Tunnel construction concrete over-consumption data acquisition system based on RPA robot

Through the tunnel construction concrete overconsumption data collection system based on RPA robots, the problem of inaccurate concrete consumption data in tunnel construction is solved, efficient and accurate data collection and monitoring is achieved, and effective cost control of project management is supported.

CN118779780APending Publication Date: 2024-10-15INTELLIGENT & TECHNOLOGY BRANCH OF CHINA RAILWAY FIRST GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410741442.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Due to decentralized construction, human factors and inaccurate measurement records during tunnel construction, there is a large difference between the actual consumption of concrete and the theoretical consumption, resulting in waste of resources, environmental pollution and impact on project quality, making it difficult for management to obtain comprehensive and accurate information. , timely concrete consumption data cannot effectively monitor and control construction costs.

Method used

A tunnel construction concrete overconsumption data collection system based on RPA robots is adopted, including a data capture module, a management system and a data analysis module. The RPA robot automatically captures and processes data, calculates overconsumption data, and provides data display and permission management. Real-time monitoring and display of data.

Benefits of technology

It achieves efficient and accurate concrete consumption data collection, reduces subjective errors in manual statistics, provides actual consumption data, supports timely monitoring and cost control of project management, reduces construction costs, and improves data collection efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118779780A_ABST
    Figure CN118779780A_ABST
Patent Text Reader

Abstract

The invention discloses a tunnel construction concrete over-consumption data acquisition system based on an RPA robot, and relates to the technical field of tunnel construction, the system comprises an RPA robot, a management system and a data analysis module, the management system sets an acquisition address needing data capture and sends the acquisition address to a data capture module; the data capturing module captures data according to the acquisition address; and the data analysis module is arranged in the management system and is used for acquiring the grabbed data, calculating overconsumption data according to the grabbed data and a pre-designed quantity and storing the overconsumption data. The use condition of concrete in the construction process can be monitored in real time, and once abnormal conditions are found, the abnormal conditions can be detected in time, and corresponding treatment measures can be taken; traditional manual filling time and labor cost are saved, efficient data acquisition and recording are achieved, and a more convenient and economical mode is provided for project management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel construction, and more specifically to a tunnel construction concrete overconsumption data collection system based on an RPA robot. Background Art

[0002] During the tunnel construction process, due to decentralized construction, human factors, and inaccurate measurement records, the actual consumption of concrete is often quite different from the theoretical consumption. Concrete over-consumption and waste lead to increased construction costs, waste of resources, environmental pollution, and even affect the quality of the project. The company's management has been working tirelessly to monitor and control the construction process, but due to inconsistent data records at various stages of the construction site, the fact that grassroots project personnel do not reflect the actual situation due to assessment pressure, the decentralized and opaque data collection process, and the lack of standardized data collection and reporting processes, the collected data is often fragmented, distorted, and difficult to integrate.

[0003] It was difficult for the management to obtain comprehensive, accurate and timely data on concrete consumption, and it was impossible to conduct in-depth analysis of the root causes of the problem and formulate effective cost-saving measures, which brought difficulties and challenges to the supervision, evaluation, improvement and cost control of tunnel construction.

[0004] Therefore, how to obtain comprehensive, accurate and timely concrete consumption data is an urgent problem that technical personnel in this field need to solve. Summary of the invention

[0005] In view of this, the present invention provides a tunnel construction concrete overconsumption data collection system based on RPA robots, which avoids the subjective errors of manual statistics and allows managers to see the actual consumption quantity during the construction process, thereby comparing it with the design quantity and promptly discovering problems in the construction process.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] A tunnel construction concrete overconsumption data collection system based on an RPA robot includes: a data capture module, a management system, and a data analysis module. The management system sets a collection address for data capture and sends it to the data capture module; the data capture module captures data according to the collection address; the data analysis module is arranged inside the management system, obtains the captured data, calculates the overconsumption data according to the captured data and the pre-designed amount, and saves the data.

[0008] Preferably, the data capture module is an RPA robot.

[0009] Preferably, the management system performs identity authentication through the provided mixing station account and password, binds the mixing station account and password, and provides the data URL corresponding to the mixing station account and password to the RPA robot.

[0010] Preferably, the management system further includes a rights management module, and the rights management module performs rights management on the account and password of the mixing station for logging in.

[0011] Preferably, it also includes a data display module, which is signal-connected to the data analysis module and displays the overconsumption data.

[0012] Preferably, the RPA robot also includes a data processing module for cleaning and formatting the captured data.

[0013] Preferably, the data display module is connected to the data analysis module via an API interface.

[0014] It can be seen from the above technical solution that compared with the prior art, the present invention discloses a tunnel construction concrete overconsumption data collection system based on RPA robots to obtain actual concrete consumption data, providing powerful guidance for designers' future planning; it can monitor the use of concrete in the construction process in real time, and once an abnormal situation is found, it can detect and take corresponding treatment measures in time; it saves the traditional manual filling time and labor costs, realizes efficient data collection and recording, and provides a more convenient and economical way for project management. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0016] Figure 1 The accompanying drawing is a schematic diagram of the structure provided by the present invention. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] The embodiment of the present invention discloses a tunnel construction concrete overconsumption data collection system based on an RPA robot. Figure 1 As shown, it includes: a data capture module, a management system, and a data analysis module. The management system sets the collection address for data capture and sends it to the data capture module; the data capture module captures data according to the collection address; the data analysis module is set inside the management system, obtains the captured data, calculates the overconsumption data according to the captured data and the pre-designed amount, and saves it.

[0019] In a specific embodiment, the data capture module writes the data capture script of the RPA robot according to the information provided in the data address setting interface, associates it with the data address, and then debugs it to ensure that the target data can be captured.

[0020] In a specific embodiment, the data analysis module obtains the design quantity pushed by the quantity calculation system of a certain work area, and after the work area is completed, it calculates the actual consumption data obtained by the RPA robot to obtain the actual data of concrete overconsumption in this work area.

[0021] In a specific embodiment, the data capture module is an RPA robot.

[0022] In a specific embodiment, the management system performs identity authentication through the provided mixing station account and password, binds the mixing station account and password, and provides the data URL corresponding to the mixing station account and password to the RPA robot.

[0023] In a specific embodiment, the management system also includes a permission management module, which performs permission management on the account and password of the logged-in mixing station to ensure that only authorized users can access and operate relevant data.

[0024] In a specific embodiment, it also includes a data display module, which is connected to the data analysis module signal to display the daily concrete consumption and the excess concrete consumption in each work area in the form of a statistical chart, so that managers can detect project abnormalities in time and designers can analyze excess consumption problems later.

[0025] In a specific embodiment, the RPA robot also includes a data processing module to clean, format or perform other necessary processing on the captured data to ensure the accuracy and completeness of the data and prepare for the next step of data analysis.

[0026] In a specific embodiment, the data display module and the data analysis module are connected via an API interface.

[0027] In a specific embodiment, a construction section of a tunnel project is selected as the experimental object. The length of the construction section is 5 kilometers. The shield method is used for construction, involving 10 mixing stations and 100 mixers. The concrete consumption data of the construction section is collected using the method and system of the present invention and the traditional manual statistical method, respectively. The differences and advantages of the two methods in terms of data accuracy, authenticity, efficiency, etc. are compared. The specific implementation steps of the present invention are as follows:

[0028] S1: Log in to the mixing station account and password through the data source setting module in the management system, bind the account and associate it, and assign different data access and operation permissions to the mixing station account and password through the permission management module;

[0029] S2: The RPA robot obtains the required data source address through the mixing station account and password. The user enters or selects the mixing station website, the concrete production notice webpage, the mixer real-time operation data webpage, and other information;

[0030] S3: Deploy RPA robots to enable them to have automated browser control and data crawling capabilities. Developers write RPA robot scripts or use graphical tools to design RPA robot processes and upload them to the data analysis module of the management system;

[0031] S4: Set up a data processing module inside the RPA robot to clean, format or perform other necessary processing on the acquired data. Developers write functions of the data processing module or use existing libraries and embed them into the scripts or processes of the RPA robot;

[0032] S5: Establish an API interface with the data analysis module so that the data display module can easily obtain the processed data. Developers write the code for the API interface or use an existing framework and deploy it to the management system or cloud server;

[0033] S6: The data analysis module calculates the actual consumption data obtained by the RPA robot based on the data processed by the data processing module and the design quantity pushed by the quantity calculation system of a certain work area after the work area is completed, obtains the actual data of concrete overconsumption in this work area, and stores it in the data analysis module of the management system.

[0034] S7: The data display module sends a request to the data analysis module through the API interface, obtains the processed data, and dynamically renders it on the page to realize the real concrete consumption data display.

[0035] The specific implementation steps of the traditional manual statistical method are as follows:

[0036] S1: The operators of the mixing station manually record the production quantity, mix ratio, time and other information of each batch of concrete according to the concrete production notice, and summarize them into the concrete production report of the day;

[0037] S2: The operators of the mixing station manually record the hourly concrete consumption, remaining amount, time and other information of each mixer according to the operation status of the mixer, and summarize them into the daily mixer operation report;

[0038] S3: The operator of the mixing station prints out the concrete production report and the mixer operation report for the day and gives them to the person in charge of the construction site;

[0039] S4: The person in charge of the construction site shall check and review the concrete production report and the mixer operation report for the day, and sign for confirmation;

[0040] S5: The person in charge of the construction site scans the concrete production report and the mixer operation report of the day into electronic version and sends them to the engineering management department;

[0041] S6: After receiving the daily concrete production report and the daily mixer operation report, the engineering management department will summarize, analyze or display them.

[0042] Experimental Results

[0043] The present invention compares the differences and advantages of the method and system of the present invention with the traditional manual statistical method in the collection of concrete consumption data, and mainly evaluates from the following aspects:

[0044] Data Accuracy

[0045] Data accuracy refers to the degree of consistency between data and the actual situation, and is an important indicator of data quality. In order to evaluate data accuracy, the present invention adopts the following method:

[0046] (a) For the data of the concrete production notice, the present invention obtains real data from the database of the mixing plant as a reference standard and compares it with the data obtained by the method and system of the present invention and the traditional manual statistical method;

[0047] (b) For the real-time operation data of the mixer, the present invention obtains real data from the sensors of the mixer as a reference standard, and compares it with the data obtained by the method and system of the present invention and the traditional manual statistical method.

[0048] The present invention uses mean absolute error (MAE) and mean relative error (MRE) as evaluation indicators, and the calculation formula is as follows:

[0049]

[0050] Among them, yi Represents real data, Indicates the acquired data, and n indicates the number of data.

[0051] Tables 1 and 2 show the accuracy evaluation results of the concrete production notice data and the real-time operation data of the mixer, respectively.

[0052] Table 1 Evaluation results of data accuracy of concrete production notice

[0053] method MAE MRE System and method of the present invention 0.12 0.01 Traditional manual statistical methods 2.35 0.18

[0054] Table 2 Accuracy evaluation results of real-time operation data of mixer

[0055] method MAE MRE System and method of the present invention 0.15 0.02 Traditional manual statistical methods 3.42 0.26

[0056] It can be seen from Table 1 and Table 2 that the system and method of the present invention have high accuracy in collecting concrete consumption data, and their MAE and MRE are much lower than those of traditional manual statistical methods, indicating that the data obtained by the system and method of the present invention is more consistent with the actual situation, avoiding errors and deviations caused by human factors.

[0057] (2) Data authenticity

[0058] Data authenticity refers to the degree of conformity between data and facts and is an important indicator of data quality. In order to evaluate data authenticity, the present invention adopts the following method:

[0059] (a) For the data of the concrete production notice, the present invention obtains real data from the database of the mixing plant as a reference standard and compares it with the data obtained by the system and method of the present invention and the traditional manual statistical method;

[0060] (b) For the real-time operation data of the mixer, the present invention obtains real data from the sensors of the mixer as a reference standard, and compares it with the data obtained by the system and method of the present invention and the traditional manual statistical method.

[0061] The present invention uses the consistency coefficient (CC) as an evaluation index, and the calculation formula is as follows:

[0062]

[0063] Among them, y i Represents real data, Indicates the acquired data. represents the average value of the real data, It represents the average value of the acquired data, and n represents the number of data.

[0064] Tables 3 and 4 show the authenticity evaluation results of the concrete production notice data and the real-time operation data of the mixer, respectively.

[0065] Table 3 Data authenticity evaluation results of concrete production notice

[0066] method CC System and method of the present invention 0.99 Traditional manual statistical methods 0.82

[0067] Table 4 Authenticity evaluation results of real-time operation data of mixer

[0068] method CC System and method of the present invention 0.98 Traditional manual statistical methods 0.76

[0069] It can be seen from Tables 3 and 4 that the system and method of the present invention have high authenticity in collecting concrete consumption data, and their CCs are close to 1, indicating that the data obtained by the system and method of the present invention are very consistent with the facts, avoiding intentional tampering, false reporting, and cutting corners.

[0070] (3) Data efficiency

[0071] Data efficiency refers to the time and cost required for data collection, processing and display, and is an important indicator of data quality. In order to evaluate data efficiency, the present invention adopts the following method:

[0072] (a) For the data of the concrete production notice, the present invention records the time required for the system and method of the present invention and the traditional manual statistical method to obtain the concrete production report of the day from the mixing station;

[0073] (b) For the real-time operation data of the mixer, the present invention records the time required by the system and method of the present invention and the traditional manual statistical method to obtain the mixer operation report of the day from the mixer;

[0074] (c) For the display of concrete consumption data, the present invention records the time required for the system and method of the present invention and the traditional manual statistical method to obtain the processed data from the management system or cloud server and display it on the front end.

[0075] Table 5 shows the results of the efficiency evaluation in terms of concrete consumption data collection and presentation.

[0076] Table 5 Concrete consumption data collection and display efficiency evaluation results

[0077] method Concrete production notice Mixer operation report Data display System and method of the present invention 5 minutes 10 minutes 1 minute Traditional manual statistical methods 2 hours 4 hours 1 day

[0078] It can be seen from Table 5 that the system and method of the present invention have high efficiency in collecting and displaying concrete consumption data, and the time and cost required are much lower than those of traditional manual statistical methods, which shows that the system and method of the present invention achieve efficient data collection and recording, and provide a more convenient and economical way for project management.

[0079] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0080] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined in the present invention may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown in the present invention, but will conform to the widest scope consistent with the principles and novel features disclosed in the present invention.

Claims

1. A tunnel construction concrete overconsumption data collection system based on RPA robot, characterized in that: include: A data capture module, a management system, and a data analysis module. The management system sets a collection address for data capture and sends it to the data capture module; the data capture module captures data according to the collection address; the data analysis module is set inside the management system, obtains the captured data, calculates the overconsumption data based on the captured data and the pre-designed amount, and saves it.

2. According to claim 1, a tunnel construction concrete consumption data acquisition system based on RPA robot is characterized in that: The data capture module is an RPA robot.

3. According to claim 2, a tunnel construction concrete consumption data acquisition system based on RPA robot is characterized in that: The management system performs identity authentication through the provided mixing station account and password, binds the mixing station account and password, and provides the data URL corresponding to the mixing station account and password to the RPA robot.

4. According to claim 3, a tunnel construction concrete consumption data acquisition system based on RPA robot is characterized in that: The management system also includes a rights management module, which performs rights management on the account and password of the mixing station for logging in.

5. According to claim 1, a tunnel construction concrete consumption data collection system based on RPA robot is characterized in that: It also includes a data display module, which is connected to the data analysis module by signal and displays the overconsumption data.

6. According to claim 2, a tunnel construction concrete consumption data collection system based on RPA robot is characterized in that: The RPA robot also includes a data processing module for cleaning and formatting the captured data.

7. According to claim 5, a tunnel construction concrete consumption data collection system based on RPA robot is characterized in that: The data display module is connected to the data analysis module via an API interface.