Karst roadbed treatment system and karst roadbed treatment process

By using a pillar system for connecting steel bars and positioning steel bars and expanded perlite materials in karst roadbed treatment, the difficulty of pillar positioning and concrete quality problems are solved, and construction efficiency and safety are improved.

CN118773972AActive Publication Date: 2024-10-15CHINA RAILWAY 23RD BUREAU GRP NO 1 ENG
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411160307.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-10-15
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

During the treatment of karst roadbed, the positioning of pillars is difficult and inefficient, which puts operators at risk, and air bubbles are prone to appear during concrete pouring, affecting the quality.

Method used

A pillar system including connecting steel bars and positioning steel bars is adopted. The telescopic structure and positioning structure are used to quickly position and fix the pillars on the karst opening surface, reducing the risk of operators entering the cave. Expanded perlite materials are used inside the pillars to improve the concrete's strength. Frost resistance and thermal insulation properties.

Benefits of technology

It improves the efficiency of pillar positioning and fixation, reduces operational risks, ensures concrete quality, avoids the formation of bubbles, and improves overall construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118773972A_ABST
    Figure CN118773972A_ABST
Patent Text Reader

Abstract

The invention discloses a karst roadbed treatment system and a process thereof, and relates to the field of karst roadbed treatment. A crane lifts a strut to be located above the opening surface of karst, one end of a connecting rope penetrates through a second through groove of a second positioning steel bar, then the two ends of the connecting rope penetrate through first through grooves, and by pulling the two ends of the connecting rope, the karst roadbed treatment system and the karst roadbed treatment process are completed. The second positioning steel bar is inserted into the first through groove in the first positioning structure, after insertion, the telescopic structure is shortened, the first positioning structure is located on the opening face of the second connecting groove, and the telescopic structure drives the supporting column to move downwards together in the shortening process. The positioning and connecting efficiency of the supporting column can be improved, the supporting column can be rapidly and conveniently fixed, and the concrete pouring quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of karst roadbed treatment, and in particular to a karst roadbed treatment system and a process thereof. Background Art

[0002] Karst collapse is widespread in my country, and many fields are deeply affected. Among them, highways, railways and mines are the most seriously affected, followed by farmland water conservancy, urban construction, roads and pipeline facilities, etc.

[0003] A large number of highways under construction or planning inevitably need to pass through karst-developed areas, and the large number of various caves on the routes have brought many difficulties to the construction of roadbeds, bridge foundations and tunnels.

[0004] When treating karst roadbed, it is usually necessary to pour cement piles and fill the upper roadbed. However, during the process of injecting concrete, it is difficult to position the mold when it is placed, and multiple operators are required to operate and fix it together, which is inefficient. In addition, during the operation, the operator is located in the karst, and accidents are prone to occur when hoisting the cement column mold.

[0005] At the same time, when the grouting pipe is moved upward by a crane, it is easy to cause the grouting pipe to shake, which in turn affects the pouring of the concrete slurry and causes bubbles and hollows to appear in the concrete slurry, affecting the quality of the cement soil mixing pile. Summary of the invention

[0006] One object of the present invention is to provide a karst roadbed treatment system and process thereof, so as to improve the efficiency of pillar positioning and connection, quickly and conveniently fix the pillars, and improve the quality of concrete pouring.

[0007] This purpose is achieved by adopting the following technical solutions:

[0008] A karst roadbed treatment system and process thereof include a closed surface layer located at a karst opening surface and pillars located in the karst; the pillars are hoisted into the karst by a crane, and an operator inserts the steel bars on the pillars into a connecting groove in a karst cave. Since the karst cave is usually small and uneven, it is time-consuming and laborious for the operator to connect the pillars and the connecting groove.

[0009] The inventor provides a karst roadbed treatment system, wherein a pillar comprises a connecting steel bar and a plurality of first positioning steel bars, wherein two first positioning steel bars are respectively located on both sides of the pillar, and a second positioning steel bar is vertically connected to the first positioning steel bar, and the second positioning steel bar is parallel to the pillar; a first connecting groove and a second connecting groove are provided in the karst, and the first connecting groove and the second connecting groove correspond to the connecting steel bar and the second positioning steel bar respectively; a positioning structure is provided in the second connecting groove, and the positioning structure comprises a first positioning structure and a second positioning structure, wherein the second positioning structure is located in the second connecting groove, and the first positioning structure is located outside the second connecting groove, and the first positioning structure and the second positioning structure are connected by a telescopic structure, and the telescopic structure enables the first positioning structure to be located on an opening surface of the karst or on an opening surface of the second connecting groove;

[0010] The first positioning structure is provided with a first through slot for passing the pillar, and the second positioning steel bar is provided with a second through slot.

[0011] When the pillar is put in, the telescopic structure is extended so that the first positioning structure is located on the opening surface of the karst.

[0012] The crane lifts the pillar and places it above the opening surface of the karst. One end of the connecting rope is passed through the second through slot of the second positioning steel bar, and then both ends of the connecting rope are passed through the first through slot. By pulling the two ends of the connecting rope, the second positioning steel bar is inserted into the first through slot on the first positioning structure. After insertion, the telescopic structure is shortened so that the first positioning structure is located on the opening surface of the second connecting slot. During the shortening of the telescopic structure, the pillar is driven to move downward together.

[0013] Compared with the existing roadbed treatment system, this system positions the pillars before they enter the karst, and the operators can operate outside the opening of the karst without entering the cave, thus avoiding dangerous accidents during the pillar placement process. It also does not require multiple workers to position and support the pillars in the cave at the same time, thus improving the operation efficiency.

[0014] Secondly, when the pillar inserts the second positioning steel bar into the first through slot on the first positioning structure above the cave, the telescopic structure shortens and cooperates with the crane to place the pillar in the cave. The crane bears most of the weight of the pillar, and the telescopic structure assists the crane to bear the weight of the pillar. Through the guidance of the telescopic structure, the connecting steel bar is inserted into the first connecting slot, and the second positioning steel bar is inserted into the second connecting slot, thereby improving the positioning connection efficiency.

[0015] Further, the first positioning structure includes a first positioning plate and a second positioning plate, and the first positioning plate and the second positioning plate are both provided with a first through groove; an adjustment plate is connected between the first positioning plate and the second positioning plate, and the adjustment plate includes a first adjustment plate and a second adjustment plate connected to each other at one end, and the first adjustment plate and the second adjustment plate are located on the same vertical line or contact each other;

[0016] In the original state, that is, when the second positioning steel bar is not inserted into the first through slot, the first adjustment plate and the second adjustment plate are located on the same vertical line, and the first positioning plate and the second positioning plate are at a certain distance; when the second positioning steel bar is inserted into the first through slot, the first positioning steel bar acts on the first positioning plate, and the first positioning plate is pressed downward under the action of the gravity of the pillar, and the connection between the first adjustment plate and the second adjustment plate rotates, so that the first adjustment plate and the second adjustment plate change from a vertical state to a horizontal state, and the first adjustment plate and the second adjustment plate contact each other, at this time, the first positioning plate and the second positioning plate contact each other. The second positioning steel bar completes passing through the first through slots of the first positioning plate and the second positioning plate, and achieves preliminary positioning.

[0017] The setting of the first positioning structure can not only quickly position the position of the pillar, but also buffer the entry of the pillar through the movement between the first positioning plate and the second positioning plate, thereby improving the stability of the entry.

[0018] The second positioning structure includes a third positioning plate located in the second connecting groove, a second through groove is arranged on the third positioning plate, and the inner diameter of the second positioning steel bar in the second connecting groove gradually decreases from top to bottom; a plurality of positioning blocks are arranged on the third positioning plate, and the positioning blocks are in contact with the side surfaces of the second positioning steel bar.

[0019] The third positioning plate is used to connect the telescopic structure. At the same time, the positioning block contacts the side of the second positioning steel bar to maintain the stability of the insertion, so that the second positioning steel bar can be more stably inserted into the second connecting groove.

[0020] Preferably, a clamping plate is provided at the opening surface of the second connection groove, and a clamping groove is provided on the second positioning steel bar, and when the lower end of the second positioning steel bar is inserted into the second connection groove, the clamping plate corresponds to the clamping groove and is inserted into the clamping groove for further fixed connection.

[0021] Furthermore, a sandwich is arranged in the pillar, and the sandwich has a first hollow layer and a second hollow layer arranged in sequence from the inside to the outside. The sandwich is made of expanded perlite material.

[0022] After the pillars are connected, concrete is poured into the first hollow layer and the second hollow layer.

[0023] Among them, expanded perlite is an inorganic mineral material, which is characterized by light weight, good thermal insulation and sound absorption performance, and abundant raw materials, low price, safe use and convenient construction.

[0024] When concrete is injected into the first hollow layer and the second hollow layer, it will expand when heated, and the expanded perlite will have a honeycomb structure inside. The expanded perlite also has good frost resistance. Since the expanded perlite itself is porous, it can obtain good frost resistance in concrete without air entraining agent. Applying it to concrete pouring can not only reduce the weight of the concrete, but also improve its thermal insulation and heat preservation properties.

[0025] In addition, expanded perlite can also be used as lightweight aggregate, which is more convenient to operate and use during transportation and movement, and the movement is safer and more reliable.

[0026] On the other hand, a karst roadbed treatment process comprises the following steps:

[0027] Obtain the location, size and type of karst beneath the roadbed;

[0028] Cleaning up the karst area;

[0029] Pre-buried slope drainage holes are installed for karst on the slope of the road cut;

[0030] Set up retaining walls at the roadbed to keep water out of the roadbed;

[0031] Reinforcement of caves according to the size and type of karst;

[0032] According to the location, size and type of the karst, the preset pillars are placed inside the karst, so that the second positioning steel bars of the pillars are inserted into the corresponding second connecting grooves, and the connecting steel bars are inserted into the corresponding first connecting grooves;

[0033] Concrete is poured into the pillar. A sandwich is arranged in the pillar, and the sandwich is provided with a first hollow layer and a second hollow layer from the inside to the outside, and the sandwich is made of expanded perlite material; concrete is poured into the pillar, specifically including:

[0034] Concrete is injected into the first hollow layer and the second hollow layer at the same time, and the grouting pressure in the first hollow layer increases step by step from a preset first initial pressure until a preset first grouting final pressure is reached; the grouting pressure in the second hollow layer increases step by step from a preset second initial pressure until a preset second grouting final pressure is reached. The grouting pressure in the first hollow layer is greater than the grouting pressure in the second hollow layer.

[0035] After pouring the concrete, a baffle is laid on the pillar, and a crushed stone layer, a soil layer and a planting layer are laid on the baffle in sequence.

[0036] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0037] The present invention provides a karst roadbed processing system and a process thereof. The present invention can preliminarily position a pillar at a karst opening surface through a first positioning structure, and the movement between a first positioning plate and a second positioning plate of the first positioning structure can buffer the pillar when it enters a karst cave, thereby improving stability. Moreover, under the action of a telescopic structure, the second positioning steel bar of the pillar is directly inserted into a second connecting groove, and the connecting steel bar is inserted into the first connecting groove, thereby improving operation efficiency.

[0038] At the same time, the pillars of the system are provided with interlayers, which are provided with a first hollow layer and a second hollow layer in sequence from the inside to the outside, and the interlayers are made of expanded perlite material. During the pouring process, the interlayer of expanded perlite can further act between the first hollow layer and the second hollow layer, making the concrete in the pillar uniform, avoiding bubbles and hollowness in the concrete in the pillar, and improving the quality of the pillar. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0040] Figure 1 It is a schematic diagram of the treatment of areas with karst and karst water development;

[0041] Figure 2 It is a schematic diagram of the pillar structure;

[0042] Figure 3 It is a schematic diagram of the structure in which the first positioning structure in the karst is located on the opening surface of the karst;

[0043] Figure 4 It is a structural schematic diagram of the first positioning structure in the karst being located on the opening surface of the second connecting groove;

[0044] Figure 5 is a structural schematic diagram of a first positioning structure;

[0045] Figure 6 A schematic diagram of the structure in which the first adjustment plate and the second adjustment plate change from a vertical state to a horizontal state;

[0046] Figure 7 is a schematic diagram of the structure of the second positioning steel bar;

[0047] Figure 8 It is a structural schematic diagram of the first positioning structure and the second positioning structure when the second positioning steel bar is not inserted into the first through groove;

[0048] Fig. 9 A schematic diagram of the structure of inserting the clamping plate into the clamping groove of the second positioning steel bar;

[0049] Fig.10A schematic diagram of the structure of inserting the second positioning steel bar into the second connecting groove;

[0050] Fig.11 It is a processing schematic diagram when the location of karst is exposed karst;

[0051] Fig.12 This is a schematic diagram of the treatment when the karst location is shallow karst.

[0052] Marks and corresponding parts names in the attached drawings:

[0053] 1-karst, 2-second connecting groove, 3-first connecting groove, 4-third positioning plate, 5-first positioning plate, 6-second positioning plate, 7-telescopic structure, 8-adjusting plate, 9-positioning block, 10-clamping plate, 11-slide, 12-second positioning steel bar, 121-clamping groove, 13-first positioning steel bar, 14-pillar, 15-connecting steel bar. DETAILED DESCRIPTION

[0054] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0055] In the description of the present invention, it should be understood that the terms "front", "rear", "left", "right", "up", "down", "vertical", "horizontal", "high", "low", "inside", "outside", etc., indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as limiting the scope of protection of the present invention.

[0056] Example 1

[0057] For the treatment of karst located in water-developed areas, such as Figure 1 As shown in the figure, for larger karst caves (underground rivers) and shafts that have been exposed or whose top plate thickness is less than the safe thickness, reinforced concrete slabs are used to cross. For smaller shallow karst caves and fissure karst, reinforced concrete slabs are used to cross or mortar-laid rubble stone pillars are used for support. Mortar-laid rubble pillars can be used for support only when construction personnel and machinery can enter the construction site. The size and spacing of mortar-laid rubble support are designed separately according to the scale of the karst cave. The safe distance between the foot of the roadbed slope and the nearby karst caves and the safe thickness of the top plate of the karst cave at the base of the roadbed need to be calculated.

[0058] When mortar-laid stone columns are used for support, the present invention first sets pillars in the cave and pours concrete through the pillars. Specifically, the system includes a closed surface layer located on the opening surface of the karst 1 and pillars 14 located in the karst 1; the pillars 14 are as follows: Figure 2 As shown, the pillar 14 includes a connecting steel bar 15 and a plurality of first positioning steel bars 13, two first positioning steel bars 13 are respectively located on both sides of the pillar 14, and a second positioning steel bar 12 is vertically connected to the first positioning steel bar 13, and the second positioning steel bar 12 is parallel to the pillar 14;

[0059] like Figure 3 As shown, a first connecting groove 3 and a second connecting groove 2 are provided in the karst 1, and the first connecting groove 3 and the second connecting groove 2 correspond to the connecting steel bar 15 and the second positioning steel bar 12 respectively;

[0060] A positioning structure is provided in the second connection groove 2, and the positioning structure includes a first positioning structure and a second positioning structure, the second positioning structure is located in the second connection groove 2, and the first positioning structure is located outside the second connection groove 2, and the first positioning structure and the second positioning structure are connected by a telescopic structure 7, and the telescopic structure 7 enables the first positioning structure to be located on the opening surface of the karst 1 or the opening surface of the second connection groove 2;

[0061] The first positioning structure is provided with a first through slot for passing the pillar 14 , and the second positioning steel bar 12 is provided with a second through slot. A connecting rope passes through the second through slot, and both ends of the connecting rope pass through the first through slot.

[0062] When in use, the telescopic structure 7 is extended so that the first positioning structure is located on the opening surface of the karst 1. Figure 3 As shown, the crane lifts the pillar and places it above the opening surface of the karst 1. The operator passes one end of the connecting rope through the second through slot of the second positioning steel bar 12, and then passes both ends of the connecting rope through the first through slot. By pulling the two ends of the connecting rope, the second positioning steel bar is inserted into the first through slot on the first positioning structure.

[0063] The telescopic structure is shortened so that the first positioning structure is located on the opening surface of the second connecting groove 2. Figure 4 As shown, during the shortening process of the telescopic structure, the support column is driven to move downward together, so that the connecting steel bar 15 is inserted into the first connecting groove 3, and the second positioning steel bar 12 is inserted into the second connecting groove 2.

[0064] Example 2

[0065] Based on Example 1, the first positioning structure is as follows Figure 5As shown, the first positioning structure includes a first positioning plate 5 and a second positioning plate 6, and the first positioning plate 5 and the second positioning plate 6 are both provided with a first through groove; an adjustment plate 8 is connected between the first positioning plate 5 and the second positioning plate 6, and the adjustment plate 8 includes a first adjustment plate and a second adjustment plate connected to each other at one end, and the first adjustment plate and the second adjustment plate are located on the same vertical line or in contact with each other;

[0066] When the second positioning steel bar 12 is inserted into the first through groove, the first positioning steel bar 13 acts on the first positioning plate 5, and the first positioning plate 5 is pressed downward under the action of the gravity of the pillar, and the connection between the first adjustment plate and the second adjustment plate rotates, so that the first adjustment plate and the second adjustment plate change from a vertical state to a horizontal state, such as Figure 6 As shown, the first adjustment plate and the second adjustment plate are in contact with each other.

[0067] A plurality of spring rods are connected between the first positioning plate 5 and the second positioning plate 6 , and the spring rods can further buffer the force between the first positioning plate 5 and the second positioning plate 6 to avoid excessive force when the pillar is inserted.

[0068] Example 3

[0069] On the basis of the above embodiment, the second positioning structure includes a third positioning plate 4 located in the second connecting groove 2, the third positioning plate 4 is provided with a second through groove, the inner diameter of the second positioning steel bar 12 in the second connecting groove 2 gradually decreases from top to bottom; a plurality of positioning blocks 9 are provided on the third positioning plate 4, and the positioning blocks 9 are in contact with the side of the second positioning steel bar 12. A clamping plate 10 is provided at the opening surface of the second connecting groove 2, a fixed plate is provided in the karst 1, and a slide groove 11 is provided on the fixed plate, the clamping plate 10 and the slide groove 11 are connected by a connecting rod, and the clamping plate can slide on the slide groove.

[0070] The structure of the second positioning steel bar 12 is as follows Figure 7 As shown, a clamping groove 121 is provided on the second positioning steel bar 12 . When the lower end of the second positioning steel bar 12 is inserted into the second connecting groove 2 , the clamping plate 10 corresponds to the clamping groove 121 , and the clamping plate 10 is inserted into the clamping groove 121 .

[0071] When in use, when the second positioning steel bar 12 is not inserted into the first through groove, the first positioning structure and the second positioning structure are as follows: Figure 8 As shown, when the second positioning steel bar is inserted into the first through groove and the first positioning steel bar 13 acts on the first positioning plate 5, the first positioning plate 5 and the second positioning plate 6 contact each other. At the same time, the telescopic structure shortens and drives the first positioning plate 5 and the second positioning plate 6 to the opening surface of the second connecting groove 2, as shown in FIG. Fig. 9 As shown, the clamping plate 10 slides on the slide groove 11 and is inserted into the clamping groove 121 of the second positioning steel bar 12 to complete the fixed connection.

[0072] When the second positioning steel bar 12 is inserted into the second connecting groove 2, Fig.10 shown.

[0073] Example 4

[0074] Based on the above embodiment, a karst roadbed treatment process includes the following steps:

[0075] Obtain the location, size and type of karst beneath the roadbed;

[0076] Cleaning up the karst area;

[0077] Pre-buried slope drainage holes are installed for karst on the slope of the road cut;

[0078] Set up retaining walls at the roadbed to keep water out of the roadbed;

[0079] Reinforcement of caves according to the size and type of karst;

[0080] According to the location, size and type of the karst, the preset pillar 14 is placed inside the karst, so that the second positioning steel bar 12 of the pillar 14 is inserted into the corresponding second connecting groove 2, and the connecting steel bar 15 is inserted into the corresponding first connecting groove 3;

[0081] Concrete is poured into the support column 14 .

[0082] A baffle is laid on the pillar 14, and a crushed stone layer, a soil layer and a planting layer are laid in sequence on the baffle.

[0083] The support column 14 is provided with an interlayer, and the interlayer is provided with a first hollow layer and a second hollow layer in sequence from the inside to the outside, and the interlayer is made of expanded perlite material; concrete is poured into the support column 14, specifically including:

[0084] Concrete is injected into the first hollow layer and the second hollow layer at the same time, and the grouting pressure in the first hollow layer increases step by step from a preset first initial pressure until a preset first grouting final pressure is reached; the grouting pressure in the second hollow layer increases step by step from a preset second initial pressure until a preset second grouting final pressure is reached. The grouting pressure in the first hollow layer is greater than the grouting pressure in the second hollow layer.

[0085] During grouting, the grouting adopts the method of thinning the slurry concentration first and then thickening. After the grouting begins, the pump suction volume and pump pressure should be observed regularly, various phenomena occurring during the grouting process should be recorded, original data should be collected, and the grouting volume and slurry concentration should be adjusted in time according to the actual situation. If a large amount of slurry escapes from the surface cracks during the grouting process, intermittent grouting should be adopted, or the pump volume should be reduced and measures should be taken to fill the cracks on the surface to prevent a large amount of slurry from the ground.

[0086] When grouting, avoid injecting a large amount of cement slurry in a short period of time. When the grouting volume is large, intermittent grouting and thick slurry construction should be adopted in time, or a funnel-shaped sand thrower should be added to the hole mouth to bring sand or slag into the hole with slurry.

[0087] In some embodiments, the location of karst includes karst located in water-developed areas, karst located on the side slopes of road cuts, and caves located at the base of roadbeds or retaining walls; the types of karst include exposed karst, shallow karst, and unexposed karst; the sizes of karst include deep and small caves, caves with small diameters, etc.

[0088] In some embodiments, the cave treatment method is first obtained based on the location, size and type of the karst under the roadbed; for karst located in water-developed areas, for smaller shallow caves and fissure karst, mortar-laid stone columns are used for support.

[0089] After the pillars are placed in the cave, concrete is injected into the first hollow layer and the second hollow layer at the same time, and the concrete brings sand or slag into the first hollow layer and the second hollow layer.

[0090] During the injection process, the size of the slag in the first hollow layer is smaller than that in the second hollow layer. Therefore, after pouring, the compactness in the first hollow layer is higher than that in the second hollow layer, thereby improving the supporting effect.

[0091] Moreover, the grouting pressure in the first hollow layer is greater than that in the second hollow layer. During grouting, small-sized slag diffuses to the larger-sized slag in the second hollow layer, further improving the tightness of the transition connection between the first hollow layer and the second hollow layer and improving stability.

[0092] Example 5

[0093] On the basis of the above embodiment, when the type of karst is exposed karst, such as Fig.11 shown.

[0094] Divert the karst caves; for karst springs or water holes on the side slopes of the road cutting, set up drainage ditches or drainage pipes to divert the water to the side ditches or platform intercepting ditches; for karst springs or water holes at the base of the roadbed, set up blind ditches or culverts to drain the water.

[0095] Cross the karst caves; use bridges and culverts to cross underground rivers, sinkholes, water holes, karst springs, etc. with large flow at the roadbed or near the roadbed; use reinforced concrete slabs to cross smaller ones, or set up retaining walls and foot guards to keep the water out of the roadbed. When the karst cave is located at the roadbed or near the roadbed, it is necessary to calculate the safe thickness of the cave roof and the safe distance from the roadbed.

[0096] Reinforcement of caves:

[0097] (1) When it is not convenient to reinforce a deep and small cave, stone cover or reinforced concrete cover slab should be used for reinforcement. If the cave is close to a ditch, leakage of ditch water should be prevented at the same time.

[0098] (2) For caves with small diameter, thin roof or broken rock layers, blast the roof and backfill with rocks for reinforcement; if the cave is deep or drainage is required, use an arch culvert or slab culvert to cross it.

[0099] (3) For surface collapse (earth holes) within the roadbed, if the bedrock is not exposed, fill it with stone slabs and compact it; if the bedrock is exposed and there is a hollow hole, block the hole with large stones and then fill the hole with stone slabs.

[0100] (4) For caves with deep burial depth and small roof safety thickness, when the caves are small filled caves, drilling and grouting method can be used for treatment.

[0101] (5) When the cave roof is thin, the cave span is large or there is water flow in the cave, and when construction personnel and mechanical equipment enter the construction site, mortar-laid stone pillars can be used for top support.

[0102] Blocking the cave:

[0103] (1) For karst caves on the slope of road cuttings, if they affect the stability of the slope, the caves shall be filled with stone pieces or hard rock slag, and the cave entrances shall be closed with mortar-laid stone pieces.

[0104] (2) For dry caves located at the base of roadbed or retaining wall, when the cave entrance is small and the depth is shallow, slabs and blocks of stone are backfilled and compacted; when the cave entrance is wide and deep, a bridge or culvert is used to cross it; when the top plate of the dry cave is too thin or the rock layer is relatively broken, it can be blasted and then backfilled or a bridge or culvert can be built to cross it.

[0105] Example 5

[0106] On the basis of the above embodiment, when the karst location is shallow karst, the treatment process is as follows: Fig.12 shown.

[0107] For the surface dry caves (top thickness less than 2m) hidden under the excavation or fill roadbed, the open excavation method can be adopted. After removing the thin layer of karst top plate, the road embankment can be filled according to the requirements of the stone filling road regulations.

[0108] For shallow dry caves that are hidden under the excavated or filled roadbed and affect the stability of the roadbed: when the cave is a small filled cave, the drilling and grouting method can be used for treatment.

[0109] For dry caves with a size and type of cave top buried depth greater than 10m and diameter less than 5m, no treatment is required if the karst roof is relatively intact.

[0110] In the calculation of the safe distance between the foot of the roadbed slope and the nearby karst caves, and the safe thickness of the top plate of the karst cave at the base of the roadbed:

[0111] Calculation of safe thickness of karst cave roof at the base of roadbed;

[0112] (1) The top plate of the karst cave at the base of the roadbed is intact, and the safety thickness is calculated according to the bending formula of the fixed beam:

[0113]

[0114] Where H is the safety thickness of the roof (m),

[0115] B is the bottom width of the embankment (m);

[0116] [6] is the flexural strength of the rock mass (kPa), and M is the bending moment (KN·m).

[0117] Calculation of fixed beams connecting two walls.

[0118] Where Q is the total load on the cave roof (including deadweight and additional load) (kN / m); B is the length of the cave along the route (m); K is the safety factor, which is >1.20 for limestone.

[0119] (2) Applicable to weathered and broken rock layers on the cave roof, estimated based on the concept of fractured arch:

[0120]

[0121] Where H is the height of the rupture arch, H0 is the height of the cave (m); b is the radius of the cave; is the internal friction angle of the rock (·); f is the strength coefficient of the rock. The safe thickness of the cave roof = (height of the rupture arch + the height required for the upper load) * safety factor.

[0122] Calculation of safe distance between roadbed and nearby karst caves;

[0123] The safe distance between the foot of the roadbed slope and the nearby karst cave is calculated according to the diffusion angle during collapse:

[0124] L=Hcorβ

[0125] Where H is the thickness of the cave roof (m); β is the collapse diffusion angle (degrees);

[0126]

[0127] In the formula, is the internal friction angle of the rock (degrees); K is the safety factor, which is taken as 1.10~1.25 (the maximum value is taken for expressways). If there is an overburden layer on the top rock layer, draw an oblique line upward at an angle of 45' from the bottom of the soil layer to find the intersection with the ground. The toe of the roadbed slope should be outside the intersection range.

[0128] The terms "first", "second", "third", etc. used herein are only used to distinguish the corresponding components for the sake of clarity of description, and are not intended to limit any order or emphasize importance, etc. In addition, the term "connected" used herein, unless otherwise specified, may refer to direct connection or indirect connection via other components.

[0129] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A karst roadbed treatment system, characterized in that: It comprises a closed surface layer located at the opening surface of the karst (1) and a pillar (14) located in the karst (1); the pillar (14) comprises a connecting steel bar (15) and a plurality of first positioning steel bars (13), two first positioning steel bars (13) are respectively located on both sides of the pillar (14), a second positioning steel bar (12) is vertically connected to the first positioning steel bar (13), and the second positioning steel bar (12) is parallel to the pillar (14); A first connecting groove (3) and a second connecting groove (2) are provided in the karst (1), and the first connecting groove (3) and the second connecting groove (2) correspond to the connecting steel bar (15) and the second positioning steel bar (12) respectively; A positioning structure is arranged in the second connecting groove (2), the positioning structure comprising a first positioning structure and a second positioning structure, the second positioning structure is located in the second connecting groove (2), the first positioning structure is located outside the second connecting groove (2), the first positioning structure and the second positioning structure are connected via a telescopic structure (7), and the telescopic structure (7) enables the first positioning structure to be located on the opening surface of the karst (1) or on the opening surface of the second connecting groove (2); The first positioning structure is provided with a first through slot for passing the pillar (14), the second positioning steel bar (12) is provided with a second through slot, a connecting rope passes through the second through slot, and both ends of the connecting rope pass through the first through slot.

2. A karst roadbed treatment system according to claim 1, characterized in that: The first positioning structure comprises a first positioning plate (5) and a second positioning plate (6), and the first positioning plate (5) and the second positioning plate (6) are both provided with a first through groove; an adjustment plate (8) is connected between the first positioning plate (5) and the second positioning plate (6), and the adjustment plate (8) comprises a first adjustment plate and a second adjustment plate connected to each other at one end, and the first adjustment plate and the second adjustment plate are located on the same vertical straight line or in contact with each other; In the original state, the first adjustment plate and the second adjustment plate are located on the same vertical straight line; when the two ends of the connecting rope pass through the first through groove and drive the second positioning steel bar (12) to insert into the first through groove, the first positioning steel bar (13) drives the first positioning plate (5) and the second positioning plate (6) to contact each other, and the first adjustment plate and the second adjustment plate are in contact with each other.

3. A karst roadbed treatment system according to claim 1, characterized in that: The second positioning structure comprises a third positioning plate (4) located in the second connecting groove (2), the third positioning plate (4) being provided with a second through groove, and the inner diameter of the second positioning steel bar (12) in the second connecting groove (2) gradually decreases from top to bottom; A plurality of positioning blocks (9) are arranged on the third positioning plate (4), and the positioning blocks (9) are in contact with the side surfaces of the second positioning steel bars (12).

4. A karst roadbed treatment system according to claim 1, characterized in that: A clamping plate (10) is provided at the opening surface of the second connection groove (2), and a clamping groove (121) is provided on the second positioning steel bar (12); when the lower end of the second positioning steel bar (12) is inserted into the second connection groove (2), the clamping plate (10) corresponds to the clamping groove (121), and the clamping plate (10) is inserted into the clamping groove (121).

5. The karst roadbed treatment system according to claim 1, characterized in that: An interlayer is arranged inside the pillar (14), and the interlayer is provided with a first hollow layer and a second hollow layer in sequence from the inside to the outside.

6. A karst roadbed treatment system according to claim 5, characterized in that: The interlayer is made of expanded perlite material.

7. A karst roadbed treatment process, characterized in that: A processing system comprising any one of claims 1 to 6, comprising the following steps: Obtain the location, size and type of karst beneath the roadbed; Cleaning up the karst area; Pre-buried slope drainage holes are installed for karst on the slope of the road cut; Set up retaining walls at the roadbed to keep water out of the roadbed; Reinforcement of caves according to the size and type of karst; According to the location, size and type of the karst, a preset support (14) is placed inside the karst, so that the second positioning steel bar (12) of the support (14) is inserted into the corresponding second connecting groove (2), and the connecting steel bar (15) is inserted into the corresponding first connecting groove (3); Concrete is poured into the pillar (14).

8. A karst roadbed treatment process according to claim 7, characterized in that: A baffle is laid on the pillar (14), and a crushed stone layer, a soil layer and a planting layer are laid in sequence on the baffle.

9. A karst roadbed treatment process according to claim 7, characterized in that: The support column (14) is provided with an interlayer, wherein the interlayer is provided with a first hollow layer and a second hollow layer in sequence from the inside to the outside, and the interlayer is made of expanded perlite material; Pouring concrete into the pillar (14) specifically includes: Concrete is injected into the first hollow layer and the second hollow layer at the same time, and the grouting pressure in the first hollow layer is gradually increased from a preset first initial pressure until a preset first grouting final pressure is reached; The grouting pressure in the second hollow layer increases step by step from a preset second initial pressure until reaching a preset second grouting final pressure.

10. A karst roadbed treatment process according to claim 9, characterized in that: The grouting pressure in the first hollow layer is greater than the grouting pressure in the second hollow layer.

Citation Information

Patent Citations

  • Construction method of deep foundation pit supporting anti-seepage system of coastal karst stratum

    CN111042146A

  • Construction method of foam concrete backfill embankment in karst area

    CN113481775A

  • Prefabricated thin-wall pipe pile composite pile foundation structure penetrating through karst cave and construction method of prefabricated thin-wall pipe pile composite pile foundation structure

    CN115928719A

  • Karst region road bed punishment structure

    CN206521656U

  • Foam concrete backfill embankment in karst area

    CN215856991U