Shield attitude tracking synchronous grouting amount calculation method and device and electronic equipment
By calculating the parameters of the shield machine and the tunnel, monitoring the grouting amount and surface settlement, and determining the grouting correction coefficient, the impact of changes in the shield's posture on the overexcavation loss was solved, and precise adjustment of the grout injection amount during shield construction was achieved, reducing the the risk of surface subsidence.
Patent Information
- Application Number
- CN202411169037.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-10-15
AI Technical Summary
The existing technology fails to effectively consider the impact of changes in shield attitude on over-excavation losses during shield construction, especially in soft soil strata, resulting in an increased risk of surface settlement.
By obtaining the size parameters and guidance system parameters of the shield machine and the target tunnel, the land loss of each ring segment is calculated, and the grouting correction coefficient is determined based on the grouting amount and surface settlement monitoring results, and the grouting amount is corrected to synchronously track the shield The amount of slurry injected in the structural posture.
Effectively calculate the synchronous slurry injection volume of each ring segment under different shield tunneling attitude modes, overcoming the influence of shield tunneling attitude on over-excavation loss, and reducing the risk of surface settlement.
Smart Images

Figure CN118774855A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of shield tunnel construction control, and in particular to a method, device and electronic equipment for calculating synchronous grouting amount for shield posture tracking. Background Art
[0002] During shield construction, the serpentine motion and posture correction of the shield machine will over-excavate the surrounding soil and increase stratum losses, especially in soft soil strata where the posture is difficult to control. If the over-excavation loss cannot be fully filled in time during the construction process, it will lead to significant surface settlement, bringing great risks to the project.
[0003] In the related technology, the theoretical grouting volume of each ring is calculated based on the theoretical shield building gap, and then the actual grouting volume of each ring is calculated by considering the influence of slurry penetration in the soil and the volume loss of slurry solidification. Generally, a grouting filling rate of 100-250% is adopted.
[0004] However, the related technology does not consider the influence of the change of shield posture on the over-excavation loss, and the over-excavation loss caused by the shield posture is very significant for the formation settlement, especially in the soft soil formation where the posture is difficult to control. Summary of the invention
[0005] The present application provides a method, device and electronic equipment for calculating the synchronous grouting amount for shield posture tracking, so as to solve the problem that the related technology fails to take into account the over-excavation loss caused by the shield posture, effectively calculate the synchronous slurry injection amount corresponding to each ring of segments under different shield excavation posture modes, and overcome the influence of the shield posture on the over-excavation loss.
[0006] The first aspect of the present application provides a method for calculating the synchronous grouting amount of shield posture tracking, comprising the following steps:
[0007] Obtaining the dimension parameters of the shield machine, the dimension parameters of the target tunnel and the shield guidance parameters of the shield guidance system;
[0008] Calculating the land loss of each ring segment according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and calculating the grouting amount of each ring segment according to the land loss of each ring segment; and
[0009] Grouting is carried out in a test section according to the grouting amount of each segment ring, and the surface settlement corresponding to the grouting amount of each segment ring is monitored. A grouting correction coefficient for the grouting amount of each segment ring is determined according to the land loss of each segment ring, the grouting amount of each segment ring and the surface settlement corresponding to the grouting amount of each segment ring, and the grouting amount of each segment ring is corrected according to the correction coefficient.
[0010] Optionally, in some embodiments, the calculating the land loss of each ring segment according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system includes:
[0011] Determine the volume of the physical gap between the outer diameter of the shield and the outer diameter of each ring of segments, determine the first soil loss volume on the excavation surface caused by the pressure of the soil compartment for each ring of segments, and determine the over-excavation soil loss volume caused by the change of the shield posture for each ring of segments;
[0012] The land loss of each ring segment is determined according to the sum of the physical gap volume, the first soil loss volume and the over-excavation soil loss volume.
[0013] Optionally, in some embodiments, monitoring the ground settlement corresponding to the grouting amount of each ring of the segment, and determining the grouting correction coefficient of the grouting amount of each ring of the segment according to the land loss of each ring of the segment, the grouting amount of each ring of the segment, and the ground settlement corresponding to the grouting amount of each ring of the segment, comprises:
[0014] According to the monitoring results of the surface settlement corresponding to the grouting amount of each ring segment, a grouting amount-surface settlement relationship curve and a soil loss amount-surface settlement curve are obtained;
[0015] Based on the grouting amount-surface settlement relationship curve and the soil loss amount-surface settlement curve, the grouting amount at the minimum surface displacement position and the soil loss amount at the minimum surface displacement position are determined, and the grouting correction coefficient of the grouting amount of each ring of segments is determined according to the grouting amount at the minimum surface displacement position and the soil loss amount at the minimum surface displacement position.
[0016] Optionally, in some embodiments, the physical gap volume is:
[0017]
[0018] Among them, V p is the physical gap volume, D c is the cutterhead diameter of the shield machine, D t is the outer diameter of the tunnel, and l is the length of each ring of segments.
[0019] Optionally, in some embodiments, the over-excavated soil loss volume is:
[0020] V oc (i)=(D c +D shell )·Δt max (i)·l / 2;
[0021] Among them, V oc is the volume lost by over-excavation, D shellis the outer diameter of the shield, Δt max (i) is the maximum compression of each ring segment.
[0022] The second aspect of the present application provides a device for calculating the synchronous grouting amount of shield posture tracking, comprising:
[0023] An acquisition module, used to acquire the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system;
[0024] a calculation module, configured to calculate the land loss of each ring segment according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and calculate the grouting amount of each ring segment according to the land loss of each ring segment; and
[0025] A correction module is used to perform grouting in a test section according to the grouting amount of each ring of the segment, monitor the surface settlement corresponding to the grouting amount of each ring of the segment, determine the grouting correction coefficient of the grouting amount of each ring of the segment according to the land loss of each ring of the segment, the grouting amount of each ring of the segment and the surface settlement corresponding to the grouting amount of each ring of the segment, and correct the grouting amount of each ring of the segment according to the correction coefficient.
[0026] Optionally, in some embodiments, the computing module includes:
[0027] The first determination unit is used to determine the volume of the physical gap between the outer diameter of the shield body and the outer diameter of each ring of the segment, determine the first soil loss volume on the excavation surface caused by the pressure of the soil compartment for each ring of the segment, and determine the over-excavation soil loss volume caused by the change of the shield posture for each ring of the segment;
[0028] The second determining unit is used to determine the land loss of each ring segment according to the sum of the physical gap volume, the first soil loss volume and the over-excavation soil loss volume.
[0029] Optionally, in some embodiments, the correction module includes:
[0030] A generating unit, configured to obtain a grouting amount-surface settlement relationship curve and a soil loss amount-surface settlement curve according to the monitoring result of the surface settlement corresponding to the grouting amount of each ring of segments;
[0031] A correction unit is used to determine the grouting amount at the minimum surface displacement position and the soil loss at the minimum surface displacement position based on the grouting amount-surface settlement relationship curve and the soil loss amount-surface settlement curve, and to determine the grouting correction coefficient of the grouting amount of each ring of the segment according to the grouting amount at the minimum surface displacement position and the soil loss amount at the minimum surface displacement position.
[0032] Optionally, in some embodiments, the physical gap volume is:
[0033]
[0034] Among them, V p is the physical gap volume, D c is the cutterhead diameter of the shield machine, D t is the outer diameter of the tunnel, and l is the length of each ring of segments.
[0035] Optionally, in some embodiments, the over-excavated soil loss volume is:
[0036] V oc (i)=(D c +D shell )·Δt max (i)·l / 2;
[0037] Among them, V oc is the volume lost by over-excavation, D shell is the outer diameter of the shield, Δt max (i) is the maximum compression of each ring segment.
[0038] The third aspect of the present application provides an electronic device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the method for calculating the synchronous grouting amount for shield posture tracking as described in the above embodiment.
[0039] The fourth aspect of the present application provides a computer-readable storage medium having a computer program stored thereon, which is executed by a processor to implement the method for calculating the synchronous grouting amount for shield posture tracking as described in the above embodiment.
[0040] Therefore, by obtaining the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and calculating the land loss of each ring of segments according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and calculating the grouting amount of each ring of segments according to the land loss of each ring of segments, and grouting is performed in the test section according to the grouting amount of each ring of segments, monitoring the surface settlement corresponding to the grouting amount of each ring of segments, determining the grouting correction coefficient of the grouting amount of each ring of segments according to the land loss of each ring of segments, the grouting amount of each ring of segments and the surface settlement corresponding to the grouting amount of each ring of segments, and correcting the grouting amount of each ring of segments according to the correction coefficient. Therefore, the problem that the related technology fails to consider the over-excavation loss caused by the shield posture is solved, and the synchronous slurry injection amount corresponding to each ring of segments under different shield excavation posture modes is effectively calculated, overcoming the influence of the shield posture on the over-excavation loss.
[0041] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0043] Figure 1 A flowchart of a method for calculating synchronous grouting amount for shield posture tracking provided in an embodiment of the present application;
[0044] Figure 2 The schematic diagram is a principle diagram of a method for calculating the synchronous grouting amount of shield posture tracking according to an embodiment of the present application, wherein: Figure 2 a is a schematic diagram of the calculation principle of pitch motion; Figure 2 b is a schematic diagram of the calculation principle of yaw motion.
[0045] Figure 3 A schematic diagram of the ratio of the synchronous grouting volume to the theoretical gap for shield posture tracking provided according to an embodiment of the present application;
[0046] Figure 4 A flowchart of a method for calculating synchronous grouting amount for shield posture tracking provided according to an embodiment of the present application;
[0047] Figure 5 A block diagram of a device for calculating synchronous grouting amount for shield posture tracking provided in an embodiment of the present application;
[0048] Figure 6 A schematic diagram of an electronic device provided according to an embodiment of the present application. DETAILED DESCRIPTION
[0049] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0050] The following describes the calculation method, device and electronic device of the synchronous grouting amount of the shield posture tracking of the embodiment of the present application with reference to the accompanying drawings. In view of the problem that the related art mentioned in the above background technology fails to consider the over-excavation loss caused by the shield posture, the present application provides a calculation method of the synchronous grouting amount of the shield posture tracking, in which the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system are obtained, and the land loss of each ring of the segment is calculated according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and the grouting amount of each ring of the segment is calculated according to the land loss of each ring of the segment, and the grouting amount of each ring of the segment is calculated, and grouting is performed in the test section according to the grouting amount of each ring of the segment, and the surface settlement corresponding to the grouting amount of each ring of the segment is monitored, and the grouting correction coefficient of the grouting amount of each ring of the segment is determined according to the land loss of each ring of the segment, the grouting amount of each ring of the segment and the surface settlement corresponding to the grouting amount of each ring of the segment, and the grouting amount of each ring of the segment is corrected according to the correction coefficient. In this way, the problem that the related technology fails to take into account the over-excavation loss caused by the shield posture is solved, and the synchronous slurry injection amount corresponding to each ring of segments under different shield excavation posture modes is effectively calculated, thereby overcoming the influence of the shield posture on the over-excavation loss.
[0051] Specifically, Figure 1 A flowchart of a method for calculating synchronous grouting volume for shield posture tracking provided in an embodiment of the present application.
[0052] like Figure 1 As shown, the calculation method of the synchronous grouting amount of the shield posture tracking includes the following steps:
[0053] In step S101, the dimension parameters of the shield machine, the dimension parameters of the target tunnel and the shield guidance parameters of the shield guidance system are obtained.
[0054] Specifically, the embodiment of the present application can determine the geometric dimensions of the shield machine and the tunnel structure according to the engineering data, for example, the cutter head diameter D c =6840mm, front shield diameter D F =6810mm, middle shield diameter D M =6800mm, backing diameter D R =6790mm, tunnel outer diameter D t =6600mm, the length of each ring segment l = 1200mm, and the shield guidance system parameters are collected in real time, including: the horizontal offset Δx of the front end of the shield at the front shield mileage i F (i) and the vertical offset Δz F (i), horizontal offset Δx at the middle end of the shield F (i) and the vertical offset Δz F (i), horizontal offset of the rear end of the shield Δx F (i) and the vertical offset Δz F(i) During the construction process, it can be directly output through the shield machine guidance system.
[0055] In step S102, the land loss of each ring segment is calculated according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and the grouting amount of each ring segment is calculated according to the land loss of each ring segment.
[0056] Optionally, in some embodiments, the land loss of each ring of segments is calculated based on the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, including: determining the physical gap volume between the outer diameter of the shield body and the outer diameter of the segment of each ring of segments, determining the first soil loss volume on the excavation surface caused by the soil chamber pressure of each ring of segments, and determining the over-excavation soil loss volume of each ring of segments caused by the change of shield posture; the land loss of each ring of segments is determined according to the sum of the physical gap volume, the first soil loss volume and the over-excavation soil loss volume.
[0057] Specifically, the soil loss V generated within the length of each ring segment under different shield tunneling posture modes is L , including: the physical gap volume V between the outer diameter of the shield of each ring segment and the outer diameter of the segment p , the first soil loss volume V on the excavation surface caused by the soil compartment pressure for each ring segment ep and the over-excavation loss volume V of each ring segment caused by the change of shield posture oc , and its calculation formula is as follows:
[0058] V L =V p +V ep +V oc ; (1)
[0059] Among them, the embodiment of the present application can maintain the balance between the soil and water pressure in the cabin and the static soil and water pressure in front of the cutterhead through the excavation face stability control system, so V ep Can be zero.
[0060] The physical gap volume V between the outer diameter of the shield and the outer diameter of the segment of each ring p The geometric dimensions of the shield machine and the segments can be obtained, and the calculation formula is:
[0061]
[0062] It should be noted that the over-excavation loss volume V of each ring segment caused by the change of shield posture is ocIt is caused by the shield extruding the surrounding soil during the excavation process, and can be determined by the initial excavation contour of the cutterhead and the position of the shield when it passes. Among them, the initial excavation contour of the cutterhead is determined by the position of the cutterhead, which can be specifically determined by the center coordinates of the shield cutterhead and the diameter of the cutterhead; the position of the shield is determined by the spatial position of the shield machine and the outer diameter of the shield.
[0063] The over-excavation loss volume V of each ring segment caused by the change of shield posture oc The calculation model is as follows Figure 2 As shown, the calculation formula is:
[0064] V oc =(D c +D shell )·Δt max (i)·l / 2; (3)
[0065] Among them, D shell is the outer diameter of the shield shell, corresponding to the diameter of the shield section where the maximum deviation occurs during the shield crossing process; Δt max (i) is the maximum compression of each ring segment, and the maximum compression of each ring segment Δt max (i) is the sum of the maximum compression in the horizontal and vertical directions, and its calculation formula is:
[0066]
[0067] in, It is the maximum vertical downward compression of each ring of segments during the shield tunneling process; It is the maximum lateral compression of each ring of segments during the shield crossing process.
[0068] The maximum vertical downward compression of each ring of segments during the shield tunneling process and maximum lateral compression The calculation formulas are:
[0069]
[0070] Where Δx max (i) and Δz max (i) is the maximum horizontal and vertical shield axis deviation at each segment position during the shield crossing process, which generally occurs at the shield hinge position or shield tail position; Δx F (i) and Δz F (i) is the horizontal and vertical shield axis deviation of the reference point at the front end of the cutterhead corresponding to each ring segment.
[0071] In step S103, grouting is performed in the test section according to the grouting amount of each segment ring, and the surface settlement corresponding to the grouting amount of each segment ring is monitored. The grouting correction coefficient of the grouting amount of each segment ring is determined according to the land loss of each segment ring, the grouting amount of each segment ring and the surface settlement corresponding to the grouting amount of each segment ring, and the grouting amount of each segment ring is corrected according to the correction coefficient.
[0072] Furthermore, in some embodiments, the surface settlement corresponding to the grouting amount of each ring of segments is monitored, and the grouting correction coefficient of the grouting amount of each ring of segments is determined according to the land loss of each ring of segments, the grouting amount of each ring of segments, and the surface settlement corresponding to the grouting amount of each ring of segments, including: obtaining a grouting amount-surface settlement relationship curve and a soil loss amount-surface settlement curve according to the monitoring results of the surface settlement corresponding to the grouting amount of each ring of segments; determining the grouting amount at the minimum surface displacement position and the soil loss amount at the minimum surface displacement position based on the grouting amount-surface settlement relationship curve and the soil loss amount-surface settlement curve, and determining the grouting correction coefficient of the grouting amount of each ring of segments according to the grouting amount at the minimum surface displacement position and the soil loss amount at the minimum surface displacement position.
[0073] Specifically, in the embodiment of the present application, the injection amount V of the synchronous slurry material that can fully fill the loss of each ring of soil is G , including the soil loss V generated within the length of each ring segment L The volume loss caused by slurry penetration, consolidation and cementation is calculated as follows:
[0074] V G =η G ·V L ; (7)
[0075] Among them, η G is the slurry correction coefficient. It is necessary to set up test sections for different soil layers, monitor the surface settlement S under different grouting volumes in real time, and draw the grouting volume V G -Surface settlement S curve and soil loss V L -Surface settlement S curve, based on the grouting volume V at the surface displacement S = 0 position (or the minimum surface displacement position) G and soil loss V L , determine the slurry correction coefficient η that meets the formation conditions G .
[0076] η G =V G / V L (S=0); (8)
[0077] In the embodiment of the present application, n is taken G =1, through the above calculation process, we can get Figure 3 The synchronous grouting volume V of each shield ring is shownG V p It can be seen from the schematic diagram of the ratio that the grouting amount of each ring segment has a significant change due to the influence of posture.
[0078] In summary, if Figure 4 As shown, Figure 4 A flowchart of a method for calculating synchronous grouting amount for shield posture tracking provided in an embodiment of the present application;
[0079] S401, determine the geometric dimensions and reference point positions of the shield machine and tunnel structure in the shield tunnel engineering, and input the shield and tunnel dimension parameters into the shield guidance system.
[0080] S402, collecting shield guidance data output by the shield guidance system in real time.
[0081] S403, calculating the soil loss V generated within the length range of each ring segment under different shield tunneling posture modes L .
[0082] S404, calculating the injection amount V of the synchronous slurry material that can fully fill the soil loss of each ring G .
[0083] S405, conduct field test section, monitor grouting volume, soil loss and ground settlement, and determine grout correction coefficient η suitable for the ground G , and through the slurry correction factor η G Correction of the injection amount V of the synchronous slurry material in step S404 G .
[0084] S406, determine whether the shield machine is continuing to dig, if so, jump to step S402, otherwise, end.
[0085] Therefore, the embodiment of the present application determines the geometric dimensions and reference point positions of the shield machine and tunnel structure in the shield tunnel project, collects the parameters of the shield guide system in real time, calculates the soil loss generated within the length range of each ring of segments under different shield excavation posture modes, and calculates the injection amount of synchronous slurry materials that can fully fill the soil loss of each ring, conducts a field test section, monitors the grouting amount, soil loss amount and stratum settlement, and determines the slurry correction coefficient adapted to the stratum. Therefore, the shield excavation spatial position is tracked in real time through the shield machine guide data, and the synchronous slurry injection amount corresponding to each ring of segments during the shield excavation process is calculated in real time, which overcomes the problem that the grouting method in the related art cannot consider the influence of over-excavation loss caused by the shield posture.
[0086] According to the calculation method of synchronous grouting amount of shield posture tracking proposed in the embodiment of the present application, by obtaining the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, the land loss of each ring of segments is calculated according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and the grouting amount of each ring of segments is calculated according to the land loss of each ring of segments, and the grouting amount of each ring of segments is grouting in the test section according to the grouting amount of each ring of segments, and the surface settlement corresponding to the grouting amount of each ring of segments is monitored, and the grouting correction coefficient of the grouting amount of each ring of segments is determined according to the land loss of each ring of segments, the grouting amount of each ring of segments and the surface settlement corresponding to the grouting amount of each ring of segments, and the grouting amount of each ring of segments is corrected according to the correction coefficient. Thus, the problem that the related technology fails to consider the over-excavation loss caused by the shield posture is solved, and the synchronous slurry injection amount corresponding to each ring of segments under different shield excavation posture modes is effectively calculated, overcoming the influence of the shield posture on the over-excavation loss.
[0087] Next, a device for calculating the synchronous grouting amount for shield posture tracking according to an embodiment of the present application will be described with reference to the accompanying drawings.
[0088] Figure 5 It is a block diagram of a device for calculating the synchronous grouting amount for shield posture tracking according to an embodiment of the present application.
[0089] like Figure 5 As shown, the calculation device 10 for the synchronous grouting amount of the shield posture tracking includes: an acquisition module 100, a calculation module 200 and a correction module 300.
[0090] The acquisition module 100 is used to acquire the dimension parameters of the shield machine, the dimension parameters of the target tunnel and the shield guidance parameters of the shield guidance system.
[0091] The calculation module 200 is used to calculate the land loss of each ring segment according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and calculate the grouting amount of each ring segment according to the land loss of each ring segment.
[0092] The correction module 300 is used to perform grouting in the test section according to the grouting amount of each ring of the segment, monitor the surface settlement corresponding to the grouting amount of each ring of the segment, determine the grouting correction coefficient of the grouting amount of each ring of the segment according to the land loss of each ring of the segment, the grouting amount of each ring of the segment and the surface settlement corresponding to the grouting amount of each ring of the segment, and correct the grouting amount of each ring of the segment according to the correction coefficient.
[0093] Optionally, in some embodiments, the calculation module 200 includes: a first determination unit and a second determination unit.
[0094] Among them, the first determination unit is used to determine the physical gap volume between the outer diameter of the shield body and the outer diameter of each ring of the segment, determine the first soil loss volume on the excavation surface caused by the soil chamber pressure of each ring of the segment, and determine the over-excavation soil loss volume caused by the change of shield posture of each ring of the segment.
[0095] The second determining unit is used to determine the land loss of each ring segment according to the sum of the physical gap volume, the first soil loss volume and the over-excavation soil loss volume.
[0096] Optionally, in some embodiments, the correction module 300 includes: a generation unit and a correction unit.
[0097] Among them, the generating unit is used to obtain the grouting amount-surface settlement relationship curve and the soil loss amount-surface settlement curve according to the monitoring results of the surface settlement corresponding to the grouting amount of each ring of the segment.
[0098] The correction unit is used to determine the grouting amount at the minimum surface displacement position and the soil loss at the minimum surface displacement position based on the grouting amount-surface settlement relationship curve and the soil loss amount-surface settlement curve, and to determine the grouting correction coefficient of the grouting amount of each ring segment according to the grouting amount at the minimum surface displacement position and the soil loss amount at the minimum surface displacement position.
[0099] Optionally, in some embodiments, the physical gap volume is:
[0100]
[0101] Among them, V p is the physical gap volume, D c is the cutterhead diameter of the shield machine, D t is the outer diameter of the tunnel, and l is the length of each ring of segments.
[0102] Optionally, in some embodiments, the over-excavated soil loss volume is:
[0103] V oc (i)=(D c +D shell )·Δt max (i)·l / 2;
[0104] Among them, V oc is the volume lost by over-excavation, D shell is the outer diameter of the shield, Δt max (i) is the maximum compression of each ring segment.
[0105] It should be noted that the above explanation of the embodiment of the method for calculating the synchronous grouting amount of shield posture tracking is also applicable to the calculation device of the synchronous grouting amount of shield posture tracking in this embodiment, and will not be repeated here.
[0106] According to the calculation device of synchronous grouting amount for shield posture tracking proposed in the embodiment of the present application, by obtaining the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, the land loss of each ring of segments is calculated according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and the grouting amount of each ring of segments is calculated according to the land loss of each ring of segments, and grouting is performed in the test section according to the grouting amount of each ring of segments, and the surface settlement corresponding to the grouting amount of each ring of segments is monitored, and the grouting correction coefficient of the grouting amount of each ring of segments is determined according to the land loss of each ring of segments, the grouting amount of each ring of segments and the surface settlement corresponding to the grouting amount of each ring of segments, and the grouting amount of each ring of segments is corrected according to the correction coefficient. Thus, the problem that the related technology fails to consider the over-excavation loss caused by the shield posture is solved, and the synchronous slurry injection amount corresponding to each ring of segments under different shield excavation posture modes is effectively calculated, and the influence of the shield posture on the over-excavation loss is overcome.
[0107] Figure 6 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. The electronic device may include:
[0108] A memory 601 , a processor 602 , and a computer program stored in the memory 601 and executable on the processor 602 .
[0109] When the processor 602 executes the program, the method for calculating the synchronous grouting amount for shield posture tracking provided in the above embodiment is implemented.
[0110] Furthermore, the electronic device further comprises:
[0111] The communication interface 603 is used for communication between the memory 601 and the processor 602 .
[0112] The memory 601 is used to store computer programs that can be executed on the processor 602 .
[0113] The memory 601 may include a high-speed RAM (Random Access Memory) memory, and may also include a non-volatile memory, such as at least one disk memory.
[0114] If the memory 601, the processor 602 and the communication interface 603 are implemented independently, the communication interface 603, the memory 601 and the processor 602 can be connected to each other through a bus and communicate with each other. The bus can be an ISA (Industry Standard Architecture) bus, a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 6 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0115] Optionally, in a specific implementation, if the memory 601, the processor 602 and the communication interface 603 are integrated on a chip, the memory 601, the processor 602 and the communication interface 603 can communicate with each other through an internal interface.
[0116] The processor 602 may be a CPU (Central Processing Unit), or an ASIC (Application Specific Integrated Circuit), or one or more integrated circuits configured to implement the embodiments of the present application.
[0117] An embodiment of the present application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method for calculating the synchronous grouting amount for shield posture tracking as described above.
[0118] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms are not necessarily directed to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or N embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0119] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, "N" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0120] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.
[0121] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiment, the N steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array, a field programmable gate array, etc.
[0122] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0123] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A method for calculating the synchronous grouting amount of shield posture tracking, characterized in that: The following steps are involved: Obtaining the dimension parameters of the shield machine, the dimension parameters of the target tunnel and the shield guidance parameters of the shield guidance system; Calculating the land loss of each ring segment according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and calculating the grouting amount of each ring segment according to the land loss of each ring segment; and Grouting is carried out in a test section according to the grouting amount of each segment ring, and the surface settlement corresponding to the grouting amount of each segment ring is monitored. A grouting correction coefficient for the grouting amount of each segment ring is determined according to the land loss of each segment ring, the grouting amount of each segment ring and the surface settlement corresponding to the grouting amount of each segment ring, and the grouting amount of each segment ring is corrected according to the correction coefficient.
2. The method according to claim 1, characterized in that The calculating of the land loss of each ring segment according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system comprises: Determine the volume of the physical gap between the outer diameter of the shield and the outer diameter of each ring of segments, determine the first soil loss volume on the excavation surface caused by the pressure of the soil compartment for each ring of segments, and determine the over-excavation soil loss volume caused by the change of the shield posture for each ring of segments; The land loss of each ring segment is determined according to the sum of the physical gap volume, the first soil loss volume and the over-excavation soil loss volume.
3. The method according to claim 1, characterized in that The monitoring of the ground settlement corresponding to the grouting amount of each ring segment and determining the grouting correction coefficient of the grouting amount of each ring segment according to the land loss of each ring segment, the grouting amount of each ring segment and the ground settlement corresponding to the grouting amount of each ring segment include: According to the monitoring results of the surface settlement corresponding to the grouting amount of each ring segment, a grouting amount-surface settlement relationship curve and a soil loss amount-surface settlement curve are obtained; Based on the grouting amount-surface settlement relationship curve and the soil loss amount-surface settlement curve, the grouting amount at the minimum surface displacement position and the soil loss amount at the minimum surface displacement position are determined, and the grouting correction coefficient of the grouting amount of each ring of segments is determined according to the grouting amount at the minimum surface displacement position and the soil loss amount at the minimum surface displacement position.
4. The method according to claim 2, characterized in that: The physical gap volume is: Among them, V p is the physical gap volume, D c is the cutterhead diameter of the shield machine, D t is the outer diameter of the tunnel, and l is the length of each ring of segments.
5. The method according to claim 2, characterized in that: The over-excavated soil loss volume is: V oc (i)=(D c +D shell )·Δt max (i)·l / 2; Among them, V oc is the volume lost by over-excavation, D shell is the outer diameter of the shield, Δt max (i) is the maximum compression of each ring segment.
6. A device for calculating synchronous grouting amount for shield posture tracking, characterized in that: include: An acquisition module, used to acquire the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system; a calculation module, for calculating the land loss of each ring segment according to the size parameters of the shield machine, the size parameters of the target tunnel and the shield guidance parameters of the shield guidance system, and calculating the grouting amount of each ring segment according to the land loss of each ring segment; as well as A correction module is used to perform grouting in a test section according to the grouting amount of each ring of the segment, monitor the surface settlement corresponding to the grouting amount of each ring of the segment, determine the grouting correction coefficient of the grouting amount of each ring of the segment according to the land loss of each ring of the segment, the grouting amount of each ring of the segment and the surface settlement corresponding to the grouting amount of each ring of the segment, and correct the grouting amount of each ring of the segment according to the correction coefficient.
7. The device according to claim 6, characterized in that The computing module comprises: The first determination unit is used to determine the volume of the physical gap between the outer diameter of the shield body and the outer diameter of each ring of the segment, determine the first soil loss volume on the excavation surface caused by the pressure of the soil compartment for each ring of the segment, and determine the over-excavation soil loss volume caused by the change of the shield posture for each ring of the segment; The second determining unit is used to determine the land loss of each ring segment according to the sum of the physical gap volume, the first soil loss volume and the over-excavation soil loss volume.
8. The device according to claim 6, characterized in that The correction module comprises: A generating unit, configured to obtain a grouting amount-surface settlement relationship curve and a soil loss amount-surface settlement curve according to the monitoring result of the surface settlement corresponding to the grouting amount of each ring of segments; A correction unit is used to determine the grouting amount at the minimum surface displacement position and the soil loss at the minimum surface displacement position based on the grouting amount-surface settlement relationship curve and the soil loss amount-surface settlement curve, and to determine the grouting correction coefficient of the grouting amount of each ring of the segment according to the grouting amount at the minimum surface displacement position and the soil loss amount at the minimum surface displacement position.
9. An electronic device, characterized in that: include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the method for calculating the synchronous grouting amount for shield posture tracking as described in any one of claims 1 to 5.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: The program is executed by a processor to implement a method for calculating synchronous grouting volume for shield posture tracking as described in any one of claims 1-5.
Citation Information
Cited By
Dry mixing grouting dynamic control method, system and program product
CN120312274A