A gas generator component sealing test system

The gas generator component sealing test system uses test shells and a prompt rod mechanism to accurately detect gas leaks in gas generator sets, overcoming environmental and operational challenges in existing detection methods.

CN118758507BActive Publication Date: 2024-12-06SHANDONG ZHONGTUO NEW ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411244442.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-12-06
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

Existing gas generator set performance tests face challenges in accurately detecting gas leaks due to ventilation and cooling fan interference, as well as the difficulty in simultaneous testing of multiple pipeline joints during varying pressure and flow conditions.

Method used

A gas generator component sealing test system using two opening and closing test shells to collect gas leaks from pipeline joints, employing a prompt rod mechanism and gas detection system to determine leaks intuitively and accurately, unaffected by environmental factors.

Benefits of technology

The system provides intuitive and accurate gas leak detection, improving convenience and stability by minimizing environmental interference and ensuring accurate identification of pipeline joint leaks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118758507B_ABST
    Figure CN118758507B_ABST
Patent Text Reader

Abstract

The technical field of pipeline gas leakage detection of the present invention is specifically a gas generator component sealing test system; it includes a test shell and a hinge bar fixedly connected to the outer wall of one end of the test shell; a hinge rod is rotatably connected between two hinge bars; the two hinge bars are twisted by a torsion spring; the hinge bar is fixedly connected to a handle at one end away from the test shell; the test shell is semi-annular in shape; the two test shells are combined to form a full ring; the inner wall of the test shell is provided with a semi-annular test groove; the bottom of the test groove is fixedly connected to an elastic bag; the present invention covers the position of the pipeline joint by two open and closed test shells, thereby collecting the gas leaked from the pipeline joint, and then judges whether the pipeline joint is leaking through the activity of the prompt rod in the prompt hole and the gas detection after collection. Compared with the existing pipeline leakage detection method, the detection method of the present invention is more intuitive and accurate, and is not affected by the surrounding environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pipeline gas leakage detection, in particular to a gas generator component sealing test system. Background Art

[0002] Gas generator sets are new types of generator sets developed to meet the world's environmental protection requirements and the new market environment. There are two main types of natural gas generator sets, one is a combined cycle gas turbine and the other is a gas internal combustion engine. Gas turbines have relatively large power and are mainly used in large and medium-sized power stations, while gas internal combustion engines have relatively small power and are mainly used in small distributed power stations. It is a new type of green and environmentally friendly power to replace oil and coal-fired units. Gas generators make full use of various natural gases or harmful gases as fuel; the working principle of gas generators is that the gas enters the combustion chamber through a pipeline, generates power by burning the gas, and then converts the power into electrical energy, which is finally supplied to the power grid or electrical equipment for use.

[0003] Gas generator sets need to be tested before delivery to test the performance of the gas generator. During the performance test of the gas generator set, the gas generator also needs to be tested for sealing. Specifically, during the test operation of the gas generator set, the gas transmission pipeline of the gas generator set needs to be tested for gas leaks, especially the location of the pipeline joints. This can be done by placing a gas leak detector close to the gas transmission pipeline. However, this method has the problem of large detection errors and difficulty in judging the leakage point. The specific reasons are as follows:

[0004] a. In order to avoid explosions, poisoning and other dangerous situations caused by gas leakage during the test, the test area is equipped with ventilation equipment. The surrounding airflow will carry away the leaked gas, making it difficult for existing gas leak detectors to accurately detect, especially to accurately test the leak location; b. The existing gas generator set is equipped with a cooling fan. The cooling fan is to dissipate heat in the combustion chamber. The rotation of the fan will also carry away the leaked gas, thereby affecting the tester's gas leak detection; c. The pipeline gas flow and pressure in the gas generator set will change according to usage requirements, and the performance test of the gas generator set takes a period of time. During this period, it is difficult for testers to use gas leak detectors to detect multiple pipeline joints at the same time. When testing in sequence, test errors will occur due to the short leak detection time and too little leakage flow. Summary of the invention

[0005] In order to make up for the deficiencies of the prior art, the present invention proposes a gas generator component sealing test system. The present invention covers the position of the pipeline joint by two opening and closing test shells, so as to collect the gas leaking from the pipeline joint, and then judges whether the pipeline joint is leaking through the movement of the prompt rod in the prompt hole and the gas detection after collection. Compared with the existing pipeline leakage detection method, the detection method of the present invention is more intuitive and accurate, and is not affected by the surrounding environment.

[0006] The technical solution adopted by the present invention to solve its technical problems is: a gas generator component sealing test system described in the present invention comprises a test shell and a hinge bar fixed on the outer wall at one end of the test shell; a hinge rod is rotatably connected between two of the hinge bars; the two hinge bars are twisted together by a torsion spring; the hinge bar is fixedly connected to a handle at one end away from the test shell; the test shell is semi-annular in shape; two test shells are combined to form a full ring; a semi-annular test groove is provided on the inner wall of the test shell; an elastic capsule is fixedly connected to the bottom of the test groove; a prompt hole is provided through the bottom of the test groove; a prompt rod is movably connected in the prompt hole; the prompt rod is located at one end of the test groove and fixedly connected to a push block; the outer wall of the push block and the bottom of the test groove are connected by a first spring; a U-shaped sealing strip is embedded in the contact position of the two test shells; the arc-shaped opening position of the test shell is sealed by a capsule strip; and a breathable groove is provided through the inner wall of the test groove.

[0007] Preferably, the prompt rod is located at one end of the outer wall of the test shell and is connected to a limit ring; one of the prompt rods is provided with a one-way air outlet along the axial direction; the one-way air outlet is connected to a side of the elastic bag close to the object to be tested through a hose; the opening pressure of the one-way air outlet is greater than the sum of all the first spring elastic forces.

[0008] Preferably, the prompt holes are evenly distributed along the circumference and axial direction of the test shell; and the number of the prompt rods is consistent with the number of the prompt holes.

[0009] Preferably, the outer wall of the prompt rod is provided with an external thread; the inner wall of the limiting ring is provided with an internal thread; the limiting ring is sleeved on the outer wall of the prompt rod and is threadably connected to the prompt rod.

[0010] Preferably, the test shell is fixedly connected to a semi-annular arc strip near the arc opening; two of the arc strips are combined to form a full ring; the capsule strip is fixedly connected to the inner arc wall of the arc strip; the capsule strip is semi-annular in shape; two capsule strips are combined to form a full ring; the handle is cylindrical in shape; a spiral groove is provided on the outer wall of the handle; a movable block is connected to the movable block in the spiral groove; the outer wall of the handle is sleeved and the movable seal is connected to the movable cylinder; the movable block is fixedly connected to the inner wall of the movable cylinder; the interior of the movable cylinder is connected to the interior of the corresponding capsule strip through the first air hole; the interior of the movable cylinder is filled with a medium.

[0011] Preferably, rotating holes are provided at corresponding positions of the hinge bar and the hinge rod; one end of the hinge rod is rotatably connected to the rotating hole, and the other end is fixedly connected to another hinge bar; a slot is provided on the outer wall of one end of the hinge rod located in the rotating hole; a groove is provided on the inner wall of the rotating hole; a block is connected to the sliding seal in the groove; the block is connected to the bottom of the groove through a second spring; the groove corresponds to the slot after the two test shells are closed; the bottom of the groove is connected to the inside of the movable cylinder through a second air hole; the block can be inserted into the slot.

[0012] Preferably, the inner wall of the rotating hole is provided with a locking groove corresponding to the groove; the locking groove and the groove are symmetrically arranged about the hinge rod; the clamping groove penetrates radially along the hinge rod; a locking block is arranged in the clamping groove; the cross-section of the locking block is the same as the cross-section of the clamping block; the locking block is inserted into the locking groove under the push of the clamping block; the locking block and the clamping block are made of magnetic material and are magnetically attracted to each other.

[0013] Preferably, a retaining groove is provided on the inner arc wall of the arc strip; a plurality of retaining grooves are distributed along the circumference of the arc strip; two groups of retaining grooves are symmetrically distributed along the axis of the hinge rod on both sides of the capsule strip; a retaining plate is slidably connected in the retaining groove; and the retaining plate is connected to the bottom of the retaining groove through a third spring.

[0014] The beneficial effects of the present invention are as follows:

[0015] 1. The present invention covers the position of the pipeline joint by two open and closed test shells, so as to collect the gas leaking from the pipeline joint, and then judge whether the pipeline joint is leaking by the movement of the prompt rod in the prompt hole and the gas detection after collection. Compared with the existing pipeline leakage detection method, the detection method of the present invention is more intuitive and accurate, and is not affected by the surrounding environment.

[0016] 2. The present invention can accurately determine the gas leakage of the pipeline joint through the position of the limit ring before and after the test, so that the tester does not need to keep staring at the prompt rod, thereby improving the convenience of the sealing test.

[0017] 3. The present invention locks the two test shells in the test process and cannot be unfolded by inserting the card block into the card slot, thereby preventing the gas leaking from the pipe joint from pushing the test shell open, thereby improving the stability of the pipe joint test; in addition, the locking block is inserted into the lock slot and the card slot is inserted into the card slot to further improve the locking strength of the locking rod and the rotating hole. In addition, the expansion of the bag strip at the arc-shaped opening position of the test shell can improve the sealing degree between the arc-shaped opening of the test shell and the outer wall of the pipe to be tested, thereby suppressing the leakage of gas in the pipe joint to be tested, thereby improving the accuracy of the pipe joint sealing test. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention is further described below in conjunction with the accompanying drawings and implementation modes.

[0019] Figure 1 is a stereogram of the present invention;

[0020] Figure 2 is a three-dimensional diagram of one of the arc-shaped shells in the present invention;

[0021] Figure 3 is a three-dimensional diagram of another arc-shaped shell in the present invention;

[0022] Figure 4 is a cross-sectional view of the present invention;

[0023] Figure 5 is a cross-sectional view of the arc strip in the present invention;

[0024] Figure 6 yes Figure 5 The enlarged view of point A in the middle;

[0025] Figure 7 yes Figure 5 The enlarged view of point B in the middle;

[0026] Figure 8 It is a three-dimensional diagram of the hinge in the present invention;

[0027] Fig. 9 It is a cross-sectional view of the groove and the card slot in the present invention.

[0028] In the figure: test shell 1, test slot 11, elastic capsule 12, prompt hole 13, push block 15, first spring 16, sealing strip 17, vent groove 18, limit ring 19, hinge strip 2, torsion spring 21, rotating hole 22, groove 23, block 24, second spring 25, lock slot 26, hinge rod 3, slot 31, lock block 32, handle 4, spiral groove 41, movable block 42, capsule strip 5, prompt rod 6, one-way air outlet 61, hose 62, arc strip 7, blocking groove 71, blocking sheet 72, third spring 73, movable cylinder 8, first air hole 81, second air hole 82. DETAILED DESCRIPTION

[0029] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0030] like Figures 1 to 9 As shown, the present invention includes the following embodiments:

[0031] Embodiment 1: A gas generator component sealing test system, comprising a test shell 1 and a hinge bar 2 fixedly connected to the outer wall at one end of the test shell 1; a hinge rod 3 is rotatably connected between two of the hinge bars 2; the two hinge bars 2 are twisted together by a torsion spring 21; the hinge bar 2 is fixedly connected to a handle 4 at one end away from the test shell 1; the test shell 1 is semi-circular in shape; two test shells 1 are combined to form a full ring; a semi-circular test groove 11 is arranged on the inner wall of the test shell 1; an elastic capsule 12 is fixedly connected to the bottom of the test groove 11; a prompt hole 13 is provided through the bottom of the test groove 11; a prompt rod 6 is movably connected in the prompt hole 13; the prompt rod 6 is located at one end of the test groove 11 and is fixedly connected to a push block 15; the outer wall of the push block 15 and the bottom of the test groove 11 are connected by a first spring 16; a U-shaped sealing strip 17 is embedded in the contact position of the two test shells 1; the arc-shaped opening position of the test shell 1 is sealed by the capsule bar 5; and a breathable groove 18 is provided through the inner wall of the test groove 11.

[0032] The prompt rod 6 is located at one end of the outer wall of the test shell 1 and is connected to the limit ring 19; one of the prompt rods 6 is provided with a one-way air outlet 61 along the axial direction; the one-way air outlet 61 is connected to the side of the elastic bag 12 close to the object to be tested through a hose 62; the opening pressure of the one-way air outlet 61 is greater than the sum of the elastic forces of all the first springs 16.

[0033] The prompt holes 13 are evenly distributed along the circumference and axial direction of the test shell 1 ; the number of the prompt rods 6 is consistent with the number of the prompt holes 13 .

[0034] After the gas generator set is assembled and transported to the test workshop, the tester connects the gas transmission pipeline in the gas generator set to the gas, and then pinches the two handles 4. After the two handles 4 are pinched, they move closer to each other. The two handles 4 will drive their respective hinges 2 to cross and move in the process of approaching each other around the hinge rod 3. The hinge 2 is L-shaped. The handles 4 lift the corresponding test shell 1 through the principle of leverage, so that the two test shells 1 will be out of contact and move away from each other. After the two test shells 1 form an opening, the two test shells 1 are moved to the position of the pipeline joint to be tested. The leakage of the pipeline joint has the highest probability, so the position where the pipeline is connected is generally tested;

[0035] After the two test shells 1 are moved to the position of the pipe joint to be tested, the handle 4 is released, and the torsion spring 21 drives the two test shells 1 to approach each other under the action of torque. Due to the action of the limit ring 19, the elastic force of the first spring 16 opens the elastic capsule 12 to the notch position of the test slot 11. As the two test shells 1 approach each other, the test shell 1 drives the elastic capsule 12 to contact with the flange and other connectors of the pipe joint. The space of the test slot 11 can cover the connector of the pipe joint. The connector on the pipe joint will squeeze the elastic capsule 12. The elastic capsule 12 is compressed and drives the prompt rod 6 to move along the corresponding prompt hole 13. The prompt rod 6 and the prompt rod 6 are evenly distributed along the circumference and axial direction of the test shell 1, so that each prompt rod 6 can move freely. The number of the first springs 16 is the same as that of the prompt rod 6. The first spring 16 is sleeved on the outer wall of the corresponding prompt rod 6. The first spring 16 transmits the elastic force to the elastic capsule 12, so that the elastic capsule 12 is tightly attached to the connector of the pipe joint, so that the elastic capsule 12 is maximized inwardly expanded in the test slot 11;

[0036] After the test shells 1 come into contact with each other, the contact position of the test shells 1 is sealed by the corresponding sealing strips 17, and the arc-shaped opening position of the test shell 1 is sealed by the capsule strips 5. The arc-shaped opening of the test shell 1 is stuck on the outer walls of the pipeline on both sides of the pipeline joint. The capsule strips 5 seal the arc-shaped opening of the test shell 1 and the outer wall of the pipeline. The elastic capsule 12 separates the test slot 11 into a storage chamber on the side of the elastic capsule 12 facing the pipeline joint and an active chamber on the side away from the pipeline joint. The active chamber is connected to the outside gas through the air-permeable groove 18. The elastic force of the first spring 16 is slightly greater than the elastic force of the elastic capsule 12. The elastic force of the elastic capsule 12 is small and less than the pressure of the gas leakage. After the two test shells 1 come into contact and seal with each other, the storage chamber is also sealed, and then the gas generator set is controlled to operate. The gas enters the cylinder through the gas transmission pipeline and mixes with the air, and is compressed and ignited, and converted into mechanical energy to generate electricity.

[0037] During the performance test of the gas generator set, the gas in the gas transmission pipeline will undergo different pressure and flow rate changes according to the performance test requirements. The positions of multiple pipeline joints are contacted and wrapped by the two test shells 1. If the corresponding pipeline joint leaks, the leaked gas will enter the storage chamber. When the gas in the storage chamber increases, the gas pressure in the storage chamber increases. The gas pressure in the storage chamber is much smaller than the outlet pressure of the one-way outlet hole 61, so it will not cause gas overflow. As the gas in the storage chamber increases, the space in the storage chamber will become larger, and the elastic capsule 12 will shrink in the direction away from the pipeline joint. During the shrinkage of the elastic capsule 12, the push block 15 will be driven to move away from the pipeline joint. The push block 15 will transfer the force exerted on the elastic capsule 12 to the first spring 16, so that the elastic capsule 12 will overcome the elastic force of the first spring 16 and shrink in the direction away from the pipeline joint. The push block 15 will drive the prompt rod 6 to move along the corresponding prompt hole 13, and the gas in the movable chamber will flow out along the venting groove 18. When the staff observes that the prompt rod 6 moves along the corresponding prompt hole 13, it indicates that there is a gas leak at the pipeline joint.

[0038] On the contrary, if the prompt rod 6 is not observed to move along the prompt hole 13, it means that there is no leakage at the pipe joint. In this way, the leakage of the pipe joint can be tested through the prompt of the prompt rod 6; the storage chamber can collect the leaked gas, so as to avoid the interference of the surrounding airflow on the leaked gas at the pipe joint. After the gas generator set has been running for a period of time, the staff will sequentially align the gas leak detector with the prompt rod 6 with the one-way air outlet 61. The outer wall of the prompt rod 6 is adapted to the inner diameter of the air inlet pipe of the gas leak detector, so the gas leak detector can be connected with the orifice of the one-way air outlet 61, and then the gas leak detector is controlled to work while pressing the prompt button. Rod 6, the gas leak detector has an air pump inside, so that it can overcome the leakage pressure in the one-way air outlet 61 and evacuate the one-way air outlet 61. In addition, squeezing the prompt rod 6 will further increase the air pressure in the storage chamber, so that the gas in the storage chamber will enter the gas leak detector along the one-way air outlet 61. The gas leak detector will further detect the leakage concentration and composition of the gas, and further determine whether the pipeline joint has a leak. After completing the leak detection, the staff will pinch the two handles 4 to move them closer to each other, so that the two test shells 1 will open again and move away from each other. After the test shells 1 move away from each other, they will be removed from the corresponding pipeline joint position for recycling;

[0039] The present invention covers the position of the pipeline joint by two open and closed test shells 1, so as to collect the gas leaking from the pipeline joint, and then judge whether the pipeline joint is leaking through the movement of the prompt rod 6 in the prompt hole 13 and the gas detection after collection. Compared with the existing pipeline leakage detection method, the detection method of the present invention is more intuitive and accurate, and is not affected by the surrounding environment.

[0040] Embodiment 2: The outer wall of the prompt rod 6 is provided with an external thread; the inner wall of the limiting ring 19 is provided with an internal thread; the limiting ring 19 is sleeved on the outer wall of the prompt rod 6 and is threadedly connected with the prompt rod 6.

[0041] Before the pipeline joint leakage test, the two test shells 1 are controlled to open, and then the two test shells 1 are wrapped around the corresponding pipeline joints. As the two test shells 1 are closed, the elastic capsule 12 will contact the pipeline joint, and the elastic capsule 12 will be squeezed by the pipeline joint to drive the prompt rod 6 to move along the prompt hole 13 until the two test shells 1 are completely closed, and the prompt rod 6 will also stop moving. Then, the limit ring 19 is twisted, and the limit ring 19 will approach the corresponding prompt hole 13 after twisting, until the limit ring 19 contacts the outer wall of the test shell 1 while keeping the prompt rod 6 stationary, completing the marking process of the limit ring 19;

[0042] Then the gas generator set is operated. In the event of gas leakage at the pipe joint, the leaked gas will cause the elastic bag 12 to shrink toward the outside, thereby driving the prompt rod 6 to move along the prompt hole 13 away from the pipe joint. The prompt rod 6 will drive the limit ring 19 away from the outer wall of the test shell 1. After a period of time, it is only necessary to observe that the limit ring 19 is out of contact with the test shell 1, indicating that there is gas in the storage cavity, that is, there is a gas leakage at the pipe joint. The position of the limit ring 19 before and after the test can accurately determine the gas leakage of the pipe joint. In this way, there is no need for the tester to keep staring at the prompt rod 6, thereby improving the convenience of the sealing test. After completing the removal of the test shell 1 from the pipe joint, the tester will reversely twist the limit ring 19 to return it to its original position.

[0043] Embodiment 3: The test shell 1 is fixedly connected to a semi-circular arc strip 7 near the arc opening; two of the arc strips 7 are combined to form a full ring; the capsule strip 5 is fixedly connected to the inner arc wall of the arc strip 7; the capsule strip 5 is semi-circular in shape; two capsule strips 5 are combined to form a full ring; the handle 4 is cylindrical in shape; a spiral groove 41 is provided on the outer wall of the handle 4; a movable block 42 is movably sealed and connected to the spiral groove 41; the outer wall of the handle 4 is sleeved and movably sealed and connected to the movable cylinder 8; the movable block 42 is fixedly connected to the inner wall of the movable cylinder 8; the interior of the movable cylinder 8 is connected to the interior of the corresponding capsule strip 5 through the first air hole 81; the interior of the movable cylinder 8 is filled with a medium.

[0044] A rotating hole 22 is provided at the corresponding positions of the hinge bar 2 and the hinge rod 3; one end of the hinge rod 3 is rotatably connected to the rotating hole 22, and the other end is fixedly connected to another hinge bar 2; a slot 31 is provided on the outer wall of one end of the hinge rod 3 located at the rotating hole 22; a groove 23 is provided on the inner wall of the rotating hole 22; a block 24 is connected with a sliding seal in the groove 23; the block 24 is connected to the bottom of the groove 23 through a second spring 25; the groove 23 corresponds to the slot 31 after the two test shells 1 are closed; the bottom of the groove 23 is connected to the inside of the movable cylinder 8 through the second air hole 82; the block 24 can be inserted into the slot 31.

[0045] The inner wall of the rotating hole 22 is provided with a locking groove 26 corresponding to the groove 23; the locking groove 26 and the groove 23 are symmetrically arranged about the hinge rod 3; the clamping groove 31 passes through radially along the hinge rod 3; a locking block 32 is arranged in the clamping groove 31; the cross-section of the locking block 32 is the same as the cross-section of the clamping block 24; the locking block 32 is inserted into the locking groove 26 under the push of the clamping block 24; the locking block 32 and the clamping block 24 are made of magnetic material and are magnetically attracted to each other.

[0046] A retaining groove 71 is provided on the inner arc wall of the arc strip 7; a plurality of retaining grooves 71 are distributed along the circumference of the arc strip 7; two groups of retaining grooves 71 are symmetrically distributed along the axis of the hinge rod 3 on both sides of the capsule strip 5; a retaining plate 72 is slidably connected in the retaining groove 71; the retaining plate 72 is connected to the bottom of the retaining groove 71 through a third spring 73.

[0047] After the two opened test shells 1 are moved to the outside of the pipe joint to be tested, the two handles 4 are released, and the torsion springs 21 drive the two test shells 1 to close together, and the two test shells 1 drive the arc strips 7 of the arc opening to move synchronously, so that the two pairs of arc strips 7 are close to each other and closed, and the blocking piece 72 is pressed against the outer wall of the pipe to be tested under the elastic force of the third spring 73, and then the two movable cylinders 8 are rotated. The movable cylinder 8 drives the movable block 42 to move along the corresponding spiral groove 41 during the rotation process, so that the two movable cylinders 8 will move close to the corresponding hinge strip 2 during the rotation process, and the liquid medium in the two movable cylinders 8 will flow out along the corresponding first air hole 81. Since one of the movable cylinders 8 is connected to the second air hole 82, The liquid medium in the movable cylinder 8 enters the groove 23 along the second air hole 82, and the medium in the groove 23 cooperates with the second spring 25 to push the block 24 out of the groove 23. Since the groove 23 is aligned with the groove 31, the block 24 partially enters the groove 31 under the push of the medium and the second spring 25, and the block 24 squeezes the locking block 32 in the groove 31, so that the locking block 32 extends along the end of the groove 31 away from the groove 23 and enters the locking groove 26, and the gas in the locking groove 26 is squeezed out, so that the hinge rod 3 is locked in the rotating hole 22, so that the two hinge strips 2 cannot move, and the two test shells 1 cannot be opened, so as to ensure the stability of the storage chamber for collecting leakage of the pipeline joint;

[0048] After the test shell 1 is locked and cannot be opened, the two pairs of arc strips 7 are also locked. After the block 24 extends from the groove 23 to the limit position, the medium in the movable cylinder 8 enters the capsule strip 5 along the first air hole 81, so that the capsule strip 5 begins to expand. The blocking piece 72 limits and blocks the capsule strip 5 in the axial direction of the hinge rod 3, so that the capsule strip 5 can only begin to expand in the radial and circumferential directions of the pipeline, so that the capsule strip 5 is more closely pressed against the outer wall of the pipeline, so as to achieve the sealing of the arc opening position of the test shell 1 and the outer wall of the pipeline with different diameters;

[0049] After the test is completed, the movable cylinder 8 is twisted in the reverse direction to make the space in the movable cylinder 8 negatively pressurized. The medium in the groove 23 flows back into the movable cylinder 8 along the second air hole 82 under the negative pressure. The clamping block 24 retracts into the groove 23. The locking block 32 returns to the clamping groove 31 along with the clamping block 24 under the magnetic force. The end of the locking block 32 moves out of the locking groove 26. In this way, the hinge rod 3 and the rotating hole 22 are unlocked, and the two test shells 1 are also unlocked. The medium in the capsule strip 5 flows back into the movable cylinder 8 along the first air hole 81.

[0050] In this embodiment, the card block 24 is inserted into the card slot 31, so that the two test shells 1 are locked and cannot be unfolded during the test process, thereby preventing the gas leaking from the pipe joint from pushing the test shell 1 open, thereby improving the stability of the pipe joint test; in addition, the locking block 32 is inserted into the locking slot 26 and cooperates with the card slot 31 to further improve the locking strength of the locking rod and the rotating hole 22. In addition, the expansion of the bag strip 5 at the arc-shaped opening position of the test shell 1 can improve the sealing degree between the arc-shaped opening of the test shell 1 and the outer wall of the pipe to be tested, thereby suppressing the leakage of gas in the pipe joint to be tested, so that the accuracy of the pipe joint sealing test is improved.

[0051] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate directions or positional relationships based on the attached Figure 1 The orientation or positional relationship shown is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, it cannot be understood as limiting the scope of protection of the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0052] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A gas generator component sealing test system, characterized in that: It includes a test shell and a hinge bar fixedly connected to the outer wall of one end of the test shell; a hinge rod is rotatably connected between the two hinge bars; the two hinge bars are twisted by a torsion spring; the end of the hinge bar away from the test shell is fixedly connected to a handle; the test shell is semi-annular in shape; the two test shells are combined to form a full ring; a semi-annular test groove is arranged on the inner wall of the test shell; an elastic capsule is fixedly connected to the bottom of the test groove; a prompt hole is provided through the bottom of the test groove; a prompt rod is movably connected in the prompt hole; the prompt rod is fixedly connected to a push block at one end of the test groove; the outer wall of the push block and the bottom of the test groove are connected by a first spring; a U-shaped sealing strip is embedded in the contact position of the two test shells; the arc-shaped opening position of the test shell is sealed by a capsule strip; a breathable groove is provided through the inner wall of the test groove; The prompt rod is located at one end of the outer wall of the test shell and is connected to a limit ring; one of the prompt rods is provided with a one-way air outlet along the axial direction; the one-way air outlet is connected to a side of the elastic bag close to the object to be tested through a hose; the opening pressure of the one-way air outlet is greater than the sum of all the first spring elastic forces; The prompt holes are evenly distributed along the circumference and axial direction of the test shell; the number of the prompt rods is consistent with the number of the prompt holes.

2. A gas generator component sealing test system according to claim 1, characterized in that: The outer wall of the prompt rod is provided with an external thread; the inner wall of the limiting ring is provided with an internal thread; the limiting ring is sleeved on the outer wall of the prompt rod and is threadedly connected with the prompt rod.

3. A gas generator component sealing test system according to claim 1, characterized in that: The test shell is fixedly connected to a semi-circular arc strip near the arc opening; two arc strips are combined to form a full ring; the capsule strip is fixedly connected to the inner arc wall of the arc strip; the handle is cylindrical in shape; a spiral groove is provided on the outer wall of the handle; a movable block is connected to the movable block in the spiral groove; the outer wall of the handle is sleeved and the movable seal is connected to the movable cylinder; the movable block is fixedly connected to the inner wall of the movable cylinder; the interior of the movable cylinder is connected to the interior of the corresponding capsule strip through the first air hole; the interior of the movable cylinder is filled with a medium.

4. A gas generator component sealing test system according to claim 3, characterized in that: The hinge bar and the hinge rod are provided with rotating holes at corresponding positions; one end of the hinge rod is rotatably connected to the rotating hole, and the other end is fixedly connected to another hinge bar; a slot is provided on the outer wall of one end of the hinge rod located in the rotating hole; a groove is provided on the inner wall of the rotating hole; a block is connected with a sliding seal in the groove; the block is connected to the bottom of the groove through a second spring; the groove corresponds to the slot after the two test shells are closed; the bottom of the groove is connected to the inside of the movable cylinder through a second air hole; the block can be inserted into the slot.

5. A gas generator component sealing test system according to claim 4, characterized in that: The inner wall of the rotating hole is provided with a locking groove corresponding to the groove; the locking groove and the groove are symmetrically arranged about the hinge rod; the clamping groove passes through the hinge rod radially; a locking block is arranged in the clamping groove; the cross-section of the locking block is the same as the cross-section of the clamping block; the locking block is inserted into the locking groove under the push of the clamping block; the locking block and the clamping block are made of magnetic material and are magnetically attracted to each other.

6. A gas generator component sealing test system according to claim 3, characterized in that: The inner arc wall of the arc strip is provided with a retaining groove; a plurality of retaining grooves are distributed along the circumference of the arc strip; two groups of retaining grooves are symmetrically distributed along the axis of the hinge rod on both sides of the capsule strip; a retaining plate is slidably connected in the retaining groove; the retaining plate is connected to the bottom of the retaining groove through a third spring.