Operation management system and operation management method

By monitoring and redistributing services in the electric vehicle operation management system, and using simulators to optimize paths and charging plans, the problems of battery performance degradation and life cycle costs are solved, and battery life extension and cost reduction are achieved.

CN118742932APending Publication Date: 2024-10-01HITACHI LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380020090.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-03-17
Filing Date
2023-02-16
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the operation management of electric vehicles, existing technology fails to effectively consider unexpected conditions, resulting in battery performance degradation and frequent replacement, which increases life cycle costs.

Method used

An operation management system is designed that monitors vehicle operation status through the operation plan monitoring department to determine whether the plan can be completed. If it cannot be completed, the remaining business will be reallocated to other vehicles, and the battery simulator and traffic simulator are used to optimize the route and charging plan. Extend battery life.

Benefits of technology

It effectively reduces the life cycle costs caused by battery performance degradation, extends battery life, and reduces battery replacement frequency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118742932A_ABST
    Figure CN118742932A_ABST
Patent Text Reader

Abstract

In order to reduce the life cycle costs of EVs caused by degradation of battery performance, an operation management system (1) manages the operation of a plurality of EVs (3) using batteries as power sources, and is provided with: an operation planning unit (11) that creates an operation plan for performing a service in which each EV (3) travels around a location; and an operation plan monitoring unit (12) that monitors the operation of each EV (3) on the basis of the operation plan, the operation plan monitoring unit (12) determines whether each EV (3) can complete the operation plan on the basis of the operation state of each EV (3), and the operation planning unit (11) recreates the operation plan on the basis of the remaining battery capacity of each EV (3). Among the services of the EVs (3) determined to be unable to complete the operation plan by the operation plan monitoring unit (12), the remaining services for which the EVs (3) travel to the non-travel locations are allocated to the other EVs (3).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an operation management system and an operation management method. Background Art

[0002] In the operation management of electric vehicles (hereinafter referred to as "EV"), it is required to satisfy the requirements of users while satisfying the constraints of battery charging time and driving distance based on battery capacity.

[0003] Here, the battery accounts for a large proportion of the vehicle cost of an EV, and in the case of a large vehicle such as a truck, since a large-capacity battery is used, the battery cost is particularly high.

[0004] Furthermore, when EVs are used for a long time, the performance degradation of the battery becomes a problem. Generally speaking, for EVs, the performance degradation of the battery is more significant than that of the vehicle body, and the battery life is shorter than the vehicle life, so the battery is replaced during the use of the EV. If the battery is replaced frequently, the cost of battery replacement increases, and the life cycle cost of the EV increases, which is disadvantageous to the user.

[0005] Therefore, a technique has been proposed for suppressing EV performance degradation, particularly battery performance degradation, by taking EV energy consumption and EV performance degradation into consideration when creating an EV operation plan (see, for example, Patent Document 1).

[0006] Prior art literature

[0007] Patent Literature

[0008] Patent Document 1: Japanese Patent Application Publication No. 2021-2216 Summary of the invention

[0009] Technical problem to be solved by the invention

[0010] However, in the above-mentioned prior art, the operation plan is not made in consideration of unexpected conditions that may occur during the actual operation of the EV. Due to the occurrence of unexpected conditions, the power consumption of the EV increases and power shortage occurs, which sometimes hinders the completion of the EV's operation plan. It is also necessary to consider fast charging of the battery in the event of power shortage to complete the operation plan. However, if the battery performance deteriorates due to fast charging and the battery is frequently replaced, the cost of battery replacement increases, and the life cycle cost of the EV still increases, which is disadvantageous to the user.

[0011] The present invention has been made in view of the above circumstances, and an object of the present invention is to provide an operation management system and an operation management method for reducing the life cycle cost of EVs caused by performance degradation of batteries.

[0012] Means for solving technical problems

[0013] In order to solve the above-mentioned technical problem, in one embodiment of the present invention, an operation management system manages the operation of multiple vehicles powered by batteries, and is characterized in that it has: an operation planning unit, which prepares an operation plan for the business of each vehicle to patrol locations; and an operation plan monitoring unit, which monitors the operation of each vehicle based on the operation plan, the operation plan monitoring unit determines whether each vehicle can complete the operation plan based on the operation status of each vehicle, and the operation planning unit again prepares the operation plan to allocate the remaining business to other vehicles based on the remaining battery power of each vehicle, and the remaining business is the business of patrolling the locations that have not been patrolled by the vehicle among the business of the vehicle that is determined by the operation plan monitoring unit as unable to complete the operation plan.

[0014] Effects of the Invention

[0015] According to the present invention, the life cycle cost of an EV caused by performance degradation of a battery can be reduced.

[0016] Technical problems, structures, and effects other than those described above will become clear from the following description of the embodiments for carrying out the invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a block diagram showing a configuration example of the operation management system 1 according to the first embodiment.

[0018] Figure 2 It is a diagram showing a configuration example of a route planning DB.

[0019] Figure 3 It is a diagram showing a configuration example of a charging plan DB.

[0020] Figure 4 It is a diagram showing a configuration example of an operation plan DB.

[0021] Figure 5 This is a flowchart showing an example of re-planning processing according to the first embodiment (part 1).

[0022] Figure 6 This is a flowchart showing an example of re-planning processing according to the first embodiment (part 2).

[0023] Figure 7 This is a diagram showing an example of the operation plan data to be subjected to the re-planning process according to the first embodiment.

[0024] Figure 8 This is a diagram showing an example of selection of a delivery vehicle for the remaining business in the re-planning process according to the first embodiment.

[0025] Fig. 9 This is a flowchart showing an example of re-planning processing according to the second embodiment (part 1).

[0026] Fig.10 This is a flowchart showing an example of re-planning processing according to the second embodiment (part 2).

[0027] Fig.11 This is a diagram showing an example of operation plan data that is a target of re-planning processing according to the second embodiment.

[0028] Fig.12 This is a diagram showing an example of selection of a delivery vehicle as a remaining job in the replanning process according to the second embodiment.

[0029] Fig.13 This is a diagram showing an example of the hardware configuration of a computer that realizes the operation management system. DETAILED DESCRIPTION

[0030] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. The embodiments are examples for illustrating the present invention, and are appropriately omitted and simplified for clarity of description. The present invention can also be implemented in various other ways. Unless otherwise specified, each constituent element can be either singular or plural.

[0031] When there are a plurality of components that are the same or have the same function, different subscripts may be added to the same reference numerals for description. In addition, when there is no need to distinguish between these multiple components, the subscripts may be omitted for description.

[0032] In the implementation mode, there is a case where the processing performed by executing a program is described. Here, the computer executes the program through a processor (such as a CPU (Central Processing Unit, central processing unit), a GPU (Graphics Processing Unit, graphics processing unit)), and uses storage resources (such as memory), interface devices (such as communication ports), etc. to perform the processing determined by the program. Therefore, the subject of the processing performed by executing the program can also be set to a processor. Similarly, the subject of the processing performed by executing the program can also be a controller, a device, a system, a computer, or a node with a processor. The subject of the processing performed by executing the program can be a computing unit, and can also include a dedicated circuit for performing specific processing. Here, the dedicated circuit is, for example, an FPGA (Field Programmable Gate Array), an ASIC (Application Specific Integrated Circuit: an integrated circuit for a specific purpose), a CPLD (Complex Programmable Logic Device: a complex programmable logic device), a quantum computer, etc.

[0033] The program may also be installed to a computer from a program source. The program source may also be, for example, a program distribution server or a computer-readable storage medium. In the case where the program source is a program distribution server, the program distribution server includes a processor and a storage resource for storing the program to be distributed, and the processor of the program distribution server may also distribute the program to be distributed to other computers. In addition, in the implementation mode, two or more programs may also be implemented as one program, or one program may also be implemented as two or more programs.

[0034] In the following description, "XXXDB" refers to a database storing "XXX" as information (or data), but may also refer to "XXX" itself stored in "XXXDB". DB (Data Base) is an example of a storage unit.

[0035] In the following embodiments, it is assumed that a corresponding operation plan is created on the day before the operation day, which vehicle is to be operated on which route and in which schedule (predetermined schedule) and which vehicle is to be charged. The operation plan can be created using the known technology disclosed in Patent Document 1 and the like.

[0036] Furthermore, in the technology disclosed in the present application, when an unexpected situation occurs while a vehicle is operating according to a pre-made operation plan and the corresponding vehicle cannot complete the remaining operation business (remaining business), the remaining business is handed over to another operating vehicle. When deciding on another vehicle to take over the remaining business, a vehicle that has a battery remaining amount sufficient to take over and complete the remaining business after completing its own operation business is selected.

[0037] [Implementation Method 1]

[0038] In this embodiment, the following example is described: when an "unexpected situation" that could not be expected at the time of planning occurs during the operation of a vehicle (hereinafter referred to as an "EV" (Electric Vehicle)) that uses a battery charged the day before as a power source, the remaining business of the EV is handed over to another EV in operation. In addition, in this embodiment, if the remaining business cannot be taken over by one EV, if the remaining business can be divided into multiple ones, an example of handing over the divided multiple remaining businesses to two or more other EVs in operation is also included.

[0039] Here, "unexpected conditions" include corresponding EV failures, accidents (inability to continue business), accident congestion, traffic bans (caused by weather, accidents, etc.), changes in operation plans (cancellation or addition), driver changes (physical discomfort, sudden early departure), etc. Specifically, if the EV is a logistics vehicle, unmanned redistribution and emergency collection accepted on the same day can be listed. In addition, if the EV is a taxi, long-distance transportation beyond normal circumstances can be listed. In addition, if the EV is a police patrol car, emergency dispatches other than patrols can be listed. "Unexpected conditions" are any conditions that make the initial operation plan impossible to complete, and are not limited to the above.

[0040] There are cases where the EV's power consumption is higher than expected due to the occurrence of "unexpected conditions" that were difficult to predict at the time of planning, resulting in power shortages and hindering business operations. In addition, although the business can be continued by using fast charging, the performance of the battery deteriorates earlier due to fast charging, and the life cycle cost of the EV increases. This embodiment can execute the business without causing battery performance degradation in the event of "unexpected conditions".

[0041] (Configuration of Operation Management System 1)

[0042] Figure 1This is a block diagram showing an example of the configuration of the operation management system 1 of Implementation Example 1. An operation manager terminal 2 such as a console equipped with a display, and one or more combinations of multiple EV 3 and chargers 4 are connected to the operation management system 1. The combination of multiple EV 3 and chargers 4 exists at each EV vehicle / charging station (hereinafter referred to as "station") such as a garage and a business office. The operation manager terminal 2 outputs output information from the operation management system 1 from a screen, etc. The EV 3 is connected to the operation management system 1 in a manner that enables wireless communication, operates according to the operation plan of each EV 3 output from the operation management system 1, and sends the current battery remaining amount and current position to the operation management system 1. The charger 4 receives power from the power system in accordance with the charging instruction from the operation management system 1 and charges the EV 3.

[0043] The operation management system 1 includes an operation planning unit 11 , an operation plan monitoring unit 12 , a map DB 1 a , a traffic simulator 13 , an electricity rate simulator 14 , a battery simulator 15 , an electric power system simulator 16 , and a vehicle management unit 17 .

[0044] The map DB 1a stores map information including, for example, the “distance” between target points connected by roads. The traffic simulator 13 simulates, for example, the “traffic conditions” of the roads connecting the target points for each time period. The electricity rate simulator 14 simulates, for example, the “necessary amount of electricity” consumed by the EV 3 when the EV 3 is driven on the roads connecting the target points under the simulated traffic conditions. The “necessary amount of electricity” is calculated based on the speed, movement path, and map information of the EV 3. The battery simulator 15 simulates, for example, the “battery remaining amount”, “life prediction”, “deterioration prediction”, etc. of the battery mounted on the EV 3 when the EV 3 is driven on the roads connecting the target points. The power system simulator 16 simulates, for example, the power that can be supplied to the EV 3 by the power system for each time period, the power price, the regenerative energy supply time period, etc. The vehicle management unit 17 has a vehicle information DB 17a that manages the “vehicle type” and “battery type”, etc. for each EV 3 identified by the “vehicle ID”. When creating the route plan DB 112a, the charging plan DB 113a, and the operation plan DB 111a described later, and when recreating the operation plan DB 111a, the "vehicle type" and the "battery type" are considered in order to reduce battery degradation and further extend the life.

[0045] Furthermore, part or all of the map DB 1 a , the traffic simulator 13 , the electricity rate simulator 14 , the battery simulator 15 , the power system simulator 16 , and the vehicle management unit 17 may be devices external to the operation management system 1 .

[0046] The operation planning unit 11 includes a comprehensive planning unit 111 , a route planning unit 112 , a charging planning unit 113 , an operation plan DB 111 a , a route plan DB 112 a , and a charging plan DB 113 a .

[0047] The route planning unit 112 creates a route planning DB 112a that collects a plurality of locations into one route of an operation plan to reduce the degradation of the battery of the EV 3 and extend its life. The route planning DB 112a is created based on "delivery instructions" and "cargo specifications" from a customer business system (not shown), "distance" based on the map DB 1a, "traffic conditions" based on the traffic simulator 13, "necessary power" and "battery remaining level" based on the battery simulator 15, and the like.

[0048] (Configuration of Route Planning DB 112a)

[0049] Figure 2 1 is a diagram showing an example of the configuration of the route plan DB 112a. The route plan DB 112a includes columns such as "route plan ID", "location ID", "location latitude and longitude", "residence", "goods ID", "planned remaining distance", "necessary power to the next location", and "planned battery remaining amount".

[0050] "Location ID", "Location Latitude and Longitude", and "Residence" are information related to the location identified by the "Location ID". "Cargo ID" is the identification information of the cargo collected or delivered at the location identified by the "Location ID", and is arranged in the patrol order of EV 3. In the route plan, the starting point and end point of the route in a route plan identified by the same "Route Plan ID" are sometimes the same (EV 3 returns to the station where it started), and sometimes different (EV 3 returns to a station different from the station where it started). When the operation management object is a delivery vehicle, the "Residence" and "Cargo ID" columns become auxiliary information for identifying the location and the patrol purpose of the location, but can be omitted.

[0051] The “predetermined remaining distance” indicates the distance from the location identified by the corresponding “location ID” to the end point in the route plan identified by the “route plan ID”. The “power required to the next location” is the amount of power required for the EV 3 to move from the location identified by the corresponding “location ID” to the next location in the route plan identified by the “route plan ID”. The “planned battery remaining amount” is the minimum battery remaining amount that the corresponding EV 3 should maintain when arriving at the location identified by the corresponding “location ID” in order to complete the route plan identified by the “route plan ID”. The “power required to the next location” and the “planned battery remaining amount” can also be displayed as either a percentage relative to the total capacity of the battery or the actual amount of power.

[0052] The charging plan unit 113 creates a charging plan DB 113a for reducing degradation of the battery of the EV 3 and extending its life based on the “vehicle type” and “battery type” of each EV 3 managed by the vehicle information DB 17a, and the “charger ID” identifying the charger 4 at the station and its charging performance.

[0053] (Configuration of Charging Plan DB 113a)

[0054] Figure 3 The diagram shows an example of the configuration of the charging plan DB 113a. The charging plan DB 113a includes columns such as "charging plan ID", "charger ID", "charging method (normal or fast)", "charging start time", "battery remaining at charging start", "charging end time", and "battery remaining at charging end".

[0055] "Charging plan ID" is information for identifying a charging plan. "Charger ID" is identification information of a charger used in the charging plan identified by the "charging plan ID". "Charging method (normal or fast)" indicates whether the charging speed in the charging plan identified by the "charging plan ID" is normal charging or fast charging. "Charging start time" is the start date and time of charging based on the charging plan identified by the "charging plan ID". "Battery remaining at the start of charging" is the battery remaining at the start of charging of the battery of the charging object based on the charging plan identified by the "charging plan ID". "Charging end time" is the end date and time of charging based on the charging plan identified by the "charging plan ID". "Battery remaining at the end of charging" is the battery remaining at the end of charging of the battery of the charging object based on the charging plan identified by the "charging plan ID". "Battery remaining at the start of charging" and "Battery remaining at the end of charging" can also be expressed by either a percentage relative to the total capacity of the battery or the actual power amount.

[0056] The comprehensive planning unit 111 determines the route plan DB 112a and the charging plan DB 113a assigned to each EV 3 based on the "delivery instruction" from the customer business system (not shown) and creates the operation plan DB 111a. The comprehensive planning unit 111 outputs the operation plan DB 111a, the route plan DB 112a, and the charging plan DB 113a from the operation manager terminal 2.

[0057] (Configuration of Operation Plan DB 111a)

[0058] Figure 4 1 is a diagram showing a configuration example of the operation plan DB 111a. The operation plan DB 111a has columns of "operation plan ID", "operation plan start date and time", "operation plan end date and time", "vehicle ID", "route plan ID", and "charging plan ID".

[0059] “Operation plan ID” is information for identifying an operation plan. “Operation plan start date and time” is the start date and time of the operation plan identified by the “Operation plan ID”. “Operation plan end date and time” is the end date and time of the operation plan identified by the “Operation plan ID”. “Vehicle ID”, “Route plan ID”, and “Charging plan ID” are IDs of the EV 3, route plan, and charging plan that are associated with the operation plan of the “Operation plan start date and time” and the “Operation plan end date and time” identified by the “Operation plan ID”.

[0060] The operation plan monitoring unit 12 includes a vehicle state acquisition unit 121 and an operation plan completion determination unit 122. The vehicle state acquisition unit 121 repeatedly receives operation statuses such as the remaining battery level and the current position from each EV 3 in the operation business at a certain period according to the operation plan. In addition, the vehicle state acquisition unit 121 sometimes also receives a re-planning request for the operation plan sent from the EV 3 based on the judgment of the driver (vehicle operator) of each EV 3. For example, when the driver is unable to execute the subsequent operation plan due to physical discomfort, the driver can send a re-planning request from the EV 3 according to his own will.

[0061] The operation plan completion determination unit 122 determines whether the corresponding EV 3 can complete the operation plan based on the latest remaining battery level and the current position each time it receives the latest remaining battery level and the current position from each EV 3. If it is determined that the corresponding EV 3 cannot complete the operation plan based on the latest remaining battery level and the current position, the operation plan completion determination unit 122 sends a re-planning request for the operation plan and the latest remaining battery level and the current position to the comprehensive planning unit 111.

[0062] In addition, if the operation plan completion determination unit 122 receives the latest battery remaining level and current position, and a re-planning request for the operation plan from EV 3, it determines that the corresponding EV 3 cannot complete the operation plan, and sends the re-planning request, the latest battery remaining level and current position to the comprehensive planning unit 111.

[0063] If the comprehensive planning unit 111 receives the re-planning request for the operation plan, the latest remaining battery level, and the current position, the re-planning process of the operation plan is performed as described below. The comprehensive planning unit 111 outputs the result of the re-planning process of the operation plan from the operation manager terminal 2, and sends the re-planned operation plan to the corresponding EV 3 so that it operates according to the new operation plan.

[0064] (Replanning Processing in Implementation Method 1)

[0065] Figure 5 as well as Figure 6 1 is a flowchart showing an example of the re-planning process according to Embodiment 1. The re-planning process is executed when the EV 3 operating according to the operation plan DB 111a prepared on the previous day of operation needs to re-plan the operation plan due to the occurrence of an "unexpected situation".

[0066] First, in step S11, the comprehensive planning unit 111 determines whether a re-planning request for the operation plan of the EV 3 (hereinafter referred to as the "re-planned vehicle") determined to be unable to complete the operation plan is received from the operation plan completion determination unit 122. If the comprehensive planning unit 111 receives the re-planning request (step S11 Yes), the processing moves to step S12, and if the re-planning request is not received (step S11 No), step S11 is repeated.

[0067] In step S12 , the comprehensive planning unit 111 checks the progress of the operation plan based on the remaining battery level and the current position of the replanned vehicle received together with the replanning request in step S11 , by simulation based on the remaining battery level and the current position of the replanned vehicle.

[0068] Then, in step S13, the comprehensive planning unit 111 determines the business (patrol locations) that cannot be completed with the remaining battery power of the replanned vehicle as remaining business based on the progress of the operation plan confirmed in step S13, by simulation based on the remaining battery power of the replanned vehicle and the current position. The remaining battery power at this time is set to the remaining power after excluding the remaining battery power used to move the replanned vehicle to the departure station or the nearest station. In addition, in the case where the replan request received by the comprehensive planning unit 111 in step S11 is based on a replan request sent from the driver of the replanned vehicle, in step S13, all unfinished business (unpatrol locations) are determined as remaining business regardless of the remaining battery power of the replanned vehicle.

[0069] In steps S12 and S13, by using simulations of simulators such as the traffic simulator 13 and the electricity rate simulator 14, the progress of the operation plan is confirmed and the remaining business is determined, thereby accurately determining the remaining business. That is, when the current battery remaining amount of EV 3 is lower than the planned battery remaining amount stored in the operation plan DB 111a, sometimes even if it is not possible to patrol all the places after the current position of EV 3, it is possible to patrol some places and return to the station. According to the simulation, not all the business of patrolling the places after the current position of EV 3 is regarded as remaining business, but the amount of remaining business handed over to other EV 3 is reduced by patrolling the remaining places as much as possible and the necessary power in this case, thereby improving the utilization efficiency of the battery of EV 3.

[0070] Alternatively, the progress confirmation of the operation plan in step S12 and the determination of the remaining business in step S13 may use the following simple calculation: the planned battery remaining amount stored in the operation plan DB 111a is compared with the current position and battery remaining amount of the EV 3, and all locations below the planned battery remaining amount are considered as remaining business.

[0071] Next, in step S14, the comprehensive planning unit 111 calculates the amount of power required to complete the remaining business determined in step S13. Next, in step S15, the comprehensive planning unit 111 attempts to extract an EV 3 (one) from other EVs 3 currently in operation that has a current actual remaining battery capacity that can take over the remaining business of the replanned vehicle in addition to being able to complete its own business.

[0072] Next, in step S16, the comprehensive planning unit 111 determines whether the EV 3 (one) that can take over the remaining business of the re-planned vehicle can be extracted in step S15. If the comprehensive planning unit 111 can extract the EV 3 (one) that can take over the remaining business of the re-planned vehicle (step S16 Yes), the processing moves to step S17; if it cannot be extracted (step S16 No), the processing moves to step S19 ( Figure 6 ).

[0073] In step S17, the comprehensive planning unit 111 determines an EV 3 extracted in step S16 that can take over the remaining business of the replanned vehicle as the handover vehicle. Then in step S18, the comprehensive planning unit 111 implements replanning of the routes of the replanned vehicle and the handover vehicle. Specifically, the comprehensive planning unit 111 re-creates an operation plan for the replanned vehicle to move to the departure station or the nearest station via the handover location. In addition, the comprehensive planning unit 111 re-creates an operation plan for the handover vehicle to complete the remaining business of the handover vehicle and the handover business via the handover location in a manner that reduces the degradation of the battery of the EV 3 and prolongs its life. If step S18 is completed, the comprehensive planning unit 111 returns the process to step S11.

[0074] In addition, there are three modes for the handover point of the business, for example. The first is a mode in which the handover vehicle moves to the current position of the replanned vehicle. In steps S15 and S18, the necessary amount of electricity for the handover vehicle to move needs to be considered. The second is a mode in which both the handover vehicle and the replanned vehicle move to the same station. In steps S15 and S18, the necessary amount of electricity for each to move to the station needs to be considered. The third is a mode in which both the handover vehicle and the replanned vehicle move to an arbitrary location (intermediate location, etc.). In steps S15 and S18, the necessary amount of electricity for each to move to an arbitrary location needs to be considered.

[0075] Next, in step S19, the comprehensive planning unit 111 determines whether the remaining business determined in step S13 can be divided in a manner that can be completed by multiple EVs 3. Being divisible means that the remaining business includes multiple businesses (tour locations). If the remaining business can be divided (step S19 is yes), the comprehensive planning unit 111 moves the processing to step S20, and if the remaining business cannot be divided (step S19 is no), the processing moves to step S24.

[0076] In step S20, the comprehensive planning unit 111 attempts to extract EV 3 (or more) from other EVs 3 currently in operation that have a planned battery remaining amount that can take over the remaining tasks after the division in addition to being able to complete their own tasks, including a mobile location.

[0077] Next, in step S21, the comprehensive planning unit 111 determines whether the EV 3 (plurality) that can take over the remaining business after the replanned vehicle is divided can be extracted in step S20. If the EV 3 (plurality) that can take over the remaining business after the replanned vehicle is divided can be extracted (step S21 Yes), the comprehensive planning unit 111 moves the process to step S22, and if it cannot be extracted (step S21 No), the process moves to step S24.

[0078] In step S22, the comprehensive planning unit 111 calculates the necessary amount of electricity consumed by each EV 3 when taking over each remaining business after the division. The handover location when each EV 3 takes over each remaining business after the division is the same as the above-mentioned handover location. The necessary amount of electricity consumed by each EV 3 in the movement of the remaining business is the amount of electricity required for each EV 3 to move to the handover location of the business and goods, etc.

[0079] Next, in step S23, the comprehensive planning unit 111 determines whether the current actual battery remaining amount of each EV 3 is sufficient as a remaining amount to include the required power amount of each EV 3 calculated in step S22. That is, the comprehensive planning unit 111 determines whether the current actual battery remaining amount of each EV 3 can complete its own remaining business and is sufficient for moving to the delivery location of business and goods. If the current actual battery remaining amount of each EV 3 is sufficient (step S23 is yes), the comprehensive planning unit 111 returns the processing to step S17 ( Figure 5 ), if it is insufficient (step S23 No), the process returns to step S20.

[0080] In step S20 to which the process returns, the comprehensive planning unit 111 attempts to extract other EVs 3 having a planned remaining battery level capable of taking over each of the divided remaining tasks by using another division pattern as the divisible remaining tasks in step S19 .

[0081] In step S24, since the integrated planning unit 111 cannot determine the vehicle to be handed over, the route replanning is performed only for the replanned vehicle, so that the replanned vehicle returns to the station at the time of departure or the nearest station. The replanned vehicle that returns to the station in step S24 is re-made (or revised) the operation plan to charge the battery, change the driver, or restart the business and perform the remaining business.

[0082] Furthermore, the operation planning unit 11 may allocate part of the remaining tasks to be performed by other EVs 3 based on the remaining battery power of each EV 3, and re-create the operation plan so that the remaining tasks other than the part are performed by the EV 3 itself determined to be unable to complete the operation plan.

[0083] (Specific example of implementation mode 1)

[0084] Next, a specific example of the operation plan data to be the target of the replanning process in the present embodiment and the selection of the delivery vehicle for the remaining traffic will be described. Figure 7 This is a diagram showing an example of the operation plan data to be the target of the re-planning process according to the first embodiment. Figure 8 This is a diagram showing an example of selection of a delivery vehicle for the remaining business in the re-planning process according to the first embodiment.

[0085] like Figure 7 As shown in FIG. 1 , it is assumed that there is an operation plan (operation plan ID = 1) in which a route plan with a route plan ID = 1 is assigned to vehicle ID = 1. When EV 3 with vehicle ID = 1 runs according to the operation plan and passes through the tour location with location ID = 14, the actual remaining battery capacity of EV 3 becomes 12 kWh. The operation plan completion determination unit 122 ( Figure 1 ) refers to the operation plan DB 111a and the route plan DB 112a, and confirms that the actual battery remaining amount is lower than the planned battery remaining amount of 13 kWh when the passing point ID = 14 in the route plan with route plan ID = 1. Since the corresponding EV 3 cannot complete the operation plan with the actual battery remaining amount of 12 kWh, the operation plan completion determination unit 122 sends a request to the comprehensive planning unit 111 ( Figure 1 )Request EV 3's path replanning.

[0086] like Figure 8 As shown, the comprehensive planning unit 111 determines the locations ID=15 and 16 as the remaining business of the vehicle ID=1, and calculates the required power (9+5)=14kWh. Furthermore, the comprehensive planning unit 111 extracts the vehicle ID=3 whose planned battery remaining power at the current tour location is 14kWh or more from among the other EVs 3 as a candidate for the handover vehicle. The comprehensive planning unit 111 obtains the actual battery remaining power of the EV 3 with the vehicle ID=3 through the operation plan monitoring unit 12, and determines whether the actual battery remaining power is sufficient for the handover of the remaining business of the EV 3 with the vehicle ID=1 in a manner that takes into account the necessary power for movement including that consumed by the handover. If the actual battery remaining power of the EV 3 with the vehicle ID=3 is sufficient for the handover of the remaining business of the EV 3 with the vehicle ID=1, the comprehensive planning unit 111 determines the EV 3 with the vehicle ID=3 as the handover vehicle for handing over the remaining business of the EV 3 with the vehicle ID=1.

[0087] [Implementation Method 2]

[0088] In the second embodiment, the same reference numerals are used for the configurations and processes that overlap with those in the first embodiment, and description thereof is omitted, and the description will focus on the differences from the first embodiment.

[0089] In this embodiment, an example is given in which the remaining business of multiple EVs that encounter an "unexpected situation" during operation is handed over by another EV in operation. In addition, in this embodiment, an example is also included in which, when the remaining business cannot be handed over by one or more EVs, the remaining business of multiple EVs is handed over by two or more other EVs in operation.

[0090] (Replanning Processing in Implementation Method 2)

[0091] Fig. 9 as well as Fig.10 1 is a flowchart showing an example of re-planning processing according to the second embodiment. Figure 5 as well as Figure 6 ) Repeated processing is marked with the same figure number and the description is omitted, and the description focuses on the differences from Implementation 1.

[0092] In step S11a, the integrated planning unit 111 collects the re-planning requests received in step S11 into one within a certain period of time.

[0093] Next, in step S12a, the integrated planning unit 111 checks the progress of the operation plans of all re-planned vehicles collected in step S11a based on the remaining battery power and the current position. Next, in step S13a, the integrated planning unit 111 determines the remaining tasks of all re-planned vehicles that cannot be completed within the remaining battery power. Next, in step S14a, the integrated planning unit 111 calculates the required power based on all the remaining tasks determined in step S13a.

[0094] Unlike the re-planning process of the first embodiment, in the re-planning process of the second embodiment, since the determined remaining business is a collection of the remaining business of a plurality of re-planned vehicles, it can be divided, and thus step S19 ( Figure 6 ) determines whether the remaining business can be divided. In the re-planning process of the second embodiment, if the answer is No in step S16, the process moves to step S20.

[0095] In the re-planning process of the second embodiment, the process proceeds to step S24 only when the determination in step S21 is NO.

[0096] By executing the replanning process of this embodiment, it is possible to realize m:1 handover in which the remaining business of multiple (m) EVs that have encountered "unexpected conditions" during operation is handed over by another EV in operation. In addition, by executing the replanning process of this embodiment, in the case where the remaining business cannot be handed over by one of the multiple EVs, it is possible to realize m:n handover in which the remaining business of multiple (m) EVs is handed over by two or more multiple (n) EVs in operation.

[0097] (Specific example of implementation mode 2)

[0098] Next, a specific example of the operation plan data to be the subject of the re-planning process and the selection of the delivery vehicle for the remaining work in the present embodiment will be described. Fig.11 This is a diagram showing an example of operation plan data that is the target of re-planning processing according to the second embodiment. Fig.12This is a diagram showing an example of selection of a delivery vehicle for the remaining business in the re-planning process according to the second embodiment.

[0099] like Fig.11 As shown, it is assumed that there is an operation plan (operation plan ID=1) to which a route plan with route plan ID=1 is assigned to vehicle ID=1, and an operation plan (operation plan ID=2) to which a route plan with route plan ID=2 is assigned to vehicle ID=2.

[0100] For EV 3 with vehicle ID = 1, Figure 7 When the EV 3 with vehicle ID=2 runs according to the running plan (running plan ID=2) and passes through the tour location with location ID=25, the actual remaining battery capacity of the EV 3 becomes 9 kWh. The running plan completion determination unit 122 ( Figure 1 ) refers to the operation plan DB 111a and the route plan DB 112a, and confirms that the actual battery remaining amount is lower than the planned battery remaining amount of 10 kWh at the point of passing through point ID = 25 in the route plan with route plan ID = 2. Since the corresponding EV 3 cannot complete the operation plan with the actual battery remaining amount of 9 kWh, the operation plan completion determination unit 122 sends a request to the comprehensive planning unit 111 ( Figure 1 )Request EV 3's path replanning.

[0101] When executing route replanning, if the replanning requests of the EVs 3 with vehicle IDs 1 and 2 approach within a predetermined time, the comprehensive planning unit 111 gathers the remaining jobs of these EVs 3 and determines a takeover vehicle.

[0102] like Fig.12 As shown, the comprehensive planning unit 111 determines location ID = 15 and 16 as the remaining business of vehicle ID = 1, and calculates the required power (9 + 5) = 14 kWh. In addition, the comprehensive planning unit 111 determines location ID = 26 as the remaining business of vehicle ID = 2, and calculates the required power 10 kWh. The comprehensive planning unit 111 determines (14 + 10) = 24 kWh as the required power required to complete the remaining business of all re-planned vehicles.

[0103] Furthermore, the comprehensive planning unit 111 extracts the vehicle ID=3 whose planned battery remaining capacity at the current tour location is 24 kWh or more among other EVs 3 as a candidate for the handover vehicle. The comprehensive planning unit 111 obtains the actual battery remaining capacity of the EV 3 with vehicle ID=3 through the operation plan monitoring unit 12, and determines whether the actual battery remaining capacity is sufficient for the handover of the remaining business of the EV 3 with vehicle ID=1 and 2 in a manner taking into account the necessary power for movement including the power consumed by the handover. If the actual battery remaining capacity of the EV 3 with vehicle ID=3 is sufficient for the handover of the remaining business of the EV 3 with vehicle ID=1 and 2, the comprehensive planning unit 111 determines the EV 3 with vehicle ID=3 as the handover vehicle to be handed over at the gathering place of the remaining business of the EV 3 with vehicle ID=1 and 2.

[0104] (Hardware of Computer 5000)

[0105] Fig.13 1 is a diagram showing a hardware configuration example of a computer 5000 for realizing the operation management system 1 .

[0106] The computer 5000 is a general-purpose computer including a processor 5100 , a memory 5200 , a storage 5300 , a network interface 5400 , an input device 5500 , and an output device 5600 , which are interconnected via an internal communication line 5700 such as a bus.

[0107] The processor 5100 manages the overall motion control of the computer 5000. In addition, the memory 5200 is composed of, for example, a volatile semiconductor memory and is used as a working memory of the processor 5100. The memory 5300 is composed of a large-capacity non-volatile storage device such as a hard disk device, an SSD (Solid State Drive) or a flash memory, and is used to store various programs and data. The executable program stored in the memory 5300 is loaded into the memory 5200 when the computer 5000 is started or when necessary. By executing the executable program loaded into the memory 5200 by the processor 5100, various functions of the operation management system 1 are realized.

[0108] Alternatively, the executable program may be recorded in a non-transitory recording medium, read from the non-transitory recording medium by a medium reading device, and loaded into the memory 5200. Alternatively, the executable program may be acquired from an external computer via a network and loaded into the memory 5200.

[0109] The network interface 5400 is an interface device for connecting the computer 5000 to a network. The network interface 5400 is constituted by, for example, a NIC (Network Interface Card) of a wired LAN (Local Area Network) or a wireless LAN.

[0110] The input device 5500 is composed of a keyboard, a mouse, or other pointing devices, and is used by the user to input various instructions and information to the computer 5000. The output device 5600 is, for example, a display device such as a liquid crystal display or an organic EL (Electro Luminescence) display, or is composed of a voice output device such as a speaker, and is used to prompt the user with required information when necessary.

[0111] The present invention is not limited to the above-mentioned embodiments, but includes various modifications. For example, the above-mentioned embodiments are described in detail for easy understanding of the present invention, and are not necessarily limited to having all the described structures. In addition, as long as no contradiction occurs, a part of the structure of a certain embodiment can be replaced with the structure of other embodiments, or the structure of other embodiments can be added to the structure of a certain embodiment. In addition, for a part of the structure of each embodiment, the structure can be added, deleted, replaced, unified, or dispersed. In addition, the structure and processing shown in the embodiment can be appropriately dispersed, unified, or replaced based on processing efficiency or installation efficiency.

[0112] Description of Reference Numerals

[0113] 1: Operation management system, 5000: Computer.

Claims

1. An operation management system for managing the operation of a plurality of vehicles using batteries as power sources, characterized in that: have: The operation planning department prepares an operation plan for each vehicle to patrol the locations; as well as an operation plan monitoring unit for monitoring the operation of each vehicle based on the operation plan, The operation plan monitoring unit determines whether each vehicle can complete the operation plan based on the operation status of each vehicle. The operation planning unit re-creates the operation plan based on the remaining battery power of each vehicle to allocate the remaining business to other vehicles for execution, wherein the remaining business is the business of patrolling locations not patrolled by the vehicle among the business of the vehicle determined by the operation plan monitoring unit as unable to complete the operation plan.

2. The operation management system according to claim 1, characterized in that: The operation plan monitoring unit determines whether each vehicle can complete the operation plan based on the remaining battery level and the current position of each vehicle received from each vehicle.

3. The operation management system according to claim 2, characterized in that: The operation plan includes a planned remaining battery level of the battery required for each vehicle to complete the operation plan when arriving at each location. The operation plan monitoring unit determines that each vehicle cannot complete the operation plan when the remaining battery level of each vehicle received from each vehicle is lower than the planned remaining battery level.

4. The operation management system according to claim 1, characterized in that: The operation plan monitoring unit determines that the vehicle that has sent the operation plan re-planning request cannot complete the operation plan when receiving the operation plan re-planning request sent from each vehicle based on an instruction of a vehicle operator of each vehicle.

5. The operation management system according to claim 1, characterized in that: The operation planning unit determines the remaining traffic based on a simulation based on a remaining amount of a battery and a current position of each vehicle received from each vehicle.

6. The operation management system according to claim 1, characterized in that: The operation planning unit re-creates the operation plan in such a manner that a portion of the remaining tasks is allocated to other vehicles based on the remaining battery power of each vehicle and the remaining tasks other than the portion are performed by the vehicle determined by the operation plan monitoring unit as unable to complete the operation plan.

7. The operation management system according to any one of claims 1 to 4, characterized in that: The operation planning unit re-creates the operation plan based on the remaining battery power of each vehicle to allocate the remaining business to other multiple vehicles for execution, wherein the remaining business is the business of patrolling locations not patrolled by the vehicle among the business of the vehicle determined by the operation plan monitoring unit as unable to complete the operation plan.

8. The operation management system according to any one of claims 1 to 4, characterized in that: The operation planning unit re-creates the operation plan based on the remaining battery power of each vehicle to allocate the remaining business to another one of the vehicles to carry out. The remaining business is the business of patrolling multiple locations that have not been patrolled by the vehicles among the businesses of the multiple vehicles that are determined by the operation plan monitoring unit to be unable to complete the operation plan.

9. The operation management system according to any one of claims 1 to 4, characterized in that: The operation planning unit re-creates the operation plan based on the remaining battery power of each vehicle to allocate the remaining business to other multiple vehicles to carry out. The remaining business is the business of patrolling multiple locations that have not been patrolled by the vehicles among the business of the multiple vehicles determined by the operation plan monitoring unit as unable to complete the operation plan.

10. An operation management method, which is an operation management method performed by an operation management system for managing the operation of a plurality of vehicles using batteries as a power source, characterized in that: have: An operation planning step of preparing an operation plan for each vehicle to patrol the locations; an operation plan monitoring step of monitoring the operation of each vehicle based on the operation plan; A determination step, determining whether each vehicle can complete the operation plan based on the operation status of each vehicle; as well as A re-creation step is to re-create the operation plan based on the remaining battery power of each vehicle and allocate the remaining business to other vehicles for execution, wherein the remaining business is the business of patrolling locations not patrolled by the vehicle among the business of the vehicle that was determined by the determination step to be unable to complete the operation plan.