Pipeline leakage rate automatic regulation control system based on test model

Through dual analysis of front-end and back-end in the pipeline leakage rate automatic adjustment control system, the problem that pipeline leakage rate regulation cannot be safely supervised in the existing technology is solved, the accuracy and stability of pipeline leakage rate regulation are improved, and the authenticity of the information is ensured. and management efficiency.

CN118775767AInactive Publication Date: 2024-10-15STATE GRID ANHUI ELECTRIC POWER CO LTD ELECTRIC POWER SCI RES INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410943880.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology cannot safely supervise the pipeline leakage rate, which affects the control accuracy and stability during the test process, resulting in low management efficiency.

Method used

Design an automatic adjustment control system for pipeline leakage rate based on the experimental model. Through the combination of the control management platform, information collection unit, control evaluation unit, front-end supervision unit, safety control unit and display, dual analysis from the front end and the back end is carried out to determine The control risk of pipeline leakage rate and the risk of information failure are generated to generate corresponding signals and early warnings to optimize the control of pipeline leakage rate.

Benefits of technology

It improves the accuracy and stability of pipeline leakage rate control, ensures the authenticity and reliability of information, provides data support through information fusion analysis, rationally optimizes control facilities, and improves management efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775767A_ABST
    Figure CN118775767A_ABST
Patent Text Reader

Abstract

The invention discloses a pipeline leakage rate automatic regulation and control system based on a test model, and the system comprises a regulation and control management platform which generates a collection instruction; the information acquisition unit is used for receiving an acquisition instruction and immediately acquiring regulation and control obstruction data and information damage data; the regulation and control evaluation unit is used for receiving the regulation and control obstruction data and then carrying out regulation and control interference supervision feedback evaluation analysis on the regulation and control obstruction data so as to judge whether the pipeline leakage rate regulation and control risk is too high or not; the front-end supervision unit is used for performing information failure risk safety supervision analysis on the information damage data after receiving the information damage data so as to judge whether the pipeline leakage rate regulation related information failure risk is too high or not; the safety regulation and control unit is used for receiving a normal signal sent by the regulation and control evaluation unit and a stable signal sent by the front-end supervision unit; the display is used for receiving the abnormal signal sent by the regulation and control evaluation unit and the failure signal sent by the front-end supervision unit; and early warning characters respectively corresponding to the abnormal signal and the failure signal are displayed. The regulation and control precision of the subsequent pipeline leakage rate can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline leakage regulation and control, in particular to an automatic regulation and control system for pipeline leakage rate based on a test model. Background Art

[0002] Water is one of the basic needs of human life, so maintaining and managing the stability and reliability of water supply networks is crucial to the development of society. However, the frequent leakage of pipe networks has brought challenges to the rational use of water resources and the normal operation of water supply systems. The pipe network leakage fault simulation test mainly studies the pipe network pressure, leakage volume, and the start and stop frequency of the pressure regulating pump. Its purpose is to detect whether there is a leakage problem in the pipeline system under normal use, so as to ensure the safe and stable operation of the pipeline system.

[0003] However, in the existing technology, it is impossible to conduct safety supervision on the pipeline leakage rate control, which in turn affects the accuracy and stability of the pipeline leakage rate control during the test. It is also impossible to conduct safety supervision on the front-end facility status performance, information security and back-end execution operations, which in turn affects the pipeline leakage rate control, which is not conducive to the effective implementation of the test and reduces the management efficiency of the pipeline leakage rate control. Summary of the invention

[0004] The technical problem to be solved by the present invention is to solve the problem that in the prior art, it is impossible to safely supervise the regulation of pipeline leakage rate.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0006] A pipeline leakage rate automatic adjustment control system based on a test model, comprising:

[0007] Control the management platform to generate collection instructions;

[0008] The information collection unit receives the collection instruction, collects the control obstacle data and the information damaged data immediately, and sends the control obstacle data and the information damaged data to the next level unit;

[0009] The control evaluation unit, after receiving the control obstruction data, performs control interference supervision feedback evaluation and analysis on the control obstruction data to determine whether the pipeline leakage rate control risk is too high;

[0010] The front-end monitoring unit, after receiving the damaged information data, conducts information failure risk safety monitoring analysis on the damaged information data to determine whether the risk of failure of the relevant information on pipeline leakage rate control is too high;

[0011] A safety control unit receives a normal signal sent by the control and evaluation unit and a stable signal sent by the front-end supervision unit;

[0012] A display, receiving the abnormal signal sent by the control and evaluation unit and the failure signal sent by the front-end supervision unit; and displaying the warning texts corresponding to the abnormal signal and the failure signal respectively;

[0013] Among them, the regulation obstacle data includes the regulation interference value and the execution interference value;

[0014] The adjustment interference value indicates that: the product of the excess temperature value of the operating temperature of the power supply line port exceeding the preset operating temperature threshold and the corresponding operating resistance value obtained after data normalization processing is greater than the number of power supply line ports corresponding to the set adjustment threshold;

[0015] The execution interference value indicates that the product of the maximum value of the operating abnormality of the control facility exceeding the abnormal preset threshold and the operating voltage fluctuation frequency of the corresponding control equipment after data normalization processing is greater than the number of control facilities corresponding to the execution threshold.

[0016] Advantages: The invention analyzes from both the front-end and back-end perspectives to improve the subsequent pipeline leakage rate control accuracy. Under the premise of front-end safety, the control safety level division analysis is performed through information fusion to obtain the pipeline leakage rate control safety level of the test model, so as to provide data support for subsequent analysis, which helps to improve the comprehensiveness of the analysis data. The analysis is performed from the perspective of back-end execution operations, that is, the control optimization demand assessment feedback analysis is performed on the control risk data, and the front-end safety level is analyzed at the same time to determine whether the pipeline leakage rate control accuracy is too low, so as to reasonably perform control optimization, so as to optimize the control facilities according to the information feedback, so as to improve the subsequent pipeline leakage rate control accuracy.

[0017] In one embodiment of the present invention, the control interference monitoring feedback evaluation and analysis of the control obstacle data to determine whether the pipeline leakage rate control risk is too high includes:

[0018] Set the monitoring period and set it as the time threshold;

[0019] Acquire the adjustment interference value and execution interference value in the test model within the time threshold;

[0020] Compare the adjustment interference value and the execution interference value with the preset adjustment interference value threshold and the preset execution interference value threshold recorded and stored in the system respectively;

[0021] If the adjustment interference value is less than the preset adjustment interference value threshold, and the execution interference value is less than the preset execution interference value threshold, a normal signal is generated; and the normal signal is sent to the safety control unit;

[0022] If the adjustment interference value is greater than a preset adjustment interference value threshold, or the execution interference value is greater than a preset execution interference value threshold, an abnormal row signal is generated and the abnormal signal is sent to the display;

[0023] After receiving the abnormal line signal, the display will display the preset warning text "Control disturbed" corresponding to the abnormal line signal.

[0024] In one embodiment of the present invention, information failure risk safety supervision analysis is performed on the damaged information data to determine whether the failure risk of the information related to the pipeline leakage rate control is too high, including:

[0025] Set a collection time threshold; obtain the number of times each sensor collects data within the collection time threshold, and set it as the analysis number, and obtain the collection value of the collected data corresponding to each analysis number;

[0026] Preset a collection threshold, obtain the analysis times corresponding to the collection values ​​exceeding the preset collection value threshold, and set it as the abnormal collection times;

[0027] Get the number of analysis times and the average interval time between two adjacent abnormal collection times;

[0028] A threshold for the number of abnormal collection and analysis is preset, and the value of the number of analysis times between two adjacent abnormal collection times exceeding the threshold for the number of abnormal collection and analysis and the average value of the interval time are obtained after data normalization, and the product value is set as the deviation risk value;

[0029] The deviation risk value is compared with a preset deviation risk value threshold stored in the system, and the number of sensors corresponding to the deviation risk value being greater than the preset deviation risk value threshold is set as the acquisition deviation coefficient;

[0030] Compare the acquisition deviation coefficient with the preset acquisition deviation coefficient threshold value recorded and stored in the system;

[0031] If the ratio between the acquisition deviation coefficient and the preset acquisition deviation coefficient threshold is less than 1, a stabilization signal is generated and sent to the safety control unit;

[0032] If the ratio between the collection deviation coefficient and the preset collection deviation coefficient threshold is greater than or equal to 1, a failure signal is generated and sent to the display. After receiving the failure signal, the display displays the preset warning text "Collection Obstructed" corresponding to the failure signal.

[0033] In one embodiment of the present invention, the system further comprises a control self-checking unit;

[0034] After receiving the normal signal sent by the control evaluation unit and the stable signal sent by the front-end monitoring unit, the safety control unit performs control safety level classification analysis to obtain the control safety level of the pipeline leakage rate of the test model;

[0035] After receiving the control safety level, the control self-inspection unit immediately collects the control risk data to determine whether the pipeline leakage rate control accuracy is too low, so as to optimize the control.

[0036] In one embodiment of the present invention, obtaining the control safety level of the pipeline leakage rate of the test model includes:

[0037] Obtaining the adjustment interference value and execution interference value corresponding to the normal signal within the time threshold;

[0038] Obtaining the acquisition deviation coefficient corresponding to the stable signal within the acquisition time threshold;

[0039] According to the adjustment interference value, execution interference value and acquisition deviation coefficient obtained in the above two steps, the control risk coefficient is obtained;

[0040] Compare the control risk factor with the preset control risk factor curve;

[0041] If the control risk factor is above the preset control risk factor curve, the control safety level is the first safety level;

[0042] If the control risk coefficient coincides with the preset control risk coefficient curve, the control safety level is the secondary safety level;

[0043] If the control risk coefficient is below the preset control risk coefficient curve, the control safety level is the third safety level.

[0044] In one embodiment of the present invention, the control risk coefficient is obtained by the following formula:

[0045]

[0046] Where P is the control risk coefficient, TK is the control interference value corresponding to the normal signal within the time threshold, ZG is the execution interference value corresponding to the normal signal within the time threshold, CP is the acquisition deviation coefficient corresponding to the stable signal within the acquisition time threshold, and a1 is the preset error factor coefficient.

[0047] In one embodiment of the present invention, the control risk data includes the number of controls and the control deviation ratio; wherein, judging whether the control accuracy of the pipeline leakage rate is too low to perform control optimization includes:

[0048] Set the control time threshold; obtain the number of times the pipeline leakage rate is controlled within the control time threshold;

[0049] Obtain the control evaluation coefficient corresponding to each control number;

[0050] Compare and analyze the control evaluation coefficient with the stored preset control evaluation coefficient threshold, and set the ratio between the number of times the control evaluation coefficient is greater than the preset control evaluation coefficient threshold and the number of controls as the control deviation ratio;

[0051] According to the control deviation ratio and control safety level, the control optimization demand coefficient is obtained;

[0052] Compare and analyze the control optimization demand coefficient with the preset control optimization demand coefficient threshold value recorded and stored in the system;

[0053] If the ratio between the control optimization demand coefficient and the preset control optimization demand coefficient threshold is less than 1, no signal is generated;

[0054] If the ratio between the control optimization demand coefficient and the preset control optimization demand coefficient threshold is greater than or equal to 1, an optimization signal is generated; and the optimization signal is sent to the display. After receiving the optimization signal, the display displays the preset warning text "Execute optimization" corresponding to the optimization signal.

[0055] In one embodiment of the present invention, the demand coefficient is regulated and optimized, and is obtained by the following formula:

[0056]

[0057] Where R is the control optimization demand coefficient, TB is the control deviation ratio, f1 is the preset proportional factor coefficient of the control deviation ratio, f2 is the correction factor coefficient, and PQ is the control safety level.

[0058] In one embodiment of the present invention, the control evaluation coefficient represents: the product of the part of the pressure change value per unit time of the pressure regulating pump that deviates from the preset pressure threshold and the duration after data normalization, and the sum of the part of the actual opening value of the needle valve that deviates from the set opening value after data normalization.

[0059] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention improves the subsequent pipeline leakage rate control accuracy by analyzing from two perspectives, the front-end and the back-end, that is, analyzing from two points of view, the front-end facility performance and the data credibility, that is, performing control interference supervision feedback evaluation analysis on the control obstacle data to determine whether the pipeline leakage rate control risk is too high, so as to timely manage and improve the stability of pipeline leakage rate control, performing information failure risk safety supervision analysis on the information damaged data to determine whether the failure risk of the information related to the pipeline leakage rate control is too high, so as to timely perform feedback management and ensure the authenticity of the data, thereby helping to improve the effectiveness and reliability of pipeline leakage rate control.

[0060] Under the premise of front-end safety, the present invention performs regulation safety level division analysis by means of information fusion to obtain the pipeline leakage rate regulation safety level of the test model, so as to provide data support for subsequent analysis, which is helpful to improve the comprehensiveness of the analysis data. The analysis is performed from the perspective of back-end execution operation, that is, regulation optimization demand assessment feedback analysis is performed on the regulation risk data, and at the same time, analysis is performed in combination with the front-end safety level to determine whether the pipeline leakage rate regulation accuracy is too low, so as to reasonably perform regulation optimization, so as to perform regulation optimization management of the regulation facilities according to the information feedback situation, so as to improve the subsequent regulation accuracy of the pipeline leakage rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 The present invention is a block diagram of a pipeline leakage rate automatic adjustment control system based on a test model according to an embodiment of the present invention.

[0062] Figure 2 The present invention is another block diagram of a pipeline leakage rate automatic adjustment control system based on a test model according to an embodiment of the present invention. DETAILED DESCRIPTION

[0063] In order to facilitate those skilled in the art to understand the technical solution of the present invention, the technical solution of the present invention is further described in conjunction with the accompanying drawings of the specification.

[0064] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0065] Example 1

[0066] See also Figure 1 As shown, the present invention provides a pipeline leakage rate automatic adjustment control system based on a test model, comprising:

[0067] Control and manage the platform to generate collection instructions.

[0068] The information collection unit is connected to the control management platform for communication, receives collection instructions, and immediately collects the control obstruction data and the information damaged data; and sends the control obstruction data and the information damaged data to the next level unit.

[0069] The control and assessment unit is connected to the information collection unit for communication, and after receiving the control and interference data, performs control and interference supervision feedback assessment and analysis on the control and interference data to determine whether the pipeline leakage rate control risk is too high.

[0070] The front-end monitoring unit is connected to the information collection unit for communication. After receiving the damaged information data, it performs information failure risk safety monitoring analysis on the damaged information data to determine whether the risk of failure of the relevant information of the pipeline leakage rate control is too high.

[0071] The safety control unit is connected to the control and evaluation unit and the front-end supervision unit for communication, and receives the normal signal sent by the control and evaluation unit and the stable signal sent by the front-end supervision unit.

[0072] The display is connected to the control and evaluation unit and the front-end supervision unit for communication, receives the abnormal signal sent by the control and evaluation unit and the failure signal sent by the front-end supervision unit, and displays the warning texts corresponding to the abnormal signal and the failure signal respectively.

[0073] In one embodiment of the present invention, the control management platform sends a collection instruction to the information collection unit, and the information collection unit immediately collects the control obstruction data and the information damaged data when receiving the collection instruction.

[0074] Among them, the regulation and control obstacle data includes the regulation interference value and the execution interference value. The regulation interference value indicates that the operating temperature of the power supply line port exceeds the temperature value of the preset operating temperature threshold, and the product value obtained by normalizing the data with the corresponding operating resistance value is greater than the number of power supply line ports corresponding to the set regulation threshold. Specifically, the power supply line port is the power supply line of the regulation and control facility, that is, the connection line of the external power supply. Among them, the regulation and control facilities may include a voltage regulating pump, a needle valve, etc. It should be noted that the larger the regulation interference value, the greater the risk of abnormal regulation of the test model. Among them, the test model is simulated and set according to the arrangement requirements, and is reduced or made in proportion to the actual components.

[0075] The execution interference value indicates that the product of the maximum value of the abnormal operation of the control facility exceeding the abnormal preset threshold and the operating voltage fluctuation frequency of the corresponding control equipment after data normalization is greater than the number of control facilities corresponding to the execution threshold. In this embodiment, the parameter of the abnormal operation is, for example, current, and the corresponding execution threshold is power. It should be noted that the larger the value of the execution interference value, the greater the risk of abnormal control of the test model.

[0076] In one embodiment of the present invention, the control interference supervision feedback evaluation and analysis of the control obstacle data is performed to determine whether the pipeline leakage rate control risk is too high, so as to manage it in time to improve the pipeline leakage rate control accuracy and stability, specifically including:

[0077] Set the monitoring period and set it as the time threshold.

[0078] The interference value and the execution interference value in the experimental model are adjusted within the time threshold.

[0079] The adjustment interference value and the execution interference value are respectively compared with the preset adjustment interference value threshold and the preset execution interference value threshold entered and stored in the system.

[0080] If the adjustment interference value is less than the preset adjustment interference value threshold, and the execution interference value is less than the preset execution interference value threshold, a normal signal is generated; and the normal signal is sent to the safety control unit.

[0081] If the adjustment interference value is greater than the preset adjustment interference value threshold, or the execution interference value is greater than the preset execution interference value threshold, an abnormal row signal is generated and the abnormal signal is sent to the display.

[0082] After receiving the abnormal line signal, the display will display the preset warning text "Control disturbed" corresponding to the abnormal line signal, so as to manage the power supply line and control facilities according to the information feedback, so as to reduce the impact on the pipeline leakage rate control, thereby helping to improve the pipeline leakage rate control effect.

[0083] In one embodiment of the present invention, after receiving the damaged information data, the front-end supervision unit immediately performs information failure risk safety supervision analysis on the damaged information data to determine whether the failure risk of the relevant information of the pipeline leakage rate control is too high, so as to conduct feedback management in a timely manner to ensure the authenticity of the data, thereby helping to improve the effectiveness and reliability of the pipeline leakage rate control. The specific information failure risk safety supervision analysis process is as follows:

[0084] Set a collection time threshold, obtain the number of times each sensor collects data within the collection time threshold, set it as the analysis number, and obtain the collection value of the collected data corresponding to each analysis number.

[0085] A collection threshold is preset, and the number of analyses corresponding to the collection value exceeding the preset collection value threshold is obtained and set as the abnormal collection number.

[0086] Get the number of analysis times and the average interval time between two adjacent abnormal collection times.

[0087] A threshold for the number of abnormal collection analyses is preset, and the value of the number of analyses between two adjacent abnormal collection times that exceeds the threshold for the number of abnormal collection analyses is obtained, and the product of the value and the mean of the interval duration is obtained after data normalization, and is set as the deviation risk value.

[0088] The deviation risk value is compared with the preset deviation risk value threshold stored in the system, and the number of sensors corresponding to the deviation risk value greater than the preset deviation risk value threshold is set as the acquisition deviation coefficient. It should be noted that the sensor acquisition is analyzed from the perspective of data to understand whether the data acquisition is biased, and the acquisition deviation coefficient is an influencing parameter that reflects the credibility of the pipeline leakage rate control information acquisition.

[0089] The acquisition deviation coefficient is compared with the preset acquisition deviation coefficient threshold value entered and stored in the system.

[0090] If the ratio between the acquisition deviation coefficient and the preset acquisition deviation coefficient threshold is less than 1, a stabilization signal is generated and sent to the safety control unit.

[0091] If the ratio between the acquisition deviation coefficient and the preset acquisition deviation coefficient threshold is greater than or equal to 1, a failure signal is generated and sent to the display. After receiving the failure signal, the display displays the preset warning text "acquisition obstructed" corresponding to the failure signal. In order to manage the sensor according to the information feedback, the accuracy of subsequent pipeline leakage rate control can be improved.

[0092] Embodiment 2

[0093] See also Figure 2 As shown, on the basis of the first embodiment, the pipeline leakage rate automatic regulation and control system based on the test model further includes a regulation and self-checking unit.

[0094] After receiving the normal signal and the stable signal, the safety control unit immediately performs a control safety level division analysis to obtain the control safety level of the pipeline leakage rate of the test model, so as to provide data support for subsequent analysis.

[0095] The control self-check unit is connected to the safety control unit and the display management unit for communication. After receiving the control safety level, it immediately collects the control risk data, which includes the number of controls and the control deviation ratio. It also performs control optimization demand assessment feedback analysis on the control risk data to determine whether the control accuracy of the pipeline leakage rate is too low, so as to reasonably perform control optimization to ensure the control accuracy of the pipeline leakage rate.

[0096] In one embodiment of the present invention, obtaining the control safety level of the pipeline leakage rate of the test model includes:

[0097] The adjustment interference value and execution interference value corresponding to the normal signal within the time threshold are obtained.

[0098] Get the acquisition deviation coefficient corresponding to the stable signal within the acquisition time threshold.

[0099] According to the adjustment interference value, execution interference value and acquisition deviation coefficient obtained in the above two steps, the control risk coefficient is obtained.

[0100] In this embodiment, the control risk coefficient is obtained by the following formula:

[0101]

[0102] Where P is the control risk coefficient, TK is the control interference value corresponding to the normal signal within the time threshold, ZG is the execution interference value corresponding to the normal signal within the time threshold, CP is the acquisition deviation coefficient corresponding to the stable signal within the acquisition time threshold, and a1 is the preset error factor coefficient.

[0103] Compare the control risk coefficient with the preset control risk coefficient curve.

[0104] If the control risk coefficient is above the preset control risk coefficient curve, the control safety level is the first level safety level.

[0105] If the control risk coefficient coincides with the preset control risk coefficient curve, the control safety level is the secondary safety level.

[0106] If the control risk coefficient is below the preset control risk coefficient curve, the control safety level is the third safety level.

[0107] In this embodiment, the security levels of the first-level security level, the second-level security level and the third-level security level increase in sequence. The first-level security level, the second-level security level and the third-level security level are collectively referred to as security values ​​and are labeled PQ. When PQ=1, it indicates the first-level security level. When PQ=2, it indicates the second-level security level, and so on. The security value is sent to the control self-inspection unit.

[0108] In one embodiment of the present invention, determining whether the pipeline leakage rate control accuracy is too low to perform control optimization includes:

[0109] Set the control time threshold and obtain the number of times the pipeline leakage rate is controlled within the control time threshold.

[0110] Get the control evaluation coefficient corresponding to each control number.

[0111] In one embodiment of the present invention, the control evaluation coefficient represents: the product of the portion of the pressure change value per unit time of the pressure regulating pump that deviates from the preset pressure threshold and the duration after data normalization, and the sum of the portion of the actual opening value of the needle valve that deviates from the set opening value after data normalization. The unit time can be one hour.

[0112] The control evaluation coefficient is compared and analyzed with the stored preset control evaluation coefficient threshold, and the ratio between the number of times the control evaluation coefficient is greater than the preset control evaluation coefficient threshold and the number of controls is set as the control deviation ratio.

[0113] In this embodiment, it should be noted that the larger the value of the control deviation ratio is, the greater the risk of deviation in the pipeline leakage rate control process, the greater the risk of abnormal control accuracy, and the greater the demand for control optimization.

[0114] According to the control deviation ratio and the control safety level, the control optimization demand coefficient is obtained.

[0115] In this embodiment, the demand coefficient is regulated and optimized, and is obtained by the following formula:

[0116]

[0117] In the formula, R is the control optimization demand coefficient, TB is the control deviation ratio, f1 is the preset proportional factor coefficient of the control deviation ratio, and the proportional factor coefficient is used to correct the deviations of various parameters in the calculation process of the formula, so as to make the calculation results more accurate, f2 is the correction factor coefficient, both f1 and f2 are greater than zero, and PQ is the control safety level.

[0118] The control optimization demand coefficient is compared and analyzed with the preset control optimization demand coefficient threshold entered and stored in the system.

[0119] If the ratio between the regulation optimization demand coefficient and the preset regulation optimization demand coefficient threshold is less than 1, no signal is generated.

[0120] If the ratio between the control optimization demand coefficient and the preset control optimization demand coefficient threshold is greater than or equal to 1, an optimization signal is generated.

[0121] The optimization signal is sent to the display, and after receiving the optimization signal, the display immediately displays the preset warning text "Execute Optimization" corresponding to the optimization signal, so as to manage the control facilities according to the information feedback and improve the subsequent pipeline leakage rate control accuracy.

[0122] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-limiting from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any reference numerals in the claims should not be regarded as limiting the claims involved.

[0123] The above-described embodiments merely represent implementation methods of the invention. The protection scope of the present invention is not limited to the above-described embodiments. For those skilled in the art, several modifications and improvements may be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A pipeline leakage rate automatic adjustment control system based on a test model, characterized in that: include: Control the management platform to generate collection instructions; The information collection unit receives the collection instruction and immediately collects the control obstacle data and the information damaged data; And send the control obstruction data and information damage data to the next level unit; The control evaluation unit, after receiving the control obstruction data, performs control interference supervision feedback evaluation and analysis on the control obstruction data to determine whether the pipeline leakage rate control risk is too high; After receiving the damaged information data, the front-end monitoring unit conducts information failure risk safety monitoring analysis on the damaged information data to determine whether the risk of failure of the relevant information on pipeline leakage rate control is too high; A safety control unit receives a normal signal sent by the control and evaluation unit and a stable signal sent by the front-end supervision unit; A display, receiving abnormal signals sent by the control and evaluation unit and failure signals sent by the front-end supervision unit; And display the warning texts corresponding to the abnormal signal and failure signal respectively; Among them, the regulation obstacle data includes the regulation interference value and the execution interference value; The adjustment interference value indicates that: the product of the excess temperature value of the operating temperature of the power supply line port exceeding the preset operating temperature threshold and the corresponding operating resistance value obtained after data normalization processing is greater than the number of power supply line ports corresponding to the set adjustment threshold; The execution interference value indicates that the product of the maximum value of the operating abnormality of the control facility exceeding the abnormal preset threshold and the operating voltage fluctuation frequency of the corresponding control equipment after data normalization processing is greater than the number of control facilities corresponding to the execution threshold.

2. The pipeline leakage rate automatic adjustment and control system based on the test model according to claim 1 is characterized in that: Conduct regulatory interference feedback assessment and analysis on regulatory obstruction data to determine whether the pipeline leakage rate regulation risk is too high, including: Set the monitoring period and set it as the time threshold; Acquire the adjustment interference value and execution interference value in the test model within the time threshold; Compare the adjustment interference value and the execution interference value with the preset adjustment interference value threshold and the preset execution interference value threshold recorded and stored in the system respectively; If the adjustment interference value is less than the preset adjustment interference value threshold, and the execution interference value is less than the preset execution interference value threshold, a normal signal is generated; and the normal signal is sent to the safety control unit; If the adjustment interference value is greater than a preset adjustment interference value threshold, or the execution interference value is greater than a preset execution interference value threshold, an abnormal row signal is generated and the abnormal signal is sent to the display; After receiving the abnormal line signal, the display will display the preset warning text "Control disturbed" corresponding to the abnormal line signal.

3. The pipeline leakage rate automatic adjustment and control system based on the test model according to claim 1 is characterized in that: Conduct information failure risk safety supervision analysis on damaged information data to determine whether the risk of failure of information related to pipeline leakage rate control is too high, including: Set a collection time threshold; obtain the number of times each sensor collects data within the collection time threshold, set it as the analysis number, and obtain the collection value of the collected data corresponding to each analysis number; Preset a collection threshold, obtain the analysis times corresponding to the collection values ​​exceeding the preset collection value threshold, and set it as the abnormal collection times; Obtain the number of analysis times and the average interval time between two adjacent abnormal collection times; A threshold for the number of abnormal collection and analysis is preset, and the value of the number of analysis times between two adjacent abnormal collection times exceeding the threshold for the number of abnormal collection and analysis and the average value of the interval time are obtained after data normalization, and the product value is set as the deviation risk value; The deviation risk value is compared with a preset deviation risk value threshold stored in the system, and the number of sensors corresponding to the deviation risk value being greater than the preset deviation risk value threshold is set as the acquisition deviation coefficient; Compare the acquisition deviation coefficient with the preset acquisition deviation coefficient threshold value recorded and stored in the system; If the ratio between the acquisition deviation coefficient and the preset acquisition deviation coefficient threshold is less than 1, a stabilization signal is generated and sent to the safety control unit; If the ratio between the collection deviation coefficient and the preset collection deviation coefficient threshold is greater than or equal to 1, a failure signal is generated and sent to the display. After receiving the failure signal, the display displays the preset warning text "Collection Obstructed" corresponding to the failure signal.

4. The pipeline leakage rate automatic adjustment and control system based on the test model according to claim 1 is characterized in that: The system also includes a control self-checking unit; After receiving the normal signal sent by the control evaluation unit and the stable signal sent by the front-end monitoring unit, the safety control unit performs control safety level classification analysis to obtain the control safety level of the pipeline leakage rate of the test model; After receiving the control safety level, the control self-inspection unit immediately collects the control risk data to determine whether the pipeline leakage rate control accuracy is too low, so as to optimize the control.

5. The pipeline leakage rate automatic adjustment and control system based on the test model according to claim 4 is characterized in that: Obtain the control safety level of the pipeline leakage rate of the test model, including: Obtaining the adjustment interference value and execution interference value corresponding to the normal signal within the time threshold; Obtaining the acquisition deviation coefficient corresponding to the stable signal within the acquisition time threshold; According to the adjustment interference value, execution interference value and acquisition deviation coefficient obtained in the above two steps, the control risk coefficient is obtained; Compare the control risk factor with the preset control risk factor curve; If the control risk factor is above the preset control risk factor curve, the control safety level is the first safety level; If the control risk coefficient coincides with the preset control risk coefficient curve, the control safety level is the secondary safety level; If the control risk coefficient is below the preset control risk coefficient curve, the control safety level is the third safety level.

6. The pipeline leakage rate automatic adjustment and control system based on the test model according to claim 5 is characterized in that: The control risk coefficient is obtained by the following formula: Where P is the control risk coefficient, TK is the control interference value corresponding to the normal signal within the time threshold, ZG is the execution interference value corresponding to the normal signal within the time threshold, CP is the acquisition deviation coefficient corresponding to the stable signal within the acquisition time threshold, and a1 is the preset error factor coefficient.

7. The pipeline leakage rate automatic adjustment and control system based on the test model according to claim 4 is characterized in that: The control risk data includes the number of controls and the control deviation ratio; among them, judging whether the control accuracy of pipeline leakage rate is too low to optimize the control, including: Set the control time threshold; obtain the number of times the pipeline leakage rate is controlled within the control time threshold; Obtain the control evaluation coefficient corresponding to each control number; Compare and analyze the control evaluation coefficient with the stored preset control evaluation coefficient threshold, and set the ratio between the number of times the control evaluation coefficient is greater than the preset control evaluation coefficient threshold and the number of controls as the control deviation ratio; According to the control deviation ratio and control safety level, the control optimization demand coefficient is obtained; Compare and analyze the control optimization demand coefficient with the preset control optimization demand coefficient threshold value recorded and stored in the system; If the ratio between the control optimization demand coefficient and the preset control optimization demand coefficient threshold is less than 1, no signal is generated; If the ratio between the control optimization demand coefficient and the preset control optimization demand coefficient threshold is greater than or equal to 1, an optimization signal is generated; and the optimization signal is sent to the display. After receiving the optimization signal, the display displays the preset warning text "Execute optimization" corresponding to the optimization signal.

8. The pipeline leakage rate automatic adjustment and control system based on the test model according to claim 7 is characterized in that: The demand coefficient is regulated and optimized, and is obtained through the following formula: Where R is the control optimization demand coefficient, TB is the control deviation ratio, f1 is the preset proportional factor coefficient of the control deviation ratio, f2 is the correction factor coefficient, and PQ is the control safety level.

9. The pipeline leakage rate automatic adjustment and control system based on the test model according to claim 7 is characterized in that: The control evaluation coefficient is expressed as: the product of the part of the pressure change value per unit time of the pressure-stabilizing pump that deviates from the preset pressure threshold and the duration after data normalization, and the sum of the part of the actual opening value of the needle valve that deviates from the set opening value after data normalization.