Intelligent fault monitoring method and equipment for tower crane

By obtaining the working and environmental information of the tower crane, judging the operating load level and analyzing historical fault data, the risk coefficient is generated, which solves the problem of low efficiency of tower crane fault diagnosis and monitoring strategies, and improves the safety and reliability of the tower crane. .

CN118723833AInactive Publication Date: 2024-10-01JIANGXI DEYE ZHIHUI IOT TECH CO LTD
View PDF 0 Cites 9 Cited by

Patent Information

Application Number
CN202411041826.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively integrate and standardize data processing in multiple dimensions based on the historical conditions of the tower crane itself, resulting in insufficient fault diagnosis accuracy and insufficient monitoring strategy efficiency.

Method used

By obtaining the working information and environmental information of the tower crane, including lifting weight value, inclination, hydraulic status, electrical status, wind direction, wind speed and humidity, etc., the operating load level is determined, and the sensor data is distributed according to time, location and type. Store and analyze historical fault information to generate risk coefficients, assess potential risks and provide early warnings.

Benefits of technology

It improves the safety and reliability of tower cranes, detects potential faults in advance, reduces the occurrence of faults, provides effective early warning and decision support, and improves the accuracy and efficiency of construction management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118723833A_ABST
    Figure CN118723833A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tower crane control, and provides an intelligent fault monitoring method and device for a tower crane, and the method comprises the steps: obtaining the working information and environment information of the tower crane, and judging the operation load grade of the tower crane; obtaining the problem time, the problem position and the problem type of each fault of each operation load level in the historical operation data of the tower crane, and sorting the problems into fault information; the workflow data and the environment data flow before the historical fault information occurs are analyzed, a fluctuation interval is analyzed according to the change condition of each problem type in time under each operation load level, and unit monitoring time is generated; when a certain type of sensor data of the tower crane is in a fluctuation interval, acquiring a maximum fluctuation value and a minimum fluctuation value, evaluating and generating a risk coefficient, and multiplying the risk coefficient by an operation load grade to generate a risk grade. The safety and reliability of the tower crane can be improved, faults can be reduced, and potential risks can be found in advance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tower crane control, and in particular to an intelligent fault monitoring method and equipment for a tower crane. Background Art

[0002] Intelligent fault monitoring of tower cranes is one of the key technologies to ensure the safe and efficient operation of tower cranes (referred to as tower cranes). With the development of the construction industry, tower cranes play an increasingly important role in the construction of high-rise and super-high-rise buildings, and their safety, reliability and efficiency have become the focus of the industry. However, due to factors such as the harsh working environment and complex operation of tower cranes, safety accidents occur from time to time. Therefore, it is particularly important to develop an effective intelligent fault monitoring system.

[0003] In recent years, intelligent monitoring and fault diagnosis systems for tower cranes based on sensor technology, computer technology, and measurement and control technology have been widely studied and applied. In terms of fault monitoring, in order to further improve the accuracy of fault diagnosis, some studies have proposed methods that combine deep learning and transfer learning frameworks to reduce data dependence and improve model performance. The application of these methods in fault diagnosis shows that they can effectively improve the accuracy and computational complexity of diagnosis. However, in terms of data processing in multiple dimensions, it is difficult to effectively integrate and standardize based on the historical situation of the tower crane itself, and it is difficult to provide efficient monitoring strategies for historical problems.

[0004] Therefore, an intelligent tower crane fault monitoring method and device are proposed to solve the problem in the prior art that it is difficult to effectively standardize data processing in multiple dimensions based on the historical conditions of the tower crane itself. Summary of the invention

[0005] In view of this, the present invention proposes an intelligent fault monitoring method and device for tower cranes to solve the problem in the prior art that data processing in multiple dimensions is difficult to effectively integrate and standardize based on the historical conditions of the tower crane itself.

[0006] On the one hand, the present invention proposes an intelligent tower crane fault monitoring method, comprising:

[0007] Acquiring the working information of the tower crane includes acquiring the maximum allowable load M of the tower crane, and setting sensors on the tower crane to acquire the hoisting weight value C, inclination, working state and working temperature of the hydraulic mechanism, and working current and working voltage of the electrical mechanism, and summarizing and generating workflow data;

[0008] Acquiring environmental information of the tower crane includes acquiring the standard operating environment and setting sensors on the tower crane to obtain wind direction, wind speed, temperature and humidity, and summarizing and generating an environmental data stream;

[0009] Determining the operation load level of the tower crane according to the workflow data and the environmental data stream;

[0010] The data collected by each sensor at different operating load levels are distributed and stored according to time, location and type;

[0011] Obtain the problem time, problem location, and problem type of each failure at each operating load level in the historical operation data of the tower crane and organize them into failure information;

[0012] Analyze the workflow data and environmental data streams before the occurrence of historical fault information, analyze the fluctuation range according to the temporal changes of each problem type under each operating load level, and generate unit monitoring time;

[0013] When sensor data of a certain type of tower crane is within the fluctuation range, the maximum fluctuation value and the minimum fluctuation value are obtained, a risk coefficient is evaluated and generated, and the risk coefficient is multiplied by the operating load level to generate a risk level.

[0014] Preferably, the aggregation and generation of workflow data includes calculating a load ratio L, and the load ratio L is obtained by calculating the following formula:

[0015]

[0016] Among them, M is the maximum allowable load, that is, the maximum working load of the tower crane in design or specification, C is the hoisting value of the tower crane, that is, the weight of the object currently hoisted by the tower crane, V is the current tilt factor of the tower crane, B is the current hydraulic efficiency factor of the tower crane, and N is the current electrical efficiency factor of the tower crane.

[0017] Preferably, the aggregation and generation of the environmental data stream includes calculating an environmental condition index E, wherein the environmental condition index E is obtained by calculating the following formula:

[0018]

[0019] Among them, α1 is the wind speed weight, where 0<α1≤1 when the wind direction is the same as the tower crane movement direction, and 1<α1≤2 when the wind direction is opposite to the tower crane movement direction. WS is the actual wind speed, I WS is the standard wind speed, α2 is the temperature weight, T is the actual temperature, I T is the standard temperature, α3 is the humidity weight, H is the actual humidity, I H is the standard humidity, where;

[0020] The environmental data stream is also preset with a first standard environmental condition index EA and a second standard environmental condition index EB, where EA<EB, and the environmental condition index E is compared with the relationship between the two to determine the environmental impact factor E. k , where k represents the time point;

[0021] When E<EA, output environmental impact factor E k is 1;

[0022] When EA≤E<EB, the output environmental impact factor E k is E;

[0023] When EB≤E, output environmental impact factor E k It is (α1+α2+α3)×E.

[0024] Preferably, judging the operation load level of the tower crane according to the workflow data and the environmental data stream includes: k The load factor R is calculated by the load ratio L, and the load factor R is obtained by the following formula:

[0025] R=β×E k +γ×L;

[0026] Among them, β is the weight value of the environmental impact factor, and γ is the weight value of the load ratio.

[0027] Preferably, the step of determining the operating load level of the tower crane further includes:

[0028] Compare the load factor R with the first load factor Ra and the second load factor Rb to determine the load level, wherein Ra<Rb;

[0029] When R<Ra, it is judged that the tower crane is at the first load level;

[0030] When Ra≤R<Rb, it is judged that the tower crane is at the second load level;

[0031] When Rb≤R, the tower crane is judged to be at the third load level.

[0032] Among them, the risk value of the first load level is smaller than the risk value of the second load level, and the risk value of the second load level is smaller than the risk value of the third load level.

[0033] Preferably, the data collected by each sensor at different operating load levels is distributedly stored according to time, location and type, including:

[0034] Assign a failure risk weight value to each type of data, and standardize each type of data using the following formula for weighted standardization:

[0035]

[0036] Among them, X i is the raw data of sensor i, X′ iYes X i Weighted and standardized data, ε i is the weight of sensor i.

[0037] Preferably, the problem time, problem location, and problem type of each failure at each operating load level in the historical operation data of the tower crane are obtained and sorted into failure information;

[0038] Obtain the fault information, organize each fault information into a fault information set S, traverse the fault information set S, perform standardization processing, and obtain each type of sensor in each fault information set S, and accumulate the weight value ε of the fault risk of each sensor type i , obtain the basic risk coefficient G of each fault information set S S , calculated by the following formula:

[0039]

[0040] The basic risk factor G S Compare with the first risk coefficient Ga and the second risk coefficient Gb, where Ga<Gb, and determine the basic risk value D of the fault information according to the comparison result;

[0041] When G S <Ga, it is determined that the basic risk value of the fault information is the first risk value D1;

[0042] When Ga≤G S <Gb, it is determined that the basic risk value of the fault information is the second risk value D2;

[0043] When Gb≤G S When , it is determined that the basic risk value of the fault information is a third risk value D3;

[0044] Among them, D1<D2<D3.

[0045] Preferably, the workflow data and environment data stream before the occurrence of historical fault information are analyzed, the fluctuation interval is analyzed according to the temporal changes of each problem type under each operating load level, and the unit monitoring time is generated, including:

[0046] The fault information is used as the middle node in the time domain to align it with the sensor data. The basic change cycle is preset according to the data type. The basic change cycle is divided into time windows. The data of each sensor in the time window before the fault occurs is statistically analyzed, including calculating the mean and standard deviation indicators. The moving average and standard deviation are calculated using the sliding window technology to capture the fluctuation range of the data. The basic change cycle is corrected according to the fluctuation range to generate a unit monitoring time. The model is trained using a machine learning algorithm to learn the problematic fluctuations in each sensor data in each fault information within the unit monitoring time.

[0047] Preferably, when the sensor data of a certain type of tower crane is within the fluctuation range, the maximum fluctuation value and the minimum fluctuation value are obtained, the risk coefficient is evaluated and generated, and the risk level is determined according to the operating load level and the risk coefficient, including:

[0048] A risk interval is preset for each sensor data, and when the maximum fluctuation value and the minimum fluctuation value belong to the risk interval, the basic risk value D is corrected using the first risk coefficient P1 to generate a risk coefficient;

[0049] When the maximum fluctuation value or the minimum fluctuation value does not belong to the risk interval, the fluctuation time when the maximum fluctuation value reaches the minimum fluctuation value is obtained, wherein:

[0050] When the fluctuation time is greater than the unit monitoring time, the second risk coefficient P2 is used to correct the basic risk value D;

[0051] When the fluctuation time is less than the unit monitoring time, the basic risk value D is corrected using the third risk coefficient P3;

[0052] Among them, 0<P1<P2<1<P3.

[0053] On the other hand, the present invention also provides an intelligent tower crane fault monitoring device, comprising:

[0054] The tower crane monitoring module obtains the working information of the tower crane, including obtaining the maximum allowable load M of the tower crane, and setting sensors on the tower crane to obtain the hoisting weight value C, inclination and working status and working temperature of the hydraulic mechanism, as well as the working current and working voltage of the electrical mechanism, and summarizes and generates workflow data;

[0055] Environmental monitoring module, which obtains environmental information of the tower crane, including obtaining the standard operating environment, and setting sensors on the tower crane to obtain wind direction, wind speed, temperature and humidity, and summarize and generate environmental data streams;

[0056] A classification module, for determining the operation load level of the tower crane according to the workflow data and the environment data stream;

[0057] The storage module stores the data collected by each sensor at different operating load levels in a distributed manner according to time, location and type;

[0058] The fault database module obtains the problem time, problem location, and problem type of each fault at each operating load level in the historical operation data of the tower crane and organizes them into fault information;

[0059] The analysis module analyzes the workflow data and environmental data stream before the historical fault information occurs, analyzes the fluctuation range according to the temporal changes of each problem type under each operating load level, and generates the unit monitoring time;

[0060] The evaluation module obtains the maximum fluctuation value and the minimum fluctuation value when the sensor data of a certain type of tower crane is within the fluctuation range, evaluates and generates a risk coefficient, and multiplies the risk coefficient with the operating load level to generate a risk level.

[0061] Compared with the prior art, the beneficial effect of the present invention lies in that, by acquiring in real time the working information of the tower crane, such as the hoisting weight value, inclination, hydraulic mechanism status, working temperature, working current and working voltage of the electrical mechanism, as well as environmental information such as wind direction, wind speed, temperature and humidity, the operation status of the tower crane can be judged and the basic risk can be evaluated. The data collected by the sensor are distributedly stored according to time, location and type to facilitate historical data analysis, fault information collation and risk assessment. The historical fault information and the workflow data and environmental data stream before the occurrence are analyzed to discover the laws and trends of the occurrence of faults. When a certain type of sensor data is monitored within the fluctuation range, the maximum fluctuation value and the minimum fluctuation value are obtained, and a risk coefficient is generated, which helps to discover potential risks in advance and provide early warning and decision support.

[0062] In general, the present invention can improve the safety and reliability of tower cranes, help reduce the occurrence of failures, and discover potential risks in advance. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0064] Figure 1 A flow chart of a tower crane intelligent fault monitoring method provided by an embodiment of the present invention;

[0065] Figure 2 This is a functional block diagram of the intelligent fault monitoring device for tower crane provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0066] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to be able to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0067] On the one hand, the present invention proposes an intelligent tower crane fault monitoring method, comprising:

[0068] Step S1: obtaining the working information of the tower crane includes obtaining the maximum allowable load M of the tower crane, and setting sensors on the tower crane to obtain the hoisting weight value C, inclination and working state and working temperature of the hydraulic mechanism, as well as the working current and working voltage of the electrical mechanism, and summarizing and generating workflow data;

[0069] Step S2: Acquiring environmental information of the tower crane includes acquiring a standard operating environment and setting sensors on the tower crane to obtain wind direction, wind speed, temperature and humidity, and summarizing and generating an environmental data stream;

[0070] Step S3: judging the operation load level of the tower crane according to the workflow data and the environment data stream;

[0071] Step S4: Distribute and store the data collected by each sensor at different operating load levels according to time, location and type;

[0072] Step S5: Obtain the problem time, problem location, and problem type of each failure at each operating load level in the historical operation data of the tower crane and organize them into failure information;

[0073] Step S6: Analyze the workflow data and environment data stream before the historical fault information occurs, analyze the fluctuation range according to the temporal changes of each problem type under each operating load level, and generate a unit monitoring time;

[0074] Step S7: When the sensor data of a certain type of tower crane is within the fluctuation range, the maximum fluctuation value and the minimum fluctuation value are obtained, a risk coefficient is evaluated and generated, and the risk coefficient is multiplied by the operating load level to generate a risk level.

[0075] Specifically, this embodiment constructs a multi-layer intelligent monitoring structure for comprehensive monitoring and data analysis, including but not limited to the use of the following sensors:

[0076] Amplitude sensor: installed on one side of the luffing mechanism drum bracket, it monitors the distance between the tower crane trolley and the center of the tower crane, parameter values ​​and amplitude in real time.

[0077] Height sensor: Installed on one side of the hoisting mechanism drum bracket, connected with a universal joint, to monitor the height from the hook to the ground in real time.

[0078] Rotation sensor: used to monitor the rotation angle and position of the tower crane to ensure that the tower crane remains stable during operation.

[0079] Wind speed sensor: used to measure the wind speed in the environment where the tower crane is located to prevent the tower crane from tipping over or causing accidents due to strong winds.

[0080] Tilt sensor: used to monitor the vertical and horizontal tilt of the tower crane, and promptly detect and prevent tower crane tipping accidents.

[0081] Force sensor: used to measure the stress conditions of various parts of the tower crane to ensure structural safety and avoid overload.

[0082] Temperature and humidity sensors: used to monitor the temperature of key components such as reducers and motors to prevent failures caused by overheating.

[0083] Current sensor: used to monitor the current of the motor and detect abnormal conditions of the motor in time.

[0084] Pressure sensor: used to monitor the pressure of the hydraulic jacking cylinder to ensure the normal operation of the hydraulic system.

[0085] Image sensor: used to identify the specific distance between the tower crane and the surrounding objects to prevent collision with objects in the surrounding environment.

[0086] The data stream is generated by aggregation, and, based on the workflow data and the environmental data stream, an algorithm or model is applied to determine the operating load level of the tower crane.

[0087] It can be understood that through real-time monitoring and fault warning, the occurrence of accidents can be reduced, personnel safety can be guaranteed, operating parameters can be dynamically adjusted to avoid excessive loading, the working efficiency of tower cranes can be improved, the data-driven decision-making process can improve the accuracy and reliability of management, and preventive maintenance can reduce unplanned downtime and maintenance costs.

[0088] In some embodiments of the present application, the workflow data is generated by aggregating and generating, including calculating a load ratio value L, where the load ratio value L is calculated by the following formula:

[0089]

[0090] Among them, M is the maximum allowable load, that is, the maximum working load of the tower crane in design or specification, C is the hoisting value of the tower crane, that is, the weight of the object currently hoisted by the tower crane, V is the current tilt factor of the tower crane, B is the current hydraulic efficiency factor of the tower crane, and N is the current electrical efficiency factor of the tower crane.

[0091] Specifically, the calculation of the load ratio L is an important part of monitoring the working status of the tower crane, which directly reflects the ratio of the current load condition of the tower crane to its designed or specified maximum working load.

[0092] By calculating the load ratio L, it is possible to monitor in real time whether the tower crane is overloaded, ensure that the tower crane operates within a safe range, and avoid safety accidents caused by overload. It is also possible to evaluate the actual working performance of the tower crane to ensure that it operates under a reasonable load, without overuse or waste of resources. When S is close to 1 or exceeds 1, the early warning system can be triggered to remind the operator to reduce the load or stop lifting to prevent structural damage. In addition, recording the changing trend of the S value can be used for long-term performance analysis to help predict maintenance needs and potential mechanical failures. Moreover, by monitoring the S value, the use of the tower crane can be optimized to ensure that it operates within an efficient and safe load range, thereby improving construction progress and economic benefits.

[0093] It can be understood that by calculating and monitoring the load ratio L, it is possible to achieve refined management of the working status of the tower crane, ensuring its operation in a safe and efficient state, while providing data support for maintenance and decision-making, and further improving the overall management level of the construction project.

[0094] In some embodiments of the present application, the environmental data stream is aggregated and generated, including calculating an environmental condition index E, where the environmental condition index E is calculated using the following formula:

[0095]

[0096] Among them, α1 is the wind speed weight, where 0<α1≤1 when the wind direction is the same as the tower crane movement direction, and 1<α1≤2 when the wind direction is opposite to the tower crane movement direction. WS is the actual wind speed, I WS is the standard wind speed, α2 is the temperature weight, T is the actual temperature, I T is the standard temperature, α3 is the humidity weight, H is the actual humidity, I H is the standard humidity, where;

[0097] The environmental data stream also presets a first standard environmental condition index EA and a second standard environmental condition index EB, where EA < EB, and compares the relationship between the environmental condition index E and the two to determine the environmental impact factor E. k , where k represents the time point;

[0098] When E<EA, output environmental impact factor Ek is 1;

[0099] When EA≤E<EB, the output environmental impact factor E k is E;

[0100] When EB≤E, the output environmental impact factor is E k It is (α1+α2+α3)×E.

[0101] Specifically, the calculation and application of the environmental condition index E is a method for evaluating the safety and suitability of tower cranes operating under specific environmental conditions. The index combines the impact of environmental factors such as wind speed, temperature and humidity, and reflects the comprehensive impact of these environmental factors on the working state of the tower crane through specific weights and threshold settings. The calculation of the E value helps determine the adaptability of the tower crane under the current environmental conditions, ensures that operations are carried out in a safe environment, and avoids damage to the tower crane caused by bad weather. By calculating the E value in real time and comparing it with the preset EA and EB thresholds, the risks that changes in environmental conditions may bring to the tower crane can be discovered in a timely manner, and corresponding measures can be taken.

[0102] Specifically, when the wind direction is the same as the tower crane movement direction, 0<α1≤1, and when the wind direction is opposite to the tower crane movement direction, 1<α1≤2. For the angle between 0 and 180 degrees, a specific embodiment is given.

[0103]

[0104] For example, when the angle is 0 degrees, the influence coefficient α1 is 1.0 (the wind direction is the same as the movement direction of the tower crane), when the angle is 45 degrees, the influence coefficient α1 is 1.25, when the angle is 90 degrees, the influence coefficient α1 is 1.5, when the angle is 135 degrees, the influence coefficient α1 is 1.75, when the angle is 180 degrees, the influence coefficient α1 is 2.0 (the wind direction is opposite to the movement direction of the tower crane).

[0105] In some embodiments of the present application, the operation load level of the tower crane is determined according to the workflow data and the environmental data stream, including the following: k The load factor R is calculated by the load ratio L. The load factor R is calculated by the following formula:

[0106] R=β×E k +γ×L;

[0107] Among them, β is the weight value of the environmental impact factor, and γ is the weight value of the load ratio.

[0108] In some embodiments of the present application, determining the operating load level of the tower crane further includes:

[0109] Compare the load factor R with the first load factor Ra and the second load factor Rb to determine the load level, where Ra<Rb;

[0110] When R<Ra, it is judged that the tower crane is at the first load level;

[0111] When Ra≤R<Rb, it is judged that the tower crane is at the second load level;

[0112] When Rb≤R, the tower crane is judged to be at the third load level.

[0113] Among them, the risk value of the first load level is smaller than the risk value of the second load level, and the risk value of the second load level is smaller than the risk value of the third load level.

[0114] It is understood that the calculation of the load factor R is based on the environmental impact factor E k The weighted average of the load factor R and the load ratio L, which allows the tower crane control system or operator to adjust the tower crane's operating strategy based on the current environmental conditions and actual workload. The calculation of the load factor R enables the tower crane to automatically adjust its operating capacity according to the actual workload and environmental conditions, avoiding overload or underload conditions. By properly distributing the load, unnecessary stress and wear on the tower crane can be reduced, thereby extending its service life. Ensure that the tower crane operates in the most efficient way at any given moment, avoiding productivity losses caused by overly conservative operating strategies. The calculation of the R value takes into account environmental factors, which means that in bad weather or other adverse conditions, the tower crane will be operated more cautiously, thereby reducing the risk of accidents. The load factor calculation based on real-time data streams allows the system to react instantly, ensuring that the tower crane continues to operate in the best condition in a changing environment. By adjusting operating parameters to match the actual load and environmental conditions, energy consumption can be managed more effectively and unnecessary waste can be reduced.

[0115] In some embodiments of the present application, data collected by each sensor at different operating load levels are distributedly stored according to time, location and type, including:

[0116] Assign a failure risk weight value to each type of data, and standardize each type of data using the following formula for weighted standardization:

[0117]

[0118] Among them, X i is the raw data of sensor i, X′ i Yes X i Weighted and standardized data, ε i is the weight of sensor i.

[0119] It is understandable that in the intelligent fault monitoring of tower cranes, weighted standardization of sensor data is a key data preprocessing step. This step is to ensure that data from all different types of sensors can be compared and analyzed on the same scale, so as to more accurately assess the overall operating status and potential fault risks of the tower crane. i The introduction of emphasizes the importance of certain sensor data for fault detection. In addition, it is easier to identify outliers in standardized data because outliers will significantly deviate from the distribution of zero mean and unit variance after standardization.

[0120] In some embodiments of the present application, the problem time, problem location, and problem type of each failure at each operating load level in the historical operation data of the tower crane are obtained and sorted into failure information;

[0121] Obtain fault information, organize each fault information into a fault information set S, traverse the fault information set S, perform standardization, and obtain each type of sensor in each fault information set S, and accumulate the weight value ε of each sensor type fault risk i , obtain the basic risk coefficient G of each fault information set S S , calculated by the following formula:

[0122]

[0123] The basic risk factor G S Compare with the first risk coefficient Ga and the second risk coefficient Gb, where Ga<Gb, and determine the basic risk value D of the fault information according to the comparison result;

[0124] When G S <Ga, it is determined that the basic risk value of the fault information is the first risk value D1;

[0125] When Ga≤G S <Gb, it is determined that the basic risk value of the fault information is the second risk value D2;

[0126] When Gb≤G S When , it is determined that the basic risk value of the fault information is a third risk value D3;

[0127] Among them, D1<D2<D3.

[0128] Specifically, it can be understood that by associating the current sensor data with the historical fault information, potential high-risk faults can be identified and warned in a timely manner, thus improving the safety of tower crane operation. In addition, through the basic risk factor G S , and the frequency of occurrence in historical events, set up periodic preventive troubleshooting plans for each sensor-related organization. When the basic risk factor GS The higher the value, the more frequent the inspection cycle.

[0129] In some embodiments of the present application, the workflow data and environment data stream before the occurrence of historical fault information are analyzed, the fluctuation interval is analyzed according to the temporal changes of each problem type under each operating load level, and the unit monitoring time is generated, including:

[0130] The fault information is used as the intermediate node in the time domain to align it with the sensor data. The basic change cycle is preset according to the data type, and the basic change cycle is divided into time windows. The data of each sensor in the time window before the fault occurs is statistically analyzed, including the calculation of the mean and standard deviation indicators. The moving average and standard deviation are calculated using the sliding window technology to capture the fluctuation range of the data. The basic change cycle is corrected according to the fluctuation range to generate a unit monitoring time. The model is trained using a machine learning algorithm to learn the problem fluctuations in each sensor data in each fault information within the unit monitoring time.

[0131] Specifically, before the data alignment process, data cleaning is performed to remove missing values ​​and outliers to ensure the accuracy of timestamps. The model is trained using a training set containing fault information and related sensor data. The goal is to enable the model to learn to identify sensor data patterns that cause faults within a unit monitoring time. In addition, the cross-validation method is used to evaluate the performance of the model to ensure the generalization ability of the model. Based on the evaluation results of the model, the hyperparameters of the algorithm are adjusted to optimize the prediction accuracy of the model.

[0132] In some embodiments of the present application, when sensor data of a certain type of tower crane is within a fluctuation range, the maximum fluctuation value and the minimum fluctuation value are obtained, a risk coefficient is generated by evaluation, and the operating load level and the risk coefficient are multiplied to generate a risk level, including:

[0133] A risk interval is preset for each sensor data. When the maximum fluctuation value and the minimum fluctuation value belong to the risk interval, the first risk coefficient P1 is used to correct the basic risk value D to generate a risk coefficient.

[0134] When the maximum fluctuation value or the minimum fluctuation value does not belong to the risk interval, the fluctuation time from the maximum fluctuation value to the minimum fluctuation value is obtained, where:

[0135] When the fluctuation time is greater than the unit monitoring time, the second risk coefficient P2 is used to correct the basic risk value D;

[0136] When the fluctuation time is less than the unit monitoring time, the third risk coefficient P3 is used to correct the basic risk value D;

[0137] Among them, 0<P1<P2<1<P3.

[0138] Specifically, when the risk level is greater than a preset value, an alarm is issued, along with the abnormal data involved in each sensor type.

[0139] It is understandable that by monitoring the fluctuation value in real time and adjusting the risk level in time, the system can detect potential failures in advance, thereby providing early warning. Dynamically adjusting maintenance plans and resource allocation based on risk levels can avoid unnecessary downtime and repair costs. By effectively identifying and managing high-risk situations, the safety of equipment and personnel can be significantly improved.

[0140] On the other hand, the present invention also provides an intelligent tower crane fault monitoring device, comprising:

[0141] The tower crane monitoring module obtains the working information of the tower crane, including obtaining the maximum allowable load M of the tower crane, and setting sensors on the tower crane to obtain the hoisting value C, inclination, working status and working temperature of the hydraulic mechanism, and working current and working voltage of the electrical mechanism, and summarizes and generates workflow data;

[0142] Environmental monitoring module, which obtains environmental information of the tower crane, including obtaining the standard operating environment, and setting sensors on the tower crane to obtain wind direction, wind speed, temperature and humidity, and summarize and generate environmental data streams;

[0143] The classification module determines the operating load level of the tower crane based on the workflow data and environmental data stream;

[0144] The storage module stores the data collected by each sensor at different operating load levels in a distributed manner according to time, location and type;

[0145] The fault database module obtains the problem time, problem location, and problem type of each fault at each operating load level in the historical operation data of the tower crane and organizes them into fault information;

[0146] The analysis module analyzes the workflow data and environmental data stream before the historical fault information occurs, analyzes the fluctuation range according to the temporal changes of each problem type under each operating load level, and generates the unit monitoring time;

[0147] The evaluation module obtains the maximum fluctuation value and the minimum fluctuation value when the sensor data of a certain type of tower crane is within the fluctuation range, evaluates and generates a risk coefficient, and multiplies the risk coefficient with the operating load level to generate a risk level.

[0148] Compared with the prior art, the beneficial effect of the present invention lies in that, by acquiring in real time the working information of the tower crane, such as the hoisting weight value, inclination, hydraulic mechanism status, working temperature, working current and working voltage of the electrical mechanism, as well as environmental information such as wind direction, wind speed, temperature and humidity, the operation status of the tower crane can be judged and the basic risk can be evaluated. The data collected by the sensor are distributedly stored according to time, location and type to facilitate historical data analysis, fault information collation and risk assessment. The historical fault information and the workflow data and environmental data stream before the occurrence are analyzed to discover the laws and trends of the occurrence of faults. When a certain type of sensor data is monitored within the fluctuation range, the maximum fluctuation value and the minimum fluctuation value are obtained, and a risk coefficient is generated, which helps to discover potential risks in advance and provide early warning and decision support.

[0149] In general, the present invention can improve the safety and reliability of tower cranes, help reduce the occurrence of failures, and discover potential risks in advance.

[0150] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0151] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0152] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0153] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0154] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A tower crane intelligent fault monitoring method, characterized in that: include: Acquiring the working information of the tower crane includes acquiring the maximum allowable load M of the tower crane, and setting sensors on the tower crane to acquire the hoisting weight value C, inclination, working state and working temperature of the hydraulic mechanism, and working current and working voltage of the electrical mechanism, and summarizing and generating workflow data; Acquiring environmental information of the tower crane includes acquiring the standard operating environment and setting sensors on the tower crane to obtain wind direction, wind speed, temperature and humidity, and summarizing and generating an environmental data stream; Determining the operation load level of the tower crane according to the workflow data and the environmental data stream; The data collected by each sensor at different operating load levels are distributed and stored according to time, location and type; Obtain the problem time, problem location, and problem type of each failure at each operating load level in the historical operation data of the tower crane and organize them into failure information; Analyze the workflow data and environmental data streams before the occurrence of historical fault information, analyze the fluctuation range according to the temporal changes of each problem type under each operating load level, and generate unit monitoring time; When sensor data of a certain type of tower crane is within the fluctuation range, the maximum fluctuation value and the minimum fluctuation value are obtained, a risk coefficient is evaluated and generated, and the risk coefficient is multiplied by the operating load level to generate a risk level.

2. The tower crane intelligent fault monitoring method according to claim 1 is characterized in that: The aggregation and generation of workflow data includes calculating a load ratio value L, and the load ratio value L is calculated by the following formula: Among them, M is the maximum allowable load, that is, the maximum working load of the tower crane in design or specification, C is the hoisting value of the tower crane, that is, the weight of the object currently hoisted by the tower crane, V is the current tilt factor of the tower crane, B is the current hydraulic efficiency factor of the tower crane, and N is the current electrical efficiency factor of the tower crane.

3. The tower crane intelligent fault monitoring method according to claim 2 is characterized in that: The step of aggregating and generating an environmental data stream includes calculating an environmental condition index E, wherein the environmental condition index E is obtained by calculating the following formula: Among them, α1 is the wind speed weight, where 0<α1≤1 when the wind direction is the same as the tower crane movement direction, and 1<α1≤2 when the wind direction is opposite to the tower crane movement direction. WS is the actual wind speed, I WS is the standard wind speed, α2 is the temperature weight, T is the actual temperature, I T is the standard temperature, α3 is the humidity weight, H is the actual humidity, I H is the standard humidity, where; The environmental data stream is also preset with a first standard environmental condition index EA and a second standard environmental condition index EB, where EA<EB, and the environmental condition index E is compared with the relationship between the two to determine the environmental impact factor E. k , where k represents the time point; When E<EA, output environmental impact factor E k is 1; When EA≤E<EB, the output environmental impact factor E k is E; When EB≤E, output environmental impact factor E k It is (α1+α2+α3)×E.

4. The tower crane intelligent fault monitoring method according to claim 3 is characterized in that: According to the workflow data and the environmental data stream, the operation load level of the tower crane is determined, including the environmental impact factor E k The load factor R is calculated by the load ratio L, and the load factor R is obtained by the following formula: R=β×E k +γ×L; Among them, β is the weight value of the environmental impact factor, and γ is the weight value of the load ratio.

5. The tower crane intelligent fault monitoring method according to claim 4 is characterized in that: The step of determining the operating load level of the tower crane further includes: Compare the load factor R with the first load factor Ra and the second load factor Rb to determine the load level, wherein Ra<Rb; When R<Ra, it is judged that the tower crane is at the first load level; When Ra≤R<Rb, it is judged that the tower crane is at the second load level; When Rb≤R, the tower crane is judged to be at the third load level. Among them, the risk value of the first load level is smaller than the risk value of the second load level, and the risk value of the second load level is smaller than the risk value of the third load level.

6. The tower crane intelligent fault monitoring method according to claim 5 is characterized in that: The data collected by each sensor at different operating load levels is distributedly stored according to time, location and type, including: Assign a failure risk weight value to each type of data, and standardize each type of data using the following formula for weighted standardization: Among them, X i is the raw data of sensor i, X′ i Yes X i Weighted and standardized data, ε i is the weight of sensor i.

7. The tower crane intelligent fault monitoring method according to claim 6 is characterized in that: Obtain the problem time, problem location, and problem type of each failure at each operating load level in the historical operation data of the tower crane and organize them into failure information; Obtain the fault information, organize each fault information into a fault information set S, traverse the fault information set S, perform standardization processing, and obtain each type of sensor in each fault information set S, and accumulate the weight value ε of the fault risk of each sensor type i , obtain the basic risk coefficient G of each fault information set S S , calculated by the following formula: The basic risk factor G S Compare with the first risk coefficient Ga and the second risk coefficient Gb, where Ga<Gb, and determine the basic risk value D of the fault information according to the comparison result; When G S <Ga, it is determined that the basic risk value of the fault information is the first risk value D1; When Ga≤G S <Gb, it is determined that the basic risk value of the fault information is the second risk value D2; When Gb≤G S When , it is determined that the basic risk value of the fault information is a third risk value D3; Among them, D1<D2<D3.

8. The tower crane intelligent fault monitoring method according to claim 7 is characterized in that: Analyze the workflow data and environmental data flow before the historical fault information occurs, analyze the fluctuation range according to the time changes of each problem type under each operating load level, and generate unit monitoring time, including: The fault information is used as the middle node in the time domain to align it with the sensor data. The basic change cycle is preset according to the data type. The basic change cycle is divided into time windows. The data of each sensor in the time window before the fault occurs is statistically analyzed, including calculating the mean and standard deviation indicators. The moving average and standard deviation are calculated using the sliding window technology to capture the fluctuation range of the data. The basic change cycle is corrected according to the fluctuation range to generate a unit monitoring time. The model is trained using a machine learning algorithm to learn the problematic fluctuations in each sensor data in each fault information within the unit monitoring time.

9. The tower crane intelligent fault monitoring method according to claim 8, characterized in that: When the sensor data of a certain type of tower crane is within the fluctuation range, the maximum fluctuation value and the minimum fluctuation value are obtained, the risk coefficient is evaluated and generated, and the risk coefficient is multiplied by the operating load level to generate the risk level, including: A risk interval is preset for each sensor data, and when the maximum fluctuation value and the minimum fluctuation value belong to the risk interval, the basic risk value D is corrected using the first risk coefficient P1 to generate a risk coefficient; When the maximum fluctuation value or the minimum fluctuation value does not belong to the risk interval, the fluctuation time when the maximum fluctuation value reaches the minimum fluctuation value is obtained, wherein: When the fluctuation time is greater than the unit monitoring time, the second risk coefficient P2 is used to correct the basic risk value D; When the fluctuation time is less than the unit monitoring time, the basic risk value D is corrected using the third risk coefficient P3; Among them, 0<P1<P2<1<P3.

10. An intelligent tower crane fault monitoring device, applied to the intelligent tower crane fault monitoring method according to any one of claims 1 to 9, characterized in that: include: The tower crane monitoring module obtains the working information of the tower crane, including obtaining the maximum allowable load M of the tower crane, and setting sensors on the tower crane to obtain the hoisting weight value C, inclination and working status and working temperature of the hydraulic mechanism, as well as the working current and working voltage of the electrical mechanism, and summarizes and generates workflow data; Environmental monitoring module, which obtains environmental information of the tower crane, including obtaining the standard operating environment, and setting sensors on the tower crane to obtain wind direction, wind speed, temperature and humidity, and summarize and generate environmental data streams; A classification module, for determining the operation load level of the tower crane according to the workflow data and the environment data stream; The storage module stores the data collected by each sensor at different operating load levels in a distributed manner according to time, location and type; The fault database module obtains the problem time, problem location, and problem type of each fault at each operating load level in the historical operation data of the tower crane and organizes them into fault information; The analysis module analyzes the workflow data and environmental data stream before the historical fault information occurs, analyzes the fluctuation range according to the temporal changes of each problem type under each operating load level, and generates the unit monitoring time; The evaluation module obtains the maximum fluctuation value and the minimum fluctuation value when the sensor data of a certain type of tower crane is within the fluctuation range, evaluates and generates a risk coefficient, and multiplies the risk coefficient with the operating load level to generate a risk level.

Citation Information

Cited By

  • Data processing method and system for mining well drilling

    CN118939985A

  • A data processing method and system for mining drilling

    CN118939985B

  • Intelligent remote early warning method and system for tower crane

    CN119612389A

  • Intelligent remote early warning method and system for tower crane

    CN119612389B

  • Ttower crane behavior management method and device

    CN120725460A