A road planning method and system for predicting traffic demand on smart construction sites
By obtaining vehicle status information and congestion prediction models in real time, and dynamically planning the vehicle driving routes, the problem of insufficient vehicle priority control in traffic management on construction sites is solved, and traffic efficiency and construction safety are improved.
Patent Information
- Application Number
- CN202411024567.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-07-29
AI Technical Summary
The existing construction site traffic management system lacks the ability to intelligently regulate the priority of different vehicles, resulting in low traffic efficiency and frequent traffic congestion, affecting the construction progress and bringing safety hazards.
By obtaining vehicle status information and destination information in real time, using the congestion prediction model to dynamically plan the vehicle driving route, prioritize the route with the lowest congestion, and adjust the vehicle speed and route when the road section is congested, restricting the vehicle's entry into the construction site to avoid congestion.
It improves the smoothness of construction site traffic, shortens vehicle waiting time, improves construction efficiency, and reduces the risk of delay and safety hazards due to traffic jams.
Smart Images

Figure CN118747962B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of traffic control technology, and in particular to a road planning method and system for predicting traffic demand at a smart construction site. Background Art
[0002] There is a significant problem in the current traffic management system for construction sites: the lack of the ability to intelligently control the priorities of different vehicles. This leads to inefficient internal traffic on the site, especially during peak hours, when various types of vehicles (such as heavy machinery, trucks transporting materials, and commuter vehicles for construction workers) are mixed together without a clear scheduling mechanism to distinguish and optimize their passage order. Due to the different priorities of vehicles, road resources are not effectively managed and allocated, often resulting in traffic congestion, which not only affects the construction progress, but also may bring safety hazards.
[0003] Most existing traffic management methods rely on manual command or fixed route planning, which cannot dynamically adapt to changes in the construction site environment, such as sudden material needs, adjustments to the construction schedule, or the impact of weather conditions. In addition, due to the lack of real-time monitoring and analysis of vehicle status, the system is often unable to accurately predict traffic demand, let alone plan in advance to avoid congestion. Summary of the invention
[0004] In order to solve at least one of the technical problems mentioned above, the present invention provides a road planning method and system for predicting traffic demand on a smart construction site.
[0005] In a first aspect, the present invention provides a road planning method for predicting traffic demand at a smart construction site, the method comprising:
[0006] When a vehicle is detected arriving at the construction site intersection, the current vehicle status information and destination information are obtained;
[0007] Perform path planning based on the location information and destination information of the construction site intersection to generate multiple drivable routes;
[0008] Obtain the status information of all vehicles on each drivable route, substitute the status information of the current vehicle and the status information of all vehicles into the preset congestion prediction model, and obtain the congestion value of each drivable route;
[0009] Obtain the actual driving routes of all vehicles on the construction site, filter out the actual driving routes that include the drivable routes of the current vehicle, and establish the actual driving route set of the vehicles on the construction site;
[0010] Determine the driving priority of the current vehicle and the vehicles in the actual driving routes. When it is identified that the driving priority of any vehicle is greater than the driving priority of the current vehicle and the congestion value of the corresponding actual driving route is greater than the preset value, the corresponding drivable route is eliminated and the drivable route with the smallest congestion value among the remaining routes is selected as the target driving route of the current vehicle.
[0011] Preferably, the congestion prediction algorithm is as follows:
[0012]
[0013] In the formula, i and j are positive integers, n is the number of vehicles, c i is the congestion value of the i-th vehicle, C j is the route congestion value corresponding to the jth route plan, W i is the vehicle type congestion weight of the i-th vehicle, S i is the speed of the i-th vehicle, D i is the distance from the i-th vehicle to the destination, T i is the destination stay time of the i-th vehicle, and α, β and γ are adjustment coefficients.
[0014] Preferably, the method further comprises:
[0015] When the distance between any two leading vehicles and the following vehicle in the same road section is greater than the preset distance, the difference in the congestion degree between any two leading vehicles and the following vehicle in the same road section is detected;
[0016] If the difference is greater than the first preset value, the speed of the following vehicle is increased within the speed limit of the construction site.
[0017] Preferably, the method further comprises:
[0018] Based on the congestion prediction algorithm, the congestion value of each road section is monitored in real time to obtain the congestion values of multiple road sections;
[0019] When it is detected that the congestion value of any road section is greater than a second preset value, the road section corresponding to the road section congestion value is determined to be a congested road section, and the congested road section is avoided in the route planning process.
[0020] Preferably, the method further comprises:
[0021] Based on the congestion prediction algorithm, the congestion value of each road section is monitored in real time to obtain the congestion values of multiple road sections;
[0022] The congestion values of multiple road sections are summed to obtain the congestion value of the construction site;
[0023] When it is detected that the congestion value of the construction site is greater than a third preset value, it is determined that the construction site is currently in a congested state, and vehicles are restricted from entering the construction site;
[0024] When it is monitored that the construction site congestion value is greater than a fourth preset value, it is determined that the construction site is currently in a congested state, and vehicles are prohibited from entering the construction site.
[0025] In a second aspect, the present invention provides a road planning system for predicting traffic demand on a smart construction site, the system comprising:
[0026] A first data acquisition module is used to acquire the current vehicle status information and destination information when a vehicle is detected to have arrived at a construction site intersection;
[0027] Route planning module, used to plan paths based on the location information and destination information of the construction site intersections, and generate multiple drivable routes;
[0028] The route evaluation module is used to obtain the status information of all vehicles on each drivable route, substitute the status information of the current vehicle and the status information of all vehicles into the preset congestion prediction model, and obtain the congestion value of each drivable route;
[0029] The optimal route determination module is used to obtain the actual driving routes of all vehicles on the construction site, screen out the actual driving routes that include the drivable routes of the current vehicle, and establish the actual driving route set of the vehicles on the construction site; determine the driving priority of the current vehicle and the vehicles in the actual driving route set. When it is identified that the driving priority of any vehicle is greater than the driving priority of the current vehicle and the congestion value of the corresponding actual driving route is greater than the preset value, the corresponding drivable route is eliminated, and the drivable route with the smallest congestion value among the remaining routes is selected as the target driving route of the current vehicle.
[0030] Preferably, the system includes a congested road section detection module, specifically including:
[0031] A first road section congestion calculation unit is used to monitor the congestion value of each road section in real time based on a congestion prediction algorithm to obtain multiple road section congestion values;
[0032] The congested section determination unit is used to determine that the section corresponding to the section congestion value is a congested section when it is detected that the congestion value of any section is greater than a second preset value, and avoid selecting the congested section in the route planning process.
[0033] Preferably, the system further includes construction site congestion status detection, specifically including:
[0034] A second road section congestion calculation unit is used to monitor the congestion value of each road section in real time based on a congestion prediction algorithm to obtain multiple road section congestion values;
[0035] A construction site congestion calculation unit, used for summing up the congestion values of multiple road sections to obtain a construction site congestion value;
[0036] A construction site congestion control unit, configured to determine that the construction site is currently in a congested state and restrict vehicles from entering the construction site when detecting that the construction site congestion value is greater than a third preset value;
[0037] The construction site congestion control unit is used to determine that the construction site is currently in a congestion state and prohibit vehicles from entering the construction site when it is monitored that the construction site congestion value is greater than a fourth preset value.
[0038] In a third aspect, the present invention further provides an electronic device comprising: a processor and a memory, wherein the memory is used to store computer program code, wherein the computer program code comprises computer instructions, and when the processor executes the computer instructions, the electronic device executes the method as described in the first aspect above and any possible implementation thereof.
[0039] In a fourth aspect, the present invention further provides a computer-readable storage medium, wherein a computer program is stored in the computer-readable storage medium, wherein the computer program includes program instructions, and when the program instructions are executed by a processor of an electronic device, the processor executes the method as described in the first aspect above and any possible implementation thereof.
[0040] Compared with the prior art, the present invention has the following beneficial effects:
[0041] The present invention can allocate optimal driving routes for different types of vehicles by collecting and analyzing vehicle status information in real time, combining a preset congestion prediction model and the driving priorities of different vehicles. This dynamic adjustment mechanism reduces traffic conflicts, improves the smoothness of traffic within the construction site, shortens vehicle waiting time, and thus improves construction efficiency. Furthermore, the present invention can monitor the traffic conditions of each road section in real time, identify potential congestion points in advance, and actively avoid or alleviate congestion by adjusting the driving route and vehicle speed, thereby reducing the risk of delays caused by traffic jams and also reducing safety hazards at the construction site.
[0042] It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the background technology, the drawings required for use in the embodiments of the present invention or the background technology will be described below.
[0044] The drawings herein are incorporated into the specification and constitute a part of the specification. These drawings illustrate embodiments consistent with the present disclosure and are used to illustrate the technical solutions of the present disclosure together with the specification.
[0045] Figure 1A schematic flow chart of a road planning method for predicting traffic demand on a smart construction site provided by an embodiment of the present invention;
[0046] Figure 2 A schematic diagram of the structure of a road planning system for predicting traffic demand on a smart construction site provided by an embodiment of the present invention;
[0047] Figure 3 A schematic diagram of the structure of a congested road section detection module provided in an embodiment of the present invention;
[0048] Figure 4 A schematic diagram of the structure of a construction site congestion status detection module provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0049] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0050] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units that are inherent to these processes, methods, products or devices.
[0051] Existing construction site traffic management technologies lack real-time dynamic response and intelligent optimization capabilities, making it difficult to effectively deal with traffic demand fluctuations and congestion problems.
[0052] The present invention provides a road planning method for predicting traffic demand on a smart construction site. Figure 1 , the method comprising:
[0053] S100, when a vehicle is detected to have arrived at a construction site intersection, obtaining current vehicle status information and destination information;
[0054] In this embodiment, a camera or radio frequency identification (RFID) tag in a vehicle-mounted sensor is used to automatically identify the type of vehicle, such as distinguishing between ordinary vehicles, engineering vehicles, and heavy trucks. The real-time speed of the vehicle is monitored by a built-in accelerometer and gyroscope, which helps to evaluate the road's traffic capacity and the vehicle's driving status. The precise location of the vehicle is determined using a global positioning system (GPS) or other satellite navigation systems (such as Beidou, Galileo, and GLONASS) for route planning and tracking. Further, the driver can enter the destination information through the vehicle information system, or the system can automatically obtain the destination through a preset itinerary plan. Based on historical data analysis, the average stay time of the vehicle at the destination is predicted, which helps to optimize route planning and resource scheduling. It also includes that the vehicle-mounted terminal uploads the collected information to a central server in real time through a wireless communication module (such as 4G / 5G, Wi-Fi) for subsequent analysis, and finally obtains the itinerary information of the current vehicle.
[0055] In one possible embodiment, the smart construction site can also deploy road section sensors and display screens to monitor and display real-time traffic conditions and enhance the comprehensiveness and accuracy of data collection.
[0056] Various types of sensors and wireless communication modules, such as infrared, radar, and video surveillance, are installed at key intersections and sections to detect the number, type, and speed of passing vehicles. Linked with the traffic signal control system, the operating status and switching cycle of the signal lights are collected, which is crucial for predicting traffic flow and congestion. Furthermore, electronic display screens are set up at the entrances, exits, and key intersections of the construction site to display traffic conditions, recommended routes, and estimated arrival times in real time, helping drivers make timely decisions, and allowing drivers to submit road condition reports through display screens or mobile applications, such as construction areas, temporarily closed sections, etc., so that the system can respond quickly and update plans.
[0057] It should be noted that the driving priority can be set for each vehicle individually, for example, "vehicle a-priority 1, vehicle b-priority 2", or it can be set uniformly for vehicles in the same project, for example, "project c vehicle-priority 1, project d vehicle-priority 2", and it can also be set based on different vehicle types, for example, "excavator vehicle-priority 5, road roller vehicle-priority 4, sprinkler truck vehicle-priority 1".
[0058] S200, performing path planning based on the location information of the construction site intersection and the destination information to generate multiple drivable routes;
[0059] The road network within the construction site is considered as a directed graph in graph theory, where each node represents an intersection and each edge represents a road segment connecting two intersections. The road segment includes but is not limited to the following attributes:
[0060] Length: the actual distance of the road segment;
[0061] Width: used to calculate traffic capacity;
[0062] Maximum speed limit: set according to the road type;
[0063] Direction of travel: one-way or multi-lane direction.
[0064] The Dijkstra algorithm in graph theory is used for path planning. Starting from the current intersection node, the shortest path to the destination node is found. After finding the first shortest path, the algorithm can continue to explore other better or suboptimal paths until a certain number is met. Finally, multiple route plans from the current intersection to the destination are obtained.
[0065] S300, obtaining status information of all vehicles on each drivable route, substituting the status information of the current vehicle and the status information of all vehicles into a preset congestion prediction model, and obtaining the congestion value of each drivable route;
[0066] Based on the steps in S100, the travel information of the vehicles involved in different route plans is obtained, and the travel information of all the vehicles in the different route plans is respectively integrated to obtain multiple route travel information sets, and each route plan corresponds to a route travel information set.
[0067] In one possible embodiment, real-time and historical data are collected from multiple sources, including real-time traffic data provided by vehicle sensors, GPS positioning, video surveillance, etc.; historical data consisting of past traffic records, covering traffic flow and accident rates in different time periods and weather conditions; and data such as construction plans, material distribution, and personnel transfers that reflect internal activities on the construction site. These data are cleaned to remove outliers and fill in missing values to ensure their high quality. Subsequently, feature engineering is performed to extract key features, such as periodic coding of time, geographic location coding, and vehicle type coding, and the numerical features are standardized or normalized.
[0068] Based on the preprocessed data, the regression models in supervised learning are selected, such as decision tree regression, random forest, and gradient boosting tree (GBDT). The model with the best prediction performance and its parameter configuration are selected through cross-validation technology. During the model training process, statistical tests, feature importance scoring, and recursive feature elimination (RFE) are used to refine the feature set to ensure that the model focuses on the factors that have the greatest impact on crowding prediction. At the same time, regularization strategies such as L1 and L2 regularization are used to fine-tune the feature weights to avoid overfitting the model to the training data.
[0069] The feature data at the current moment is input into the trained model to generate the predicted value of future congestion. The mean square error (MSE), root mean square error (RMSE), mean absolute error (MAE) and other indicators are used to comprehensively evaluate the accuracy of the model prediction, and the model is regularly updated according to the actual situation, new data is added, and parameters are adjusted to obtain the final congestion prediction algorithm.
[0070] In the congestion prediction stage, the travel information and multiple route travel information sets are input into a preset congestion prediction algorithm, and finally multiple route congestion values are obtained.
[0071] S400, obtaining actual driving routes of all vehicles in the construction site, screening out actual driving routes that include drivable routes of the current vehicle, and establishing an actual driving route set for vehicles in the construction site;
[0072] S500, determining the driving priority of the current vehicle and the vehicles in the actual driving routes. When it is identified that the driving priority of any vehicle is greater than the driving priority of the current vehicle, and the congestion value of the corresponding actual driving route is greater than a preset value, the corresponding drivable route is eliminated, and the drivable route with the smallest congestion value among the remaining routes is selected as the target driving route of the current vehicle.
[0073] In a possible embodiment, when a truck (priority 3) arrives at a certain intersection of the construction site, its RFID tag is read or the vehicle type, current load, and destination (such as warehouse A) are obtained through the vehicle GPS. This information is used to preliminarily determine the impact of the vehicle on the traffic congestion of the construction site. According to the construction site map data and real-time traffic conditions, three possible route plans are generated for the truck: x, y, and z. At the same time, the congestion prediction algorithm is used to predict the congestion values of each route, assuming that they are 10, 20, and 30 respectively. If a concrete mixer truck (priority 6) is detected to be heading to the other end of the construction site along route w (route w includes route x), and the congestion of route w is 50, which is higher than the preset value (for example, 35), route x is removed from the alternative routes of the truck because the concrete mixer truck has a higher priority and route w is too congested, so as to control the truck to actively avoid the concrete mixer truck. Among the remaining routes y and z, route y with a lower congestion value (congestion value 20) is selected as the target driving route of the truck.
[0074] It should be noted that every vehicle entering the construction site will re-plan its route based on real-time travel information and multiple route travel information sets when passing through each intersection.
[0075] In this embodiment, dynamic route planning is used to reduce waiting time caused by traffic congestion, thereby improving the internal logistics efficiency and construction progress of the construction site.
[0076] Preferably, the congestion prediction algorithm is as follows:
[0077]
[0078] In the formula, i and j are positive integers, n is the number of vehicles, c i is the congestion value of the i-th vehicle, C j is the route congestion value corresponding to the jth route plan, W i is the vehicle type congestion weight of the i-th vehicle, S i is the speed of the i-th vehicle, D i is the distance from the i-th vehicle to the destination, T i is the destination stay time of the i-th vehicle, and α, β and γ are adjustment coefficients.
[0079] W i Vehicle type congestion weight. Different types of vehicles have different impacts on road congestion. For example, large trucks occupy and affect the road much more than ordinary cars. Therefore, a weight is assigned to each type of vehicle to reflect its potential contribution to road congestion. i represents the speed of the i-th vehicle. The slower the speed, the longer the vehicle occupies the road and the greater its contribution to road congestion. Therefore, Reflects the impact of speed on congestion. The faster the speed, the larger the denominator and the smaller the contribution to congestion. The distance of the i-th vehicle from the destination. The closer the vehicle is to the destination, the smaller the impact on road congestion because they are about to leave the road network. Exponential function It means that as the distance increases, the congestion contribution decreases exponentially. α, β and γ are adjustment coefficients used to adjust the influence of the above factors on the congestion contribution. These coefficients can be adjusted according to actual conditions and experience to more accurately reflect the impact of vehicles on road congestion in the real world. By accumulating the congestion values c of all vehicles traveling on the route i , and the total congestion value C of the route is obtained j , C j It reflects the congestion level of the route at the current moment.
[0080] Based on the real-time collection and analysis of vehicle travel information, the congestion prediction algorithm can quickly calculate the congestion level of different routes, thereby providing an important reference for vehicles to adjust route planning in real time to avoid congested areas and reduce waiting time. It significantly improves the efficiency and effectiveness of construction site traffic management and is a key component of modern smart construction site construction.
[0081] In a possible embodiment, the method further includes:
[0082] When the distance between any two leading vehicles and the following vehicle in the same road section is greater than the preset distance, the difference in the congestion degree between any two leading vehicles and the following vehicle in the same road section is detected;
[0083] If the difference is greater than the first preset value, the speed of the following vehicle is increased within the speed limit of the construction site.
[0084] In the traffic management of smart construction sites, especially when the roads are narrow and the traffic is dense, maintaining appropriate vehicle spacing is crucial to preventing traffic jams and ensuring driving safety. However, traditional methods often rely on fixed speed limits and lack a response mechanism to real-time road conditions. This may result in the rear vehicles being unable to speed up due to speed limits even if the road ahead is unobstructed, thus forming unnecessary convoy congestion and reducing the overall traffic efficiency and safety of the construction site.
[0085] In order to solve the above problem, in a possible embodiment, during the driving process of the vehicle, sensor technologies such as on-board radar, laser rangefinder or video monitoring are used to continuously monitor the distance between any two front and rear vehicles in the same road section to determine whether it exceeds a preset safety distance threshold.
[0086] Based on factors such as vehicle type, acceleration and deceleration performance, and current speed, a mathematical model is established to evaluate the potential contribution of each vehicle to traffic congestion and calculate the congestion value. The congestion values of any two vehicles in the same section are compared and the difference between them is calculated. If the difference between the congestion values of the two vehicles in front and behind is greater than the first preset value and is currently within the speed limit of the construction site, the driver will be automatically or advised to increase the speed of the following vehicle appropriately to reduce the distance between vehicles and optimize traffic flow.
[0087] In this embodiment, by dynamically adjusting the vehicle speed, the road space is fully utilized and the formation of unnecessary convoys is reduced, thereby improving the overall traffic capacity of the road. Furthermore, by monitoring the vehicle spacing and congestion contribution, potential traffic jams are prevented in advance and the probability of emergency braking and rear-end collisions is reduced.
[0088] In a possible embodiment, the method further includes:
[0089] Based on the congestion prediction algorithm, the congestion value of each road section is monitored in real time to obtain the congestion values of multiple road sections;
[0090] When it is detected that the congestion value of any road section is greater than a second preset value, the road section corresponding to the road section congestion value is determined to be a congested road section, and the congested road section is avoided in the route planning process.
[0091] Traffic congestion is a common problem in the daily operation of smart construction sites, especially when multiple construction activities are carried out at the same time, and vehicles are concentrated on certain key sections of the road, resulting in reduced traffic efficiency and even safety issues. Traditional static route planning methods are difficult to respond to these dynamic changes in real time, so vehicles may be directed to already congested sections of the road, exacerbating traffic pressure. In addition, the particularity of the construction site environment, such as temporary closures, material stacking, large-scale machinery operations, etc., may also change the road capacity in an instant, and traditional route planning systems are often unable to identify and adjust in time.
[0092] In order to solve the above problem, in one possible embodiment, an established congestion prediction algorithm is used to continuously monitor the traffic conditions of each road section in the construction site, calculate the real-time congestion value, and set a second preset value as the congestion threshold. When the congestion value of a certain road section is monitored to exceed this threshold, the road section is immediately marked as a "congested section" and its status is updated to the construction site traffic management system. When performing route planning, the system will automatically exclude roads that have been marked as "congested sections" and give priority to those sections with good traffic conditions and lower congestion values to ensure that vehicles can travel along the smoothest path. As the traffic conditions on the construction site change, the congestion value of the road section is continuously monitored and updated, and the route is replanned when necessary to ensure that the route planning is always in the optimal state.
[0093] In this implementation, by marking "congested sections" and excluding "congested sections" from the optional range in the route planning process, the obtained route plan is more in line with the congestion requirements. Furthermore, avoiding high-congestion sections can reduce the safety hazards caused by traffic congestion, reduce the accident rate, and ensure the safety of personnel and equipment.
[0094] In a possible embodiment, the method further includes:
[0095] Based on the congestion prediction algorithm, the congestion value of each road section is monitored in real time to obtain the congestion values of multiple road sections;
[0096] The congestion values of multiple road sections are summed to obtain the congestion value of the construction site;
[0097] When it is detected that the congestion value of the construction site is greater than a third preset value, it is determined that the construction site is currently in a congested state, and vehicles are restricted from entering the construction site;
[0098] When it is monitored that the construction site congestion value is greater than a fourth preset value, it is determined that the construction site is currently in a congested state, and vehicles are prohibited from entering the construction site.
[0099] In the traffic management of smart construction sites, the overall traffic conditions of the construction site are not only affected by individual road sections, but also by the traffic network status of the entire construction site. When the traffic demand within the construction site reaches a certain threshold, even if there is no obvious congestion on a single road section, the entire construction site may fall into an inefficient operation state due to the excessive number of vehicles, resulting in a decrease in traffic speed, increased delays, or even complete congestion, seriously affecting construction efficiency and safety.
[0100] In order to solve the above problems, in one possible embodiment, an evaluation and control mechanism of the overall construction site congestion is introduced, as follows:
[0101] Using the above-mentioned congestion prediction algorithm, the congestion values of each road section in the construction site are continuously monitored, and these congestion values are summed to obtain the congestion value of the entire construction site (reflecting the traffic pressure of the construction site). Two different preset values are set. The third preset value is used to determine whether the construction site is in a congested state, and the fourth preset value is used to determine whether it has reached a serious congestion state. The setting of these two values should be based on the normal operating capacity and safety standards of the construction site. Once the congestion value of the construction site exceeds the third preset value, the system will determine that the construction site is in a state of mild congestion. At this time, restrictive measures are taken, such as reducing the number of vehicles entering the construction site to avoid worsening traffic conditions. If the congestion value further increases and exceeds the fourth preset value, the construction site is determined to be in a state of serious congestion. At this time, stricter control measures will be implemented to prohibit any unnecessary vehicles from entering the construction site until the traffic conditions improve. Through the construction site's communication system, congestion or blockage warning information will be sent to construction site managers and drivers, and construction plans and logistics arrangements will be adjusted to reduce the pressure on construction site traffic.
[0102] In this embodiment, the vehicle flow within the construction site is reasonably controlled to ensure that construction materials and personnel can circulate efficiently, avoid unnecessary waiting and delays, and improve the construction progress.
[0103] In a possible implementation, the present invention provides a road planning system for predicting traffic demand on a smart construction site. Figure 2 , the system comprising:
[0104] The data acquisition module 100 is used to acquire the current vehicle status information and destination information when a vehicle is detected to have arrived at a construction site intersection;
[0105] The route planning module 200 is used to plan a route based on the location information and destination information of the construction site intersection and generate multiple drivable routes;
[0106] The route evaluation module 300 is used to obtain the status information of all vehicles on each drivable route, substitute the status information of the current vehicle and the status information of all vehicles into a preset congestion prediction model, and obtain the congestion value of each drivable route;
[0107] The optimal route determination module 400 is used to obtain the actual driving routes of all vehicles in the construction site, screen out the actual driving routes that include the drivable routes of the current vehicle, and establish the actual driving route set of the vehicles on the construction site; determine the driving priority of the current vehicle and the vehicles in the actual driving route set, and when it is identified that the driving priority of any vehicle is greater than the driving priority of the current vehicle and the congestion value of the corresponding actual driving route is greater than a preset value, the corresponding drivable route is eliminated, and the drivable route with the smallest congestion value among the remaining routes is selected as the target driving route of the current vehicle.
[0108] In one possible embodiment, see Figure 2 and Figure 3 The system includes a congested road section detection module 500, which specifically includes:
[0109] A first road section congestion calculation unit 510 is used to monitor the congestion value of each road section in real time based on a congestion prediction algorithm to obtain multiple road section congestion values;
[0110] The congested section determination unit 520 is used to determine that the section corresponding to the section congestion value is a congested section when it is detected that the congestion value of any section is greater than a second preset value, and avoid selecting the congested section in the route planning process.
[0111] In one possible embodiment, see Figure 2 and Figure 4 The system further includes a construction site congestion state detection module 600, which specifically includes:
[0112] A second road section congestion calculation unit 610 is used to monitor the congestion value of each road section in real time based on a congestion prediction algorithm to obtain multiple road section congestion values;
[0113] A construction site congestion calculation unit 620, used to sum up the congestion values of multiple road sections to obtain a construction site congestion value;
[0114] A construction site congestion control unit 630, configured to determine that the construction site is currently in a congested state and restrict vehicles from entering the construction site when detecting that the construction site congestion value is greater than a third preset value;
[0115] The construction site congestion control unit 640 is used to determine that the construction site is currently in a congestion state and prohibit vehicles from entering the construction site when it is monitored that the construction site congestion value is greater than a fourth preset value.
[0116] It can be understood that the functions or modules included in the system provided in this embodiment can be used to execute the method described in the above method embodiment. Its specific implementation can refer to the description of the above method embodiment. For the sake of brevity, it will not be repeated here.
[0117] The present invention also provides an electronic device, including a processor and a memory, wherein the memory is used to store computer program code, and the computer program code includes computer instructions. When the processor executes the computer instructions, the electronic device executes the method described in any one of the above embodiments.
[0118] The present invention also provides a computer-readable storage medium, in which a computer program is stored. The computer program includes program instructions. When the program instructions are executed by a processor of an electronic device, the processor executes the method described in any of the above embodiments.
[0119] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0120] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments, and will not be repeated here. Those skilled in the art can also clearly understand that the descriptions of the various embodiments of the present invention have different focuses. For the convenience and brevity of description, the same or similar parts may not be repeated in different embodiments. Therefore, for parts not described or not described in detail in a certain embodiment, refer to the records of other embodiments.
[0121] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0122] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0123] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented by software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium or transmitted through the computer-readable storage medium. The computer instructions can be transmitted from a website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (digital subscriber line, DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode. The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that includes one or more available media integrated. The available medium may be a magnetic medium (eg, a floppy disk, a hard disk, a magnetic tape), an optical medium (eg, a digital versatile disc (DVD)), or a semiconductor medium (eg, a solid state disk (SSD)).
[0124] A person skilled in the art can understand that to implement all or part of the processes in the above-mentioned embodiments, the processes can be completed by a computer program to instruct the relevant hardware, and the program can be stored in a computer-readable storage medium. When the program is executed, it can include the processes of the above-mentioned method embodiments. The aforementioned storage medium includes: a read-only memory (ROM) or a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
Claims
1. A road planning method for predicting traffic demand on a smart construction site, characterized in that: The method comprises: When the vehicle arrives at the intersection of the construction site, the current vehicle travel information is obtained, and the travel information includes vehicle type, vehicle speed, current location information, destination information, and destination stay time; Perform route planning based on the current construction site intersection and the destination information to obtain multiple route plans; Acquire the travel information of the vehicles traveling on the route plan respectively to obtain a plurality of route travel information sets; Inputting the trip information and the plurality of route trip information sets into a preset congestion prediction algorithm, and outputting a plurality of route congestion scores; The congestion prediction algorithm is as follows: , , In the formula, and is a positive integer, is the number of vehicles, For the The congestion contribution score of each vehicle, For the The route congestion score corresponding to the route plan is For the The vehicle type congestion weight of the vehicle, For the The speed of the car, For the The distance of the vehicle to the destination, For the The vehicle’s dwell time at the destination, , and is the adjustment factor; The route solution corresponding to the smallest route congestion score is selected and determined as the latest driving path of the current vehicle.
2. A road planning method for predicting traffic demand on a smart construction site according to claim 1, characterized in that: The method further comprises: When the distance between any two leading vehicles and the following vehicle on the same road section is greater than a preset distance, the difference in congestion contribution scores between any two leading vehicles and the following vehicle on the same road section is detected; If the difference is greater than a first preset value, the speed of the following vehicle is increased within the speed limit of the construction site.
3. The road planning method for predicting traffic demand of a smart construction site according to claim 1 is characterized in that: The method further comprises: Based on the congestion prediction algorithm, the congestion score of each road section is monitored in real time to obtain multiple road section congestion scores; When it is detected that the congestion score of any of the road sections is greater than a second preset value, the road section corresponding to the road section congestion score is determined to be a congested road section, and the congested road section is avoided in the route planning process.
4. The road planning method for predicting traffic demand of a smart construction site according to claim 1 is characterized in that: The method further comprises: Based on the congestion prediction algorithm, the congestion score of each road section is monitored in real time to obtain multiple road section congestion scores; Sum up the congestion scores of the plurality of road sections to obtain a construction site congestion score; When it is detected that the congestion score of the construction site is greater than a third preset value, determining that the construction site is currently in a congested state, and restricting vehicles from entering the construction site; When it is monitored that the congestion score of the construction site is greater than a fourth preset value, it is determined that the construction site is currently in a congested state, and vehicles are prohibited from entering the construction site.
5. A road planning system for predicting traffic demand on smart construction sites, characterized in that: The system comprises: The first data acquisition module is used to acquire the current vehicle travel information when the vehicle drives to the construction site intersection, and the travel information includes vehicle type, vehicle speed, current location information, destination information, and destination stay time; A route planning module, used to perform route planning processing according to the current construction site intersection and the destination information to obtain multiple route plans; A second data acquisition module is used to respectively acquire the travel information of vehicles traveling on the route plan to obtain a plurality of route travel information sets; a route evaluation module, configured to input the trip information and a plurality of the route trip information sets into a preset congestion prediction algorithm, and output a plurality of route congestion scores; The congestion prediction algorithm is as follows: , , In the formula, and is a positive integer, is the number of vehicles, For the The congestion contribution score of each vehicle, For the The route congestion score corresponding to the route plan is For the The vehicle type congestion weight of the vehicle, For the The speed of the car, For the The distance of the vehicle to the destination, For the The vehicle’s dwell time at the destination, , and is the adjustment factor; The optimal route determination module is used to select a route solution corresponding to the smallest route congestion score and determine it as the latest driving path of the current vehicle.
6. A road planning system for predicting traffic demand on a smart construction site according to claim 5, characterized in that: The system also includes a congested road section detection module, including: A first road section congestion calculation unit, configured to monitor the congestion score of each road section in real time based on the congestion prediction algorithm, and obtain a plurality of road section congestion scores; The congested road section determination unit is used to determine that the road section corresponding to the road section congestion score is a congested road section when it is detected that the congestion score of any road section is greater than a second preset value, and avoid selecting the congested road section in the route planning process.
7. The road planning system for predicting traffic demand on a smart construction site according to claim 5 is characterized in that: The system also includes a construction site congestion status detection module, including: A second road section congestion calculation unit is used to monitor the congestion score of each road section in real time based on the congestion prediction algorithm to obtain multiple road section congestion scores; A construction site congestion calculation unit, used for summing up the congestion scores of the plurality of road sections to obtain a construction site congestion score; A construction site congestion control unit, configured to determine that the construction site is currently in a congested state and restrict vehicles from entering the construction site when detecting that the construction site congestion score is greater than a third preset value; The construction site congestion control unit is used to determine that the construction site is currently in a congestion state and prohibit vehicles from entering the construction site when it is monitored that the congestion score of the construction site is greater than a fourth preset value.
8. An electronic device, characterized in that: include: A processor and a memory, wherein the memory is used to store computer program code, wherein the computer program code includes computer instructions. When the processor executes the computer instructions, the electronic device executes the road planning method for predicting traffic demand for a smart construction site as described in any one of claims 1 to 4.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, which includes program instructions. When the program instructions are executed by a processor of an electronic device, the processor executes the road planning method for predicting traffic demand for a smart construction site as described in any one of claims 1 to 4.
Citation Information
Patent Citations
Traffic jam prediction control system based on big data
CN112614338A
Vehicle driving route planning method, intelligent terminal and storage medium
CN115164921A