Arch dam flood discharge and energy dissipation structure
By setting up raised areas and retractable energy dissipators in the high arch dam flood discharge structure, the problems of water flow energy dissipation and dam body stability are solved, and the water flow can enter the water without collision, reduce the atomization intensity, and reduce the excavation depth of the project. and investment.
Patent Information
- Application Number
- CN202411041799.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-10-01
AI Technical Summary
During the flood discharge process of high arch dams, the energy dissipation of water flow mainly relies on the shearing of the water tongue and the water body in the pad pond, which causes the bottom plate of the pad pond to face strong impact, requiring a large excavation depth, affecting the stability of the dam body and project investment. .
An arch dam flood discharge energy dissipation structure is designed. By setting up a raised area on the upstream side of the water cushion pond, the water tongue of the overflow surface hole flows into the water depth area. Combined with the shrinkage energy dissipation device, the water flow collision and atomization are reduced. Reduce the excavation depth of the project and enhance the stability of the dam body.
It effectively reduces the impact dynamic pressure of water flow on the bottom plate of the water cushion pond, enhances the stability of the dam body, reduces project investment, and at the same time realizes the collision-free entry of water flow into the water in the air, reducing the atomization intensity of flood discharge.
Smart Images

Figure CN118727675A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an arch dam flood discharge and energy dissipation structure, belonging to the technical field of energy dissipation and anti-scour of hydropower engineering. Background Art
[0002] Arch dam is a common dam construction form in water conservancy and hydropower projects, usually built in high mountain valleys. The main technical difficulties of its flood discharge arrangement are: huge flood discharge of the dam body, high water head, narrow river valley, and poor geological conditions. In order to reduce the impact of flood discharge atomization on the mountains on both sides, the non-collision water entry method of surface and deep hole water tongues has gradually become the preferred choice for flood discharge and energy dissipation of high arch dam projects.
[0003] However, non-collision water entry means that most of the energy dissipation can only rely on the shear between the water tongue and the water body in the cushion pond. In order to ensure the safety of the cushion pond bottom plate under the impact of strong water flow, the cushion pond needs to be excavated to a sufficient depth.
[0004] like Figure 1 As shown, Figure 1 It is a typical arrangement of a cushion pond behind a high arch dam, comprising a dam body 1, on which an overflow surface hole 2 and a flood discharge middle hole 3 are arranged, and a cushion pond 7 and a second dam 10 are arranged in sequence downstream of the dam body 1, and the flood discharge centerline coincides with the centerline of the cushion pond; the excavation depth on the upstream side of the cushion pond near the dam heel is relatively large, which affects the integrity of the resistance body and increases the excavation workload of the cushion pond; at the same time, there is an obvious still water area on the upstream side of the cushion pond, and most of the water body does not participate in the shear energy dissipation of the incident water flow during the flood discharge operation. Summary of the invention
[0005] The present invention aims to solve the above technical problems and provide an arch dam flood discharge and energy dissipation structure, which retains as many resistance bodies as possible at the dam shoulders and heels to enhance the stability of the dam body while ensuring the discharge volume and the safety of the water cushion pond bottom plate.
[0006] In order to achieve the above object, the technical solution adopted by the present invention is: An arch dam flood discharge and energy dissipation structure comprises a dam body, on which an overflow surface hole and a flood discharge middle hole are arranged, and a water cushion pond and a second dam are arranged in sequence downstream of the dam body, the flood discharge center line coincides with the center line of the water cushion pond, the water cushion pond comprises an elevated area, and a water cushion pond bottom plate whose height is less than that of the elevated area is arranged on the downstream side of the elevated area; one side of the elevated area is connected to the dam body, and the other side of the elevated area extends in an upstream to downstream direction; the extension length of the elevated area from upstream to downstream does not exceed the position of the water tongue of the overflow surface hole near the landing point in the water cushion pond; the height of the elevated area is less than the height of the second dam; a deep water area is formed between the downstream side of the elevated area and the second dam.
[0007] The overflow surface hole water tongue is divided into a near-drop point water tongue and a far-drop point water tongue according to its position in the water cushion pond. When the shape of the surface hole is determined, the thickness of the water flow flowing down from the hollow part of the bottom plate is relatively small. The near-drop point of the surface hole water tongue is basically fixed, while the far-drop point varies with the operating water level.
[0008] Therefore, an elevated area is set up on the upstream side of the cushion pond so that the main water inlet point of the surface hole water tongue is located in the deeper area of the water cushion, and the near and far landing points of the water tongue are both located in the deeper water area of the cushion pond. By setting up the elevated area, the water depth of the main water tongue inlet point is increased while maintaining the original excavation depth, and a more complete resistance body can be retained on the downstream side of the dam body, reducing the excavation depth, enhancing the stability of the dam body and reducing the project investment.
[0009] According to the embodiments of the present invention, the present invention can be further optimized. The following is the technical solution formed after optimization: In order to prevent the downstream water flow from directly impacting the bottom plate on the upstream side of the cushion pond when the surface hole is first opened, further, the height of the elevated area does not exceed half of the height of the second dam.
[0010] Furthermore, a first energy dissipator located inside the overflow surface hole is provided at the outlet end of the overflow surface hole, and a second energy dissipator is provided at the outlet end of the flood discharge center hole.
[0011] Furthermore, the overflow surface hole and the flood discharge middle hole both include side walls and a bottom plate arranged between the two side walls, and the end of the bottom plate is located on the inner side of the tail end of the side wall.
[0012] Furthermore, the first energy dissipator and the second energy dissipator are both contraction type energy dissipators. The contraction type energy dissipator forms a contraction section by means of the contraction of the side walls on both sides toward the middle, forcing the water flow to deform, enhancing turbulence and aeration, and forming a vertical and longitudinal diffusion water flow pattern. The contraction type energy dissipator can shrink the water flow, so that the outlet sections of the surface hole and the middle hole on the dam gradually narrow at the same time to form a narrow gap, thereby making the downstream water flow diffuse and stretch in the vertical direction of the space and the longitudinal direction of the river channel, interweaving with each other in the air and entering the water in the water cushion pond in different areas, and finding a new form of flood discharge and energy dissipation that fully utilizes the longitudinal space of the river channel, so that the water tongues flowing out of the surface and middle holes have no collision or less collision, thereby avoiding the atomization problem caused by the collision of water flow in the air, greatly reducing the intensity of the atomization of the entire project, and ensuring as much as possible that the impact dynamic pressure of the water flow on the bottom plate of the water cushion pond energy dissipation pool is small, which is suitable for the engineering characteristics of narrow river valley areas.
[0013] The first energy dissipator and the second energy dissipator adopt the retractable energy dissipator and the ends of the bottom plates of the overflow surface hole and the flood discharge middle hole are located on the inner side of the tail end of the side wall, so that the surface hole outflow tongue is longitudinally stretched, the water tongue landing point is spindle-shaped, the main flow of water is located in front of the water tongue, and impacts the bottom plate of the water cushion pond. The concentration of the main flow of the surface hole water tongue is adjusted by the extension length of the outlet bottom plate on the inner side of the tail end of the side wall.
[0014] Furthermore, the weir top elevations of the overflow surface holes are on the same horizontal plane, and the flood discharge middle holes are flat-bottomed outflow holes with consistent bottom plate elevations.
[0015] For the integrity of the bedrock on both sides, without affecting the water entry of the surface hole water tongue, further, at least one side of the elevated area is provided with a side wall, and the side of the side wall facing the left bank or the right bank extends toward the center line of the water cushion pond.
[0016] Furthermore, a water cushion pond bottom plate having a height less than that of the elevated area is provided on the downstream side of the elevated area, and an inclined connecting section is provided between the elevated area and the water cushion pond bottom plate.
[0017] Furthermore, there are concrete slope protections on both sides of the water cushion pond.
[0018] Compared with the prior art, the present invention has the following beneficial effects: 1) The arch dam flood discharge and energy dissipation structure of the present invention makes full use of water cushions of different depths in the water cushion pond for shear energy dissipation, thereby avoiding the problem of excessive dynamic water pressure on the bottom plate of the water cushion pond caused by concentrated water inflow from the surface holes. A more complete resistance body can be retained on the downstream side of the dam body, thereby enhancing the stability of the dam body and reducing the project investment.
[0019] 3) The near and far landing points of the water tongue of the arch dam flood discharge and energy dissipation structure of the present invention are both located in the deeper area of the water cushion, which increases the shear area with the water body in the water cushion pond and provides a larger space for the water tongue of the surface hole to enter the water in the lateral direction, thereby realizing the collision-free water flow in the air; the horizontal length of the raised area of the bottom plate on the upstream side of the special-shaped water cushion pond is controlled by the position of the main flow landing point of the surface hole water tongue, so that the main flow water inlet point of the surface hole water tongue is located in the deeper area of the water cushion. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a typical arrangement form of the water cushion pond behind the high arch dam in the prior art; Figure 2 It is a schematic diagram of the water-entry shape of the water tongue in the table of the present invention; Figure 3 yes Figure 2 Middle AA section view; Figure 4 yes Figure 2 The center section view of the overflow table hole; Figure 5yes Figure 2 Cross-sectional view of the center of the flood discharge hole; Figure 6 It is an isometric structural schematic diagram of the water cushion pond of the present invention; Figure 7 It is a schematic structural diagram of the combined state of the dam body and the water cushion pond of the present invention.
[0021] In the figure 1- dam body; 2- overflow surface hole; 3- flood discharge middle hole; 4- side wall; 5- bottom plate; 6- concrete slope protection; 7- cushion pond; 71- raised area; 711- side wall; 72- cushion pond bottom plate; 8- surface hole water tongue landing point; 9- middle hole water tongue landing point; 10- second dam; 11- first energy dissipator; 12- second energy dissipator. DETAILED DESCRIPTION
[0022] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict. For the convenience of description, if the words "upper", "lower", "left" and "right" appear in the following, they only indicate that the upper, lower, left and right directions are consistent with the drawings themselves, and do not limit the structure.
[0023] like Figure 2-Figure 7 As shown, the arch dam flood discharge and energy dissipation structure of this embodiment includes a dam body 1, on which an overflow surface hole 2 and a flood discharge middle hole 3 are arranged, and a water cushion pond 7 and a second dam 10 are arranged in sequence downstream of the dam body 1. The flood discharge center line coincides with the center line of the water cushion pond 7, and there are concrete slope protection 6 on both sides of the water cushion pond 7.
[0024] The upstream side of the cushion pond 7 is provided with a raised area 71, one side of which is connected to the dam body 1, and the other side of which extends to the downstream side of the cushion pond 7; the extension length of the raised area 71 from upstream to downstream does not exceed the position of the water tongue of the overflow surface hole 2 near the landing point of the cushion pond 7; the height of the raised area 71 does not exceed half of the height of the second dam 10, and a deep water area is formed between the raised area 71 and the second dam 10. The center line of flood discharge coincides with the center line of the cushion pond and is parallel to the center line of the arch dam.
[0025] A water cushion pond bottom plate 72 whose height is smaller than that of the raised area 71 is disposed on the downstream side of the raised area 71 , and an inclined connecting section 73 is disposed between the raised area 71 and the water cushion pond bottom plate 72 .
[0026] like Figure 4 , Figure 5 , Figure 7As shown, the overflow surface hole 2 and the flood discharge middle hole 3 are staggered in the width direction of the dam body 1 so that the surface hole water tongue and the middle hole water tongue will not cross; the outlet end of the overflow surface hole 2 is provided with a first energy dissipator 11 located inside the overflow surface hole 2, and the outlet end of the flood discharge middle hole 3 is provided with a second energy dissipator 12. The weir top elevations of the overflow surface hole 2 are on the same horizontal plane, and the flood discharge middle hole 3 is a flat bottom outflow with the same bottom plate elevation; the overflow surface hole 2 and the flood discharge middle hole 3 both include side walls 4 and a bottom plate 5 arranged between the two side walls 4, the end of the bottom plate 5 is located on the inner side of the tail end of the side wall 4, and the first energy dissipator 11 and the second energy dissipator 12 are both retractable energy dissipators.
[0027] The arch dam flood discharge and energy dissipation structure of this embodiment is provided with flood discharge surface holes 2 and flood discharge middle holes 3 at different elevations of the dam body, and a special-shaped water cushion pond 7 is arranged on the downstream side of the arch dam, wherein the flood discharge surface holes 2 and the flood discharge middle holes 3 both adopt contraction type energy dissipation, and the outlet bottom plate is air-permeable.
[0028] Among them, after the outlet of the flood discharge surface hole 2 adopts a contraction-type energy dissipator and the bottom plate is completely hollow, the surface hole outflow water tongue is stretched longitudinally, the water tongue landing point is spindle-shaped, the main flow of water is located in the front of the water tongue, and impacts the bottom plate of the water cushion pond. The concentration of the main flow of the surface hole water tongue is adjusted by the length of the outlet bottom plate. The flood discharge middle hole 3 adopts a flat bottom layout, and the narrow slit outflow form that shrinks on both sides makes the water flow discharged from the middle hole stretch and diffuse along the longitudinal direction of the river channel. The water tongue landing points are all located in the deeper area of the water cushion, which increases the shear area with the water body in the water cushion pond, and provides more space for the surface hole water tongue to enter the water in the horizontal direction, realizing the collision-free water flow in the air.
[0029] like Figure 2 , Figure 7 As shown, for the integrity of the bedrock on both sides, at least one side of the raised area 71 is provided with a side wall 711, and the side wall 711 extends toward the center line of the plunge pool 7 on the left bank or the right bank. If necessary, the side wall 711 can be provided on both the left bank and the right bank, provided that the water inlet of the surface hole water tongue is not affected.
[0030] Since the horizontal length of the raised area 71 does not exceed the location of the water tongue of the overflow surface hole 2 in the cushion pond 7, the surface hole water tongue landing point 8 and the middle hole water tongue landing point 9 are both in the deep water area of the cushion pond 7, which increases the shear area with the water body in the cushion pond and provides a larger space for the surface hole water tongue to enter the water in the horizontal direction, so that the water flow in the air is collision-free. The horizontal length of the raised area 71 of the upstream side of the special-shaped cushion pond 7 is controlled by the position of the main flow landing point of the flood discharge surface hole 2 water tongue, so that the main flow water inlet point of the surface hole water tongue is located in the deeper area of the water cushion. The height of the raised area 71 of the upstream side of the cushion pond 7 is controlled within half of the height of the second dam 10 to prevent the downstream water flow from directly impacting the upstream side of the cushion pond 7 when the surface hole is opened. The side wall of the raised area 71 of the upstream side of the cushion pond is completely controlled by the resistance bodies on both sides of the arch dam and approaches the center line of the cushion pond 7.
[0031] The flood discharge and energy dissipation structure of the arch dam in this embodiment includes surface holes and middle holes arranged at different elevations of the dam body, and a special-shaped water cushion pond on the downstream side of the arch dam. The center line of the flood discharge coincides with the center line of the water cushion pond and is parallel to the center line of the arch dam. The surface holes and middle holes of the flood discharge both adopt contraction-type energy dissipation, and the bottom plate area is hollowed out. Through the reasonable arrangement of the surface holes and middle holes, the water tongues of the dam body can enter the water without collision, while adapting to the changes in the bottom plate of the water cushion pond. After the water tongues are dispersed into the water, there is no water flow directly impacting the front bottom plate boss of the water cushion pond, meeting the requirements of flood discharge and energy dissipation of high arch dams. Under the premise of ensuring the discharge volume and the safety of the bottom plate of the water cushion pond, this embodiment retains as many resistance bodies as possible at the dam shoulder and heel positions, enhancing the stability of the dam body while reducing the project investment.
[0032] The contents explained in the above embodiments should be understood as these embodiments are only used to more clearly illustrate the present invention, and are not used to limit the scope of the present invention. After reading the present invention, various equivalent forms of modifications to the present invention made by those skilled in the art all fall within the scope defined by the claims attached to this application.
Claims
1. An arch dam flood discharge and energy dissipation structure, comprising a dam body (1), wherein an overflow surface hole (2) and a flood discharge middle hole (3) are arranged on the dam body (1), a water cushion pond (7) and a second dam (10) are arranged in sequence downstream of the dam body (1), and a flood discharge center line coincides with a center line of the water cushion pond (7), Features: The cushion pond (7) comprises an elevated area (71), and a cushion pond bottom plate (72) having a height less than that of the elevated area (71) is arranged on the downstream side of the elevated area (71); one side of the elevated area (71) is connected to the dam body (1), and the other side of the elevated area (71) extends in a direction from upstream to downstream; the extension length of the elevated area (71) from upstream to downstream does not exceed the position of the water tongue of the overflow surface hole (2) near the landing point of the cushion pond (7); the height of the elevated area (71) is less than the height of the second dam (10); and a deep water area is formed between the downstream side of the elevated area (71) and the second dam (10).
2. The arch dam flood discharge and energy dissipation structure according to claim 1, Features: The height of the raised area (71) does not exceed half the height of the second dam (10).
3. The arch dam flood discharge and energy dissipation structure according to claim 1, Features: The outlet end of the overflow surface hole (2) is provided with a first energy dissipator (11) located inside the overflow surface hole (2), and the outlet end of the flood discharge center hole (3) is provided with a second energy dissipator (12).
4. The arch dam flood discharge and energy dissipation structure according to claim 3, Features: The overflow surface hole (2) and the flood discharge middle hole (3) both comprise a side wall (4) and a bottom plate (5) arranged between the two side walls (4), the end of the bottom plate (5) being located on the inner side of the tail end of the side wall (4); the overflow surface hole (2) and the flood discharge middle hole (3) are arranged alternately along the width direction of the dam body (1).
5. The arch dam flood discharge and energy dissipation structure according to claim 3, Features: The first energy dissipator (11) and the second energy dissipator (12) are both retractable energy dissipators.
6. The arch dam flood discharge and energy dissipation structure according to claim 1, Features: The weir top elevations of the overflow surface holes (2) are on the same horizontal plane, and the flood discharge middle holes (3) are flat-bottomed outflow holes with the same bottom plate elevations.
7. The arch dam flood discharge and energy dissipation structure according to claim 1, Features: At least one side of the elevated area (71) is provided with a side wall (711), and the side of the side wall (711) facing the left bank or the right bank extends in the direction of the center line of the plunge pool (7).
8. The arch dam flood discharge and energy dissipation structure according to claim 1, Features: A connecting section (73) inclined toward one side of the water cushion pond bottom plate is provided between the raised area (71) and the water cushion pond bottom plate (72).
9. The arch dam flood discharge and energy dissipation structure according to any one of claims 1 to 8, Features: Both banks of the water cushion pond (7) are provided with concrete slope protection (6).