Polyethylene gas pipeline detection equipment

By designing a polyethylene gas pipeline inspection equipment that includes a chassis, a mounting plate and a sandblasting mechanism, the problem of low detection efficiency of existing equipment is solved, efficient detection and environmental simulation of pipeline curvature performance are achieved, and detection efficiency is improved. Efficiency and accuracy.

CN118730758AActive Publication Date: 2024-10-01CHENGDU CHUANLU PLASTIC GRP CO LTD
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202411201211.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-10-01
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

Existing polyethylene gas pipeline inspection equipment needs to replace the pipe after detecting a specific bend, making the inspection process cumbersome and time-consuming.

Method used

A testing equipment including a chassis, mounting plate, fixed plate, electric slide rail, rotating shaft, power unit, receiving plate, pressure plate and protective cover is designed to detect cracks and delamination in the bends of the pipeline through ultrasonic or radiographic testing technology , and simulates a strong wind environment through a sandblasting mechanism, and uses cylinders and cooling rings to improve detection efficiency and accuracy.

Benefits of technology

It realizes the performance testing of polyethylene gas pipelines under different curvatures, without the need to frequently replace pipelines, improves detection efficiency, and simulates the performance evaluation of pipelines in high temperature and strong wind environments, reducing the complexity and time of the detection process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730758A_ABST
    Figure CN118730758A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of polyethylene gas pipelines, in particular to polyethylene gas pipeline detection equipment which comprises a bottom frame, a mounting plate, a fixing plate and the like. Two mounting plates are connected to the bottom frame; the opposite portions of the two mounting plates are each fixedly connected with a fixing plate, and through holes are formed in the two fixing plates. According to the method, after the polyethylene gas pipeline is bent for a set time, the bent part of the polyethylene gas pipeline is detected by utilizing ultrasonic detection equipment or ray detection equipment, and whether the polyethylene gas pipeline is cracked, layered and the like or not is detected; if yes, the performance of the polyethylene gas pipeline after bending deformation is unqualified, normal use of the polyethylene gas pipeline is affected, and risks such as leakage exist; when one section is detected, one section is pushed forwards, the performance of the polyethylene gas pipeline under various bending degrees can be detected by using one polyethylene gas pipeline, the polyethylene gas pipeline does not need to be replaced frequently, and the detection efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of polyethylene gas pipelines, and in particular to polyethylene gas pipeline detection equipment. Background Art

[0002] A notable advantage of polyethylene gas pipelines is their flexibility and bendability, which allows PE pipelines to be laid in a winding shape and bend along the terrain without the need for additional pipe fittings such as elbows. Polyethylene gas pipelines will deform at the bends, and bending deformation may cause cracks inside the polyethylene gas pipeline material, thereby increasing the risk of leakage. Therefore, it is necessary to test the bending resistance of polyethylene gas pipelines. After current testing equipment tests the performance of polyethylene gas pipelines after a specific degree of bending, it is often necessary to replace new polyethylene gas pipelines for the next round of testing. This process is cumbersome and time-consuming. Summary of the invention

[0003] In order to overcome the disadvantages of current testing equipment that, after testing the performance of a polyethylene gas pipeline after a certain degree of curvature, a new polyethylene gas pipeline often needs to be replaced for the next round of testing, and this process is cumbersome and time-consuming, the present invention provides a polyethylene gas pipeline testing device.

[0004] The technical solution is: a polyethylene gas pipeline detection equipment, including a base frame, a mounting plate and a fixed plate; two mounting plates are connected to the base frame; the facing parts of the two mounting plates are respectively fixed with a fixed plate, and both fixed plates are provided with through holes; it also includes an electric slide rail I, a rotating shaft, a power unit I, a receiving plate, a pressure plate and a protective cover, the protective cover is made of high temperature resistant material, and the protective cover is arranged as a telescopic structure; a rotating shaft is fixed to the middle of the base frame; one of the mounting plates is rotatably connected to the rotating shaft; an arc track is arranged on the left part of the base frame, and the electric slide rail I is slidably connected in the arc track; the rotating shaft is located at the center of the arc track; the electric slide rail I is fixed to one of the mounting plates; one of the mounting plates is connected with a power unit I; the power unit I is connected with a receiving plate, and the power unit I is used to drive the receiving plate to move left and right; the receiving plate is detachably connected with a pressure plate; a protective cover is fixed between the two mounting plates, and two air pipes are passed through the protective cover.

[0005] Furthermore, the through holes of the two fixing plates are both beveled on one side facing the receiving plate.

[0006] Furthermore, it also includes a rubber sealing ring; a rubber sealing ring is fixedly connected to the facing parts of the two mounting plates.

[0007] Furthermore, it also includes a power unit II, a connecting rod II and a positioning ring; a power unit II is connected to one side of a fixed plate away from the protective cover; the power unit II is connected to a plurality of connecting rods II, and the power unit II is used to drive the connecting rods II to move left and right; the ends of the plurality of connecting rods II are commonly fixed with a positioning ring.

[0008] Furthermore, the left portion of the aligning ring is beveled.

[0009] Furthermore, it also includes a cooling ring, a water inlet pipe and a water outlet pipe; a cooling ring is fixedly connected to one of the fixed plates; the upper part of the cooling ring is connected to the water inlet pipe; the lower part of the cooling ring is connected to the water outlet pipe; the water inlet pipe and the water outlet pipe both pass through one of the fixed plates.

[0010] Furthermore, the fitting portion inside the cooling ring is provided with an elastic material.

[0011] Furthermore, it also includes a sandblasting tube and a flexible collection frame; a plurality of sandblasting tubes penetrate the front side of the protective cover; and a flexible collection frame is fixedly connected to the lower part of the protective cover.

[0012] Furthermore, a plurality of high temperature resistant bristles are fixedly connected to the inner left portion and the inner right portion of the protective cover respectively.

[0013] Furthermore, it also includes a cylinder I; a cylinder I is fixedly connected to the lower side of each of the two mounting plates; and the telescopic ends of the two cylinders I are both located directly below the flexible collection frame.

[0014] Beneficial Effects

[0015] 1. The present invention uses ultrasonic detection equipment or X-ray detection equipment to detect the bent portion of the polyethylene gas pipeline after the polyethylene gas pipeline is bent and maintained for a predetermined period of time, and detects whether cracks and stratification occur in the polyethylene gas pipeline. If so, it indicates that the performance of the polyethylene gas pipeline is unqualified after bending and deformation, which will affect its normal use and may cause leakage. After each section is detected, the pipeline is advanced one section at a time, and the performance of the polyethylene gas pipeline under various curvatures can be detected using one polyethylene gas pipeline, without the need for frequent replacement of the polyethylene gas pipeline, thereby improving the detection efficiency.

[0016] 2. During the test, high-temperature gas is introduced into the protective cover through the air pipe. The rubber sealing ring is in close contact with the outer wall of the polyethylene gas pipeline to prevent the high-temperature gas from overflowing. The introduced high-temperature gas is in contact with the curved part of the polyethylene gas pipeline, thereby heating the polyethylene gas pipeline to simulate the high-temperature environment that the pipeline may encounter in actual operation.

[0017] 3. The present invention controls the sandblasting mechanism to spray sand and gravel through the sandblasting tube toward the curved and outwardly protruding part, simulating the situation of being scratched by sand and gravel in strong wind weather. The fallen sand and gravel are discharged into the collection box below through the flexible collection frame for collection, and then tested to detect whether the performance of the polyethylene gas pipeline is affected by the sand and gravel. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a three-dimensional structural schematic diagram of the polyethylene gas pipeline detection device of the present invention; Figure 2 It is a schematic diagram of the three-dimensional structure of the receiving plate and the pressing plate of the polyethylene gas pipeline detection equipment of the present invention; Figure 3 It is a sectional view of the three-dimensional structure of the fixing plate and the protective cover of the polyethylene gas pipeline detection equipment of the present invention; Figure 4 It is a schematic diagram of the three-dimensional structure of the electric slide rail III, the electric slide block II, the connecting rod II and the alignment ring of the polyethylene gas pipeline detection equipment of the present invention; Figure 5 It is a schematic diagram of the three-dimensional structure of the cooling ring, water inlet pipe and water outlet pipe of the polyethylene gas pipeline detection equipment of the present invention; Figure 6 It is a schematic diagram of the three-dimensional structure of the sandblasting tube, the flexible collecting frame and the cylinder I of the polyethylene gas pipeline detection equipment of the present invention from a first viewing angle; Figure 7 This is a schematic diagram of the three-dimensional structure of the polyethylene gas pipeline detection equipment of the present invention, including the sandblasting tube, the flexible collecting frame and the cylinder I from a second viewing angle.

[0019] The names and serial numbers of the parts in the figure are: 1-base, 2-mounting plate, 3-fixed plate, 4-electric slide rail I, 5-rotating shaft, 6-electric slide rail II, 7-electric slider I, 8-supporting plate, 9-pressure plate, 10-protective cover, 11-rubber sealing ring, 21-electric slide rail III, 22-electric slider II, 23-connecting rod II, 24-aligning ring, 31-cooling ring, 3101-fitting part, 32-water inlet pipe, 33-water outlet pipe, 41-sandblasting pipe, 42-flexible collection frame, 43-cylinder I. DETAILED DESCRIPTION

[0020] The preferred technical solutions of the present invention are described in detail below with reference to the accompanying drawings.

[0021] Embodiment 1

[0022] A polyethylene gas pipeline detection device, such as Figure 1-7 As shown, it includes a base frame 1, a mounting plate 2 and a fixing plate 3; two mounting plates 2 are connected to the base frame 1; a fixing plate 3 is welded to the facing parts of the two mounting plates 2, and both fixing plates 3 have through holes; It also includes an electric slide rail Ⅰ4, a rotating shaft 5, a power unit Ⅰ, a receiving plate 8, a pressure plate 9 and a protective cover 10. The protective cover 10 is made of high temperature resistant material and is arranged as a telescopic structure; a rotating shaft 5 is fixedly connected to the middle of the base frame 1; the left mounting plate 2 is rotatably connected to the rotating shaft 5; an arc track is arranged on the left part of the base frame 1, and the electric slide rail Ⅰ4 is slidably connected in the arc track; the rotating shaft 5 is located at the center of the arc track; the electric slide rail Ⅰ4 is fixedly connected to the left mounting plate 2; the right mounting plate 2 is connected to the power unit Ⅰ; the power unit Ⅰ is connected to the receiving plate 8; the pressure plate 9 is detachably connected to the receiving plate 8; a protective cover 10 is fixedly connected between the two mounting plates 2, and two air pipes pass through the protective cover 10.

[0023] Furthermore, the power unit I includes an electric slide rail II 6 and an electric slider I 7; the electric slide rail II 6 is bolted to the right mounting plate 2; the electric slider I 7 is slidably connected to the electric slide rail II 6; and the electric slider I 7 is fixedly connected to the receiving plate 8.

[0024] Furthermore, in order to facilitate the insertion of the polyethylene gas pipeline, the right sides of the through holes of the two fixing plates 3 are both beveled.

[0025] Furthermore, a rubber sealing ring 11 is included; a rubber sealing ring 11 is fixedly connected to the facing parts of the two mounting plates 2 .

[0026] The first step: manually pass the left end of the polyethylene gas pipeline through the through holes on the two fixing plates 3. The inner diameter of the through holes on the fixing plates 3 is slightly larger than the outer diameter of the polyethylene gas pipeline. The right end of the polyethylene gas pipeline is placed on the receiving plate 8. Then, the pressing plate 9 is manually covered on the receiving plate 8. The pressing plate 9 and the receiving plate 8 are fixed with bolts, that is, the pressing plate 9 covers the receiving plate 8 to clamp the right end of the polyethylene gas pipeline.

[0027] The second step: control the electric slide rail Ⅰ4 to drive the left mounting plate 2 and its connected parts to slide backward in the arc track on the left part of the mounting plate 2. Taking the top-down view as the reference, the left mounting plate 2 rotates clockwise around the rotating shaft 5, and the left fixed plate 3 and the left part of the protective cover 10 move with the left mounting plate 2. When the left fixed plate 3 moves, it will bend the polyethylene gas pipeline, so that the part of the polyethylene gas pipeline between the two mounting plates 2 and the protective cover 10 are bent. The moving distance of the electric slide rail Ⅰ4 can be controlled to control the bending amplitude of the polyethylene gas pipeline. The more the electric slide rail Ⅰ4 moves, the greater the bending amplitude.

[0028] Step 3: After the polyethylene gas pipeline is bent and maintained for a predetermined time, the electric slide rail Ⅰ4 is controlled to drive the left mounting plate 2 and its connected components to slide forward and reset in the arc track on the left part of the mounting plate 2, and the polyethylene gas pipeline is straightened again. Then, the electric slide rail Ⅱ6 is controlled to drive the electric slider Ⅰ7, the receiving plate 8, the pressure plate 9 and the polyethylene gas pipeline to move to the left, so that the inspected part of the polyethylene gas pipeline moves to the left of the left fixed plate 3. Then, the ultrasonic detection equipment or the X-ray detection equipment is used to detect the bent part of the polyethylene gas pipeline to detect whether the polyethylene gas pipeline has cracks and delamination. If so, it means that the performance of the polyethylene gas pipeline is unqualified after bending and deformation. , which will affect its normal use and pose risks such as leakage; at this time, the part of the polyethylene gas pipeline located in the two fixed plates 3 brackets is a part that has not been tested, and then the second step is repeated to detect whether the performance of the polyethylene gas pipeline decreases after different bending degrees; in this way, the performance of the polyethylene gas pipeline under various bending degrees can be detected using one polyethylene gas pipeline, and there is no need to frequently replace the polyethylene gas pipeline, thereby improving the detection efficiency; when the entire polyethylene gas pipeline is used up, the electric slide rail Ⅱ6 is controlled to drive the electric slider Ⅰ7, the receiving plate 8, the pressure plate 9 and the polyethylene gas pipeline to move to the right and reset, and then the pressure plate 9 is removed from the receiving plate 8, and finally the polyethylene gas pipeline can be removed.

[0029] Step 4: During the test, high-temperature gas can be introduced into the protective cover 10 through the air pipe. The rubber sealing ring 11 is in close contact with the outer wall of the polyethylene gas pipeline to prevent the high-temperature gas from overflowing. The introduced high-temperature gas is in contact with the bent part of the polyethylene gas pipeline, thereby heating the polyethylene gas pipeline to simulate the high-temperature environment that the pipeline may encounter in actual operation, such as the increase in ground temperature in summer. In this way, it is evaluated whether the performance of the polyethylene gas pipeline will decrease after encountering high temperature after bending.

[0030] Embodiment 2

[0031] Based on the second embodiment, Figure 3-Figure 5 As shown, it also includes a power unit II, a connecting rod II 23 and a positioning ring 24; the right side of the fixed plate 3 away from the protective cover 10 is connected to the power unit II; the power unit II is connected to two connecting rods II 23; the left parts of the two connecting rods II 23 are welded with a positioning ring 24.

[0032] Furthermore, the power unit II includes an electric slide rail III21 and an electric slider II22; two electric slide rails III21 are fixedly connected to the right side of the right fixed plate 3; an electric slider II22 is slidably connected to the two electric slide rails III21 respectively; and the two electric sliders II22 are fixedly connected to a connecting rod II23 respectively.

[0033] Furthermore, in order to facilitate the alignment of the polyethylene gas pipeline, the left portion of the alignment ring 24 is beveled.

[0034] Furthermore, it also includes a cooling ring 31, a water inlet pipe 32 and a water outlet pipe 33; the cooling ring 31 is fixedly connected to the right fixed plate 3; the upper part of the cooling ring 31 is connected to the water inlet pipe 32; the lower part of the cooling ring 31 is connected to the water outlet pipe 33; the water inlet pipe 32 and the water outlet pipe 33 both pass through the right fixed plate 3.

[0035] Furthermore, in order to better fit the polyethylene gas pipeline, the fitting portion 3101 on the inner side of the cooling ring 31 is set to an elastic material.

[0036] In the fourth step of the first embodiment: the electric slide rail I4 is controlled to drive the left mounting plate 2 and its connected components to slide forward and reset in the arc track on the left part of the mounting plate 2, so that when the polyethylene gas pipeline is straightened again, if the polyethylene gas pipeline is heated, the elastic recovery ability decreases, or the elastic recovery ability decreases due to bending, it will not be able to be straightened, resulting in the polyethylene gas pipeline being difficult to pass through the through hole of the left fixed plate 3 when it is moved to the left, and there is a jamming situation; at this time, the electric slide rail III21 is controlled to drive the electric slider II22, the connecting rod II23 and the alignment ring 24 to move to the left, so that the alignment ring 24 slides on the outer surface of the polyethylene gas pipeline, and the inner diameter of the alignment ring 24 is the same as the outer diameter of the polyethylene gas pipeline. In this way, the polyethylene gas pipeline is straightened and aligned by the alignment ring 24. After alignment, the electric slide rail III21 is controlled to drive the electric slider II22, the connecting rod II23 and the alignment ring 24 to move to the right and reset, and then the polyethylene gas pipeline can smoothly pass through the through hole of the left fixed plate 3.

[0037] In the third step of Example 1: high-temperature gas is introduced into the protective cover 10 through the air pipe, and the introduced high-temperature gas contacts the curved part of the polyethylene gas pipe. When the polyethylene gas pipe is heated in this way, the heat will be transferred to the part of the polyethylene gas pipe located on the right side of the fixed plate 3, causing the part of the polyethylene gas pipe located on the right side of the fixed plate 3 to be heated, thereby interfering with subsequent detection; therefore, a cooling ring 31 is provided in the fixed plate 3, and the water inlet pipe 32 and the water outlet pipe 33 are connected to an external cold water circulation system. Cooling water is injected into the cooling ring 31 through the water inlet pipe 32, and the polyethylene gas pipe on the inner side of the cooling ring 31 is cooled by the cooling water to prevent heat from being transferred to the part of the polyethylene gas pipe located on the right side of the fixed plate 3, thereby avoiding interference with subsequent detection; the fitting part 3101 on the inner side of the cooling ring 31 is set to an elastic material. After the cooling water is introduced, the cooling water forces the fitting part 3101 to deform inward and fit tightly against the outer wall of the polyethylene gas pipe to enhance the cooling effect.

[0038] Embodiment 3

[0039] Based on the second embodiment, Figure 6-Figure 7As shown, it also includes a sandblasting tube 41 and a flexible collecting frame 42; four sandblasting tubes 41 penetrate the front side of the protective cover 10; and the flexible collecting frame 42 is fixedly connected to the lower part of the protective cover 10.

[0040] Furthermore, in order to remove the sand and gravel remaining on the upper part of the polyethylene gas pipeline, a plurality of high temperature resistant bristles are fixedly connected to the inner left part and the inner right part of the protective cover 10 respectively.

[0041] Furthermore, it also includes a cylinder I 43; a cylinder I 43 is fixedly connected to the lower side of each of the two mounting plates 2; and the telescopic ends of the two cylinders I 43 are both located directly below the flexible collection frame 42.

[0042] In polyethylene gas pipelines installed in open areas outdoors, the parts that are bent and protruding outward are often the most vulnerable parts of the structure. When encountering strong winds, the pipeline will be hit and scratched by sand and gravel, which may pose a threat to the integrity of the pipeline. Therefore, it is necessary to perform scratch resistance testing on the parts of the polyethylene gas pipeline that are bent and protruding outward to evaluate whether its performance is affected after being scratched by sand and gravel. The sandblasting tube 41 is pre-connected with the external sandblasting mechanism, the cover at the bottom of the flexible collecting frame 42 is opened, and a collection box is placed underneath it. In the second step, after the polyethylene gas pipeline is bent, the flexible collecting frame 42 bends with the protective cover 10, and then the sandblasting mechanism is controlled to spray sand and gravel through the sandblasting tube 41 toward the part that is bent and protruding outward, simulating the situation of being scratched by sand and gravel when encountering strong winds. The fallen sand and gravel are discharged into the collection box below through the flexible collecting frame 42 for collection, and then a test is performed to detect whether the performance of the polyethylene gas pipeline is affected by the sand and gravel.

[0043] After the sandblasting test is completed, some sand and gravel will remain on the upper part of the polyethylene gas pipeline, which will affect the movement of the polyethylene gas pipeline through the rubber sealing ring 11. The sand and gravel will scratch the rubber sealing ring 11, causing damage to the rubber sealing ring 11, affecting the sealing of the high-temperature gas; therefore, a number of high-temperature resistant bristles are fixed to the inner left and inner right parts of the protective cover 10 respectively. When the polyethylene gas pipeline moves through the rubber sealing ring 11, the high-temperature resistant bristles will brush off the sand and gravel remaining on the upper part of the polyethylene gas pipeline to avoid scratching the rubber sealing ring 11, causing damage to the rubber sealing ring 11, and affecting the sealing of the high-temperature gas.

[0044] In addition, some sand and gravel will remain in the folding part of the lower part of the protective cover 10. When the protective cover 10 is bent and deformed, the sand and gravel will rub against the protective cover 10, which will cause the protective cover 10 to be damaged over time. Therefore, when the protective cover 10 is in a horizontal or vertical state, the cylinder Ⅰ43 can be controlled to intermittently extend and retract and intermittently contact with the flexible collecting frame 42. After the telescopic end of the cylinder Ⅰ43 is extended and contacts with the flexible collecting frame 42, the flexible collecting frame 42 is driven to move upward. The flexible collecting frame 42 moves upward and squeezes the protective cover 10 upward, so that the protective cover 10 is deformed, and the sand and gravel remaining in the folding part of the lower part of the protective cover 10 is lifted up, and after being lifted up, it falls into the flexible collecting frame 42, and then falls into the collection box below for collection. After the telescopic end of the cylinder Ⅰ43 is retracted and reset, it is no longer in contact with the flexible collecting frame 42. Due to the elasticity of the protective cover 10, the deformation of the protective cover 10 is restored, so that the protective cover 10 is deformed back and forth and shakes, and the sand and gravel remaining in the folding part of the protective cover 10 is shaken off, avoiding damage to the protective cover 10.

[0045] The technical principles of the embodiments of the present invention are described above in conjunction with specific embodiments. These descriptions are only for explaining the principles of the embodiments of the present invention and cannot be interpreted in any way as limiting the protection scope of the embodiments of the present invention. Based on the explanations herein, those skilled in the art can think of other specific implementation methods of the embodiments of the present invention without creative work, and these methods will fall within the protection scope of the embodiments of the present invention.

Claims

1. A polyethylene gas pipeline detection device, comprising a base frame (1), a mounting plate (2) and a fixing plate (3); the base frame (1) is connected to two mounting plates (2); a fixing plate (3) is fixedly connected to the facing parts of the two mounting plates (2), and the two fixing plates (3) are each provided with a through hole; It is characterized in that The invention also comprises an electric slide rail I (4), a rotating shaft (5), a power unit I, a receiving plate (8), a pressure plate (9) and a protective cover (10), wherein the protective cover (10) is made of a high temperature resistant material and is arranged as a telescopic structure; a rotating shaft (5) is fixedly connected to the middle of the base frame (1); one of the mounting plates (2) is rotatably connected to the rotating shaft (5); an arc track is arranged on the upper left portion of the base frame (1), and the electric slide rail I (4) is slidably connected in the arc track; the rotating shaft (5) is located at the center of the arc track; the electric slide rail I (4) is fixedly connected to one of the mounting plates (2); one of the mounting plates (2) is connected to the power unit I; the power unit I is connected to the receiving plate (8), and the power unit I is used to drive the receiving plate (8) to move left and right; the pressure plate (9) is detachably connected to the receiving plate (8); a protective cover (10) is fixedly connected between the two mounting plates (2), and two air pipes are passed through the protective cover (10).

2. A polyethylene gas pipeline detection device according to claim 1, It is characterized in that The through holes of the two fixing plates (3) are both beveled on one side facing the receiving plate (8).

3. A polyethylene gas pipeline detection device according to claim 1, It is characterized in that It also includes a rubber sealing ring (11); the two mounting plates (2) are each fixedly connected to the facing parts with a rubber sealing ring (11).

4. A polyethylene gas pipeline detection device according to claim 3, It is characterized in that It also includes a power unit II, a connecting rod II (23) and a positioning ring (24); one side of a fixing plate (3) away from the protective cover (10) is connected to the power unit II; the power unit II is connected to a plurality of connecting rods II (23), and the power unit II is used to drive the connecting rods II (23) to move left and right; and the ends of the plurality of connecting rods II (23) are fixedly connected to the positioning ring (24).

5. A polyethylene gas pipeline detection device according to claim 4, It is characterized in that The left portion of the aligning ring (24) is provided with an oblique angle.

6. A polyethylene gas pipeline detection device according to claim 4, It is characterized in that It also includes a cooling ring (31), a water inlet pipe (32) and a water outlet pipe (33); the cooling ring (31) is fixedly connected to one of the fixed plates (3); the upper part of the cooling ring (31) is connected to the water inlet pipe (32); the lower part of the cooling ring (31) is connected to the water outlet pipe (33); the water inlet pipe (32) and the water outlet pipe (33) both pass through one of the fixed plates (3).

7. A polyethylene gas pipeline detection device according to claim 6, It is characterized in that The fitting portion (3101) on the inner side of the cooling ring (31) is configured to be made of elastic material.

8. A polyethylene gas pipeline detection device according to claim 6, It is characterized in that It also includes a sandblasting tube (41) and a flexible collection frame (42); a plurality of sandblasting tubes (41) penetrate the upper front side of the protective cover (10); and a flexible collection frame (42) is fixedly connected to the lower part of the protective cover (10).

9. A polyethylene gas pipeline detection device according to claim 8, It is characterized in that A plurality of high temperature resistant bristles are fixedly connected to the inner left portion and the inner right portion of the protective cover (10) respectively.

10. A polyethylene gas pipeline detection device according to claim 9, It is characterized in that It also includes a cylinder I (43); a cylinder I (43) is fixedly connected to the lower side of each of the two mounting plates (2); and the telescopic ends of the two cylinders I (43) are both located directly below the flexible collection frame (42).

Citation Information

Patent Citations

  • Device for measuring flexural rigidity and torsional rigidity of hose

    CN104101545A

  • Rubber hose component bending test device

    CN109540696A

  • Pipeline protection device capable of intelligently monitoring and preventing gas pipeline leakage

    CN115523422A

  • Equipment for testing bending performance of whole PVC (Polyvinyl Chloride) pipe

    CN116519494A

  • Bending resistance testing device for polyethylene corrugated pipe production

    CN117309570A