Cast-in-place concrete floor thickness control and pouring construction method

By adopting large-area pouring in the construction of cast-in-place concrete floor slabs and then using customized pedals for partial concrete pouring along the designed route, the problem of floor slab thickness control deviation in the existing technology is solved, achieving precise control of floor slab thickness and improving construction quality.

CN118728084AActive Publication Date: 2024-10-01CHINA MCC5 GROUP CORP LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411013570.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-10-01
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

There are deviations in the thickness control of cast-in-place concrete floor slabs in the existing technology, which leads to weakening and cracking of the load-bearing capacity of the floor structure. The main methods such as the wire pulling method, the soldering method and the slab thickness controller have high accuracy and human factors, and the cost is high and Concrete is not easy to vibrate and compact.

Method used

After a large area of ​​concrete is poured, a customized pouring pedal is used for local concrete pouring along the designed pouring route. The thickness of the concrete is controlled through the overflow holes of the first and second pouring pedals, combined with the steel support frame and steel plate structure to ensure the thickness of the floor slab. precise control.

Benefits of technology

It achieves precise control of floor slab thickness, reduces the impact of human factors, improves construction quality and qualification rate, reduces manual review workload, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728084A_ABST
    Figure CN118728084A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of cast-in-place concrete floor slab construction and provides a cast-in-place concrete floor slab thickness control and pouring construction method in order to solve the problems that in the prior art, a floor slab thickness control method has defects, the slab thickness cannot be accurately controlled, deviation exists in the slab thickness, and consequently a cast-in-place concrete floor slab cracks. Comprising the steps that S1, floor large-area concrete pouring is conducted, and the pouring thickness is smaller than the floor thickness; s2, local concrete pouring is conducted on the floor, and the thickness of the floor is accurately controlled; s3, concrete curing is conducted; floor slab concrete with a certain thickness (smaller than the thickness of the floor slab) is poured in a large area firstly, then local concrete pouring of the floor slab is conducted along a set pouring route, in the process, pouring pedals are adopted for assistance, floor slab thickness control is conducted, the floor slab thickness is accurately controlled, the floor slab construction quality is improved, and the floor slab thickness qualification rate is increased; and the workload of manually rechecking the floor elevation for the second time in the pouring process is greatly reduced, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cast-in-place concrete floor slab construction, and in particular to a cast-in-place concrete floor slab thickness control and pouring construction method. Background Art

[0002] Among the structural components of building projects, floor slabs are important horizontal dividing components. During the construction process, if the thickness of the floor slab is too large or too small, it will inevitably increase the center deflection of the floor slab, weaken the bearing capacity of the floor slab structure, and cause cracks in the cast-in-place concrete floor slab.

[0003] At present, the main methods used to control the thickness of floor slabs are wire drawing method, plugging method, and plate thickness controller. The advantage of the wire drawing method is that it is simple and clear, but the deviation of the formwork and wall column reinforcement during construction will lead to adverse effects such as inaccurate elevation control line and shaking of the wire, which will directly lead to deviations in plate thickness control. The plugging method is greatly affected by human factors. Many factors such as the precision of tool manufacturing and the operating techniques during operation will cause large fluctuations in the measured plate thickness data, greatly affecting the results of plate thickness control. The cost of the plate thickness controller is relatively high. In addition, the concrete within the controller range is not easy to vibrate and compact. Summary of the invention

[0004] The present invention aims to provide a cast-in-place concrete floor slab thickness control and pouring construction method to solve the problem that the floor slab thickness control method in the prior art has defects, the slab thickness cannot be accurately controlled, the slab thickness has deviations, and thus the cast-in-place concrete floor slab cracks.

[0005] The present invention is achieved by adopting the following technical solutions:

[0006] The present invention provides a cast-in-place concrete floor slab thickness control and pouring construction method, comprising the following steps:

[0007] S1: pouring concrete over a large area of ​​the floor slab, with the pouring thickness being less than the floor slab thickness;

[0008] S2: Carry out local concrete pouring of the floor slab to accurately control the thickness of the floor slab;

[0009] Step S2 specifically includes:

[0010] S201: Design the floor slab concrete pouring route;

[0011] S202: installing a first pouring pedal at the starting point of the pouring route, and installing a second pouring pedal beside the first pouring pedal along the pouring route;

[0012] The first pouring pedal and the second pouring pedal have the same structure, both comprising a pedal surface and a support frame, the pedal surface is fixedly mounted on the support frame, and an overflow hole is opened at the center of the pedal surface;

[0013] The worker stands on the second pouring pedal to pour concrete in the area of ​​the first pouring pedal until the concrete overflows from the overflow hole on the first pouring pedal, and then stops pouring concrete in this area;

[0014] After the pouring of this area is completed, the first pouring pedal is taken out and installed next to the second pouring pedal along the pouring route, and then the concrete in the area of ​​the first pouring pedal is finished;

[0015] S203: pouring concrete in part of the floor slab along the pouring route according to step S202, the worker stands on the next pouring pedal to pour concrete in the area of ​​the previous pouring pedal, after the pouring of the area of ​​the previous pouring pedal is completed, the previous pouring pedal is removed and installed next to the next pouring pedal, and then the concrete in the area of ​​the previous pouring pedal is finished, and the above operation is repeated until the concrete pouring of the entire floor slab is completed;

[0016] S3: Carry out concrete curing.

[0017] As the preferred technical solution:

[0018] Step S1 specifically includes:

[0019] Pour floor slab concrete over a large area, with the pouring thickness being two-thirds of the floor slab thickness.

[0020] As the preferred technical solution:

[0021] Step S201 specifically includes:

[0022] Adopt S-shaped casting route.

[0023] As the preferred technical solution:

[0024] The support frame is a steel support frame, and the pedal board surface is a steel plate, which is welded to the steel support frame.

[0025] As the preferred technical solution:

[0026] The steel bar support frame comprises a horizontal steel bar mesh and vertical steel bar legs, and a plurality of vertical steel bar legs are welded to the bottom of the horizontal steel bar mesh.

[0027] As the preferred technical solution:

[0028] The horizontal steel mesh includes longitudinal steel bars and transverse steel bars. The longitudinal steel bars are arranged perpendicular to the transverse steel bars, and the longitudinal steel bars and the transverse steel bars form a mesh structure.

[0029] As the preferred technical solution:

[0030] In step S202:

[0031] The finishing route is consistent with the pouring route.

[0032] As the preferred technical solution:

[0033] Step S3 specifically includes:

[0034] After the concrete is poured, it is watered and maintained.

[0035] As the preferred technical solution:

[0036] The BIM model is used to simulate each step of the cast-in-place concrete slab thickness control and pouring construction method, and on-site concrete pouring is performed after the simulation is completed.

[0037] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0038] By analyzing the defects of cast-in-place concrete floor slab construction technology and conventional floor slab thickness control measures, the present invention proposes a cast-in-place concrete floor slab thickness control and pouring construction method, which first casts a certain thickness of floor slab concrete (less than the floor slab thickness) over a large area, and then locally pours concrete of the floor slab along a predetermined pouring route. In the process, a customized pouring pedal is used to assist in controlling the floor slab thickness. The method has strong applicability and accurate floor slab elevation, reduces the influence of human factors on floor slab thickness control during direct large-area pouring, ensures the quality of concrete pouring, realizes precise control of floor slab thickness, improves the quality of floor slab construction, improves the qualified rate of cast-in-place concrete floor slab thickness, greatly reduces the workload of manual secondary review of floor slab elevation during pouring, and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 The present invention provides a flow chart of the cast-in-place concrete floor slab thickness control and pouring construction method.

[0040] Figure 2 It is a schematic diagram of the pouring route described in the present invention.

[0041] Figure 3 This is a top view of the first casting pedal described in the present invention.

[0042] Figure 4 for Figure 3 perspective view.

[0043] Figure 5 for Figure 4 Cross-sectional view along the AA direction.

[0044] Figure 6 for Figure 4 Cross-sectional view along the BB direction.

[0045] Icon: 1-pedal board, 2-support frame, 3-overflow hole, 201-horizontal steel mesh, 202-vertical steel support leg. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] Example 1

[0048] like Figure 1 As shown, this embodiment provides a cast-in-place concrete floor thickness control and pouring construction method, comprising the following steps:

[0049] S1: pouring concrete over a large area of ​​the floor slab, with the pouring thickness being less than the floor slab thickness;

[0050] Casting large-area concrete of the floor slab, with a casting thickness of about two-thirds of the thickness of the floor slab; wherein, "large area" is a description relative to "partial", and "large area" can refer to the area of ​​the entire floor slab, or it can refer to the area of ​​a part of the floor slab, but its area is larger. When "large area" refers to the area of ​​the entire floor slab, step S1 is: casting the entire floor slab with concrete, and the casting thickness is less than the thickness of the floor slab; at the same time, it is not limited to casting two-thirds of the thickness of the floor slab, for example, casting half of the thickness of the floor slab can also be used, and it does not exceed the thickness of the floor slab;

[0051] S2: Carry out local concrete pouring of the floor slab to accurately control the thickness of the floor slab;

[0052] Step S2 specifically includes:

[0053] S201: Design the floor slab concrete pouring route; in this embodiment, an S-shaped pouring route is adopted, such as Figure 2 As shown, the S-shaped pouring route can realize continuous pouring construction, and the direction indicated by the arrow in the figure is the direction of the pouring route; but it is not limited to the S-shaped pouring route, and other pouring routes are also acceptable, as long as the concrete pouring of the entire floor slab is completed;

[0054] S202: installing a first pouring pedal at the starting point of the pouring route, and installing a second pouring pedal beside the first pouring pedal along the pouring route;

[0055] The first pouring pedal and the second pouring pedal have the same structure. Figure 3-Figure 6As shown, they all include a pedal board 1 and a support frame 2, the pedal board 1 is fixedly mounted on the support frame 2, and an overflow hole 3 is opened at the center of the pedal board 1; in this embodiment, the support frame 2 is a steel support frame, the pedal board 1 is a steel plate, and the steel plate is welded to the steel support frame; the steel support frame includes a horizontal steel mesh 201 and vertical steel legs 202, and a plurality of vertical steel legs 202 are welded to the bottom of the horizontal steel mesh 201; the horizontal steel mesh 201 includes longitudinal steel bars and transverse steel bars, the longitudinal steel bars are arranged perpendicular to the transverse steel bars, and the longitudinal steel bars and the transverse steel bars form a mesh structure;

[0056] The staff stands on the second pouring pedal to pour concrete in the first pouring pedal area until the concrete overflows from the overflow hole 3 on the first pouring pedal, and then stops pouring concrete in this area to accurately control the floor thickness in this area;

[0057] After the pouring of this area is completed, the first pouring pedal is taken out and installed next to the second pouring pedal along the pouring route, and then the concrete in the first pouring pedal area is finished. The finishing can fill the steel bar holes formed by the vertical steel bar legs 202 in the first pouring pedal. The finishing can ensure the flatness and uniformity of the concrete and ensure that the pouring height of the concrete meets the requirements;

[0058] S203: pouring concrete in part of the floor slab along the pouring route according to step S202, the worker stands on the next pouring pedal to pour concrete in the area of ​​the previous pouring pedal, after the pouring of the area of ​​the previous pouring pedal is completed, the previous pouring pedal is removed and installed next to the next pouring pedal, and then the concrete in the area of ​​the previous pouring pedal is finished, and the above operation is repeated until the concrete pouring of the entire floor slab is completed;

[0059] According to this step, the finishing route is consistent with the pouring route;

[0060] S3: Carry out concrete curing;

[0061] After the concrete is poured, sprinkle water to moisten it and maintain for 14 days.

[0062] The above method is used for pouring floor slab concrete. First, a certain thickness of floor slab concrete (less than the floor slab thickness) is poured over a large area. Then, local concrete pouring of the floor slab is carried out along the specified pouring route. In the process, a customized pouring pedal is used to assist in controlling the floor slab thickness. The method has strong applicability and accurate floor slab elevation. The influence of human factors on the control of floor slab thickness during direct large-area pouring is reduced, and the floor slab thickness can be accurately controlled. The quality of floor slab construction and the qualified rate of cast-in-place concrete floor slab thickness can be improved. In addition, the workload of manual secondary review of floor slab elevation during pouring is greatly reduced, thereby improving construction efficiency.

[0063] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A cast-in-place concrete floor thickness control and pouring construction method, characterized in that: The following steps are involved: S1: large-area concrete pouring of the floor slab, with the pouring thickness being less than the floor slab thickness; S2: Carry out local concrete pouring of the floor slab to accurately control the thickness of the floor slab; Step S2 specifically includes: S201: Design the floor slab concrete pouring route; S202: installing a first pouring pedal at the starting point of the pouring route, and installing a second pouring pedal beside the first pouring pedal along the pouring route; The first pouring pedal and the second pouring pedal have the same structure, both comprising a pedal surface and a support frame, the pedal surface is fixedly mounted on the support frame, and an overflow hole is opened at the center of the pedal surface; The worker stands on the second pouring pedal to pour concrete in the area of ​​the first pouring pedal until the concrete overflows from the overflow hole on the first pouring pedal, and then stops pouring concrete in this area; After the pouring of this area is completed, the first pouring pedal is taken out and installed next to the second pouring pedal along the pouring route, and then the concrete in the area of ​​the first pouring pedal is finished; S203: pouring concrete in part of the floor slab along the pouring route according to step S202, the worker stands on the next pouring pedal to pour concrete in the area of ​​the previous pouring pedal, after the pouring of the area of ​​the previous pouring pedal is completed, the previous pouring pedal is removed and installed next to the next pouring pedal, and then the concrete in the area of ​​the previous pouring pedal is finished, and the above operation is repeated until the concrete pouring of the entire floor slab is completed; S3: Carry out concrete curing.

2. The method for controlling the thickness of cast-in-place concrete floor slab and pouring construction according to claim 1, characterized in that: Step S1 specifically includes: Pour floor slab concrete over a large area, with the pouring thickness being two-thirds of the floor slab thickness.

3. The method for controlling the thickness of cast-in-place concrete floor slab and pouring construction according to claim 1, characterized in that: Step S201 specifically includes: Adopt S-shaped casting route.

4. The method for controlling the thickness of cast-in-place concrete floor slab and pouring construction according to claim 1, characterized in that: The support frame is a steel support frame, and the pedal board surface is a steel plate, which is welded to the steel support frame.

5. The method for controlling the thickness of cast-in-place concrete floor slab and pouring construction according to claim 4 is characterized in that: The steel bar support frame comprises a horizontal steel bar mesh and vertical steel bar legs, and a plurality of vertical steel bar legs are welded to the bottom of the horizontal steel bar mesh.

6. The method for controlling the thickness of cast-in-place concrete floor slab and pouring construction according to claim 5, characterized in that: The horizontal steel mesh includes longitudinal steel bars and transverse steel bars. The longitudinal steel bars are arranged perpendicular to the transverse steel bars, and the longitudinal steel bars and the transverse steel bars form a mesh structure.

7. The method for controlling the thickness of cast-in-place concrete floor slab and pouring construction according to claim 1, characterized in that: In step S202: The finishing route is consistent with the pouring route.

8. The method for controlling the thickness of cast-in-place concrete floor slab and pouring construction according to claim 1, characterized in that: Step S3 specifically includes: After the concrete is poured, it is watered and maintained.

9. The method for controlling the thickness of cast-in-place concrete floor slab and pouring construction according to claim 1, characterized in that: The BIM model is used to simulate each step of the cast-in-place concrete slab thickness control and pouring construction method, and on-site concrete pouring is performed after the simulation is completed.

Citation Information

Patent Citations

  • Adjustable leveling stool and method for controlling floorslab thickness by using same

    CN102127971A

  • Pitched roof concrete pouring method

    CN114033107A

  • High-strength concrete anti-cracking construction method for nuclear island plant

    CN115324347A

  • Cast-in-situ concrete floor thickness control device

    CN203879014U

  • Cast -in -place concrete floor gauge control device

    CN206091085U