Cast-in-situ bored pile construction device

By arranging an inner film layer and an elastic cushion layer inside the steel casing, combined with the pressure pump to adjust the pressure in the cavity and the use of lubricating oil, the problem of low demoulding efficiency of the steel casing is solved, reducing friction and improving demoulding efficiency. effect.

CN118727730APending Publication Date: 2024-10-01CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410883265.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the existing construction of bored piles, the demoulding efficiency of the steel casing is low, and the concrete surface is rough, resulting in high friction between the steel casing and the cast-in-place piles, which increases the difficulty of demoulding and the construction cost.

Method used

Design a bored pile construction device, which includes setting an inner membrane layer and an elastic cushion layer inside the steel casing. The inner membrane layer is used to separate the concrete and steel casing. The elastic cushion layer reduces friction through deformation and is adjusted by a pressure pump. The pressure in the cavity is used to lubricate and disperse the lubricating oil, reducing the difficulty of demoulding.

Benefits of technology

It effectively reduces the difficulty of separation between the steel casing and the cast-in-place piles, improves the demoulding efficiency, and reduces the difficulty and cost of the bored pile construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727730A_ABST
    Figure CN118727730A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of geological exploration sampling equipment, and particularly relates to a cast-in-situ bored pile construction device which comprises a steel casing which is a cylindrical structural body with two open ends. The device further comprises a convenient demolding assembly, and the convenient demolding assembly is installed on the steel casing and used for enhancing the demolding difficulty of the steel casing. The inner film layer and the elastic cushion layer are arranged in the steel casing, on one hand, concrete and the steel casing are separated through the inner film layer, the separation difficulty between the steel casing and the cast-in-place pile is effectively reduced, and on the other hand, the steel casing and the cast-in-place pile are separated through the deformation capacity of the elastic cushion layer and the property that friction force between the elastic cushion layer and the inner film layer is small. And the separation difficulty of the cast-in-place pile and the steel casing after pouring is greatly reduced, so that the construction process difficulty of the cast-in-place pile is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of cast-in-place pile construction equipment, in particular to a bored cast-in-place pile construction device. Background Art

[0002] In the bored cast-in-place pile construction process, in order to reduce the difficulty of drilling and prevent the soil from losing stability, the bored cast-in-place pile construction is usually protected by burying steel casing.

[0003] In the related art, the steel casing has a simple structure and is relatively easy to install. In the bored cast-in-place pile construction process, the use of the steel casing not only reduces the convenience of drilling, but also plays a certain protective role in the forming of the bored pile. However, in order to reduce the construction cost of the bored pile, the steel casing made of high-quality steel needs to be recycled. Since the bored pile is formed inside the steel casing, when pouring concrete slurry, the concrete contacts the inner wall of the steel casing. As the concrete gradually tightens, the concrete and the steel casing are more tightly combined. At present, when disassembling the steel casing, knocking and vibration are mostly used to separate the bored pile from the steel casing, and then the steel casing is pulled upward to demould the steel casing. In actual operation, the effect of vibration knocking on the demoulding efficiency of the steel casing is relatively low, and the surface of the bored pile formed by concrete is rough, resulting in a large friction between the bored pile and the inner wall of the steel casing, thereby making the demoulding efficiency of the steel casing low and the demoulding difficulty greater.

[0004] The related art discloses a heating type demoulding steel casing, and the application number is 2016112512048. The scheme is that a fusible layer and a spiral heating wire are provided on the inner wall of the steel casing body, and the spiral heating wire is embedded in the fusible layer. During demoulding, the fusible layer is melted by heating, thereby separating the steel casing from the bored pile. However, in actual application, it is found that, on the one hand, it is difficult to provide a fusible layer on the steel casing, and during the concrete pouring process, the fusible layer is easily caused to fall off, thereby causing a great impact on the demoulding of the steel casing. On the other hand, when the thickness of the fusible layer is small, the gap between the steel casing and the bored pile is small, and the additive effect on the demoulding effect of the steel casing is relatively weak. If the thickness of the fusible layer is large, not only the arrangement of the fusible layer is more troublesome, but also the cost of the bored pile construction process is significantly increased. In view of this, the present invention designs a bored pile construction device to solve the above problems.

[0005] The information disclosed in this background technology section is only intended to deepen the understanding of the overall background technology of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art known to those skilled in the art. Summary of the invention

[0006] In order to make up for the deficiencies of the prior art and solve the above-mentioned technical problems, the present invention proposes a bored cast-in-place pile construction device.

[0007] The technical solution adopted by the present invention to solve the technical problem is as follows: a bored pile construction device described in the present invention comprises a steel casing, which is a cylindrical structure with openings at both ends;

[0008] It also includes a convenient demoulding component, which is installed on the steel casing and is used to increase the difficulty of demoulding the steel casing;

[0009] The convenient demoulding component comprises an inner film layer and an elastic cushion layer;

[0010] The inner film layer is a cylindrical structure made of a thin film material, and the inner film layer is located inside the steel casing;

[0011] An elastic cushion layer is fixedly installed on the inner wall of the steel casing. The elastic cushion layer is made of elastic material and is located between the inner membrane layer and the elastic cushion layer. The elastic cushion layer and the inner membrane layer are both smoothly arranged on one side close to each other.

[0012] Preferably, it also includes an adjustment component, which cooperates with the convenient demoulding component to enhance the demoulding difficulty of the steel casing, and the adjustment component includes an adjustment chamber and a pressure pump;

[0013] An adjustment cavity is provided in the elastic cushion layer, a connecting pipe is fixedly installed on the elastic cushion layer, and the connecting pipe is conductively connected with the adjustment cavity;

[0014] The regulating chamber is conductively connected to a pressure pump via a connecting pipe, and the pressure pump adjusts the pressure in the regulating chamber by extracting or conveying a medium.

[0015] Preferably, the elastic cushion layer is provided with evenly distributed adsorption holes on a side away from the steel casing, one end of the inner membrane layer is fixedly connected to a gravity block, and the outer diameter of the inner membrane layer is larger than the inner diameter of the elastic cushion layer.

[0016] Preferably, an oil filling pipe is fixedly installed on the elastic cushion layer, and the oil filling pipe is used to inject lubricating oil into the regulating cavity. In an initial state, a sealing plug is detachably fixedly installed on the end of the oil filling pipe. The oil filling pipe extends into the regulating cavity, and the oil filling pipe is provided with evenly distributed micropores in the regulating cavity.

[0017] Preferably, a fiber sheet is fixedly installed in the adjustment cavity, the fiber sheet is a thin sheet structure made of elastic fiber material, and the fiber sheet is used to cover the adsorption holes.

[0018] Preferably, the fiber sheet layer is made of oleophobic material.

[0019] Preferably, an annular isolation membrane is fixedly installed in the regulating chamber, and the isolation membrane divides the regulating chamber into two chambers that are not connected to each other. The connecting tube is designed in a Y shape, and the connecting tube is connected to both sides of the regulating chamber. In the initial state, the volume of the chamber on one side of the regulating chamber where the fiber sheet layer is installed is smaller than the volume of the chamber on the other side.

[0020] Preferably, a protective ring is fixedly mounted on the steel casing, and the protective ring is located at the upper and lower ends of the elastic cushion layer. In an initial state, the inner diameter of the protective ring is larger than the inner diameter of the elastic cushion layer.

[0021] Preferably, the steel casing includes an outer cylinder and an inner cylinder, the outer cylinder is coaxially sleeved with the inner cylinder, the outer diameter of the inner cylinder is smaller than the inner diameter of the outer cylinder, a straightening ring is fixedly installed on the outer wall of the inner cylinder, the straightening ring is rotatably installed with evenly distributed balls toward one side of the outer cylinder, and the elastic cushion layer is fixedly installed on the inner wall of the inner cylinder.

[0022] The beneficial effects of the present invention are as follows:

[0023] 1. The bored pile construction device described in the present invention provides an inner membrane layer and an elastic cushion layer inside a steel casing. On the one hand, the inner membrane layer is used to separate concrete from the steel casing, thereby effectively reducing the difficulty of separating the steel casing from the bored pile. On the other hand, the elastic cushion layer has the ability to deform, and the elastic cushion layer has a small friction between the inner membrane layer, thereby greatly reducing the difficulty of separating the bored pile from the steel casing after casting, thereby reducing the difficulty of the bored pile construction process.

[0024] 2. The bored pile construction device described in the present invention continuously infuses air into the regulating cavity through a pressure pump. The air enters the adsorption holes and eventually enters the gap between the inner film layer and the elastic cushion layer and flows out from the top of the gap. During this process, the air entrains and pushes the lubricating oil, causing the lubricating oil to be dispersed between the elastic cushion layer and the inner film layer. The lubricating oil is used to further reduce the friction between the elastic cushion layer and the inner film layer, thereby further reducing the difficulty of demoulding. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The present invention will be further described below in conjunction with the accompanying drawings.

[0026] Figure 1 is a stereogram of the present invention;

[0027] Figure 2 yes Figure 1 A partial enlarged view of the middle part;

[0028] Figure 3 It is a three-dimensional diagram of the outer cylinder and the inner cylinder being separated;

[0029] Figure 4 is a cross-sectional view of the present invention;

[0030] Figure 5 yes Figure 4 A partial enlarged view of point B in the middle;

[0031] Figure 6 yes Figure 4 A partial enlarged view of point C in the middle;

[0032] In the figure: 1. steel casing; 11. outer cylinder; 12. inner cylinder; 2. inner membrane layer; 21. elastic cushion layer; 22. regulating chamber; 23. connecting pipe; 24. pressure pump; 25. adsorption hole; 26. gravity block; 3. oil filling pipe; 31. sealing plug; 4. fiber sheet layer; 41. isolation membrane; 42. protective ring; 5. straightening ring; 51. ball. DETAILED DESCRIPTION

[0033] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0034] like Figures 1 to 6 As shown, a bored pile construction device described in the present invention includes a steel casing 1, which is a cylindrical structure with openings at both ends, and also includes a convenient demoulding component, which is installed on the steel casing 1. The convenient demoulding component is used to increase the difficulty of demoulding the steel casing 1. The convenient demoulding component includes an inner film layer 2 and an elastic cushion layer 21. The inner film layer 2 is a cylindrical structure made of a film material. The inner film layer 2 is located inside the steel casing 1. The inner film layer 2 is made of a flexible plastic film material and is mainly used to separate the steel casing 1 from the concrete material poured later, so that the steel casing 1 is not in direct contact with the concrete material.

[0035] An elastic cushion layer 21 is fixedly installed on the inner wall of the steel casing 1. The elastic cushion layer 21 is made of elastic material and is located between the inner film layer 2 and the elastic cushion layer 21. The elastic cushion layer 21 and the inner film layer 2 are both smoothly arranged on one side close to each other.

[0036] In the bored cast-in-place pile construction process, the presence of steel casing 1 is to reduce the difficulty of drilling and prevent the soil from losing stability. At the same time, it can also play a protective role in the concrete pouring machine's bored pile forming and enhance the bored cast-in-place pile construction effect. In the bored cast-in-place pile construction process, after completing the pile hole position positioning, installing steel casing 1, drilling and opening holes with a drill rig, and cleaning holes and other operations, the steel cage is placed inside the steel casing 1, and then concrete can be poured into the steel casing 1. When the concrete solidifies, the concrete and the steel cage form a bored pile. At this time, the steel casing 1 needs to be taken out from the ground for recycling and reuse. In this process, the convenient demoulding component provided by the present invention can effectively reduce the difficulty of taking out the steel casing 1 from the ground.

[0037] Specifically, in the present invention, a convenient demoulding component is arranged inside the steel casing 1, wherein the convenient demoulding component mainly comprises an inner membrane layer 2 and an elastic cushion layer 21, the elastic cushion layer 21 is made of elastic rubber material, and when the steel casing 1 is produced, the elastic cushion layer 21 is fixedly installed on the inner wall of the steel casing 1 by means of adhesive glue and steel nails, while the inner membrane layer 2 and the steel casing 1 are in a separated state, and the inner membrane layer 2 is combined with the elastic cushion layer 21 on the inner wall of the steel casing 1 below the steel cage, and because the inner membrane layer 2 is made of elastic rubber material and is also a cylindrical structure, the inner membrane layer 2 and the elastic cushion layer 21 coexist in a mutually nested manner, and then concrete is poured into the steel cage below the steel casing 1. During the concrete pouring process, due to the presence of the inner membrane layer 2, in cooperation with the inner wall of the bottom of the borehole, the concrete is wrapped, so that the concrete is separated from the elastic cushion layer 21 outside the inner membrane layer 2, and when the concrete solidifies, the inner membrane The layer 2 fits tightly with the bored pile formed by the concrete. At this time, when the steel casing 1 is pulled upward, on the one hand, due to the presence of the inner membrane layer 2, the concrete is wrapped, and the inner membrane layer 2 and the elastic cushion layer 21 are both smooth surfaces on the side close to each other, so the friction between the inner membrane layer 2 and the elastic cushion layer 21 is greatly reduced, thereby greatly reducing the difficulty of demoulding the steel casing 1 and the elastic cushion layer 21. It should be noted that the inner membrane layer 2 retained on the surface of the bored pile has cheap materials and low manufacturing costs, so it can be mass-produced and used. On the other hand, since the elastic cushion layer 21 itself is made of elastic material, in the concrete pouring machine, under the pressure of the concrete slurry, the presence of the elastic cushion layer 21 can make the concrete fit with the inner membrane layer 2, and in the demoulding process, when the elastic cushion layer 21 is subjected to the friction force, it can reduce the friction force through its own deformation, thereby further reducing the difficulty of separating the steel casing 1 from the bored pile.

[0038] The present invention arranges an inner membrane layer 2 and an elastic cushion layer 21 inside the steel casing 1. On the one hand, the inner membrane layer 2 is used to separate the concrete from the steel casing 1, thereby effectively reducing the difficulty of separating the steel casing 1 from the bored piles. On the other hand, the deformation ability of the elastic cushion layer 21 and the small friction between the elastic cushion layer 21 and the inner membrane layer 2 are utilized to greatly reduce the difficulty of separating the bored piles from the steel casing 1 after casting, thereby reducing the difficulty of the bored pile construction process.

[0039] As a preferred embodiment of the present invention, it also includes an adjustment component, which cooperates with the convenient demoulding component to enhance the demoulding difficulty of the steel casing 1. The adjustment component includes an adjustment chamber 22 and a pressure pump 24. The elastic cushion layer 21 is provided with an adjustment chamber 22, and a connecting pipe 23 is fixedly installed on the elastic cushion layer 21. The connecting pipe 23 is connected to the adjustment chamber 22. The adjustment chamber 22 is located inside the elastic cushion layer 21 and the elastic cushion layer 21 itself is made of elastic rubber material, so that the thickness adjustment range of the elastic cushion layer 21 is increased. The adjustment chamber 22 is provided in the elastic cushion layer 21. 2 is connected to the pressure pump 24 through the connecting pipe 23. The pressure pump 24 adjusts the pressure in the regulating chamber 22 by extracting or conveying the medium. In the present invention, the pressure pump 24 is preferably an air pump or an air compressor. In practical application, the pressure pump 24 is connected to the regulating chamber 22 through the connecting pipe 23, and then the thickness of the elastic cushion layer 21 is adjusted by the compression and flow of air. Specifically, when the steel cage is below, in order to reduce the probability of scratching between the steel cage and the inner membrane layer 2, the air in the regulating chamber 22 is extracted by the pressure pump 24, and then the negative pressure is used to adjust the thickness of the elastic cushion layer 21. The pressure causes the elastic cushion layer 21 to shrink in volume. At this time, the steel cage is lowered to reduce the probability of contact between the two. At the same time, in other embodiments of the present invention, in order to further ensure the smoothness of the installation of the steel cage, a centralizer can be set at the end of the steel casing 1 to limit the movement path of the steel cage and further reduce the probability of contact between the two. After the concrete is poured, the staff can manually adjust the pressure pump 24, so that the pressure pump 24 compresses and pumps the air into the adjustment chamber 22. Under the action of the air pressure, the elastic cushion layer 21 expands to a certain extent. In actual During application, according to the different degrees of hollow pressure increase in the elastic cushion layer 21, a certain degree of extrusion can be formed on the unsolidified concrete at this time, thereby increasing the distance between the steel casing 1 and the bored pile formed by the concrete, and then during the demoulding process, the pressure in the regulating cavity 22 is again drawn out, causing the thickness of the elastic cushion layer 21 to decrease. At this time, the inner membrane layer 2 is fixed on the bored pile, thereby increasing the gap between the elastic cushion layer 21 and the inner membrane layer 2. When the steel casing 1 is pulled out, the friction between the elastic cushion layer 21 and the inner membrane layer 2 is further reduced, thereby making the demoulding process smoother.

[0040] As a preferred embodiment of the present invention, the elastic cushion layer 21 is provided with evenly distributed adsorption holes 25 on the side away from the steel casing 1, and a gravity block 26 is fixedly connected to one end of the inner membrane layer 2. The outer diameter of the inner membrane layer 2 is larger than the inner diameter of the elastic cushion layer 21. Due to the separate installation method between the inner membrane layer 2 and the elastic cushion layer 21, and the inner membrane layer 2 is made of a flexible film material, in order to make the inner membrane layer 2 fit evenly with the elastic cushion layer 21, during the design, evenly distributed adsorption holes 25 are provided on the elastic cushion layer 21. Before placing the inner membrane layer 2, a gravity block 26 is first made of waste materials such as mud at the construction site, and is adhered and fixed to the bottom of the inner membrane layer 2, and then the inner membrane layer 2 is moved toward the elastic cushion layer 2. The inner membrane layer 2 is placed inside the elastic cushion layer 21. When the two are completely aligned, the air in the regulating chamber 22 is continuously extracted under the action of the pressure pump 24, and then the outside air enters the regulating chamber 22 through the gap between the inner membrane layer 2 and the elastic cushion layer 21 and the adsorption holes 25. Under the action of the airflow, the inner membrane layer 2 is finally made to cling to the inner wall of the elastic cushion layer 21 and the adsorption holes 25 are blocked. During the pouring of concrete, the negative pressure in the adsorption holes 25 is maintained, so that the inner membrane layer 2 can be smoothly attached to the elastic cushion layer 21, which is convenient for construction. It should be noted that in actual application, the length of the inner membrane layer 2 is greater than that of the elastic cushion layer 21, which can not only facilitate the separation of concrete, but also enhance the convenience of using the inner membrane layer 2.

[0041] As a preferred embodiment of the present invention, an oil injection pipe 3 is fixedly installed on the elastic cushion layer 21, and the oil injection pipe 3 is used to inject lubricating oil into the regulating cavity 22. In the initial state, the end of the oil injection pipe 3 is detachably fixedly installed with a sealing plug 31, and the oil injection pipe 3 extends into the regulating cavity 22, and the oil injection pipe 3 is located in the regulating cavity 22 and has uniformly distributed micropores. In order to further reduce the difficulty of demoulding, when the cast-in-place pile is formed, the staff adjusts the pressure in the regulating cavity 22 to separate the elastic cushion layer 21 from the inner film layer 2. Then the staff pours the lubricating oil into the regulating cavity 22 through the oil filling pipe 3, and then continuously injects air into the regulating cavity 22 through the pressure pump 24. The air enters the adsorption hole 25 and finally enters the gap between the inner film layer 2 and the elastic cushion layer 21, and flows out from the top of the gap. In this process, the air entrains and pushes the lubricating oil, causing the lubricating oil to be dispersed between the elastic cushion layer 21 and the inner film layer 2. The lubricating oil is used to further reduce the friction between the elastic cushion layer 21 and the inner film layer 2, so that the demoulding difficulty is further reduced.

[0042] As a preferred embodiment of the present invention, a fiber layer 4 is fixedly installed in the regulating chamber 22. The fiber layer 4 is a thin sheet structure made of elastic fiber material. The fiber layer 4 is used to cover the adsorption hole 25. The fiber layer 4 is made of oleophobic material. The setting of the fiber layer 4 can guide the flow of the lubricating oil by using the fiber layer 4 when the lubricating oil is added, and cooperate with the flow of air to make the lubricating oil pass through the adsorption hole 25 and enter the gap between the elastic cushion layer 21 and the inner film layer 2. At the same time, the fiber layer 4 is located inside the regulating chamber 22 and blocks the adsorption hole 25. When the pressure pump 24 draws air, the air is filtered through the adsorption hole 25 and the fiber layer 4 in turn to prevent large particles of impurities from entering the regulating chamber 22.

[0043] As a preferred embodiment of the present invention, an annular isolation diaphragm 41 is fixedly installed in the regulating chamber 22, and the isolation diaphragm 41 divides the regulating chamber 22 into two chambers that are not connected to each other. The connecting pipe 23 is designed in a Y shape, and the connecting pipe 23 is connected to both sides of the regulating chamber 22. In the initial state, the volume of the chamber on one side of the regulating chamber 22 where the fiber sheet layer 4 is installed is smaller than the volume of the chamber on the other side. Since the length of the steel casing 1 is relatively large, in order to save the amount of lubricating oil used, in this embodiment, the isolation diaphragm 41 in the regulating chamber 22 divides the regulating chamber 22 into two chambers. When the lubricating oil is added, the pressure pump 24 pumps air into the connecting pipe 23, and the shape of the connecting pipe 23 The setting causes the air to flow into the two parts of the regulating chamber 22 at the same time, and because one of the chambers does not have an air outlet channel, as the air is pumped in, the volume of the regulating chamber 22 on the side where the fiber sheet layer 4 is installed is squeezed. At this time, the lubricating oil guided to flow through the fiber sheet layer 4 is squeezed and pushed, and flows out through the adsorption hole 25. Due to the increase in the thickness of the elastic cushion layer 21, the gap between the elastic cushion layer 21 and the inner film layer 2 is reduced. By repeatedly pumping air and stopping pumping, the gap between the elastic cushion layer 21 and the inner film layer 2 continues to change, and then the lubricating oil is evenly dispersed on the elastic cushion layer 21 and the inner film layer 2 by pressure, thereby saving the amount of lubricating oil used.

[0044] As a preferred embodiment of the present invention, a protective ring 42 is fixedly installed on the steel casing 1, and the protective ring 42 is located at the upper and lower ends of the elastic cushion layer 21. In the initial state, the inner diameter of the protective ring 42 is larger than the inner diameter of the elastic cushion layer 21. The existence of the protective ring 42 forms a limit on the two ends of the elastic cushion layer 21, thereby reducing the probability of separation of the steel casing 1 and the elastic cushion layer 21 during long-term use.

[0045] The steel casing 1 comprises an outer cylinder 11 and an inner cylinder 12, wherein the outer cylinder 11 is coaxially sleeved with the inner cylinder 12, wherein the outer diameter of the inner cylinder 12 is smaller than the inner diameter of the outer cylinder 11, and a straightening ring 5 is fixedly mounted on the outer wall of the inner cylinder 12, wherein the straightening ring 5 is rotated toward one side of the outer cylinder 11 and is evenly distributed with balls 51, and the elastic cushion layer 21 is fixedly mounted on the inner wall of the inner cylinder 12. In order to further enhance the convenience of the device, the steel casing 1 comprises an inner cylinder 12. And the outer cylinder 11, the outer cylinder 11 is a cylindrical cavity structure. When burying the steel casing 1, the outer cylinder 11 is buried first. When the outer cylinder 11 is fixed, the inner cylinder 12 fixed with the elastic cushion layer 21 is sunk into the outer cylinder 11. During the sinking process, the straightening ring 5 cooperates with the ball 51 to enhance the installation accuracy of the inner cylinder 12 and reduce the sinking friction. When demolding, the inner cylinder 12 is taken out first, and then the outer cylinder 11 is disassembled, thereby further reducing the difficulty of loading and unloading the steel casing 1.

[0046] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A bored pile construction device, comprising a steel casing (1), wherein the steel casing (1) is a cylindrical structure with openings at both ends; Features: It also comprises a convenient demoulding component, which is installed on the steel casing (1) and is used to increase the demoulding difficulty of the steel casing (1); The convenient demoulding component comprises an inner film layer (2) and an elastic cushion layer (21); The inner film layer (2) is a cylindrical structure made of a thin film material, and the inner film layer (2) is located inside the steel casing (1); An elastic cushion layer (21) is fixedly installed on the inner wall of the steel casing (1). The elastic cushion layer (21) is made of elastic material. The elastic cushion layer (21) is located between the inner film layer (2) and the elastic cushion layer (21). The elastic cushion layer (21) and the inner film layer (2) are both smoothly arranged on one side close to each other.

2. A bored pile construction device according to claim 1, characterized in that: It also includes an adjustment component, which cooperates with the convenient demoulding component to enhance the demoulding difficulty of the steel casing (1), and the adjustment component includes an adjustment chamber (22) and a pressure pump (24); An adjustment cavity (22) is provided in the elastic cushion layer (21), a connecting pipe (23) is fixedly mounted on the elastic cushion layer (21), and the connecting pipe (23) is conductively connected to the adjustment cavity (22); The regulating chamber (22) is conductively connected to a pressure pump (24) via a connecting pipe (23); the pressure pump (24) adjusts the pressure in the regulating chamber (22) by extracting or conveying a medium.

3. A bored pile construction device according to claim 2, characterized in that: The elastic cushion layer (21) is provided with evenly distributed adsorption holes (25) on the side away from the steel casing (1), one end of the inner film layer (2) is fixedly connected to a gravity block (26), and the outer diameter of the inner film layer (2) is larger than the inner diameter of the elastic cushion layer (21).

4. A bored pile construction device according to claim 3, characterized in that: An oil injection pipe (3) is fixedly mounted on the elastic cushion layer (21), and the oil injection pipe (3) is used to inject lubricating oil into the regulating cavity (22). In an initial state, a sealing plug (31) is detachably fixedly mounted on the end of the oil injection pipe (3). The oil injection pipe (3) extends into the regulating cavity (22), and the oil injection pipe (3) is provided with uniformly distributed micropores in the regulating cavity (22).

5. A bored pile construction device according to claim 4, characterized in that: A fiber sheet (4) is fixedly installed in the adjustment cavity (22); the fiber sheet (4) is a thin sheet structure made of elastic fiber material; and the fiber sheet (4) is used to cover the adsorption hole (25).

6. A bored pile construction device according to claim 5, characterized in that: The fiber sheet layer (4) is made of oleophobic material.

7. A bored pile construction device according to claim 6, characterized in that: An annular isolation membrane (41) is fixedly installed in the regulating chamber (22), and the isolation membrane (41) divides the regulating chamber (22) into two chambers that are not connected to each other. The connecting pipe (23) is designed in a Y shape, and the connecting pipe (23) is connected to both sides of the regulating chamber (22). In an initial state, the volume of the chamber on one side of the regulating chamber (22) where the fiber sheet layer (4) is installed is smaller than the volume of the chamber on the other side.

8. A bored pile construction device according to claim 1 or 7, characterized in that: A protective ring (42) is fixedly mounted on the steel casing (1), and the protective ring (42) is located at the upper and lower ends of the elastic cushion layer (21). In an initial state, the inner diameter of the protective ring (42) is larger than the inner diameter of the elastic cushion layer (21).

9. A bored pile construction device according to claim 8, characterized in that: The steel casing (1) comprises an outer cylinder (11) and an inner cylinder (12), wherein the outer cylinder (11) and the inner cylinder (12) are coaxially sleeved and connected, the outer diameter of the inner cylinder (12) is smaller than the inner diameter of the outer cylinder (11), a stabilizing ring (5) is fixedly mounted on the outer wall of the inner cylinder (12), and the stabilizing ring (5) is rotatably mounted with evenly distributed balls (51) on one side of the outer cylinder (11), and the elastic cushion layer (21) is fixedly mounted on the inner wall of the inner cylinder (12).