Distributed networking system beam residence scheduling method based on multi-radar cooperative detection

By adopting the beam dwell scheduling method of multi-radar collaborative detection in the distributed networking system, the execution utility of the task-radar combination is calculated and multiple radars are allowed to collaboratively perform the same task, which solves the problem that a single radar system is difficult to adapt to the distributed networking environment. problem, improves the task detection success rate and time resource utilization, and enhances the system's adaptive capability.

CN118733217APending Publication Date: 2024-10-01UNIV OF ELECTRONICS SCI & TECH OF CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410733199.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing radar beam residency scheduling algorithms are mainly aimed at single radar systems, and are difficult to effectively solve the problems of task execution utility, time resource utilization and real-time performance in distributed networked radar systems. Especially in multi-radar collaborative detection environments, the computational complexity is high. High and insufficient adaptability.

Method used

A distributed networking system beam residency scheduling method based on multi-radar collaborative detection is adopted. By calculating the execution utility of the task-radar combination, the task with the highest task execution utility is selected for priority scheduling, and the difference threshold of radar time pointers is introduced to allow multiple Radars collaborate to perform the same task to improve detection probability and time resource utilization.

Benefits of technology

It improves the mission detection success rate and time resource utilization, reduces the mission loss rate, enhances the system's adaptive capability and mission execution effectiveness, and adapts to the complex environment of multi-functional multi-channel radar networks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118733217A_ABST
    Figure CN118733217A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of electronic system resource management, and particularly relates to a distributed networking system beam residence scheduling method based on multi-radar cooperative detection. In order to give full play to combat effectiveness of a distributed networking radar system and realize reasonable distribution of system resources among multi-radar tasks, the invention provides a distributed networking system beam residence scheduling method based on multi-radar cooperative detection. In the scheduling process, the algorithm selects the task with the highest task execution effectiveness for priority scheduling by calculating the task execution effectiveness obtained by each task-radar combination, and gives consideration to the task detection probability performance in the task execution effectiveness and the expected execution criterion in the scheduling process. Particularly, the scheduling strategy allows multiple radars to cooperatively execute the same task so as to improve the detection probability obtained by the task, and meanwhile, in order to avoid time resource waste caused by gaps existing in time axes on some radars due to actual pointer synchronization, a difference threshold value of radar time pointers is introduced in the algorithm, so that the time resource utilization rate of the system is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of electronic system resource management, and in particular relates to a distributed networking system beam resident scheduling method based on multi-radar cooperative detection. Background Art

[0002] As the modern battlefield environment becomes increasingly complex, the limitations of the combat capability of a single platform are gradually exposed. In order to meet this challenge, distributed systems have become a research hotspot. Compared with single-base radars, distributed radar systems have more robust combat performance and a larger range of action. Effectively networking multiple multi-function radars to form a multi-function distributed system can effectively improve the measurement accuracy, detection capability and anti-interference ability of the radar system (see literature: Zhou Wenhui. Research on resource management technology of phased array radar and networked tracking system [D]. National University of Defense Technology, 2004; Wang Wei, Liu Lei. Resource management technology of phased array radar and networked tracking system [J]. Electronic Technology and Software Engineering, 2016, (18): 136.). In order to give full play to the combat effectiveness of distributed networked radar systems and realize the reasonable allocation of system resources among multiple radar tasks, how to design an effective beam dwell scheduling algorithm is the key.

[0003] The existing research on radar beam dwell scheduling algorithm is mainly carried out on single radar system. Radar beam dwell scheduling algorithm is mainly divided into two parts: template-based scheduling algorithm and adaptive scheduling algorithm. Compared with the template-based scheduling algorithm, the adaptive scheduling algorithm is considered to be a better beam dwell scheduling algorithm (see literature: TANQQ, CHENGT, LIX. Online adaptive dwell scheduling based on dynamic template for PAR. Journal of Systems Engineering and Electronics, 2021, 32(5): 1119-1129; T. Cheng, Z. Li, Q. Tan, S. Wang and C. Yue, "Real-Time Adaptive Dwell Scheduling for Digital Array Radar Based on Virtual Dynamic Template," in IEEE Transactions on Aerospace and Electronic Systems, vol. 58, no. 4, pp. 3197-3208, Aug. 2022, doi: 10.1109 / TAES.2022.3145773;), which can be further divided into a beam dwell scheduling algorithm based on heuristic methods and a beam dwell scheduling algorithm based on swarm intelligence algorithms. The beam dwell scheduling algorithm based on heuristic method adopts heuristic rules to solve the beam dwell scheduling optimization problem. The literature (Lu Jianbin, Hu Weidong, Yu Wenxian. Research on real-time task scheduling of multifunctional phased array radar [J]. Journal of Electronics, 2006, 34 (4): 732-736) maps the two parameters of comprehensive task working mode priority and deadline to the same level and then weights them, and designs a scheduling algorithm that takes both into account (Higher Priority Earliest Deadline First, HPEDF). Among them, the time pointer scheduling method based on HPEDF has the highest task scheduling success rate among the current algorithms.In view of the non-convex, nonlinear and multi-constrained characteristics of beam dwell scheduling optimization problem, intelligent algorithms have begun to be used to solve the beam dwell scheduling problem, including particle swarm optimization based on entropy theory (see the literature ZHANG, HAOWEI, XIE, JUNWEI, GE, JIAANG, et al. An Entropy-based PSO for DAR task scheduling problem [J]. Applied Soft Computing, 2018, 73862-873. DOI: 10.1016 / j.asoc.2018.09.022.), hybrid particle swarm and genetic algorithm (see the literature ZHANGHW, XIEJ, LUW. Ascheduling method based on a hybrid genetic particles warm algorithm for multifunction phased array radar. Frontiers of optimization and finite element analysis). technology & electronic, 2017, 18(11): 1806-1816.) and reinforcement learning methods based on transfer learning (see Akbar S, Adver S, Ding Z, et al. Transfer-Based DRL for Task Scheduling in Dynamic Environments for Cognitive Radar. IEEE Transactions on Aerospace and Electronic Systems, 2024, 60(1): 31-50.). However, due to the high computational complexity, the biggest weakness of the beam dwell scheduling algorithm based on intelligent methods is the real-time problem.

[0004] The above-mentioned beam dwell scheduling algorithm based on a single radar system only allocates the time resources of the radar platform to give the optimal execution time sequence of multiple tasks, that is, determines the actual execution time of each beam dwell task. In the beam dwell of a distributed networked radar system, it is also necessary to determine the radar node that specifically executes the beam dwell task. The literature (Shaghaghi M, Adver S. Task selection and scheduling in multifunction multichannel radars [C]. Radar Conference. IEEE, 2017: 0969-0974.) considers the task selection and scheduling problem of a multifunction multichannel radar, and proposes the branch and bound method (B&B) to obtain the optimal solution of the proposed problem model. However, due to the high computational complexity of this method, it is not suitable for problems with real-time requirements. In the context of studying the task scheduling problem of multi-function radar network, the paper (Xu L, Zhang T, Wang Y, et al. Resources conversion and complementarity based tasks scheduling for multifunction radar network [C]. 2019 IEEE Radar Conference (Radar Conf 19). IEEE, 2019.) introduced task compression and task delay mechanisms, and proposed an allocation method based on time-constrained combinatorial double auction. However, the comparison algorithm in its simulation results only considered that this algorithm did not consider task compression or task delay, and did not consider the traditional radar networking task scheduling method. Subsequently, Zhang Tianxian's team proposed a generalized task scheduling method for multi-function radar network, established a multi-function radar random period radar task model, adjusted the task cycle, and assigned tasks to corresponding radars respectively. However, this method did not consider the correlation between task performance and task residence time. In practical problems, for search tasks, its detection performance is proportional to its residence time (see the paper: Li X, Xu L, Zhang T, et al. Ascheduling method of generalized tasks for multifunctional radar network [C]. 2019 International Conference on Control, Automation and Information Sciences (ICCAIS). 2019).With the widespread application of reinforcement learning, the paper (Xu L, Zhang T, Reinforcement learning based dynamic task scheduling for multifunction radar network [C]. Radar Conference (RadarConf20). IEEE, 2020: 1-5.) proposed a Q-learning-based beam dwell scheduling method for radar networking, which gave the task node allocation, transmission power and actual task execution time results, but its adaptability to the environment is not strong. When the multifunctional radar network is in an unknown environmental model, the learning ability of the algorithm will be reduced.

[0005] In view of the above problems, the present invention proposes a distributed networking system beam dwell scheduling method based on multi-radar cooperative detection. During the scheduling process, the algorithm calculates the task execution utility obtained by each task-radar combination, selects the task with the highest task execution utility for priority scheduling, and takes into account the task detection probability performance in the task execution utility and the expected execution criteria in the scheduling process. In particular, the scheduling strategy allows multiple radars to collaboratively execute the same task to improve the detection probability obtained by the task. At the same time, in order to avoid the waste of time resources due to gaps in the actual pointer synchronization on the time axis of some radars, this algorithm introduces the difference threshold of the radar time pointer, which effectively improves the time resource utilization of the system. Summary of the invention

[0006] The present invention provides a distributed networking system beam resident scheduling method based on multi-radar cooperative detection.

[0007] The task model is T n ={rt n ,l n ,r n ,dw n ,pri n}, where n is the number of the resident task, rt n is the expected execution time of the resident task, l n is the time window of the resident task, r n The vector represents the distance between the resident task n and each radar in the radar network, dw n is the residence time of the residence task, pri n The working mode priority for the resident task.

[0008] Assume that the current scheduling interval is [t0, t0+SI], where t0 is the start time of the current scheduling interval and SI is the duration of a scheduling interval. Currently, there is a task queue The application is scheduled to be executed on M radars, then a distributed networking system beam dwell scheduling method based on multi-radar cooperative detection includes the following steps:

[0009] Step 1: Initialize the time pointer vector tp = [tp1, tp2, ..., tp M ]=[t0,t0,...,t0], task execution queue and task deletion queue T drop Empty, radar task matching relationship matrix is a zero matrix, which represents the matching relationship between all tasks and all radars in the networking system. The element u m,n =0 means that task n is not executed on radar m.

[0010] Step 2: Find the task request queue T that satisfies rt i +l i <min(tp) tasks, remove them from the task request queue and put them into the deletion queue T drop .

[0011] Step 3: Find the task request queue T that satisfies max(tp) ≥ rt i -l i For all tasks, assume that there are X tasks that meet the conditions. If X>0, calculate the task benefit values ​​of X tasks under all their respective feasible strategies. The feasible strategy of the task refers to one or more radar nodes that can be selected for the task. Assume that the corresponding feasible strategy of each task is S i , i∈{1,2,K,X}, each task can be executed on a single radar system or through the collaborative execution of multiple radar systems. When the task is executed through the collaborative execution of multiple radar systems, each task needs to be executed at the maximum value of the radar time pointer in its corresponding strategy, that is, if the task T i It needs to be executed by radar A and radar B in coordination. Assume that tp A >tp B , you need to slide to update tp B =tp A , so that the time pointers of the two radars are aligned to coordinate the execution of the task T i , if X=0, go to step 7.

[0012] Step 4: Because multiple radars cooperate to perform the same task, the execution strategy of the task will have a corresponding Δtp. Δtp is the difference between the maximum and minimum time pointers of each radar in a certain strategy. It is calculated according to formula (1) The execution utility of the task-strategy combination is calculated and the largest task-strategy combination is selected. The corresponding task in the combination with the largest execution utility is denoted as T n ,

[0013]

[0014] The execution utility of a task is composed of the product of the task priority and the detection probability. The specific calculation is shown in formula (2):

[0015]

[0016] where v n =[u 1,n ,u 2,n ,L,u M,n ] Τ represents the nth column vector, α and β are weighting factors, and their value range is [0,1]. To perform task T n The accumulated detection probability is is the detection probability obtained by radar m performing task n, which is calculated as shown in formula (3):

[0017]

[0018] Where S m,n is the detection signal-to-noise ratio of radar m performing task n under each independent detection condition, which can be obtained from formula (4), TH is the detection threshold, which can be obtained from the false alarm probability P fa By inverse calculation, assuming that the false alarm probability is a given value,

[0019]

[0020] Among them, SNR m To search for a position at a set distance r max When the signal-to-noise ratio of radar m is n (m) is the distance between radar m and the target corresponding to task n.

[0021] Step 5: To avoid wasting too much time resources due to synchronizing multiple radar time pointers, this algorithm introduces a threshold Δtp th As a condition for whether multiple radars can perform a task collaboratively, if the Δtp of the strategy satisfies Δtp≤Δtp th , then T n Its dispatching radar R in the corresponding strategy j* On, where R j* =[R1,K,R num ], that is, the number of radars in the strategy is R num , then the task T n The actual execution time is updated to max(tpj*), Δtp this the threshold of the maximum value of the difference between the radar time pointers allowed in the strategy, and updates the time pointer of the corresponding radar tpj*=max(tpj*)+dwnRnum, where dw n R num is the actual occupied time of each radar performing the task, that is, the ratio of the task residence time to the number of radars cooperating to perform the task. At the same time, the task-radar matching relationship U is updated, and T n Add to the execution queue T exe Finally, go to step 8.

[0022] Step 6: If Δtp>Δtp th , then delete this task-strategy combination, and select the corresponding task T in the combination with the maximum execution utility from the remaining task-strategy combinations n , and return to step 5 and repeat.

[0023] Step 7: Update min(tp)=min(tp)+Δtp min , where Δtp min The minimum sliding step of the time pointer.

[0024] Step 8: If T is not empty and min(tp)<t0+t SI , then return to step 2, otherwise the scheduling interval analysis ends and the task execution queue T is output exe , Task deletion queue T drop and radar-task matching relationship U.

[0025] Principle of the Invention

[0026] The present invention applies a distributed networking system beam dwell scheduling method based on multi-radar cooperative detection. This method introduces a time pointer vector to indicate the current scheduling analysis time of multiple radar nodes, and at the same time, selects the set of tasks that can be scheduled at the current time according to the time pointer vector, and updates the system's time pointer vector in real time according to the heuristic rule after scheduling the task to quantify the time resources of the networking system to reduce the task loss rate. In addition, this method also considers the scenario where multiple radar systems cooperate to perform the same task, that is, multiple radars simultaneously detect the same target to achieve the effect of increasing the detection probability. The principle is explained below.

[0027] The present invention uses task execution utility EFF n As an evaluation task T nThe standard for good or bad execution is expressed as shown in formula (1). The task execution utility takes into account the detection performance of the task. In terms of detection performance, based on the accumulation of multiple radar detection results, as long as one radar among the multiple radars detects the target, it is determined that the networking system has successfully detected the target, as shown in formula (2). This can improve the execution success rate of the task to a certain extent.

[0028] To ensure efficient resource scheduling, the task benefit takes into account the impact of different radar nodes on the execution of the task. The objective function is set to maximize the sum of the execution utilities of the total task, as shown in formula (5):

[0029]

[0030] In the objective function, N1 is the number of tasks to be executed, which is determined by U, st n is the actual execution time of task n. Due to the characteristics of the distributed networking system, the beam dwell scheduling process has the following constraints: first, the actual execution time periods of different tasks assigned to the same radar node cannot overlap; second, the task must be executed within its executable time window. Therefore, the scheduling optimization model of the present invention is designed as shown in formula (6):

[0031]

[0032] in is the column vector of the actual residence time of each task on radar m. When multiple radars perform tasks collaboratively, the actual residence time occupied by each radar performing the task is calculated by dividing the total residence time of the task by the total number of radars used. m,n is a Boolean variable whose value can only be 0 or 1. m,n = 1, it means that radar m successfully executes task n. The first two inequalities of the scheduling optimization model correspond to the above two constraints.

[0033] This scheduling optimization model is an NP-hard problem, and this problem has a huge solution space. First, in order to reduce the solution space of the problem, it is necessary to pre-screen the tasks applying for scheduling in advance to reduce the computational complexity of the scheduling process. As shown in step 2, the task set whose latest executable time is less than the minimum value of the time pointer in the time pointer vector is removed from the task queue applying for execution as a deletion task queue. Then, in order to maximize the task execution utility in the objective function, each time the task to be scheduled is analyzed, the task with the largest benefit in the combination of executable tasks and radar strategies at the current scheduling analysis time is selected, while considering the priority and efficiency of the task, as shown in step 4. At the same time, step 4 also determines the actual execution time of the current scheduling analysis task and the radar node required to execute the task, and realizes the output of the beam residence scheduling result of the distributed network radar system. Finally, it is worth mentioning that the present invention introduces a multi-radar collaborative detection mechanism, allowing multiple radars to execute the same task at the same time, which makes the residence time required for the task to obtain the same cumulative detection probability shorter, further maximizing the system resource utilization and improving the total execution utility of the task. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is the application task sequence diagram of a scheduling interval of this algorithm;

[0035] Figure 2 It is the task allocation diagram of the networked radar execution in a scheduling interval of this algorithm;

[0036] Figure 3 This is a comparison chart of EFF, a resident scheduling algorithm for three distributed radar networking systems; DETAILED DESCRIPTION

[0037] Assume that there are three phased array radars deployed in this distributed radar network system, and each radar can perform all tasks. There are four search tasks in the scenario, and the number ratio of the four tasks is 1:1:1:1. The dwell time is 4ms, 6ms, 8ms, and 9ms respectively, and the time window length is 20ms, 25ms, 25ms, and 30ms respectively. The task priority is randomly generated within [0.1, 1]. The scheduling interval duration t SI Set to 50ms.

[0038] In order to comprehensively evaluate the performance of the algorithm, the task execution utility (Effectiveness, EFF) corresponding to the objective function is used here, which is defined as follows:

[0039] Task execution utility (EFF): defined as the product of the task cumulative detection probability term and the task priority. It can be expressed as:

[0040]

[0041] Among them, N1 represents the total number of tasks to be executed, pri n Indicates the task priority. Represents the cumulative detection probability of the task.

[0042] The distributed networking system beam dwell scheduling method based on multi-radar cooperative detection proposed by the present invention is adopted, wherein the time pointer threshold in the algorithm is Δtp th = 2. In order to explain the specific scheduling mechanism of this algorithm in detail, a scheduling application timing diagram and a multi-radar task execution result diagram in a scheduling interval are given to analyze the specific scheduling process of this algorithm in this scheduling interval.

[0043] Figure 1 It shows that the execution time of the application execution task sequence overlaps, indicating that there is resource preemption in the application execution time of multiple tasks, and a suitable scheduling method is needed to analyze the actual execution time and execution radar node of the task. Figure 2 The specific execution mode of the task is given, and each specific execution mode is circled with a numbered text box. Case 1 represents two different type 2 tasks that are coordinated and scheduled by three radars in sequence; Case 2 represents a type 4 task that is coordinated and executed by radar 1 and radar 2; It is worth noting that the type 3 task scheduled in case 3 is lower in height and longer in width than the tasks of the same type that are scheduled at the same time. This is because this type 3 task is scheduled by radar 3 alone, so the residence time is twice that of the task coordinated and executed by radar 1 and radar 2. The above analysis results are all corresponding to the specific scheduling mechanism of this algorithm, and this scheduling algorithm can adaptively schedule multiple tasks with conflicts, and give the task scheduling sequence on each radar in the networked radar.

[0044] The performance of this algorithm is compared with other algorithms. Assume that the algorithm in the present invention is named MTP-cooperation, and introduce two comparative algorithms, one is the beam dwell scheduling algorithm of the distributed networked radar system based on the time pointer (see the document SHAGHAGHlMandADVERS.Task selection and scheduling in multifunction multichannel radars [C]. IEEE Radar Conference, Seattle, USA, 2017969-974doi101109 / RADAR20177944344), that is, the TP method, the TP method gives priority to the task with the earliest deadline at each time pointer analysis scheduling moment, and each task can only select one radar system to execute, and the second is, the scheduling algorithm that does not consider coordination on the basis of the algorithm proposed in the present invention, that is, the MTP method. Figure 3 The simulation results shown are the results of one hundred Monte Carlo experiments.

[0045] Figure 3 The task efficiency comparison results of the three algorithms are given. As the number of tasks increases, the algorithm of the present invention, which considers that multiple radar nodes can collaboratively perform the same task, has higher task efficiency. In order to specifically analyze the improvement of the execution efficiency obtained by the algorithm, the data in Table 1 are given to intuitively show the total task execution utility data obtained by the three algorithms under different numbers of search tasks. From Table 1, it can be seen that as the number of tasks increases, the improvement of the algorithm relative to other comparison algorithms gradually increases. When the number of tasks is 4, the improvement of the algorithm relative to the MTP algorithm and TP algorithm is 4.06% and 7.00% respectively. When the number of tasks increases to 32, the improvement of the algorithm relative to the MTP algorithm and TP algorithm is 7.18% and 8.90% respectively.

[0046] Table 1. Comparison of EFF algorithms for three distributed radar networking systems

[0047]

Claims

1. A distributed networking system beam dwell scheduling method based on multi-radar cooperative detection, comprising the following steps: Step 1: Initialize the time pointer vector tp = [tp1, tp2, ..., tp M ]=[t0,t0,...,t0], task execution queue and task deletion queue T drop Empty, radar task matching relationship matrix is a zero matrix, which represents the matching relationship between all tasks and all radars in the networking system. The element u m,n =0 means that task n is not executed on radar m. Step 2: Find the task request queue T that satisfies rt i +l i <min(tp) tasks, remove them from the task request queue and put them into the deletion queue T drop . Step 3: Find the task request queue T that satisfies max(tp) ≥ rt i -l i For all tasks, assume that there are X tasks that meet the conditions. If X>0, calculate the task benefit values ​​of X tasks under all their respective feasible strategies. The feasible strategy of the task refers to one or more radar nodes that can be selected for the task. Assume that the corresponding feasible strategy of each task is S i , i∈{1,2,K,X}, each task can be executed on a single radar system or through the collaborative execution of multiple radar systems. When the task is executed through the collaborative execution of multiple radar systems, each task needs to be executed at the maximum value of the radar time pointer in its corresponding strategy, that is, if the task T i It needs to be executed by radar A and radar B in coordination. Assume that tp A >tp B , you need to slide to update tp B =tp A , so that the time pointers of the two radars are aligned to coordinate the execution of the task T i , if X=0, go to step 7. Step 4: Because multiple radars cooperate to perform the same task, the execution strategy of the task will have a corresponding Δtp. Δtp is the difference between the maximum and minimum time pointers of each radar in a certain strategy. It is calculated according to formula (1) The execution utility of the task-strategy combination is calculated and the largest task-strategy combination is selected. The corresponding task in the combination with the largest execution utility is denoted as T n , The execution utility of a task is composed of the product of the task priority and the detection probability. The specific calculation is shown in formula (2): where v n =[u 1,n ,u 2,n ,L,u M,n ] Τ represents the nth column vector, α and β are weighting factors, and their value range is [0,1]. To perform task T n The accumulated detection probability is is the detection probability obtained by radar m performing task n, which is calculated as shown in formula (3): Where S m,n is the detection signal-to-noise ratio of radar m performing task n under each independent detection condition, which can be obtained from formula (4), TH is the detection threshold, which can be obtained from the false alarm probability P fa By inverse calculation, assuming that the false alarm probability is a given value, Among them, SNR m To search for a position at a set distance r max When the signal-to-noise ratio of radar m is n (m) is the distance between radar m and the target corresponding to task n. Step 5: To avoid wasting too much time resources due to synchronizing multiple radar time pointers, this algorithm introduces a threshold Δtp th As a condition for whether multiple radars can perform a task collaboratively, if the Δtp of the strategy satisfies Δtp≤Δtp th , then T n The radar R in the corresponding strategy is scheduled j* On, where R j* =[R1,K,R num ], that is, the number of radars in the strategy is R num , then the task T n The actual execution time is updated to max(tp j* ), Δtp th is the threshold of the maximum value of the difference between radar time pointers allowed in the strategy, and updates the time pointer tp of the corresponding radar j* =max(tp j* )+dw n / R num , where dw n / R num is the actual occupied time of each radar performing the task, that is, the ratio of the task residence time to the number of radars cooperating to perform the task. At the same time, the task-radar matching relationship U is updated, and T n Add to the execution queue T exe Finally, go to step 8. Step 6: If Δtp>Δtp th , then delete this task-strategy combination, and select the corresponding task T in the combination with the maximum execution utility from the remaining task-strategy combinations n , and return to step 5 and repeat. Step 7: Update min(tp)=min(tp)+Δtp min , where Δtp min The minimum sliding step of the time pointer. Step 8: If T is not empty and min(tp)<t0+t SI , then return to step 2, otherwise the scheduling interval analysis ends and the task execution queue T is output exe , Task deletion queue T drop and radar-task matching relationship U.