Method and system for tracking construction progress of vertical shaft in real time
Through the combination of RFID tags and BIM systems, machine learning and clustering algorithms are used to update construction progress in real time, solving the problem that the BIM system cannot automatically update, achieving real-time tracking and accuracy of construction progress, and improving management efficiency and data quality.
Patent Information
- Application Number
- CN202410795602.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-10-01
AI Technical Summary
The existing BIM system cannot automatically update in real-time tracking of construction progress and requires manual input. It lacks real-time performance, resulting in information lags and errors, which affects the timeliness and accuracy of construction management.
Using a combination of RFID tags and BIM systems, the construction process data is uploaded to the backend server through an RFID reader. Machine learning algorithms and clustering algorithms are used for data processing and display, and the construction progress information in the BIM system is updated in real time, combined with real-time data processing. Framework and event-driven architecture to achieve real-time processing and transmission of data.
It achieves real-time updates of construction progress information, reduces manual recording errors, improves the timeliness and accuracy of information, enhances management efficiency, and ensures data quality and system stability and reliability.
Smart Images

Figure CN118735441A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of shaft construction, and in particular to a method and system for real-time tracking of shaft construction progress. Background Art
[0002] In the current power transmission and transformation project management, shaft construction is an important and complex link. The traditional construction progress tracking method relies on manual recording and manual updating, which is not only time-consuming and labor-intensive, but also prone to information lag and errors. With the development of building information modeling (BIM) technology, more and more projects have begun to apply BIM technology to improve the efficiency and accuracy of construction management. However, the existing BIM system still has certain limitations in real-time tracking of construction progress, mainly manifested in the inability to automatically update construction progress information, requiring manual input, and lack of real-time performance. In traditional methods, the construction progress needs to rely on manual recording and regular updates to the BIM system, which is prone to information lag and affects the timeliness of management decisions. The manual recording and input process is prone to errors, which may lead to inaccurate construction progress information and affect the execution and adjustment of the construction plan. Due to the lack of real-time performance, project managers cannot grasp the actual progress of the construction site in a timely manner, and it is difficult to discover and solve problems in a timely manner, which reduces management efficiency. Summary of the invention
[0003] The purpose of the present invention is to provide a real-time tracking method and system for shaft construction progress, so as to solve the problem that the prior art BIM system cannot automatically update the construction progress information, requires manual input, and lacks real-time performance.
[0004] To achieve the above purpose, the following technical solution is adopted.
[0005] A real-time tracking system for shaft construction progress, comprising:
[0006] RFID tags are used to mark each construction link and record the data of each construction link;
[0007] An RFID reader is used to scan the RFID tag and read the recorded data of the construction link, and upload the read data of the construction link to the background server;
[0008] The backend server is used to receive and process the data of the construction link uploaded by the RFID reader, obtain the processed data, and send the processed data to the BIM system;
[0009] The BIM system is used to receive the processed data from the background server and update the construction progress information in real time.
[0010] Optionally, the background server uses a machine learning algorithm to process the received construction phase data, including cleaning, integration and fusion.
[0011] Optionally, the background server also uses a clustering algorithm to cluster the processed data to obtain similar construction activities, and display them in different colors or marks in the BIM system.
[0012] Optionally, a real-time data processing framework is also included. The real-time data processing framework is built using stream processing technology and is used to perform real-time processing and updating of data. The real-time data processing framework includes:
[0013] A message queue system, for receiving updated construction phase data from the RFID reader, and transmitting the updated construction phase data to the backend server for processing according to the queue;
[0014] A database is set in the backend server and is used to store data processed by the backend server.
[0015] Optionally, an event-driven architecture is further included, wherein the event-driven architecture includes an event generation module and an event processing module, wherein the event generation module is disposed in the RFID reader and is used to generate a data update event for the updated construction link data when the RFID reader reads that the construction link data is updated, and transmit the generated data update event to the message queue system;
[0016] The event processing module is arranged in the background server, and is used for receiving the data update events transmitted by the message queue system, parsing the data update events and processing them, obtaining the processed data, sending the processed data to the database, and sending them to the BIM system.
[0017] Optionally, it also includes an edge computing module, including the RFID reader and the background server, and the edge computing module is set at the construction site.
[0018] Optionally, it also includes an interface display module, which is connected to the BIM system and includes an interactive panel for displaying the progress of the BIM system and playing real-time animation.
[0019] A method for real-time tracking of shaft construction progress comprises the following steps:
[0020] Mark each construction link with RFID tags and record the data of each construction link;
[0021] Scan the RFID tag with an RFID reader and read the recorded data of the construction link, and upload the read data of the construction link to the backend server;
[0022] The backend server receives and processes the data of the construction process uploaded by the RFID reader, obtains the processed data, and sends the processed data to the BIM system;
[0023] The BIM system receives processed data from the backend server and updates the construction progress information in real time.
[0024] Optionally, the processing steps in the step of receiving and processing the data of the construction link uploaded by the RFID reader by the background server specifically include:
[0025] Use K-Nearest Neighbors algorithm to fill in the missing values of the read construction link data to obtain the filled data;
[0026] The padded data is scaled to a uniform numerical range through mathematical transformation to obtain normalized data;
[0027] Use the Isolation Forest algorithm to analyze the normalized data, identify and remove abnormal data points, and obtain cleaned data;
[0028] The cleaned data is integrated and fused to obtain the processed data.
[0029] Optionally, the steps of scanning the RFID tag and reading the recorded data of the construction link by an RFID reader, and uploading the read data of the construction link to a background server; the background server receives and processes the data of the construction link uploaded by the RFID reader, obtains the processed data, and sends the processed data to the BIM system specifically include:
[0030] When the RFID reader reads the construction phase data update, the event generation module generates a data update event for the updated construction phase data, and transmits the generated data update event to the message queue system;
[0031] The event processing module receives data update events transmitted by the message queue system, parses the data update events and processes them to obtain processed data, sends the processed data to the database, and sends them to the BIM system.
[0032] Compared with the prior art, the present invention has the following beneficial effects:
[0033] 1. The present invention realizes real-time updating of construction progress information through the combination of RFID tags and BIM technology. After the construction personnel scan the RFID tags, the progress information is automatically uploaded to the BIM system to ensure the timeliness of the information.
[0034] 2. The present invention reduces errors in manual recording and input processes and improves the accuracy of construction progress information through the uniqueness of RFID tags and automated data collection.
[0035] 3. The present invention uses an interface display module to intuitively and in real time view the construction progress, promptly discover and solve problems arising during the construction process, and improve overall management efficiency.
[0036] 4. The background server of the present invention uses machine learning algorithms to clean, integrate and merge data, and uses clustering algorithms to classify and display data, which reduces human errors and improves the automation level and accuracy of data processing. The K-Nearest Neighbors algorithm, mathematical transformation and Isolation Forest algorithm used in the background server improve the intelligent level of missing value and outlier processing and ensure data quality.
[0037] 5. The present invention ensures that the system can quickly respond to data changes through the combination of a real-time data processing framework and an event-driven architecture, and enhances the stability and reliability of the system through reliable transmission and processing of events.
[0038] 6. The present invention realizes efficient data transmission and real-time processing through message queue system and stream processing technology, and reduces the delay of data transmission and processing.
[0039] 7. The setting of the edge computing module of the present invention enables the RFID reader and the background server to process and analyze data in real time on site, reducing the dependence on the central server and improving the speed of data processing and the responsiveness of the system.
[0040] 8. The event generation and processing modules in the event-driven architecture of the present invention ensure that RFID data updates can be quickly captured and synchronized to the BIM system, maintaining data consistency and up-to-date status. The modular design of the present invention, including RFID readers, backend servers, BIM systems, real-time data processing frameworks and event-driven architectures, makes the system easy to expand and adapt to different construction environments and requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 It is a schematic diagram of an embodiment of a real-time tracking system for shaft construction progress of the present invention.
[0042] Figure 2 The present invention is a flowchart of a method for real-time tracking of shaft construction progress according to an embodiment of the present invention. DETAILED DESCRIPTION
[0043] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0044] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present application belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention.
[0045] Example 1
[0046] like Figure 1 As shown, a real-time tracking system for shaft construction progress includes:
[0047] RFID tags are used to mark each construction link and record the data of each construction link;
[0048] An RFID reader is used to scan the RFID tag and read the recorded data of the construction link, and upload the read data of the construction link to the background server;
[0049] The backend server is used to receive and process the data of the construction link uploaded by the RFID reader, obtain the processed data, and send the processed data to the BIM system;
[0050] The BIM system is used to receive the processed data from the background server and update the construction progress information in real time.
[0051] Specifically, RFID tags are attached to each key link of shaft construction and are used to store key data in the construction process, such as construction nodes, timestamps, operator identification, etc.
[0052] RFID reader is a handheld scanning device or other form of reading device, which is used to scan RFID tags on the construction link and obtain the data stored in the tag. Handheld scanning devices are easy for construction workers to carry and operate, ensuring the flexibility and convenience of data reading.
[0053] The backend server constitutes the core data processing unit of the system and is responsible for receiving construction data uploaded from RFID readers. The backend server has data preprocessing capabilities, including data cleaning, integration and fusion to ensure data accuracy and availability. In addition, the backend server is also responsible for performing deeper data processing tasks, such as using machine learning algorithms to further analyze data and using clustering algorithms to classify construction activities.
[0054] The BIM system is connected to the backend server to receive processed data and apply it to the real-time update of the construction progress. Based on the received data, the BIM system dynamically adjusts the construction model to reflect the latest construction status, providing project managers with intuitive progress display and decision support.
[0055] RFID readers include not only handheld scanning devices, but also fixed readers or other forms of automatic identification devices to adapt to different construction environments and needs.
[0056] The data preprocessing function of the backend server may further include data deduplication, outlier detection and processing, and data timing correction to improve data quality.
[0057] The machine learning algorithm of the backend server can adopt a variety of algorithms, such as classification, regression or deep learning models, to adapt to different data processing needs, such as predicting construction progress, identifying construction bottlenecks, etc.
[0058] The real-time update function of the BIM system can be further expanded to include but not limited to the visual display of construction progress, dynamic allocation of construction resources, and real-time early warning of construction risks.
[0059] As a preferred example, the background server adopts a machine learning algorithm to process the received data of the construction links, including cleaning, integration and fusion.
[0060] Specifically, the backend server receives the construction link data uploaded from the RFID reader through a wired or wireless network interface. The backend server performs data preprocessing, including removing invalid records, filling missing values, identifying and correcting inconsistencies to ensure data quality. The data sources from different RFID tags are merged to form a unified data set for further analysis. Machine learning algorithms are applied to the integrated data, such as the K-Nearest Neighbors (KNN) algorithm to fill missing values, mathematical transformations for data normalization, and the Isolation Forest algorithm to identify and remove abnormal data points. Useful features are extracted from the cleaned and fused data to provide input for construction progress analysis. Use appropriate machine learning models, such as decision trees, random forests, or neural networks, to train the model to identify dependencies and time series patterns between construction links. The processed data and analysis results are output to the database or sent directly to the BIM system for real-time update and visualization of the construction progress.
[0061] As a preferred example, the background server also uses a clustering algorithm to cluster the processed data to obtain similar construction activities, and displays them in different colors or marks in the BIM system.
[0062] Specifically, the backend server receives and processes data from the RFID reader, and after data cleaning, integration and fusion, forms a data set that can be used for cluster analysis. Key features such as construction link type, construction duration, resource consumption, etc. are selected from the processed data set as inputs to the clustering algorithm. Clustering algorithms such as K-means, hierarchical clustering or density clustering algorithms are used to group construction activities with similar characteristics. Similarity metrics such as Euclidean distance, Manhattan distance or cosine similarity are defined to evaluate the similarity between construction activities. The clustering algorithm divides the construction activities into several clusters based on the similarity metrics, and each cluster represents a class of similar construction activities. A unique identifier is assigned to each cluster, and different colors or marks are given according to the characteristics of the cluster. The clustering results are integrated into the BIM system so that the BIM model of each construction link can display the corresponding color or mark according to the identifier of the cluster to which it belongs. Based on the clustering results, the BIM system displays each construction link in a three-dimensional model with different colors or marks to achieve intuitive distinction and identification of construction activities.
[0063] As a preferred example, a real-time data processing framework is also included. The real-time data processing framework is built by stream processing technology and is used for real-time processing and updating of data. The real-time data processing framework includes:
[0064] A message queue system, for receiving updated construction phase data from the RFID reader, and transmitting the updated construction phase data to the backend server for processing according to the queue;
[0065] A database is set in the backend server and is used to store data processed by the backend server.
[0066] Specifically, the message queue system can be an efficient data transmission system for asynchronously receiving updates of construction data from RFID readers. The message queue system has high throughput and low latency characteristics, which can ensure real-time data transmission. The data receiving mechanism implemented inside the message queue system can handle high-frequency data update events and ensure the integrity and sequence of data. The data distribution strategy adopted by the message queue system ensures that the data is transmitted to the background server according to priority or specific rules. The data interface provided by the background server is used to receive data transmitted by the message queue system and trigger the data processing process. The database system set in the background server is used to store processed data, including but not limited to relational databases, NoSQL databases or time series databases. The data storage structure in the database optimizes the storage and retrieval of construction data and supports fast query and analysis. The built-in data consistency guarantee mechanism of the database system ensures the accuracy and reliability of data during concurrent processing. The data update mechanism provided by the database system supports the background server to update and maintain the stored data in real time.
[0067] As a preferred example, an event-driven architecture is further included, wherein the event-driven architecture includes an event generation module and an event processing module, wherein the event generation module is arranged in the RFID reader, and is used to generate a data update event for the updated construction link data when the RFID reader reads that the construction link data is updated, and transmit the generated data update event to the message queue system;
[0068] The event processing module is arranged in the background server, and is used for receiving the data update events transmitted by the message queue system, parsing the data update events and processing them, obtaining the processed data, sending the processed data to the database, and sending them to the BIM system.
[0069] Specifically, the event generation module is set in the RFID reader. When the RFID reader scans the RFID tag and detects that the data of the construction link has changed, the module is responsible for generating a data update event. The data update event includes but is not limited to the identifier of the construction link, the timestamp, the changed data, and the possible reasons for the change. The event generation module encapsulates the data update into a structured event object, which follows a predetermined format and data protocol. The event generation module sends the data update event to the message queue system through the interface with the message queue system. The message queue system is responsible for receiving the event object and adding it to the message queue, waiting for further processing by the background server.
[0070] The event processing module is set in the background server and is responsible for monitoring and receiving data update events from the message queue system. The event processing module parses the received event object and extracts the updated content of the construction phase data. The data processing process preset by the background server is executed on the parsed update content, including data cleaning, verification, conversion and other steps. The processed data is stored in the database, and the construction phase data stored in the database is updated. The updated data is synchronized to the BIM system to ensure that the construction progress information in the BIM system is consistent with the actual construction status. The BIM system updates the visual display of the construction progress in real time based on the synchronized data, including but not limited to the construction progress bar, construction status mark, etc.
[0071] As a preferred example, it also includes an edge computing module, including the RFID reader and the background server, and the edge computing module is set at the construction site.
[0072] Specifically, the edge computing module is physically deployed at the construction site to reduce data transmission delays and increase data processing speed. As part of the edge computing module, the RFID reader scans the RFID tags at the construction site in real time to collect data from the construction process. The edge computing module performs preliminary processing on the collected RFID data, including noise filtering, outlier detection, and preliminary data cleaning. Using the computing power of the edge computing module, the pre-processed data is quickly analyzed to identify construction progress and potential problems. The edge computing module uses stream processing technology to process real-time data streams to achieve instant response to construction status. The edge computing module synchronizes the processed data analysis results to the background server through a secure network connection. The background server receives data from the edge computing module and further performs complex data processing and analysis tasks. The processed data is updated to the BIM system to reflect the construction progress and status changes in real time.
[0073] As a preferred example, it also includes an interface display module, which is connected to the BIM system and includes an interactive panel for displaying the progress of the BIM system and playing real-time animation.
[0074] Specifically, the interface display module is integrated with the BIM system as a user interaction interface to provide an interface for users to access and operate BIM data. The interactive panel includes a graphical user interface (GUI) designed to display construction progress information and realize user interaction through controls such as buttons, sliders, lists, etc. Through the interactive panel, the construction progress data in the BIM system is displayed in real time in the form of graphics or charts, so that users can intuitively understand the construction status. The interface display module supports playing real-time animations of the construction progress to display the construction process and current progress in a dynamic way. The interactive panel can display multiple dimensions of the construction progress, such as time, cost, resource usage, etc., and provide a comprehensive construction view. Provide user interaction functions, such as clicking on the construction link to obtain detailed information, zooming and panning the view to view the construction status of different areas. Allow users to customize views as needed, including selecting different data dimensions, setting filtering conditions, and creating personal dashboards. The interactive panel is synchronized with the BIM system to ensure that the displayed construction progress information is up to date and reflects the actual construction status. When there is a deviation or abnormality in the construction progress, the interface display module can issue an alarm or notification to the user to prompt potential problems. Ensure that the interface display module has an access control mechanism to protect data security and display corresponding information according to user permissions.
[0075] like Figure 2 As shown, a real-time tracking method for shaft construction progress includes the following steps:
[0076] Mark each construction link with RFID tags and record the data of each construction link;
[0077] Scan the RFID tag with an RFID reader and read the recorded data of the construction link, and upload the read data of the construction link to the backend server;
[0078] The backend server receives and processes the data of the construction process uploaded by the RFID reader, obtains the processed data, and sends the processed data to the BIM system;
[0079] The BIM system receives processed data from the backend server and updates the construction progress information in real time.
[0080] Specifically, they include:
[0081] Data tagging of construction links: RFID tags are deployed at each link of shaft construction to record relevant information of the construction link, such as construction status, time, personnel, etc.
[0082] Data collection: Use RFID readers to scan RFID tags on construction sites and automatically collect data stored in the tags.
[0083] Data upload: The collected construction data is wirelessly transmitted to the background server via the RFID reader to achieve preliminary data collection.
[0084] Data processing:
[0085] After the backend server receives the data, it performs data cleaning to remove invalid or erroneous data entries.
[0086] Integrate data from different RFID tags into a unified format for easy analysis.
[0087] Apply machine learning algorithms to conduct in-depth analysis of the integrated data and extract key information on construction progress.
[0088] Data optimization: Clustering algorithms are used to classify the processed data and identify similar construction activities in preparation for visualization in the BIM system.
[0089] Data storage: Store the processed and optimized data in the database of the backend server to ensure data persistence and traceability.
[0090] Data synchronization: Through the real-time data processing framework, the data in the database is synchronized to the BIM system to ensure that the BIM system has the latest construction progress data.
[0091] Real-time update of construction progress:
[0092] The BIM system receives synchronized data and updates the construction progress model to reflect the current construction status.
[0093] In the BIM system, similar construction activities are displayed with different colors or marks based on the clustering results to improve the readability of the construction progress.
[0094] User interaction: Through the interface display module, users are allowed to interact with the BIM system, query construction progress details, and monitor construction status.
[0095] Real-time monitoring and reporting: The system supports real-time monitoring of construction progress and generates progress reports as needed to provide decision support for project management.
[0096] As a preferred example, the processing steps in the step of receiving and processing the data of the construction link uploaded by the RFID reader by the background server specifically include:
[0097] Use K-Nearest Neighbors algorithm to fill in the missing values of the read construction link data to obtain the filled data;
[0098] The padded data is scaled to a uniform numerical range through mathematical transformation to obtain normalized data;
[0099] Use the Isolation Forest algorithm to analyze the normalized data, identify and remove abnormal data points, and obtain cleaned data;
[0100] The cleaned data is integrated and fused to obtain the processed data.
[0101] Specifically, the K-Nearest Neighbors (KNN) algorithm is used to estimate and fill in the missing construction link data values according to the K nearest neighbors of the data points to obtain the filled data set.
[0102] Perform mathematical transformations on the padded data set, such as Min-Max Scaling or Z-Score standardization, to scale the data to a uniform numerical range, such as [0,1] or a value with unit variance, to obtain a normalized data set.
[0103] The normalized data is analyzed using the Isolation Forest algorithm, and the anomaly score of the algorithm is used to identify outliers in the data, which have shorter path lengths in the random isolation tree.
[0104] According to the anomaly score threshold provided by the Isolation Forest algorithm, the identified abnormal data points are removed to obtain the cleaned data set.
[0105] Integrate multiple data sources or data features in a cleaned data set to form a comprehensive data view, which may include alignment of time series data, conversion of different measurement units, etc.
[0106] Data fusion techniques, such as weighted averaging, feature selection, or feature extraction, are used to convert the integrated data into a unified dataset for subsequent analysis and model training.
[0107] After data fusion, data validation is performed to ensure the quality and consistency of the data, including checking the statistical characteristics and logical consistency of the data.
[0108] The padded, normalized, cleaned, integrated and fused data are output as a processed dataset, which is ready to be sent to the BIM system for further analysis and construction progress update.
[0109] As a preferred example, the steps of scanning an RFID tag and reading the recorded data of the construction link by an RFID reader, and uploading the read data of the construction link to a background server; the background server receives and processes the data of the construction link uploaded by the RFID reader, obtains the processed data, and sends the processed data to the BIM system specifically include:
[0110] When the RFID reader reads the construction phase data update, the event generation module generates a data update event for the updated construction phase data, and transmits the generated data update event to the message queue system;
[0111] The event processing module receives data update events transmitted by the message queue system, parses the data update events and processes them to obtain processed data, sends the processed data to the database, and sends them to the BIM system.
[0112] Specifically, the RFID reader scans the RFID tag attached to the construction link, automatically reads and captures the recorded construction link data. When data update is detected, the event generation module in the RFID reader is triggered to create a data update event containing the updated data.
[0113] The generated data update events are encapsulated into messages in a standard format and sent to the message queue system through a network transmission interface to achieve asynchronous transmission and buffering of data.
[0114] The message queue system receives data update events from RFID readers, manages them in a first-in-first-out order or based on priority rules, and waits for processing by the background server.
[0115] The event processing module in the background server receives data update events from the message queue system periodically or based on event triggering, parses them, and extracts the updated content of the construction phase data.
[0116] The parsed data goes through the data processing flow of the backend server, including using the K-NearestNeighbors algorithm to fill in missing values, data normalization, and the Isolation Forest algorithm to identify and remove abnormal data points, and finally generates processed data.
[0117] The processed data is stored in the database of the backend server and synchronized to the BIM system as needed to achieve real-time updates of the construction progress.
[0118] The BIM system receives updated data from the backend server through an integrated data interface and automatically updates the construction progress model to reflect the latest construction status.
[0119] User interface feedback: After receiving data updates, the user interface display module of the BIM system provides feedback to users, including real-time display of construction progress, animation playback, and interactive query.
[0120] Exception handling mechanism: During the entire process of data reading, transmission, processing and updating, the system has an exception handling mechanism that can identify and respond to problems such as data transmission errors, processing failures or synchronization delays.
[0121] System monitoring and reporting: The system provides monitoring functions, records the status of data flows and processing processes, and generates monitoring reports for problem diagnosis and performance optimization.
[0122] It is known from common technical knowledge that the present invention can be implemented by its embodiments without departing from its spirit or essential features. Therefore, the embodiments disclosed above are only illustrative in all respects and are not exclusive. All changes within the scope of the present invention or within the scope equivalent to the present invention are included in the present invention.
Claims
1. A real-time tracking system for shaft construction progress, characterized in that: include: RFID tags are used to mark each construction link and record the data of each construction link; An RFID reader is used to scan the RFID tag and read the recorded data of the construction link, and upload the read data of the construction link to the background server; The backend server is used to receive and process the data of the construction link uploaded by the RFID reader, obtain the processed data, and send the processed data to the BIM system; The BIM system is used to receive the processed data from the background server and update the construction progress information in real time.
2. The system according to claim 1, characterized in that The backend server uses a machine learning algorithm to process the received construction link data, including cleaning, integration and fusion.
3. The system according to claim 1, characterized in that The backend server also uses a clustering algorithm to cluster the processed data to obtain similar construction activities, and displays them in different colors or marks in the BIM system.
4. The system according to claim 1, characterized in that It also includes a real-time data processing framework, which is built using stream processing technology and is used to process and update data in real time. The real-time data processing framework includes: A message queue system, for receiving updated construction phase data from the RFID reader, and transmitting the updated construction phase data to the backend server for processing according to the queue; A database is set in the backend server and is used to store data processed by the backend server.
5. The system according to claim 4, characterized in that It also includes an event-driven architecture, which includes an event generation module and an event processing module. The event generation module is set in the RFID reader, and is used to generate a data update event for the updated construction link data when the RFID reader reads the construction link data update, and transmit the generated data update event to the message queue system; The event processing module is arranged in the background server, and is used for receiving the data update events transmitted by the message queue system, parsing the data update events and processing them, obtaining the processed data, sending the processed data to the database, and sending them to the BIM system.
6. The system according to claim 1, characterized in that It also includes an edge computing module, including the RFID reader and the background server, and the edge computing module is set at the construction site.
7. The system according to claim 1, characterized in that It also includes an interface display module, which is connected to the BIM system and includes an interactive panel for displaying the progress of the BIM system and playing real-time animation.
8. A method for real-time tracking of shaft construction progress, based on a real-time tracking system for shaft construction progress according to any one of claims 1 to 7, characterized in that: The following steps are involved: Mark each construction link with RFID tags and record the data of each construction link; Scan the RFID tag with an RFID reader and read the recorded data of the construction link, and upload the read data of the construction link to the backend server; The backend server receives and processes the data of the construction process uploaded by the RFID reader, obtains the processed data, and sends the processed data to the BIM system; The BIM system receives processed data from the backend server and updates the construction progress information in real time.
9. The method according to claim 8, characterized in that The processing steps in the step of receiving and processing the data of the construction link uploaded by the RFID reader by the background server specifically include: Use K-Nearest Neighbors algorithm to fill in the missing values of the read construction link data to obtain the filled data; The padded data is scaled to a uniform numerical range through mathematical transformation to obtain normalized data; Use the Isolation Forest algorithm to analyze the normalized data, identify and remove abnormal data points, and obtain cleaned data; The cleaned data is integrated and fused to obtain the processed data.
10. The method according to claim 8, characterized in that The steps of scanning the RFID tag and reading the recorded data of the construction link by the RFID reader, and uploading the read data of the construction link to the backend server; the backend server receives and processes the data of the construction link uploaded by the RFID reader, obtains the processed data, and sends the processed data to the BIM system specifically include: When the RFID reader reads the construction phase data update, the event generation module generates a data update event for the updated construction phase data, and transmits the generated data update event to the message queue system; The event processing module receives data update events transmitted by the message queue system, parses the data update events and processes them to obtain processed data, sends the processed data to the database, and sends them to the BIM system.