Fabricated laminated slab water and electricity reservation pre-embedding control tool and construction method
Through the prefabricated laminated board water and electricity reservation control tool, components such as corner seats, frames and sub-frames are used to realize the rapid and accurate embedment of water and electricity pipelines, which solves the problem of short water and electricity embedment time and low qualification rate in the construction of prefabricated laminated boards. problems, improving construction efficiency and installation accuracy.
Patent Information
- Application Number
- CN202411007362.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-01
AI Technical Summary
In the construction of prefabricated composite panels, the pre-embedding of water and electricity pipelines is usually carried out after the installation of PC components, resulting in short construction time, high difficulty, and low qualification rate, which affects the progress of the project.
Provides a prefabricated laminated plate hydropower pre-embedded control tool, including corner seats, frames, sub-frames, first rods and connectors. Through precise positioning and adjustment of the tool, rapid and accurate installation of pipeline embedded parts can be achieved. Adapt to laminates of different thicknesses.
It improves the efficiency and qualification rate of hydropower embedded construction, shortens construction time, ensures project progress, and reduces the top elevation of embedded pipes, enhancing the stability and accuracy of installation.
Smart Images

Figure CN118728113A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of fabricated composite panel processing, and in particular to a pre-buried control tool and construction method for pre-buried water and electricity reserves for fabricated composite panels. Background Art
[0002] The traditional pre-buried water and electricity pipelines are carried out after the floor formwork is completed, the junction box is laid out and installed, and the vertical casing is fixed. After the floor bottom reinforcement is tied, the pipelines are pre-buried, installed and fixed. After the floor reinforcement is completed, the inspection and acceptance are carried out, and then the damaged finished products are repaired.
[0003] In the construction of prefabricated composite slabs, the pre-buried water and electricity pipes are not started until the PC components are installed. After the PC components are installed, the civil engineering only needs to tie a layer of reinforcement before pouring concrete. The civil engineering period is significantly shortened, but the time for pre-buried water and electricity construction is reduced invisibly, also known as free time difference. It is more difficult to plan and arrange the water and electricity construction, and it is necessary to increase the first-time qualified rate of pre-buried to effectively ensure the progress of the project. Summary of the invention
[0004] In order to save the time of pre-embedded water and electricity construction of prefabricated composite slabs and improve the qualified rate of pre-embedded water and electricity, the present application provides a pre-embedded water and electricity control tool and construction method for pre-embedded water and electricity of prefabricated composite slabs.
[0005] In the first aspect, the present application provides a pre-buried control tool for water and electricity in an assembled composite plate, which adopts the following technical solution: A prefabricated composite slab water and electricity reserved embedded control tool, including a corner seat, a frame, a sub-frame, a first rod and a connecting member, wherein four corner seats are provided, the corner seats are vertically arranged, and the four corner seats are arranged in a rectangular shape, a plurality of frames are provided, and the frames are overlapped with two adjacent corner seats respectively, a plurality of sub-frames are also provided, and a plurality of sub-frames are overlapped on the frame and slidably connected to the frame, and the sliding direction of the sub-frame is along the length direction of the frame, a positioning box is fixed at the bottom of the first rod, the embedded member is arranged in the positioning box, the first rod is plug-in connected to the connecting member, a plug-in assembly for quick plug-in of the first rod and the connecting member is provided between the first rod and the connecting member, an end of the connecting member away from the first rod is slidably connected to the sub-frame, the first rod and the connecting member slide back and forth along the length direction of the sub-frame, and bolts for locking the sub-frame and the connecting member are respectively provided on the sub-frame and the connecting member.
[0006] By adopting the above technical solution, the dimensions of the frame and the sub-frame are determined according to actual needs, the positions of the four corner seats are placed according to the rectangular area, and then the frame is overlapped on two adjacent corner seats, the height of the corner seats is adjusted to a suitable position, and then the frame and the corner seats are fixed with bolts, the position of the pipeline embedded parts is planned according to the drawings, the sub-frame is overlapped on the frame, and the position of the sub-frame is adjusted so that the sub-frame fits the intersection of the embedded parts and the pipelines, and then the positioning box is fixed in the embedded parts, and then the connecting parts are installed, and the connecting parts are fixed to the sub-frame, and the positions of the first rod and the connecting parts are adjusted to accurately adjust the positions of the embedded parts.
[0007] Optionally, the plug-in assembly includes a mounting seat and an insertion rod, the mounting seat and the first rod are threadedly connected, an insertion block is fixed on the insertion rod, a limiting groove is provided on the mounting seat, and a limiting block for quickly locking the limiting block is provided in the limiting groove.
[0008] By adopting the above technical solution, the first rod is vertically arranged, and the mounting seat is threadedly connected to the first rod. When installing the connecting member and the mounting seat, it is only necessary to insert the plug rod into the mounting seat, and then the limit block in the mounting seat locks the plug block, so that the connecting member and the mounting seat can be quickly installed.
[0009] Optionally, a spring is fixed in the limit groove, and the spring is fixedly connected to the limit block. The sides of the plug block and the limit block that are close to each other are set as inclined surfaces. When the plug block abuts against the limit block, the spring is compressed until the plug block slides off the inclined surface of the limit block, and the limit block locks the plug block.
[0010] By adopting the above technical solution, when the plug block approaches the limit block, the inclined surfaces of the plug block and the limit block slide against each other and compress the spring at the same time, until the plug block slides away from the limit block, the spring returns to its original position and the limit block locks the plug block.
[0011] Optionally, the sides of the positioning box are all threadedly connected with a spiral rod, a rubber layer is fixed to the end of the spiral rod, and the rubber layer abuts against the embedded box.
[0012] By adopting the above technical solution, the embedded box is placed in the positioning box, and the spiral rods around it are tightened to make them abut against the embedded box, so that the embedded box can be fixed. At the same time, the rubber layer on the spiral rod can also reduce the wear of the embedded box.
[0013] Optionally, the corner seat includes a mounting piece, a shell and a base plate. The mounting piece is fixed to the frame, and the mounting piece slides back and forth in a vertical direction relative to the shell. The shell rotates relative to the base plate, and the rotation axis of the shell is in the vertical direction. A driving component for driving the mounting piece to rise and fall is provided in the shell.
[0014] By adopting the above technical solution and starting the driving assembly, the height of the mounting member can be changed, that is, the height of the frame and the sub-frame can be changed, so as to adapt to composite panels of different thicknesses.
[0015] Optionally, the driving assembly includes a threaded rod and a threaded block. The threaded rod rotates relative to the base plate, and the rotation axis of the threaded rod is in the vertical direction. The threaded block is threadedly connected to the threaded rod, and a receiving groove is provided on the threaded block. The positioning rod is arranged in the receiving groove and abuts against the threaded block.
[0016] By adopting the above technical solution, while the threaded rod rotates relative to the base plate, the threaded rod and the threaded block rotate threadably, and a positioning rod is placed in the receiving groove on the threaded block. Under the restriction of the notch in the lock shell, the positioning rod can only rise or fall in the vertical direction, thereby realizing the height adjustment of the mounting part.
[0017] Optionally, a first gear is fixed on the threaded rod, a second gear is rotatably connected to the base plate, a gear ring is fixed to the inner wall of the shell, the first gear and the second gear are meshed, the second gear is meshed with the gear ring, a lock cap is threadedly connected to the shell, the lock cap is in contact with the mounting piece, a guide rod is fixed to the base plate, and the lock cap slides along the length direction of the guide rod.
[0018] By adopting the above technical solution, when the threaded rod rotates relative to the base plate, it also drives the first gear to rotate, the first gear and the second gear mesh, driving the second gear to rotate, the second gear and the gear ring mesh, driving the gear ring to rotate, that is, the casing rotates. When the casing rotates, the locking cap is threadedly connected to the casing and moves in the vertical direction under the action of the guide rod, that is, the locking cap and the mounting piece can achieve synchronous movement, thereby increasing the stability of the mounting piece.
[0019] Optionally, a second rod is provided on the connecting member, the second rod is spaced apart from the first rod along the length direction of the sub-frame, and a die for accommodating the embedded pipe is fixed at the bottom of the second rod.
[0020] By adopting the above technical solution, the die parts are used to place the intersection of the pipes, and the prototype grooves are left after the composite slabs are cast. The die parts can reduce the elevation of the top of the embedded pipes so that it does not exceed the height.
[0021] Optionally, the die piece itself is configured to be semicircular, with the arc surface facing the side away from the second rod.
[0022] By adopting the above technical solution, the die parts cooperate with the grooves on the composite plate to place the pipeline bridges at multiple angles and directions to reduce damage to the pipeline.
[0023] In the second aspect, the present application provides a construction method for pre-buried control tools for water and electricity in assembled composite panels, which adopts the following technical solution: A construction method for pre-buried control tools for water and electricity in assembled composite slabs, comprising the following steps: S1. Determine the length of the frame and the sub-frame according to the required size of the prefabricated composite board, set the four corner seats at the four corners according to the four vertices of the rectangle, and then overlap the frame on two adjacent corner seats; S2. Set the position of the embedded parts of the pipelines and the intersection of the pipelines when laying the pipelines according to the planned drawings, then overlap the sub-frame on the frame, and slide the sub-frame on the frame to make the position of the sub-frame fit the intersection of the embedded parts and the pipelines; S3, overlapping the first rod with the intersection of the pipes left after casting on the composite plate, installing the second rod with the positioning box, locating the position of the embedded part, and then connecting the first rod and the second rod with the auxiliary frame by connecting pieces respectively; S4. According to the actual situation, appropriately adjust the elevation of the angle seat and the positions of the first rod and the second rod to improve the positioning accuracy of the embedded wire box and the casing.
[0024] In summary, the present application includes at least one of the following beneficial technical effects: 1. Place the corner seat according to the required size of the prefabricated composite board, overlap the frame and the sub-frame, then fix the sub-frame according to the position of the embedded parts, and then install the first rod and the connecting member. The height of the corner seat can be adjusted, and the connecting member can also be adjusted relative to the first rod. This can adapt to the thickness of composite boards of different sizes and facilitate accurate positioning of the embedded parts. 2. The plug-in assembly between the connecting member and the first rod member facilitates the quick installation between the connecting member and the first rod member; 3. The second rod bottom fixed die piece matches with the groove reserved when casting the composite slab, which can reduce the problem of the top elevation of the embedded pipe not exceeding the height. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application; Figure 2 It is a schematic diagram showing the structure of the first rod; Figure 3 It is a schematic diagram showing the structure of the second rod; Figure 4 It is a schematic diagram for showing the structure of the plug-in assembly; Figure 5 This is a schematic diagram showing the structure of the angle seat; Figure 6 This is a schematic diagram showing the cross-sectional structure of the corner seat.
[0026] Explanation of the reference numerals in the accompanying drawings: 1. Angle seat; 11. Mounting piece; 111. Mounting plate; 112. Column body; 1121. Positioning rod; 12. Housing; 13. Bottom plate; 14. Driving assembly; 141. Threaded rod; 142. Threaded block; 1421. Receiving groove; 143. Driving motor; 15. First gear; 16. Second gear; 17. Gear ring; 18. Locking cap; 19. Guide rod; 2. Frame; 3. Sub-frame; 4. First rod member; 41. Positioning box; 411. Screw rod; 5. Second rod member; 51. Press-molded member; 6. Connecting piece; 7. Plug-in assembly; 71. Mounting seat; 711. Limiting groove; 7111. Spring; 7112. Limiting block; 72. Plug-in rod; 721. Plug-in block; 8. Bolt. DETAILED DESCRIPTION
[0027] The following is combined with Figure 1-Figure 6 This application is described in further detail.
[0028] The embodiment of the present application discloses a pre-buried control tool for water and electricity reservation of an assembled composite slab.
[0029] refer to Figure 1 A prefabricated composite slab water and electricity reserved embedded control tool includes a corner seat 1, a frame 2, a sub-frame 3, a first rod 4, a second rod 5 and a connecting member 6. Four corner seats 1 are provided, and the corner seats 1 are vertically arranged, and the four corner seats 1 are rectangularly arranged at four corners. Four frames 2 are provided, and the frame 2 is overlapped with two adjacent corner seats 1 respectively, and the corner seat 1 and the frame 2 are fixed by bolts 8. A plurality of sub-frames 3 are also provided, and a plurality of sub-frames 3 are overlapped on the frame 2. Sliding holes are opened on the frame 2 and the sub-frame 3. The sub-frame 3 slides on the frame 2 and is also fixed by bolts 8.
[0030] The connecting member 6 connects the first rod member 4 and the second rod member 5 respectively. The first rod member 4 and the second rod member 5 are both vertically arranged and spaced along the corresponding pipeline embedded parts and the intersection position of the pipeline. The first rod member 4 and the second rod member 5 are both connected to the connecting member 6 through the plug-in assembly 7. The connecting member 6 is also provided with a sliding hole, and the sliding hole is also provided with a bolt 8 for fixing with the sub-frame 3.
[0031] refer to Figure 2 , Figure 3 and Figure 4The plug-in assembly 7 includes a mounting seat 71 and an insert rod 72. The mounting seat 71 is threadedly connected to the first rod 4. An insert block 721 is fixed on the insert rod 72. The cross section of the insert block 721 itself is set as a right triangle. A limiting groove 711 is provided on the mounting seat 71. A spring 7111 is fixed in the limiting groove 711 in a direction perpendicular to the insert rod 72. A limiting block 7112 is fixed on the spring 7111. The limiting block 7112 is set as an oblique surface facing the side of the insert block 721. When the insert rod 72 approaches the limiting block 7112, the oblique surface of the limiting block 7112 is fitted and abutted against the oblique surface of the insert block 721. At this time, the spring 7111 is compressed until the insert block 721 slides away from the inclined surface of the limiting block 7112, and the spring 7111 returns to its original length. At this time, the limiting block 7112 locks the insert block 721.
[0032] refer to Figure 2 , Figure 3 and Figure 4 A rectangular positioning box 41 is fixed at the bottom of the first rod 4, and the sides of the positioning box 41 are all threadedly connected with a spiral rod 411. A rubber layer is fixed to the end of the spiral rod 411. The embedded part is arranged in the positioning box 41, and the rubber layer abuts against the embedded box. At this time, the positioning box 41 is customized according to the size of the embedded part. If the actual size of the embedded part is larger than the size of the positioning box 41, the embedded part can also be arranged on the outside of the positioning box 41, and the spiral rod 411 is installed in reverse, and the spiral rod 411 is extended outward to abut and fix with the positioning box 41.
[0033] A die 51 is fixed at the bottom of the second rod 5. The die 51 itself is set to be semicircular, and the arc surface faces the side away from the second rod 5. After the composite plate is cast, a prototype groove will be left. The die 51 can be placed in multiple directions and angles for the "bend" of the pipeline bridging, that is, the elbow joint used where the pipelines overlap, so as to ensure that the top elevation of the embedded pipe does not exceed the limit.
[0034] refer to Figure 1 , Figure 5 and Figure 6 The angle seat 1 includes a mounting member 11, a casing 12, a locking cap 18 and a base plate 13. The mounting member 11 includes a mounting plate 111 and a column body 112. A through hole is opened on the mounting plate 111, and a bolt 8 is set in the through hole to be fixed to the frame 2. The mounting plate 111 is fixed to the column body 112. The column body 112 slides in the vertical direction relative to the casing 12. The casing 12 rotates relative to the base plate 13. The rotation axis direction of the casing 12 is in the vertical direction. The casing 12 is threadedly connected with the locking cap 18. A guide rod 19 is vertically fixed on the base plate 13. The locking cap 18 is slidably connected to the guide rod 19. The sliding direction of the locking cap 18 reciprocates in the vertical direction. A driving assembly 14 is arranged in the casing 12.
[0035] The driving assembly 14 includes a threaded rod 141, a threaded block 142 and a driving motor 143. The driving motor 143 is fixedly connected to the base plate 13. The motor shaft of the driving motor 143 is vertically fixed to the threaded rod 141. The threaded block 142 is threadedly connected to the threaded rod 141. A receiving groove 1421 is provided on the threaded block 142. A positioning rod 1121 is horizontally inserted into the column body 112. The positioning rod 1121 is arranged in the receiving groove 1421 and abuts against the threaded block 142.
[0036] A first gear 15 is coaxially fixed on the threaded rod 141, a second gear 16 is rotatably connected to the bottom plate 13, a gear ring 17 is fixed to the inner wall of the casing 12, the first gear 15 and the second gear 16 are meshed, the second gear 16 and the gear ring 17 are meshed, the driving motor 143 is started, the threaded rod 141 rotates, the threaded block 142 is driven to perform lifting motion, and at the same time, the mounting member 11 is driven to lift up and down through the positioning rod 1121. In addition, while the threaded rod 141 is rotating, it drives the casing 12 to rotate, the casing 12 and the locking cap 18 to threadedly move, the locking cap 18 moves in the vertical direction under the guidance of the guide rod 19, and the locking cap 18 is always in contact with the column body 112, so as to always maintain the stability of the column body 112.
[0037] The implementation principle of a prefabricated composite slab water and electricity pre-embedded control tool in an embodiment of the present application is as follows: a plurality of corner seats 1 are placed vertically according to the size of the composite slab, and then the frame 2 is fixed to the corner seats 1 respectively by bolts 8, and the sub-frame 3 is fixed to the frame 2 by bolts 8 at the positions of the predetermined embedded parts and the positions where the pipelines intersect, and then the positions of the first rod 4 and the second rod 5 are set, and the first rod 4 and the second rod 5 are respectively connected to the sub-frame 3 by the connecting member 6, the positioning box 41 at the bottom of the first rod 4 can fix the embedded parts, and the die 51 at the bottom of the second rod 5 can reduce the situation where the top elevation of the embedded pipe at the position where the pipelines intersect is too high.
[0038] The embodiment of the present application also discloses a construction method for pre-buried control tools for water and electricity in an assembled composite slab.
[0039] The following steps are involved: S1. Determine the length of the frame 2 and the sub-frame 3 according to the required size of the prefabricated composite board, set the four corner seats 1 at the four corners according to the four vertices of the rectangle, and then overlap the frame 2 on the two adjacent corner seats 1; S2. Set the position of the embedded parts of the pipelines and the intersection of the pipelines when laying the pipelines according to the planned drawings, and then overlap the sub-frame 3 on the frame 2, and slide the sub-frame 3 on the frame 2 to make the position of the sub-frame 3 fit the intersection of the embedded parts and the pipelines; S3, overlap the first rod 4 with the intersection of the pipes left after pouring on the composite board, install the second rod 5 with the positioning box 41, locate the position of the embedded parts, and then use the connecting piece 6 to connect the first rod 4 and the second rod 5 with the auxiliary frame 3; S4. According to the actual situation, appropriately adjust the elevation of the angle seat 1 and the positions of the first rod 4 and the second rod 5 to improve the positioning accuracy of the embedded wire box and the casing.
[0040] The embodiments of this specific implementation method are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A pre-buried control tool for water and electricity in assembled composite panels, characterized by: The invention comprises a corner seat (1), a frame (2), a sub-frame (3), a first rod (4) and a connecting member (6); four corner seats (1) are provided, the corner seats (1) are arranged vertically, and the four corner seats (1) are arranged in a rectangular shape; a plurality of frames (2) are provided, and the frame (2) is overlapped with two adjacent corner seats (1) respectively; a plurality of sub-frames (3) are also provided, and the plurality of sub-frames (3) are overlapped on the frame (2) and slidably connected with the frame (2); the sliding direction of the sub-frame (3) is along the length direction of the frame (2); a positioning member is fixed at the bottom of the first rod (4); The positioning box (41) has an embedded part arranged in the positioning box (41); the first rod (4) is plug-connected with the connecting member (6); a plug-in assembly (7) for quick plug-in of the first rod (4) and the connecting member (6) is arranged between the first rod (4) and the connecting member (6); an end of the connecting member (6) away from the first rod (4) is slidably connected to the sub-frame (3); the first rod (4) and the connecting member (6) reciprocate along the length direction of the sub-frame (3); and bolts (8) for locking the sub-frame (3) and the connecting member (6) are respectively arranged on the sub-frame (3) and the connecting member (6).
2. According to claim 1, a pre-buried control tool for pre-reserved water and electricity for assembled composite slabs is characterized by: The plug-in assembly (7) comprises a mounting seat (71) and an insertion rod (72); the mounting seat (71) and the first rod (4) are threadedly connected; an insertion block (721) is fixed on the insertion rod (72); a limiting groove (711) is provided on the mounting seat (71); a limiting block (7112) for quickly locking the limiting block (7112) is provided in the limiting groove (711).
3. According to claim 2, a pre-buried control tool for pre-reserved water and electricity for assembled composite slabs is characterized by: A spring (7111) is fixed in the limiting groove (711), and the spring (7111) is fixedly connected to the limiting block (7112). The sides of the insert block (721) and the limiting block (7112) that are close to each other are both arranged as inclined surfaces. When the insert block (721) abuts against the limiting block (7112), the spring (7111) is compressed until the insert block (721) slides away from the inclined surface of the limiting block (7112), and the limiting block (7112) locks the insert block (721).
4. The pre-buried control tool for water and electricity reservation of assembled composite slabs according to claim 1 is characterized by: The sides of the positioning box (41) are all threadedly connected with a spiral rod (411), a rubber layer is fixed to the end of the spiral rod (411), and the rubber layer abuts against the embedded box.
5. The pre-buried control tool for water and electricity reserved for assembled composite slabs according to claim 1 is characterized by: The corner seat (1) comprises a mounting member (11), a casing (12) and a bottom plate (13); the mounting member (11) is fixed to the frame (2); the mounting member (11) slides back and forth in a vertical direction relative to the casing (12); the casing (12) rotates relative to the bottom plate (13); the rotation axis of the casing (12) is in a vertical direction; a driving component (14) for driving the mounting member (11) to rise and fall is arranged in the casing (12).
6. The pre-buried control tool for water and electricity reservation of assembled composite slabs according to claim 5 is characterized by: The driving assembly (14) comprises a threaded rod (141) and a threaded block (142); the threaded rod (141) rotates relative to the bottom plate (13), and the rotation axis direction of the threaded rod (141) is along the vertical direction; the threaded block (142) is threadedly connected to the threaded rod (141); a receiving groove (1421) is provided on the threaded block (142); and a positioning rod (1121) is arranged in the receiving groove (1421) and abuts against the threaded block (142).
7. The pre-buried control tool for water and electricity reserved for assembled composite slabs according to claim 6 is characterized by: A first gear (15) is fixed on the threaded rod (141), a second gear (16) is rotatably connected to the bottom plate (13), a toothed ring (17) is fixed to the inner wall of the casing (12), the first gear (15) and the second gear (16) are meshed, the second gear (16) and the toothed ring (17) are meshed, a locking cap (18) is threadedly connected to the casing (12), the locking cap (18) is in close contact with the mounting member (11), a guide rod (19) is fixed to the bottom plate (13), and the locking cap (18) slides along the length direction of the guide rod (19).
8. The pre-buried control tool for water and electricity reserved for assembled composite slabs according to claim 1 is characterized by: The connecting member (6) is provided with a second rod member (5), the second rod member (5) and the first rod member (4) are arranged at intervals along the length direction of the sub-frame (3), and a die member (51) for accommodating a pre-buried pipe is fixed at the bottom of the second rod member (5).
9. The pre-buried control tool for water and electricity reserved for assembled composite slabs according to claim 8 is characterized by: The pressing mold (51) itself is configured in a semicircular shape, with the arc surface facing the side away from the second rod (5).
10. A construction method for pre-buried control tools for water and electricity in assembled composite slabs, characterized in that: The following steps are involved: S1. Determine the length of the frame (2) and the sub-frame (3) according to the required size of the prefabricated composite board, set the four corner seats (1) at the four corners according to the four vertices of the rectangle, and then overlap the frame (2) on two adjacent corner seats (1); S2. Set the position of the embedded parts of the pipelines and the intersection of the pipelines when laying the pipelines according to the planned drawings, then overlap the sub-frame (3) on the frame (2), and slide the sub-frame (3) on the frame (2) to make the position of the sub-frame (3) fit the intersection of the embedded parts and the pipelines; S3, overlapping the first rod (4) with the intersection of the pipes left after casting on the composite plate, installing the second rod (5) with the positioning box (41), locating the position of the embedded parts, and then connecting the first rod (4) and the second rod (5) with the auxiliary frame (3) respectively by using the connecting piece (6); S4. According to the actual situation, appropriately adjust the elevation of the angle seat (1) and the positions of the first rod (4) and the second rod (5) to improve the positioning accuracy of the embedded wire box and the casing.
