Comprehensive construction method for preventing root of inclined leg of special-shaped box girder from cracking
By adopting a comprehensive method of lower chord beams and upper chord beams in the construction of special-shaped box beams, and using fine steel threads and full-length bracket technology, the problem of cracking at the roots of the oblique legs of special-shaped box beams has been solved, and construction safety and aesthetics have been improved.
Patent Information
- Application Number
- CN202410880783.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-08
AI Technical Summary
The roots of the inclined legs of special-shaped box beams are prone to cracking during the construction process, posing safety and quality risks, and the angle steel needs to be pre-embedded, affecting the beauty of the bridge.
A comprehensive construction method for the lower chord beam and the upper chord beam is adopted, including the erection of the lower chord beam bracket and the installation of the formwork. Fine steel threads are used to pull the formwork to reduce the influence of inelastic deformation of the bracket; the upper chord beam is constructed with full-hall brackets, and the door-shaped bracket spans the diagonal legs to reduce the load; by pouring concrete in two steps, the strength is gradually increased and tension grouting is performed to avoid cracking at the roots of the inclined legs and without the need for pre-embedded angle steel.
It effectively prevents cracking at the roots of the inclined legs of special-shaped box beams, reduces the amount of construction work, maintains the beautiful appearance of the bridge, and improves construction safety and quality.
Smart Images

Figure CN118745700A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, in particular to a comprehensive construction method for preventing cracks from occurring at the roots of inclined legs of special-shaped box beams. Background Art
[0002] With the rapid development of modern bridge engineering, special-shaped box girder structures have been widely used in urban viaducts, overpasses and other projects due to their unique shape and good mechanical properties. The roots of the inclined legs of special-shaped box girders are in a complex stress state, subject to large bending moments, shear forces and torques.
[0003] In the prior art, when constructing a special-shaped box girder structure, the upper box girder support is placed on the V-shaped inclined legs, which increases the load borne by the V-shaped inclined legs and easily causes cracks at the roots of the inclined legs, posing safety and quality risks. In addition, angle steel needs to be embedded at the top of the inclined legs, affecting the overall appearance of the bridge.
[0004] Therefore, it is necessary to provide a comprehensive construction method for preventing cracks at the root of the inclined legs of special-shaped box beams to solve the above technical problems. Summary of the invention
[0005] The invention provides a comprehensive construction method for preventing cracks at the roots of inclined legs of special-shaped box girders, thereby solving the problems that cracks at the roots of inclined legs pose safety and quality risks and affect the overall appearance of the bridge.
[0006] In order to solve the above technical problems, the present invention provides a comprehensive construction method for preventing cracking at the root of the inclined legs of a special-shaped box beam, comprising the following steps:
[0007] S1. Construction of lower chord beam: First, erect the bracket of lower chord beam. The standard vertical and horizontal spacing of the bracket poles is 90cm along the bridge and 60cm across the bridge. The standard bracket step is 1.5m. The template of lower chord beam adopts customized steel template. Before pouring concrete of lower chord beam, fine steel thread is used to pull the steel template to ensure the overall stability of the inclined leg during concrete pouring. Then, pour concrete of lower chord beam is carried out.
[0008] S2. Erection of upper chord beam support: After the concrete strength reaches 75%, the formwork is removed to pull the threaded steel bar, and then the support is erected; before the construction of the upper support of the inclined leg of the box beam, the buckle support is set up on both sides of the inclined leg, and the I@25a is used to cross the inclined leg. The upper buckle support pole of the inclined leg is placed on the I-beam. The I@25a I-beam is used as the main crossbeam. The longitudinal conversion beam is relatively non-load-bearing, and the double-jointed I@12a is used. The transverse distribution beam uses the I@25a. The horizontal distribution beam is supported by the buckle support, and the distance between the buckle support poles is 30cm. Adjust the position of the gate-type support according to the actual situation of the on-site inclined leg, and the distance between the lower poles of the gate-type support is 2.4m.
[0009] S3. Construction of upper chord: The upper chord is constructed in two steps. The first step is to pour the concrete until the chamfer on the web, and the second step is to pour the remaining concrete. The concrete of the box girder is poured from the lower end to the upper end. The vertical step is to pour the bottom plate → web in a step-like manner. The horizontal step is to pour the bottom plate of the box girder symmetrically. First, pour the bottom plate of the box girder, starting from one end of the bottom plate and moving toward the other end. When the bottom plate is poured for about 10m, pour 1 / 2 of the web from the first poured end. After pouring 1 / 2 of the web, pour the second section of the bottom plate, and then return to pour the web in sequence. The 5m from the beam end should be poured in the order from the beam end to the mid-span direction to prevent the floating slurry from gathering at the beam end and affecting the quality of the concrete in the anchoring area. When the strength reaches 95% of the design strength, the elastic modulus reaches 80%, and the age is not less than 7 days, the first tensioning and grouting is completed. After the first tensioning and grouting is completed, the box girder in the triangular area enters a stable state, which can avoid the subsequent cracking of the root of the lower chord.
[0010] Preferably, the length of the work @25a is about 3m, and the upper part carries 5 vertical poles, which can meet the requirements of the bracket and reduce the stress on the inclined legs, preventing excessive bending moment at the root of the inclined legs and causing cracks.
[0011] Preferably, a buckle bracket is required in step S1, and the buckle bracket comprises a column, an octagonal plate is fixedly mounted on the outer side of the column, and a plurality of mounting holes are opened inside the octagonal plate.
[0012] Preferably, a snap-in frame is sleeved on the outer side surface of the octagonal plate, movable grooves are provided on the top and bottom of the snap-in frame, and snap-in blocks are slidably connected to the inner sides of the two movable grooves, and the snap-in blocks are snap-connected to the inner side surfaces of the mounting holes.
[0013] Preferably, limiting blocks are fixedly installed on both sides of the inner side surface of one of the movable grooves, limiting grooves are provided on both sides of the clamping block, and the limiting blocks are slidably connected to the inner side surface of the limiting groove.
[0014] Preferably, a baffle is rotatably connected to the bottom of the inner side of the limiting groove, a magnetic plate is provided on the top of the baffle, and the magnetic plate is fixedly installed on one side of the inner side of the limiting groove.
[0015] Preferably, a threaded rod is fixedly mounted on one end of the clamping frame, and a threaded sleeve is threadedly connected to the outer side surface of the threaded rod.
[0016] Preferably, a rotating block is fixedly mounted on the outer side of the threaded sleeve.
[0017] Preferably, a plurality of grooves are provided on the side surface of the rotating block, and the inner sides of the plurality of grooves are rotatably connected to two rotating plates.
[0018] Preferably, opposite ends of the two rotating plates are rotatably connected with rotating shafts, and the rotating shafts are fixedly mounted on the inner side surfaces of the grooves.
[0019] Compared with the related art, the comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention has the following beneficial effects:
[0020] The present invention provides a comprehensive construction method for preventing cracks at the roots of the slanted legs of special-shaped box beams. After the lower chord beam support is erected and the template is installed, a fine steel thread is used to set a tension on the template, so that the influence of the non-elastic deformation of the support on the roots of the slanted legs during the concrete construction of the lower chord beam can be reduced, and the cracks at the roots of the slanted legs can be prevented; the upper chord beam is constructed by using a full-span support, the box beam support above the V-shaped slanted legs adopts a gate-type support to cross the slanted legs, and the upper buckle support uprights of the slanted legs are placed on the I-beam of the gate-type support, so the load borne by the V-shaped slanted legs is reduced, and the cracks at the roots of the slanted legs are prevented; the upper box beam is constructed by using a full-span support, the box beam support above the V-shaped slanted legs adopts a gate-type support to cross the slanted legs, and the upper buckle support uprights of the slanted legs are placed on the I-beam of the gate-type support, so there is no need to pre-embed angle steel on the upper part of the V-shaped slanted legs, the construction workload is reduced, and the appearance quality of the municipal landscape bridge is not affected. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram of a process and a structure of a first embodiment of a comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention;
[0022] Figure 2 for Figure 1 The structural schematic diagram of process 2 shown;
[0023] Figure 3 for Figure 2 The schematic diagram of the process three structures shown;
[0024] Figure 4 for Figure 3 The schematic diagram of the structure of process four shown;
[0025] Figure 5 for Figure 4 The schematic diagram of the upper box beam support of the lower chord beam is shown;
[0026] Figure 6 A schematic structural diagram of a second embodiment of a comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention;
[0027] Figure 7 for Figure 6 The schematic diagram of the side structure of the card connection frame shown;
[0028] Figure 8 for Figure 7 The schematic diagram of the card connection frame from top view shown;
[0029] Fig. 9 A schematic structural diagram of a third embodiment of a comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box girder provided by the present invention.
[0030] Numbers in the figure: 1, column, 11, octagonal plate, 12, mounting hole, 2, threaded sleeve, 21, rotating block, 22, threaded rod, 3, clamping frame, 31, moving groove, 32, limiting block, 33, clamping block, 34, limiting groove, 35, pull ring, 36, magnetic plate, 37, baffle, 4, groove, 41, rotating plate, 42, rotating shaft. DETAILED DESCRIPTION
[0031] The present invention will be further described below in conjunction with the accompanying drawings and implementation modes.
[0032] First embodiment
[0033] Please refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 ,in, Figure 1 A schematic diagram of a process and a structure of a first embodiment of a comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention; Figure 2 for Figure 1 The structural schematic diagram of process 2 shown; Figure 3 for Figure 2 The schematic diagram of the process three structures shown; Figure 4 for Figure 3 The schematic diagram of the structure of process four shown; Figure 5 for Figure 4 A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box girder comprises the following steps:
[0034] S1. Construction of lower chord beam: First, erect the lower chord beam support. The standard vertical and horizontal spacing of the bracket poles is 90cm along the bridge and 60cm across the bridge. The standard step distance of the support is 1.5m. The lower chord beam formwork uses customized steel formwork. Before pouring the concrete of the lower chord beam, fine steel threads are used to pull the steel formwork to ensure the overall stability of the inclined legs during the concrete pouring process. Then, the lower chord beam concrete is poured;
[0035] S2. Erection of upper chord beam support: After the concrete strength reaches 75%, the formwork is removed to pull the threaded steel bar, and then the support is erected; before the construction of the upper support of the inclined leg of the box beam, the buckle support is set up on both sides of the inclined leg, and the I@25a is used to cross the inclined leg. The upper buckle support pole of the inclined leg is placed on the I-beam. The I@25a I-beam is used as the main crossbeam. The longitudinal conversion beam is relatively non-load-bearing, and the double-jointed I@12a is used. The transverse distribution beam uses the I@25a. The horizontal distribution beam is supported by the buckle support, and the distance between the buckle support poles is 30cm. Adjust the position of the gate-type support according to the actual situation of the on-site inclined leg, and the distance between the lower poles of the gate-type support is 2.4m.
[0036] S3. Construction of upper chord: The upper chord is constructed in two steps. The first step is to pour the concrete until the chamfer on the web, and the second step is to pour the remaining concrete. The concrete of the box girder is poured from the lower end to the upper end. The vertical step is to pour the bottom plate → web in a step-like manner. The horizontal step is to pour the bottom plate of the box girder symmetrically. First, pour the bottom plate of the box girder, starting from one end of the bottom plate and moving toward the other end. When the bottom plate is poured for about 10m, pour 1 / 2 of the web from the first poured end. After pouring 1 / 2 of the web, pour the second section of the bottom plate, and then return to pour the web in sequence. The 5m from the beam end should be poured in the order from the beam end to the mid-span direction to prevent the floating slurry from gathering at the beam end and affecting the quality of the concrete in the anchoring area. When the strength reaches 95% of the design strength, the elastic modulus reaches 80%, and the age is not less than 7 days, the first tensioning and grouting is completed. After the first tensioning and grouting is completed, the box girder in the triangular area enters a stable state, which can avoid the subsequent cracking of the root of the lower chord.
[0037] The length of the work @25a is about 3m, and the upper part carries 5 vertical poles, which can meet the requirements of the bracket and reduce the stress on the inclined legs, preventing excessive bending moment at the root of the inclined legs and causing cracks.
[0038] The working principle of a comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention is as follows:
[0039] See also Figure 1 First, the lower chord beam bracket is erected. The standard vertical and horizontal spacing of the buckle bracket poles is 90cm along the bridge and 60cm across the bridge. The standard bracket step is 1.5m. The lower chord beam formwork adopts customized steel formwork. Before pouring the concrete of the lower chord beam, the steel formwork is pulled with fine steel threads to ensure the overall stability of the inclined legs during the concrete pouring process. Then the lower chord beam concrete is poured.
[0040] See also Figure 2, after the concrete strength reaches 75%, remove the formwork and pull the threaded steel bar, and then erect the bracket; before the construction of the upper bracket of the inclined leg of the box girder, set up the buckle bracket on both sides of the inclined leg, use I@25a to cross the inclined leg, and place the upper buckle bracket upright on the I-beam. The I@25a I-beam is used as the main crossbeam, and the longitudinal transfer beam is relatively non-load-bearing. Double-piece I@12a is used, and the transverse distribution beam uses I@25a. The transverse distribution beam is supported by a buckle bracket, and the distance between the buckle bracket uprights is 30cm. Adjust the position of the gate bracket according to the actual situation of the on-site inclined leg, and the spacing between the lower uprights of the gate bracket is 2.4m;
[0041] See also Figure 3 and Figure 4 The upper chord is constructed in two times. The first pouring is to the chamfer of the web, and the second pouring is to pour the remaining concrete. The box girder concrete is poured from the lower end to the upper end. The vertical pouring is carried out in a step-like manner from the bottom plate to the web. The horizontal plane is poured symmetrically. The box girder bottom plate is poured first, starting from one end of the bottom plate and advancing to the other end. When the bottom plate is poured for about 10m, 1 / 2 of the web is poured from the first poured end. After 1 / 2 of the web is poured, the second section of the bottom plate is poured, and then the web is poured in sequence. The 5m from the beam end should be poured in the order from the beam end to the mid-span direction to prevent the floating slurry from gathering at the beam end and affecting the quality of the concrete in the anchoring area. When the strength reaches 95% of the design strength, the elastic modulus reaches 80%, and the age is not less than 7 days, the first tensioning and grouting is completed. After the first tensioning and grouting is completed, the box girder in the triangular area enters a stable state, which can avoid the subsequent cracking of the root of the lower chord.
[0042] Compared with the related art, the comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention has the following beneficial effects:
[0043] By using fine steel threads to set up the formwork for tensioning after completing the erection of the lower chord beam support and the installation of the formwork, the influence of the non-elastic deformation of the support on the root of the inclined leg during the construction of the lower chord beam concrete can be reduced, and the root of the inclined leg can be prevented from cracking; by using full-span support for the upper chord beam, the box beam support above the V-shaped inclined leg adopts a gate-type support to cross the inclined leg, and the upper disc-shaped support column of the inclined leg is placed on the I-beam of the gate-type support, so as to reduce the load borne by the V-shaped inclined leg and prevent the root of the inclined leg from cracking; by using full-span support for the upper box beam, the box beam support above the V-shaped inclined leg adopts a gate-type support to cross the inclined leg, and the upper disc-shaped support column of the inclined leg is placed on the I-beam of the gate-type support, there is no need to pre-embed the angle steel on the upper part of the V-shaped inclined leg, which reduces the construction workload and does not affect the appearance quality of the municipal landscape bridge.
[0044] Second embodiment
[0045] Please refer to Figure 6 , Figure 7 and Figure 8Based on the comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box girder provided in the first embodiment of the present application, the second embodiment of the present application proposes another comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box girder. The second embodiment is only a preferred method of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment.
[0046] Specifically, the second embodiment of the present application provides a comprehensive construction method for preventing cracks at the roots of the slanted legs of a special-shaped box girder. The difference is that, in a comprehensive construction method for preventing cracks at the roots of the slanted legs of a special-shaped box girder, a buckle bracket is required in step S1, and the buckle bracket includes a column 1, and an octagonal plate 11 is fixedly installed on the outer side surface of the column 1, and a plurality of mounting holes 12 are opened inside the octagonal plate 11.
[0047] The outer side surface of the octagonal plate 11 is sleeved with a clamping frame 3, and the top and bottom of the clamping frame 3 are both provided with movable grooves 31, and the inner sides of the two movable grooves 31 are slidably connected with clamping blocks 33, and the clamping blocks 33 are clamped to the inner side surface of the mounting hole 12.
[0048] Limiting blocks 32 are fixedly installed on both sides of the inner side of the moving groove 31 , and limiting grooves 34 are provided on both sides of the clamping block 33 . The limiting blocks 32 are slidably connected to the inner side of the limiting groove 34 .
[0049] A baffle 37 is rotatably connected to the bottom of the inner side of the limiting groove 34 , and a magnetic plate 36 is provided on the top of the baffle 37 . The magnetic plate 36 is fixedly installed on one side of the inner side of the limiting groove 34 .
[0050] A threaded rod 22 is fixedly mounted on one end of the clamping frame 3 , and a threaded sleeve 2 is threadedly connected to the outer side surface of the threaded rod 22 .
[0051] A rotating block 21 is fixedly mounted on the outer side of the threaded sleeve 2 .
[0052] Threaded rods 22 are threadedly connected at both ends of the threaded sleeve 2, and one end of the two threaded rods 22 is fixedly installed with a clamping frame 3, so that the two clamping frames 3 and the two octagonal plates 11 are connected to play a role in strengthening the two columns 1;
[0053] When in use, the user can use a tool to rotate the rotating block 21, so that the rotating block 21 drives the threaded sleeve 2 to be threadedly connected to the outer side of the threaded rod 22, and then adjust the distance between the two clamping blocks 3 to adapt to different distances for use;
[0054] When disassembling, the user can first push the baffle 37 so that the baffle 37 is magnetically attracted to one side of the magnetic plate 36, thereby limiting the baffle 37 on the inner side of the limiting groove 34, and then the user only needs to lift the pull ring 35 upwards.
[0055] The working principle of a comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention is as follows:
[0056] When in use, the user clamps the snap-in frame 3 on the outer side of the octagonal plate 11, and then the user loosens the pull ring 35. At this time, the snap-in block 33 will move downward by gravity, so that the snap-in block 33 is clamped into the inner side of the mounting hole 12. At this time, the baffle 37 will move to the bottom of the snap-in frame 3. Then the user pulls the baffle 37 to separate one side of the baffle 37 and one side of the magnetic plate 36, so that the baffle 37 moves out from the inner side of the limiting groove 34, and the baffle 37 is blocked at the bottom of the snap-in frame 3, thereby limiting the snap-in block 33.
[0057] Compared with the related art, the comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention has the following beneficial effects:
[0058] By cooperating with each other through structures such as the snap-fitting frame 3, the movable groove 31, the limit block 32, the snap-fitting block 33, the limit groove 34, the magnetic plate 36 and the baffle 37, when in use, the snap-fitting block 33 can be respectively inserted into the inner side surfaces of the movable groove 31 and the mounting hole 12, thereby limiting the position between the snap-fitting frame 3 and the octagonal plate 11, making it convenient for users to operate.
[0059] Third embodiment
[0060] Please refer to Fig. 9 Based on the comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box girder provided in the first embodiment of the present application, the third embodiment of the present application proposes another comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box girder. The third embodiment is only a preferred method of the first embodiment, and the implementation of the third embodiment will not affect the independent implementation of the first embodiment.
[0061] Specifically, the third embodiment of the present application provides a comprehensive construction method for preventing cracks at the roots of the oblique legs of special-shaped box girders, which is different in that a plurality of grooves 4 are provided on the side of the rotating block 21, and the inner sides of the plurality of grooves 4 are rotatably connected to two rotating plates 41.
[0062] A rotating shaft 42 is rotatably connected inside opposite ends of the two rotating plates 41 , and the rotating shaft 42 is fixedly installed on the inner side surface of the groove 4 .
[0063] The working principle of a comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention is as follows:
[0064] During use, when the user needs to rotate the rotating block 21, the user can first rotate the rotating plate 41 out from the inner side of the groove 4, and then the user rotates the rotating plate 41, so that the rotating plate 41 drives the rotating block 21 to rotate, and the rotating block 21 drives the threaded sleeve 2 to rotate on the outer side of the threaded rod 22, thereby adjusting the distance between the two clamping blocks 3.
[0065] Compared with the related art, the comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam provided by the present invention has the following beneficial effects:
[0066] Through the cooperation of the groove 4, the rotating plate 41 and the rotating shaft 42, when in use, the user rotates the rotating plate 41, so that the rotating plate 41 drives the rotating block 21 and the threaded sleeve 2 to rotate, so that the threaded sleeve 2 is threadedly connected to the outer side of the threaded rod 22, so that the user can adjust the distance between the two clamping frames 3 to increase the adaptability of the bracket.
[0067] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam, characterized in that: The following steps are involved: S1. Construction of lower chord beam: First, erect the bracket of lower chord beam. The standard vertical and horizontal spacing of the bracket poles is 90cm along the bridge and 60cm across the bridge. The standard bracket step is 1.5m. The template of lower chord beam adopts customized steel template. Before pouring concrete of lower chord beam, fine steel thread is used to pull the steel template to ensure the overall stability of the inclined leg during concrete pouring. Then, pour concrete of lower chord beam is carried out. S2. Erection of upper chord beam support: After the concrete strength reaches 75%, remove the formwork and pull the threaded steel bar, then proceed with the support erection; before the construction of the upper support of the inclined leg of the box girder, set up buckle supports on both sides of the inclined leg, use I@25a to cross the inclined leg, and place the upper buckle support poles on the inclined leg on the I-beam. The I@25a I-beam is used as the main crossbeam, and the longitudinal transfer beam is relatively non-load-bearing. Double-jointed I@12a is used, and the transverse distribution beam uses I@25a. The transverse distribution beam is supported by a buckle support, and the distance between the buckle support poles is 30cm. Adjust the position of the gate-type support according to the actual situation of the on-site inclined leg, and the distance between the lower poles of the gate-type support is 2.4m; S3. Construction of upper chord: The upper chord is constructed in two steps. The first step is to pour the concrete until the chamfer of the web, and the second step is to pour the remaining concrete. The concrete of the box girder is poured from the lower end to the upper end. The vertical direction is to pour the bottom plate → web in a step-like manner. The concrete is poured symmetrically in the horizontal plane. The bottom plate of the box girder is poured first, starting from one end of the bottom plate and moving toward the other end. When the bottom plate is poured for about 10m, 1 / 2 of the web is poured from the first poured end. After the 1 / 2 web is poured, the second section of the bottom plate is poured, and then the web is poured in sequence. The concrete should be poured from the beam end to the mid-span within 5m of the beam end to prevent the floating slurry from gathering at the beam end and affecting the quality of concrete in the anchoring area. The first tensioning and grouting should be completed after the strength reaches 95% of the design strength, the elastic modulus reaches 80%, and the age is not less than 7 days. After the first tensioning and grouting is completed, the box girder in the triangular area enters a stable state, which can avoid subsequent cracking at the root of the lower chord beam.
2. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam according to claim 1, characterized in that: The length of the work @25a is about 3m, and the upper part carries 5 vertical poles, which can meet the requirements of the bracket and reduce the stress on the inclined legs, preventing excessive bending moment at the root of the inclined legs and causing cracks.
3. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam according to claim 1, characterized in that: In the step S1, a buckle bracket is required, and the buckle bracket includes a column, and an octagonal plate is fixedly installed on the outer side of the column, and a plurality of mounting holes are opened inside the octagonal plate.
4. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam according to claim 3, characterized in that: The outer side surface of the octagonal plate is sleeved with a clamping frame, the top and bottom of the clamping frame are both provided with moving grooves, the inner sides of the two moving grooves are both slidably connected with clamping blocks, and the clamping blocks are clamped on the inner side surface of the mounting hole.
5. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam according to claim 4, characterized in that: Limiting blocks are fixedly installed on both sides of the inner side of the movable groove, and limiting grooves are arranged on both sides of the clamping block. The limiting blocks are slidably connected to the inner side of the limiting groove.
6. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam according to claim 5, characterized in that: A baffle is rotatably connected to the bottom of the inner side of the limiting groove, and a magnetic plate is arranged on the top of the baffle. The magnetic plate is fixedly installed on one side of the inner side of the limiting groove.
7. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam according to claim 6, characterized in that: A threaded rod is fixedly mounted on one end of the clamping frame, and a threaded sleeve is threadedly connected to the outer side surface of the threaded rod.
8. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam according to claim 7, characterized in that: A rotating block is fixedly mounted on the outer side of the threaded sleeve.
9. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam according to claim 8, characterized in that: A plurality of grooves are provided on the side surface of the rotating block, and the inner sides of the plurality of grooves are rotatably connected to two rotating plates.
10. A comprehensive construction method for preventing cracking at the root of the oblique legs of a special-shaped box beam according to claim 9, characterized in that: The insides of opposite ends of the two rotating plates are both rotatably connected with rotating shafts, and the rotating shafts are fixedly installed on the inner side surfaces of the grooves.