train so that the other unloading ports are moved to the top of the conveying material foundation pit group for unloading.
[0086] Step S40: The auger assembly transports and lifts the bulk materials in the conveying material foundation pit group into the quantitative filling hopper of the filling machine.
[0087] Step S50: The quantitative filling hopper quantitatively fills the bulk material into the rated material bag, and the bag clamping machine clamps the filled rated material bag and transports it to the packaging machine for packaging under the drive of the conveyor belt.
[0088] Step S60: The packaged rated material bags are transported to the loading and unloading integrated machine via a conveyor belt. The loading and unloading integrated machine delivers the packaged rated material bags to a railway freight car, and the operator assists in stacking them.
[0089] Step S70: When one end of the railway freight car is filled with rated material bags, the output end of the loading and unloading machine is moved to the other end of the railway freight car for bagging.
[0090] During the filling process, when one end of the railway freight car is full, the output end of the loading and unloading machine needs to be moved to the other end of the railway freight car for bagging.
[0091] Step S80: After all bulk materials have been replaced, the conveying arm of the loading and unloading machine is retracted, the loading and unloading machine is parked in a safe position, and the auger cover is placed on the conveying material foundation pit group.
[0092] When the freight train has unloaded all the bulk materials, the pit is cleaned to allow the auger components to be transported to the filling machine. Then the loading and unloading machine is retracted to park it in a safe position, and the auger cover is placed on the conveying material pit group to complete the cross-track loading operation.
[0093] The railway bulk cargo transshipment method does not require any moving equipment during the transshipment process and will not affect the safe operation of the train. It can realize the unloading, lifting, weighing, packaging, transportation of bulk materials in freight trains and the loading of railway freight wagons, thereby improving the automation level of cross-track bulk cargo transshipment operations, reducing the number of operators and reducing the labor intensity of operators.
[0094] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A railway bulk cargo transshipment device, characterized in that: The loading and unloading device comprises a conveying material pit group (1), an augers assembly (2), a filling machine (3) and a loading and unloading machine (4); one end of the augers assembly (2) is arranged in the conveying material pit group (1), and the other end of the augers assembly (2) is arranged in the filling machine (3); the conveying material pit group (1) is used to receive bulk materials transported by a freight train (8); the augers assembly (2) is used to transport the bulk materials from the conveying material pit group (1) to the filling machine (3); the filling machine (3) is used to fill the bulk materials into a rated material bag for clamping and sealing; and the loading and unloading machine (4) is used to transport the sealed rated material bag to a railway freight car (7).
2. The dressing device according to claim 1, characterized in that: The material conveying pit group (1) comprises: A plurality of first material conveying pits (11), each of the first material conveying pits (11) being arranged between adjacent sleepers (5), and the plurality of first material conveying pits (11) being arranged side by side in sequence along the arrangement direction of the sleepers (5); A second material conveying pit (12) is extended along the track (6) and arranged below the ends of the plurality of first material conveying pits (11), and the second material conveying pit (12) is connected to the plurality of first material conveying pits (11); The third material conveying pit (13) is arranged at one end of the second material conveying pit (12), and the third material conveying pit (13) is connected to the second material conveying pit (12).
3. The dressing device according to claim 2, characterized in that: The auger assembly (2) comprises: A plurality of first augers (21), one of the first augers (21) being installed in each of the first conveying material foundation pits (11), the discharge port of the first augers (21) being located at an end where the first conveying material foundation pit (11) is connected to the second conveying material foundation pit (12), and the first augers (21) are used to convey bulk materials from the first conveying material foundation pit (11) to the second conveying material foundation pit (12); A second auger (22) is installed in the second conveying material foundation pit (12), the discharge port of the second auger (22) is located at one end where the second conveying material foundation pit (12) is connected to the third conveying material foundation pit (13), and the second auger (22) is used to transport bulk materials from the second conveying material foundation pit (12) to the third conveying material foundation pit (13); A third auger (23), wherein the feed port of the third auger (23) is installed in the third material conveying pit (13), and the discharge port of the third auger (23) is located on the filling machine (3). The third auger (23) is used to lift and convey bulk materials from the third material conveying pit (13) to the filling machine (3).
4. The dressing device according to claim 2, characterized in that: The material conveying pit group (1) further comprises: A plurality of baffles (14) are respectively arranged above the plurality of first conveying material foundation pits (11), each of the baffles (14) is located between two adjacent sleepers (5) and below the track (6), the tops of adjacent baffles (14) are in contact, and the baffles (14) include a middle baffle (141) located between the two tracks (6) and an end baffle (142) located outside the two tracks (6); A plurality of auger cover plates (15) are respectively detachably covered on the corresponding first material conveying pit (11).
5. The dressing device according to claim 3, characterized in that: The dimensions of the first conveying material pit (11) include a length of 3600 mm, a width of 180 mm or 200 mm, and a depth of 180 mm or 200 mm; the dimensions of the second conveying material pit (12) include a length of 3500 mm, a width of 400 mm, and a depth of 400 mm; the dimensions of the third conveying material pit (13) include a length of 500 mm, a width of 500 mm, and a depth of 1100 mm; the dimensions of the first augers (21) include a diameter of 165 mm and a length of 3500 mm; the dimensions of the second augers (22) include a diameter of 340 mm and a length of 2850 mm; the dimensions of the third augers (23) include a diameter of 340 mm and a length of 5600 mm.
6. The dressing device according to claim 1, characterized in that: The filling machine (3) comprises: Support frame (31); A quantitative filling hopper (32) is fixed on the support frame (31), and the quantitative filling hopper (32) is used to quantitatively fill the received bulk material into a rated material bag; A packing machine (33) is fixed on the supporting frame (31), the packing machine (33) is located on one side of the quantitative filling hopper (32), and the packing machine (33) is used to pack the filled rated material bags; A bag clamping machine (34) is installed on the supporting frame (31), the bag clamping machine (34) moves between the lower side of the quantitative filling hopper (32) and the packaging machine (33), and the bag clamping machine (34) is used to clamp the filled rated material bag; a conveyor belt (35) installed on the supporting frame (31) and located below the quantitative filling hopper (32), the bag clamping machine (34) and the packaging machine (33); the conveyor belt (35) is used to transport the filled rated material bags from below the quantitative filling hopper (32) through the bag clamping machine (34) and the packaging machine (33) in sequence; A control module is installed on the support frame (31), and the control module is electrically connected to the quantitative filling hopper (32), the packaging machine (33), the bag clamping machine (34), and the conveyor belt (35).
7. The changing device according to claim 6, characterized in that: A running wheel (36) is installed at the bottom of the support frame (31), a control cabinet (37) is arranged on the outside of the control module, an automatic heating device and an automatic heat dissipation device are arranged inside the control cabinet (37), and the loading and unloading integrated machine (4) is located at one end of the conveyor belt (35).
8. The dressing device according to claim 1, characterized in that: The reloading device further comprises a controller which is electrically connected to the auger assembly (2), the filling machine (3) and the loading and unloading machine (4), and the controller is used to control and monitor the operating status of the auger assembly (2), the filling machine (3) and the loading and unloading machine (4).
9. A railway bulk cargo transshipment method, using the railway bulk cargo transshipment device according to any one of claims 1 to 8, characterized in that: The refitting method comprises: Control the unloading port of the freight train (8) to move to the top of the conveying material foundation pit group (1), and open the auger cover plate (15); Controlling the input end of the loading and unloading machine (4) to be aligned with the output end of the conveyor belt (35) of the filling machine (3), and moving the output end of the loading and unloading machine (4) to one end of the railway freight caravan (7); Controlling the opening of the unloading port of the freight train (8), and unloading the bulk materials into the conveying material foundation pit group (1); The auger assembly (2) transports and lifts the bulk material in the conveying material foundation pit assembly (1) into the quantitative filling hopper (32) of the filling machine (3); The quantitative filling hopper (32) quantitatively fills the bulk material into the rated material bag, and the bag clamping machine (34) clamps the filled rated material bag and transports it to the packaging machine (33) for packaging under the drive of the conveyor belt (35); The packaged rated material bags are transported to the loading and unloading integrated machine (4) via a conveyor belt (35), and the loading and unloading integrated machine (4) delivers the packaged rated material bags to a railway freight car (7), where they are stacked with the assistance of an operator.
10. The refitting method according to claim 9, characterized in that: The refitting method further comprises: When one end of the railway freight car (7) is filled with rated material bags, the output end of the loading and unloading integrated machine (4) is moved to the other end of the railway freight car (7) for bagging; After all bulk material replacement is completed, the conveying arm of the loading and unloading integrated machine (4) is retracted, the loading and unloading integrated machine (4) is parked in a safe position, and the auger cover plate (15) is covered on the conveying material foundation pit group (1).
