By designing an indoor simulation device for CO2 flooding well pattern intensification in high water-cut oil reservoirs to simulate formation compaction, sealing, crude oil saturation, water injection and oil production, and well pattern intensification, gas injection and oil production, the problem that existing technology cannot simulate high and low fluctuations and well pattern intensification is solved. , achieving true restoration of well locations and optimization of CO2 flooding strategies.

CN118728333APending Publication Date: 2024-10-01YANCHANG OIL FIELD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410835330.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing technology cannot simulate the ups and downs between multiple strata, cannot use wellbores to simulate production volume, and does not have the purpose of intensifying and adjusting well patterns, making it difficult to effectively develop high water-cut oil reservoirs.

Method used

An indoor simulation device for CO2 flooding well network intensification in high water-cut oil reservoirs is designed, including an observation box, a simulated wellbore, a compaction mechanism and a high-pressure pump. It simulates formation compaction, sealing, crude oil saturation, water injection and oil production, and well network intensification injection. The steps of gas and oil recovery realize the simulation of well pattern intensification and CO2 displacement.

Benefits of technology

It realizes the simulation of formations with different thicknesses and heights and the true restoration of well locations, which facilitates experimental adjustments, improves the closeness of experimental results to real oil field conditions, and provides a theoretical basis for well network intensification and CO2 flooding strategies in high water content oil fields.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728333A_ABST
    Figure CN118728333A_ABST
Patent Text Reader

Abstract

The invention discloses a high-water-content oil reservoir CO2 drive well pattern densification indoor simulation device which comprises an observation box, a fixing plate is horizontally arranged in the observation box, A * A through holes are formed in the fixing plate at equal intervals, a simulation shaft movably penetrates through each through hole, fixing rods are symmetrically and vertically arranged on the two sides of the observation box, and the two fixing rods are connected through a connecting rod. A sliding groove is formed in the connecting rod in the length direction, a first compaction mechanism and a second compaction mechanism are arranged in the sliding groove in a sliding mode, the lower end of the first compaction mechanism is connected with a compaction cavity matched with the observation box, and the second compaction mechanism is movably connected with the observation box through a connecting assembly. The invention further discloses a method for conducting well pattern encryption gas injection oil extraction simulation through the simulation device. According to the CO2 flooding well pattern densification indoor simulation device for the high-water-content oil reservoir, the problems that in the prior art, fluctuation among multiple stratums cannot be simulated, the mineshaft cannot be used for simulating the production quantity, and well pattern densification adjustment cannot be simulated are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oil and gas field development experiments, and in particular relates to an indoor simulation device for CO2 flooding well network densification in high water content oil reservoirs, and also relates to a simulation method using the simulation device. Background Art

[0002] When the water content of the reservoir reaches more than 80%, it enters the high water content period, and the underground oil and water distribution has undergone major changes. It is difficult to find large, layered, and continuously distributed residual oil in the oil layer. The residual oil has become highly dispersed, mostly distributed in the boundary parts of each sand body, unused low-permeability thin layers, and off-surface reservoirs. At this time, the impact of reservoir plane differences on development has become the main contradiction. It is difficult to extract these scattered residual oils by relying on the original well network, and the well network needs to be further intensified and adjusted. Well network intensification refers to adding adjustment wells on the basis of the original well network to reduce the impact of reservoir plane differences on oilfield development.

[0003] Carbon dioxide flooding technology is a technology that injects carbon dioxide into oil layers to increase oil recovery. When carbon dioxide and formation crude oil first come into contact, they cannot form a miscible phase, but under the conditions of appropriate pressure, temperature and crude oil composition, carbon dioxide can form a miscible front. Supercritical fluid will extract heavier hydrocarbons from crude oil and continuously concentrate the gas at the displacement front. As a result, carbon dioxide and crude oil become miscible liquids, forming a single liquid phase, which can effectively displace formation crude oil to the production well.

[0004] In recent years, foreign countries have vigorously carried out the research and development and application of carbon dioxide flooding enhanced oil recovery (EOR) technology. This technology can not only meet the needs of oil field development, but also solve the problem of carbon dioxide storage, protect the atmospheric environment, and inhibit the greenhouse effect. This technology is not only applicable to conventional oil reservoirs, but also can significantly improve the recovery rate of crude oil for low-permeability and ultra-low-permeability oil reservoirs. Low-permeability oil reservoirs can significantly improve the recovery rate of crude oil, especially for high-water-content oil fields after water flooding, which has a more obvious effect, and researchers have also increased the intensity of field and indoor research.

[0005] Indoor CO2 flooding simulation devices are generally core displacement or displacement simulation of the entire formation. For example, the Chinese invention patent "Carbon Dioxide Oil Flooding and Burial Simulation Device and Method" with an application date of February 8, 2023 and a publication number of CN116122805A includes a formation model, a pressure chamber, a carbon dioxide container assembly, a back pressure element, and a monitoring assembly. The formation model is used to be set in the pressure chamber, and the formation model has pores; the pressure chamber is used to maintain a first preset pressure; the carbon dioxide container assembly is used to introduce the configured supercritical carbon dioxide conductive fluid into the formation model; the back pressure element is connected to the formation model, and when the pressure of the formation model pores reaches the second preset pressure, the back pressure element is turned on, and the monitoring assembly is at least used to monitor the pressure and conductivity changes inside the formation model during the supercritical carbon dioxide conductive fluid flooding and burial process. It can simulate the carbon dioxide oil flooding and burial process and dynamically monitor the process. However, the device and method cannot simulate the ups and downs between multiple formations, nor can it use the wellbore to simulate the production volume, and it also does not have the purpose of simulating the density adjustment of the well network. Summary of the invention

[0006] The purpose of the present invention is to provide an indoor simulation device for CO2 drive well network densification in high water-content oil reservoirs, which solves the problems that the prior art cannot simulate the ups and downs between multiple formations, cannot use wellbores to simulate production volume, and cannot simulate well network densification adjustment.

[0007] Another object of the present invention is to provide a method for simulating gas injection and oil production for well network densification using the above-mentioned simulation device.

[0008] The first technical solution adopted by the present invention is an indoor simulation device for densification of CO2 flooding well network in high water-content oil reservoirs, including an observation box, a fixed plate is horizontally arranged in the observation box, A×A through holes are equidistantly opened on the fixed plate, the value of A is 5-8, a simulated wellbore is movably penetrated in each through hole, fixed rods are symmetrically and vertically arranged on both sides of the observation box, the upper ends of the two fixed rods are connected by a connecting rod, the connecting rod is provided with a slide groove along the length direction, a first compaction mechanism and a second compaction mechanism are respectively slidably arranged in the slide groove, the lower end of the first compaction mechanism is connected to a compaction cavity matched with the observation box, and the second compaction mechanism is movably connected to the observation box through a connecting assembly;

[0009] It also includes a high-pressure water pump, a high-pressure air pump and two produced oil collection boxes. A number of saturated oil access pipes are symmetrically arranged on the front and rear side walls of the observation box.

[0010] The present invention is also characterized in that:

[0011] A support tray matched with the simulated wellbore is arranged at the bottom of the observation box, the support tray is located below the simulated wellbore, and a slot matched with the support tray is opened at the bottom of the observation box.

[0012] A sealing rod is threaded through the bottom end of the simulated wellbore, a number of seepage holes are opened on the side wall of the simulated wellbore, and a magnetic sheet is arranged on the top of the simulated wellbore. The diameter of the seepage holes is 1 to 3 mm.

[0013] The first compacting mechanism includes a first slider, which is slidably arranged in a slide groove. The upper end of the first slider is connected to a first hydraulic press, and the first hydraulic press is connected to a first hydraulic rod. The first hydraulic rod passes through the first slider and the slide groove and is connected to the compacting cavity.

[0014] The shape, area and size of the compaction cavity are the same as those of the inner cavity of the observation box. The compaction cavity is hollow inside. A-1×A-1 third hydraulic presses are arranged at equal intervals on the top of the compaction cavity. Each third hydraulic press is connected to a third hydraulic rod. The third hydraulic rod movably penetrates the top of the compaction cavity. A pressing plate is connected to the free end of the third hydraulic rod. Through holes matching with a plurality of pressing plates are arranged at the bottom of the compaction cavity. The pressing plates can movably penetrate the corresponding through holes. Each free end of the third hydraulic rod is connected to a pressing plate. The shape and area of ​​the pressing plate are proportionally reduced to 1 / 2 to 2 / 3 of the rectangle surrounded by any number of through holes connected end to end.

[0015] A rubber pad is provided at the bottom of the compaction cavity with a thickness of 4 to 8 mm. Both ends of the rubber pad are fixed to the bottom of the compaction cavity by steel bars. A-1 magnetic belts are equidistantly provided between the two steel bars. Each magnetic belt is docked with the top of each corresponding column of simulated wellbores. A fourth hydraulic press is provided on each side of the top of the compaction cavity. Each fourth hydraulic press is connected to a fourth hydraulic rod. The fourth hydraulic rod passes through the compaction cavity and is connected to a strip plate. The length of each strip plate is 3 / 4 of the length of the compaction cavity.

[0016] The second compacting mechanism includes a second slider, which is slidably arranged in a slide groove. A second hydraulic press is provided on the upper end of the second slider, and the second hydraulic press is connected to a second hydraulic rod. The second hydraulic rod passes through the second slider and the slide groove and is connected to a compacting block. The shape, area and size of the compacting block are the same as those of the inner cavity of the observation box. A sealing plate with the same shape and area as the compacting block is detachably connected to the bottom of the compacting block, and the sealing plate is movably connected to the observation box through a connecting assembly.

[0017] The connecting component includes a plurality of inverted T-shaped blocks symmetrically arranged at the bottom of the sealing plate, a slot matching the block is provided on the observation box, springs are provided on both sides of the slot, one end of the spring is connected to the observation box, and the other end of the spring is connected to an arc-shaped block, and a limit block is also provided at the slot, a limit groove matching the limit block is provided on the arc-shaped block, the limit block is slidably arranged in the corresponding limit groove, and the size of the lateral part of the block is larger than the distance between the two arc-shaped blocks when the two springs are in a free state.

[0018] The second technical solution adopted by the present invention is a method for simulating using the above-mentioned high water content oil reservoir CO2 flooding well network densification indoor simulation device, comprising the following steps:

[0019] S1. Simulated stratum compaction: install each simulated wellbore in the corresponding through hole, keep the simulated wellbore always in the through hole, add the first small layer of simulated stratum soil into the observation box, compact the simulated stratum soil according to the height structure of the first small layer, slide the first slider to move the first compaction mechanism to the top of the observation box, start the first hydraulic press to drive the compaction cavity to descend until the bottom of the compaction cavity contacts the simulated wellbore and pushes the simulated wellbore downward; when the bottom of the compaction cavity contacts the simulated stratum soil, start the third hydraulic press to lower each third hydraulic rod, adjust the corresponding height of each pressing plate according to the height structure of the first small layer to compact the simulated stratum soil, after the compaction of the first small layer is completed, lift the compaction cavity and the simulated wellbore and add the simulated stratum soil of the second small layer, complete the compaction of the simulated stratum soil of the second small layer in the same way as above, and complete the compaction of the simulated stratum soil of all small layers by analogy, and repeat the compaction of each small layer 3 to 5 times;

[0020] S2, sealing of the observation box: after the compaction of the simulated formation soil of all small layers is completed, the sealing soil is added to cover the top of the simulated wellbore, and the second compaction mechanism is moved to the top of the observation box by sliding the second slider, and the second hydraulic press is turned on to drive the compaction block to descend, and the sealing soil is compacted 3 to 5 times, and then the sealing plate is placed on the sealing soil, and the compaction block is lowered again to complete the sealing of the sealing plate and the observation box;

[0021] S3, simulated crude oil saturation: by injecting simulated formation crude oil into a saturated oil access pipe, one or more small layers corresponding to the position are used as simulated oil layers, with a saturation pressure of 12 to 20 MPa;

[0022] S4, simulated water injection and oil production: turn the observation box 180 degrees to make the sealing plate face downward, rotate and remove the sealing rods in one or more simulated wellbores set as water injection wells, rotate and remove the sealing rods in one or more simulated wellbores set as oil production wells, inject water into the water injection wells through the seepage holes into the simulated oil layer, and displace the simulated crude oil in the simulated oil layer to the vicinity of the oil production well, and then flow out from the seepage holes of the oil production well and be collected;

[0023] S5. Densification of the simulated well network by gas injection and oil production: When the water content of the simulated crude oil displaced by the simulated water injection and oil production is greater than 90%, the sealing rods of one or more simulated wellbores that were previously sealed are threaded and removed, and one part is used as steam injection wells and the other part as new oil production wells to complete the densification of the well network. CO2 is injected into the original water injection wells and steam injection wells, so that the CO2 gas enters the simulated oil layer through the seepage holes and displaces the remaining simulated crude oil in the simulated oil layer to the vicinity of the original oil production wells and the new oil production wells, and then flows out from the seepage holes of the oil production wells and is collected, and the simulated recovery rate is calculated.

[0024] The present invention is also characterized in that:

[0025] In step S4, the ratio of the number of water injection wells to the number of oil production wells is 1:3, and the oil production wells are adjacent to the corresponding water injection wells.

[0026] In step S5, after the well pattern is encrypted, the ratio of the sum of the original water injection wells and steam injection wells to the sum of the original oil production wells and the new oil production wells is 1:1-5.

[0027] The beneficial effects of the present invention are:

[0028] (1) The indoor simulation device for CO2 flooding well network densification in high water-content oil reservoirs of the present invention can realize the simulation of strata of different thickness and height by setting up an observation box, a simulated wellbore and multiple compaction mechanisms, thereby more realistically restoring the strata conditions and the well locations, making it convenient for experimenters to observe and adjust the injection-production relationship and observe statistics. The experimental results are closer to the actual oil field conditions, which is of great significance for the densification of well networks and the adjustment of CO2 flooding strategies in high water-content oil fields.

[0029] (2) The indoor simulation device for CO2 flooding well network densification in high water-content oil reservoirs of the present invention maintains a reasonable simulation range by optimizing the value range of the well group number A, and at the same time scales it in proportion to the actual well network size to achieve height restoration. The rubber cushion is used in conjunction with multiple pressure plates to simulate the fluctuations in different formation heights. The design is reasonable and easy to use.

[0030] (3) The indoor simulation device for the densification of the well network of CO2 flooding in high-water-content oil reservoirs of the present invention can achieve docking with the top of the simulated wellbore through the arrangement of steel bars and magnetic suction belts, so that the simulated wellbore can be kept sliding up and down when adding simulated formation soil of each formation, and the simulated formation soil is prevented from covering the top of the simulated wellbore, thereby achieving the purpose of stratification. The high-pressure water pump, high-pressure air pump and two produced oil collection boxes can achieve the purpose of simulated water injection, simulated gas injection and collection of produced oil. The saturated oil access pipe can simulate the saturation of formation crude oil at the location of the required oil layer;

[0031] (4) The indoor simulation device for densifying the well pattern of CO2 flooding in high water-content oil reservoirs of the present invention can realize the fixed sealing connection of the sealing plate through the arrangement of the card block, the card slot and the interior of the card slot, and can keep the simulated wellbore height synchronous at the beginning of the experiment and prevent it from falling off from the through hole through the arrangement of the support tray;

[0032] (5) The indoor simulation method for well network densification of CO2 flooding in high water-content oil reservoirs of the present invention provides detailed well network densification rules and optimizes the ratio of the number of water injection wells to oil production wells. It is not limited to this and can be expanded and extended around the device structure to realize the simulation of various well network densification or thinning strategies, providing a theoretical basis for the well network densification of high water-content oil fields and the adjustment of CO2 flooding strategies. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a schematic diagram of the overall structure of the simulation device of the present invention;

[0034] Figure 2 It is a front view of the simulation device of the present invention and a schematic diagram of the internal structure of the observation box;

[0035] Figure 3 It is a schematic diagram of the internal structure of a simulated wellbore in the simulation device of the present invention;

[0036] Figure 4 It is a schematic diagram of the structure when the compaction cavity in the simulation device of the present invention is connected with each simulated wellbore;

[0037] Figure 5 It is a schematic diagram of the internal structure of the compaction cavity in the simulation device of the present invention;

[0038] Figure 6 It is a schematic diagram of the internal structure of the compaction cavity when the heights of the pressing plates in the simulation device of the present invention are different;

[0039] Figure 7 It is a schematic diagram of the bottom structure of the compaction cavity in the simulation device of the present invention;

[0040] Figure 8 It is a schematic diagram of the structure of adding simulated stratum soil into the observation box in the simulation device of the present invention;

[0041] Fig. 9 It is a schematic diagram of the internal structure of the card slot in the simulation device of the present invention;

[0042] Fig.10 It is a schematic diagram of the overall structure of the simulation device of the present invention after the compaction of each simulated stratum is completed;

[0043] Fig.11 It is a schematic diagram of the overall structure of the observation box after flipping in the simulation device of the present invention;

[0044] Fig.12 It is a well location map before the well network is encrypted in the indoor simulation method for the CO2 flooding well network encryption of high water-content oil reservoirs of the present invention;

[0045] Fig.13 It is a well location map after the well network is encrypted in the indoor simulation method for the CO2 flooding well network encryption of high water-content oil reservoirs of the present invention;

[0046] Fig.14 It is the well location map after the well pattern is thinned out in the experimental example of the present invention.

[0047] In the figure, 1. observation box, 11. fixing plate, 12. through hole, 13. slot, 131. spring, 132. arc stopper, 133. limit slot, 134. limit block, 14. high pressure water pump, 15. high pressure air pump, 16. produced oil collection box, 17. saturated oil access pipe, 18. slot, 19. tray, 2. simulated wellbore, 21. sealing rod, 22. seepage hole, 23. magnetic sheet, 3. fixing rod, 31. connecting rod, 32. slide groove, 4. first compaction Mechanism, 41. first slider, 42. first hydraulic press, 43. first hydraulic rod, 5. second compacting mechanism, 51. second slider, 52. second hydraulic press, 53. second hydraulic rod, 54. compacting block, 55. sealing plate, 56. clamping block, 6. compacting cavity, 61. rubber cushion, 62. third hydraulic press, 63. third hydraulic rod, 64. pressing plate, 65. steel bar, 66. magnetic belt, 67. fourth hydraulic press, 68. fourth hydraulic rod, 69. strip plate. DETAILED DESCRIPTION

[0048] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0049] Indoor simulation device for CO2 flooding well network intensification in high water-content reservoirs, such as Figure 1 As shown, it includes an observation box 1, a fixed plate 11 is horizontally arranged in the observation box 1, and the size and shape of the fixed plate 11 are the same as the inner diameter size and shape of the observation box 1, and A×A through holes 12 are equidistantly opened on the fixed plate 11, and the value of A is 5-8. By optimizing the value range of A, it is kept in a reasonable simulation range, and at the same time, it is proportionally scaled with the actual well network size to achieve high restoration, and a simulated wellbore 2 is movably penetrated in each through hole 12, and fixed rods 3 are symmetrically and vertically arranged on both sides of the observation box 1. The upper ends of the two fixed rods 3 are connected by a connecting rod 31, and the connecting rod 31 is provided with a slide groove 32 along the length direction, and a first compaction mechanism 4 and a second compaction mechanism 5 are respectively slidably arranged in the slide groove 32, and the lower end of the first compaction mechanism 4 is connected to a compaction cavity 6 matched with the observation box 1, and the second compaction mechanism 5 is movably connected to the observation box 1 through a connecting component;

[0050] It also includes a high-pressure water pump 14, a high-pressure air pump 15 and two produced oil collection boxes 16. A number of saturated oil access pipes 17 are symmetrically arranged on the front and rear side walls of the observation box 1. The high-pressure water pump 14, the high-pressure air pump 15 and the two produced oil collection boxes 16 can achieve the purpose of simulated water injection, simulated gas injection and collection of produced oil. The saturated oil access pipes can simulate the saturation of formation crude oil at the required oil layer location.

[0051] like Figure 2As shown, a receiving tray 19 matching with the simulated wellbore 2 is provided at the bottom of the observation box 1. The receiving tray 19 is located below the simulated wellbore 2. A slot 18 matching with the receiving tray 19 is provided at the bottom of the observation box 1. The receiving tray 19 can be pulled out or inserted through the slot 18. The setting of the receiving tray 19 can keep the height of the simulated wellbore 2 synchronized at the beginning of the experiment and prevent it from falling off from the through hole 12.

[0052] like Figure 3 As shown, a sealing rod 21 is threadedly penetrated through the bottom end of the simulated wellbore 2, a plurality of seepage holes 22 are opened on the side wall of the simulated wellbore 2, a magnetic sheet 23 is arranged at the top of the simulated wellbore 2, and the aperture of the seepage hole 22 is 1 to 3 mm.

[0053] like Figure 4 As shown, the first compacting mechanism 4 includes a first slider 41, which is slidably set in the slide groove 32, and the upper end of the first slider 41 is connected to the first hydraulic press 42, and the first hydraulic press 42 is connected to the first hydraulic rod 43, and the first hydraulic rod 43 passes through the first slider 41 and the slide groove 32 and is connected to the compacting cavity 6, wherein the first slider 41 is an inverted T-shaped setting, and the stability of the first compacting mechanism can be maintained by the first slider. In actual operation, the first slider 41 can be moved to drive the first hydraulic press 42, the first hydraulic rod 43 and the compacting cavity 6 to move, and can be moved to the top of the observation box 1 for corresponding operations.

[0054] like Figures 5 to 7 As shown, the shape, area and size of the compaction cavity 6 are the same as the inner cavity of the observation box 1. The compaction cavity 6 is hollow inside, and A-1×A-1 third hydraulic presses 62 are evenly spaced on the top of the compaction cavity 6. Each third hydraulic press 62 is connected to a third hydraulic rod 63, and the third hydraulic rod 63 movably passes through the top of the compaction cavity 6. The free end of the third hydraulic rod 63 is connected to a pressure plate 64. Holes matching with several pressure plates 64 are provided at the bottom of the compaction cavity 6. The pressure plates 64 can movably pass through the corresponding holes. The shape area of ​​the pressure plate 64 is a rectangle surrounded by any four through holes 12 connected end to end, reduced in proportion to 1 / 2 to 2 / 3, and is located between the four through holes 12.

[0055] A rubber pad 61 is provided at the bottom of the compaction cavity 6, and the thickness of the rubber pad 61 is 4 to 8 mm. Both ends of the rubber pad 61 are fixed to the bottom of the compaction cavity 6 by steel bars 65. A-1 magnetic belts 66 are equidistantly provided between the two steel bars 65, and each magnetic belt 66 is docked with the top of each corresponding column of simulated wellbores 2. A fourth hydraulic press 67 is provided on each left and right side of the top of the compaction cavity 6, and each fourth hydraulic press 67 is connected to a fourth hydraulic rod 68. The fourth hydraulic rod 68 passes through the compaction cavity 6 and is connected to a strip plate 69. The length of each strip plate 69 is 3 / 4 of the length of the compaction cavity 6. The function of the strip plate 69 is similar to that of the pressure plate 64. Both compact and simulate the formation soil to form a formation height difference trend. The only difference is that the pressure plate 64 is located relatively close to the middle, while the strip plate 69 is located on both sides. The requirements for the formation height difference trend on both sides are not so high, so a long strip plate 69 can be used for unified compaction.

[0056] By setting the steel bar 65 and the magnetic belt 66, docking with the top of the simulated wellbore 2 can be achieved, so that the simulated wellbore 2 can be kept sliding up and down when adding simulated formation soil of each stratum, avoiding the simulated formation soil covering the top of the simulated wellbore 2, thereby achieving the purpose of stratification.

[0057] like Figure 8 As shown, the second compacting mechanism 5 includes a second slider 51, which is slidably arranged in the slide groove 32, and a second hydraulic press 52 is arranged on the upper end of the second slider 51, and the second hydraulic press 52 is connected to a second hydraulic rod 53, and the second hydraulic rod 53 passes through the second slider 51 and the slide groove 32 and is connected to a compacting block 54, and the shape, area and size of the compacting block 54 are the same as the inner cavity of the observation box 1, and the bottom of the compacting block 54 is detachably connected to a sealing plate 55 of the same shape and area, specifically, the sealing plate 55 is connected to the bottom of the compacting block 54 by magnetic attraction, and the sealing plate 55 is movably connected to the observation box 1 through a connecting assembly, wherein the second slider is an inverted T-shaped setting, and the stability of the second compacting mechanism can be maintained by the second slider. In actual operation, the second slider 51 can be moved to drive the second hydraulic press 52, the second hydraulic rod 53 and the compacting block 54 to move, and can be moved to the top of the observation box 1 for corresponding operations.

[0058] like Fig. 9 As shown, the connecting assembly includes a sealing plate 55 with a plurality of inverted T-shaped blocks 56 symmetrically arranged at the bottom, a slot 13 matching the block 56 is provided on the observation box 1, springs 131 are provided on both sides of the slot 13, one end of the spring 131 is connected to the observation box 1, and the other end of the spring 131 is connected to an arc-shaped block 132, a limit block 134 is also provided at the slot 13, a limit groove 133 matching the limit block 134 is provided on the arc-shaped block 132, the limit block 134 is slidably arranged in the corresponding limit groove 133, and the lateral size of the block 56 is larger than the distance between the two arc-shaped blocks 132 when the two springs 131 are in a free state.

[0059] When sealing the sealing plate 55, the compacting block 54 is first moved to the top of the observation box 1 through the second slider 51, and the second hydraulic rod 53 pushes the compacting block 54 downward to make the block 56 press the arc block 132 downward, so that the spring 131 is compressed, and the arc block 132 moves outward, so that the block 56 contacts the bottom of the slot 13, and then the arc block 132 rebounds under the rebound action of the spring 131 to limit and fix the block 56, and the limit block 134 slides in the limit slot 133 to offset the friction force. When the sealing plate 55 needs to be removed at the end of the experiment, the staff can manually move the arc block 132. The fixed sealing connection of the sealing plate 55 can be achieved through the setting of the block 56 and the slot 13.

[0060] The method for simulating by using the indoor simulation device for CO2 flooding well pattern densification in high water-content oil reservoirs of the present invention comprises the following steps:

[0061] S1, simulated stratum compaction: install each simulated wellbore 2 in the corresponding through hole 12, keep the simulated wellbore 2 always in the through hole 12, add the first small layer of simulated stratum soil into the observation box 1, compact the simulated stratum soil according to the height structure of the first small layer, slide the first slider 41 to move the first compaction mechanism 4 to the top of the observation box 1, start the first hydraulic press 42 to drive the compaction cavity 6 to descend until the bottom of the compaction cavity 6 contacts the simulated wellbore 2 and pushes the simulated wellbore 2 downward; when the bottom of the compaction cavity 6 contacts the simulated stratum soil, start the third hydraulic press 62 to lower each third hydraulic rod 63, adjust the corresponding height of each pressing plate 64 according to the height structure of the first small layer to compact the simulated stratum soil, after the compaction of the first small layer is completed, lift the compaction cavity 6 and the simulated wellbore 2 and add the simulated stratum soil of the second small layer, complete the compaction of the simulated stratum soil of the second small layer in the same way as above, and complete the compaction of the simulated stratum soil of all small layers by analogy, and repeat the compaction of each small layer 3 to 5 times;

[0062] S2, sealing of the observation box 1: after the compaction of the simulated formation soil of all small layers is completed, the sealing soil is added to cover the top of the simulated wellbore 2, and the second compacting mechanism 5 is moved to the top of the observation box 1 by sliding the second slider 51, and the second hydraulic press 52 is turned on to drive the compacting block 54 to descend, and the sealing soil is compacted 3 to 5 times, and then the sealing plate 55 is placed on the sealing soil, and the compacting block 54 is lowered again to complete the sealing of the sealing plate 55 and the observation box 1;

[0063] S3, simulated crude oil saturation: by injecting simulated formation crude oil into a saturated oil access pipe 17, one or more small layers corresponding to the position are used as simulated oil layers, and the saturation pressure is 12-20 MPa;

[0064] S4. Simulated water injection and oil production: flip the observation box 1 180° so that the sealing plate 55 faces downward, and threadably rotate and remove the sealing rod 21 in one or more simulated wellbores 2 set as water injection wells, and threadably rotate and remove the sealing rod 21 in one or more simulated wellbores 2 set as oil production wells. Use the high-pressure water pump 14 to inject water into the water injection well, and enter the simulated oil layer through the seepage holes 22 to displace the simulated crude oil in the simulated oil layer to the vicinity of the oil production well, and then flow out from the seepage holes 22 of the oil production well and be collected. The ratio of water injection wells to oil production wells is 1:3, and the oil production wells are adjacent to the corresponding water injection wells.

[0065] S5. Simulated well network densification and gas injection for oil production: when the water content of the simulated crude oil displaced by simulated water injection for oil production is greater than 90%, the sealing rods 21 of one or more simulated wellbores 2 that were previously sealed are threaded and taken out, and one part is used as a steam injection well and the other part as a new oil production well to complete the well network densification. CO2 is injected into the original water injection wells and steam injection wells, so that the CO2 gas enters the simulated oil layer through the seepage holes 22 to displace the remaining simulated crude oil in the simulated oil layer to the vicinity of the original oil production wells and the new oil production wells, and then flows out from the seepage holes 22 of the oil production wells and is collected, and the simulated recovery factor is calculated. After the well network is densified, the ratio of the sum of the original water injection wells and steam injection wells to the sum of the original oil production wells and the new oil production wells is 1:1-5.

[0066] The working principle of the indoor simulation device for densification of CO2 flooding well network in high water-content oil reservoirs of the present invention is further explained below in combination with the method of the present invention.

[0067] When performing the step S1 to simulate the formation compaction, when the first hydraulic press 42 is turned on to drive the compaction cavity 6 to descend, each magnetic belt 66 is docked with the magnetic sheet 23 at the top of each corresponding simulated wellbore 2, so that the simulated wellbore 2 is fixedly docked with the magnetic belt 66 under the action of magnetic attraction, and this continues until the end of the entire step S1. Whenever the compaction cavity 6 drives each simulated wellbore 2 to rise to the top, that is, the bottom of the compaction cavity 6 rises out of the top of the observation box 1, as shown in FIG. Figure 8 As shown, only then can simulated formation soil be added to the observation box 1, and the bottom of the simulated wellbore 2 is always located in the through hole 12 to prevent the simulated formation soil from entering the through hole 12. Every time a small layer is compacted, the compaction cavity 6 needs to be lifted again to repeat the step of adding simulated formation soil.

[0068] In order to adjust the stratum height difference fluctuation of each small layer, each time a small layer is compacted, simulation is performed according to the height statistical data of the small layer, and the height at which each third hydraulic press 62 drives the third hydraulic rod 63 to descend is adjusted, so that the compaction height of each pressing plate 64 is different. At this time, the pressing plate 64 presses down the rubber cushion 61 to make it fluctuate up and down under the action of elasticity, thereby creating the ups and downs of the small layer, such as Figure 6It can be seen that the working state of the compaction cavity 6 at this time is that the magnetic belt 66 is very thin and soft and will bend to a certain extent as the pressure plate 64 is pressed down, so the error here hardly affects the simulation of the overall stratum structure. The schematic diagram after all the small layers are compacted is as follows: Fig.10 It can be seen intuitively that the ups and downs of all small layers can be observed intuitively at this time;

[0069] It should be noted here that, due to the experimental conditions, the topmost small layer is required to fix the bottom of each simulated wellbore 2 when adding the simulated formation soil of the topmost small layer, and then the magnetic sheet 23 is separated from the magnetic suction belt 66, and the sealing soil added subsequently can cover the top of the simulated wellbore 2 to complete the auxiliary fixation and compaction, and can be further compacted during the subsequent compaction process of the second compaction mechanism 5, while the simulated wellbore 2 maintains the seal and fastening between each small layer, more realistically simulating the formation conditions, and avoiding seepage between the simulated wellbore 2 and the simulated formation soil;

[0070] When the sealing plate 55 is sealed, the block 56 presses down the arc block 132 to compress the spring 131 and retract the arc block 132. The block 56 contacts the bottom of the slot 13. Then, the arc block 132 rebounds under the rebound action of the spring 131 to limit and fix the block 56. The limit block 134 slides in the limit slot 133 to offset the friction force. When the sealing plate 55 needs to be removed after the experiment, the staff can manually move the arc block 132.

[0071] When performing step S4, simulating water injection for oil production, the observation box 1 is turned over 180 degrees so that the sealing plate 55 faces downward. The structural diagram at this time is as follows: Fig.11 As shown, the high-pressure water pump 14, the high-pressure air pump 15 and the two produced oil collection boxes 16 are connected to the corresponding simulated wellbore 2;

[0072] Example 1

[0073] Indoor simulation device for CO2 flooding well network intensification in high water-content reservoirs, such as Figure 1 As shown, it includes an observation box 1, a fixed plate 11 is horizontally arranged in the observation box 1, and A×A through holes 12 are equidistantly opened on the fixed plate 11, the value of A is 5, and a simulated wellbore 2 is movably penetrated in each through hole 12, and fixed rods 3 are symmetrically and vertically arranged on both sides of the observation box 1, and the two fixed rods 3 are connected by a connecting rod 31, and the connecting rod 31 is provided with a slide groove 32 along the length direction, and a first compacting mechanism 4 and a second compacting mechanism 5 are slidably arranged in the slide groove 32 respectively, and the lower end of the first compacting mechanism 4 is connected to a compacting cavity 6 matched with the observation box 1, and the second compacting mechanism 5 is movably connected to the observation box 1 through a connecting assembly;

[0074] It also includes a high-pressure water pump 14, a high-pressure air pump 15 and two produced oil collection boxes 16. A plurality of saturated oil access pipes 17 are symmetrically arranged on the front and rear side walls of the observation box 1.

[0075] The high-pressure water pump 14, high-pressure air pump 15 and two produced oil collection boxes 16 can realize the purpose of simulated water injection, simulated gas injection and collection of produced oil. The saturated oil access pipe can simulate the saturation of formation crude oil at the required oil layer location.

[0076] like Figure 2 As shown, a receiving tray 19 cooperating with the simulated wellbore 2 is provided at the bottom of the observation box 1. The receiving tray 19 is located at the bottom of the simulated wellbore 2. A slot 18 cooperating with the receiving tray 19 is provided on one side of the bottom of the observation box 1. Through the setting of the receiving tray 19, the height of the simulated wellbore 2 can be kept synchronized at the beginning of the experiment and it can be prevented from falling off from the through hole 12.

[0077] like Figure 3 As shown, the simulated wellbore 2 is hollow, a sealing rod 21 is threadedly penetrated through the bottom end of the simulated wellbore 2, a plurality of seepage holes 22 are opened on the side wall of the simulated wellbore 2, a magnetic sheet 23 is provided at the top of the simulated wellbore 2, and the aperture of the seepage hole 22 is 2 mm.

[0078] like Figure 4 As shown, the first compacting mechanism 4 includes a first slider 41, which is slidably arranged in the slide groove 32, and a first hydraulic press 42 is arranged on the upper end of the first slider 41, and the first hydraulic press 42 is connected to a first hydraulic rod 43, and the first hydraulic rod 43 penetrates the first slider 41 and the slide groove 32 and is connected to the compacting cavity 6, wherein the first slider 41 is arranged in an inverted T shape, and the stability of the first compacting mechanism can be maintained by the first slider. In actual operation, the first slider 41 can be moved to drive the first hydraulic press 42, the first hydraulic rod 43 and the compacting cavity 6 to move, and can be moved to the top of the observation box 1 for corresponding operations.

[0079] like Figures 5 to 7 As shown, the shape, area and size of the compaction cavity 6 are the same as the inner cavity of the observation box 1. The interior of the compaction cavity 6 is hollow. 4×4 third hydraulic presses 62 are evenly spaced at the top of the compaction cavity 6. Each third hydraulic press 62 is connected to a third hydraulic rod 63. The third hydraulic rod 63 movably passes through the top of the compaction cavity 6. The free end of the third hydraulic rod 63 is connected to a pressure plate 64. Holes matching with several pressure plates 64 are provided at the bottom of the compaction cavity 6. The pressure plates 64 can movably pass through the corresponding holes. The shape area of ​​the pressure plate 64 is a rectangle surrounded by any four through holes 12 connected end to end, which is proportionally reduced to 1 / 2, and is located between the four through holes 12.

[0080] A rubber pad 61 is provided at the bottom of the compaction cavity 6, and the thickness of the rubber pad 61 is 6 mm. The two ends of the rubber pad 61 are fixed to the bottom of the compaction cavity 6 by steel bars 65. A-1 magnetic belts 66 are equidistantly provided between the two steel bars 65, and each magnetic belt 66 is docked with the top of each corresponding column of simulated wellbores 2. A fourth hydraulic press 67 is provided on each side of the top of the compaction cavity 6, and each fourth hydraulic press 67 is connected to a fourth hydraulic rod 68. The fourth hydraulic rod 68 penetrates the top and bottom surfaces of the compaction cavity 6 and is connected to a strip plate 69. The length of each strip plate 69 is 3 / 4 of the length of the compaction cavity 6.

[0081] By setting the steel bar 65 and the magnetic belt 66, docking with the top of the simulated wellbore 2 can be achieved, so that the simulated wellbore 2 can be kept sliding up and down when adding simulated formation soil of each stratum, avoiding the simulated formation soil covering the top of the simulated wellbore 2, thereby achieving the purpose of stratification.

[0082] like Figure 8 As shown, the second compacting mechanism 5 includes a second slider 51, which is slidably arranged in the slide groove 32, and a second hydraulic press 52 is arranged on the upper end of the second slider 51, and the second hydraulic press 52 is connected to a second hydraulic rod 53, and the second hydraulic rod 53 passes through the second slider 51 and the slide groove 32 and is connected to a compacting block 54, and the shape, area and size of the compacting block 54 are the same as the inner cavity of the observation box 1, and the bottom of the compacting block 54 is detachably connected to a sealing plate 55 of the same shape and area, specifically, the sealing plate 55 is connected to the bottom of the compacting block 54 by magnetic attraction, and the sealing plate 55 is movably connected to the observation box 1 through a connecting assembly, wherein the second slider is an inverted T-shaped setting, and the stability of the second compacting mechanism can be maintained by the second slider. In actual operation, the second slider 51 can be moved to drive the second hydraulic press 52, the second hydraulic rod 53 and the compacting block 54 to move, and can be moved to the top of the observation box 1 for corresponding operations.

[0083] like Fig. 9 As shown, the connecting assembly includes a sealing plate 55 with a plurality of inverted T-shaped blocks 56 symmetrically arranged at the bottom, a slot 13 matching the block 56 is provided on the observation box 1, springs 131 are provided on both sides of the slot 13, one end of the spring 131 is connected to the observation box 1, and the other end of the spring 131 is connected to an arc-shaped block 132, a limit block 134 is also provided at the slot 13, a limit groove 133 matching the limit block 134 is provided on the arc-shaped block 132, the limit block 134 is slidably arranged in the corresponding limit groove 133, and the lateral size of the block 56 is larger than the distance between the two arc-shaped blocks 132 when the two springs 131 are in a free state.

[0084] When sealing the sealing plate 55, the compacting block 54 is first moved to the top of the observation box 1 through the second slider 51, and the second hydraulic rod 53 pushes the compacting block 54 downward to make the block 56 press the arc block 132 downward, so that the spring 131 is compressed, and the arc block 132 moves outward, so that the block 56 contacts the bottom of the slot 13, and then the arc block 132 rebounds under the rebound action of the spring 131 to limit and fix the block 56, and the limit block 134 slides in the limit slot 133 to offset the friction force. When the sealing plate 55 needs to be removed at the end of the experiment, the staff can manually move the arc block 132. The fixed sealing connection of the sealing plate 55 can be achieved through the setting of the block 56 and the slot 13.

[0085] Example 2

[0086] The difference between this embodiment and embodiment 1 is that the value of A is 6, the diameter of the seepage hole 22 is 1 mm, the thickness of the rubber pad 61 is 4 mm, and the shape area of ​​the pressure plate 64 is a rectangle surrounded by any four through holes 12 connected end to end, which is proportionally reduced to 1 / 2 of the original.

[0087] Example 3

[0088] The difference between this embodiment and embodiment 1 is that the value of A is 8, the diameter of the seepage hole 22 is 3 mm, the thickness of the rubber pad 61 is 8 mm, and the shape area of ​​the pressure plate 64 is a rectangle surrounded by any four through holes 12 connected end to end, which is proportionally reduced to 2 / 3 of the original.

[0089] Example 4

[0090] This embodiment is a method for simulating the densification of the CO2 flooding well network in a high water-cut oil reservoir by using the indoor simulation device for densification of the CO2 flooding well network in a high water-cut oil reservoir in Embodiment 1, comprising the following steps:

[0091] S1, simulated stratum compaction: each simulated wellbore 2 is installed in the through hole 12 one by one, and the simulated wellbore 2 is always located in the through hole 12, and the first small layer of simulated stratum soil is added into the observation box 1, and the simulated stratum soil is compacted according to the height structure of the first small layer, and the first compaction mechanism 4 is moved to the top of the observation box 1 by sliding the first slider 41, and the first hydraulic press 42 is turned on to drive the compaction cavity 6 to descend until the bottom of the compaction cavity 6 docks with the simulated wellbore 2 and pushes the simulated wellbore 2 downward. When the bottom of the solid cavity 6 contacts the simulated formation soil, each third hydraulic rod 63 is lowered by turning on the third hydraulic press 62, and the corresponding height of each pressing plate 64 is adjusted according to the height structure of the first small layer to compact the simulated formation soil. After the compaction of the first small layer is completed, the compaction cavity 6 and the simulated wellbore 2 are lifted up and the simulated formation soil of the second small layer is added. The simulated formation soil of the second small layer is compacted in the same way as above, and the simulated formation soil of all small layers is compacted by analogy. Each small layer is compacted repeatedly 5 times.

[0092] S2, sealing of the observation box 1: after the compaction of the simulated formation soil of all small layers is completed, the sealing soil is added to cover the top of the simulated wellbore 2, and the second compacting mechanism 5 is moved to the top of the observation box 1 by sliding the second slider 51, and the second hydraulic press 52 is turned on to drive the compacting block 54 to descend, and the sealing soil is compacted 5 times, and then the sealing plate 55 is placed on the sealing soil, and the compacting block 54 is lowered again to complete the sealing of the sealing plate 55 and the observation box 1;

[0093] S3, simulated crude oil saturation: by injecting simulated formation crude oil into a saturated oil access pipe 17, one or more small layers corresponding to the position are used as simulated oil layers, and the saturation pressure is 20MPa;

[0094] S4, simulated water injection and oil production: after turning the observation box 1 180° so that the sealing plate 55 faces downward, the sealing rod 21 in one or more simulated wellbores 2 set as water injection wells is threadedly rotated and taken out, and the sealing rod 21 in one or more simulated wellbores 2 set as oil production wells is threadedly rotated and taken out, and water is injected into the water injection well by the high-pressure water pump 14, and water enters the simulated oil layer through the seepage holes 22 to displace the simulated crude oil in the simulated oil layer to the vicinity of the oil production well, and then flows out from the seepage holes 22 of the oil production well and is collected. The ratio of the number of water injection wells to that of oil production wells is 1:3, and the oil production wells are adjacent to the corresponding water injection wells;

[0095] S5, simulated well network densification and gas injection oil production: when the simulated crude oil water content displaced by simulated water injection oil production is greater than 90%, the sealing rods 21 of one or more simulated wellbores 2 that were previously sealed are threaded and taken out, one part is used as a steam injection well, and the other part is used as a new oil production well, to complete the well network densification, and CO2 is injected into the original water injection well and steam injection well, so that the CO2 gas enters the simulated oil layer through the seepage holes 22 to displace the remaining simulated crude oil in the simulated oil layer to the vicinity of the original oil production well and the new oil production well, and then flows out from the seepage holes 22 of the oil production well and is collected, and the simulated recovery factor is calculated, such as Fig.12 , 13 As shown, after the well network is encrypted in step S5, the ratio of the sum of the original water injection wells and steam injection wells to the sum of the original oil production wells and the new oil production wells is 1:1.

[0096] Example 5

[0097] The difference between this embodiment and embodiment 4 is that in step S1, each small layer is repeatedly compacted 3 times, in step S2, the sealing soil is compacted 3 times, in step S3, the saturation pressure is 12MPa, and in step S5, after the well network is densified, the ratio of the sum of the original water injection wells and steam injection wells to the sum of the original oil production wells and new oil production wells is 1:3.

[0098] Example 6

[0099] The difference between this embodiment and embodiment 4 is that in step S1, each small layer is repeatedly compacted 4 times, in step S2, the sealing soil is compacted 4 times, in step S3, the saturation pressure is 18MPa, and in step S5, after the well network is densified, the ratio of the sum of the original water injection wells and steam injection wells to the sum of the original oil production wells and new oil production wells is 1:5.

[0100] When a larger saturation pressure is required, the number of compactions should be increased accordingly.

[0101] According to the above embodiment, actual experimental verification is carried out, and the results are as follows:

[0102] A simulation experiment was carried out according to the apparatus and method in Example 1 and Example 4. Taking the actual working conditions of an oil field in western my country as an example, a real proportionally scaled formation height fluctuation was introduced, and the well network densification and well network thinning were simulated successively. When S5 and the simulated well network densification and gas injection for oil production were performed, it was measured that the recovery rate was 22% when the simulated crude oil water content was greater than 90%. The recovery rate of an oil reservoir refers to the ratio of the amount of crude oil produced to the original geological reserves of the oil reservoir, which is the ratio of the amount of simulated formation oil produced to the total amount of simulated formation oil. After the well network was densified and CO2 was injected for adjustment, the recovery rate reached 35%, and the recovery rate reached 32% after the well network thinning. Therefore, it is more reasonable to optimize the well network densification adjustment measures.

[0103] It should be noted that the device of the present invention can not only simulate the situation of well pattern density, but also simulate the situation of well pattern thinning, such as Fig.14 As shown, this is a schematic diagram of the working condition of well network thinning.

Claims

1. An indoor simulation device for CO2 flooding well pattern densification in high water-content oil reservoirs, characterized in that: The invention comprises an observation box (1), wherein a fixing plate (11) is horizontally arranged in the observation box (1), and A×A through holes (12) are equidistantly provided on the fixing plate (11), wherein the value of A is 5 to 8, and a simulated wellbore (2) is movably penetrated in each of the through holes (12), and fixing rods (3) are symmetrically and vertically arranged on both sides of the observation box (1), and the upper ends of the two fixing rods (3) are connected by a connecting rod (31), and the connecting rod (31) is provided with a slide groove (32) along the length direction, and a first compacting mechanism (4) and a second compacting mechanism (5) are slidably arranged in the slide groove (32), respectively, and the lower end of the first compacting mechanism (4) is connected to a compacting cavity (6) matched with the observation box (1), and the second compacting mechanism (5) is movably connected to the observation box (1) through a connecting assembly; It also comprises a high-pressure water pump (14), a high-pressure air pump (15) and two produced oil collection boxes (16). A plurality of saturated oil access pipes (17) are symmetrically arranged on the front and rear side walls of the observation box (1).

2. According to claim 1, the indoor simulation device for CO2 flooding well pattern densification in high water content oil reservoirs is characterized in that: The bottom of the observation box (1) is provided with a receiving tray (19) that matches the simulated wellbore (2); the receiving tray (19) is located below the simulated wellbore (2); and the bottom of the observation box (1) is provided with a slot (18) that matches the receiving tray (19).

3. The indoor simulation device for CO2 flooding well pattern densification in high water-content oil reservoirs according to claim 1, characterized in that: A sealing rod (21) is threadedly penetrated at the bottom end of the simulated wellbore (2), a plurality of seepage holes (22) are opened on the side wall of the simulated wellbore (2), a magnetic sheet (23) is provided at the top end of the simulated wellbore (2), and the diameter of the seepage hole (22) is 1 to 3 mm.

4. The indoor simulation device for CO2 flooding well pattern densification in high water-content oil reservoirs according to claim 1, characterized in that: The first compacting mechanism (4) comprises a first slider (41), the first slider (41) being slidably disposed in a slide groove (32), the upper end of the first slider (41) being connected to a first hydraulic press (42), the first hydraulic press (42) being connected to a first hydraulic rod (43), the first hydraulic rod (43) penetrating the first slider (41) and the slide groove (32) and being connected to the compacting cavity (6).

5. The indoor simulation device for CO2 flooding well pattern densification in high water content oil reservoir according to claim 1, characterized in that: The shape, area and size of the compaction cavity (6) are the same as those of the inner cavity of the observation box (1). The compaction cavity (6) is hollow inside. A-1×A-1 third hydraulic presses (62) are evenly spaced at the top of the compaction cavity (6). Each of the third hydraulic presses (62) is connected to a third hydraulic rod (63). The third hydraulic rod (63) movably passes through the top of the compaction cavity (6). The free end of the third hydraulic rod (63) is connected to a pressing plate (64). The bottom of the compaction cavity (6) is provided with holes that match a plurality of pressing plates (64). The pressing plates (64) can movably pass through the corresponding holes. The free end of each of the third hydraulic rods (63) is connected to a pressing plate (64). The shape and area of ​​the pressing plate (64) is a rectangle enclosed by any four through holes (12) connected end to end, which is proportionally reduced to 1 / 2 to 2 / 3. A rubber pad (61) is provided at the bottom of the compaction cavity (6), and the thickness of the rubber pad (61) is 4 to 8 mm. Both ends of the rubber pad (61) are fixed to the bottom of the compaction cavity (6) by steel bars (65). A-1 magnetic belts (66) are equidistantly provided between two of the steel bars (65), and each of the magnetic belts (66) is connected to the top of each corresponding column of simulated wellbores (2). A fourth hydraulic press (67) is provided on the left and right sides of the top of the compaction cavity (6), and each of the fourth hydraulic presses (67) is connected to a fourth hydraulic rod (68). The fourth hydraulic rod (68) passes through the compaction cavity (6) and is connected to a strip plate (69), and the length of each of the strip plates (69) is 3 / 4 of the length of the compaction cavity (6).

6. The indoor simulation device for CO2 flooding well pattern densification in high water-content oil reservoirs according to claim 1, characterized in that: The second compacting mechanism (5) comprises a second slider (51), the second slider (51) is slidably arranged in a slide groove (32), a second hydraulic press (52) is arranged at the upper end of the second slider (51), the second hydraulic press (52) is connected to a second hydraulic rod (53), the second hydraulic rod (53) passes through the second slider (51) and the slide groove (32) and is connected to a compacting block (54), the shape, area and size of the compacting block (54) are the same as the inner cavity of the observation box (1), the bottom of the compacting block (54) is detachably connected to a sealing plate (55) of the same shape and area, and the sealing plate (55) is movably connected to the observation box (1) through a connecting component.

7. The indoor simulation device for CO2 flooding well pattern densification in high water-content oil reservoirs according to claim 1, characterized in that: The connection assembly comprises a plurality of inverted T-shaped blocks (56) symmetrically arranged at the bottom of the sealing plate (55); a slot (13) matching with the block (56) is provided on the observation box (1); springs (131) are provided on both sides of the slot (13); one end of the spring (131) is connected to the observation box (1); the other end of the spring (131) is connected to an arc-shaped block (132); a limit block (134) is also provided at the slot (13); a limit groove (133) matching with the limit block (134) is provided on the arc-shaped block (132); the limit block (134) is slidably arranged in the corresponding limit groove (133); and the size of the transverse portion of the block (56) is greater than the distance between the two arc-shaped blocks (132) when the two springs (131) are in a free state.

8. A method for simulating using the indoor simulation device for CO2 flooding well pattern densification in high water content oil reservoirs according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1. Simulated stratum compaction: each simulated wellbore (2) is installed in the corresponding through hole (12), the simulated wellbore (2) is kept in the through hole (12), a first small layer of simulated stratum soil is added into the observation box (1), the simulated stratum soil is compacted according to the height structure of the first small layer, the first sliding block (41) is slid to move the first compaction mechanism (4) to the top of the observation box (1), the first hydraulic press (42) is turned on to drive the compaction cavity (6) to descend, until the bottom of the compaction cavity (6) contacts the simulated wellbore (2) and pushes the simulated wellbore (2) downward. ); when the bottom of the compaction cavity (6) contacts the simulated formation soil, the third hydraulic press (62) is turned on to lower each third hydraulic rod (63), and the corresponding height of each pressing plate (64) is adjusted according to the height structure of the first small layer to compact the simulated formation soil. After the compaction of the first small layer is completed, the compaction cavity (6) and the simulated wellbore (2) are lifted up and the simulated formation soil of the second small layer is added. The simulated formation soil of the second small layer is compacted in the same way as above, and the simulated formation soil of all small layers is compacted in this way. Each small layer is compacted repeatedly 3 to 5 times; S2, sealing the observation box (1): after the compaction of the simulated stratum soil of all small layers is completed, sealing soil is added to cover the top of the simulated wellbore (2), and the second compacting mechanism (5) is moved to the top of the observation box (1) by sliding the second slider (51), and the second hydraulic press (52) is turned on to drive the compacting block (54) to descend, and the sealing soil is compacted 3 to 5 times, and then the sealing plate (55) is placed on the sealing soil, and the compacting block (54) is lowered again to complete the sealing of the sealing plate (55) and the observation box (1); S3, simulated crude oil saturation: by injecting simulated formation crude oil into a saturated oil access pipe (17), one or more corresponding small layers at the position are used as simulated oil layers, and the saturation pressure is 12-20 MPa; S4, simulated water injection and oil production: after turning the observation box (1) by 180 degrees so that the sealing plate (55) faces downward, the sealing rod (21) in one or more simulated wellbores (2) set as water injection wells is threadedly rotated and removed, and the sealing rod (21) in one or more simulated wellbores (2) set as oil production wells is threadedly rotated and removed, and water is injected into the water injection well by a high-pressure water pump (14), and water enters the simulated oil layer through the seepage hole (22) to displace the simulated crude oil in the simulated oil layer to the vicinity of the oil production well, and then flows out from the seepage hole (22) of the oil production well and is collected; S5. Simulated well network densification and gas injection for oil production: When the water content of the simulated crude oil displaced by simulated water injection for oil production is greater than 90%, the sealing rods (21) of one or more simulated wellbores (2) that were previously sealed are threadedly removed, with one part used as steam injection wells and the other part as new oil production wells to complete the densification of the well network. CO2 is injected into the original water injection wells and steam injection wells, so that the CO2 gas enters the simulated oil layer through the seepage holes (22) to displace the remaining simulated crude oil in the simulated oil layer to the vicinity of the original oil production well and the new oil production well, and then flows out from the seepage holes (22) of the oil production well and is collected to calculate the simulated recovery rate.

9. The method for simulating using the indoor simulation device for CO2 flooding well pattern densification in high water content oil reservoirs according to claim 8, characterized in that: In step S4, the ratio of the number of water injection wells to the number of oil production wells is 1:3, and the oil production wells are adjacent to the corresponding water injection wells.

10. The method for simulating by using the indoor simulation device for CO2 flooding well pattern densification in high water content oil reservoirs according to claim 8, characterized in that: In step S5, after the well pattern is densified, the ratio of the sum of the original water injection wells and steam injection wells to the sum of the original oil production wells and the new oil production wells is 1:1-5.

Citation Information

Cited By

  • Automatic pressurizing device for oil exploitation equipment

    CN122215696A