Aluminum film production line monitoring system and method based on Internet of Things

Data from the aluminum-plated film production line is obtained through Internet of Things technology, and the winding speed and cooling equipment height are predicted and regulated, which solves the problems of uneven and low efficiency of aluminum-plated layers in aluminum-plated film production, achieving efficient production and cost reduction.

CN118773565BActive Publication Date: 2024-11-22JIAXING HAONENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411254115.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-11-22
Estimated Expiration
2044-09-09

AI Technical Summary

Technical Problem

In the production of aluminum plating films, the prior art leads to uneven aluminum plating layers and low production efficiency, resulting in increased costs.

Method used

Using the Internet of Things-based aluminum-coated film production line monitoring method, the material properties of the plastic base film and the evaporation time of the aluminum-coated film are obtained, and the winding speed prediction model and cooling equipment layout prediction model are input to determine the target winding speed and cooling equipment. Height, control the rolling roller and cooling equipment to avoid uneven aluminum plating layer and improve production efficiency.

Benefits of technology

Effectively avoid uneven aluminum plating layer and aluminum swelling, improve the production efficiency of aluminum plating film, and reduce production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118773565B_ABST
    Figure CN118773565B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of production management. A monitoring system and method for an aluminum film production line based on the Internet of Things are provided. The method comprises: inputting the first material property of the plastic base film and the first evaporation time of the aluminum film into a winding speed prediction model to obtain a target winding speed; inputting the first material property of the plastic base film, the first evaporation time of the aluminum film and the target winding speed into a cooling equipment layout prediction model to obtain a height layout scheme of several cooling equipment; controlling the winding roller to perform a winding operation according to the target winding speed, and controlling each cooling equipment to cool the aluminum film being wound at a corresponding height according to the height layout scheme; obtaining the real-time winding speed of the winding roller and the real-time cooling height of each cooling equipment through the Internet of Things, monitoring the real-time winding speed and the real-time cooling height, and outputting alarm information in a timely manner. The present invention can improve the production efficiency of the aluminum film while avoiding uneven aluminum film.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production management, and in particular to an aluminum coating production line monitoring system and method based on the Internet of Things. Background Art

[0002] Aluminized film is a thin film material with metallic luster formed by depositing a very thin layer of metal aluminum on the surface of plastic film through vacuum aluminizing process. It is widely used in food packaging, pharmaceutical packaging, electronic product packaging and other fields, and has good barrier properties, high temperature resistance, mechanical strength, chemical resistance, etc.

[0003] When producing aluminized film, the roll film is first placed in a vacuum chamber and evacuated to a certain degree. Then the evaporation boat is heated to 1300℃-1400℃, and the aluminum wire with a purity of 99.9% is sent to the evaporation boat. The aluminum wire melts and evaporates to form gaseous aluminum particles; the gaseous aluminum particles are deposited on the surface of the moving film substrate to form a continuous and bright metal aluminum layer. After the aluminum layer is formed on the film substrate, the aluminized film is rolled up and stored by the winding equipment. However, the aluminum layer on the film substrate needs a period of time to cool, otherwise the winding behavior will easily lead to uneven aluminum layer and even aluminum throwing. The existing processing method is to wait until the aluminum layer on the aluminized film is completely cooled before winding, but this will greatly reduce the production efficiency of the aluminized film, and indirectly increase the production cost of the aluminized film.

[0004] In summary, how to improve the production efficiency and reduce the production cost of the aluminized film while ensuring that the aluminum layer on the aluminized film meets the quality standards is a technical problem that urgently needs to be solved. Summary of the invention

[0005] In this regard, the present invention provides an aluminum film production line monitoring method, an intelligent robot, an electronic device, a computer storage medium and a computer program product based on the Internet of Things to solve the above-mentioned technical problems.

[0006] The present invention discloses a method for monitoring an aluminized film production line based on the Internet of Things, the method comprising the following steps: obtaining a first material property of a plastic base film and a first evaporation time of the aluminized film through the Internet of Things; inputting the first material property of the plastic base film and the first evaporation time of the aluminized film into a winding speed prediction model, the winding speed prediction model outputting a corresponding target winding speed; inputting the first material property of the plastic base film, the first evaporation time of the aluminized film and the target winding speed into a cooling equipment layout prediction model, the cooling equipment layout prediction model outputting a height layout scheme of several cooling equipment; controlling a winding roller to perform a winding operation according to the target winding speed, and controlling each cooling equipment to cool the aluminized film being wound at a corresponding height according to the height layout scheme; obtaining a real-time winding speed of the winding roller and a real-time cooling height of each cooling equipment through the Internet of Things, monitoring the real-time winding speed and the real-time cooling height, and outputting alarm information in a timely manner.

[0007] In some embodiments, the obtaining of the first material property of the plastic base film and the first evaporation time of the aluminum-coated film through the Internet of Things includes: determining the input form of the plastic base film, the input form including manual input and machine automatic input; if the input form is manual input, setting the base film reading reader to transmit an activation signal at a first frequency, and receiving a response signal from the electronic tag on the plastic base film; if the input form is machine automatic input, setting the base film reading reader to transmit an activation signal at a second frequency, and receiving a response signal from the electronic tag on the plastic base film; reading the first material property of the plastic base film from the response signal; wherein the first frequency is lower than the second frequency; using an evaporation reader to receive an evaporation signal emitted by a transmitter on an evaporation device, and the evaporation reader reads the first evaporation time of the aluminum-coated film from the evaporation signal.

[0008] In some embodiments, before inputting the first material properties of the plastic base film and the first evaporation time of the aluminum-coated film into the winding speed prediction model, the method also includes: collecting multiple groups of first aluminum-coated film operation data in the winding stage, each of the first aluminum-coated film operation data includes the second material properties of the plastic base film, the second evaporation time of the aluminum-coated film, the winding speed and the first aluminum-coated film quality label, and constructing a first training data set and a second training data set based on each group of the first aluminum-coated film operation data; using the first training data set to simultaneously train the winding speed prediction model and the winding speed inverse model until the winding speed inverse model reaches the training termination condition; inputting the training data in the second training data set one by one into the winding speed inverse model to obtain a reverse training data set; fusing the reverse training data set and the second training data set to obtain a third training data set, and using the third training data set to continue training the winding speed prediction model until the winding speed prediction model reaches the training termination condition.

[0009] In some embodiments, the fusion of the inverse training data set and the second training data set includes: determining the number of training data in the first training data set used when the winding speed inverse model reaches the training termination condition, and determining a fusion ratio according to the number; randomly screening a corresponding number of training data from the inverse training data set according to the fusion ratio, and importing the training data into the second training data set.

[0010] In some embodiments, the cooling equipment layout prediction model outputs height layout plans for several cooling equipment, including: the cooling equipment layout prediction model predicts the first material properties of the plastic base film and the first evaporation time of the aluminum-coated film to obtain preliminary height layout plans for the several cooling equipment, the preliminary height layout plan including preliminary layout heights corresponding to each of the cooling equipment, and the preliminary layout height of each of the cooling equipment becomes lower as the distance from the evaporation equipment increases; a correction coefficient is determined according to the target winding speed, and the preliminary layout height corresponding to each of the cooling equipment in the preliminary height layout plan is corrected using the correction coefficient to obtain the height layout plan.

[0011] In some embodiments, before inputting the first material properties of the plastic base film, the first evaporation time of the aluminum-coated film and the target winding speed into the cooling equipment layout prediction model, the method also includes: collecting multiple groups of second aluminum-coated film operation data in the winding stage, each of the second aluminum-coated film operation data includes the third material properties of the plastic base film, the third evaporation time of the aluminum-coated film, the layout height of the cooling equipment, the distance between the cooling equipment and the evaporation equipment, and the second aluminum-coated film quality label, and constructing a fourth training data set based on each group of the second aluminum-coated film operation data; using the fourth training data set to train the cooling equipment layout prediction model until the training termination condition is reached.

[0012] The present invention also discloses a monitoring system for an aluminum-plated film production line based on the Internet of Things, the system comprising an acquisition module, a first prediction module, a second prediction module, an execution module, and a monitoring and alarm module; the acquisition module is used to acquire a first material property of a plastic base film and a first evaporation time of the aluminum-plated film through the Internet of Things; the first prediction module is used to input the first material property of the plastic base film and the first evaporation time of the aluminum-plated film into a winding speed prediction model, and the winding speed prediction model outputs a corresponding target winding speed; the second prediction module is used to input the first material property of the plastic base film and the first evaporation time of the aluminum-plated film into a winding speed prediction model, and the winding speed prediction model outputs a corresponding target winding speed; The first evaporation time and the target winding speed are input into a cooling equipment layout prediction model, and the cooling equipment layout prediction model outputs a height layout plan for several cooling devices; the execution module is used to control the winding roller to perform winding operations according to the target winding speed, and control each cooling device to cool the aluminum-coated film in the winding at a corresponding height according to the height layout plan; the monitoring and alarm module is used to obtain the real-time winding speed of the winding roller and the real-time cooling height of each cooling device through the Internet of Things, monitor the real-time winding speed and the real-time cooling height, and output alarm information in a timely manner.

[0013] The present invention also discloses an electronic device, comprising: at least one processor, a memory, and a computer program stored in the memory and executable on the at least one processor, wherein the processor executes the computer program to implement the method described in any of the preceding items.

[0014] The present invention also discloses a computer storage medium, wherein the computer-readable storage medium stores a computer program, and the computer program is executed by a processor to implement any of the above methods.

[0015] The present invention also discloses a computer program product, which includes computer codes. When the computer codes are executed by a processor of an electronic device, any of the above methods is implemented.

[0016] The beneficial effects of the present invention are as follows: the present invention determines a critical winding speed for avoiding uneven aluminum coating or even aluminum throwing off based on the first material property of the plastic base film and the first evaporation time of the aluminum coating film, and determines the cooling operating height of each cooling device according to the first material property of the plastic base film, the first evaporation time of the aluminum coating film and the critical winding speed, that is, by regulating the winding speed of the winding roller and the blowing height of the cooling device, the probability of quality defects in the aluminum coating film is reduced, and the aluminum coating film can be wound at a reasonable speed when it is not completely cooled, which can greatly improve the production efficiency of the aluminum coating film and thus reduce the production cost.

[0017] After determining the above-mentioned target winding speed and height layout plan, the winding roller and the cooling equipment are controlled to execute respectively, and the Internet of Things technology continues to be used to obtain the real-time winding speed of the winding roller and the real-time cooling height of the cooling equipment. When it is identified that the winding roller and the cooling equipment do not execute the above-mentioned target winding speed and height layout plan, an alarm message is output in time to remind relevant personnel to intervene. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 It is a flow chart of a method for monitoring an aluminum film production line based on the Internet of Things disclosed in an embodiment of the present invention.

[0020] Figure 2 It is a schematic diagram of a height deployment solution disclosed in an embodiment of the present invention.

[0021] Figure 3 It is a structural schematic diagram of an aluminum film production line monitoring system based on the Internet of Things disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0022] The following is a description of the implementation of the present application by specific specific embodiments. People familiar with the technology can easily understand other advantages and effects of the present application from the contents disclosed in this specification. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0023] In addition, the technical features involved in the different embodiments of the present application described below can be combined with each other as long as they do not conflict with each other.

[0024] like Figure 1 As shown, an embodiment of the present invention discloses a method for monitoring an aluminized film production line based on the Internet of Things, the method comprising the following steps: obtaining a first material property of a plastic base film and a first evaporation time of the aluminized film through the Internet of Things; inputting the first material property of the plastic base film and the first evaporation time of the aluminized film into a winding speed prediction model, and the winding speed prediction model outputs a corresponding target winding speed; inputting the first material property of the plastic base film, the first evaporation time of the aluminized film and the target winding speed into a cooling equipment layout prediction model, and the cooling equipment layout prediction model outputs a height layout plan of several cooling equipment; controlling the winding roller to perform a winding operation according to the target winding speed, and controlling each cooling equipment to cool the aluminized film being wound at a corresponding height according to the height layout plan; obtaining the real-time winding speed of the winding roller and the real-time cooling height of each cooling equipment through the Internet of Things, monitoring the real-time winding speed and the real-time cooling height, and outputting alarm information in a timely manner.

[0025] The production of aluminized film mainly includes the following steps: substrate preparation, surface treatment, evaporation, cooling and solidification, and winding. In the production process of aluminized film, the control of winding speed is critical to ensure product quality, because the aluminum layer on the aluminized film after evaporation is not completely cooled and is not firm. If the winding speed is too fast, it may cause uneven aluminum layer or even aluminum throwing, that is, the aluminum layer falls off or moves due to excessive tension during the winding process. As described in the background technology, the existing method of waiting for the aluminized film to be completely cooled will greatly reduce the production efficiency of the aluminized film and is not economical.

[0026] In view of the above technical problems, the present invention arranges an Internet of Things on the production line of aluminum-plated film, and the Internet of Things includes multiple reader nodes, which can respectively read the first material attribute of the plastic base film selected for the aluminum-plated film and the first evaporation time of the aluminum-plated film set. Among them, substrate films of different materials (PET, BOPP, CPP, PVC, etc.) have different physical and chemical properties, which may affect the firmness of the aluminum-plated layer when it is not cooled. And the first evaporation time will also affect the firmness of the aluminum-plated layer. Specifically, if the evaporation time is too long, the aluminum-plated layer will be too thick, and the local adhesion of the aluminum-plated layer will decrease; if the evaporation time is too short, the thickness of the aluminum-plated layer will be insufficient, and it will not be able to fully combine with the surface of the substrate, resulting in insufficient adhesion. The present invention simultaneously inputs the above two factors into the pre-established winding speed prediction model, so as to obtain the output target winding speed belonging to the critical speed, that is, when the winding roller is controlled to wind the aluminum-plated film after evaporation according to the target winding speed, it will not cause uneven aluminum-plated layer and aluminum throwing phenomenon.

[0027] At the same time, using cooling equipment to assist in cooling the evaporated aluminum-coated film can also improve the bonding firmness between the aluminum-coated layer and the plastic base film, thereby assisting in reducing the probability of uneven aluminum-coated layer and aluminum-stripping caused by winding. In this regard, the present invention also pre-establishes a cooling equipment layout prediction model, which comprehensively analyzes the first material property of the plastic base film, the first evaporation time of the aluminum-coated film, and the critical speed obtained by the above prediction, i.e., the target winding speed, and outputs the best height layout plan for each cooling device. When the evaporated aluminum-coated film is wound up, each cooling device is controlled to adjust the distance from the aluminum-coated film below according to the above-mentioned height layout plan, so as to achieve the goal of assisting in cooling the aluminum-coated film and preventing the aluminum-coated layer on the aluminum-coated film from being blown unevenly due to excessive force of the cold wind.

[0028] Therefore, the present invention determines the critical winding speed that can avoid uneven aluminum coating or even aluminum throwing phenomenon based on the first material property of the plastic base film and the first evaporation time of the aluminum-coated film, and determines the cooling operating height of each cooling device according to the first material property of the plastic base film, the first evaporation time of the aluminum-coated film and the critical winding speed. That is, the probability of quality defects in the aluminum-coated film is reduced by regulating the winding speed of the winding roller and the blowing height of the cooling equipment, and the aluminum-coated film can be wound at a reasonable speed when it is not completely cooled, which can greatly improve the production efficiency of the aluminum-coated film and thus reduce the production cost.

[0029] After determining the above-mentioned target winding speed and height layout plan, the winding roller and the cooling equipment are controlled to execute respectively, and the Internet of Things technology continues to be used to obtain the real-time winding speed of the winding roller and the real-time cooling height of the cooling equipment. When it is identified that the winding roller and the cooling equipment do not execute the above-mentioned target winding speed and height layout plan, an alarm message is output in time to remind relevant personnel to intervene.

[0030] The winding speed prediction model and the cooling equipment layout prediction model are preferably constructed using a deep learning algorithm, such as a feedforward neural network, a convolutional neural network, a recurrent neural network, a generative adversarial network, a deep residual network, etc. The winding speed prediction model and the cooling equipment layout prediction model may use the same deep learning algorithm or different deep learning algorithms, which is not limited by the present invention.

[0031] In some embodiments, the obtaining of the first material property of the plastic base film and the first evaporation time of the aluminum-coated film through the Internet of Things includes: determining the input form of the plastic base film, the input form including manual input and machine automatic input; if the input form is manual input, setting the base film reading reader to transmit an activation signal at a first frequency, and receiving a response signal from the electronic tag on the plastic base film; if the input form is machine automatic input, setting the base film reading reader to transmit an activation signal at a second frequency, and receiving a response signal from the electronic tag on the plastic base film; reading the first material property of the plastic base film from the response signal; wherein the first frequency is lower than the second frequency; using an evaporation reader to receive an evaporation signal emitted by a transmitter on an evaporation device, and the evaporation reader reads the first evaporation time of the aluminum-coated film from the evaporation signal.

[0032] The Internet of Things set up in the present invention includes at least a base film reading reader and a vapor deposition reader, and also includes a reader for reading the real-time winding speed of the winding roller and the real-time cooling height of each cooling device, which will not be described in detail.

[0033] Among them, the base film reader first determines the input form of the plastic base film, that is, whether the plastic base film is manually input into the production equipment or the machine automatically inputs the plastic base film into the production equipment. In different aluminum-plated film production workshops, the delivery method of the plastic base film may be different, which can be selected by the manual / machine switch. If the input form is manual input, only a small amount of plastic base film with an electronic tag can be placed into the production equipment manually each time. In this case, the base film reader needs to emit an activation signal at a lower frequency to read the content of the electronic tag, which can reduce the power consumption of the activation signal emission; and if the input form is automatic machine input, the input rate of the machine is faster. At this time, the base film reader needs to be set to emit an activation signal at a higher frequency to avoid missing the recognition of the plastic base film. The base film reader preferably uses RFID technology, and the electronic tag is a passive tag. The radio frequency signal emitted by the base film reader can activate the passive tag on the plastic base film, and the passive tag sends tag information to the outside, and the base film reader obtains the first material attribute of the plastic base film.

[0034] Different from the base film reader, the evaporation reader in the present invention adopts a passive receiving method, that is, when the evaporation equipment is about to start or complete the evaporation of the plastic base film, it will send the preset or actual first evaporation time to the base film reader.

[0035] In some embodiments, before inputting the first material properties of the plastic base film and the first evaporation time of the aluminum-coated film into the winding speed prediction model, the method also includes: collecting multiple groups of first aluminum-coated film operation data in the winding stage, each of the first aluminum-coated film operation data includes the second material properties of the plastic base film, the second evaporation time of the aluminum-coated film, the winding speed and the first aluminum-coated film quality label, and constructing a first training data set and a second training data set based on each group of the first aluminum-coated film operation data; using the first training data set to simultaneously train the winding speed prediction model and the winding speed inverse model until the winding speed inverse model reaches the training termination condition; inputting the training data in the second training data set one by one into the winding speed inverse model to obtain a reverse training data set; fusing the reverse training data set and the second training data set to obtain a third training data set, and using the third training data set to continue training the winding speed prediction model until the winding speed prediction model reaches the training termination condition.

[0036] The winding speed prediction model needs to be pre-trained before it can be put into use. The present invention first collects the aluminized film operation data of the winding stage of each aluminized film production line, including the second material attribute of the plastic base film, the second evaporation time of the aluminized film, the winding speed and the first aluminized film quality label, and the first aluminized film quality label can be manually labeled. Based on these data, a training data set is constructed and divided into a first training data set and a second training data set in proportion (for example, 1:1).

[0037] The present invention also constructs a winding speed reverse model, which has the opposite function to the winding speed prediction model. The training goal of the winding speed prediction model is to predict the critical speed, i.e., the target winding speed, based on the input material properties of the plastic base film and the evaporation time of the aluminized film, while the winding speed reverse model is based on the aluminized film quality label in the input training data to reversely deduce multiple groups of plastic base film material properties, aluminized film evaporation time, and winding speeds that match the aluminized film quality label, i.e., to analyze which combination of material properties, evaporation time, and winding speed can generate an aluminized film of corresponding quality. The training data of the winding speed reverse model and the winding speed prediction model can be the same, but the internal structures of the two models are slightly different, which will not be described in detail in the present invention.

[0038] The first training data set is used to train the winding speed prediction model and the winding speed inverse model at the same time, and the training termination condition of the winding speed prediction model is set higher, so that the winding speed inverse model will reach the training termination condition first. Then the training data in the second training data set is input into the trained winding speed inverse model, and the winding speed inverse model inversely infers multiple sets of training data (the data format is the same as the first training data set and the second training data set). The inversely inferred training data is organically integrated with the originally determined second training data set, so that a new third training data set is obtained, and the third training data set is used to continue training the winding speed prediction model until the training termination condition is reached.

[0039] The advantage of setting the above-mentioned winding speed reverse deduction model in the present invention is that it provides more quantity and types of training data, which is very helpful in the situation where the collected aluminum coating operation data is insufficient, and this situation is common.

[0040] In some embodiments, the fusion of the inverse training data set and the second training data set includes: determining the number of training data in the first training data set used when the winding speed inverse model reaches the training termination condition, and determining a fusion ratio according to the number; randomly screening a corresponding number of training data from the inverse training data set according to the fusion ratio, and importing the training data into the second training data set.

[0041] The fusion ratio of the reverse training data and the measured training data should be reasonable. Specifically, first calculate the number of training data in the first training data set used when the winding speed reverse model reaches the training termination condition. For example, there are 200 training data in the first training data set, and the winding speed reverse model reaches the training termination condition after using 150 training data. 150 / 200=3 / 4. At this time, the reverse training data in the third training data set is set to account for 3 parts, and the training data in the original second training data set accounts for 4 parts. Since the amount of training data in the second training data set is known, the amount of reverse training data can be obtained. The corresponding amount of training data is randomly screened from the reverse training data set and imported into the second training data set, that is, the third training data set is obtained.

[0042] In some embodiments, the cooling equipment layout prediction model outputs height layout plans for several cooling equipment, including: the cooling equipment layout prediction model predicts the first material properties of the plastic base film and the first evaporation time of the aluminum-coated film to obtain preliminary height layout plans for the several cooling equipment, the preliminary height layout plan including preliminary layout heights corresponding to each of the cooling equipment, and the preliminary layout height of each of the cooling equipment becomes lower as the distance from the evaporation equipment increases; a correction coefficient is determined according to the target winding speed, and the preliminary layout height corresponding to each of the cooling equipment in the preliminary height layout plan is corrected using the correction coefficient to obtain the height layout plan.

[0043] The cooling equipment layout prediction model first predicts the first material properties of the plastic base film and the first evaporation time of the aluminum film, and predicts the initial height layout plan. Figure 2 As shown, in the preliminary height layout scheme, the preliminary layout heights of each cooling device have different layout heights, and their layout heights become lower as the distance from the evaporation device increases. The advantage of this arrangement is that the temperature of the aluminum-coated film rolled out from the evaporation device is still high. At this time, the cooling device should be set at a higher position to cool down the part of the aluminum-coated film. The aluminum-coated film has naturally cooled down during the process of being rolled out, and its firmness has been improved. At this time, the cooling device is set at a lower position to cool down the aluminum-coated film, and it will not affect the quality of the aluminum-coated film.

[0044] In addition, the present invention is also provided to adjust the layout height of each cooling device in the preliminary height layout scheme according to the target winding speed. Specifically, the correction coefficient is determined according to the target winding speed and the corresponding positive correlation function, that is, the higher the target winding speed, the larger the corresponding correction coefficient, and the preliminary layout height is adjusted to be larger at this time, that is, the cooling device cools the aluminized film at a higher position; conversely, the cooling device cools the aluminized film at a slightly higher position. The advantage of such a setting is that when the target winding speed is faster, the aluminum layer on the aluminum film is at a critical speed, and at this time it is not suitable for the cooling device to forcefully blow air to cool it. Accordingly, the height of the cooling device is uniformly raised to further reduce the occurrence of uneven aluminum film or even aluminum shedding.

[0045] In some embodiments, before inputting the first material properties of the plastic base film, the first evaporation time of the aluminum-coated film and the target winding speed into the cooling equipment layout prediction model, the method also includes: collecting multiple groups of second aluminum-coated film operation data in the winding stage, each of the second aluminum-coated film operation data includes the third material properties of the plastic base film, the third evaporation time of the aluminum-coated film, the layout height of the cooling equipment, the distance between the cooling equipment and the evaporation equipment, and the second aluminum-coated film quality label, and constructing a fourth training data set based on each group of the second aluminum-coated film operation data; using the fourth training data set to train the cooling equipment layout prediction model until the training termination condition is reached.

[0046] In the embodiment of the present invention, like the winding speed prediction model, the cooling equipment layout prediction model also needs to be pre-trained, and the difference between the two lies in the different training data. The training data of the cooling equipment layout prediction model includes the third material attribute of the plastic base film, the third evaporation time of the aluminized film, the layout height of the cooling equipment, the distance between the cooling equipment and the evaporation equipment, and the second aluminized film quality label.

[0047] The first aluminum coating film operation data and the second aluminum coating film operation data can be collected together, that is, all data related to the aluminum coating film operation in the winding stage are collected, and the data are screened according to the needs of the first aluminum coating film operation data and the second aluminum coating film operation data, and the details are not repeated here.

[0048] like Figure 3As shown, an embodiment of the present invention further discloses a monitoring system for an aluminized film production line based on the Internet of Things, the system comprising an acquisition module, a first prediction module, a second prediction module, an execution module, and a monitoring and alarm module; the acquisition module is used to acquire a first material property of a plastic base film and a first evaporation time of the aluminized film through the Internet of Things; the first prediction module is used to input the first material property of the plastic base film and the first evaporation time of the aluminized film into a winding speed prediction model, and the winding speed prediction model outputs a corresponding target winding speed; the second prediction module is used to input the first material property of the plastic base film and the first evaporation time of the aluminized film into a winding speed prediction model, and the winding speed prediction model outputs a corresponding target winding speed; The first evaporation time of the aluminum film and the target winding speed are input into the cooling equipment layout prediction model, and the cooling equipment layout prediction model outputs a height layout plan for several cooling devices; the execution module is used to control the winding roller to perform the winding operation according to the target winding speed, and control each cooling device to cool the aluminum-plated film in the winding at the corresponding height according to the height layout plan; the monitoring and alarm module is used to obtain the real-time winding speed of the winding roller and the real-time cooling height of each cooling device through the Internet of Things, monitor the real-time winding speed and the real-time cooling height, and output alarm information in a timely manner.

[0049] An embodiment of the present invention further discloses an electronic device, comprising: at least one processor, a memory, and a computer program stored in the memory and executable on the at least one processor, wherein the processor executes the computer program to implement the method described in the above embodiment.

[0050] An embodiment of the present invention further discloses a computer storage medium, wherein the computer storage medium stores a computer program, and the computer program is executed by a processor to implement the method described in the above embodiment.

[0051] An embodiment of the present invention further discloses a computer program product, which includes computer code. When the computer code is executed by a processor of an electronic device, the method described in the above embodiment is implemented.

[0052] The present invention is described with reference to the flowchart and / or block diagram of the method, device (system), and computer program product according to the embodiment of the present invention. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the process and / or box in the flowchart and / or block diagram can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device produce a device for implementing the functions specified in one process or multiple processes in the flowchart and / or one box or multiple boxes in the block diagram.

[0053] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to work in a specific manner, so that the instructions stored in the computer-readable memory produce a manufactured product including an instruction device that implements the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0054] These computer program instructions may also be loaded onto a computer or other programmable data processing device so that a series of operational steps are executed on the computer or other programmable device to produce a computer-implemented process, whereby the instructions executed on the computer or other programmable device provide steps for implementing the functions specified in one or more processes in a flowchart and / or one or more boxes in a block diagram.

[0055] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention.

Claims

1. A method for monitoring an aluminum film production line based on the Internet of Things, characterized in that The method includes the following steps: obtaining the first material property of the plastic base film and the first evaporation time of the aluminum-plated film through the Internet of Things; inputting the first material property of the plastic base film and the first evaporation time of the aluminum-plated film into a winding speed prediction model, and the winding speed prediction model outputs a corresponding target winding speed; inputting the first material property of the plastic base film, the first evaporation time of the aluminum-plated film and the target winding speed into a cooling equipment layout prediction model, and the cooling equipment layout prediction model outputs a height layout plan of several cooling equipment; controlling the winding roller to perform the winding operation according to the target winding speed, and controlling each cooling equipment to cool the aluminum-plated film being wound at a corresponding height according to the height layout plan; obtaining the real-time winding speed of the winding roller and the real-time cooling height of each cooling equipment through the Internet of Things, monitoring the real-time winding speed and the real-time cooling height, and outputting alarm information in a timely manner.

2. The method for monitoring an aluminum film production line based on the Internet of Things according to claim 1, characterized in that: Obtaining a first material property of a plastic base film and a first evaporation time of an aluminum-coated film through the Internet of Things includes: determining an input form of the plastic base film, the input form including manual input and machine automatic input; if the input form is manual input, setting a base film reader to transmit an activation signal at a first frequency, and receiving a response signal from an electronic tag on the plastic base film; if the input form is machine automatic input, setting a base film reader to transmit an activation signal at a second frequency, and receiving a response signal from an electronic tag on the plastic base film; reading the first material property of the plastic base film from the response signal; wherein the first frequency is lower than the second frequency; using an evaporation reader to receive an evaporation signal transmitted by a transmitter on an evaporation device, and the evaporation reader reading the first evaporation time of the aluminum-coated film from the evaporation signal.

3. The method for monitoring an aluminum film production line based on the Internet of Things according to claim 1, characterized in that: Before inputting the first material properties of the plastic base film and the first evaporation time of the aluminum-coated film into the winding speed prediction model, the method also includes: collecting multiple groups of first aluminum-coated film operation data in the winding stage, each of the first aluminum-coated film operation data includes the second material properties of the plastic base film, the second evaporation time of the aluminum-coated film, the winding speed and the first aluminum-coated film quality label, and constructing a first training data set and a second training data set based on each group of the first aluminum-coated film operation data; using the first training data set to simultaneously train the winding speed prediction model and the winding speed inverse model until the winding speed inverse model reaches the training termination condition; inputting the training data in the second training data set one by one into the winding speed inverse model to obtain an inverse training data set; fusing the inverse training data set and the second training data set to obtain a third training data set, and using the third training data set to continue training the winding speed prediction model until the winding speed prediction model reaches the training termination condition.

4. The method for monitoring an aluminum film production line based on the Internet of Things according to claim 3 is characterized in that: The reverse deduction training data set and the second training data set are merged, including: determining the number of training data in the first training data set used when the winding speed reverse deduction model reaches the training termination condition, and determining a fusion ratio according to the number; randomly selecting a corresponding number of training data from the reverse deduction training data set according to the fusion ratio, and importing the training data into the second training data set.

5. The method for monitoring an aluminum film production line based on the Internet of Things according to claim 4, characterized in that: The cooling equipment layout prediction model outputs several height layout plans of cooling equipment, including: the cooling equipment layout prediction model predicts the first material properties of the plastic base film and the first evaporation time of the aluminum-coated film to obtain preliminary height layout plans of the cooling equipment, the preliminary height layout plan includes preliminary layout heights corresponding to each cooling equipment, and the preliminary layout height of each cooling equipment becomes lower as the distance from the evaporation equipment increases; a correction coefficient is determined according to the target winding speed, and the preliminary layout height corresponding to each cooling equipment in the preliminary height layout plan is corrected using the correction coefficient to obtain the height layout plan.

6. The method for monitoring an aluminum film production line based on the Internet of Things according to claim 5, characterized in that: Before inputting the first material properties of the plastic base film, the first evaporation time of the aluminum-coated film and the target winding speed into the cooling equipment layout prediction model, the method also includes: collecting multiple groups of second aluminum-coated film operation data in the winding stage, each of the second aluminum-coated film operation data includes the third material properties of the plastic base film, the third evaporation time of the aluminum-coated film, the layout height of the cooling equipment, the distance between the cooling equipment and the evaporation equipment, and the second aluminum-coated film quality label, and constructing a fourth training data set based on each group of the second aluminum-coated film operation data; using the fourth training data set to train the cooling equipment layout prediction model until the training termination condition is reached.

7. An aluminum film production line monitoring system based on the Internet of Things, characterized in that The system includes an acquisition module, a first prediction module, a second prediction module, an execution module, and a monitoring and alarm module; the acquisition module is used to acquire the first material property of the plastic base film and the first evaporation time of the aluminum-plated film through the Internet of Things; the first prediction module is used to input the first material property of the plastic base film and the first evaporation time of the aluminum-plated film into a winding speed prediction model, and the winding speed prediction model outputs a corresponding target winding speed; the second prediction module is used to input the first material property of the plastic base film, the first evaporation time of the aluminum-plated film and the target winding speed into a cooling equipment layout prediction model, and the cooling equipment layout prediction model outputs a height layout plan of several cooling equipment; the execution module is used to control the winding roller to perform the winding operation according to the target winding speed, and control each cooling device to cool the aluminum-plated film in the winding at the corresponding height according to the height layout plan; the monitoring and alarm module is used to acquire the real-time winding speed of the winding roller and the real-time cooling height of each cooling device through the Internet of Things, monitor the real-time winding speed and the real-time cooling height, and output alarm information in a timely manner.

8. An electronic device comprising: At least one processor, a memory, and a computer program stored in the memory and executable on the at least one processor, wherein the processor executes the computer program to implement the method according to any one of claims 1 to 6.

9. A computer storage medium storing a computer program, characterized in that: The computer program is executed by a processor to implement the method according to any one of claims 1 to 6.

10. A computer program product, comprising computer code, characterized in that: When the computer code is executed by a processor of an electronic device, the method according to any one of claims 1 to 6 is implemented.