Oil-water well immovable string stratum and shaft scale removing and preventing method

Through the method of cleaning and preventing scale without moving the pipe string, the problem of scaling and blockage in the oil and water well wellbore and formation is solved, the entire wellbore is treated at one time, the impact on production hourly rate is reduced, the permeability of the formation is restored, and the water injection effect is improved. .

CN118774680APending Publication Date: 2024-10-15PETROCHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310347574.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-03
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Oil and water wells suffer from high-pressure under-injection, reduced permeability, and reduced recovery rates due to scaling and blockage in the wellbore and formation. Existing technologies cannot effectively clean and prevent scales in the wellbore and formation without moving the pipe string, affecting production efficiency.

Method used

A method of cleaning and anti-scaling that does not move the pipe string is adopted, including low-replacement circulation, deblocking fluid injection, reaction, backwash well and anti-scaling fluid injection, which can treat the entire wellbore at one time, avoid scale stripping and jamming of the pump, and reduce production Time rate impact.

Benefits of technology

It realizes full wellbore cleaning and anti-scaling treatment without the need for separate operations, relieves formation blockage, restores permeability, improves water injection effect, and ensures crude oil production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774680A_ABST
    Figure CN118774680A_ABST
Patent Text Reader

Abstract

The invention discloses an oil-water well immovable string stratum and shaft scale removing and preventing method. The method comprises the steps that water is injected from a casing pipe for low displacement circulation; the plug removal liquid is reversely replaced into the shaft from the casing pipe; opening the well until the plug removal liquid is seen at the well mouth, and lowering the piston to a bottom dead center; stopping the well; the plug removal liquid is supplemented from the casing till the shaft is filled with the plug removal liquid, and displacement liquid is squeezed into the oil sleeve annulus; well shut-in reaction; backwashing a well from an oil sleeve annulus, and lowering a piston to a pump cylinder; and anti-scaling liquid and displacing liquid are squeezed into the oil sleeve annulus. According to the oil-water well immovable string stratum and shaft scale removal and prevention method, scale removal and prevention treatment can be carried out on the whole shaft at a time, graded operation is not needed, and meanwhile the situation that a scale sample is stripped and a pump is stuck is avoided. Besides, in the treatment process, scale removal treatment and scale prevention treatment can be carried out at the same time, and the influence on the production time rate can be reduced, so that the production of crude oil is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of petroleum exploitation, and in particular to a method for cleaning scales in a fixed pipe column formation and a wellbore of an oil and water well. Background Art

[0002] As an effective development method, water injection plays a vital role in stabilizing the production of low permeability oil fields. Due to the lack of water resources in some areas, the injected water is rich in SO4 2- ions, and the high concentration of Ca in formation water 2 + , Ba 2+ / Sr 2+ When the sulfate scale meets the formation, it is easy to form insoluble sulfate scale. Once the scale is formed, the reservoir is easily damaged and difficult to recover, causing formation blockage, increased injection pressure, reduced injection efficiency, and great harm to production. Therefore, it is necessary to treat the formation sulfate scale.

[0003] As the water content in development continues to rise, scaling prevention and control has become a long-term direction for improving quality and efficiency. The research has important economic and practical significance and broad application prospects. With the deepening of oilfield development, the comprehensive water content continues to rise. In recent years, scaling in formations, wellbores and surface gathering and transportation systems has become increasingly serious. The scaling mechanism is complex, the scaling cycle is short, and the control is difficult, which seriously affects normal production and the stable production foundation of oilfields.

[0004] To address this problem, it is urgent to carry out research on scale cleaning, prevention and blockage removal technologies for complex scale formations in oil fields, so as to solve problems such as high-pressure underinjection, decreased permeability and reduced recovery rate in oil and water wells caused by scale blockage in wellbores and formations.

[0005] Conventional descaling increases operating costs and reduces the production rate of oil wells by pulling out the tubing in the wellbore and then operating again. The operation without moving the tubing cannot handle the wellbore, oil pipe, pump and sucker rod. Patent application: CN 105952431B discloses a method for deblocking with a fixed tubing, which uses the original tubing of the oil and water well to acidify and stew the well to remove the blockage of the target layer. Patent application: CN115538982A discloses a deep deblocking method for a complex blocked well in an offshore oil field with a fixed tubing, which uses "bubble-deblock-measure-pressure-wash" to perform deblocking operations. Patent application: CN 107502328A discloses an acidic deblocking agent and preparation method for sulfate scale in a fixed tubing of an oil and water well, which performs descaling operations through a cooperative deblocking agent. These patented technologies cannot solve the problem of descaling and preventing scale in the wellbore and formation without moving the tubing at all in oil, gas and water wells. Summary of the invention

[0006] In order to overcome the problems existing in the above-mentioned prior art, the purpose of the present invention is to provide a blockage removal method which can treat the entire wellbore at one time without moving the tubing string, will not get the pump stuck, and can both clear scale and prevent scale in one operation, thereby reducing the impact of the blockage removal operation on the production time rate.

[0007] To achieve the above object, the technical solution adopted by the present invention is:

[0008] A method for cleaning and preventing scale in a fixed pipe column formation and a wellbore of an oil and water well, comprising the following steps:

[0009] S1: low displacement circulation by injecting water from casing;

[0010] S2: reverse displacement of plugging fluid from casing into the wellbore;

[0011] S3: Open the well until the plugging-releasing fluid is seen at the wellhead, and lower the piston to the bottom dead center;

[0012] S4: stop the well;

[0013] S5: Fill the casing with plugging fluid until the wellbore is full, and squeeze the displacement fluid into the casing annulus;

[0014] S6: shut-in response;

[0015] S7: Backwash the well from the casing annulus and lower the piston into the pump barrel;

[0016] S8: Squeeze anti-scaling liquid and displacement fluid into the casing annulus.

[0017] Optionally, in step S6, clean water is injected until the liquid in the column fills the column.

[0018] Optionally, in step S2, the volume of the reverse displacement plugging solution is 15-35m 3 In step S6, the volume of displacement fluid squeezed into the casing annulus is 15-20m 3 .

[0019] Optionally, in step S6, the well is shut down for reaction for at least 12 hours.

[0020] Optionally, in step S7, before backwashing the well, the pumping unit is moved upward to the top dead center, the sucker rod is clamped, the pumping unit head is loosened to the lowest position, the sucker rod string is connected, and the pumping unit is moved upward to the top dead center again so that the piston draws out of the pump barrel itself, and then the sucker rod is clamped.

[0021] Optionally, in step S7, the displacement of the casing annulus backwash well is 0.5-1m 3 / min.

[0022] Optionally, the plugging-removing fluid includes one or more of potassium ethylenediaminetetraacetate, pentapotassium aminotrimethylene phosphate, and sodium ethylenediaminetetraacetate.

[0023] Optionally, the mass concentration of the plugging-removing liquid is 5%-30%.

[0024] Optionally, the anti-scaling liquid includes one or more of sodium imidazoline dimethyl phosphate, diethylenetriamine pentamethyl phosphate, and sodium ethylenediaminetetramethylene phosphate.

[0025] Optionally, the concentration of the anti-scaling liquid is 1-16 mg / L.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] The method for cleaning and preventing scale in the formation and wellbore of an oil and water well without moving a pipe column of the present invention can clean and prevent scale in the entire wellbore at one time without the need for multiple operations, and will not cause scale peeling and pump jam. In addition, during the treatment process, the cleaning and anti-scaling treatments can be performed simultaneously, which can reduce the impact on the production time rate, thereby ensuring the production of crude oil.

[0028] Furthermore, the present invention can also remove some organic blockages in the formation, inhibit various blockages caused by particle migration and clay expansion, so as to restore or improve the permeability of the formation and enhance the water injection effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The drawings described herein are for explanation purposes only and are not intended to limit the scope of the present invention in any way. In addition, the shapes and proportional dimensions of the components in the drawings are only for illustration purposes to help understand the present invention, and are not intended to specifically limit the shapes and proportional dimensions of the components of the present invention. In the drawings:

[0030] Figure 1 It is a flow chart of the steps of the present invention. DETAILED DESCRIPTION

[0031] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0032] It should be noted that when an element is referred to as being "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only embodiment.

[0033] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0034] The present invention is described in detail below with reference to the accompanying drawings.

[0035] The present invention provides a method for cleaning and preventing scale in a fixed pipe column formation and a wellbore of an oil and water well, comprising the following steps:

[0036] Prepare descaling and blocking liquid 10-35m 3 , anti-scaling liquid 15-20m 3 ;

[0037] First, preparatory work is carried out, i.e., the well is shut down;

[0038] Then open the tubing valve and inject clean water from the casing for low-displacement circulation, so that the liquid fills the tubing string as much as possible;

[0039] Keep the tubing valve open and replace the plugging fluid from the casing into the wellbore; optionally, the volume of the plugging fluid is 15-35m 3

[0040] Open the well until the unblocking fluid is seen at the wellhead, lower the piston to the bottom dead center, stop the well, apply the brake; stop the pump and close the oil pipe valve.

[0041] Fill the casing with plugging fluid until the wellbore is full, and squeeze the displacement fluid into the annulus of the casing (1.0m short of the top 3 ), optionally, the displacement fluid is active water, optionally, the volume of the displacement fluid is 15-20m 3 .

[0042] Shut in the well and wait for reaction. Optionally, the shut-in reaction time is 12-48 hours; soak all the casing, tubing, pumps and sucker rods to remove scale and blockage.

[0043] After the reaction is sufficient, backwashing is performed to prevent scale and debris from clogging the wellbore: move the pump upward to the top dead center, insert the square clip to clamp the sucker rod, loosen the pump head to the lowest position, connect the sucker rod string, move it upward to the top dead center again, so that the piston can be pulled out of the pump barrel itself, and then insert the square clip to clamp the sucker rod.

[0044] Backwash well from casing annulus, optional, backwash well displacement is 0.5-1m 3 / min. After washing out 1.5-2 wellbore volumes, lower the piston into the pump barrel.

[0045] Close the oil pipe valve. Squeeze anti-scaling liquid and displacement liquid from the oil casing annulus. Optionally, the volume of the anti-scaling liquid is 30-50m 3 The displacement fluid is 15-20m 3 (1.0-2.5m3 less top), shut down the well for 12 hours and then reopen it for production.

[0046] The plugging-removing fluid includes but is not limited to one or more of potassium ethylenediaminetetraacetate, pentapotassium aminotrimethylenephosphate, and sodium ethylenediaminetetraacetate, and the mass concentration thereof is 5%-30%.

[0047] The anti-scaling liquid includes but is not limited to one or more of sodium imidazoline dimethyl phosphate, diethylene triamine penta methylene phosphate, and sodium ethylene diamine tetra methylene phosphate, and the concentration thereof is 1-16 mg / L.

[0048] Embodiment 1:

[0049] The initial daily liquid production of a well is 5.34m 3 , with a daily oil output of 4.21t and a water content of 18%. 3 Down to 6.5m 3 , the water content increased to 46.1%, and the next month the water content increased to 59.7%, the dynamic liquid level dropped from 1631m to 1794m, the blockage characteristics were obvious, the sucker rod load increased, and the well was implemented with the method of cleaning and preventing scale without moving the tubing string, formation and wellbore to restore the single well production capacity.

[0050] First, prepare 10 ml of potassium ethylenediaminetetraacetate as a descaling and plugging solution. 3 , mass concentration is 5%; prepare anti-scaling liquid imidazoline dimethyl sodium phosphate 15m 3 , concentration is 1mg / L; stop the well; open the tubing valve, inject clean water from the casing for low-replacement circulation, so that the liquid fills the tubing string as much as possible; keep the tubing valve open, and replace the plugging liquid from the casing for a total of about 15m 3 to the wellbore; open the well until the plugging-releasing fluid is seen at the wellhead, lower the piston to the bottom dead center, stop the well, brake; stop the pump and close the tubing valve. Add plugging-releasing fluid from the casing until the wellbore is filled, and squeeze 15.6m of displacement fluid from the casing annulus. 3 (1.0m below the top 3). Shut in the well for 12 hours to wait for reaction, soak the casing, tubing, pump and sucker rod to remove scale and blockage; after the reaction is sufficient, backwash is performed to prevent scale and residue from clogging the wellbore. The pumping unit moves upward to the top dead center, and the square clamp is used to clamp the sucker rod. The pumping unit head is loosened to the lowest position, and the sucker rod string is connected. Move upward to the top dead center again, so that the piston can be pulled out of the pump barrel itself, and then the square clamp is used to clamp the sucker rod. Backwash the well from the casing annulus, with a displacement of 0.5m 3 / min, after washing out 1.5 wellbore volumes, lower the piston to the pump barrel. Close the tubing valve. Squeeze 30m of anti-scaling liquid into the casing annulus. 3 , displacement fluid 20m 3 (1.0m below the top 3 ). The well was shut in for 12 hours and then put into production. After unblocking, the daily oil production increased from 0.36t to 3.80t, an increase of 3.44t per day.

[0051] Example 2

[0052] The initial daily liquid production of a well is 6.5m 3 , daily oil production was 3.5t, water content was 13%. Later, daily liquid production suddenly dropped by 4.5m 3 , the water content increased to 50.2%, the dynamic liquid level dropped, the clogging characteristics were obvious, and the sucker rod load increased. The well was implemented with the method of cleaning and preventing scale without moving the tubing string, formation and wellbore to restore the single well production capacity.

[0053] Preparation of scale removal and plugging liquid amino trimethylene pentapotassium phosphate 35m 3 , concentration is 30%; anti-scaling liquid imidazoline dimethyl sodium phosphate 35m 3 , concentration is 16mg / L; stop the well; open the tubing valve, inject clean water from the casing for low-replacement circulation, so that the liquid fills the tubing string as much as possible; keep the tubing valve open, and replace the plugging liquid from the casing for a total of about 15m 3 to the wellbore; open the well until the plugging-releasing fluid is seen at the wellhead, lower the piston to the bottom dead center, stop the well, brake; stop the pump and close the tubing valve. Add plugging-releasing fluid from the casing until the wellbore is filled, and squeeze 17.5m of displacement fluid from the casing annulus. 3 (2.5m below the ceiling 3 ). Shut in the well for 24 hours to wait for reaction, soak the casing, tubing, pump and sucker rod to remove scale and blockage; after the reaction is sufficient, backwash is performed to prevent scale and residue from blocking the wellbore. The pumping unit moves upward to the top dead center, and the square clamp is used to clamp the sucker rod. The pumping unit head is loosened to the lowest position, the sucker rod string is connected, and the well is moved upward to the top dead center again, so that the piston can be pulled out of the pump barrel itself, and the square clamp is used to clamp the sucker rod. Backwash the well from the casing annulus, with a displacement of 0.5m 3 / min, after washing out 1.5 wellbore volumes, lower the piston to the pump barrel. Close the tubing valve. Squeeze 50m of anti-scaling liquid into the casing annulus. 3 , displacement fluid 15m 3 (2.5m below the ceiling3 ). The well was shut in for 12 hours. The well was opened and put into production. After the plugging was unblocked, the daily oil production increased from 0.12t to 2.20t, with a daily increase of 2.62t.

[0054] Example 3

[0055] The initial daily liquid production of a well is 7.3m 3 , daily oil production 3.2t, water content 11%. Liquid volume suddenly dropped 4.1m 3 , the water content increased to 52.3%, the dynamic liquid level dropped, the blockage characteristics were obvious, and the sucker rod load increased. The well was implemented with the method of cleaning and preventing scale without moving the tubing string, formation and wellbore to restore the single well production capacity.

[0056] Preparation of descaling and plugging liquid sodium EDTA 35m 3 , mass concentration is 20%; anti-scaling liquid diethylenetriamine penta (methylene phosphate) 35m 3 , concentration is 13mg / L; stop the well; open the tubing valve, inject clean water from the casing for low-replacement circulation, so that the liquid fills the tubing string as much as possible; keep the tubing valve open, and replace the plugging liquid from the casing for a total of about 17m 3 to the wellbore; open the well until the plugging-releasing fluid is seen at the wellhead, lower the piston to the bottom dead center, stop the well, brake; stop the pump and close the tubing valve. Add plugging-releasing fluid from the casing until the wellbore is filled, and squeeze 13.3m of displacement fluid from the casing annulus. 3 (2.0m below the ceiling 3 ). Shut in the well for 24 hours to wait for reaction, soak the casing, tubing, pump and sucker rod to remove scale and blockage; after the reaction is sufficient, backwash is carried out to prevent scale and residue from blocking the wellbore. The pumping unit moves upward to the top dead center, and the square clamp is used to clamp the sucker rod. The pumping unit head is loosened to the lowest position, the sucker rod string is connected, and the well is moved upward to the top dead center again, so that the piston can be pulled out of the pump barrel itself, and the square clamp is used to clamp the sucker rod. Backwash the well from the casing annulus, with a displacement of 0.6m 3 / min, after washing out 2.0 wellbore volumes, lower the piston to the pump barrel. Close the tubing valve. Squeeze 50m of anti-scaling liquid into the casing annulus. 3 , displacement fluid 15m 3 (2.0m below the ceiling 3 ). The well was shut in for 12 hours. The well was reopened and put into production. After the plugging was removed, the daily oil production increased from 0.21t to 3.5t, with a daily increase of 2.98t.

[0057] Unless otherwise specified, the device elements involved in the above embodiments are all conventional device elements, and the structural settings, working modes or control modes involved are all conventional settings, working modes or control modes in the art unless otherwise specified.

[0058] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the present invention by ordinary technicians in the field should be included in the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solution of the present invention.

Claims

1. A method for cleaning and preventing scale in a fixed pipe column formation and wellbore of an oil and water well, characterized in that: The following steps are involved: S1: low displacement circulation by injecting water from casing; S2: reverse displacement of plugging fluid from casing into the wellbore; S3: Open the well until the plugging-releasing fluid is seen at the wellhead, and lower the piston to the bottom dead center; S4: stop the well; S5: Fill the casing with plugging fluid until the wellbore is full, and squeeze the displacement fluid into the casing annulus; S6: Shut-in response; S7: Backwash the well from the casing annulus and lower the piston into the pump barrel; S8: Squeeze anti-scaling liquid and displacement fluid into the casing annulus.

2. A method for cleaning and preventing scale in a fixed pipe column formation and wellbore of an oil and water well according to claim 1, characterized in that: In step S6, clean water is injected until the liquid in the column fills the column.

3. A method for cleaning and preventing scale in a fixed pipe column formation and wellbore of an oil and water well according to claim 1, characterized in that: In step S2, the volume of reverse displacement solution is 15-35m 3 In step S6, the volume of displacement fluid squeezed into the casing annulus is 15-20m 3 .

4. A method for cleaning and preventing scale in a fixed pipe column formation and wellbore of an oil and water well according to claim 1, characterized in that: In step S6, the well is shut down for at least 12 hours to wait for reaction.

5. The method for cleaning and preventing scale in the fixed pipe column formation and wellbore of an oil and water well according to claim 1, characterized in that: In step S7, before backwashing the well, the pumping unit is moved upward to the top dead center, the sucker rod is clamped, the pumping unit head is loosened to the lowest position, the sucker rod string is connected, and the pumping unit is moved upward to the top dead center again, so that the piston is pulled out of the pump barrel itself, and then the sucker rod is clamped.

6. A method for cleaning and preventing scale in a fixed pipe column formation and wellbore of an oil and water well according to claim 1, characterized in that: In step S7, the displacement of the casing annulus backwash well is 0.5-1m 3 / min.

7. A method for cleaning and preventing scale in a fixed pipe column formation and wellbore of an oil and water well according to claim 1, characterized in that: The plugging-removing fluid includes one or more of potassium ethylenediaminetetraacetate, pentapotassium aminotrimethylenephosphate, and sodium ethylenediaminetetraacetate.

8. A method for cleaning and preventing scale in a fixed pipe column formation and wellbore of an oil and water well according to claim 7, characterized in that: The mass concentration of the plugging-removing liquid is 5%-30%.

9. The method for cleaning and preventing scale in the fixed pipe column formation and wellbore of an oil and water well according to claim 1, characterized in that: The anti-scaling liquid includes one or more of sodium imidazoline dimethyl phosphate, diethylene triamine penta methylene phosphate, and sodium ethylene diamine tetra methylene phosphate.

10. A method for cleaning and preventing scale in a fixed pipe column formation and wellbore of an oil and water well according to claim 9, characterized in that: The concentration of the anti-scaling liquid is 1-16 mg / L.