Calculation method of maximum step height on the tunnel face in shallow tunnel excavation with short step method

The method calculates the maximum step height on the tunnel face using an arc surface to plane failure mode model and soil pressure equations, addressing the stability and safety concerns in shallow tunnel excavation.

CN118780093BActive Publication Date: 2024-12-06NO 1 ENG COMPANY CO LTD OF CCCC FIRST HARBOR ENG COMPANY +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411260583.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-12-06
Estimated Expiration
2044-09-10

AI Technical Summary

Technical Problem

Current methods for determining the step height in shallow tunnel excavation using the short step method do not adequately consider the impact on tunnel face stability and construction safety, particularly the height of the upper step, which is crucial for maintaining structural stability during excavation.

Method used

A method is developed to calculate the maximum height of the step on the tunnel face using a calculation model based on the arc surface to plane failure mode of the soil body in front of the tunnel face, incorporating moment balance equations and soil pressure resultant force calculations to ensure stability and safety during excavation.

Benefits of technology

The method effectively determines the maximum step height, guiding the excavation process to ensure tunnel face stability and safety during shallow tunnel construction using the short step method.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780093B_ABST
    Figure CN118780093B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of tunnel engineering, and relates to a method for calculating the maximum height of steps on the tunnel face when excavating a shallow tunnel using the short step method. The method comprises: establishing a calculation model based on the surface load, the physical properties of the soil layer, the structural characteristics of the shallow tunnel, and the failure mode of the soil in front of the tunnel face when assuming the shallow tunnel is excavated; integrating the moment equation along the rupture surface of the soil in front of the tunnel face to obtain the moment balance equation on the entire rupture surface, and solving it to obtain the calculation formula for the soil pressure at any height on the tunnel face and the calculation formula for the soil pressure coefficient, and then obtaining the calculation formula for the resultant soil pressure on the tunnel face; solving the soil pressure coefficient; and solving the maximum height of the steps on the tunnel face. The present invention creatively proposes a method for calculating the step height on the tunnel face, and then can determine the maximum height of the steps on the tunnel face, so as to guide the excavation of the upper steps during actual construction, and ensure the stability of the tunnel face and the construction safety during the short step method excavation of the shallow tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel engineering, and in particular relates to a method for calculating the maximum height of a step on a tunnel face excavated using a short step method in a shallow tunnel. Background Art

[0002] Each tunnel project has its own unique surrounding rock geological conditions, hydrological conditions, etc., and the corresponding excavation methods are not the same. Common tunnel excavation methods at this stage include the full section method, the step method, and the pilot pit advance method. Among them, the step method refers to the construction method of first excavating the upper section of the tunnel (upper step), and then starting to excavate the lower section (lower step) after the upper step advances a certain distance, and the upper and lower steps proceed simultaneously. The step method plays an important role in maintaining structural stability.

[0003] The step method is divided into three types according to the length of the step: long step method, short step method and micro step method. Among them, the long step method is suitable for surrounding rock of grade I to III. Excavation, support, transportation, ventilation, drainage and other operations are carried out on the upper and lower steps respectively, so the step length is long. However, if the step length is too long, such as more than 100m, it will increase the support and closure time, increase the difficulty of ventilation, smoke exhaust and drainage, and reduce the overall efficiency of construction; therefore, long steps are generally used when the surrounding rock conditions are relatively good, the construction period is not controlled, and there is no large-scale mechanized operation. The short step method is suitable for surrounding rock of grade III to V, and the step length is 10 to 15m, that is, 1 to 2 times the excavation width. The main consideration is to achieve both step excavation and early support closure. The upper step generally adopts small-volume loosening blasting, and the slag is transported to the lower step by manual or small machinery. Therefore, the step length should not be too long. If it exceeds 15m, the time required for slag removal is too long. The short step method can shorten the support closure time, improve the stress conditions of the initial support, and is conducive to controlling the deformation of the surrounding rock. The micro-step method is a variant of full-section excavation, which is suitable for surrounding rock of grade V to VI. The general step length is 3 to 5m. When the step length is less than 3m, it is impossible to carry out the normal drilling and arch spraying and anchoring support operations. When the step length is greater than 5m, it is difficult to use blasting to turn the slag to the lower step, and manual slag turning must be used. The upper and lower sections of the micro-step method are close to each other, and the mechanical equipment is concentrated, so there is great interference during operation, low production efficiency, and slow construction speed.

[0004] For shallow tunnels, short steps are generally used for excavation, and the excavation has less disturbance on the surrounding rock; however, the current construction experience emphasizes the length of the steps according to the grade of the surrounding rock, and shortens the length of the steps to reduce the exposure time of the face. The step height is generally determined according to previous experience, and there are few studies on the impact of the step height on the face. However, the step height, especially the height of the upper step, will restrict the stability of the face and the working space. It is necessary to study the height of the upper step and determine the maximum height of the step on the face to guide the excavation of the upper step during the actual construction of the shallow tunnel, thereby ensuring the stability of the face and construction safety during the short step excavation of the shallow tunnel. Summary of the invention

[0005] In view of the shortcomings existing in the related technologies, the present invention provides a method for calculating the maximum height of the steps on the tunnel face when excavating a shallow tunnel using the short-step method, aiming to determine the maximum height of the steps on the tunnel face to guide the excavation of the steps during actual construction, thereby ensuring the stability of the tunnel face and the construction safety when excavating a shallow tunnel using the short-step method.

[0006] The present invention provides a method for calculating the maximum height of a step on a tunnel face excavated by a short step method in a shallow tunnel, comprising the following steps:

[0007] S1. A calculation model is established based on the surface load, soil physical properties, structural characteristics of shallow tunnels, and the failure mode of the soil in front of the tunnel face when the shallow tunnel is excavated using the short step method.

[0008] The soil damage area in front of the tunnel face is composed of the first soil block area and the second soil block area. The second soil block area is a curved wedge-shaped body in front of the tunnel face and its fracture surface is a circular arc surface. The first soil block area is an inverted cone-shaped body located obliquely above the second soil block area and its fracture surface is a plane, so that the fracture surface of the soil damage area in front of the tunnel face presents a circular arc surface ~ plane failure mode; the partition surface between the first soil block area and the second soil block area intersects with the extension surface of the tunnel face at the surface;

[0009] S2. Analyze and integrate the moment equation along the fracture surface of the soil failure area in front of the tunnel face to obtain the moment equilibrium equation on the entire fracture surface, and perform an integral operation on the moment equilibrium equation to obtain the moment integral equation on the entire fracture surface;

[0010] S3. Solve the moment integral equation on the entire fracture surface to obtain the moment integral equation at any height on the tunnel face. Earth pressure at Calculation formula and earth pressure coefficient , , The calculation formula for any height on the tunnel face Earth pressure at The calculation formula is integrated to obtain the resultant earth pressure on the tunnel face. The calculation formula of

[0011] S4. Calculate the earth pressure coefficient , , ;

[0012] S5. Calculate the resultant earth pressure on the tunnel face The maximum height of the step on the face .

[0013] In some embodiments, step S1 further includes defining model parameters, the model parameters including surface loads 、The internal friction angle of soil , soil cohesion , soil weight , shallow tunnel top burial depth , shallow tunnel height , the slope of the fracture surface of the first soil block area , the slope of the fracture surface in the second soil block area , the surface collapse range corresponding to the soil damage area in front of the tunnel face .

[0014] In some embodiments, in step S2, the moment equations are analyzed along the fracture surface of the first soil block area and the fracture surface of the second soil block area, which are expressed as equations (1) and (2) respectively, and the moment balance equation on the entire fracture surface is expressed as equation (3); the moment integral equation on the entire fracture surface is expressed as equation (4);

[0015] (1);

[0016] (2);

[0017] (3);

[0018] (4);

[0019] In formula (1) to formula (4), is the slope of the fracture surface in the soil failure area in front of the tunnel face, is the X coordinate value of any point on the entire fracture surface; It is the Z coordinate value of any point on the entire fracture surface.

[0020] In some embodiments, in step S3, any height of the tunnel face obtained Earth pressure at The calculation formula is expressed as formula (5); the earth pressure coefficient obtained is , , The calculation formulas are expressed as formula (6)-formula (8) respectively;

[0021] (5);

[0022] (6);

[0023] (7);

[0024] (8).

[0025] In some embodiments, in step S3, the soil pressure resultant on the tunnel face is obtained. The calculation formula is expressed as formula (9),

[0026] (9).

[0027] In some embodiments, in step S4, according to the internal friction angle of the soil during the short step method excavation of the shallow tunnel , and use equations (6) to (8) to solve the earth pressure coefficient , , .

[0028] In some embodiments, in step S5, when the earth pressure on the tunnel face is season , the maximum height of the step on the tunnel face The calculation formula is expressed as formula (10), and then the maximum height of the step on the tunnel face is solved. ;

[0029] (10).

[0030] Based on the above technical scheme, the method for calculating the maximum height of the step on the tunnel face excavated by the short step method of a shallow tunnel in the embodiment of the present invention can determine the maximum height of the step on the tunnel face by jointly using a calculation model established based on the arc surface to plane failure mode of the soil body in front of the tunnel face during the short step method of a shallow tunnel excavation, a rupture surface moment balance equation, and a tunnel face soil pressure resultant force calculation formula, so as to guide the excavation of the upper step during actual construction, thereby ensuring the stability of the tunnel face and construction safety during the short step method of excavation of a shallow tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0032] Figure 1 It is a flow chart of a method for calculating the maximum height of a step on a tunnel face excavated using a short step method in a shallow tunnel according to the present invention;

[0033] Figure 2 It is a schematic diagram of a calculation model in a method for calculating the maximum height of steps on a tunnel face excavated by a short step method of a shallow tunnel according to the present invention. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0035] In the description of the present invention, it should be understood that the terms "center", "lateral", "longitudinal", "up", "down", "top", "bottom", "inside", "outside", "left", "right", "front", "back", "vertical", "horizontal", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0036] The terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of the features.

[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0038] refer to Figure 1-Figure 2 As shown, the present invention provides a method for calculating the maximum height of a step on a tunnel face excavated by a short step method in a shallow tunnel, the method comprising the following steps:

[0039] S1. A calculation model is established based on the surface load, soil physical properties, structural characteristics of shallow tunnels, and the failure mode of the soil in front of the tunnel face when the shallow tunnel is excavated using the short step method. The failure zone of the soil in front of the tunnel face consists of the first soil block area and the second soil block area. The second soil block area is an arc-shaped wedge in front of the tunnel face, and its rupture surface is an arc surface. The first soil block area is an inverted cone located obliquely above the second soil block area, and its rupture surface is a plane. This makes the rupture surface of the failure zone of the soil in front of the tunnel face present a failure mode of an arc surface to a plane. The partition surface between the first soil block area and the second soil block area intersects with the extension surface of the tunnel face at the surface.

[0040] It should be noted that the failure mode of the soil in front of the face during the short step method excavation of the shallow tunnel in this embodiment is different from the N.Horn instability failure mode currently commonly used in the industry; this embodiment found that when a shallow tunnel is excavated, due to the shallow top burial depth of the shallow tunnel, the fracture surface range of the face tends to expand in front of the face toward the ground surface, resulting in the face instability failure after the failure zone will eventually penetrate the ground surface, so it is innovatively proposed as follows Figure 2 The failure mode of the arc surface to the plane is shown in the figure; and through simulation analysis and experimental verification, it is shown that this failure mode is more suitable for the instability failure during the excavation of shallow buried tunnels.

[0041] refer to Figure 2 As shown in the figure, it is further explained that, assuming that the ground surface is horizontal, the soil damage area in front of the tunnel face AD ​​is divided into two areas, namely, the first soil block area FOE and the second soil block area AOF. The second soil block area AOF is an arc wedge in front of the tunnel face AD, and its fracture surface AF is an arc surface. The first soil block area FOE is an inverted cone located obliquely above the second soil block area AOF, and its fracture surface FE is a plane, so that the fracture surface AFE of the soil damage area in front of the tunnel face AD ​​presents a failure mode of arc surface ~ plane; the partition surface FO between the first soil block area FOE and the second soil block area AOF intersects with the extension surface DO of the tunnel face AD ​​at the ground surface O. It can be understood by those skilled in the art that the ground surface O away from the tunnel excavation direction is usually taken as the positive X direction, and the ground surface O toward the inside of the ground surface is taken as the positive Z direction.

[0042] S2. Analyze and integrate the moment equation along the fracture surface AFE of the soil failure area in front of the tunnel face AD ​​to obtain the moment balance equation on the entire fracture surface AFE, and perform an integral operation on it to obtain the moment integral equation on the entire fracture surface AFE.

[0043] S3. Solve the moment integral equation on the entire fracture surface AFE to obtain the moment integral equation at any height on the tunnel face AD. Earth pressure at The calculation formula of the earth pressure coefficient can be obtained , , The calculation formula is: It is the height difference between a point on the tunnel face AD ​​and the ground surface; Figure 2 In and The soil pressure at the top and bottom of the tunnel face AD ​​is shown respectively; further, for any height on the tunnel face AD Earth pressure at The calculation formula is integrated to obtain the resultant earth pressure on the tunnel face AD. The calculation formula for .

[0044] S4. Calculate the earth pressure coefficient , , .

[0045] S5, based on the calculated earth pressure coefficient , , And the earth pressure resultant on the tunnel face AD ​​is obtained The calculation formula is used to solve the resultant earth pressure on the tunnel face AD. The maximum height of the step on the tunnel face AD It should be noted that the height of the upper step of the tunnel face AD ​​is the height difference between the top surface of the upper step and the top surface of the shallow buried tunnel.

[0046] The above-mentioned schematic embodiment creatively proposes a method for calculating the step height on the tunnel face through a series of process steps, such as establishing a calculation model based on the arc surface-plane failure mode, analyzing the moment equation of the rupture surface, and obtaining the calculation formula for the resultant earth pressure on the tunnel face. The method can then determine the maximum height of the step on the tunnel face to guide the excavation of the step during actual construction, thereby ensuring the stability of the tunnel face and construction safety during excavation of a shallow tunnel using the short step method.

[0047] refer to Figure 2 As shown, in some embodiments, step S1 also includes defining model parameters, and the model parameters include surface loads 、The internal friction angle of soil , soil cohesion , soil weight , shallow tunnel top burial depth , shallow tunnel height , the slope of the fracture surface FE of the first soil block area FOE , the slope of the fracture surface AF of the second soil block area AOF , the surface collapse range corresponding to the soil damage area in front of the tunnel face AD ; Further, the buried depth of the top of the shallow tunnel is the height difference between the top surface of the shallow tunnel and the ground surface, and the height of the shallow tunnel is the height difference between the bottom surface of the tunnel and the top surface of the tunnel; for the failure mode of the soil in front of the heading face AD ​​during the short-step excavation of the shallow tunnel in this embodiment, the surface collapse range corresponding to the soil damage area in front of the heading face AD ​​is the surface collapse range corresponding to the first soil block area FOE, that is, the surface collapse range corresponding to EO.

[0048] In some embodiments, in step S2, a method combining the upper limit method of limit analysis and the limit equilibrium method is used to perform a detailed analysis on the soil in front of the tunnel face AD; the moment equation is analyzed along the fracture surface FE of the first soil block area FOE and the fracture surface AF of the second soil block area AOF, which are expressed as formula (1) and formula (2) respectively, and the moment equilibrium equation on the entire fracture surface AFE is expressed as formula (3); the moment integral equation on the entire fracture surface AFE is expressed as formula (4);

[0049] (1);

[0050] (2);

[0051] (3);

[0052] (4);

[0053] In formula (1) to formula (4), is the X coordinate value of any point on the entire fracture surface AFE; is the Z coordinate value of any point on the entire fracture surface AFE, is the slope of the fracture surface AFE in the soil failure area in front of the tunnel face AD. It can be understood that when the moment equation is integrated along the fracture surface AF, equal , when integrating along the fracture surface FE equal This exemplary embodiment realizes the analysis and integration of the moment equation along the rupture surface of the arc surface to the plane of the soil body in front of the tunnel face AD, making it more suitable for the stress condition of the soil body in front of the tunnel face AD ​​during shallow tunnel excavation.

[0054] In some embodiments, in step S3, the moment integral equation on the entire fracture surface AFE is solved, and the moment integral equation on any height of the tunnel face AD ​​is obtained. Earth pressure at The calculation formula is expressed as formula (5), and the earth pressure coefficient is obtained , , The calculation formulas are expressed as formula (6)-formula (8) respectively;

[0055] (5);

[0056] (6);

[0057] (7);

[0058] (8).

[0059] It should be noted that the calculation formula of the earth pressure coefficient in this embodiment is different from the calculation formula of the earth pressure coefficient under other failure modes currently commonly used in the industry, but is derived based on the arc surface to plane failure mode of the soil in front of the tunnel face AD ​​during shallow tunnel excavation of the present invention. The fracture surface mode based on which the calculation formula is based has taken into account the extreme value condition of the yield function, so there is no need to calculate the extreme value; then in step S4, using formula (6) to formula (8), and according to the internal friction angle of the soil during shallow tunnel excavation , the earth pressure coefficient during shallow tunnel excavation can be calculated , , .

[0060] In some embodiments, in step S3, for any height on the tunnel face AD Earth pressure at The calculation formula is integrated to obtain the resultant earth pressure on the tunnel face AD. The calculation formula is expressed as formula (9);

[0061] (9).

[0062] In some embodiments, in step S5, when the earth pressure on the tunnel face AD ​​is season , and substitute them into formula (9) to obtain the maximum height of the step on the tunnel face AD ​​at this time: The calculation formula is expressed as formula (10), and then according to the top depth of the shallow tunnel , soil weight during shallow tunnel excavation , soil cohesion , surface load And the calculated earth pressure coefficient , , , the maximum height of the step on the tunnel face when the shallow tunnel is excavated by the short step method can be calculated ;

[0063] (10).

[0064] Taking a shallow tunnel as an example, the maximum height of the step on the tunnel face excavated by the short step method is demonstrated through a specific example. The solution results are shown in Table 1. Among them, the top depth of the shallow tunnel is ; Shallow tunnel height ; The ground surface is level and the ground load ; Soil layer weight , the internal friction angle of soil , the cohesion of soil .

[0065] Table 1 Maximum step height on the tunnel face of a shallow tunnel excavated by short step method (Unit: m)

[0066]

[0067] It should be noted that the maximum height of the step on the tunnel face calculated in Table 1 , is the theoretical solution value of the maximum height of the upper step that can make the tunnel face stable when the short step method is used to excavate the shallow tunnel under the current surface load and soil physical characteristics. When it is a negative value, it means that under the current surface load and soil physical properties, the shallow tunnel does not meet the stability requirements of the face when excavating the upper step, that is, it does not have the self-stabilizing ability, and reinforcement measures are needed to improve the cohesion / internal friction angle of the soil. When the maximum height of the step on the face is calculated, When it is positive, it means that under the current surface load and soil physical properties, the shallow tunnel can meet the stability requirements of the face when excavating the upper step. In the engineering practice of shallow tunnel excavation with short steps, according to the surrounding rock parameters (i.e. the cohesion of the soil) of the construction grade, and internal friction angle ), refer to Table 1 to find the maximum height of the step on the tunnel face , and the excavation of the upper step is guided by this. It is understandable that the height of the upper step used in actual construction is smaller than the maximum height of the step on the tunnel face. , thereby ensuring the stability of the heading face and the safety of tunnel excavation construction during the short-step excavation of the shallow tunnel.

[0068] In summary, the method for calculating the maximum height of the step on the tunnel face excavated by the short step method of a shallow tunnel of the present invention can determine the maximum height of the step on the tunnel face through the combined use of a calculation model established based on the arc surface to plane failure mode of the soil body in front of the tunnel face during the short step method of a shallow tunnel excavation, a rupture surface moment balance equation, and a tunnel face soil pressure resultant force calculation formula, so as to guide the excavation of the upper step during actual construction, thereby ensuring the stability of the tunnel face and the construction safety during the short step method of excavation of a shallow tunnel.

[0069] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0070] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. A method for calculating the maximum step height on the tunnel face of a shallow tunnel excavated using the short step method, characterized in that: The following steps are involved: S1. A calculation model is established based on the surface load, soil physical properties, structural characteristics of shallow tunnels, and the failure mode of the soil in front of the tunnel face when assuming the short-step method for shallow tunnel excavation. The soil failure zone in front of the tunnel face consists of a first soil block zone and a second soil block zone. The second soil block zone is a curved wedge-shaped body in front of the tunnel face, and its fracture surface is a circular arc surface. The first soil block zone is an inverted cone-shaped body located obliquely above the second soil block zone, and its fracture surface is a plane. As a result, the fracture surface of the soil failure zone in front of the tunnel face presents a failure mode of circular arc surface to plane surface. The partition surface between the first soil block zone and the second soil block zone intersects with the extension surface of the tunnel face at the ground surface. S2. Analyzing and integrating the moment equation along the fracture surface of the soil failure region in front of the tunnel face to obtain a moment equilibrium equation on the entire fracture surface, and performing an integral operation on the moment equilibrium equation to obtain a moment integral equation on the entire fracture surface; S3, solve the moment integral equation on the entire fracture surface, and obtain the moment integral equation at any height on the tunnel face. Earth pressure at Calculation formula and earth pressure coefficient 、 、 The calculation formula for any height on the tunnel face Earth pressure at The calculation formula is integrated to obtain the resultant earth pressure on the tunnel face. The calculation formula of S4. Calculate the earth pressure coefficient 、 、 ; S5. Calculate the resultant earth pressure on the tunnel face The maximum height of the step on the tunnel face .

2. The method for calculating the maximum step height on the tunnel face of a shallow tunnel excavated using the short step method according to claim 1 is characterized in that: Step S1 also includes defining model parameters, including surface loads , the internal friction angle of the soil , soil cohesion , soil weight , shallow tunnel top burial depth , shallow tunnel height , the slope of the fracture surface of the first soil block area , the slope of the fracture surface of the second soil block area , the surface collapse range corresponding to the soil damage area in front of the tunnel face .

3. The method for calculating the maximum step height on the tunnel face of a shallow tunnel excavated using the short step method according to claim 2 is characterized in that: In step S2, the moment equations along the fracture surface of the first soil block area and the fracture surface of the second soil block area are analyzed and expressed as equations (1) and (2) respectively. The moment balance equation on the entire fracture surface is expressed as equation (3); the moment integral equation on the entire fracture surface is expressed as equation (4). (1); (2); (3); (4); In formula (1) to formula (4), is the slope of the fracture surface in the soil failure area in front of the tunnel face, is the X coordinate value of any point on the entire fracture surface; is the Z coordinate value of any point on the entire fracture surface.

4. The method for calculating the maximum step height on the tunnel face of a shallow tunnel excavated using the short step method according to claim 3 is characterized in that: In step S3, any height on the tunnel face is obtained Earth pressure at The calculation formula is expressed as formula (5); the obtained earth pressure coefficient 、 、 The calculation formulas are expressed as formula (6)-formula (8) respectively; (5); (6); (7); (8)。 5. The method for calculating the maximum step height on the tunnel face of a shallow tunnel excavated using the short step method according to claim 4 is characterized in that: In step S3, the earth pressure resultant on the tunnel face is obtained The calculation formula is expressed as formula (9), (9)。 6. The method for calculating the maximum height of steps on the tunnel face of a shallow tunnel excavated using the short step method according to claim 5 is characterized in that: In step S4, the internal friction angle of the soil during the shallow tunnel short step method excavation is calculated. , and use equations (6) to (8) to calculate the earth pressure coefficient 、 、 .

7. The method for calculating the maximum step height on the tunnel face of a shallow tunnel excavated using the short step method according to claim 6 is characterized in that: In step S5, when the earth pressure on the tunnel face is season , the maximum height of the step on the tunnel face The calculation formula is expressed as formula (10), and then the maximum height of the step on the tunnel face is solved. ; (10)。

Citation Information

Patent Citations

  • Tunnel face stability calculation method taking seepage force into consideration

    CN108875152A

  • Method and system for determining supporting pressure of tunnel face of oppositely excavated tunnel and medium

    CN115935481A

  • Construction method for making water-rich sand layer shield over cross existing line and underneath cross sewage push pipe at close range

    US20210301660A1