Suspender replacement device, system and method for suspender arch bridge

By designing the boom replacement device for the support component, the moving component and the lifting component, and using the cooperation of the driving wheel and the lifting rope, the problems of manual safety hazards and low efficiency during the replacement process of the boom in the boom arch bridge are solved, and the problem is achieved Efficient and safe replacement of booms.

CN118774043APending Publication Date: 2024-10-15WUHAN CCCC TEST & REINFORCEMENT ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411049001.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

There are potential safety hazards and low efficiency problems of manual disassembly and assembly during the replacement process of suspenders in suspender arch bridges, especially the high-altitude transportation risks and replacement efficiency caused by the narrow width of the arch ribs and multiple disassembly and assembly.

Method used

A boom replacement device including a support component, a moving component and a lifting component is designed. It uses structures such as driving wheels, connecting frames, support cables and lifting ropes. The driving wheels move along the arch bridge to drive the connecting frames. The supporting cables and The connecting ring maintains balance and transfers the tension of the boom through the rewinding and unwinding of the lifting drive, enabling efficient replacement of the boom.

Benefits of technology

It improves the efficiency and safety of boom replacement and reduces the risk of manual work at high altitudes. Through the cooperation of support ropes and connecting rings, the lifting components are kept balanced, making it easier for operators to disassemble and replace the boom.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774043A_ABST
    Figure CN118774043A_ABST
Patent Text Reader

Abstract

The suspender replacing device for the suspender arch bridge comprises a supporting assembly, a moving assembly and a hoisting assembly, the supporting assembly comprises supporting cables and supporting beams, the supporting beams are symmetrically arranged on the two sides of the arch bridge, at least two supporting beam arrays are fixed to the arch bridge, the supporting cables are erected on the supporting beams, and the two ends of the supporting cables are fixedly connected with the two ends of the arch bridge; the moving assembly comprises a driving wheel and a connecting frame, the driving wheel is installed on the connecting frame, connecting rings slidably connected with the supporting cable are arranged on the two sides of the connecting frame, the hoisting assembly comprises a transfer beam, a first hoisting rope, a second hoisting rope and a hoisting driving part, and the hoisting driving part is installed on the connecting frame; the first hoisting ropes are symmetrically arranged on the two sides of the hoisting driving part, one ends of the first hoisting ropes on the two sides are wound around the hoisting driving part, the other ends of the first hoisting ropes on the two sides are connected with the transfer beam, the second hoisting ropes are symmetrically arranged on the two sides of the transfer beam, one ends of the second hoisting ropes on the two sides are fixedly connected with the transfer beam, and the other ends of the second hoisting ropes on the two sides are detachably connected with a steel beam at the bottom of a bridge floor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge maintenance, and in particular to a hanger replacement device, system and method for a hanger arch bridge. Background Art

[0002] A hanger arch bridge is a bridge that uses multiple hangers to connect between the arch rib and the bridge deck to maintain the balance of the bridge deck. It is widely used due to its advantages such as beautiful shape, large spanning capacity, and strong adaptability to basic conditions. The design life of a hanger arch bridge is mostly about 100 years, while the service life of the hangers on the arch bridge is only about 20 years. During the service life of the hanger arch bridge, the hangers need to be replaced about five times, and the replacement is mostly done manually. First, two hanger toolings are fixed on the arch rib and the steel beam at the bottom of the bridge deck respectively, and then a temporary cable is connected between the two toolings and the temporary cable is tightened with a jack to transfer the tension of the hanger on the bridge deck to the temporary cable. Subsequently, the hanger is disassembled and replaced. Due to the large number of hangers, the tooling needs to be disassembled and assembled multiple times to replace multiple hangers one by one. Due to the narrow width of the arch rib, there are great safety hazards in manually disassembling and assembling the tooling and transporting the tooling at high altitude. In addition, multiple disassembly and assembly of the tooling directly affects the replacement efficiency of the hanger. In view of this, the present invention is proposed. Summary of the invention

[0003] In order to solve the problem that manual disassembly of boom tooling and high-altitude transportation of tooling pose safety hazards, and multiple disassembly and assembly affect the efficiency of boom replacement, the present invention provides a boom replacement device, system and method for a boom arch bridge.

[0004] In order to solve the above technical problems, the present invention provides a hanger rod replacement device for a hanger arch bridge, the hanger rod replacement device for a hanger arch bridge comprises a support assembly, a moving assembly and a lifting assembly, the support assembly comprises a support cable and at least two groups of support beams arranged in pairs, the support beams arranged in pairs are symmetrically arranged on both sides of the arch bridge, at least two groups of support beam arrays are fixed on the arch bridge, the support cable is mounted on the support beam and the two ends are fixedly connected to the two ends of the arch bridge, the moving assembly comprises a driving wheel and a connecting frame, the driving wheel is installed on the connecting frame to drive the connecting frame to move along the arch bridge The connecting frame is movable, and connecting rings slidably connected to the supporting cable are arranged on both sides of the connecting frame. The lifting assembly includes a conversion beam, a first lifting rope, a second lifting rope and a lifting drive. The lifting drive is installed on the connecting frame. The first lifting rope is symmetrically arranged on both sides of the lifting drive, and one end of the first lifting rope on both sides is wound around the lifting drive, and the other end is connected to the conversion beam. The second lifting rope is symmetrically arranged on both sides of the conversion beam, and one end of the second lifting rope on both sides is fixedly connected to the conversion beam, and the other end is detachably connected to the steel beam at the bottom of the bridge deck.

[0005] In an embodiment of the present invention, the connecting frame is N-shaped, the driving wheel is installed in the middle position of the connecting frame, protruding horizontal ear plates are provided on both sides of the connecting frame, and reinforcing ribs are provided between the horizontal ear plates and the connecting frame on the horizontal ear plates where the connecting ring is installed.

[0006] In an embodiment of the present invention, the connecting ring includes a connecting end and a limiting end, the connecting end is a screw rod, the limiting end is a circular ring, the connecting end passes through a horizontal ear plate and is connected by a nut, and the limiting end is sleeved on the supporting cable.

[0007] In an embodiment of the present invention, at least two rollers are arranged at the bottom of the connecting frame, an arch surface is arranged on the surface of the supporting beam, and the driving wheel moves on the arch bridge to drive the rollers to fit into the arch surface.

[0008] In an embodiment of the present invention, the support beam is Z-shaped and includes a first support end, a second support end and a third support end, the first support end and the third support end are in a vertical state, the surface of the first support end is fixedly connected to the side of the arch bridge, the top of the third support end is provided with a limiting groove adapted to the support cable, the second support end is in a horizontal state and the two sides are fixedly connected to the first support end and the third support end respectively, and reinforcing ribs are arranged between the first support end and the second support end.

[0009] In an embodiment of the present invention, the arch surface is arranged on the surface of the second supporting end, an arc segment is arranged on the top of the third supporting end, the limiting groove is opened on the arc segment, the curvature of the arc segment is adapted to the curvature of the arch surface, and the arc segment is detachably connected to the third supporting end.

[0010] In an embodiment of the present invention, the number of the supporting cables is four, and two rows of connecting rings are connected side by side on a single horizontal ear plate, and the two rows of connecting rings are respectively sleeved on two supporting cables.

[0011] In an embodiment of the present invention, the width of the driving wheel is matched with the thickness of the arch bridge, and a groove matched with the arch bridge is provided on the circumferential surface of the driving wheel.

[0012] In order to solve the problems in the prior art, the present invention also provides a boom replacement system for a boom arch bridge, which is applied to the above-mentioned boom replacement device. The boom replacement system includes a movement control module and a lifting control module. The movement control module is electrically connected to the driving wheel to control the rotation of the driving wheel, and the lifting control module is electrically connected to the lifting drive to control the lifting drive to perform lifting.

[0013] In order to solve the problems in the prior art, the present invention also provides a method for replacing a suspender rod of a suspender arch bridge, characterized in that the method is applied to the above-mentioned suspender rod replacement device and comprises the following steps:

[0014] S1: Control the moving position of the lifting drive member and make the position of the lifting drive member correspond to the position of the boom;

[0015] S2: The second hoisting rope is fixedly connected to the steel beam at the bottom of the bridge deck;

[0016] S3: Control the hoisting driving member to reel in the first hoisting rope and drive the transfer beam to tighten the second hoisting rope;

[0017] S4: Remove the hanger and install a new hanger between the arch bridge and the steel beam;

[0018] S5: disassembling the second hoisting rope and controlling the hoisting drive member to move the position so that the position of the hoisting drive member corresponds to the position of the next hoisting rod;

[0019] S6: Repeat steps S2-S5 until all the booms are replaced.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] By controlling the driving wheel to move along the arch bridge to the position corresponding to the hanger, and fixing the second lifting rope to the steel beam, when the lifting driving component reels in the first lifting rope, the second lifting rope is tightened through the conversion beam, so that the pulling force of the hanger on the bridge deck is transferred to the first lifting rope and the second lifting rope. At the same time, the lifting driving component is kept balanced with the support and cooperation of the connecting ring and the supporting cable, which facilitates the replacement of the hanger by the operating personnel and improves the efficiency of the replacement of the hanger. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present invention, but do not constitute a limitation on the embodiments of the present invention. In the accompanying drawings:

[0023] Figure 1 is a schematic diagram of a three-dimensional structure of a suspension rod replacement device provided by an embodiment of the present invention installed on an arch bridge;

[0024] Figure 2 yes Figure 1 A in the enlarged view;

[0025] Figure 3 is a schematic diagram of the exploded structure of the boom replacement device provided by an embodiment of the present invention;

[0026] Figure 4It is a flowchart of the steps of the boom replacement method provided in an embodiment of the present invention.

[0027] Description of Reference Numerals

[0028] 1. Suspension rod replacement device; 2. Arch rib; 11. Support assembly; 12. Moving assembly; 13. Lifting assembly; 21. Suspension rod; 111. Support cable; 112. Support beam; 121. Driving wheel; 122. Connecting frame; 123. Connecting ring; 131. Transfer beam; 132. First lifting rope; 133. Second lifting rope; 134. Lifting drive member; 135. Jack; 1221. Horizontal ear plate; 1222. Roller; 1121. First supporting end; 1122. Second supporting end; 1123. Third supporting end; 1124. Arc segment. DETAILED DESCRIPTION

[0029] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.

[0030] See also Figure 1-Figure 3 The device 1 for replacing the suspender 21 of the suspender 21 arch bridge of the present invention comprises a support assembly 11, a moving assembly 12 and a lifting assembly 13, wherein the support assembly 11 comprises a support cable 111 and at least two groups of support beams 112 arranged in pairs, wherein the support beams 112 arranged in pairs are symmetrically arranged on both sides of the arch rib 2, and at least two groups of support beams 112 are fixed on the arch rib 2 in an array, wherein the support cable 111 is mounted on the support beams 112 and both ends are fixedly connected to both ends of the arch rib 2, wherein the moving assembly 12 comprises a driving wheel 121 and a connecting frame 122, wherein the driving wheel 121 is mounted on the connecting frame 122 to drive the connecting frame 122 to move along the arch rib 2, and both sides of the connecting frame 122 are provided with A connecting ring 123 is provided which is slidably connected to the supporting cable 111. The lifting assembly 13 includes a conversion beam 131, a first lifting rope 132, a second lifting rope 133 and a lifting drive member 134. The lifting drive member 134 is installed on the connecting frame 122. The first lifting rope 132 is symmetrically arranged on both sides of the lifting drive member 134, and one end of the first lifting rope 132 on both sides is wound around the lifting drive member 134, and the other end is connected to the conversion beam 131. The second lifting rope 133 is symmetrically arranged on both sides of the lifting plate, and one end of the second lifting rope 133 on both sides is fixedly connected to the conversion beam 131, and the other end is detachably connected to the steel beam at the bottom of the bridge deck.

[0031] Before replacing the suspension rod 21, the support beam 112 array is first fixed on the arch rib 2, and the two ends of the support cable 111 are fixedly connected to the two ends of the arch rib 2. At the same time, the support cable 111 is set on the support beams 112 on both sides of the arch rib 2, so that the support cable 111 and the arch rib 2 provide support for the moving component 12 at the same time, that is, the arch rib 2 provides support for the driving wheel 121, and the support cable 111 provides support for the connecting frame 122, so that when the driving wheel 121 moves along the arch rib 2, the support cable 111 always provides support for the connecting frame 122, so that the connecting frame 122 maintains balance. Figure 1 On both sides of the X-axis direction, both sides of arch rib 2 Figure 1 On both sides of the Y axis.

[0032] The lifting drive member 134 is installed on the connecting frame 122, and one end of the first lifting rope 132 is wound around the two sides of the lifting drive member 134, and the other end is fixedly connected to the conversion beam 131, so that the conversion beam 131 can be driven to rise and fall under the drive of the lifting drive member 134, and one end of the second lifting rope 133 is fixed on the two sides of the conversion beam 131, and the other end is connected to the steel beam, so that after the lifting drive member 134 reels in the first lifting rope 132 and tightens the first lifting rope 132 and the second lifting rope 133, the pulling force of the hanger 21 on the bridge deck can be transferred to the first lifting rope 132 and the second lifting rope 133, which makes it convenient for operators to disassemble and replace the hanger 21.

[0033] When replacing the boom 21, the driving wheel 121 is controlled to move along the arch rib 2 so that the driving wheel 121 drives the connecting frame 122 to move to the position corresponding to the boom 21 and then stops moving. At this time, the first lifting rope 132 is reeled in by controlling the lifting drive 134 to tighten the first lifting rope 132 and the second lifting rope 133, so that the tension of the boom 21 on the bridge deck is transferred to the first lifting rope 132 and the second lifting rope 133, which makes it convenient for operators to replace the boom 21 and improves the efficiency of replacing the boom 21.

[0034] During the replacement operation of the boom 21, the connecting ring 123 is slidably connected to the support cable 111 to provide balanced support for the connecting frame 122 under the action of the connecting ring 123, and when the balance of the connecting frame 122 shifts, the support cable 111 on one side can support the connecting ring 123, and at the same time, the connecting ring 123 on the other side pulls the support cable 111, so that the forces on the support cables 111 on both sides remain balanced, and finally the connecting frame 122 remains balanced.

[0035] By setting the second lifting rope 133 and the steel beam as a detachable connection, the second lifting rope 133 can be removed from the steel beam after the current hanger 21 is replaced, and the lifting drive 134 can be used to reel in the first lifting rope 132. The driving wheel 121 moves along the arch rib 2 to drive the connecting frame 122 to move to the next hanger 21, and the conversion beam 131 is transferred to the next hanger 21. Subsequently, the first lifting rope 132 is unwound by the lifting drive 134, so that the operator can fix the second lifting rope 133 on the steel beam, and the lifting drive 134 can reel in the first lifting rope 132 and tighten the second lifting rope 133 through the conversion beam 131, thereby transferring the tension of the hanger 21 on the bridge deck to the first lifting rope 132 and the second lifting rope 133. At this time, it is convenient for the operator to replace the hanger 21.

[0036] In the above embodiment, a hook is provided on the steel beam, and a spring buckle is provided on the second lifting rope 133. When the second lifting rope 133 is connected to the steel beam, the spring buckle is pulled and the spring buckle is buckled and connected with the hook, so as to realize the connection between the second lifting rope 133 and the steel beam, and then the lifting drive member 134 can reel in the first lifting rope 132, so that the conversion beam 131 rises with the first lifting rope and pulls the second lifting rope 133 tight, so as to transfer the pulling force of the suspension rod 21 on the bridge deck to the lifting assembly. At this time, the suspension rod 21 at the first lifting rope 132 can be replaced. After completing the replacement operation of the current suspension rod 21, the spring buckle can be removed from the hook, so that when the driving wheel 121 drives the second lifting rope 133 to move to the position of the next suspension rod 21, the spring buckle can be buckled again to the steel beam hook at the corresponding position of the suspension rod 21.

[0037] In an embodiment of the present invention, the driving wheel 121 adopts a motor wheel and is equipped with an electronic brake, so that the connecting frame 122 is driven to move along the arch rib 2 under the rotation of the motor wheel, and the connecting frame 122 is kept balanced during the movement under the support of the support cable 111. When the motor wheel moves to the position corresponding to the boom 21, the brake signal is transmitted through the electronic brake and the motor wheel is controlled to brake, so that the position of the motor wheel remains fixed, avoiding displacement of the moving component 12 during the replacement operation of the boom 21.

[0038] In the above embodiment, the lifting drive 134 adopts any one of an electric hoist and a crane to reel in the first lifting rope 132. Two first lifting ropes 132 are provided. The two first lifting ropes 132 are respectively wound around the two sides of the lifting drive 134, and the other ends of the two first lifting ropes 132 are fixed on the two sides of the conversion beam 131, so that when the lifting drive 134 is working, the two first lifting ropes 132 are driven to be reeled and unreeled at the same time, and the force on the conversion beam 131 is kept balanced during the reeling and unreeling process.

[0039] In the above embodiment, the detachable connection between the second hoisting rope 133 and the steel beam is a hook connection, so that the operator can quickly disassemble the second hoisting rope 133 and improve the operation efficiency.

[0040] In the above embodiment, the conversion beam 131 includes a first conversion beam, a second conversion beam and a plug-in rod, the plug-in rod is fixedly connected to the side of the first conversion beam, and the side of the second conversion beam is provided with a plug hole for inserting the plug-in rod, so that after the plug-in rod is inserted into the second conversion beam, the first conversion beam and the second conversion beam are spliced ​​into a complete plate surface, wherein the surfaces of the first conversion beam and the second conversion beam that are in contact with each other are provided with a through hole, so that after the plug-in rod is inserted into the second conversion beam, the suspension rod 21 is enclosed in the through hole, so as to facilitate the subsequent replacement of the suspension rod 21.

[0041] In the above embodiment, the first transfer beam and the second transfer beam are both made of steel beams, and the splicing rods are made of square steel splicing rods to strengthen the structural strength of the first transfer beam and the second transfer beam after being spliced, so as to avoid the transfer beam 131 having insufficient structural strength, resulting in the first lifting rope 132 and the second lifting rope 133 being unable to withstand the tension on the bridge deck after being straightened, thereby causing the transfer beam 131 to be damaged and causing a safety accident.

[0042] In an embodiment of the present invention, a jack 135 is provided on the transfer beam 131, and the output end of the jack 135 passes through the transfer beam 131 and can be abutted against the bridge deck to tension the second lifting rope 133, thereby realizing the adjustment of the tensioning force of the second lifting rope 133, so as to reduce the distance between the steel beam and the bridge deck of the arch bridge, and transfer the pulling force of the hanger 21 on the bridge deck to the second lifting rope 133, thereby facilitating the replacement of the hanger 21 by the operating personnel, wherein the tensioning force of the second lifting rope 133 on the steel beam can be adjusted by adjusting the tensioning force of the jack 135 in batches, so that the operating personnel can accurately adjust the tensioning force of the second lifting rope 133 to facilitate the replacement of the hanger 21.

[0043] In an embodiment of the present invention, the connecting frame 122 is N-shaped, the driving wheel 121 is installed in the middle position of the connecting frame 122, protruding horizontal ear plates 1221 are provided on both sides of the connecting frame 122, the connecting ring 123 is installed on the horizontal ear plate 1221, and reinforcing ribs are provided between the horizontal ear plate 1221 and the connecting frame 122.

[0044] By designing the connecting frame 122 into an N shape, the driving wheel 121 can be installed in the middle position of the connecting frame 122, so that the driving wheel 121 can drive the connecting frame 122 to move synchronously when moving on the arch rib 2, and the connecting ring 123 is installed on the horizontal ear plates 1221 on both sides of the connecting frame 122 to provide support for the connecting frame 122 with the cooperation of the connecting ring 123 and the support cable 111, thereby enhancing the stability of the driving wheel 121 when moving, and by arranging reinforcing ribs between the horizontal ear plates 1221 and the connecting frame 122 to improve the structural strength and bearing capacity of the connecting frame 122, thereby ensuring the stability and safety during the replacement of the boom 21.

[0045] In an embodiment of the present invention, the connecting ring 123 includes a connecting end and a limiting end, the connecting end is a screw, the limiting end is a circular ring, the connecting end passes through the horizontal ear plate 1221 and is connected by a nut, and the limiting end is sleeved on the supporting cable 111.

[0046] By passing the connecting end through the horizontal ear plate 1221 and then connecting it through a nut, the connecting ring 123 can be fixed on the horizontal ear plate 1221. Before fixing the supporting cable 111 on both ends of the arch rib 2, the supporting cable 111 can be passed through the limiting end first, so as to provide support for the connecting frame 122 under the action of the limiting end, and make the connecting ring 123 slide on the supporting cable 111 when the driving wheel 121 moves, and at the same time prevent the connecting ring 123 and the supporting cable 111 from detaching, thereby improving the safety and reliability of the replacement process of the boom 21.

[0047] The connecting end and the horizontal ear plate 1221 are connected by a nut, so that when the limit end is severely worn, the connecting ring 123 can be removed from the horizontal ear plate 1221 for replacement to reduce safety hazards.

[0048] In an embodiment of the present invention, at least two rollers 1222 are provided at the bottom of the connecting frame 122, and an arch surface is provided on the surface of the support beam 112. The driving wheel 121 moves on the arch rib 2 to drive the roller 1222 to fit the arch surface, so that when the driving wheel 121 moves to the support beam 112, the roller 1222 rolls on the arch surface to reduce the friction and supporting force of the support cable 111 on the connecting ring 123, thereby ensuring the balance and smooth movement of the entire connecting frame 122, while reducing the wear of the connecting ring 123 and the support cable 111 due to friction, extending the service life of the connecting ring 123 and the support cable 111, and at the same time, when the rolling wheel 1222 moves to the second support end 1122, the action of the second support end 1122 can prevent the moving component 12 from sliding off the support component 11, thereby improving the stability of the moving component 12 on the support component 11.

[0049] In an embodiment of the present invention, the support beam 112 is Z-shaped and includes a first support end 1121, a second support end 1122 and a third support end 1123, the first support end 1121 and the third support end 1123 are in a vertical state, the surface of the first support end 1121 is fixedly connected to the side of the arch rib 2, the top of the third support end 1123 is provided with a limiting groove adapted to the support cable 111, the second support end 1122 is in a horizontal state and the two sides are fixedly connected to the first support end 1121 and the third support end 1123 respectively, and a reinforcing rib is arranged between the first support end 1121 and the second support end 1122.

[0050] By setting the support beam 112 into a Z shape so that the first support end 1121 is fixedly connected to the side of the arch rib 2, a limiting groove is opened on the third support end 1123 to provide support and limitation for the support cable 111 under the action of the limiting groove, and then the support cable 111 provides support for the connecting frame 122 and keeps the connecting frame 122 balanced. By connecting the second support end 1122 between the first support end 1121 and the third support end 1123, and setting reinforcing ribs between the first support end 1121 and the second support end 1122, the structural stability of the support beam 112 is enhanced, and the bearing capacity and anti-deformation ability of the support beam 112 are improved.

[0051] In an embodiment of the present invention, the arch surface is arranged on the surface of the second supporting end 1122, and an arc segment 1124 is arranged on the top of the third supporting end 1123. The limiting groove is opened on the arc segment 1124, the curvature of the arc segment 1124 is adapted to the curvature of the arch surface, and the arc segment 1124 is detachably connected to the third supporting end 1123.

[0052] By setting the second support end 1122 as an arch surface and providing an arc segment 1124 that matches the curvature of the arch surface on the third support segment, the support cable 111 is supported and limited in the limiting groove on the arc segment 1124, and when the driving wheel 121 moves to the support beam 112, the roller 1222 contacts the arch surface and increases the height of the connecting frame 122. At the same time, the curvature of the arc segment 1124 is coordinated to reduce the friction between the connecting ring 123 and the limiting groove, so that the connecting ring 123 can easily cross the arc segment 1124, so that the driving wheel 121 drives the connecting frame 122 to move to the position of the next suspension rod 21. At the same time, when the rolling wheel 1222 moves to the second support end 1122, the action of the second support end 1122 can prevent the moving component 12 from sliding off the support component 11, thereby improving the stability of the moving component 12 on the support component 11.

[0053] By setting the arc segment 1124 to be detachably connected to the third support end 1123, it is convenient to replace the arc segment 1124 when the limit groove is severely worn, thereby improving the maintenance portability and repair efficiency of the support beam 112. The detachable connection between the arc segment 1124 and the third support end 1123 adopts a plug-in connection, that is, a slider is provided on the arc segment 1124, and a slide groove is provided on the third support end 1123, so that the slider and the slide groove are slidably plugged into each other, thereby realizing the detachable connection between the arc segment 1124 and the third support end 1123.

[0054] In the embodiment of the present invention, the number of the supporting cables 111 is four, and two rows of connecting rings 123 are connected side by side on a single horizontal ear plate 1221 , and the two rows of connecting rings 123 are respectively sleeved on two supporting cables 111 .

[0055] By providing four support cables 111 connected to four rows of connection rings 123 , the support stability of the support cables 111 on the connection frame 122 is increased, ensuring that the connection frame 122 maintains balance during movement.

[0056] In the embodiment of the present invention, the width of the driving wheel 121 is matched with the thickness of the arch rib 2 , and a groove matched with the arch rib 2 is provided on the circumferential surface of the driving wheel 121 .

[0057] By precisely matching the width of the driving wheel 121 to the thickness of the arch rib 2, it is ensured that the driving wheel 121 can fit against the surface of the arch rib 2, and a groove matching the shape of the arch rib 2 is provided on the driving wheel 121 to increase the contact area between the driving wheel 121 and the arch rib 2, thereby improving the grip of the driving wheel 121 and reducing the risk of the driving wheel 121 slipping, thereby improving the safety of the use of the boom 21 replacement device 1.

[0058] In order to solve the problems in the prior art, the present invention also provides a hanger 21 replacement system for the hanger 21 arch rib 2, which is applied to the above-mentioned hanger 21 replacement device 1, and the hanger 21 replacement system includes a movement control module and a lifting control module. The movement control module is electrically connected to the driving wheel 121 to control the rotation of the driving wheel 121, and the lifting control module is electrically connected to the lifting drive 134 to control the lifting drive 134 for lifting.

[0059] The rotation of the driving wheel 121 and the lifting operation of the lifting drive member 134 are controlled by the mobile control module and the lifting control module respectively, so that the operating personnel can control the driving wheel 121 and the lifting drive member 134 on the bridge deck, thereby facilitating the division of work among the operating personnel to realize the replacement operation of the suspension rod 21.

[0060] Before replacing the suspension rod 21, the support beam 112 array is first fixed on the arch rib 2, and the two ends of the support cable 111 are fixedly connected to the two ends of the arch rib 2. At the same time, the support cable 111 is set on the support beams 112 on both sides of the arch rib 2, so that the support cable 111 and the arch rib 2 provide support for the moving component 12 at the same time, that is, the arch rib 2 provides support for the driving wheel 121, and the support cable 111 provides support for the connecting frame 122, so that when the driving wheel 121 moves along the arch rib 2, the support cable 111 always provides support for the connecting frame 122, so that the connecting frame 122 maintains balance. Figure 1 On both sides of the X-axis direction, both sides of arch rib 2 Figure 1 On both sides of the Y axis.

[0061] The lifting drive member 134 is installed on the connecting frame 122, and one end of the first lifting rope 132 is wound around the two sides of the lifting drive member 134, and the other end is fixedly connected to the conversion beam 131, so that the conversion beam 131 can be driven to rise and fall under the drive of the lifting drive member 134, and one end of the second lifting rope 133 is fixed on the two sides of the conversion beam 131, and the other end is connected to the steel beam, so that after the lifting drive member 134 reels in the first lifting rope 132 and tightens the first lifting rope 132 and the second lifting rope 133, the pulling force of the hanger 21 on the bridge deck can be transferred to the first lifting rope 132 and the second lifting rope 133, which makes it convenient for operators to disassemble and replace the hanger 21.

[0062] When replacing the boom 21, the driving wheel 121 is controlled to move along the arch rib 2 so that the driving wheel 121 drives the connecting frame 122 to move to the position corresponding to the boom 21 and then stops moving. At this time, the first lifting rope 132 is reeled in by controlling the lifting drive 134 to tighten the first lifting rope 132 and the second lifting rope 133, so that the tension of the boom 21 on the bridge deck is transferred to the first lifting rope 132 and the second lifting rope 133, which makes it convenient for operators to replace the boom 21 and improves the efficiency of replacing the boom 21.

[0063] During the replacement operation of the boom 21, the connecting ring 123 is slidably connected to the support cable 111 to provide balanced support for the connecting frame 122 under the action of the connecting ring 123, and when the balance of the connecting frame 122 shifts, the support cable 111 on one side can support the connecting ring 123, and at the same time, the connecting ring 123 on the other side pulls the support cable 111, so that the forces on the support cables 111 on both sides remain balanced, and finally the connecting frame 122 remains balanced.

[0064] By setting the second lifting rope 133 and the steel beam as a detachable connection, the second lifting rope 133 can be removed from the steel beam after the current hanger 21 is replaced, and the lifting drive 134 can be used to reel in the first lifting rope 132. The driving wheel 121 moves along the arch rib 2 to drive the connecting frame 122 to move to the next hanger 21, and the conversion beam 131 is transferred to the next hanger 21. Subsequently, the first lifting rope 132 is unwound by the lifting drive 134, so that the operator can fix the second lifting rope 133 on the steel beam, and the lifting drive 134 can reel in the first lifting rope 132 and tighten the second lifting rope 133 through the conversion beam 131, thereby transferring the tension of the hanger 21 on the bridge deck to the first lifting rope 132 and the second lifting rope 133. At this time, it is convenient for the operator to replace the hanger 21.

[0065] In an embodiment of the present invention, the driving wheel 121 adopts a motor wheel and is equipped with an electronic brake, so that the connecting frame 122 is driven to move along the arch rib 2 under the rotation of the motor wheel, and the connecting frame 122 is kept balanced during the movement under the support of the support cable 111. When the motor wheel moves to the position corresponding to the boom 21, the brake signal is transmitted through the electronic brake and the motor wheel is controlled to brake, so that the position of the motor wheel remains fixed, avoiding displacement of the moving component 12 during the replacement operation of the boom 21.

[0066] In the above embodiment, the lifting drive 134 adopts any one of an electric hoist and a crane to reel in the first lifting rope 132. Two first lifting ropes 132 are provided. The two first lifting ropes 132 are respectively wound around the two sides of the lifting drive 134, and the other ends of the two first lifting ropes 132 are fixed on the two sides of the conversion beam 131, so that when the lifting drive 134 is working, the two first lifting ropes 132 are driven to be reeled and unreeled at the same time, and the force on the conversion beam 131 is kept balanced during the reeling and unreeling process.

[0067] In the above embodiment, the detachable connection between the second hoisting rope 133 and the steel beam is a hook connection, so that the operator can quickly disassemble the second hoisting rope 133 and improve the operation efficiency.

[0068] In the above embodiment, the conversion beam 131 includes a first conversion beam, a second conversion beam and a plug-in rod, the first plug-in plate is fixedly connected to the side of the first conversion beam, and the side of the second conversion beam is provided with a plug-in hole for inserting the plug-in rod, so that after the plug-in rod is inserted into the second conversion beam, the first conversion beam and the second conversion beam are spliced ​​into a complete plate surface, wherein the surfaces of the first conversion beam and the second conversion beam that are in contact with each other are provided with a through hole, so that after the plug-in rod is inserted into the second conversion beam, the suspension rod 21 is enclosed in the through hole, so as to facilitate the subsequent replacement of the suspension rod 21.

[0069] In the above embodiment, the first transfer beam and the second transfer beam are both made of steel plates, and the splicing rods are made of square steel splicing rods to strengthen the structural strength of the first transfer beam and the second transfer beam after being spliced, so as to avoid the transfer beam 131 having insufficient structural strength, which may cause the first lifting rope 132 and the second lifting rope 133 to be unable to withstand the tension on the bridge deck after being straightened, thereby causing the transfer beam 131 to be damaged and a safety accident to occur.

[0070] In order to solve the problems in the prior art, the present invention also provides a method for replacing a suspender 21 of a suspender 21 arch bridge, which is applied to the above-mentioned suspender 21 replacement device 1. The suspender 21 replacement method comprises the following steps:

[0071] S1: Control the moving position of the lifting driving member 134 and make the position of the lifting driving member 134 correspond to the position of the suspension rod 21;

[0072] S2: The second hoisting rope 133 is fixedly connected to the steel beam at the bottom of the bridge deck;

[0073] S3: Control the hoisting driving member 134 to reel in the first hoisting rope 132 and drive the conversion beam 131 to tighten the second hoisting rope 133;

[0074] S4: dismantle the hanger 21 and install a new hanger 21 between the arch rib 2 and the steel beam;

[0075] S5: dismantle the second hoisting rope 133, and control the hoisting driving member 134 to move the position so that the position of the hoisting driving member 134 corresponds to the position of the next hoisting rod 21;

[0076] S6: Repeat steps S2-S5 until all the suspension rods 21 are replaced.

[0077] Before replacing the suspension rod 21, the support beam 112 array is first fixed on the arch rib 2, and the two ends of the support cable 111 are fixedly connected to the two ends of the arch rib 2. At the same time, the support cable 111 is set on the support beams 112 on both sides of the arch rib 2, so that the support cable 111 and the arch rib 2 provide support for the moving component 12 at the same time, that is, the arch rib 2 provides support for the driving wheel 121, and the support cable 111 provides support for the connecting frame 122, so that when the driving wheel 121 moves along the arch rib 2, the support cable 111 always provides support for the connecting frame 122, so that the connecting frame 122 maintains balance. Figure 1 On both sides of the X-axis direction, both sides of arch rib 2 Figure 1 On both sides of the Y axis.

[0078] The lifting drive member 134 is installed on the connecting frame 122, and one end of the first lifting rope 132 is wound around the two sides of the lifting drive member 134, and the other end is fixedly connected to the conversion beam 131, so that the conversion beam 131 can be driven to rise and fall under the drive of the lifting drive member 134, and one end of the second lifting rope 133 is fixed on the two sides of the conversion beam 131, and the other end is connected to the steel beam, so that after the lifting drive member 134 reels in the first lifting rope 132 and tightens the first lifting rope 132 and the second lifting rope 133, the pulling force of the hanger 21 on the bridge deck can be transferred to the first lifting rope 132 and the second lifting rope 133, which makes it convenient for operators to disassemble and replace the hanger 21.

[0079] When replacing the boom 21, the driving wheel 121 is controlled to move along the arch rib 2 so that the driving wheel 121 drives the connecting frame 122 to move to the position corresponding to the boom 21 and then stops moving. At this time, the first lifting rope 132 is reeled in by controlling the lifting drive 134 to tighten the first lifting rope 132 and the second lifting rope 133, so that the tension of the boom 21 on the bridge deck is transferred to the first lifting rope 132 and the second lifting rope 133, which makes it convenient for operators to replace the boom 21 and improves the efficiency of replacing the boom 21.

[0080] During the replacement operation of the boom 21, the connecting ring 123 is slidably connected to the support cable 111 to provide balanced support for the connecting frame 122 under the action of the connecting ring 123, and when the balance of the connecting frame 122 shifts, the support cable 111 on one side can support the connecting ring 123, and at the same time, the connecting ring 123 on the other side pulls the support cable 111, so that the forces on the support cables 111 on both sides remain balanced, and finally the connecting frame 122 remains balanced.

[0081] By setting the second lifting rope 133 and the steel beam as a detachable connection, the second lifting rope 133 can be removed from the steel beam after the current hanger 21 is replaced, and the lifting drive 134 can be used to reel in the first lifting rope 132. The driving wheel 121 moves along the arch rib 2 to drive the connecting frame 122 to move to the next hanger 21, and the conversion beam 131 is transferred to the next hanger 21. Subsequently, the first lifting rope 132 is unwound by the lifting drive 134, so that the operator can fix the second lifting rope 133 on the steel beam, and the lifting drive 134 can reel in the first lifting rope 132 and tighten the second lifting rope 133 through the conversion beam 131, thereby transferring the tension of the hanger 21 on the bridge deck to the first lifting rope 132 and the second lifting rope 133. At this time, it is convenient for the operator to replace the hanger 21.

[0082] In an embodiment of the present invention, the driving wheel 121 adopts a motor wheel and is equipped with an electronic brake, so that the connecting frame 122 is driven to move along the arch rib 2 under the rotation of the motor wheel, and the connecting frame 122 is kept balanced during the movement under the support of the support cable 111. When the motor wheel moves to the position corresponding to the boom 21, the brake signal is transmitted through the electronic brake and the motor wheel is controlled to brake, so that the position of the motor wheel remains fixed, avoiding displacement of the moving component 12 during the replacement operation of the boom 21.

[0083] In the above embodiment, the lifting drive 134 adopts any one of an electric hoist and a crane to reel in the first lifting rope 132. Two first lifting ropes 132 are provided. The two first lifting ropes 132 are respectively wound around the two sides of the lifting drive 134, and the other ends of the two first lifting ropes 132 are fixed on the two sides of the conversion beam 131, so that when the lifting drive 134 is working, the two first lifting ropes 132 are driven to be reeled and unreeled at the same time, and the force on the conversion beam 131 is kept balanced during the reeling and unreeling process.

[0084] In the above embodiment, the detachable connection between the second hoisting rope 133 and the steel beam is a hook connection, so that the operator can quickly disassemble the second hoisting rope 133 and improve the operation efficiency.

[0085] In the above embodiment, the conversion beam 131 includes a first conversion beam, a second conversion beam and a plug-in rod, the first plug-in plate is fixedly connected to the side of the first conversion beam, and the side of the second conversion beam is provided with a plug-in hole for inserting the plug-in rod, so that after the plug-in rod is inserted into the second conversion beam, the first conversion beam and the second conversion beam are spliced ​​into a complete plate surface, wherein the surfaces of the first conversion beam and the second conversion beam that are in contact with each other are provided with a through hole, so that after the plug-in rod is inserted into the second conversion beam, the suspension rod 21 is enclosed in the through hole, so as to facilitate the subsequent replacement of the suspension rod 21.

[0086] In the above embodiment, the first transfer beam and the second transfer beam are both made of steel plates, and the splicing rods are made of square steel splicing rods to strengthen the structural strength of the first transfer beam and the second transfer beam after being spliced, so as to avoid the transfer beam 131 having insufficient structural strength, which may cause the first lifting rope 132 and the second lifting rope 133 to be unable to withstand the tension on the bridge deck after being straightened, thereby causing the transfer beam 131 to be damaged and a safety accident to occur.

[0087] In an embodiment of the present invention, a jack 135 is provided on the transfer beam 131, and the output end of the jack 135 passes through the transfer beam 131 and can be abutted against the bridge deck to tension the second lifting rope 133, thereby realizing the adjustment of the tensioning force of the second lifting rope 133, so as to reduce the distance between the steel beam and the bridge deck of the arch bridge, and transfer the pulling force of the hanger 21 on the bridge deck to the second lifting rope 133, thereby facilitating the replacement of the hanger 21 by the operating personnel, wherein the tensioning force of the second lifting rope 133 on the steel beam can be adjusted by adjusting the tensioning force of the jack 135 in batches, so that the operating personnel can accurately adjust the tensioning force of the second lifting rope 133 to facilitate the replacement of the hanger 21.

[0088] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0089] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited thereto. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications, including the combination of various specific technical features in any appropriate manner. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations. However, these simple modifications and combinations should also be regarded as the contents disclosed by the present invention and belong to the protection scope of the present invention.

[0090] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A suspension rod replacement device for a suspension rod arch bridge, characterized in that: The boom replacement device includes a support assembly, a moving assembly and a lifting assembly. The support assembly includes a support cable and at least two groups of support beams arranged in pairs. The support beams arranged in pairs are symmetrically arranged on both sides of the arch bridge. At least two groups of support beam arrays are fixed on the arch bridge. The support cable is mounted on the support beam and both ends are fixedly connected to the two ends of the arch bridge. The moving assembly includes a driving wheel and a connecting frame. The driving wheel is installed on the connecting frame to drive the connecting frame to move along the arch bridge. Connecting rings slidably connected to the support cable are provided on both sides of the connecting frame. The lifting assembly includes a conversion beam, a first lifting rope, a second lifting rope and a lifting drive. The lifting drive is installed on the connecting frame. The first lifting rope is symmetrically arranged on both sides of the lifting drive, and one end of the first lifting rope on both sides is wound around the lifting drive, and the other end is connected to the conversion beam. The second lifting rope is symmetrically arranged on both sides of the conversion beam, and one end of the second lifting rope on both sides is fixedly connected to the conversion beam, and the other end is detachably connected to the steel beam at the bottom of the bridge deck.

2. The hanger rod replacement device for a hanger arch bridge according to claim 1, characterized in that: The connecting frame is in an N shape, the driving wheel is installed in the middle position of the connecting frame, protruding horizontal ear plates are arranged on both sides of the connecting frame, and reinforcing ribs are arranged between the horizontal ear plates and the connecting frame on the horizontal ear plates where the connecting ring is installed.

3. The hanger rod replacement device for a hanger arch bridge according to claim 2, characterized in that: The connecting ring includes a connecting end and a limiting end, the connecting end is a screw rod, the limiting end is a circular ring, the connecting end passes through a horizontal ear plate and is connected by a nut, and the limiting end is sleeved on the supporting cable.

4. The hanger rod replacement device for a hanger arch bridge according to claim 2, characterized in that: At least two rollers are arranged at the bottom of the connecting frame, an arch surface is arranged on the surface of the supporting beam, and the driving wheel moves on the arch bridge to drive the rollers to fit into the arch surface.

5. The hanger rod replacement device for a hanger arch bridge according to claim 4, characterized in that: The support beam is Z-shaped and includes a first support end, a second support end and a third support end. The first support end and the third support end are in a vertical state. The surface of the first support end is fixedly connected to the side of the arch bridge. The top of the third support end is provided with a limiting groove adapted to the support cable. The second support end is in a horizontal state and both sides are fixedly connected to the first support end and the third support end respectively. Reinforcing ribs are arranged between the first support end and the second support end.

6. The hanger rod replacement device for a hanger arch bridge according to claim 5, characterized in that: The arch surface is arranged on the surface of the second supporting end, an arc segment is arranged on the top of the third supporting end, the limiting groove is opened on the arc segment, the curvature of the arc segment is adapted to the curvature of the arch surface, and the arc segment is detachably connected to the third supporting end.

7. The hanger rod replacement device for a hanger arch bridge according to claim 2, characterized in that: There are four supporting cables, and two rows of connecting rings are connected side by side on a single horizontal ear plate, and the two rows of connecting rings are respectively sleeved on two supporting cables; the width of the driving wheel is adapted to the thickness of the arch bridge, and a groove adapted to the arch bridge is provided on the circumferential surface of the driving wheel.

8. The hanger rod replacement device for a hanger arch bridge according to claim 1, characterized in that: A jack is arranged on the transfer beam, and an output end of the jack passes through the transfer beam and can abut against the bridge deck to tension the second hoisting rope.

9. A suspension rod replacement system for a suspension rod arch bridge, applied to the suspension rod replacement device according to any one of claims 1 to 8, characterized in that: The boom replacement system includes a movement control module and a lifting control module. The movement control module is electrically connected to the driving wheel to control the rotation of the driving wheel, and the lifting control module is electrically connected to the lifting drive to control the lifting drive to perform lifting.

10. A method for replacing a suspender rod of a suspender arch bridge, characterized in that: Applicable to the boom replacement device according to any one of claims 1 to 8, the boom replacement method comprises the following steps S1: Control the moving position of the lifting drive member and make the position of the lifting drive member correspond to the position of the boom; S2: The second hoisting rope is fixedly connected to the steel beam at the bottom of the bridge deck; S3: Control the hoisting driving member to reel in the first hoisting rope and drive the transfer beam to tighten the second hoisting rope; S4: Remove the hanger and install a new hanger between the arch bridge and the steel beam; S5: disassembling the second hoisting rope and controlling the hoisting drive member to move the position so that the position of the hoisting drive member corresponds to the position of the next hoisting rod; S6: Repeat steps S2-S5 until all the booms are replaced.