Material combined type conveying device and method
By designing a combined material transportation device and utilizing horizontal and vertical transportation mechanisms, the problem of low efficiency and poor safety of traditional transportation methods in construction in mountain and valley areas has been solved, fast and safe material transportation has been achieved, and construction costs and labor costs have been reduced.
Patent Information
- Application Number
- CN202411138206.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-08-19
AI Technical Summary
During construction in mountain and canyon areas, traditional human or animal transportation methods lead to high labor intensity, low construction efficiency, and long transportation cycles. They cannot meet the rapid transportation needs of scenic area development and affect construction costs and safety.
A combined material transportation device is designed, including a horizontal transportation mechanism and a vertical transportation mechanism. It uses components such as masts, rock anchors, load-bearing ropes, circulating winches, and electric hoists to achieve fast and safe transportation of materials. Through the total station Measurements are taken to determine the anchoring points, the load-bearing system is assembled, and horizontal and vertical transport is carried out using hoisting components and loop ropes.
This device saves labor costs, shortens the construction period, improves transportation efficiency and safety, avoids the labor intensity and environmental pollution problems of traditional transportation methods, ensures that materials arrive at the construction site quickly and effectively, and reduces construction costs.
Smart Images

Figure CN118770880A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of transport devices, and in particular to a combined material transport device and method. Background Art
[0002] As we all know, in recent years, tourist attractions in high mountain canyon areas have developed rapidly, and the market for scenic spot projects has become increasingly broad. Therefore, material transportation is particularly important in the construction of high mountain canyon areas. At present, for construction in high mountain canyon areas, traditional human or animal power transportation is generally used. However, no matter which of the above transportation methods is used, there are high labor intensity, low construction efficiency, long transportation cycle, and low material transportation efficiency, which is not conducive to the operation of scenic spots. Summary of the invention
[0003] 1. Technical issues to be solved In view of the deficiencies in the prior art, the present invention provides a material combined transportation device and method which can quickly and effectively transport materials to the construction site after they enter the site, thereby saving construction costs, improving construction progress, ensuring construction safety, shortening the transportation cycle, and improving material transportation efficiency.
[0004] (II) Technical solution To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a combined material transport device, including a horizontal transport mechanism and a vertical transport mechanism, the horizontal transport mechanism including a gantry, two rock anchors, a load-bearing rope, a slide and a traction assembly, the two rock anchors are respectively anchored on the rock mass at the top of the mountain and the valley, the two ends of the load-bearing rope are respectively fixedly connected to the two rock anchors, a first fixed pulley is rotatably installed on the top of the gantry, the load-bearing rope is in close contact with the first fixed pulley, and the slide is slidably installed on the load-bearing rope; the traction assembly includes a single-drum circulating winch, a circulating rope, a first guide A pulley, a second guide pulley, a third guide pulley and a fourth guide pulley, the first guide pulley and the second guide pulley are both installed on the gantry, the third guide pulley and the fourth guide pulley are fixedly installed on the rock mass in the valley, the middle part of the circulating rope is fixedly connected to the drum on the single-drum circulating winch, one end of the circulating rope is fixedly connected to one end of the slide after passing around the first guide pulley, the other end of the circulating rope is connected to the slide after passing around the second guide pulley, the third guide pulley and the fourth guide pulley; the vertical transportation mechanism includes an electric hoist and a lifting assembly for material holding.
[0005] Preferably, the lifting assembly includes a base, two symmetrically arranged and rotatably mounted tipping buckets on the base, and two automatically closed lifting parts symmetrically arranged on both sides of the base, the automatically closed lifting parts include a lifting rope and two guide pulleys, the two guide pulleys are fixedly mounted on both sides of the middle of the base, mounting columns are provided on the tipping bucket, and both ends of the lifting rope are respectively passed around the two guide pulleys and then connected to the corresponding mounting columns; further, a square bucket is formed when the two tipping buckets are closed.
[0006] Preferably, hinges are installed at the corners of the dump bucket, the hinges include a fixed hinge and a movable hinge, and the movable hinge is provided with a support block.
[0007] Preferably, it also includes an anti-falling component, which includes a mounting seat fixedly mounted on the base and adjacent to the guide pulley, a feed block slidably mounted on the mounting seat, an adjusting bolt threaded on the mounting seat and rotatably connected to the feed block, and a pressure wheel rotatably mounted on the feed block.
[0008] Preferably, a handle is installed on the tipping bucket near the hinge.
[0009] Preferably, a hook is provided on the base.
[0010] Preferably, it also includes two control cabinets and a wire hanging mechanism, the control cabinet is provided with an adapter electrically connected to the control cabinet, the wire hanging mechanism is installed on a slide, the wire hanging mechanism includes a wire roller rotatably installed on the slide, a cable wound on the wire roller, and an electric motor providing power for the rotation of the wire roller, one end of the cable is electrically connected to the electric hoist, and the other end of the cable is provided with a plug; further, the motor adopts a motor with its own battery, and the motor can be remotely controlled by an external electromagnetic remote control or the like; the two control cabinets are respectively located at the gantry on the top of the mountain and in the valley.
[0011] Preferably, it also includes a hoisting winch, a cantilever frame installed on the gantry and a pull rope, wherein a second fixed pulley is rotatably installed on the cantilever frame, one end of the pull rope is connected to the hoisting winch, and the other end of the pull rope hangs down naturally after passing around the second fixed pulley.
[0012] A combined material transportation method, using the combined material transportation device to transport materials, comprises the following steps: S1. Equipment assembly: According to the actual terrain on site, the best height difference section and the most economical transportation route are selected by total station measurement, and the anchor points of the gantry and rock anchors are determined. The gantry uses the excavated tunnel anchor working pit as the bottom foundation. According to the traction force analysis and calculation, the gantry foundation is poured with concrete, the welded gantry is accurately positioned, the gantry height is controlled, and the load-bearing rope is connected to the two rock anchors after transition through the first fixed pulley at the top of the gantry to form a load-bearing system; the first guide pulley and the second guide pulley are hung on both sides of the connecting beam at the top of the gantry, and the cantilever frame and the second guide pulley are installed on the crossbeam at the top of the gantry. The fixed pulley is used to install the third guide pulley and the fourth guide pulley on the cross beam at the rock anchor end, and the circulating rope is wound in the single-drum circulating winch and two rope ends are respectively released. The tail end of one rope end is temporarily anchored on the gantry after passing through the first guide pulley, and the front end of the other rope end is temporarily anchored on the gantry after passing through the second guide pulley, the third guide pulley and the fourth guide pulley. Then, the hoisting winch under the gantry is used to pass through the second fixed pulley of the cantilever frame to complete the installation of the slide and the vertical transport mechanism on the load-bearing rope, and then the rope ends at both ends of the circulating rope are fixed to the two sides of the slide to complete the installation of the horizontal transport device; S2. Material loading: After the two buckets rotate 90 degrees, they are in the open state. The operator loads the materials into the buckets, and then connects the lifting rope to the electric hoist on the vertical transport mechanism. The electric hoist starts and drives the lifting rope upward. During this process, the bottom support keeps in contact with the ground, and the lifting rope forms a pulling force on the installation column. The two buckets rotate synchronously until they are closed. S3, Material transportation: The electric hoist lifts the lifting assembly loaded with materials to a certain height and then stops, then starts the single-drum circulating winch, which pulls one end of the circulating rope to do the winding operation, while the other end of the circulating rope is used for the line release operation, so that the slide can be pulled along the load-bearing rope to the gantry on the top of the mountain; S4, material unloading: the electric hoist is started again until the lifting assembly falls to the ground. The operator pulls the handle to rotate the bucket until the vertical side of the bucket contacts the ground and is in a tilted state. The material in the bucket slides down from the bucket under the action of gravity. The operator can assist in cleaning the remaining material in the bucket. Repeat the steps of S1-S4 to complete the material transportation.
[0013] (III) Beneficial effects Compared with the prior art, the present invention provides a combined material transportation device and method, which have the following beneficial effects: the combined material transportation device and method, by placing the material in a lifting assembly, the vertical transportation mechanism lifts the lifting assembly, and the horizontal transportation mechanism transports the lifting assembly from the valley to the top of the mountain; compared with traditional human or animal power transportation methods, it saves labor costs, is simple to operate, and each material transportation cycle is fast, shortening the construction period; it avoids the adverse factors of human and animal power, and any emergency can be discovered and quickly resolved at the first time, greatly eliminating potential dangers, improving safety benefits, and avoiding environmental pollution problems caused by animal power during transportation; after the materials enter the site, they can be quickly and effectively transported to the construction site, saving construction costs, improving construction progress, ensuring construction safety, shortening the transportation cycle, and improving material transportation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a three-dimensional structural schematic diagram of the present invention; Figure 2 It is a front plan view structural schematic diagram of the present invention; Figure 3 The present invention Figure 1 A schematic diagram of the partially enlarged structure at center A; Figure 4 The present invention Figure 1 A schematic diagram of the partially enlarged structure at B in the middle; Figure 5 The present invention Figure 4 A schematic diagram of the partially enlarged structure at C in the middle; Markings in the attached drawings: 1. gantry; 2. rock anchor; 3. load-bearing rope; 4. slide; 5. first fixed pulley; 6. single-drum circulating winch; 7. circulating rope; 8. first guide pulley; 9. second guide pulley; 10. third guide pulley; 11. fourth guide pulley; 12. vertical transportation mechanism; 13. electric hoist; 14. lifting assembly; 15. bottom support; 16. tipping bucket; 17. lifting rope; 18. guide pulley; 19. mounting column; 20. hinge; 21. support block; 22. mounting seat; 23. feed block; 24. adjusting bolt; 25. pressure wheel; 26. handle; 27. hook; 28. adapter; 29. wire roller; 30. cable; 31. motor; 32. plug; 33. lifting winch; 34. cantilever frame; 35. pull rope; 36. second fixed pulley; 37. control cabinet. DETAILED DESCRIPTION
[0015] In order to enable those skilled in the art to better understand the invention, the technical solutions in the embodiments of the invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the invention. Obviously, the described embodiments are only embodiments of a part of the invention, not all of the embodiments. Based on the embodiments in the invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the invention.
[0016] In order to enable those skilled in the art to better understand the invention, the technical solutions in the embodiments of the invention will be clearly and completely described below in conjunction with the accompanying drawings.
[0017] It should be noted that, in the absence of conflict, the embodiments of the invention and the features and technical solutions in the embodiments may be combined with each other.
[0018] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0019] Example 1 Specifically, please refer to Figure 1-2 The combined material transport device specifically includes: a horizontal transport mechanism and a vertical transport mechanism 12. The horizontal transport mechanism includes a gantry 1, two rock anchors 2, a load-bearing rope 3, a slide 4 and a traction assembly. The two rock anchors 2 are respectively anchored on the rock mass at the top of the mountain and the valley. The two ends of the load-bearing rope 3 are respectively fixedly connected to the two rock anchors 2. A first fixed pulley 5 is rotatably installed on the top of the gantry 1. The load-bearing rope 3 is in close contact with the first fixed pulley 5. The slide 4 is slidably installed on the load-bearing rope 3; the traction assembly includes a single-drum circulating winch 6, a circulating rope 7, a first guide pulley 8, a second guide pulley 9, a third guide pulley 10 and a fourth guide pulley 11. The first guide pulley 8 and the second guide pulley 9 are both installed on the gantry 1, and the third guide pulley 10 and the fourth guide pulley 11 are fixedly installed. On the rock mass in the valley, the middle part of the circulating rope 7 is fixedly connected to the drum on the single-drum circulating winch 6, one end of the circulating rope 7 is fixedly connected to one end of the slide 4 after passing through the first guide pulley 8, and the other end of the circulating rope 7 is connected to the slide 4 after passing through the second guide pulley 9, the third guide pulley 10 and the fourth guide pulley 11; the vertical transportation mechanism 12 includes an electric hoist 13 and a lifting assembly 14 for material holding; it should be noted that the first guide pulley 8 and the second guide pulley 9 have a certain distance in the horizontal and vertical directions, and the third guide pulley 10 and the fourth guide pulley 11 have a certain distance in the horizontal and vertical directions to prevent the circulating rope 7 from interfering with the movement of the pulley, thereby ensuring the smooth lifting operation of the vertical transportation mechanism 12 in the vertical direction.
[0020] Please refer to Figure 4The lifting assembly 14 includes a base 15, two symmetrically arranged and rotatably mounted tipping buckets 16 on the base 15, and two automatically closed lifting parts symmetrically arranged on both sides of the base 15. The automatically closed lifting parts include a lifting rope 17 and two guide pulleys 18. The two guide pulleys 18 are fixedly mounted on both sides of the middle of the base 15. Mounting columns 19 are provided on the tipping bucket 16. The two ends of the lifting rope 17 pass around the two guide pulleys 18 and are connected to the corresponding mounting columns 19. Furthermore, the two tipping buckets 16 form a square bucket after closing.
[0021] The combined material transport device provided in the present embodiment is a conventional hanger, in which materials are prone to slipping off the hanger during the hoisting process; and a hanger equipped with a hopper is not convenient for loading materials into the hopper due to the height of the hopper; whereas in the present embodiment, during the material loading process, the two tipping buckets 16 are rotated 90 degrees and are in an open state, so that the operator can conveniently and labor-savingly load the materials into the tipping buckets 16, and then connect the lifting rope 17 to the electric hoist 13 on the vertical transport mechanism 12, the electric hoist 13 is started and drives the lifting rope 17 to move upward, during which the bottom support 15 is kept in contact with the ground, the lifting rope 17 forms a pulling force on the mounting column 19, and the two tipping buckets 16 rotate synchronously until they are closed to each other. The two buckets 16 are closed to form a closed square bucket with an upper opening to prevent the material in the bucket 16 from falling during the lifting process. When the electric hoist 13 is lifting the lifting component 14, the two buckets 16 are always in a tightly closed state under the action of the lifting rope 17. When the material is lifted into place, the lifting rope 17 is released from the electric hoist 13, and the bucket 16 is rotated to the initial loading state to unload the material in the bucket 16, thereby improving the convenience of loading and unloading the material in the bucket 16, and preventing the material from falling at a high place during the lifting process, reducing the rate of damage caused by the material falling from a high place and the rate of accidents of injuring people, and improving the safety of the device.
[0022] Example 2 Please refer to Figure 4 A hinge 20 is installed at the corner of the dump bucket 16, and the hinge 20 includes a fixed hinge and a movable hinge, and a support block 21 is provided on the movable hinge; further, the hinge 20 is preferably an inert hinge; the height of the support block 21 is the same as or higher than the height of the base 15.
[0023] It also includes an anti-falling component, which includes a mounting seat 22 fixedly mounted on the base 15 and adjacent to the guide pulley 18, a feed block 23 slidably mounted on the mounting seat 22, an adjusting bolt 24 screwed on the mounting seat 22 and rotatably connected to the feed block 23, and a pressure wheel 25 rotatably mounted on the feed block 23.
[0024] A handle 26 is installed on the tipping bucket 16 near the hinge 20 .
[0025] The bottom bracket 15 is provided with a hook 27 .
[0026] The material combined transport device provided in this embodiment rotates the support block 21 on the hinge 20 to the position as shown in FIG. Figure 4 The handle 26 is used to rotate the bucket 16 until the support block 21 contacts the ground after the bucket 16 rotates 90 degrees. At this time, the vertical side of the bucket 16 is in a horizontal state, and the material can be loaded. When the material in the bucket 16 is unloaded, the vertical side of the bucket 16 directly contacts the ground after the bucket 16 rotates 90 degrees, so that the vertical side of the bucket 16 is tilted away from the center of the bottom support 15. In this way, the material in the bucket 16 can slide down and unload under the action of gravity, further improving the material in the bucket 16. The unloading of materials is convenient; by turning the adjusting bolt 24, the feed block 23 is fed to the corresponding guide pulley 18 until the pressure wheel 25 presses the lifting rope 17 onto the guide pulley 18. Under the action of pressure, the lifting rope 17 can be prevented from detaching from the guide pulley 18; in the initial stage of lifting the lifting assembly 14, the external rope connected to the ground can be hung on the hook 27 to limit the bottom support 15, so that the two tipping buckets 16 can be closed smoothly. When the tipping bucket 16 is closed, the external rope is detached from the hook 27.
[0027] Example 3 Please refer to Figure 1-2 , also includes two control cabinets 37 and a wire hanging mechanism. The control cabinet 37 is provided with an adapter 28 electrically connected to the control cabinet 37. The wire hanging mechanism is installed on the slide 4. The wire hanging mechanism includes a wire roller 29 rotatably installed on the slide 4, a cable 30 wound on the wire roller 29, and a motor 31 for providing power for the rotation of the wire roller 29. One end of the cable 30 is electrically connected to the electric hoist 13, and the other end of the cable 30 is provided with a plug 32; further, the motor 31 adopts a motor 31 with a self-contained battery, and the motor 31 can be remotely controlled by an external electromagnetic remote control, etc. The two control cabinets 37 are respectively located at the gantry 1 at the top of the mountain and in the valley; it should be noted that the electric hoist 13 has a built-in mechanical brake, and the electric hoist 13 locks automatically when the power is off. The self-locking structure and working principle of the electric hoist 13 are not further limited or elaborated here.
[0028] By remotely starting the motor 31, the motor 31 drives the wire roller 29 to rotate, so that one end of the cable 30 with the plug 32 moves downward. After it drops to a certain distance, the plug 32 is connected to the adapter 28, and the start and stop of the electric hoist 13 is controlled through the control cabinet 37; and when the material is transported horizontally, the wire roller 29 winds and collects the cable 30 to prevent the cable 30 and the plug 32 from swinging around under the action of wind.
[0029] Specifically, it also includes a lifting winch 33, a cantilever frame 34 installed on the gantry 1, and a pull rope 35. A second fixed pulley 36 is rotatably installed on the cantilever frame 34. One end of the pull rope 35 is connected to the lifting winch 33, and the other end of the pull rope 35 naturally hangs down after passing around the second fixed pulley 36. The lifting winch 33 and the pull rope 35 can be used to assist in the lifting and installation of the slide 4 and the vertical transport mechanism 12. It can also be used for the auxiliary lifting and unloading of large and heavy objects in the lifting assembly 14.
[0030] A combined material transportation method, using the combined material transportation device to transport materials, comprises the following steps: S1. Equipment assembly: According to the actual terrain on site, the best height difference section and the most economical transportation route are selected by total station measurement, and the anchoring points of the gantry 1 and the rock anchor 2 are determined. The gantry 1 uses the excavated tunnel anchor working pit as the bottom foundation. According to the traction force analysis and calculation, the foundation of the gantry 1 is poured with concrete, and the welded gantry 1 is accurately positioned to control the height of the gantry 1. The load-bearing rope 3 is connected to the two rock anchors 2 after transition through the first fixed pulley 5 on the top of the gantry 1 to form a load-bearing system; the first guide pulley 8 and the second guide pulley 9 are hung on both sides of the top connecting beam of the gantry 1, and the cantilever frame 34 and the second fixed pulley 36 are installed on the top crossbeam of the gantry 1. The third guide pulley 10 and the fourth guide pulley 11 are installed on the cross beam at the rock anchor end, and the circulating rope 7 is wound in the single-drum circulating winch 6 and two rope ends are respectively released. The tail end of one rope end is temporarily anchored on the gantry 1 after passing through the first guide pulley 8, and the front end of the other rope end is temporarily anchored on the gantry 1 after passing through the second guide pulley 9, the third guide pulley 10 and the fourth guide pulley 11. Then, the hoisting winch 33 under the gantry 1 is used to pass through the second fixed pulley 36 of the cantilever frame 34 to complete the installation of the slide 4 and the vertical transport mechanism 12 on the load-bearing rope 3, and then the rope ends at both ends of the circulating rope 7 are fixed to the two sides of the slide 4 to complete the installation of the horizontal transport device; S2, material loading: the two buckets 16 are rotated 90 degrees and are in an open state. The operator loads the material into the bucket 16, and then connects the lifting rope 17 to the electric hoist 13 on the vertical transport mechanism 12. The electric hoist 13 starts and drives the lifting rope 17 to move upward. During this process, the bottom support 15 keeps in contact with the ground, and the lifting rope 17 forms a pulling force on the mounting column 19. The two buckets 16 rotate synchronously until they are closed to each other; S3, material transportation: the electric hoist 13 lifts the lifting assembly 14 loaded with materials to a certain height and then stops, and then starts the single-drum circulating winch 6, which pulls one end of the circulating rope 7 to perform winding operation, while the other end of the circulating rope 7 performs line release operation, so that the slide 4 can be pulled along the load-bearing rope 3 to the gantry 1 on the top of the mountain; S4, material unloading: the electric hoist 13 is started again until the hoisting assembly 14 falls to the ground, and the operator pulls the handle 26 to rotate the bucket 16 until the vertical side of the bucket 16 contacts the ground and is in a tilted state. The material in the bucket 16 slides down from the bucket 16 under the action of gravity, and the operator can assist in cleaning the remaining residual material in the bucket 16; the steps of S1-S4 are repeated to complete the material transportation.
[0031] In the invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be fixedly connected, detachably connected, or integrated; it can be mechanically connected, electrically connected, or able to communicate with each other; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.
Claims
1. A combined material transport device, characterized in that: including a horizontal transport mechanism and a vertical transport mechanism (12); The horizontal transport mechanism comprises a gantry (1), two rock anchors (2), a load-bearing rope (3), a slide (4) and a traction assembly, wherein the two rock anchors (2) are respectively anchored on the rock mass at the top of a mountain and at the valley, and the two ends of the load-bearing rope (3) are respectively fixedly connected to the two rock anchors (2). A first fixed pulley (5) is rotatably mounted on the top of the gantry (1), the load-bearing rope (3) is in close contact with the first fixed pulley (5), and the slide (4) is slidably mounted on the load-bearing rope (3); The traction assembly comprises a single-drum circulating hoist (6), a circulating rope (7), a first guide pulley (8), a second guide pulley (9), a third guide pulley (10) and a fourth guide pulley (11); the first guide pulley (8) and the second guide pulley (9) are both mounted on the gantry (1); the third guide pulley (10) and the fourth guide pulley (11) are fixedly mounted on the rock mass in the valley; the middle portion of the circulating rope (7) is fixedly connected to the drum on the single-drum circulating hoist (6); one end of the circulating rope (7) passes around the first guide pulley (8) and is fixedly connected to one end of the slide (4); the other end of the circulating rope (7) passes around the second guide pulley (9), the third guide pulley (10) and the fourth guide pulley (11) and is connected to the slide (4); The vertical transport mechanism (12) comprises an electric hoist (13) and a hoisting assembly (14) for holding materials.
2. The material combined transport device according to claim 1, characterized in that: The lifting assembly (14) comprises a base (15), two symmetrically arranged and rotatably mounted tipping buckets (16) on the base (15), and two automatically closed lifting parts symmetrically arranged on both sides of the base (15), wherein the automatically closed lifting parts comprise a lifting rope (17) and two guide pulleys (18), wherein the two guide pulleys (18) are fixedly mounted on both sides of the middle of the base (15), and mounting columns (19) are provided on the tipping bucket (16), and the two ends of the lifting rope (17) are connected to the corresponding mounting columns (19) after passing through the two guide pulleys (18) respectively.
3. The material combined transport device according to claim 2, characterized in that: A hinge (20) is installed at a corner of the tipping bucket (16), the hinge (20) comprising a fixed hinge and a movable hinge, and a support block (21) is provided on the movable hinge.
4. The combined material transport device according to claim 3, characterized in that: It also includes an anti-falling component, which includes a mounting seat (22) fixedly mounted on the base (15) and adjacent to the guide pulley (18), a feed block (23) slidably mounted on the mounting seat (22), and an adjustment bolt (24) screwed on the mounting seat (22) and rotatably connected to the feed block (23), and a pressure wheel (25) rotatably mounted on the feed block (23).
5. The combined material transport device according to claim 4, characterized in that: A handle (26) is installed on the tipping bucket (16) adjacent to the hinge (20).
6. The combined material transport device according to claim 5, characterized in that: The base support (15) is provided with a hook (27).
7. The combined material transport device according to claim 1, characterized in that: The invention also comprises two control cabinets (37) and a wire hanging mechanism, wherein the control cabinet (37) is provided with an adapter (28) electrically connected to the control cabinet (37), and the wire hanging mechanism is installed on a slide (4), and comprises a wire roller (29) rotatably installed on the slide (4), a cable (30) wound around the wire roller (29), and a motor (31) providing power for the wire roller (29) to rotate, one end of the cable (30) is electrically connected to the electric hoist (13), and the other end of the cable (30) is provided with a plug (32).
8. The combined material transport device according to claim 1 or 6, characterized in that: It also includes a hoisting winch (33), a cantilever frame (34) mounted on the door frame (1), and a pull rope (35), wherein a second fixed pulley (36) is rotatably mounted on the cantilever frame (34), one end of the pull rope (35) is connected to the hoisting winch (33), and the other end of the pull rope (35) naturally hangs down after passing around the second fixed pulley (36).
9. A combined material transport method, using the combined material transport device according to claims 1 to 8 to transport materials, characterized in that: The following steps are involved: S1. Equipment assembly: According to the actual terrain on site, the best height difference section and the most economical transportation route are selected by total station measurement, and the anchoring points of the portal frame (1) and the rock anchor (2) are determined. The portal frame (1) uses the excavated tunnel anchor working pit as the bottom foundation. According to the traction force analysis and calculation, the portal frame (1) foundation is poured with concrete, and the welded portal frame (1) is accurately positioned to control the height of the portal frame (1). The load-bearing rope (3) is connected to the two rock anchors (2) after transition through the first fixed pulley (5) at the top of the portal frame (1) to form a load-bearing system; the first guide pulley (8) and the second guide pulley (9) are hung on both sides of the top connecting beam of the portal frame (1), and the cantilever frame (34) and the second fixed pulley (36) are installed on the top crossbeam of the portal frame (1). A third guide pulley (10) and a fourth guide pulley (11) are installed on the crossbeam, and the circulating rope (7) is wound in the single-drum circulating winch (6) and two rope ends are respectively released, and the tail end of one rope end is temporarily anchored on the door frame (1) after passing through the first guide pulley (8), the front end of the other rope end is temporarily anchored on the door frame (1) after passing through the second guide pulley (9), the third guide pulley (10) and the fourth guide pulley (11), and then the hoisting winch (33) below the door frame (1) is used to pass through the second fixed pulley (36) of the cantilever frame (34) to complete the installation of the slide frame (4) and the vertical transport mechanism (12) on the load-bearing rope (3), and then the rope ends at both ends of the circulating rope (7) are fixed to the two sides of the slide frame (4) to complete the installation of the horizontal transport device; S2, material loading: the two buckets (16) are rotated 90 degrees and are in an open state. The operator loads the material into the bucket (16), and then connects the lifting rope (17) to the electric hoist (13) on the vertical transport mechanism (12). The electric hoist (13) is started and drives the lifting rope (17) to move upward. During this process, the bottom support (15) remains in contact with the ground, and the lifting rope (17) forms a pulling force on the mounting column (19). The two buckets (16) rotate synchronously until they are closed to each other; S3, material transportation: the electric hoist (13) lifts the lifting assembly (14) loaded with materials to a certain height and then stops, and then the single-drum circulating winch (6) is started, and the single-drum circulating winch (6) pulls one end of the circulating rope (7) to perform winding operation, while the other end of the circulating rope (7) performs line release operation, so that the slide (4) can be pulled along the load-bearing rope (3) to move to the gantry (1) on the top of the mountain; S4, material unloading: the electric hoist (13) is started again until the lifting assembly (14) falls to the ground, and the operator pulls the handle (26) to rotate the tipping bucket (16) until the vertical side of the tipping bucket (16) contacts the ground and is in a tilted state. The material in the tipping bucket (16) slides out of the tipping bucket (16) under the action of gravity, and the operator can assist in cleaning the remaining residual material in the tipping bucket (16); the steps of S1 to S4 are repeated to complete the material transportation.
Citation Information
Patent Citations
Novel quick-to-mount cargo ropeway
CN105620493A
Circulation traction anchoring system
CN108797347A
Handling fang dou for construction
CN204689399U
Swiftly adorn discharge apparatus
CN208684243U
Transportation device for intercepting ditch and side slope protection materials
CN211004461U
