Pull rope type layered settlement monitoring device and method
By using a pull-rope type layer settlement monitoring device in layered settlement monitoring and using telemetry terminals and pull-rope displacement meters to collect data in real time, the problem of low accuracy and inability to monitor in real time with traditional methods has been solved, and high-precision and long-term monitoring has been achieved. Subsidence monitoring.
Patent Information
- Application Number
- CN202410574040.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2024-10-01
AI Technical Summary
The traditional layered settlement monitoring method has the problem of low monitoring accuracy and inability to monitor settlement in real time, especially when the depth exceeds 10 meters, the joints affect the accuracy.
A pull-rope type layered settlement monitoring device is used, including a telemetry terminal, a pull-rope displacement meter, a settlement rod and a measuring line. A central plate is installed at the bottom of the settlement rod, and a settlement ring is set in the middle. There is a telemetry terminal inside the monitoring rod. Through the pull-rope displacement Sensors and telemetry terminals collect data in real time, automatically alarm and upload monitoring data to ensure high-precision and long-term monitoring.
It realizes high-precision layered settlement monitoring, can collect and analyze data in real time, automatically alarms and uploads data, meets the needs of long-term monitoring, and is much higher than the monitoring accuracy of traditional methods.
Smart Images

Figure CN118730036A_ABST
Abstract
Description
Technical Field
[0001] The present invention specifically relates to a rope-drawing type stratified settlement monitoring device and method. Background Art
[0002] Traditional layered settlement monitoring generally uses magnetic rings and high-frequency passive electronic tags as settlement markers. The markers are inserted into a hollow fixed rod. The probe is slowly placed in the monitoring rod to sense the markers and record the depth position to measure the settlement of each layer. The main problems of this method are low monitoring accuracy and inability to monitor the settlement amount and the time of occurrence in real time. When the monitoring depth exceeds 10 meters, the joint of the monitoring rod will affect the monitoring accuracy and quality. Therefore, a pull-rope layered settlement monitoring device and method are proposed to solve the above problems. Summary of the invention
[0003] The purpose of the present invention is to provide a pull-rope type stratified settlement monitoring device to address the deficiencies of the prior art, and the pull-rope type stratified settlement monitoring device can well solve the above-mentioned problems.
[0004] In order to meet the above requirements, the technical solution adopted by the present invention is: to provide a pull-rope type stratified settlement monitoring device, which includes a telemetry terminal, a pull-rope displacement meter, a settlement rod, a monitoring rod and a measuring line. A centering plate is installed at the bottom of the settlement rod, and a settlement ring is sleeved in the middle. The settlement rod is a stainless steel pipe of about 38 to 100 mm, and a connector is provided between two pipes when the length exceeds 6 m; a monitoring rod is provided on the top of the settlement rod, and a telemetry terminal is provided inside the monitoring rod; a pull-rope group is provided on the outer end face of the monitoring rod, and a stainless steel wire rope is connected to the bottom of the pull-rope group, and the bottom of the stainless steel wire rope is connected to the top of the settlement ring through the measuring line.
[0005] The advantages of the pull-rope type stratified settlement monitoring device are as follows:
[0006] The telemetry terminal collects the electrical signals of the pull-rope sensor in real time and analyzes and processes them in time. When the deformation exceeds the warning threshold, it automatically alarms and sends an alarm SMS to the relevant responsible person, and uploads the monitoring data via 4G. Since the pull-rope displacement sensor and telemetry terminal are both on the ground, they are easy to maintain and replace, so that the monitoring point meets the long-term monitoring requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0007] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The same reference numerals are used in these drawings to represent the same or similar parts. The exemplary embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0008] Figure 1The structural diagram of a rope-type stratified settlement monitoring device according to an embodiment of the present application is schematically shown.
[0009] Figure 2 The figure schematically shows a top view of a settlement ring of a rope-type layered settlement monitoring device according to an embodiment of the present application.
[0010] Figure 3 The figure schematically shows a side view of a settlement ring of a rope-type layered settlement monitoring device according to an embodiment of the present application.
[0011] Figure 4 A side view of a base of a pull-rope type stratified settlement monitoring device according to an embodiment of the present application is schematically shown.
[0012] Figure 5 A top view of the base of a pull-rope type stratified settlement monitoring device according to an embodiment of the present application is schematically shown.
[0013] Figure 6 The structural diagram of a rope-type stratified settlement monitoring device according to an embodiment of the present application is schematically shown.
[0014] Among them: 1. Telemetry terminal; 2. Pull rope group; 21. Measuring line; 22. Plastic steel hose; 3. Solar power supply device; 4. Monitoring pole; 41. Measuring line buckle; 5. Sedimentation ring; 51. Wing; 6. Sedimentation rod; 61. Connector; 7. Base; 71. Cylinder; 8. Layered mark. DETAILED DESCRIPTION
[0015] In order to make the objectives, technical solutions and advantages of the present application more clear, the present application is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0016] In the following description, references to "one embodiment", "an embodiment", "an example", "an example", etc. indicate that the embodiment or example described in this way may include specific features, structures, characteristics, properties, elements or limitations, but not every embodiment or example necessarily includes the specific features, structures, characteristics, properties, elements or limitations. In addition, repeated use of the phrase "according to one embodiment of the present application" may refer to the same embodiment, but does not necessarily refer to the same embodiment.
[0017] For the sake of simplicity, certain technical features well known to those skilled in the art are omitted in the following description.
[0018] According to one embodiment of the present application, a pull-rope type layered settlement monitoring device is provided, such as Figure 1-6As shown, it includes a telemetry terminal 1, a pull-rope displacement meter 2, a settlement rod 6, a monitoring rod 4 and a measuring line 21. A centering plate 7 is installed at the bottom of the settlement rod 6, and a settlement ring 5 is sleeved in the middle. The settlement rod is a stainless steel pipe of about 38 to 100 mm. When the length exceeds 6 m, a connector 61 is provided between two pipes; a monitoring rod 4 is provided on the top of the settlement rod 6, and a telemetry terminal 1 is provided inside the monitoring rod 4; a pull rope group 2 is provided on the outer end face of the monitoring rod 4.
[0019] According to one embodiment of the present application, the telemetry terminal has sampling, edge computing and transmission functions, is fixed in the monitoring pole, and has a solar power supply 3 device on the top; the pull rope group is a plurality of pull rope displacement sensors, which are installed on the outside of the upper part of the monitoring pole 4, and the output end is connected to the telemetry terminal 1, and the pull rope heads are respectively connected to the measuring lines. One end of the measuring line 21 is connected to the pull rope head, and the other end is fixed on the settlement ring 5. The measuring line 21 of the underground part is passed through a plastic steel hose 22, and one end of the plastic steel hose 22 is fixed on the measuring line buckle 41. According to the monitoring task, multiple settlement rings and measuring lines can be arranged on the monitoring pole. The settlement pole is a stainless steel pipe, and the connector can connect two stainless steel pipes in series. Multiple sections can be configured according to the settlement monitoring depth. The settlement ring is a circular ring with an inner diameter slightly larger than the monitoring pole. There are 2 to 8 deployable wings 51 around the ring.
[0020] According to one embodiment of the present application, the pull-rope type layered settlement monitoring device includes a telemetry terminal 1, a pull-rope group 2, a measuring line 22, a monitoring rod 4, a settlement ring 5, and a settlement rod 6; the telemetry terminal 1 has sampling, edge computing and transmission functions, is fixed in the monitoring rod 4, and has a solar power supply device 3 on the top; the pull-rope group 2 is a plurality of pull-rope displacement sensors, which are installed on the outside of the upper part of the monitoring rod 4, and the output end is connected to the telemetry terminal, and the pull rope is connected to the settlement ring 5 through a stainless steel wire rope; the settlement rod 6 is a stainless steel pipe, and the connector 61 can connect two stainless steel pipes 6 in series. Together, multiple sections can be configured according to the settlement monitoring depth. The base 7 is used to control the centering of the settlement rod during installation. The spherical diameter of the base 7 is slightly smaller than the borehole diameter. The cylinder 71 is partially inserted into the stainless steel pipe. The multiple circular holes on the base play a water-permeable role, which is convenient for the installation of the settlement rod; the settlement ring 5 is annular, and the inner diameter is slightly larger than the monitoring rod. There are 2 to 8 deployable wings 51 around the ring; the measuring line 21 is a stainless steel wire rope, and the part buried underground is covered with a plastic steel hose 22, arranged along the surface of the settlement rod 6, one end is fixed on the settlement ring 5, and the other end is connected to the position rope head. According to the monitoring task, multiple settlement rings and measuring lines can be arranged on the monitoring rod.
[0021] According to an embodiment of the present application, the pull-rope type layered settlement monitoring device determines the length of the settlement rod 6 according to the depth of the borehole. Generally, the length of the stainless steel pipe is 6 meters. If the depth is more than 6 meters, multiple connectors 61 need to be prepared. First, the base 7 is installed at the bottom of the settlement rod, and it is placed down into the borehole. The next stainless steel pipe is connected in series with the connector and also placed in the borehole. The settlement rod is exposed about 50CM above the ground.
[0022] According to an embodiment of the present application, one end of the stainless steel wire rope 21 of the pull-rope type layered settlement monitoring device is fixed on the settlement ring, and the length is 3 meters according to the depth of the monitored settlement. Each stainless steel wire rope is covered with a plastic steel hose 22, and the length is from the settlement monitoring position to the top of the settlement rod. Each plastic steel hose is numbered in sequence according to the length. The settlement ring is put on the settlement rod in turn, and the settlement ring is pushed to the monitoring position with a plastic pipe, and finally the drilled hole is filled with fine soil.
[0023] According to an embodiment of the present application, the pull-rope type layered settlement monitoring device fixes the monitoring rod 4 on the settlement rod 6, fixes the plastic steel hose on the buckle, and in turn connects the stainless steel wire rope to the pull-rope sensor and fixes it.
[0024] According to an embodiment of the present application, the pull-rope type layered settlement monitoring device completes the installation of the layered settlement monitoring device through the above steps. The settlement rings of each layer will pull the pull-rope sensor to change as the soil settles. The accuracy of the sensor can reach 1mm, and its monitoring accuracy is much higher than the current monitoring accuracy of other layered settlements. When the settlement exceeds the range, the position of the stainless steel wire rope and the sensor can be re-fixed, and the measurement range can exceed 2 meters.
[0025] Example 2: See how to describe
[0026] According to the "ground subsidence monitoring network construction" currently being done, the layered mark 8 is arranged at a depth for each borehole, and the construction cost is very high. Generally, five layered marks are made at 100 meters, 200 meters, 300 meters, 400 meters and 500 meters. In order to make full use of the 0-200 meter layered mark under construction, we can install a settlement ring outside the layered mark 8 casing to realize subsidence monitoring at multiple depths and obtain monitoring data for more layers.
[0027] According to an embodiment of the present application, the telemetry terminal of the pull-rope type layered settlement monitoring device collects the electrical signal of the pull-rope sensor in real time and analyzes and processes it in time. When the deformation exceeds the warning threshold, it automatically alarms and sends an alarm text message to the relevant responsible person, and uploads the monitoring data via 4G. Since the pull-rope displacement sensor and the telemetry terminal are both on the ground, they are easy to maintain and replace, so that the monitoring point meets the long-term monitoring requirements.
[0028] The above-mentioned embodiments only represent several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person skilled in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the claims.
Claims
1. A pull-rope type layered settlement monitoring device, characterized in that: It includes a main pipe and a settling rod arranged inside the main pipe; A sinking ring is sleeved on the bottom of the sinking rod, and a connecting head is provided above the sinking ring; A monitoring rod is provided on the top of the settlement rod, and a telemetry terminal is provided inside the monitoring rod; A pull rope group is provided on the outer end surface of the monitoring rod, a stainless steel wire rope is connected to the bottom of the pull rope group, and the bottom of the stainless steel wire rope is connected to the top of the settlement ring through a measuring line.
2. The pull-rope type layered settlement monitoring device according to claim 1 is characterized in that: A solar power supply device is arranged on the top of the monitoring pole.
3. A rope-pull type layered settlement monitoring method, characterized in that: Layered settlement monitoring is performed using the pull-rope type layered settlement monitoring device as described in claim 1 or 2.
Citation Information
Cited By
Installation method of pore water pressure and layered settlement comprehensive monitoring device for soft foundation
CN119287859A
