Community type transformer area capacity path planning method and system
By defining dynamic path indicators and building models, we optimize the technology migration rate of community-type platform areas, solve the problems of power supply and consumption balance and carbon emissions in community-type platform area planning, and achieve scientific path planning and technology deployment.
Patent Information
- Application Number
- CN202410274007.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-10-01
AI Technical Summary
It is difficult to achieve power supply and consumption balance, energy interaction and coordination, and technical value assessment during the planning process of community-based Taiwan areas, and carbon emission reduction issues have not been fully considered.
Define the dynamic path indicators of community-type station area capacity, build relevant models and calculate the optimal technology migration rate through technology migration rate, taking into account factors such as electricity carbon emissions, photovoltaic installed capacity, residential electrification, building energy consumption and electric vehicle travel rate, to form Total physical quantity balance formula to optimize path planning.
It realizes scientific planning of community-type station area capacity, considers the application degree of new technologies, provides support for optimal deployment, reduces carbon emissions, and improves the accuracy and scalability of planning.
Smart Images

Figure CN118735316A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power systems, and more specifically, to a path planning method and system for community-type substation capacity. Background Art
[0002] At present, with the rapid advancement of urbanization in my country, the concentration of urban residents and the supporting degree of living facilities are constantly improving, forming a residential community that includes residential communities, social units, and supporting living infrastructure. As the basic unit of life for urban and rural residents, the community is the basic carrier for building a resource-saving and environmentally friendly society. The direct energy consumed by the community mainly includes electricity, natural gas, and fuel for travel. Electricity is the main body of community energy consumption, and the distribution station area is the basic unit for providing electric energy to the community. According to the type of electricity consumption, the corresponding station area is also called a "community-type station area."
[0003] The number and energy consumption of community substations are increasing rapidly. It is difficult to achieve a balance between the production capacity and energy consumption of various equipment in community substations. The interaction and synergy between different energy sources within the community are not ideal. The planning and construction logic of community substations is still unclear, and the capacity and scale deployment methods of community substations are also unclear.
[0004] In the existing technology, the deployment and planning of community-based substations still mainly rely on statistical data and scenario simulation. This method is mainly oriented to the macro level and cannot take into account the impact of specific technical applications on the power supply and consumption of the substation and its various costs, which makes it difficult to balance the construction, operation, production capacity and environmental protection requirements of the substation.
[0005] For example, the development of low-grid loss transformer technology enables community-based substations to achieve sufficient power supply to a large extent, and can also play a greater role in energy conservation and environmental protection. However, when this new technology is applied to the construction process of community-based substations, the existing technology cannot effectively and reasonably evaluate the technical value of this technology in the application of community-based substations. Therefore, it is impossible to reasonably plan the specific type of transformer used in community-based substations.
[0006] Secondly, as the number of distributed photovoltaic grid-connected systems increases, distributed photovoltaic systems have a positive impact on the planning and development path of community-based substations in terms of providing supplementary electricity and reducing carbon emissions. However, at present, there are still no quantitative indicators in the existing technology that can reasonably evaluate and predict the construction scale of distributed photovoltaic systems in each community-based substation.
[0007] Furthermore, similar to distributed photovoltaics, low-grid loss transformers and other technologies, the development of building energy-saving technologies, coal-to-electricity or gas-to-electricity technologies, and electric vehicle charging piles will promote the planning and expansion of community-type substations to a certain extent. However, in the process of applying various technologies, there are also problems with technology selection and technology compatibility ratio selection. In the existing technology, no evaluation and improvement of this type of problem has been carried out.
[0008] In addition, carbon emissions and their reduction in community-based substations have become the focus of low-carbon society construction at this stage. At the same time, with the rapid development of green and low-carbon technologies such as distributed photovoltaics, energy storage, and charging piles in recent years, low-carbon energy supply has become a focus of attention. However, these factors are not fully considered in the current planning process of community-based substations.
[0009] In view of the above problems, a path planning method and system for community-based substation capacity is urgently needed. Summary of the invention
[0010] In order to solve the deficiencies in the prior art, the present invention provides a path planning method and system for community substation capacity. The method defines multiple dynamic path indicators related to the community substation capacity, obtains the objective function and constraints by constructing a community substation capacity model, and uses the technical mobility rate of the dynamic path indicator as the input vector to calculate the optimal technical mobility rate of each indicator.
[0011] The present invention adopts the following technical solution.
[0012] The first aspect of the present invention relates to a path planning method for community substation capacity, the method comprising the following steps: Step 1, defining a dynamic path indicator of the community substation capacity, setting multiple technical standard time periods, and defining the technical mobility rate of each of the dynamic path indicators in each of the technical standard time periods; Step 2, constructing a community substation capacity model based on the technical mobility rate of each of the dynamic path indicators; Step 3, summarizing the total physical quantity balance formula of the community substation capacity based on the community substation capacity model, and constructing an objective function based on the total physical quantity balance formula; Step 4, solving the objective function with the number of the technical standard time periods as a constraint condition, and determining the optimal technical mobility rate value of each of the dynamic path indicators in each of the technical standard time periods.
[0013] Preferably, the dynamic path indicators include at least one of the electric carbon emission factor, photovoltaic installed capacity, residential electrification scale, building energy consumption per unit area, electric vehicle travel rate and substation network loss rate in the community-type substation.
[0014] Preferably, the dynamic path indicator refers to a model parameter that causes a continuous change in the value of the total physical quantity of the community-type substation capacity in the community-type substation capacity planning path.
[0015] Physical quantities include:
[0016] Photovoltaic installed capacity, depreciation factors related to photovoltaic equipment maintenance, and total power system capacity;
[0017] Community population P, per capita electricity consumption pe e , per capita natural gas consumption pe g ;
[0018] The per capita area of each type of building in the community is A, and the energy consumption per unit area of each type of building is e;
[0019] Fuel vehicle travel ratejk o 、Travel radius D of fuel vehicle users o 、Energy consumption per 100 kilometers of fuel vehicles o 、Electric vehicle travel ratejk e , Electric vehicle user travel radius D e 、Energy consumption of electric vehicles per 100 kilometers e , Rail transit travel ratejk r , Rail transit user travel radius D r 、Energy consumption per 100 km of rail transit r ;
[0020] Grid power supply capacity E e , Standard carbon emission factor EF of regional power grid ew , the number of low grid loss transformers N;
[0021] The total physical quantity balance is the balance between power generation and power consumption between the total capacity of the power system and the demand response calculated through various physical quantities.
[0022] Preferably, the community substation capacity model includes at least one of an electricity carbon emission model, a photovoltaic model, a residential energy consumption model, a public building energy consumption model, a transportation energy consumption model and a power grid loss model.
[0023] Preferably, based on the electricity carbon emission factor EF e The electricity carbon emission model is constructed based on the technology migration rate; the electricity carbon emission model includes the electricity carbon emission factors:
[0024] EF ei =EF ewi ·k cv0 (1+η gf ) i
[0025] Where, EF eiis the carbon emission factor of electricity in the i-th technical standard time period, and the value range of i is any integer between 1 and the number of the technical standard time period.
[0026] EF ewi is the standard electricity carbon emission factor of the regional power grid under the i-th technical standard time period,
[0027] k cv0 is the value of the coefficient determined by the proportion of photovoltaic power generation in the community-type substation in the first technical standard period,
[0028] η gf It is the rate of change of photovoltaic installed capacity between multiple technical standard time periods.
[0029] Preferably, the photovoltaic model is constructed based on the technical mobility of photovoltaic installed capacity;
[0030] Wherein, the photovoltaic model includes the demand response of photovoltaic construction, and the demand response is determined by the technical mobility of photovoltaic installed capacity;
[0031] Demand response for photovoltaic construction PVci for
[0032] C PVci =δ·p i γ PV
[0033] Among them, δ is the demand response of photovoltaic construction per unit of electricity produced by photovoltaics,
[0034] Technical migration rate p of photovoltaic installed capacity in technical standard time period i i For p i =E i ·k cv0 (1+η gf ) i -E i-1 ·k cv0 (1+η gf ) i-1
[0035] γ PV is the depreciation factor related to the maintenance of photovoltaic equipment,
[0036] E i is the total capacity of the power system under the i-th technical standard time period.
[0037] Preferably, the residential energy consumption model is constructed based on the technical migration rate of the residential electrification scale;
[0038] The residential energy consumption model includes a residential energy consumption demand response, and the residential energy consumption demand response is determined by the technology migration rate of the residential electrification scale; wherein the residential electrification scale is:
[0039] ck ei =ck e0 *(1+η sh ) i
[0040] In the formula, ck ei is the scale of residential electrification under technical standard time period i,
[0041] pe ei is the per capita electricity consumption in the technical standard time period i,
[0042] pe gi is the per capita natural gas consumption in the technical standard time period i,
[0043] ck e0 is the scale of residential electrification in the first technical standard period,
[0044] η sh is the technology migration rate of residential electrification scale, given by Obtained by conversion.
[0045] Preferably, the residential energy demand response includes a residential energy emission response and an electrification substitution demand response; the residential energy emission response is:
[0046] CE i =P i ·pe i ·((1-ck ei ) / 10.5 EF g +ck ei ·EF ei )
[0047] Where, CE i is the residential energy emission response under the i-th technical standard time period,
[0048] P i is the community population in the i-th technical standard time period,
[0049] pe i is the per capita energy consumption in the i-th technical standard time period, and pe i =pe ei +pe gi ,
[0050] EF g is the carbon emission factor of natural gas;
[0051] Electrification alternatives to demand response are:
[0052] C SHi =P i ·pr g ·(pe i ·ck ei -pe i-1 ·ck e(i-1) )
[0053] Among them, C SHi is the electrification replacement demand response under the i-th technical standard time period,
[0054] pr g is the gas substitution cost per unit of energy consumption.
[0055] Preferably, the public building energy consumption model is constructed based on the technical migration rate of building energy consumption per unit area;
[0056] The public building energy consumption model includes a building energy consumption demand response, and the building energy consumption demand response is determined by the technical migration rate of the building energy consumption per unit area; wherein the building energy consumption per unit area is glxi for:
[0057] e glxi =e glx0 (1-η jz ) i
[0058] In the formula, e glxi is the energy consumption per unit area of each type of building in the i-th technical standard time period,
[0059] η jz is the technical migration rate of building energy consumption per unit area.
[0060] Preferably, the building energy demand response includes a building energy emission response and a building energy consumption reduction demand response; the building energy emission response is:
[0061] BE i =P i ·(A sci ·e sci ·EF ei +A xxi ·e xxi ·EF ei )
[0062] Where, BE i is the building energy emission response under the i-th technical standard time period,
[0063] A sci is the per capita shopping mall area in the community under the i-th technical standard time period, Axxi is the per capita school area in the community under the i-th technical standard time period,
[0064] e sci and e xxi are the energy consumption per unit area of shopping malls and schools in the i-th technical standard time period,
[0065] P i is the population of the community residents in the i-th technical standard time period;
[0066] The building energy consumption reduction demand response is:
[0067] C BEi =P i ·pr jz ·[(A sc(i-1) ·e sc(i-1) -A sci ·e sci )+(A xx(i-1) ·e xx(i-1) -A xxi ·e xxi )]
[0068] In the formula, pr jz It is the unit energy saving factor of the building per unit area.
[0069] Preferably, constructing a community-type area capacity model based on the technical mobility of each of the dynamic path indicators further includes:
[0070] Constructing the transportation energy model based on the technology migration rate of electric vehicle travel rate;
[0071] The traffic energy model includes a traffic energy demand response, and the traffic energy demand response is determined by the technical migration rate of the electric vehicle travel rate;
[0072] Among them, the electric vehicle travel rate is:
[0073] jk ei =jk e0 ·(1+η jt ) i
[0074] In the formula, jk ei is the electric vehicle travel rate in technical standard time period i,
[0075] jk e0 is the electric vehicle travel rate in the first standard period,
[0076] η jt is the technology migration rate of electric vehicle travel rate.
[0077] Preferably, the traffic energy demand response includes a traffic energy emission response and an electric vehicle charging pile construction demand response; the traffic energy emission response is:
[0078] JT i =P i ·(jk oi ·D oi ·ec o ·EF o +jk ei ·D ei ·ec e ·EF ei +jk ri ·D ri ·ec r ·EF ei )
[0079] JT i is the traffic energy emission response under the i-th technical standard time period,
[0080] P i is the community population in the i-th technical standard time period,
[0081] jk oi and jk ri are the fuel vehicle travel rate and rail transit travel rate in the technical standard time period i,
[0082] D oi , D ei and D ri are the travel radius of fuel vehicle users, electric vehicle users and rail transit users in the technical standard time period i, respectively.
[0083] EF o is the carbon emission factor of fuel;
[0084] The construction demand response of electric vehicle charging piles is:
[0085] C JTi =β·N i ·(γ JT +ε)
[0086] Among them, C JTi is the construction demand response of electric vehicle charging piles under the i-th technical standard time period,
[0087] β is the cost of a single electric vehicle charging station,
[0088] N i is the number of electric vehicle charging piles added in the i-th technical standard time period, and there are N i =P i ·(jkei -jk e0 ),
[0089] γ JT is the depreciation factor related to the maintenance of charging pile equipment,
[0090] ε is the operation and maintenance coefficient related to the maintenance of charging pile equipment.
[0091] Preferably, the power grid loss model is constructed based on the technical mobility of the area network loss rate;
[0092] Among them, the network loss rate ΔP% is:
[0093] ΔP i % = ΔP0% (1-η we ) i
[0094] In the formula, ΔP i % is the network loss rate under the technical standard time period i,
[0095] ΔP0% is the network loss rate in the first technical standard time period.
[0096] η we is the technical migration rate of the network loss rate, which is related to the number N of low network loss transformers.
[0097] Preferably, the grid loss demand response includes grid loss emission demand response and low grid loss transformer construction demand response; the grid loss emission demand response is:
[0098] WE i =ΔP i %×E ei ×EF ewi
[0099] In the formula, WE i is the network loss emission demand response under the i-th technical standard time period,
[0100] E ei is the power supply capacity of the power grid under the i-th technical standard time period;
[0101] The demand response for low grid loss transformer construction is:
[0102] C WEci =N·β we ·ε we +N·pr we
[0103] In the formula, β we The configuration cost of low grid loss transformer,
[0104] ε we is the conversion factor of low grid loss transformer,
[0105] pr we The cost of transformer replacement.
[0106] Preferably, the total physical quantity is the result of weighted summation of each demand response;
[0107] The total physical quantity balance is the balance between the total capacity of the power system and the power generation and power consumption calculated by the demand response of each physical quantity;
[0108] The objective function is constructed based on the principle of minimizing the total physical quantity.
[0109] Preferably, the input vector of the artificial bee colony algorithm is constructed with the technical mobility rate of the dynamic path indicator as a variable; based on the path planning requirements, the number of technical standard time periods is input in advance as a constraint condition of the artificial bee colony algorithm; the input vector and the constraint condition are input into the objective function, and the artificial bee colony algorithm is used to solve the optimal vector; the optimal vector is used as the value of the technical mobility rate of each of the dynamic path indicators, thereby obtaining the optimal technical mobility rate value.
[0110] The second aspect of the present invention relates to a path planning system for community substation capacity, and the system is used to implement the steps of the method in the first aspect of the present invention; and the system includes an indicator definition module, a model construction module, a physical quantity summary module, and an indicator solving module; wherein the indicator definition module is used to define the dynamic path indicator of the community substation capacity, set multiple technical standard time periods of the same length, and define the technical mobility of each dynamic path indicator in the technical standard time period; the model construction module is used to construct a community substation capacity model based on the technical mobility of each dynamic path indicator; the physical quantity summary module is used to summarize the total physical quantity balance formula of the community substation capacity based on the community substation capacity model, and construct an objective function based on the total physical quantity balance formula; the indicator solving module is used to solve the objective function with the number of the technical standard time periods as a constraint condition, and determine the optimal technical mobility value of each of the dynamic path indicators in each of the technical standard time periods.
[0111] A third aspect of the present invention relates to an electronic device, comprising a processor and a storage medium; the storage medium is used to store instructions; the processor is used to operate according to the instructions to execute the steps of the method in the first aspect of the present invention.
[0112] A fourth aspect of the present invention relates to a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method in the first aspect of the present invention.
[0113] The beneficial effect of the present invention is that, compared with the prior art, the path planning method and system of the community-type substation capacity in the present invention defines multiple dynamic path indicators related to the community-type substation capacity, obtains the objective function and constraint conditions by constructing a community-type substation capacity model, and uses the technology mobility of the dynamic path indicator as the input vector to calculate the optimal technology mobility of each indicator. The present invention provides a method for the scientific planning of the community-type substation capacity path, fully considers the application degree of various new technologies in the community-type substation, and provides support for achieving the optimal deployment of the community-type substation.
[0114] The beneficial effects of the present invention also include:
[0115] 1. The effect of the method includes associating various potential technologies that can be applied to community-type substations into dynamic path indicators, and planning the speed of technology application and evolution through dynamic path indicators. On this basis, the method uses intelligent algorithms to solve the optimal solution of multiple dynamic path indicators, thereby providing a reference direction for the path planning method of substation capacity and the technological evolution of substations.
[0116] 2. The method considers a variety of different physical quantities as the optimization objectives to guide the dynamic path indicators. In the process of designing physical quantities, the method not only takes into account the carbon emissions of the substation and the cost of overcoming carbon emissions, but also considers the various costs of various technologies in the application process. The design of the total physical quantity makes the method highly scalable, and can expand or adjust the definition method of the total physical quantity according to various different needs of substation construction to meet the needs of all parties in the substation construction process.
[0117] 3. The method takes the number of technical standard time periods as a constraint, which not only ensures the traceability of the new technology replacement rate in the path planning method, but also takes into account the depreciation rate of various equipment under the constraint conditions and the natural growth of relevant indicators in the model, such as the number of residents, building area, etc., so that the algorithm improves the accuracy of the modeling stage while meeting the path planning time of the substation, makes the planning results closer to the actual evolution process of the substation, reduces the impact of uncontrollable factors, and has good reference value. BRIEF DESCRIPTION OF THE DRAWINGS
[0118] Figure 1 A schematic diagram of the steps of a path planning method for community-type substation capacity according to the present invention;
[0119] Figure 2 The present invention is a schematic diagram of the module structure of a path planning system for community-type substation capacity. DETAILED DESCRIPTION
[0120] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in the present invention are only embodiments of a part of the present invention, not all embodiments. Based on the spirit of the present invention, all other embodiments not recorded in the present invention obtained by ordinary technicians in this field according to the embodiments recorded in the present invention without making creative work should belong to the protection scope of the present invention.
[0121] Figure 1 FIG. 1 is a schematic diagram of the steps of a method for path planning of community-type substation capacity according to the present invention. Figure 1 As shown, the first aspect of the present invention relates to a community-type substation capacity path planning method, and the method includes steps 1 to 4.
[0122] Step 1: define the dynamic path indicators of community substation capacity, set multiple technical standard time periods of the same length, and define the technical migration rate of each dynamic path indicator in the technical standard time period.
[0123] In order to achieve reasonable planning and construction of community-type substations, and to realize the evolution of planning and adjustment and modification of substation models according to the capacity requirements of the substations, the method of the present invention involves multiple indicators that are fully relevant to the community-type substations in the planning process. These indicators are referred to as dynamic path indicators in the following text.
[0124] In the dynamic path indicator, as the scale of community substations and the evolution of technology, the value of the indicator will change. The data used to characterize the rate of change of the indicator value is called the technology migration rate under the technical standard time period.
[0125] The present invention sets multiple technical standard time periods of the same length, which is also used to define each time node in the path planning of the area capacity. The present invention relatively specifically defines multiple technical standard time periods of equal length. In actual application, according to the development law of various area improvement technologies, multiple technical standard time periods that are gradually shortened can also be defined, such as the time length that decreases exponentially, etc.
[0126] Each indicator may correspond to an equal technology mobility rate in all technology standard time periods, or the technology mobility rate itself may also have a certain regular change, such as gradually increasing or decreasing, etc. Considering that the change rules between the various indicators in the present invention have the characteristics of mutual influence, the method may be designed so that the technology mobility rates of the various indicators have the same or similar change rules, or have related change characteristics.
[0127] Preferably, the dynamic path indicators include at least one of the electric carbon emission factor, photovoltaic installed capacity, residential electrification scale, building energy consumption per unit area, electric vehicle travel rate and substation network loss rate in the community-type substation.
[0128] Dynamic path indicators refer to model parameters that cause the value of the total physical quantity to continuously change in the community-type substation capacity planning path.
[0129] As mentioned above, the method defines the key indicators that have a great impact on the total physical quantity mentioned in the following text as dynamic path indicators based on the total physical quantity that needs to be calculated and evaluated. The implementation process of this indicator selection is actually based on the prediction of the development trend of various technologies in the future period, and the results are obtained after a full and reasonable analysis of the ways that affect the development of community-type substations.
[0130] For example, considering the development trend and speed of new energy technologies such as distributed photovoltaic, wind power generation, and solar power generation, the method defines the indicator of electric carbon emission factor. Here, it should be additionally explained that this indicator is different from the commonly defined electric carbon emission factor, but is an additional indicator item defined in the present invention based on the proportion of new energy and traditional energy in community-type substations.
[0131] The installed capacity of photovoltaic power generation is Refers to the total capacity of the generating units in the photovoltaic power station in the regional power grid, for example, by calculating the photovoltaic Total rated power of all solar panels in the power station get.
[0132] In addition, considering the development of various technologies, electricity has become a trend as a way of consuming energy in residents' lives. For example, the living habits of using coal as a heating method in traditional communities are gradually changing. Therefore, the method of the present invention takes this technological development trend into consideration, realizes the planning of the indicator of the scale of residential electrification, and uses the technical migration rate of this indicator to characterize the speed of technological development and the scale of the actual application of this technology in community-type substations.
[0133] Similarly, the building energy consumption per unit area takes into account the impact of technological development in commercial buildings, public facilities and other areas on energy conservation and energy consumption reduction rates in community-type substations. The electric vehicle travel rate takes into account the replacement efficiency of electric vehicles for traditional fuel vehicles, while the substation network loss rate takes into account the network loss reduction effect after low-loss transformers replace traditional transformers.
[0134] The above indicators are defined based on the actual development of new technologies and their application in community-type substations. With the development of actual technologies, the method can also achieve the increase or decrease of indicators in a similar way. The method abstracts and digitizes the technologies that affect substation capacity and planning paths in the form of indicators, and materializes technologies that are difficult to value into easily measurable technical content, thereby providing the premise and foundation for the mathematical evaluation method of substation capacity path planning.
[0135] It should be noted that although the method artificially realizes the abstract selection of various indicators, this abstraction process is achieved by considering the application depth of various physical technologies in the substation and the way they affect the substation capacity.
[0136] Step 2: Construct a community-type substation capacity model based on the technology migration rate of each dynamic path indicator.
[0137] After a plurality of dynamic path indicators are clearly defined, the method can obtain a community-type substation capacity model based on the technology mobility of the dynamic path indicators. The model in the present invention includes an abstract operation model for implementing various different devices in the community-type substation. The method can realize the merging of different devices according to the direction of the total physical quantity to be calculated, and use the overall indicator to characterize the model.
[0138] Preferably, the community substation capacity model includes at least one of a photovoltaic model, a residential energy consumption model, a public building energy consumption model, a transportation energy consumption model and a power grid loss model.
[0139] For example, for the photovoltaic model, the method does not consider every distributed photovoltaic device in the photovoltaic model, but integrates all the distributed photovoltaic devices in the substation to determine their total photovoltaic power generation and the proportion of energy supply in the substation, so as to characterize their impact on the substation with overall indicators.
[0140] In addition, the residential energy consumption model also integrates the various life needs of all residents, such as the energy consumption of washing clothes and cooking, and comprehensively considers the consumption of natural gas and electricity. In one embodiment, the method can also consider the participation of other energy sources in the residents' energy consumption according to actual conditions, so as to improve the connotation of the model, for example, not only considering the consumption of natural gas and electricity, but also considering the consumption and conversion of other energy sources.
[0141] The public building energy consumption model takes into account the energy consumption of community residents in other scenarios such as work and study. The transportation energy consumption model takes into account the travel energy consumption of community residents. The power grid loss model considers the energy that is not transmitted to end users during the operation of the power grid but is consumed in the power generation or transmission process of the power grid.
[0142] In the model of the present invention, the situation where the energy of different devices and models is consumed for no reason is mainly considered. In other words, with the development of technology, this part of energy can be recovered or saved in some way. Therefore, this is also an important path for energy conservation in the substation or cost saving in the substation planning process. However, since the energy consumed by the actual end users is defined as a difficult-to-reduce component, it is no longer involved in the path planning of the present invention.
[0143] Step 3: Summarize the total physical quantity balance formula of the community substation capacity based on the community substation capacity model, and construct the objective function based on the total physical quantity balance formula.
[0144] The present invention will clarify the specific meaning of each model in step 3, and define the formulas of each physical quantity generated by the model based on the actual meaning of the model.
[0145] Preferably, based on the electricity carbon emission factor EF e The electric carbon emission model is constructed based on the technical mobility; the electric carbon emission model includes the electric carbon emission factor:
[0146] EF ei =EF ewi ·k cv0 (1+η gf ) i
[0147] Where, EF ei is the carbon emission factor of electricity in the i-th technical standard time period, the value range of i is any integer between 1 and the number of the technical standard time period, and the unit is tCO2e / kWh, EF ewi is the standard electricity carbon emission factor of the regional power grid under the i-th technical standard time period, k cv0 is the value of the coefficient determined by the proportion of photovoltaic power generation in the area in the first technical standard time period, η gf is the rate of change of photovoltaic installed capacity between multiple technical standard time periods. In addition, the value range of i is determined according to the number of technical standard time periods. If there are N technical standard time periods in total, the value range of i is any integer between 1 and N.
[0148] It is understandable that the electric carbon emission factor considered in this method is not the standard electric carbon emission factor in the relevant area obtained from the authoritative agency, but on this basis, the actual proportion of photovoltaic grid connection and participation in power supply is taken into account, and the standard electric carbon emission factor is corrected. In this correction process, the method considers the proportion of photovoltaic power generation in the entire substation capacity during the first technical standard time period, and uses this as a benchmark to set the technical migration rate of the electric carbon emission factor in multiple time periods as a geometric series. That is, without considering the standard electric carbon emission factor, the development scale of photovoltaic grid connection has been steadily increasing year by year, which also affects the electric carbon emission factor of the community substation where photovoltaics participate.
[0149] In the present invention, the electric carbon emission factor is calculated mainly to consider the environmental cost caused by carbon emissions after a certain technology is applied to the construction of the substation. The method effectively measures the environmental cost of technology application through this formula, and uses carbon emissions as a basis for judging the advantages and disadvantages of technology, ensuring the degree of environmental protection during the construction of the substation, so that the path planning process develops in the direction of green environmental protection.
[0150] η gf It is the change of photovoltaic installed capacity between multiple technical standard time periods, which can actually be understood as the speed of distributed photovoltaic application in the substation. When the multi-deployed distributed photovoltaic capacity can be determined between two technical standard time periods, the method can directly use the formula in the present invention to evaluate the rationality of substation planning.
[0151] It is understandable that in the present invention, the photovoltaic model mainly considers the installed capacity of photovoltaics, and of course, the increase in construction costs, maintenance costs, etc. caused by each unit of installed capacity must also be considered. To this end, the method constructs a demand response for photovoltaic construction. It is understandable that the demand response does not only include economic indicators, but may also include various costs and prices of technology transformation, such as the grid connection efficiency and actual utilization rate of distributed energy. The method can combine various factors to generate a demand response δ under a unit capacity, thereby making subsequent estimates more convenient.
[0152] In one embodiment of the present invention, the photovoltaic model is constructed based on the technical mobility of photovoltaic installed capacity;
[0153] Wherein, the photovoltaic model includes the demand response of photovoltaic construction, and the demand response is determined by the technical mobility of photovoltaic installed capacity;
[0154] Demand response for photovoltaic construction PVci for
[0155] C PVci =δ·p i γ PV
[0156] Among them, δ is the demand response of photovoltaic construction per unit of electricity produced by photovoltaics,
[0157] Technical migration rate p of photovoltaic installed capacity in technical standard time period i i For p i =E i .k cv0 (1+η gf ) i -E i-1 ·k cv0 (1+η gf ) i-1
[0158] γ PV is the depreciation factor related to the maintenance of photovoltaic equipment,
[0159] E i is the total capacity of the power system under the i-th technical standard time period.
[0160] In the above embodiment, the photovoltaic installed capacity in the technical standard time period i changes year by year, which causes the demand response of photovoltaic construction to change year by year.
[0161] In addition, the method also takes into account the depreciation rate of the photovoltaic equipment itself and the cost required for maintenance, and therefore defines a depreciation coefficient. The method can define the value of this indicator based on actual experience, thereby ensuring that the calculated demand response representing the predicted characteristics of the substation is consistent with the actual development of the substation.
[0162] Preferably, the residential energy consumption model is constructed based on the technical migration rate of the residential electrification scale;
[0163] The residential energy consumption model includes the residential energy consumption demand response, which is determined by the technical migration rate of the residential electrification scale; wherein the residential electrification scale is
[0164]
[0165] In the formula, ck ei is the scale of residential electrification in the technical standard time period i, that is, the proportion of electricity in per capita energy consumption in the i-th technical standard time period, pe ei is the per capita electricity consumption in technical standard time period i, kWh / person, pe gi is the per capita natural gas consumption in the technical standard time period i, m 3 / person, ck e0 is the scale of residential electrification in the first technical standard period, η sh is the technology migration rate of residential electrification scale, given by Obtained by conversion.
[0166] It is understandable that the scale of residential electrification will also take into account the scale of residential electrification in each standard period. Using an ideal forecasting method, the method estimates that the scale of residential electrification in multiple time periods in the future will increase proportionally. Therefore, indicators such as per capita electricity consumption and per capita natural gas consumption can be calculated based on this assumption and current data such as the scale of residential electrification in the first technical standard period.
[0167] Preferably, the residential energy demand response includes a residential energy emission response and an electrification substitution demand response; the residential energy emission response is:
[0168] CE i =P i ·pe i ·((1-ck ei ) / 10.5 EF g +ck ei ·EF ei )
[0169] Where, CE i is the residential energy emission response under the i-th technical standard time period, in tCO2e, P i is the community population under the i-th technical standard time period, pe i is the per capita energy consumption in the i-th technical standard time period, in kWh / person, and has pe i =pe ei +pe gi , E.F. g is the carbon emission factor of natural gas tCO2e / m 3 ; Electrification alternative demand response is:
[0170] C SHi =P i ·pr g ·(pe i ·ck ei -pe i-1 ·ck e(i-1) )
[0171] Among them, C SHi is the electrification replacement demand response under the i-th technical standard time period, pr g is the gas substitution cost per unit of energy consumption.
[0172] It is understandable that the demand response of this model is mainly composed of two parts. One is the emission response during the residents' energy use process. In order to avoid or reduce carbon emissions, the method needs to calculate the total carbon emissions of the model. In this method, the community population P under the technical standard time period i , per capita energy consumption pei The carbon emissions of different energy sources will affect the total emission response. In addition, the scale of electrification, that is, the proportion of electricity consumption in all energy consumption, will also affect the range of emission responses.
[0173] In the above model, 10.5 is the energy density ratio of electricity to natural gas, in kWh / m 3 The method can be determined by calculating the substitution efficiency of electricity instead of natural gas to achieve the same demand based on the degree of technological advancement, and modifying 10.5 to other data based on actual conditions.
[0174] In addition, the model also provides other technical solutions, including electrification to replace demand response, to define the cost of electrifying other energy consumption methods. For example, to replace gas with electricity, you can consider changing gas stoves or gas water heaters, gas heating equipment, etc. to electrical equipment. Therefore, pr g It is necessary to consider the rated power, operating power, equipment efficiency, gas combustion efficiency per unit energy consumption, heat production efficiency, etc. of the electrical equipment that plays a replacement role, so as to comprehensively define the value of the gas replacement cost.
[0175] Preferably, the public building energy consumption model is constructed based on the technical migration rate of building energy consumption per unit area; the public building energy consumption model includes a building energy demand response, and the building energy demand response is determined by the technical migration rate of building energy consumption per unit area; wherein the building energy consumption per unit area is glxi for:
[0176] e glxi =e glx0 (1-η jz ) i
[0177] In the formula, e glxi is the energy consumption per unit area of each type of building under the i-th technical standard time period, and the energy consumption per unit area of each type of building is e glx is the energy consumption per unit area of the shopping mall sc Or the energy consumption per unit area of the school xx , η jz is the technical migration rate of building energy consumption per unit area.
[0178] It is understandable that various types of buildings may include at least commercial buildings and school buildings, and of course other types of buildings. In fact, the types of buildings can be classified to similar degrees according to the energy consumption of the buildings, usually only considering the energy consumption per unit area of the building. For example, office spaces may require higher energy consumption than large shopping malls due to the presence of network equipment, computer terminals, etc.
[0179] In one embodiment of the present invention, only two types, shopping malls and schools, are considered.
[0180] Preferably, the building energy demand response includes a building energy emission response and a building energy consumption reduction demand response; the building energy emission response is:
[0181] BE i =P i ·(A sci ·e sci ·EF ei +A xxi ·e xxi ·EF ei )
[0182] Where, BE i is the building energy emission response under the i-th technical standard time period, A sci is the per capita shopping mall area in the community under the i-th technical standard time period, m 2 / person, A xxi is the per capita school area in the community under the i-th technical standard time period, e sci and e xxi are the energy consumption per unit area of shopping malls and schools under the i-th technical standard time period, kWh / m 2 , P i is the population of the community residents in the i-th technical standard time period;
[0183] The building energy consumption reduction demand response is:
[0184] C BEi =P i ·pr jz ·[(A sc(i-1) ·e sc(i-1) -A sci ·e sci )+(A xx(i-1) ·e xx(i-1) -A xxi ·e xxi )]
[0185] In the formula, pr jz It is the unit energy saving factor of the building per unit area.
[0186] Similarly, building energy consumption also includes carbon emission-related accounting, as well as construction-related accounting for building energy consumption reduction. The unit energy saving factor can be defined according to actual conditions, such as considering relevant technologies for energy saving. For example, when the air conditioners used on a large scale in buildings are uniformly upgraded from fixed-frequency air conditioners to variable-frequency air conditioners, the method can calculate the total amount of electric energy that can be saved by the air conditioner in a certain technical standard time period, and the unit energy saving factor can be obtained by dividing the electric energy by indicators such as building area. Similarly, if it is predicted that there is a trend of technological advancement in the main energy-consuming equipment in buildings such as air conditioning equipment and lighting equipment, the method can naturally define the unit energy saving factor built on this technology.
[0187] Preferably, the traffic energy model is constructed based on the technical mobility rate of the electric vehicle travel rate; the traffic energy model includes a traffic energy demand response, and the traffic energy demand response is determined by the technical mobility rate of the electric vehicle travel rate; wherein the electric vehicle travel rate is:
[0188] jk ei =jk e0 ·(1+η jt ) i
[0189] In the formula, jk ei is the electric vehicle travel rate in technical standard time period i, jk e0 is the electric vehicle travel rate in the first standard period, η jt is the technology migration rate of electric vehicle travel rate.
[0190] Similarly, the method can also define the electric vehicle travel rate. As electric vehicles become more popular, electric vehicles will gradually replace fuel vehicles and achieve an increase in the travel rate.
[0191] Preferably, the traffic energy demand response includes a traffic energy emission response and an electric vehicle charging pile construction demand response; the traffic energy emission response is:
[0192] JT i =P i ·(jk oi ·D oi ·ec o ·EF o +jk ei ·D ei ·ec e ·EF ei +jk ri ·D ri ·ec r ·EF ei )
[0193] JTi is the traffic energy emission response under the i-th technical standard time period, P i is the community population in the i-th technical standard time period, jk oi and jk ri are the fuel vehicle travel rate and rail transit travel rate in the technical standard time period i, respectively. oi , D ei and D ri are the travel radius of fuel vehicle users, electric vehicle users and rail transit users in technical standard time period i, km / (person-year), EF o is the carbon emission factor of fuel;
[0194] The construction demand response of electric vehicle charging piles is:
[0195] C JTi =β·N i ·(γ JT +ε)
[0196] Among them, C JTi is the construction demand response of electric vehicle charging piles under the i-th technical standard time period. For example, it can include construction engineering costs, installation engineering costs, equipment purchase costs and other costs incurred before the completion of the project.
[0197] β is the cost of a single electric vehicle charging station, N i is the number of electric vehicle charging piles added in the i-th technical standard time period, and there are N i =P i ·(jk ei -jk e0 ), γ JT is the depreciation coefficient related to the maintenance of charging pile equipment, and ε is the operation and maintenance coefficient related to the maintenance of charging pile equipment. The operation and maintenance coefficient may include but is not limited to the human operation cost and maintenance cost invested after the completion of the project.
[0198] The traffic energy emission response in the method includes the emission calculations of fuel vehicles, electric vehicles and rail transit respectively. The construction demand response of electric vehicle charging piles considers the growth rate of electric vehicle charging piles to achieve the definition. Among them, the depreciation coefficient γ JT The objective loss rate of the equipment itself can be considered, and the operation and maintenance coefficient ε can be considered as the labor cost of maintaining the equipment.
[0199] Preferably, the power grid loss model is constructed based on the technical mobility of the substation network loss rate; wherein the substation network loss rate ΔP% is:
[0200] ΔP i % = ΔP0% (1-η we )i
[0201] In the formula, ΔP i % is the network loss rate in the technical standard time period i, ΔP0% is the network loss rate in the first technical standard time period, η we is the technical migration rate of the network loss rate, which is related to the number N of low network loss transformers.
[0202] In the present invention, the loss of the distribution transformer accounts for a large part of the loss in the substation. Therefore, reducing the loss of the distribution transformer has a very obvious effect on reducing the loss of the entire substation distribution network. Taking the above into consideration, the method uses a new type of transformer with low loss, thereby reducing carbon emissions in the substation.
[0203] Preferably, the network loss emission demand response is:
[0204] WE i =ΔP i %×E ei ×EF ewi
[0205] In the formula, WE i is the network loss emission demand response under the i-th technical standard time period, E ei is the power supply capacity of the power grid in kWh under the i-th technical standard time period; the demand response for low-loss transformer construction is:
[0206] C WEci =N·β we ·ε we +N·pr we
[0207] In the formula, β we is the configuration cost of low grid loss transformer, ε we is the conversion factor of low grid loss transformer, pr we The cost of transformer replacement.
[0208] Using the above model, the method clearly and objectively sorts out the real network losses, on this basis, the demand response of network losses is defined, which includes emission demand response on the one hand and construction demand response on the other hand.
[0209] Preferably, the total physical quantity is the result of the weighted summation of each demand response; the balance of the total physical quantity is the balance between the power generation and the power consumption between the total capacity of the power system and the demand responses calculated by each physical quantity; and the objective function is constructed based on the principle of minimizing the total physical quantity.
[0210] Using the above model, the method can calculate the physical quantity of each model. According to a reasonable method, the method can weight and sum each indicator to obtain the total physical quantity. For example, if the carbon emission index needs to meet the legal requirements of the construction of the substation more than the construction cost, the weight of this type of index can be increased. Finally, the total physical quantity formula obtained by solving can be used as the objective function, that is, the objective function is solved by adjusting each dynamic path indicator to obtain the optimal indicator.
[0211] In the present invention, the physical quantities may be, but are not limited to: photovoltaic installed capacity, depreciation coefficient related to photovoltaic equipment maintenance, total capacity of the power system; community population P, per capita power consumption pe e , per capita natural gas consumption pe g ; The per capita area of each type of building in the community A, the energy consumption per unit area of each type of building e; the travel rate of fuel vehicles jk o 、Travel radius D of fuel vehicle users o 、Energy consumption per 100 kilometers of fuel vehicles o 、Electric vehicle travel ratejk e , Electric vehicle user travel radius D e 、Energy consumption of electric vehicles per 100 kilometers e , Rail transit travel ratejk r , Rail transit user travel radius D r 、Energy consumption per 100 km of rail transit r ; Grid power supply capacity E e , Standard carbon emission factor EF of regional power grid ew , the number of low-loss transformers N. The total physical quantity balance is the balance between power generation and power consumption between the total capacity of the power system and the demand response calculated through various physical quantities.
[0212] Each physical quantity can be stored in the model. For example, the photovoltaic model includes photovoltaic installed capacity, photovoltaic power generation ratio in the area and carbon emission factor EF. e The relationship between them; among them, the carbon emission factor of electricity changes with the photovoltaic installed capacity and the proportion of photovoltaic power generation in the substation area under multiple standard time periods. The residential energy model includes the community population P, per capita electricity consumption pe e , per capita natural gas consumption pe g The relationship between the scale of residential electrification and the scale of residential electrification; the scale of residential electrification increases with the community population P and per capita electricity consumption pe e , per capita natural gas consumption pe g Varies over multiple standard time periods.
[0213] The public building energy consumption model includes the relationship between the community population P, the per capita area A of various types of buildings in the community, the unit area energy consumption e of various types of buildings and the comprehensive energy consumption of the building.
[0214] The traffic energy model includes the fuel vehicle travel rate jk o 、Travel radius D of fuel vehicle users o 、Energy consumption per 100 kilometers of fuel vehicles o (unit: L), electric vehicle travel rate jk e , Electric vehicle user travel radius D e 、Energy consumption of electric vehicles per 100 kilometers e (unit: kWh), rail transit travel rate jk r , Rail transit user travel radius D r 、Energy consumption per 100 km of rail transit r The relationship between (in kWh) and the electric vehicle travel rate.
[0215] The power grid loss model includes the power grid supply capacity E e , Standard carbon emission factor EF of regional power grid ew , the correlation between the number of low-loss transformers N and the grid loss rate ΔP%.
[0216] It should be noted that the physical quantities of each model calculated in the present invention may not only be related to carbon emissions, equipment costs, etc., but may also be used as physical quantities to be solved based on other technical indicators of various new technologies applied by the method. In other words, the present invention only selects the above indicators in one embodiment, and according to different requirements of the capacity planning of the substation area, the method may adaptively select physical quantities with other connotations, and is not limited to the above physical quantities mentioned in this application.
[0217] Step 4: solving the objective function with the number of the technical standard time periods as a constraint condition to determine the optimal technical mobility value of each dynamic path indicator in each of the technical standard time periods.
[0218] The technical standard time period designed in the present invention can be multiple time lengths as mentioned above. In one embodiment of the present invention, it can be selected as 1 year. According to the actual planning granularity, it can also be defined as 5 years or 1 month, etc.
[0219] In addition, the number of technical standard time periods can also be defined according to actual needs. For example, if the fundamental purpose of planning is to ensure the achievement of a certain goal in a longer period of time, the method can reasonably divide this longer period of time into multiple technical standard time periods. If a certain goal needs to be achieved within about ten years, the method can define the length of the technical standard time period as years, and the number as 10 or dozens.
[0220] According to different actual path planning requirements, the method can also define different types of technical standard time periods. For example, if the method hopes to achieve the popularization of electric vehicles within 3 or 5 years, the time covered by multiple consecutive technical standard time periods can also be adjusted to 3 to 5 years accordingly.
[0221] Preferably, the input vector of the artificial bee colony algorithm is constructed with the technical mobility rate of the dynamic path indicator as a variable; based on the path planning requirements, the number of technical standard time periods is input in advance as a constraint condition of the artificial bee colony algorithm; the input vector and the constraint condition are input into the objective function, and the artificial bee colony algorithm is used to solve the optimal vector; the optimal vector is used as the value of the technical mobility rate of each of the dynamic path indicators, thereby obtaining the optimal technical mobility rate value.
[0222] After defining the constraints, the method can solve the algorithm using the technology mobility of the dynamic path indicator as the input variable and output result of the algorithm. The algorithm used in one embodiment of the present invention is an artificial bee colony algorithm, and in fact, the method can also use a swarm intelligence algorithm to achieve global and local optimal solution search. The artificial bee colony algorithm has fewer control parameters and strong robustness, which greatly improves the probability of obtaining the optimal solution.
[0223] The method can randomly generate technology mobility values of multiple indicators according to the possible value range of technology mobility of each dynamic path indicator. Then, the multiple technology mobility values are randomly combined into multiple vectors as the initial population. Of course, the method can also use other methods in the prior art to achieve the construction of the initial population.
[0224] As above, for each solution in the population, that is, each bee, there is a corresponding multidimensional vector, whose dimension is the number of dynamic path indicators. After completing the initialization of the population, the method can calculate the fitness value of each bee in the population, and then update the bee position according to the following formula:
[0225] x′ id =x id +φ id (x id -x kd )
[0226] In this formula, i is the number of the bee, d is the dimension number in the vector, and φ id is a random number between the interval [-1, 1], k≠i. The updated bees also need to calculate the fitness value.
[0227] Then, according to the greedy selection strategy, the method can retain the better solution. In other words, each bee can choose the appropriate nectar source according to the greedy algorithm, and the probability formula is:
[0228]
[0229] In this formula, fit i and fit j is the fitness value of bee i and bee j, and j is any bee in the initialization population SN. According to the probability formula, the method obtains the appropriate nectar source.
[0230] In addition, the observer bee is not only responsible for selecting the nectar source according to the probability value, but also generates new nectar sources and calculates the fitness value. At the same time, it decides to abandon the poor nectar source until all the search spaces are traversed, the iteration is completed, and the optimal solution is output.
[0231] In the above, it also includes scout bees that search for new possible solutions. The search process of scout bees is:
[0232]
[0233] Where r is a random number in the interval [0, 1], and are the upper and lower bounds of this dimension respectively.
[0234] The optimal solution obtained by the final algorithm is the optimal technology migration rate. Each dimension corresponds to the technology migration rate of the dynamic path indicator. According to the technology migration rate of each dynamic path indicator, the method can determine the equipment replacement speed or application speed of a certain or a certain set of new technologies corresponding to the indicator, thereby ensuring that the substation and substation capacity can develop according to the expected planning path.
[0235] Figure 2 FIG. 1 is a schematic diagram of the module structure of a path planning system for community-type substation capacity according to the present invention. Figure 2As shown, the second aspect of the present invention relates to a path planning system for community substation capacity, which is used to implement the steps of the method in the first aspect of the present invention, and the system includes an indicator definition module, a model construction module, a physical quantity summary module, and an indicator solving module; wherein the indicator definition module is used to define the dynamic path indicator of the community substation capacity, set multiple technical standard time periods of the same length, and define the technical mobility of each dynamic path indicator in the technical standard time period; the model construction module is used to construct a community substation capacity model based on the technical mobility of each dynamic path indicator; the physical quantity summary module is used to summarize the total physical quantity balance formula of the community substation capacity based on the community substation capacity model, and construct an objective function based on the total physical quantity balance formula; the indicator solving module is used to solve the objective function with the number of the technical standard time periods as a constraint condition, and determine the optimal technical mobility value of each of the dynamic path indicators in each of the technical standard time periods.
[0236] It is understandable that the substation capacity path planning system in the present invention includes hardware structures and / or software modules corresponding to the execution of each function in order to realize the various functions in the method provided in the above-mentioned embodiment of the present application. Those skilled in the art should easily realize that, in combination with the algorithm steps of each example described in the embodiments disclosed herein, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present application.
[0237] The embodiment of the present application can divide the system into functional modules according to the above method example. For example, each functional module can be divided according to each function, or two or more functions can be integrated into one processing module. The above integrated module can be implemented in the form of hardware or in the form of software functional modules. It should be noted that the division of modules in the embodiment of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation.
[0238] The system can be implemented by one or more devices communicating with each other. The device includes at least one processor, a bus system and at least one communication interface. The processor is composed of a central processing unit, a field programmable logic gate array, an application-specific integrated circuit or other hardware. The memory is composed of a read-only memory, a random access memory, etc. The memory can be independent and connected to the processor through a bus. The memory can also be integrated with the processor. The hard disk can be a mechanical disk or a solid-state hard disk, etc. The embodiment of the present invention does not limit this. The above embodiments are usually implemented by software and hardware. When implemented using a software program, it can be implemented in the form of a computer program product. The computer program product includes one or more computer instructions.
[0239] When loading and executing computer program instructions on a computer, corresponding functions are implemented according to the process provided in the embodiment of the present invention. The computer program instructions involved may be assembly instructions, machine instructions, or codes written in a programming language, etc.
[0240] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A path planning method for community-type area capacity, characterized in that: The method comprises the following steps: Step 1, defining a dynamic path indicator of community-type substation capacity, setting multiple technical standard time periods, and defining a technical migration rate of each of the dynamic path indicators in each of the technical standard time periods; Step 2, constructing a community-type area capacity model based on the technical mobility rate of each dynamic path indicator; Step 3, summarizing the total physical quantity balance formula of the community-type substation capacity based on the community-type substation capacity model, and constructing an objective function based on the total physical quantity balance formula; Step 4: solving the objective function with the number of the technical standard time periods as a constraint condition to determine the optimal technical mobility value of each dynamic path indicator in each of the technical standard time periods.
2. A method for community-type area capacity path planning according to claim 1, characterized in that: The dynamic path indicator includes at least one of the electric carbon emission factor, photovoltaic installed capacity, residential electrification scale, building energy consumption per unit area, electric vehicle travel rate and grid loss rate in the community-type substation.
3. The method for path planning of community-type area capacity according to claim 1, characterized in that: The dynamic path indicator refers to a model parameter that causes a continuous change in the value of the total physical quantity of the community-type substation capacity in the community-type substation capacity planning path.
4. The method for path planning of community-type area capacity according to claim 2, characterized in that: The community-type substation capacity model includes at least one of an electricity carbon emission model, a photovoltaic model, a residential energy consumption model, a public building energy consumption model, a transportation energy consumption model and a power grid loss model.
5. A method for path planning of community-type area capacity according to claim 4, characterized in that: Based on the electricity carbon emission factor EF e The electric carbon emission model is constructed based on the technical mobility; The electricity carbon emission model includes the electricity carbon emission factors: EF ei =EF ewi ·k cv0 (1+η gf ) i Where, EF ei is the carbon emission factor of electricity in the i-th technical standard time period, and the value range of i is any integer between 1 and the number of the technical standard time period. ewi is the standard electricity carbon emission factor of the regional power grid under the i-th technical standard time period, k cv0 is the value of the coefficient determined by the proportion of photovoltaic power generation in the community-type substation in the first technical standard time period, η gf It is the rate of change of photovoltaic installed capacity between multiple technical standard time periods.
6. A method for path planning of community-type area capacity according to claim 5, characterized in that: In the step 2, a community-type area capacity model is constructed based on the technical mobility of each of the dynamic path indicators, including: Constructing the photovoltaic model based on the technical mobility of photovoltaic installed capacity; Wherein, the photovoltaic model includes the demand response of photovoltaic construction, and the demand response is determined by the technical mobility of photovoltaic installed capacity; Demand response for photovoltaic construction PVci for C PVci =δ·p i ·c PV Where δ is the demand response of the photovoltaic construction per unit of electricity produced by photovoltaics, Technical migration rate p of photovoltaic installed capacity in technical standard time period i i for p i =E i ·k cv0 (1+n) gf ) i -E i-1 ·k cv0 (1+n) gf ) i-1 γ PV is the depreciation factor related to the maintenance of photovoltaic equipment, E i is the total capacity of the power system under the i-th technical standard time period.
7. A method for path planning of community-type area capacity according to claim 4, characterized in that: In the step 2, a community-type area capacity model is constructed based on the technical mobility of each of the dynamic path indicators, including: Constructing the residential energy consumption model based on the technology migration rate of the residential electrification scale; The residential energy consumption model includes a residential energy consumption demand response, and the residential energy consumption demand response is determined by the technology migration rate of the residential electrification scale; wherein the residential electrification scale is: ck ei =ck e0 *(1+η sh ) i In the formula, ck ei is the scale of residential electrification under technical standard time period i, pe ei is the per capita electricity consumption in the technical standard time period i, pe gi is the per capita natural gas consumption in the technical standard time period i, ck e0 is the scale of residential electrification in the first technical standard period, η sh is the technology migration rate of the residential electrification scale, given by Obtained by conversion.
8. A method for community-type area capacity path planning according to claim 7, characterized in that: The residential energy demand response includes residential energy emission response and electrification substitution demand response; The residential energy emission response is: WHAT i =P i ·on i ·((1-ck ei ) / 10.5·EF g +ck ei ·EF ei ) Where, CE i is the residential energy emission response under the i-th technical standard time period, P i is the population of the community residents in the i-th technical standard time period, pe i is the per capita energy consumption in the i-th technical standard time period, and pe i =pe ei +pe gi , EF g is the carbon emission factor of natural gas; The electrification alternative demand response is: C SHi =P i ·for g ·(on i ·ck ei -on i-1 ·ck e(i-1) ) Among them, C SHi is the electrification replacement demand response under the i-th technical standard time period, pr g is the gas substitution cost per unit of energy consumption.
9. A method for path planning of community-type area capacity according to claim 4, characterized in that: In the step 2, a community-type area capacity model is constructed based on the technical mobility of each of the dynamic path indicators, including: Constructing the public building energy consumption model based on the technical migration rate of building energy consumption per unit area; The public building energy consumption model includes a building energy consumption demand response, and the building energy consumption demand response is determined by the technical migration rate of the building energy consumption per unit area; wherein the building energy consumption per unit area is glxi for: And glxi =and glx0 (1-η jz ) i In the formula, e glx0 is the energy consumption per unit area of each type of building in the first technical standard time period, η jz is the technical migration rate of building energy consumption per unit area.
10. A method for path planning of community-type area capacity according to claim 9, characterized in that: The building energy demand response includes building energy emission response and building energy consumption reduction demand response; The building energy emission response is: BE i =P i ·(A sci ·e sci ·EF ei +A xxi ·e xxi ·EF ei ) Where, BE i is the building energy emission response under the i-th technical standard time period, A sci is the per capita shopping mall area in the community under the i-th technical standard time period, A xxi is the per capita school area in the community under the i-th technical standard time period, e sci and e xxi are the energy consumption per unit area of the shopping mall and the energy consumption per unit area of the school under the i-th technical standard time period, P i is the population of the community residents during the i-th technical standard time period; The building energy consumption reduction demand response is: C BEi =P i ·pr jz ·[(A sc(i-1) ·e sc(i-1) -A sci ·e sci )+(A xx(i-1) ·e xx(i-1) -A xxi ·e xxi , In the formula, pr jz It is the unit energy saving factor of the building per unit area.
11. A method for path planning of community-type area capacity according to claim 4, characterized in that: In the step 2, constructing a community-type area capacity model based on the technical mobility of each of the dynamic path indicators also includes: Constructing the transportation energy model based on the technology migration rate of electric vehicle travel rate; The traffic energy model includes a traffic energy demand response, and the traffic energy demand response is determined by the technical migration rate of the electric vehicle travel rate; Among them, the electric vehicle travel rate is: jk ei =jk e0 .(1+η jt ) i In the formula, jk ei is the electric vehicle travel rate under the technical standard time period i, jk e0 is the electric vehicle travel rate in the first standard period, η jt is the technological migration rate of the electric vehicle travel rate.
12. A method for community-type area capacity path planning according to claim 11, characterized in that: The traffic energy demand response includes traffic energy emission response and electric vehicle charging pile construction demand response; The traffic energy emission response is: JT i =P i ·(jk oi ·D oi ·ec o ·EF o +jk ei ·D ei ·ec e ·EF ei +jk ri ·D ri ·ec r ·EF ei ) JT i is the traffic energy emission response under the i-th technical standard time period, P i is the population of the community residents in the i-th technical standard time period, jk oi and jk ri are the fuel vehicle travel rate and rail transit travel rate in the technical standard time period i, D oi , D ei and D ri are the travel radius of fuel vehicle users, electric vehicle users and rail transit users in the technical standard time period i, respectively. EF o is the carbon emission factor of fuel; The construction demand response of the electric vehicle charging pile is: C JTi =β·N i ·(c JT +e) Among them, C JTi is the construction demand response of electric vehicle charging piles under the i-th technical standard time period, β is the cost of a single electric vehicle charging station, N i is the number of electric vehicle charging piles added in the i-th technical standard time period, and there are N i =P i ·(jk ei -jk e0 ), γ JT is the depreciation factor related to the maintenance of charging pile equipment, ε is the operation and maintenance coefficient related to the maintenance of charging pile equipment.
13. A method for community-type area capacity path planning according to claim 4, characterized in that: In the step 2, a community-type area capacity model is constructed based on the technical mobility of each of the dynamic path indicators, including: The power grid loss model is constructed based on the technical migration rate of the substation network loss rate.
14. A method for community-type area capacity path planning according to claim 13, characterized in that: The grid loss demand response includes grid loss emission demand response and low grid loss transformer construction demand response; The network loss emission demand response is: WE i =ΔP i %×E ei ×EF ewi In the formula, WE i is the network loss emission demand response under the i-th technical standard time period, E ei is the power supply capacity of the power grid under the i-th technical standard time period; ΔP i % is the grid loss rate of the substation area under the technical standard time period i, which is given by ΔP i % = ΔP0% (1-η we ) i Sure; ΔP0% is the network loss rate of the substation area under the first technical standard time period, η we is the technical migration rate of the grid loss rate in the substation area, which is related to the number N of low grid loss transformers; The demand response for low grid loss transformer construction is: C WEci =N β we ·ε we +N·pr we In the formula, β we The configuration cost of low grid loss transformer, ε we is the conversion factor of low grid loss transformer, pr we The cost of transformer replacement.
15. The method for path planning of community-type area capacity according to claim 1, characterized in that: The total physical quantity is the result of weighted summation of each demand response; The total physical quantity balance is the balance between the total capacity of the power system and the power generation and power consumption calculated by the demand response of each physical quantity; The objective function is constructed based on the principle of minimizing the total physical quantity.
16. A method for path planning of community-type area capacity according to claim 1, characterized in that: The step 4 includes: Taking the technology migration rate of the dynamic path indicator as a variable, constructing an input vector of the artificial bee colony algorithm; Based on the path planning requirements, the number of technical standard time periods input in advance is a constraint condition of the artificial bee colony algorithm; Inputting the input vector and constraint conditions into the objective function, and using the artificial bee colony algorithm to solve the optimal vector; The optimal vector is used as the value of the technical mobility of each dynamic path indicator, thereby obtaining the optimal technical mobility value.
17. A path planning system using the community-type area capacity of any one of claims 1 to 16, characterized in that: The system includes an indicator definition module, a model construction module, a physical quantity summary module, and an indicator solution module; wherein, The indicator definition module is used to define the dynamic path indicator of the community-type substation capacity, set multiple technical standard time periods of the same length, and define the technical migration rate of each of the dynamic path indicators in each of the technical standard time periods; The model building module is used to build a community-type substation capacity model based on the technical mobility rate of each dynamic path indicator; The physical quantity summary module is used to summarize the total physical quantity balance formula of the community-type substation capacity based on the community-type substation capacity model, and construct an objective function based on the total physical quantity balance formula; The indicator solving module is used to solve the objective function with the number of the technical standard time periods as a constraint condition, and determine the optimal technical mobility value of each dynamic path indicator in each of the technical standard time periods.
18. An electronic device, comprising a processor and a storage medium; characterized in that: The storage medium is used to store instructions; The processor is configured to operate according to the instructions to execute the steps of the method according to any one of claims 1-16.
19. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 16 are implemented.