Single-station-end power grid fault diagnosis system based on power grid monitoring system
By integrating the expert library and intelligent analysis functions into the power grid monitoring system, real-time diagnosis and early warning of power grid faults are realized, which solves the problems of delayed fault diagnosis and untimely maintenance in the existing technology, and improves the intelligent level and equipment of power grid operation and maintenance. reliability.
Patent Information
- Application Number
- CN202411187580.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing power grid fault diagnosis system mainly relies on manual analysis. The diagnosis is performed after the fault occurs, resulting in delays and losses. It also lacks preventive maintenance capabilities and cannot effectively reduce losses and labor costs.
The single-station power grid fault diagnosis system based on the power grid monitoring system integrates expert database, real-time monitoring, intelligent analysis and early warning functions. Through the fault analysis module, fault early warning module, fault risk prediction unit, maintenance frequency calculation module and maintenance plan generation module, Real-time fault diagnosis, early warning, risk prediction and optimized maintenance strategies.
It has significantly improved the intelligent level of power grid operation and maintenance, shortened fault response time, reduced operation and maintenance costs, improved maintenance efficiency and equipment reliability, and ensured the safe and stable operation of the power grid.
Smart Images

Figure CN118739607A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid data processing, and in particular to a single-station power grid fault diagnosis system based on a power grid monitoring system. Background Art
[0002] Grid fault diagnosis is of great significance to ensure the safe, stable and reliable operation of the power system. By timely and accurately diagnosing grid faults, the fault point can be quickly located, the scope and time of the fault's impact on the grid can be reduced, and the power supply reliability and stability of the grid can be improved.
[0003] Publication No. CN105158647B discloses a single-station power grid fault diagnosis and auxiliary decision-making method based on a power grid monitoring system, including establishing an expert database; dividing the accident information into switch quantity information reflecting the operating status of the substation equipment and the continuous change information of the process data during the accident; describing the switch quantity information with state elements and performing logical AND operations, and determining the faulty component; performing multi-source information fusion on the continuously changing information; matching the fusion result with the expected accident set and identifying the fault type; determining the nature of the accident based on the expert database, and performing auxiliary decision-making on the accident handling; displaying and tracking all data and results in real time on the monitoring system; the invention can use computers and existing power grid intelligent monitoring systems to assist in decision-making on single-station power grid faults, avoid the monitoring personnel manually processing massive monitoring data and the monitoring personnel's lack of processing experience, and can quickly and accurately make decisions on single-station power grid faults to prevent accidents from occurring.
[0004] For example, as shown in the above technology, the existing power grid fault detection generally only analyzes the cause of the fault point manually. A smarter approach is to combine expert experience for intelligent analysis, but diagnosis is still performed after the fault occurs. Although the maintenance time is reduced, it will still cause certain losses. If the overall observation can be achieved, early prediction and early maintenance of key locations can be carried out to prevent failures, it will reduce a lot of losses and also reduce labor costs. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a single-station power grid fault diagnosis system based on a power grid monitoring system, which solves the above-mentioned problems.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a single-station power grid fault diagnosis system based on a power grid monitoring system, including: an expert library for recording historical data of power grid faults in the station and updating it in real time after each fault occurs; a power grid monitoring system for monitoring power grid data and establishing a three-dimensional model of the power grid in the power station; a fault analysis module for performing fault analysis on the power grid data obtained by the power grid monitoring unit in combination with the data stored in the expert library to determine whether a fault occurs; a fault warning module for issuing a warning when a fault occurs when the fault analysis module analyzes a fault, and displaying the analyzed fault cause. If there are multiple causes, the probability is calculated and sorted; a fault risk prediction unit for calculating the probability of each cause. The failure rate and failure frequency of the fault points are sorted and thresholds are set respectively. Points exceeding the threshold are marked as prone to failure and marked with colors in the three-dimensional model of the power grid; the maintenance frequency calculation module assigns weights to the failure rate and failure frequency according to expert experience, calculates the maintenance frequency of the prone to failure points, and other fault points are regularly maintained according to the original frequency; the maintenance plan generation module analyzes the type of fault through the fault analysis module combined with the expert database data, and proposes a matching maintenance plan for reference by maintenance personnel; the maintenance plan optimization module summarizes the historical fault records of each fault point, determines multiple solutions and calculates the feasibility respectively, and comprehensively repairs and adjusts the fault point according to the most feasible plan.
[0007] Preferably, the establishment of the expert database specifically includes: data structure: the expert database contains fault type Ty, fault cause Ca, and maintenance plan So, E is a set of records in the expert database, and the Kth record is represented by E k ={Ty k , Ca k ,So k}; Record update: After each maintenance, the record of the corresponding fault type is updated according to the maintenance report, including the newly added fault cause and optimized maintenance plan.
[0008] Preferably, the working steps of the power grid monitoring unit specifically include: data collection: real-time collection of key data of the power grid, including but not limited to voltage, current, and power; establishment of a three-dimensional model: using GIS or BIM technology to establish a three-dimensional model of the power grid in the power station.
[0009] Preferably, the analysis method of the fault analysis module is: using a machine learning algorithm or a rule engine, combined with the knowledge in the expert database to perform real-time analysis of the power grid data: let D be the power grid data set, then the fault analysis is expressed as F(D,E)→{0,1}, where 1 indicates the presence of a fault, 0 indicates no fault, and F() represents the fault judgment logic function.
[0010] Preferably, the working steps of the fault warning module include: warning mechanism: when the fault analysis module determines that a fault occurs, a warning is triggered and the most likely cause of the fault is displayed; probability sorting: if there are multiple causes, the probability of each cause is calculated using the Bayesian formula or conditional probability, and the causes are sorted; let C i is the i-th fault cause, P(C i |D) is C under given data D i The conditional probability of , then: .
[0011] Among them, P(C i ) is the reason C i The prior probability of i Probability of occurrence; P(D|C i ) indicates that in reason C i The probability of observing data D when ∑ j P(D|C j )P(C j ) is the sum of all possible causes C j The weighted sum of is used to normalize the posterior probability to ensure that the sum of the posterior probabilities of all possible causes is 1.
[0012] Preferably, the working steps of the fault risk prediction unit include: Failure rate calculation: Count the number of failures N of each line fault point i And the total number of failures N, calculate the failure rate R i : .
[0013] Introduction of time concept: Calculation of fault frequency F i , that is, the number of failures per unit time t: .
[0014] Threshold setting: set the threshold value Tf of the failure rate Tr and frequency based on historical data and expert experience; 3D model marking: compare the corresponding threshold values of each failure rate and failure frequency, mark the line fault points exceeding the threshold value as prone to failure points, and color-mark them in the 3D model, and use different colors to mark the prone to failure points according to the failure rate and failure frequency.
[0015] Preferably, the working steps of the maintenance frequency calculation module include: weight allocation: assigning weights W to the failure rate and the failure frequency according to expert experience r and W f , satisfying W r +W f =1; Maintenance frequency calculation: The maintenance frequency M of the fault-prone points is calculated using the weighted sum method i , the calculation formula is: Mi =W r R i +W f F i .
[0016] Preferably, the maintenance frequency of the fault-prone points is calculated by a maintenance frequency calculation module, and the remaining fault points are regularly maintained according to the original maintenance frequency.
[0017] Preferably, in the maintenance solution generation module, solution matching includes: searching for matching maintenance solutions from an expert database according to the result of the fault analysis module, and evaluating the matching degree by a similarity algorithm.
[0018] Preferably, the working steps of the maintenance plan optimization module include: historical record statistics: statistics of the number and type of historical failures of each fault point; multi-plan evaluation: propose multiple solutions for each fault point and calculate their feasibility F easj , considering the cost P j , Maintenance time T j and maintenance impact I j , then F easj The calculation formula is: .
[0019] Where α, β, and γ are the cost P j , Maintenance time T j and maintenance impact I j Weight coefficient; Select the best solution: Select F easj The biggest plan is being implemented.
[0020] The present invention provides a single-station power grid fault diagnosis system based on a power grid monitoring system. Compared with the prior art, it has the following beneficial effects: 1. The single-station power grid fault diagnosis system based on the power grid monitoring system significantly improves the intelligence level of power grid operation and maintenance by integrating expert database, real-time monitoring, intelligent analysis and prediction and other functions; the system can update historical data in real time, accurately analyze power grid faults, quickly warn and display the cause of faults, and effectively shorten the fault response time; at the same time, the fault risk prediction and maintenance frequency calculation module intuitively displays the prone to fault points through quantitative evaluation and color marking, optimizes maintenance strategies, and reduces operation and maintenance costs; the maintenance plan generation and optimization module relies on big data analysis and expert experience to provide maintenance personnel with accurate and efficient maintenance guidance, further improve maintenance efficiency and effect, ensure the safe and stable operation of the power grid, and has significant economic and social benefits.
[0021] 2. The single-station power grid fault diagnosis system based on the power grid monitoring system has achieved efficient management and updating of fault knowledge by establishing a structured expert database, thereby improving the accuracy and efficiency of maintenance decisions. The power grid monitoring unit combines a three-dimensional model to enhance the visualization and real-time nature of the power grid status, making it easier for operation and maintenance personnel to intuitively understand the power grid status. The fault analysis and early warning module uses advanced machine learning algorithms and probability sorting methods to improve the accuracy and response speed of fault identification, and reduce false alarms and missed alarms. The fault risk prediction unit introduces the concept of time, calculates the failure rate and frequency of occurrence, and sets thresholds for key marking, effectively predicting potential high-risk points and providing a scientific basis for preventive maintenance. These measures have jointly improved the intelligence level of power grid operation and maintenance, reduced operation and maintenance costs, and enhanced the safety and stability of the power grid.
[0022] 3. The single-station power grid fault diagnosis system based on the power grid monitoring system further refines the power grid operation and maintenance management by introducing the maintenance frequency calculation module and the maintenance plan generation module; the weight allocation mechanism makes the maintenance decision more scientific and reasonable, and determines the maintenance priority based on the comprehensive evaluation of the failure rate and frequency; the maintenance plan generation module uses the expert library and similarity algorithm to quickly match and provide targeted maintenance plans, thereby improving maintenance efficiency and accuracy; these improvements reduce unnecessary maintenance costs and enhance the stability and reliability of the power grid system.
[0023] 4. The single-station power grid fault diagnosis system based on the power grid monitoring system and the maintenance plan optimization module can accurately grasp the distribution and type of equipment faults through detailed historical records and statistics, providing a solid data basis for subsequent decision-making. Its multi-plan evaluation mechanism comprehensively considers the cost, time and maintenance impact, and uses weight coefficients to flexibly adjust the importance of each factor to ensure that the evaluation is comprehensive and close to actual needs. Finally, by selecting F easj The implementation of the largest solution has achieved the optimal allocation and utilization of resources, effectively reduced maintenance costs, shortened maintenance cycles, and reduced the adverse effects of maintenance activities on production operations, significantly improving overall maintenance efficiency and equipment reliability. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is the overall system principle block diagram of the present invention.
[0025] Figure 2 It is a principle block diagram of the power grid monitoring system and the fault risk prediction unit of the present invention.
[0026] Figure 3 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] See also Figure 1-Figure 3 The present invention provides the following four technical solutions: The first implementation method: A single-station power grid fault diagnosis system based on a power grid monitoring system includes: an expert library for recording historical data of power grid faults in the station and updating it in real time after each fault occurs; a power grid monitoring system for monitoring power grid data and establishing a three-dimensional model of the power grid in the power station; a fault analysis module for performing fault analysis on the power grid data obtained by the power grid monitoring unit in combination with the data stored in the expert library to determine whether a fault occurs; a fault warning module for issuing a warning when a fault occurs when the fault analysis module analyzes a fault, and displaying the analyzed fault cause. If there are multiple causes, the probability is calculated and sorted; a fault risk prediction unit for calculating each cause. The failure rate and failure frequency of the fault points are sorted and thresholds are set respectively. Points exceeding the threshold are marked as prone to failure and marked with colors in the three-dimensional model of the power grid; the maintenance frequency calculation module assigns weights to the failure rate and failure frequency according to expert experience, calculates the maintenance frequency of the prone to failure points, and other fault points are regularly maintained according to the original frequency; the maintenance plan generation module analyzes the type of fault through the fault analysis module combined with the expert database data, and proposes a matching maintenance plan for reference by maintenance personnel; the maintenance plan optimization module summarizes the historical fault records of each fault point, determines multiple solutions and calculates the feasibility respectively, and comprehensively repairs and adjusts the fault point according to the most feasible plan.
[0029] By integrating expert database, real-time monitoring, intelligent analysis and prediction and other functions, the intelligence level of power grid operation and maintenance has been significantly improved; the system can update historical data in real time, accurately analyze power grid faults, quickly warn and display the causes of faults, and effectively shorten the fault response time; at the same time, the fault risk prediction and maintenance frequency calculation module, through quantitative evaluation and color marking, intuitively displays fault-prone points, optimizes maintenance strategies, and reduces operation and maintenance costs; the maintenance plan generation and optimization module, relying on big data analysis and expert experience, provides maintenance personnel with accurate and efficient maintenance guidance, further improves maintenance efficiency and effectiveness, ensures safe and stable operation of the power grid, and has significant economic and social benefits.
[0030] The second implementation mode is mainly different from the first implementation mode in that the establishment of the expert database specifically includes: data structure: the expert database contains the fault type Ty (Type), the fault cause Ca (Cause), and the maintenance solution So (Solution). E is the record set in the expert database, and the Kth record is represented by E k ={Ty k , Ca k ,So k}; Record update: After each maintenance, the record of the corresponding fault type is updated according to the maintenance report, including the newly added fault cause and optimized maintenance plan.
[0031] The working steps of the power grid monitoring unit specifically include: data collection: real-time collection of key data of the power grid, including but not limited to voltage, current, and power; establishment of a three-dimensional model: using GIS (geographic information system) or BIM (building information modeling) technology to establish a three-dimensional model of the power grid in the power station for easy visualization.
[0032] The analysis method of the fault analysis module is: using machine learning algorithms (such as decision trees, random forests) or rule engines, combined with the knowledge in the expert database to perform real-time analysis of power grid data: let D be the power grid data set, then the fault analysis is expressed as F(D,E)→{0,1}, where 1 indicates the presence of a fault, 0 indicates no fault, and F() represents the fault judgment logic function, which analyzes the input D and E, analyzes whether D is faulty, and outputs 0 or 1 for representation.
[0033] The working steps of the fault warning module include: warning mechanism: when the fault analysis module determines that a fault occurs, it triggers a warning and displays the most likely cause of the fault; probability sorting: if there are multiple causes, use the Bayesian formula or conditional probability to calculate the probability of each cause and sort them; let C i is the i-th fault cause, P(C i |D) is C under given data D i The conditional probability of , then: .
[0034] Among them, P(C i ) is the reason C i The prior probability of i Probability of occurrence; P(D|C i ) indicates that in reason C i The probability of observing data D when ∑ j P(D|C j )P(C j ) is for all possible causes C jThe weighted sum of is used to normalize the posterior probability to ensure that the sum of the posterior probabilities of all possible causes is 1.
[0035] Suppose there are three possible fault causes C1, C2, C3, and a given set of data D, and calculate the i The conditional probability P(C i |D): Prior probability P(C i ): P(C1)=0.3; P(C2)=0.5; P(C3)=0.2.
[0036] Likelihood function P(D|C i ): P(D|C1)=0.4; P(D|C2)=0.8; P(D|C3)=0.1.
[0037] Calculate the normalization factor: ∑ j P(D|C j )P(C j ) =P(D∣C1)P(C1)+P(D∣C2)P(C2)+P(D∣C3)P(C3) =0.4×0.3+0.8×0.5+0.1×0.2 = 0.12 + 0.4 + 0.02 = 0.54.
[0038] Calculate the posterior probability P(C i |D): For C1: ; For C2: ; For C3: .
[0039] The working steps of the fault risk prediction unit include: Failure rate calculation: Count the number of failures N at each line fault point i And the total number of failures N, calculate the failure rate R i : .
[0040] Introduction of time concept: Calculation of fault frequency F i , that is, the number of failures per unit time t: .
[0041] Threshold setting: set the threshold value Tf of the failure rate Tr and frequency based on historical data and expert experience; 3D model marking: compare the corresponding threshold values of each failure rate and failure frequency, mark the line fault points exceeding the threshold value as prone to failure points, and color-mark them in the 3D model, and use different colors to mark the prone to failure points according to the failure rate and failure frequency.
[0042] Assume there are 3 different lines (Line A, Line B, Line C), and the failure data of each line in one month is as follows: Line A: Total number of failures N A =10, the number of faults at fault point 1 is N A1 =5, the number of failures at fault point 2 is N A2 =3, the number of failures at fault point 3 is N A3 =2.
[0043] Line B: Total number of faults N B =20, the number of faults at fault point 1 is N B1 =12, the number of faults at fault point 2 is N B2 =5, the number of faults at fault point 3 is N B3 =3.
[0044] Line C: Total number of faults N C =5, the number of faults at fault point 1 is N C1 =3, the number of failures at fault point 2 is N C2 =2.
[0045] Total time t=30 days.
[0046] Calculate the failure rate:
[0047] For each fault point of each line, its failure rate R can be calculated i : Route A: ; ; ; Route B: ; ; ; Route C: ; ; For each fault point of each line, its failure rate R can be calculated i : Route A: ; ; ; Route B: ; ; ; Route C: ; .
[0048] By establishing a structured expert database, efficient management and updating of fault knowledge is achieved, and the accuracy and efficiency of maintenance decisions are improved; the power grid monitoring unit combines with the three-dimensional model to enhance the visualization and real-time nature of the power grid status, making it easier for operation and maintenance personnel to intuitively understand the power grid status; the fault analysis and early warning module uses advanced machine learning algorithms and probability sorting methods to improve the accuracy and response speed of fault identification, and reduce false alarms and missed alarms; the fault risk prediction unit introduces the concept of time, calculates the failure rate and frequency of occurrence, and sets thresholds for key marking, effectively predicting potential high-risk points and providing a scientific basis for preventive maintenance; these measures have jointly improved the intelligence level of power grid operation and maintenance, reduced operation and maintenance costs, and enhanced the safety and stability of the power grid.
[0049] The third implementation mode is mainly different from the second implementation mode in that: the working steps of the maintenance frequency calculation module include: weight allocation: assigning weights W to the failure rate and the failure frequency according to expert experience r and W f , satisfying W r +W f =1; Maintenance frequency calculation: The maintenance frequency M of the fault-prone points is calculated using the weighted sum method i , the calculation formula is: M i =W r R i +W f F i .
[0050] Assume there are three vulnerable points (i=1,2,3) for calculation: Failure rate (R i ): R1=0.05 (i.e. 5% failure rate); R2=0.03 (i.e. 3% failure rate); R3=0.02 (i.e. 2% failure rate); Fault frequency (Fi ): F1=10 (i.e. 10 failures per unit time); F2=5 (i.e. 5 failures per unit time); F3=2 (i.e. 2 faults occur per unit time).
[0051] Weight distribution (W r and W f ): Assuming that expert experience believes that the failure rate is slightly more important than the failure frequency, we can assign W r =0.6 and W f = 0.4, satisfying W r +W f =1; use the weighted sum method to calculate the maintenance frequency M of each fault-prone point i : For M1: M1=W r R1+W f F1=0.6×0.05+0.4×1=0.03+4=4.03; For M2: M2=W r R2+W f F2=0.6×0.03+0.4×5=0.018+2=2.018; For M3: M3=W r R3+W f F3=0.6×0.02+0.4×2=0.012+0.8=0.812.
[0052] Summary: Through the above calculations, the maintenance frequencies of the three fault-prone points are obtained: M1=4.03, M2=2.018, M3=0.812; the maintenance frequencies of the fault-prone points are calculated by the maintenance frequency calculation module, and the remaining fault points are regularly maintained according to the original maintenance frequencies.
[0053] In the maintenance plan generation module, plan matching includes: searching for matching maintenance plans from the expert database based on the results of the fault analysis module, and evaluating the matching degree through a similarity algorithm (such as cosine similarity).
[0054] By introducing the maintenance frequency calculation module and the maintenance plan generation module, the power grid operation and maintenance management is further refined; the weight allocation mechanism makes maintenance decisions more scientific and reasonable, and determines the maintenance priority based on the comprehensive evaluation of failure rate and frequency; the maintenance plan generation module uses the expert library and similarity algorithm to quickly match and provide targeted maintenance plans, thereby improving maintenance efficiency and accuracy; these improvements reduce unnecessary maintenance costs and enhance the stability and reliability of the power grid system.
[0055] The fourth implementation mode is mainly different from the second implementation mode in that the working steps of the maintenance plan optimization module include: historical record statistics: statistics of the number and type of historical failures of each fault point; multi-plan evaluation: propose multiple solutions for each fault point and calculate their feasibility F easj , considering the cost P j , Maintenance time T j and maintenance impact I j , then F easj The calculation formula is: .
[0056] Where α, β, and γ are the cost P j , Maintenance time T j and maintenance impact I j Weight coefficient; Select the best solution: Select F easj The biggest plan is implemented.
[0057] Assume there is a fault point, and three solutions are proposed for this fault point (Solution 1, Solution 2, Solution 3). The cost of each solution is P j , Maintenance time T j and maintenance impact I j As shown in Table 1: Table 1. List of costs, repair time and repair impact of three solutions
[0058] Assume the weight coefficients are as follows: Cost weight α = 0.3; Maintenance time weight β = 0.4; Maintenance impact weight γ = 0.3; Then the F of the three schemes easj The calculation formula is: ; ; .
[0059] After comparative analysis, Solution 2 has the highest feasibility and should be selected as the optimal solution for implementation.
[0060] The maintenance plan optimization module can accurately grasp the distribution and type of equipment failures through detailed historical records and statistics, providing a solid data basis for subsequent decision-making; its multi-plan evaluation mechanism comprehensively considers cost, time and maintenance impact, and uses weight coefficients to flexibly adjust the importance of each factor to ensure that the evaluation is comprehensive and close to actual needs; finally, by selecting F easj The implementation of the largest solution has achieved the optimal allocation and utilization of resources, effectively reduced maintenance costs, shortened maintenance cycles, and reduced the adverse effects of maintenance activities on production operations, significantly improving overall maintenance efficiency and equipment reliability.
[0061] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0062] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0063] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A single-station power grid fault diagnosis system based on a power grid monitoring system, characterized by: include: Expert database, which is used to record historical data of power grid faults within the station and update it in real time after each fault occurs; The power grid monitoring system is used to monitor power grid data and establish a three-dimensional model of the power grid in the power station; The fault analysis module is used to analyze the power grid data obtained by the power grid monitoring unit in combination with the data stored in the expert database to determine whether a fault has occurred; The fault warning module issues a warning when a fault occurs in the fault analysis module, and displays the analyzed fault cause. If there are multiple causes, the probability is calculated and sorted; The fault risk prediction unit calculates the failure rate and frequency of each fault point and sorts them, sets thresholds for each point, marks points exceeding the threshold as prone to failure, and marks them with colors in the three-dimensional model of the power grid; The maintenance frequency calculation module assigns weights to the failure rate and failure frequency according to expert experience, calculates the maintenance frequency of the failure-prone points, and performs regular maintenance on other failure points according to the original frequency; The maintenance plan generation module analyzes the type of fault by combining the fault analysis module with the expert database data, and proposes a matching maintenance plan for the maintenance personnel to refer to; The maintenance plan optimization module summarizes the historical fault records of each fault point, determines multiple solutions and calculates the feasibility of each solution, and comprehensively repairs and adjusts the fault point according to the most feasible solution.
2. The single-station power grid fault diagnosis system based on the power grid monitoring system according to claim 1 is characterized in that: The establishment of the expert database specifically includes: Data structure: The expert database contains fault type Ty, fault cause Ca, and maintenance plan So. E is the record set in the expert database, and the Kth record is represented by E k ={Ty k , Ca k ,So k }; Record update: After each maintenance, the record of the corresponding fault type is updated according to the maintenance report, including the newly added fault cause and optimized maintenance plan.
3. The single-station power grid fault diagnosis system based on the power grid monitoring system according to claim 1 is characterized in that: The working steps of the power grid monitoring unit specifically include: Data collection: real-time collection of key data of the power grid, including voltage, current, and power; Establish a three-dimensional model: Use GIS or BIM technology to establish a three-dimensional model of the power grid in the power station.
4. The single-station power grid fault diagnosis system based on the power grid monitoring system according to claim 2 is characterized in that: The analysis method of the fault analysis module is: using a machine learning algorithm or a rule engine, combined with the knowledge in the expert database to perform real-time analysis on the power grid data: Assume D is the power grid data set, then the fault analysis is expressed as F(D,E)→{0,1}, where 1 indicates the presence of a fault, 0 indicates no fault, and F() represents the fault judgment logic function.
5. The single-station power grid fault diagnosis system based on the power grid monitoring system according to claim 4 is characterized in that: The working steps of the fault warning module include: Early warning mechanism: When the fault analysis module determines that a fault has occurred, an early warning is triggered and the most likely cause of the fault is displayed; Probability ranking: If there are multiple causes, use the Bayesian formula or conditional probability to calculate the probability of each cause and rank them; Let C i is the i-th fault cause, P(C i |D) is C under given data D i The conditional probability of , then: ; Among them, P(C i ) is the reason C i The prior probability of i Probability of occurrence; P(D|C i ) indicates that in reason C i The probability of observing data D when ∑ j P(D|C j )P(C j ) is for all possible causes C j The weighted sum of is used to normalize the posterior probability to ensure that the sum of the posterior probabilities of all possible causes is 1.
6. The single-station power grid fault diagnosis system based on the power grid monitoring system according to claim 4 is characterized in that: The working steps of the fault risk prediction unit include: Failure rate calculation: Count the number of failures N at each line fault point i And the total number of failures N, calculate the failure rate R i : ; Introduction of time concept: Calculation of fault frequency F i , that is, the number of failures per unit time t: ; Threshold setting: Set the threshold Tf of the failure rate Tr and frequency based on historical data and expert experience; 3D model marking: Compare each fault rate and fault frequency with the corresponding threshold, mark the line fault points that exceed the threshold as prone to fault points, and mark them with colors in the 3D model. Different colors are used to mark the prone to fault points according to the fault rate and fault frequency.
7. The single-station power grid fault diagnosis system based on the power grid monitoring system according to claim 6 is characterized in that: The working steps of the maintenance frequency calculation module include: Weight assignment: Assign weights W to the failure rate and failure frequency based on expert experience r and W f , satisfying W r +W f =1; Maintenance frequency calculation: The maintenance frequency M of the fault-prone points is calculated using the weighted sum method. i , the calculation formula is: M i =W r R i +W f F i 。 8. The single-station power grid fault diagnosis system based on the power grid monitoring system according to claim 7 is characterized in that: The maintenance frequency of the prone-to-failure points is calculated by the maintenance frequency calculation module, and the remaining fault points are regularly maintained according to the original maintenance frequency.
9. The single-station power grid fault diagnosis system based on the power grid monitoring system according to claim 1, characterized in that: In the maintenance plan generation module, plan matching includes: searching for matching maintenance plans from an expert database according to the results of the fault analysis module, and evaluating the matching degree through a similarity algorithm.
10. The single-station power grid fault diagnosis system based on the power grid monitoring system according to claim 1, characterized in that: The working steps of the maintenance scheme optimization module include: Historical record statistics: Statistics on the number and type of historical faults at each fault point; Multi-solution evaluation: Propose multiple solutions for each fault point and calculate their feasibility F easj , considering the cost P j , Maintenance time T j and maintenance impact I j , then F easj The calculation formula is: ; Where α, β, and γ are the cost P j , Maintenance time T j and maintenance impact I j The weight coefficient of Choose the best solution: Choose F easj The biggest plan is implemented.
Citation Information
Patent Citations
Single-station power grid fault diagnosis and auxiliary decision-making method based on power grid monitoring system
CN105158647B
Single station end fault diagnosis and auxiliary decisionmaking method based on power supply monitoring system
CN105158647A
Fault diagnosis method, device, equipment and program product
CN115328689A
Vertical water pump unit vibration monitoring device and method thereof
CN115614292A
Wind power plant remote monitoring and intelligent fault diagnosis system
CN117559651A
Cited By
Electromechanical equipment fault prediction method and system fused with hybrid expert model, and intelligent operation and maintenance gateway
CN119272097A
Mechanical and electrical equipment fault prediction method, system and intelligent operation and maintenance gateway based on hybrid expert model
CN119272097B
Micro-grid intelligent regulation and control method
CN119362723A
Gas meter production line monitoring system based on data intelligent analysis
CN119376313A
Industrial maintenance operation management system and method based on artificial intelligence
CN120746545A