A charging device for a solid-state lead battery energy storage power station
By introducing detection and analysis units into solid-state lead battery energy storage power stations, the power changes of the equipment to be charged in real time are solved, and the problem of low charging efficiency in the existing technology is achieved, and the charging status is accurately monitored and the charging efficiency is improved.
Patent Information
- Application Number
- CN202411244298.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-09-06
AI Technical Summary
The existing energy storage power stations cannot determine the charging status of the equipment to be charged in real time, resulting in low charging efficiency.
A charging equipment for solid-state lead battery energy storage power station is designed, including power generation unit, power storage unit, power supply unit, detection unit and analysis unit. The power change of the equipment to be charged is periodically obtained through the detection unit, and the analysis unit is based on the preset. Standards and historical data determine whether the charging process meets the standards and adjusts charging parameters to improve charging efficiency.
Real-time monitoring of charging equipment and sensitivity to charging status are achieved, timely handling of charging abnormalities, and improving charging efficiency and stability.
Smart Images

Figure CN118763784B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy storage power stations, and in particular to charging equipment for a solid-state lead battery energy storage power station. Background Art
[0002] With the development of national production and the improvement of people's living standards, higher requirements have been placed on the demand and amount of electricity. With the increasing prominence of environmental problems, countries around the world have proposed to develop clean energy, such as vigorously developing hydropower, wind power, and solar power generation. Energy storage power stations are another type of equipment that the country has advocated in recent years to effectively store and utilize energy. They play a very important role in supplementing electricity to the power grid and adjusting the peaks and valleys of the power grid.
[0003] China Patent Publication No.: CN116093494B discloses a high-safety energy storage power station, including an energy storage power station, wherein a plurality of energy storage battery cabinets are arranged inside the energy storage power station, and two groups of vertical side beams are symmetrically arranged on the inner wall of the energy storage battery cabinet, and a horizontal cross beam is fixedly connected between each group of vertical side beams. When the battery pack in the energy storage power station generates a large amount of heat during charging or discharging, the thermistor in the temperature control system continuously changes, and the operational amplifier is used to compare and amplify the changing voltage, so that the fluctuation value of the circuit output voltage is proportional to the fluctuation value of the working temperature detected by the temperature sensor, and the output voltage signal is slowly adjusted and changed by the PID control system, and finally the output signal voltage is added to the semiconductor refrigeration plate, and the semiconductor refrigeration plate is cooled or heated by the continuous change of the resistance value of the thermistor; it can be seen that the above technical solution has the following problems: the charging state of the device to be charged cannot be determined in real time, resulting in low charging efficiency for the device to be charged. Summary of the invention
[0004] To this end, the present invention provides a charging device for a solid-state lead battery energy storage power station, so as to overcome the problem in the prior art that the charging state of the device to be charged cannot be determined in real time, resulting in low charging efficiency for the device to be charged.
[0005] To achieve the above object, the present invention provides a charging device for a solid-state lead battery energy storage power station, comprising:
[0006] A power generation unit, which is a power grid that converts natural energy into electrical energy;
[0007] An electricity storage unit, which is connected to the power generation unit and is used to receive and store the electric energy output by the power generation unit, comprises a plurality of lead-acid batteries arranged in parallel and a plurality of heating films respectively arranged between two corresponding lead-acid batteries;
[0008] A power supply unit connected to the power storage unit for delivering the electric energy stored in the power storage unit to the device to be charged. The power supply unit includes a plurality of charging connectors for connecting to the corresponding device to be charged to deliver the electric energy to the device to be charged;
[0009] A detection unit, which is arranged in the power supply unit, including a plurality of power detectors for detecting the storage power of the corresponding device to be charged, a plurality of voltage detectors for detecting the charging voltage of the power supply unit for the corresponding device to be charged, and a temperature detector for detecting the ambient temperature of the power supply unit;
[0010] An analysis unit is connected to the detection unit, and is used to determine whether the charging process of the device to be charged by the power supply unit meets the standards based on the change of the power of the device to be charged measured by the detection unit. The analysis unit is also used to determine the reason for non-compliance with the standards based on the acquired historical changes when it is determined that the charging process of the device to be charged by the power supply unit does not meet the standards, and to determine the charging parameters of the device to be charged by the power supply unit or issue corresponding notification information based on the determined reasons, wherein the charging parameters include the voltage for the heating film and the charging voltage for the device to be charged.
[0011] Further, the detection unit is used to periodically obtain corresponding parameters during the operation of the power supply unit through each detector, and the analysis unit is further used to determine whether the charging process of the power supply unit for the device to be charged meets the standard based on the change in power of the device to be charged obtained by the detection unit in a single cycle, wherein the change in power is the difference between the power of the device to be charged in the current cycle and the power in the previous cycle:
[0012] If the amount of change in power is greater than a second preset amount of change in power set in the analysis unit, the analysis unit determines that the charging process of the device to be charged by the power supply unit meets the standard, and the analysis unit controls the detection unit to continuously detect the power of the device to be charged;
[0013] If the power change is less than or equal to the second preset power change and greater than the first preset power change set in the analysis unit, the analysis unit determines whether the charging process for the device to be charged meets the standard based on the power of the device to be charged;
[0014] If the change in power is less than or equal to the first preset change in power, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines the reason why the charging process for the device to be charged does not meet the standard based on the historical change in power for the device to be charged obtained by the detection unit.
[0015] Furthermore, the analysis unit is further used to determine whether the charging process for the device to be charged meets the standard based on the comparison result of the power of the device to be charged in the current cycle and the preset critical power set in the analysis unit, wherein:
[0016] If the power is less than or equal to the preset critical power, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines the reason why the charging process for the device to be charged does not meet the standard based on the historical power change amount for the device to be charged obtained by the detection unit;
[0017] If the power level is greater than the preset critical power level, the analysis unit determines to redetermine the second preset power level change based on the power level, and re-determines whether the charging process for the device to be charged meets the standard based on the redetermined second preset power level change.
[0018] Furthermore, the analysis unit is further configured to re-determine the second preset power change amount based on the power difference, wherein the power difference is the difference between the power of the device to be charged in the current cycle and the preset critical power:
[0019] If the power difference is less than or equal to a first preset power difference set in the analysis unit, the analysis unit uses a first standard correction coefficient to correct the second preset power change to a corresponding value;
[0020] If the power difference is greater than the first preset power and less than or equal to a second preset power difference set in the analysis unit, the analysis unit uses a second standard correction coefficient to correct the second preset power change to a corresponding value;
[0021] If the power difference is greater than the second preset power, the analysis unit uses a third standard correction coefficient to correct the second preset power change to a corresponding value.
[0022] Further, the analysis unit is further used to draw a cycle-power change curve based on the historical power change of the device to be charged in the historical cycle obtained by the detection unit, and determine the reason why the charging process of the device to be charged does not meet the standard based on the slope of the curve at the current cycle node, wherein:
[0023] If the slope is greater than a second preset slope set in the analysis unit, the analysis unit determines that the reason for non-compliance with the standard is that the power supply environment of the power supply unit does not meet the standard, and the analysis unit determines the voltage passed to each of the heating films based on the temperature measured by the temperature detector;
[0024] If the slope is less than or equal to the second preset slope and greater than the first preset slope set in the analysis unit, the analysis unit determines the reason why the charging process of the device to be charged does not meet the standard based on the power of the device to be charged;
[0025] If the slope is less than or equal to the first preset slope, the analyzing unit determines the reason why the charging process of the device to be charged does not meet the standard based on the voltage passed to the device to be charged measured by the voltage detector.
[0026] Furthermore, the analysis unit is also used to determine a regulation method for the voltage passed through each heating film based on the temperature measured by the temperature detector, wherein:
[0027] If the temperature is less than or equal to a first preset temperature set in the analysis unit, the analysis unit uses a first heating voltage adjustment coefficient to adjust the voltage passed through each of the heating films to a corresponding value;
[0028] If the temperature is greater than the first preset temperature and less than or equal to the second preset temperature set in the analysis unit, the analysis unit uses the second heating voltage adjustment coefficient to adjust the voltage passed through each heating film to a corresponding value;
[0029] If the temperature is greater than the second preset temperature, the analysis unit uses a third heating voltage adjustment coefficient to adjust the voltage applied to each heating film to a corresponding value.
[0030] Furthermore, the analysis unit is further configured to determine the reason why the charging process of the device to be charged does not meet the standard based on a comparison result between the power of the device to be charged in the current cycle and a preset critical power set in the analysis unit, wherein:
[0031] If the power is less than or equal to the preset critical power, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines that the reason for not meeting the standard is that the charging voltage of the power supply unit for the device to be charged is lower than the preset standard, and the analysis unit determines the charging voltage for the device to be charged based on the measured change in power of the device to be charged in this cycle;
[0032] If the electric quantity is greater than the preset critical electric quantity, the analyzing unit determines the reason why the charging process of the device to be charged does not meet the standard based on the voltage passed to the device to be charged measured by the voltage detector.
[0033] Further, the analysis unit is further used to determine an adjustment method for the charging voltage of the device to be charged based on the difference in the amount of charge change, wherein the difference in the amount of charge change is a difference between a first preset amount of charge change and an amount of charge change of the device to be charged measured by the detection unit in the current cycle:
[0034] If the power change difference is less than or equal to a first preset power change difference set in the analysis unit, the analysis unit uses a first charging voltage adjustment coefficient to adjust the charging voltage for the device to be charged to a corresponding value;
[0035] If the power change difference is greater than the first preset power change difference and less than or equal to the second preset power change difference set in the analysis unit, the analysis unit uses the second charging voltage adjustment coefficient to adjust the charging voltage for the device to be charged to a corresponding value;
[0036] If the power change difference is greater than the second preset power change difference, the analysis unit uses a third charging voltage adjustment coefficient to adjust the charging voltage for the device to be charged to a corresponding value.
[0037] Furthermore, the analysis unit is further used to determine the reason why the charging process of the device to be charged does not meet the standard based on the comparison result between the voltage passed into the device to be charged measured by the voltage detector and the rated charging voltage set by the device to be charged, wherein:
[0038] If the voltage is greater than the rated charging voltage, the analysis unit determines that the reason for not meeting the standard is that the load of the device to be charged is higher than the standard, and the analysis unit issues a charging suspension notification;
[0039] If the voltage is less than or equal to the rated charging voltage, the analysis unit determines that the reason for not meeting the standard is that the amount of electricity stored in the power storage unit is lower than the standard, and the analysis unit issues a power shortage notification;
[0040] If the voltage is zero, the analysis unit determines that the reason for not meeting the standard is that the connector is disconnected from the device to be charged, and the analysis unit issues a poor contact notification.
[0041] Compared with the prior art, the beneficial effect of the present invention lies in that when a solid-state lead battery is used as a power source to charge an external device, the charging state of the device to be charged is monitored in real time, and the change in power is periodically determined to determine the charging status of the device to be charged. When the change in power is less than or equal to a second preset change in power and greater than a first preset change in power, the charging speed of the device to be charged is relatively slow. In this case, there is a possibility that the charging status is abnormal. The charging status is determined in a timely manner in combination with the power of the device to be charged, which effectively improves the sensitivity of monitoring the charging status of the device to be charged. The power of the device to be charged is determined comprehensively. When the device to be charged is about to be charged, the voltage of the battery gradually increases when the battery power is close to being fully charged because the device to be charged uses a constant current charging method. In order to protect the battery, the charger will reduce the charging current, thereby causing the change in the charging power to become slower. When the power is greater than the preset critical power, the second preset change in power is adjusted, and a specific evaluation standard is determined according to the actual situation of the device to be charged, which effectively improves the charging efficiency of the device to be charged.
[0042] Furthermore, the analysis unit determines whether the charging process of the power supply unit for the device to be charged meets the standard based on the adjusted second preset power change amount after completing the adjustment of the second preset power change amount; if the power change amount is greater than the adjusted second preset power change amount, it is determined that the charging process of the power supply unit for the device to be charged meets the standard, and the analysis unit controls the detection unit to continuously detect the power of the device to be charged; if the power change amount is less than or equal to the adjusted second preset power change amount, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines the reason why the charging process for the device to be charged does not meet the standard based on the historical power change amount for the device to be charged obtained by the detection unit.
[0043] Furthermore, when it is determined that the charging process of the device to be charged does not meet the preset standard, the abnormal situation is promptly determined, and the slope of the curve at the current cycle node is obtained to determine the specific situation of the change in the amount of electricity in the current cycle compared with the historical cycle. When the slope is greater than the second preset slope, the rate of increase of electricity is steadily reduced. In this case, the charging speed is abnormally reduced due to the abnormal power supply environment. At this time, the input voltage of the heating film is adjusted to reduce the impact of the power supply environment on the charging condition, thereby further improving the charging efficiency of the device to be charged.
[0044] Furthermore, when the slope is less than or equal to the second preset slope and greater than the first preset slope, the change in charge slowly decreases. In this case, the change in charge is unstable in historical data. At this time, the abnormal situation is comprehensively determined in combination with the charge of the device to be charged in the current cycle. During the actual charging process of the device to be charged, polarization will occur inside the battery, causing the actual voltage of the battery to be lower than the open circuit voltage, hindering the battery from continuing to charge. When the charge in the current cycle is less than or equal to the preset critical charge, the charging voltage is increased to overcome the polarization effect; when the charge is greater than the preset critical charge, the specific cause of the abnormal charging condition is further comprehensively determined by passing the voltage into the device to be charged, so as to take corresponding solutions, thereby effectively improving the charging efficiency of the device to be charged.
[0045] Furthermore, based on the measured voltage passed into the device to be charged, the cause of the abnormality is further specifically determined. When the voltage is zero, it is due to the disconnection between the connector and the device to be charged, resulting in poor contact; when the voltage is less than or equal to the rated charging voltage, in this case, the abnormal power output is caused by the abnormality of the charging end, and at this time, the power storage unit is too low to cause insufficient power; when the voltage is greater than the rated charging voltage, in this case, the load is too high, so charging is suspended first, and each abnormal situation is handled in a targeted manner, thereby effectively improving the stability of charging the device to be charged, thereby improving the charging efficiency of the device to be charged. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 This is a module block diagram of a charging device of a solid-state lead battery energy storage power station according to an embodiment of the present invention;
[0047] Figure 2 This is a flow chart of an analysis unit according to an embodiment of the present invention determining whether a charging process of a device to be charged by a power supply unit meets standards based on a change in the amount of power of the device to be charged. DETAILED DESCRIPTION
[0048] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0049] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0050] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.
[0051] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0052] See also Figure 1 and Figure 2 As shown, they are respectively a module block diagram of a charging device of a solid-state lead battery energy storage power station according to an embodiment of the present invention, and a flow chart of an analysis unit determining whether a charging process of a device to be charged by a power supply unit meets a standard based on a change in the amount of electricity of the device to be charged; a charging device of a solid-state lead battery energy storage power station according to an embodiment of the present invention comprises:
[0053] A power generation unit, which is a power grid that converts natural energy into electrical energy;
[0054] An electricity storage unit, which is connected to the power generation unit and is used to receive and store the electric energy output by the power generation unit, comprises a plurality of lead-acid batteries arranged in parallel and a plurality of heating films respectively arranged between two corresponding lead-acid batteries;
[0055] A power supply unit connected to the power storage unit for delivering the electric energy stored in the power storage unit to the device to be charged. The power supply unit includes a plurality of charging connectors for connecting to the corresponding device to be charged to deliver the electric energy to the device to be charged;
[0056] A detection unit, which is arranged in the power supply unit, including a plurality of power detectors for detecting the storage power of the corresponding device to be charged, a plurality of voltage detectors for detecting the charging voltage of the power supply unit for the corresponding device to be charged, and a temperature detector for detecting the ambient temperature of the power supply unit;
[0057] An analysis unit is connected to the detection unit, and is used to determine whether the charging process of the device to be charged by the power supply unit meets the standards based on the change of the power of the device to be charged measured by the detection unit. The analysis unit is also used to determine the reason for non-compliance with the standards based on the acquired historical changes when it is determined that the charging process of the device to be charged by the power supply unit does not meet the standards, and to determine the charging parameters of the device to be charged by the power supply unit or issue corresponding notification information based on the determined reasons, wherein the charging parameters include the voltage for the heating film and the charging voltage for the device to be charged.
[0058] Specifically, the detection unit is used to periodically obtain the corresponding parameters of the power supply unit during operation through each detector, and the analysis unit is further used to determine whether the charging process of the power supply unit for the device to be charged meets the standard based on the change in the amount of power of the device to be charged obtained by the detection unit in a single cycle, wherein the change in power is the difference between the power of the device to be charged in the current cycle and the power in the previous cycle:
[0059] If the amount of change in power is greater than a second preset amount of change in power set in the analysis unit, the analysis unit determines that the charging process of the device to be charged by the power supply unit meets the standard, and the analysis unit controls the detection unit to continuously detect the power of the device to be charged;
[0060] If the power change is less than or equal to the second preset power change and greater than the first preset power change set in the analysis unit, the analysis unit determines whether the charging process for the device to be charged meets the standard based on the power of the device to be charged;
[0061] If the change in power is less than or equal to the first preset change in power, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines the reason why the charging process for the device to be charged does not meet the standard based on the historical change in power for the device to be charged obtained by the detection unit.
[0062] Specifically, the first preset power change is 16.7 kWh, and the second preset power change is 24 kWh.
[0063] Specifically, when a solid-state lead battery is used as a power source to charge an external device, the charging state of the device to be charged is monitored in real time, and the amount of charge change is periodically determined to determine the charging status of the device to be charged. When the amount of charge change is less than or equal to a second preset amount of charge change and greater than a first preset amount of charge change, the charging speed of the device to be charged is relatively slow. In this case, there is a possibility that the charging status is abnormal. The charging status is determined in a timely manner in combination with the amount of charge of the device to be charged, which effectively improves the sensitivity of monitoring the charging status of the device to be charged. The amount of charge of the device to be charged is determined comprehensively. When the device to be charged is about to be charged, the voltage of the battery gradually increases when the battery is close to being fully charged because the device to be charged uses a constant current charging method. In order to protect the battery, the charger will reduce the charging current, which will cause the charging amount of charge to change more slowly. When the amount of charge is greater than the preset critical amount of charge, the second preset amount of charge change is adjusted, and the specific evaluation standard is determined according to the actual situation of the device to be charged, which effectively improves the charging efficiency of the device to be charged.
[0064] Specifically, the analysis unit is further used to determine whether the charging process for the device to be charged meets the standard based on the comparison result of the power of the device to be charged in the current cycle and the preset critical power set in the analysis unit, wherein:
[0065] If the power is less than or equal to the preset critical power, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines the reason why the charging process for the device to be charged does not meet the standard based on the historical power change amount for the device to be charged obtained by the detection unit;
[0066] If the power level is greater than the preset critical power level, the analysis unit determines to redetermine the second preset power level change based on the power level, and re-determines whether the charging process for the device to be charged meets the standard based on the redetermined second preset power level change.
[0067] Specifically, the preset critical power is 64kWh.
[0068] Specifically, the analysis unit is further used to re-determine the second preset power change amount based on the power difference, wherein the power difference is the difference between the power of the device to be charged in the current cycle and the preset critical power:
[0069] If the power difference is less than or equal to a first preset power difference set in the analysis unit, the analysis unit uses a first standard correction coefficient to correct the second preset power change to a corresponding value;
[0070] If the power difference is greater than the first preset power and less than or equal to a second preset power difference set in the analysis unit, the analysis unit uses a second standard correction coefficient to correct the second preset power change to a corresponding value;
[0071] If the power difference is greater than the second preset power, the analysis unit uses a third standard correction coefficient to correct the second preset power change to a corresponding value.
[0072] Specifically, the first preset power difference is 12kWh, the second preset power difference is 32kWh, the first standard correction coefficient is 0.92, the second standard correction coefficient is 0.87, and the third standard correction coefficient is 0.73.
[0073] Specifically, the analysis unit determines whether the charging process of the power supply unit for the device to be charged meets the standard based on the adjusted second preset power change amount after the adjustment is completed under the condition that the adjustment of the second preset power change amount is completed; if the power change amount is greater than the adjusted second preset power change amount, it is determined that the charging process of the power supply unit for the device to be charged meets the standard, and the analysis unit controls the detection unit to continuously detect the power of the device to be charged; if the power change amount is less than or equal to the adjusted second preset power change amount, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines the reason why the charging process for the device to be charged does not meet the standard based on the historical power change amount for the device to be charged obtained by the detection unit.
[0074] Specifically, the analysis unit is further used to draw a cycle-power change curve based on the historical power change of the device to be charged in the historical cycle obtained by the detection unit, and determine the reason why the charging process of the device to be charged does not meet the standard based on the slope of the curve at the current cycle node, wherein:
[0075] If the slope is greater than a second preset slope set in the analysis unit, the analysis unit determines that the reason for non-compliance with the standard is that the power supply environment of the power supply unit does not meet the standard, and the analysis unit determines the voltage passed to each of the heating films based on the temperature measured by the temperature detector;
[0076] If the slope is less than or equal to the second preset slope and greater than the first preset slope set in the analysis unit, the analysis unit determines the reason why the charging process of the device to be charged does not meet the standard based on the power of the device to be charged;
[0077] If the slope is less than or equal to the first preset slope, the analyzing unit determines the reason why the charging process of the device to be charged does not meet the standard based on the voltage passed to the device to be charged measured by the voltage detector.
[0078] Specifically, the first preset slope is -14.7 kWh / h, and the second preset slope is -11.5 kWh / h.
[0079] Specifically, when it is determined that the charging process of the device to be charged does not meet the preset standard, the abnormal situation is promptly determined, and the slope of the curve at the current cycle node is obtained to determine the specific situation of the change in the amount of electricity in the current cycle compared with the historical cycle. When the slope is greater than the second preset slope, the rate of increase of electricity is steadily reduced. In this case, the charging speed is abnormally reduced due to the abnormal power supply environment. At this time, the input voltage of the heating film is adjusted to reduce the impact of the power supply environment on the charging condition, thereby further improving the charging efficiency of the device to be charged.
[0080] Specifically, the analysis unit is further used to determine a regulation method for the voltage passed through each heating film based on the temperature measured by the temperature detector, wherein:
[0081] If the temperature is less than or equal to a first preset temperature set in the analysis unit, the analysis unit uses a first heating voltage adjustment coefficient to adjust the voltage passed through each of the heating films to a corresponding value;
[0082] If the temperature is greater than the first preset temperature and less than or equal to the second preset temperature set in the analysis unit, the analysis unit uses the second heating voltage adjustment coefficient to adjust the voltage passed through each heating film to a corresponding value;
[0083] If the temperature is greater than the second preset temperature, the analysis unit uses a third heating voltage adjustment coefficient to adjust the voltage applied to each heating film to a corresponding value.
[0084] Specifically, the first preset temperature is -17°C, the second preset temperature is -5°C, the first heating voltage adjustment coefficient is 1.28, the second heating voltage adjustment coefficient is 1.17, and the third heating voltage adjustment coefficient is 1.1.
[0085] Specifically, the analysis unit is further used to determine the reason why the charging process of the device to be charged does not meet the standard based on the comparison result of the power of the device to be charged in the current cycle and the preset critical power set in the analysis unit, wherein:
[0086] If the power is less than or equal to the preset critical power, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines that the reason for not meeting the standard is that the charging voltage of the power supply unit for the device to be charged is lower than the preset standard, and the analysis unit determines the charging voltage for the device to be charged based on the measured change in power of the device to be charged in this cycle;
[0087] If the electric quantity is greater than the preset critical electric quantity, the analyzing unit determines the reason why the charging process of the device to be charged does not meet the standard based on the voltage passed to the device to be charged measured by the voltage detector.
[0088] Specifically, when the slope is less than or equal to the second preset slope and greater than the first preset slope, the change in charge slowly decreases. In this case, the change in charge is unstable in historical data. At this time, the abnormal situation is comprehensively determined based on the charge of the device to be charged in the current cycle. During the actual charging process of the device to be charged, polarization will occur inside the battery, causing the actual voltage of the battery to be lower than the open circuit voltage, hindering the battery from continuing to charge. When the charge in the current cycle is less than or equal to the preset critical charge, the charging voltage is increased to overcome the polarization effect. When the charge is greater than the preset critical charge, the specific cause of the abnormal charging condition is further comprehensively determined by passing the voltage into the device to be charged, so as to take corresponding solutions, thereby effectively improving the charging efficiency of the device to be charged.
[0089] Specifically, the analysis unit is further used to determine the adjustment method of the charging voltage for the device to be charged based on the difference in the amount of change in electric power, wherein the difference in the amount of change in electric power is the difference between the first preset amount of change in electric power and the amount of change in electric power of the device to be charged measured by the detection unit in the current cycle:
[0090] If the power change difference is less than or equal to a first preset power change difference set in the analysis unit, the analysis unit uses a first charging voltage adjustment coefficient to adjust the charging voltage for the device to be charged to a corresponding value;
[0091] If the power change difference is greater than the first preset power change difference and less than or equal to the second preset power change difference set in the analysis unit, the analysis unit uses the second charging voltage adjustment coefficient to adjust the charging voltage for the device to be charged to a corresponding value;
[0092] If the power change difference is greater than the second preset power change difference, the analysis unit uses a third charging voltage adjustment coefficient to adjust the charging voltage for the device to be charged to a corresponding value.
[0093] Specifically, the first preset power change difference is 2kWh, the second preset power change difference is 6kWh, the first charging voltage adjustment coefficient is 1.11, the second charging voltage adjustment coefficient is 1.19, and the third charging voltage adjustment coefficient is 1.29.
[0094] Specifically, the analysis unit is further used to determine the reason why the charging process of the device to be charged does not meet the standard based on the comparison result of the voltage passed to the device to be charged measured by the voltage detector and the rated charging voltage set by the device to be charged, wherein:
[0095] If the voltage is greater than the rated charging voltage, the analysis unit determines that the reason for not meeting the standard is that the load of the device to be charged is higher than the standard, and the analysis unit issues a charging suspension notification;
[0096] If the voltage is less than or equal to the rated charging voltage, the analysis unit determines that the reason for not meeting the standard is that the amount of electricity stored in the power storage unit is lower than the standard, and the analysis unit issues a power shortage notification;
[0097] If the voltage is zero, the analysis unit determines that the reason for not meeting the standard is that the connector is disconnected from the device to be charged, and the analysis unit issues a poor contact notification.
[0098] Specifically, the rated charging voltage is 240V.
[0099] Specifically, the cause of the abnormality is further determined based on the measured voltage passed into the device to be charged. When the voltage is zero, it is due to the disconnection between the connector and the device to be charged, resulting in poor contact; when the voltage is less than or equal to the rated charging voltage, in this case, the abnormal power output is caused by the abnormality of the charging end, and at this time, the power storage unit is too low to cause insufficient power; when the voltage is greater than the rated charging voltage, in this case, the load is too high, so charging is suspended first, and each abnormal situation is handled in a targeted manner, thereby effectively improving the stability of charging for the device to be charged, thereby improving the charging efficiency of the device to be charged.
[0100] Example 1
[0101] For a single device to be charged, the detection unit obtains that the power change in a single cycle of 30 minutes is 17kWh, which is less than or equal to the second preset power change of 24kWh and greater than the first preset power change of 16.7kWh. The detection unit obtains that the power of the device to be charged in the current cycle is 72kWh, which is greater than the preset critical power of 64kWh. The analysis unit calculates that the difference between the power of the device to be charged in the current cycle and the preset critical power is 8kWh, which is less than or equal to the first preset power difference of 12kWh. The analysis unit uses the first standard correction coefficient of 0.92 to correct the second preset power change of 24kWh to 22.08kW h, the power change of 17kWh is less than or equal to the adjusted second preset power change of 22.08kWh, the analysis unit also draws a cycle-power change curve based on the historical power change of the device to be charged in the historical cycle obtained by the detection unit, and obtains the slope of the curve at the current cycle node as -6.8kWh / h, which is greater than the second preset slope of -11.5kWh / h set in the analysis unit, the temperature measured by the temperature detector is -21°C, which is less than or equal to the first preset temperature of -17°C set in the analysis unit, and the analysis unit uses the first heating voltage adjustment coefficient of 1.28 to adjust the voltage of 24V passed to each heating film to 30.72V;
[0102] At an interval of 30 minutes in a single cycle, the detection unit obtains that the power change of the device to be charged in a single cycle is 22.5 kWh, which is greater than the adjusted second preset power change of 22.08 kWh. The analysis unit determines that the charging process of the device to be charged by the power supply unit meets the standard, and the analysis unit controls the detection unit to continuously detect the power of the device to be charged.
[0103] Example 2
[0104] For a single device to be charged, the detection unit obtains that its power change within a single cycle of 30 minutes is 16kWh, which is less than or equal to the first preset power change of 16.7kWh. The analysis unit draws a cycle-power change curve based on the historical power change of the device to be charged in the historical cycle obtained by the detection unit, and obtains the slope of the curve at the current cycle node as -18kWh / h. The analysis unit obtains that the voltage measured by the voltage detector passing into the device to be charged is zero. The analysis unit determines that the reason for non-compliance with the standard is that the connector is disconnected from the device to be charged, and the analysis unit issues a poor contact notification.
[0105] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
[0106] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A charging device for a solid-state lead battery energy storage power station, characterized in that: include: A power generation unit, which is a power grid that converts natural energy into electrical energy; An electricity storage unit, which is connected to the power generation unit and is used to receive and store the electric energy output by the power generation unit, comprises a plurality of lead-acid batteries arranged in parallel and a plurality of heating films respectively arranged between two corresponding lead-acid batteries; A power supply unit connected to the power storage unit for delivering the electric energy stored in the power storage unit to the device to be charged. The power supply unit includes a plurality of charging connectors for connecting to the corresponding device to be charged to deliver the electric energy to the device to be charged; A detection unit, which is arranged in the power supply unit, including a plurality of power detectors for detecting the storage power of the corresponding device to be charged, a plurality of voltage detectors for detecting the charging voltage of the power supply unit for the corresponding device to be charged, and a temperature detector for detecting the ambient temperature of the power supply unit; an analysis unit connected to the detection unit, and configured to determine whether the charging process of the device to be charged by the power supply unit meets the standard according to the change of the power of the device to be charged measured by the detection unit, and the analysis unit is further configured to determine the reason for non-compliance with the standard based on the acquired historical change situation when it is determined that the charging process of the device to be charged by the power supply unit does not meet the standard, and determine the charging parameters of the device to be charged by the power supply unit or issue corresponding notification information based on the determined reason, wherein the charging parameters include the voltage for the heating film and the charging voltage for the device to be charged; The detection unit is used to periodically obtain corresponding parameters during the operation of the power supply unit through each detector, and the analysis unit is also used to determine whether the charging process of the power supply unit for the device to be charged meets the standard based on the change in power of the device to be charged obtained by the detection unit in a single cycle, wherein the change in power is the difference between the power of the device to be charged in the current cycle and the power in the previous cycle: If the amount of change in power is greater than a second preset amount of change in power set in the analysis unit, the analysis unit determines that the charging process of the device to be charged by the power supply unit meets the standard, and the analysis unit controls the detection unit to continuously detect the power of the device to be charged; If the power change is less than or equal to the second preset power change and greater than the first preset power change set in the analysis unit, the analysis unit determines whether the charging process for the device to be charged meets the standard based on the power of the device to be charged; If the amount of change in power is less than or equal to the first preset amount of change in power, the analysis unit determines that the charging process of the device to be charged by the power supply unit does not meet the standard, and the analysis unit determines the reason why the charging process of the device to be charged does not meet the standard based on the historical amount of change in power for the device to be charged obtained by the detection unit; The analysis unit is further used to determine whether the charging process for the device to be charged meets the standard based on the comparison result of the power of the device to be charged in the current cycle and the preset critical power set in the analysis unit, wherein: If the power is less than or equal to the preset critical power, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines the reason why the charging process for the device to be charged does not meet the standard based on the historical power change amount for the device to be charged obtained by the detection unit; If the power is greater than the preset critical power, the analysis unit determines to redetermine the second preset power change based on the power, and re-determines whether the charging process for the device to be charged meets the standard based on the redetermined second preset power change; The analysis unit is further configured to re-determine the second preset power change amount based on the power difference, wherein the power difference is the difference between the power of the device to be charged in the current cycle and the preset critical power: If the power difference is less than or equal to a first preset power difference set in the analysis unit, the analysis unit uses a first standard correction coefficient to correct the second preset power change to a corresponding value; If the power difference is greater than the first preset power and less than or equal to a second preset power difference set in the analysis unit, the analysis unit uses a second standard correction coefficient to correct the second preset power change to a corresponding value; If the power difference is greater than the second preset power, the analysis unit uses a third standard correction coefficient to correct the second preset power change to a corresponding value; The analysis unit is further used to draw a cycle-power change curve based on the historical power change of the device to be charged in the historical cycle obtained by the detection unit, and determine the reason why the charging process of the device to be charged does not meet the standard based on the slope of the curve at the current cycle node, wherein: If the slope is greater than a second preset slope set in the analysis unit, the analysis unit determines that the reason for non-compliance with the standard is that the power supply environment of the power supply unit does not meet the standard, and the analysis unit determines the voltage passed to each of the heating films based on the temperature measured by the temperature detector; If the slope is less than or equal to the second preset slope and greater than the first preset slope set in the analysis unit, the analysis unit determines the reason why the charging process of the device to be charged does not meet the standard based on the power of the device to be charged; If the slope is less than or equal to the first preset slope, the analyzing unit determines the reason why the charging process of the device to be charged does not meet the standard based on the voltage passed to the device to be charged measured by the voltage detector.
2. The charging device of the solid-state lead battery energy storage power station according to claim 1, characterized in that: The analysis unit is further used to determine a regulation method for the voltage passed through each heating film based on the temperature measured by the temperature detector, wherein: If the temperature is less than or equal to a first preset temperature set in the analysis unit, the analysis unit uses a first heating voltage adjustment coefficient to adjust the voltage passed through each of the heating films to a corresponding value; If the temperature is greater than the first preset temperature and less than or equal to the second preset temperature set in the analysis unit, the analysis unit uses the second heating voltage adjustment coefficient to adjust the voltage passed through each heating film to a corresponding value; If the temperature is greater than the second preset temperature, the analysis unit uses a third heating voltage adjustment coefficient to adjust the voltage applied to each heating film to a corresponding value.
3. The charging device of the solid-state lead battery energy storage power station according to claim 2, characterized in that: The analysis unit is further used to determine the reason why the charging process of the device to be charged does not meet the standard based on the comparison result of the power of the device to be charged in the current cycle and the preset critical power set in the analysis unit, wherein: If the power is less than or equal to the preset critical power, the analysis unit determines that the charging process of the power supply unit for the device to be charged does not meet the standard, and the analysis unit determines that the reason for not meeting the standard is that the charging voltage of the power supply unit for the device to be charged is lower than the preset standard, and the analysis unit determines the charging voltage for the device to be charged based on the measured change in power of the device to be charged in this cycle; If the electric quantity is greater than the preset critical electric quantity, the analyzing unit determines the reason why the charging process of the device to be charged does not meet the standard based on the voltage passed to the device to be charged measured by the voltage detector.
4. The charging device of the solid-state lead battery energy storage power station according to claim 3, characterized in that: The analysis unit is further used to determine a method for adjusting the charging voltage of the device to be charged based on the difference in the amount of charge change, wherein the difference in the amount of charge change is a difference between a first preset amount of charge change and an amount of charge change of the device to be charged measured by the detection unit in a current cycle: If the power change difference is less than or equal to a first preset power change difference set in the analysis unit, the analysis unit uses a first charging voltage adjustment coefficient to adjust the charging voltage for the device to be charged to a corresponding value; If the power change difference is greater than the first preset power change difference and less than or equal to the second preset power change difference set in the analysis unit, the analysis unit uses the second charging voltage adjustment coefficient to adjust the charging voltage for the device to be charged to a corresponding value; If the power change difference is greater than the second preset power change difference, the analysis unit uses a third charging voltage adjustment coefficient to adjust the charging voltage for the device to be charged to a corresponding value.
5. The charging device of the solid-state lead battery energy storage power station according to claim 4, characterized in that: The analysis unit is further used to determine the reason why the charging process of the device to be charged does not meet the standard based on the comparison result between the voltage passed to the device to be charged measured by the voltage detector and the rated charging voltage set by the device to be charged, wherein: If the voltage is greater than the rated charging voltage, the analysis unit determines that the reason for not meeting the standard is that the load of the device to be charged is higher than the standard, and the analysis unit issues a charging suspension notification; If the voltage is less than or equal to the rated charging voltage, the analysis unit determines that the reason for not meeting the standard is that the amount of electricity stored in the power storage unit is lower than the standard, and the analysis unit issues a power shortage notification; If the voltage is zero, the analysis unit determines that the reason for not meeting the standard is that the connector is disconnected from the device to be charged, and the analysis unit issues a poor contact notification.