Heat source equipment installed capacity planning method and device

By constructing a mathematical model and a multi-objective optimization model, combined with the particle swarm algorithm to optimize the installed capacity of air source heat pumps and gas boilers, the problem of installed capacity planning in the existing technology that is difficult to take into account energy consumption, environmental protection and economy is solved, and the problem of cold weather is achieved. Efficient heating and economical balance in all weather conditions.

CN118780176APending Publication Date: 2024-10-15MCC CAPITAL ENGINEERING & RESEARCH INC LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411004661.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

When planning the installed capacity of an air source heat pump coupled with a gas boiler heating system, it is difficult to take into account system energy consumption, environmental protection benefits and economy when planning the installed capacity of the air source heat pump and gas boiler coupled heating system with the existing technology, resulting in low operating efficiency of the air source heat pump or excessively high economic costs in cold weather.

Method used

By obtaining basic information, constructing a mathematical model, drawing a heat load duration diagram and establishing a multi-objective optimization model, the particle swarm algorithm is used to determine the installed capacity of air source heat pumps and gas boilers, comprehensively considering the impact of outdoor temperature on the efficiency of air source heat pumps, and optimizing Annual value of costs, carbon emissions and operating energy consumption during the heating period.

Benefits of technology

It is possible to quickly and accurately calculate the installed capacity of air source heat pumps and gas boilers that meet user preferences while ensuring residents' heat needs, taking into account good ecological and environmental protection effects and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780176A_ABST
    Figure CN118780176A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses a heat source equipment installed capacity planning method and device, and the method comprises the steps: determining the annual cost value, the carbon emission and the operation energy consumption of a heat supply system in a heating period under different installed capacities, and calculating the installed capacity of heat source equipment according to the annual cost value, the carbon emission and the operation energy consumption; establishing a multi-objective optimization model of the installed capacity of the heat source equipment of the heat supply system; and inputting the weights of an economic index, a carbon emission index and an energy consumption index preset by a user into the multi-objective optimization model, and solving by using a particle swarm optimization algorithm to obtain the installed capacities of the air source heat pump and the gas boiler of the heat supply system according with the weights preset by the user. According to the method, the installed capacity of the air source heat pump and the gas-fired boiler meeting user preferences can be rapidly and accurately calculated, and good ecological benefits and economic benefits are considered under the condition that the heat requirements of residents are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to installed capacity planning of heat source equipment in a heating system coupled with an air source heat pump and a gas boiler, and in particular to a method and device for planning installed capacity of heat source equipment. Background Art

[0002] The heating method of coupling air source heat pumps with gas boilers can greatly reduce the use of fossil energy and carbon dioxide emissions. Air source heat pumps have the advantages of energy saving, environmental protection, and high efficiency, but their heating effect will continue to decay as the ambient temperature decreases, and even "frost"; gas boilers have high thermal efficiency and are little affected by the weather. Considering the high price of natural gas, gas boilers are often used as peak-shaving heat sources to make up for the disadvantages of air source heat pumps in cold weather and ensure the stability of system heating. The installed capacity planning of heat source equipment for coupling air source heat pumps and gas boilers for heating should be based on meeting the heat needs of residents, and should reduce the energy consumption of the heating system as much as possible, and make the system have good ecological and environmental protection effects and economically reasonable investment and operation costs.

[0003] At present, most of the planning of the installed capacity of heat source equipment for air source heat pump and gas boiler coupled heating relies on experience, and lacks comprehensive consideration of system energy consumption, environmental benefits and economy, ignoring the impact of outdoor ambient temperature on the COP of air source heat pump. In order to pursue environmental benefits, some projects set too high installed capacity of air source heat pump, resulting in too low operating efficiency of air source heat pump in cold weather, which is difficult to meet the heat demand of residents; some projects choose overly conservative installed capacity of air source heat pump and gas boiler to ensure the stability of heating system, resulting in excessive economic cost. Therefore, how to reasonably balance system energy consumption, environmental benefits and economy in actual projects has become the key issue in solving the planning of installed capacity of heat source equipment for air source heat pump and gas boiler coupled heating. Summary of the invention

[0004] In order to solve at least one technical problem in the above-mentioned background technology, the present invention proposes a method and device for planning the installed capacity of heat source equipment.

[0005] In order to achieve the above object, according to one aspect of the present invention, a method for planning installed capacity of heat source equipment is provided, the method comprising:

[0006] Obtain the basic information required for planning the installed capacity of the heat source equipment, wherein the basic information includes: the location of the air source heat pump and gas boiler coupled heating system, the electricity price of the location, the natural gas price of the location, and the requirements for the proportion of the installed capacity of the air source heat pump in the total installed capacity of the coupled heating system at the location;

[0007] Construct a mathematical model of the energy efficiency ratio of air source heat pumps and a mathematical model of gas consumption of gas boilers;

[0008] Draw a heat load duration time diagram for the location; establish a mathematical model of the total electricity consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period and a mathematical model of the total heat supply borne by the air source heat pump based on the heat load duration time diagram and the mathematical model of the air source heat pump heating energy efficiency ratio; determine the annual cost value of the heating system during the heating period under different installed capacities based on the basic information; determine the carbon emissions during the operation stage of the heating system during the heating period under different installed capacities based on the mathematical model of gas consumption of the gas boiler and the mathematical model of the total electricity consumption of the air source heat pump; determine the operating energy consumption during the operation stage of the heating system during the heating period under different installed capacities based on the heat load duration time diagram and the mathematical model of the total heat supply borne by the air source heat pump; and establish a multi-objective optimization model for the installed capacity of the heat source equipment of the heating system based on the annual cost value, the carbon emissions and the operating energy consumption;

[0009] The weights of the economic index, carbon emission index and energy consumption index preset by the user are input into the multi-objective optimization model, and the particle swarm algorithm is used to solve the installed capacity of the air source heat pump and gas boiler of the heating system that meets the user's preset weights.

[0010] In order to achieve the above object, according to another aspect of the present invention, a device for planning installed capacity of heat source equipment is provided, the device comprising:

[0011] A basic information acquisition unit is used to acquire basic information required for planning the installed capacity of heat source equipment, wherein the basic information includes: the location of the air source heat pump and gas boiler coupled heating system, the electricity price of the location, the natural gas price of the location, and the requirements of the location for the proportion of the installed capacity of the air source heat pump in the total installed capacity of the coupled heating system;

[0012] A mathematical model building unit, used to build a mathematical model of air source heat pump heating energy efficiency ratio and a mathematical model of gas consumption of gas boiler;

[0013] A multi-objective optimization model establishment unit is used to draw a heat load duration diagram of the location; according to the heat load duration diagram and the mathematical model of the air source heat pump heating energy efficiency ratio, a mathematical model of the total power consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period and a mathematical model of the total heat supply undertaken by the air source heat pump are established; according to the basic information, the annual cost value of the heating system during the heating period under different installed capacities is determined; according to the mathematical model of gas consumption of the gas boiler and the mathematical model of the total power consumption of the air source heat pump, the carbon emissions during the operation stage of the heating system during the heating period under different installed capacities are determined; according to the heat load duration diagram and the mathematical model of the total heat supply undertaken by the air source heat pump, the operating energy consumption of the heating system during the heating period under different installed capacities is determined; and according to the annual cost value, the carbon emissions and the operating energy consumption, a multi-objective optimization model of the installed capacity of the heat source equipment of the heating system is established;

[0014] The installed capacity determination unit is used to input the weights of the economic index, carbon emission index and energy consumption index preset by the user into the multi-objective optimization model, and use the particle swarm algorithm to solve and obtain the installed capacity of the air source heat pump and gas boiler of the heating system that meets the user's preset weights.

[0015] In order to achieve the above-mentioned purpose, according to another aspect of the present invention, a computer device is also provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned method for planning installed capacity of heat source equipment when executing the computer program.

[0016] In order to achieve the above-mentioned purpose, according to another aspect of the present invention, a computer-readable storage medium is provided, on which a computer program / instruction is stored, and when the computer program / instruction is executed by a processor, the steps of the above-mentioned method for planning installed capacity of heat source equipment are implemented.

[0017] The beneficial effects of the present invention are:

[0018] The embodiment of the present invention determines the annual cost value, carbon emissions and operating energy consumption of the heating system during the heating period under different installed capacities, and establishes a multi-objective optimization model for the installed capacity of the heat source equipment of the heating system according to the annual cost value, carbon emissions and operating energy consumption. Then, the weights of the economic index, carbon emission index and energy consumption index preset by the user are input into the multi-objective optimization model, and the particle swarm algorithm is used to solve and obtain the installed capacity of the air source heat pump and the gas boiler of the heating system that meets the user's preset weights, thereby achieving the beneficial effect of quickly and accurately calculating the installed capacity of the air source heat pump and the gas boiler that meets the user's preferences, and taking into account good ecological and economic benefits while ensuring the heat demand of residents. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0020] Figure 1 is a first flow chart of a method for planning installed capacity of heat source equipment according to an embodiment of the present invention;

[0021] Figure 2 is a second flow chart of the method for planning installed capacity of heat source equipment according to an embodiment of the present invention;

[0022] Figure 3 is a third flow chart of the method for planning installed capacity of heat source equipment according to an embodiment of the present invention;

[0023] Figure 4 is a fourth flow chart of the method for planning installed capacity of heat source equipment according to an embodiment of the present invention;

[0024] Figure 5 is a heat load duration diagram of an embodiment of the present invention;

[0025] Figure 6 A comparison chart of the annual cost values ​​of the examples under the present invention and the reference objects;

[0026] Figure 7 A comparison of CO2 emissions during heating under the present invention and the reference object is shown in FIG.

[0027] Figure 8 The figure is a comparison of the energy consumption of the example during the heating period under the present invention and the reference object in terms of standard coal consumption;

[0028] Fig. 9 It is a structural block diagram of a device for planning installed capacity of heat source equipment according to an embodiment of the present invention;

[0029] Fig.10 It is a schematic diagram of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0030] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0031] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0032] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of the present invention and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or apparatus.

[0033] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0034] The purpose of the present invention is to provide a method for planning the installed capacity of heat source equipment for coupling heating of air source heat pumps and gas boilers, which meets the personalized needs of users, reduces the energy consumption of the heating system as much as possible, and enables the system to have good ecological and environmental protection effects and economically reasonable investment and operation costs while considering the influence of outdoor temperature on the efficiency of the air source heat pump.

[0035] The present invention particularly proposes a method for planning the installed capacity of heat source equipment for coupled heating of air source heat pumps and gas boilers, focusing on a multi-objective optimization model based on a heat load duration diagram and using annual cost values ​​and carbon emissions to represent economic objective functions and environmental objective functions respectively. The method comprehensively considers the impact of outdoor ambient temperature on the coupled heating system of air source heat pumps and gas boilers, and can quickly and accurately calculate the installed capacity of air source heat pumps and gas boilers that meet user preferences in the project planning stage, taking into account both good ecological and economic benefits while ensuring the heat needs of residents.

[0036] Figure 1 is a first flow chart of the method for planning installed capacity of heat source equipment according to an embodiment of the present invention. Figure 1 As shown, in one embodiment of the present invention, the method for planning installed capacity of heat source equipment of the present invention includes steps S101 to S104.

[0037] Step S101, obtaining basic information required for planning the installed capacity of heat source equipment, wherein the basic information includes: the location of the air source heat pump and gas boiler coupled heating system, the electricity price of the location, the natural gas price of the location, and the requirement of the location for the proportion of the installed capacity of the air source heat pump in the total installed capacity of the coupled heating system.

[0038] In one embodiment of the present invention, the basic information to be determined includes: the location of the air source heat pump and gas boiler coupled heating system (for example, the city or region), the local electricity price of the location, e , the local natural gas price at the location d L , the local policy of the location mentioned requires the proportion of air source heat pump installed capacity in the total installed capacity of the coupled heating system.

[0039] In one embodiment of the present invention, the proportion of the installed capacity of the air source heat pump in the total installed capacity of the coupled heating system may be:

[0040] θ min ≤θ≤θ max

[0041] Among them, θ is the proportion of air source heat pump installed capacity in the total installed capacity of the coupled heating system, θ min and θ max They are respectively the minimum and maximum proportions of the air source heat pump capacity in the total installed capacity of the coupled heating system as stipulated by the local policy of the location.

[0042] Step S102, constructing a mathematical model of the air source heat pump heating energy efficiency ratio and a mathematical model of the gas consumption of the gas boiler.

[0043] In one embodiment of the present invention, the mathematical model of the air source heat pump heating energy efficiency ratio can be:

[0044] COP t =f1(t)

[0045] Where t is the outdoor dry bulb temperature, COP t is the heating energy efficiency ratio of the air source heat pump when the outdoor dry bulb temperature is t℃, and f1 represents the mathematical model of the heating energy efficiency ratio of the air source heat pump and the outdoor dry bulb temperature obtained by fitting the operating data of the equipment manufacturer.

[0046] In one embodiment of the present invention, the mathematical model of gas consumption of a gas boiler may be:

[0047] n L =Q L / (q L ×η b ×η c )

[0048] Among them, n L is the gas consumption of the gas boiler, Q L Provide heat for gas boiler, q L is the calorific value of natural gas, η b is the gas boiler's own efficiency, η c is the heat transfer efficiency of the plate heat exchanger.

[0049] Step S103, draw a heat load duration diagram for the location; establish a mathematical model of the total electricity consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period and a mathematical model of the total heating amount borne by the air source heat pump according to the heat load duration diagram and the mathematical model of the air source heat pump heating energy efficiency ratio; determine the annual cost of the heating system during the heating period under different installed capacities according to the basic information; determine the carbon emissions of the heating system during the heating period under different installed capacities according to the mathematical model of gas consumption of the gas boiler and the mathematical model of the total electricity consumption of the air source heat pump; determine the operating energy consumption of the heating system during the heating period under different installed capacities according to the heat load duration diagram and the mathematical model of the total heating amount borne by the air source heat pump; and establish a multi-objective optimization model for the installed capacity of the heat source equipment of the heating system according to the annual cost, the carbon emissions and the operating energy consumption.

[0050] Step S104, input the weights of the economic index, carbon emission index and energy consumption index preset by the user into the multi-objective optimization model, and use the particle swarm algorithm to solve and obtain the installed capacity of the air source heat pump and gas boiler of the heating system that meets the user's preset weights.

[0051] At present, when planning the installed capacity of heat source equipment for coupled heating of air source heat pumps and gas boilers, the economic, environmental and energy benefits of the coupled system are not comprehensively considered. The heat source equipment ratio scheme obtained by the existing method can only meet the best in one aspect, and it is difficult to balance the economic, environmental and energy benefits, and it is impossible to meet the personalized needs of users. At present, when planning the installed capacity of heat source equipment for coupled heating of air source heat pumps and gas boilers, the economic, environmental and energy benefits of the coupled system are not comprehensively considered. The heat standby ratio scheme obtained by the conventional method can only meet the best in one aspect, and it is difficult to balance the economic, environmental and energy benefits. The method of the present invention completes the task of planning the installed capacity scheme of heat source equipment with the best economy, environmental protection and energy saving under the personalized needs of users by establishing a mathematical model of the heat source equipment, a multi-objective optimization model and proposing user preferences.

[0052] The outdoor temperature in winter has a great influence on the efficiency of air source heat pumps. Existing methods often calculate the COP of air source heat pumps as a fixed value. This simplification may cause a large error from the actual situation. The present invention improves the problem of calculating the COP of air source heat pumps as a fixed value in conventional methods by establishing a mathematical model of air source heat pumps and using a heat load delay diagram to express the influence of outdoor ambient temperature on the efficiency of air source heat pumps. It is more in line with reality and improves the accuracy of the planning scheme.

[0053] Figure 5 is a heat load duration diagram of an embodiment of the present invention, such as Figure 5 As shown in the figure, it can be concluded from the heat load duration diagram that the maximum heat load borne by the air source heat pump and gas boiler coupled heating system is q max , the outdoor calculated temperature for winter heating is t w , the total duration of the heating period is T w , the installed capacity of the air source heat pump is q b , the installed capacity of the gas boiler is (q max -q b ), heat load q b The corresponding heating time is T b , heat load q b The corresponding outdoor dry-bulb temperature is t b .

[0054] From the heat load duration diagram, it can be concluded that the functional relationship between heating heat load and heating duration is:

[0055] q T =f2(T)

[0056] From the heat load duration diagram, it can be concluded that the functional relationship between the outdoor dry bulb temperature and the duration is:

[0057] t=f3(T)

[0058] 120≤T≤T w

[0059] Among them, q T is the heat load under different durations, T is the heating duration, and f2 and f3 are obtained by fitting.

[0060] like Figure 2 As shown, in one embodiment of the present invention, the above-mentioned step S103 establishes a mathematical model of the total power consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period and a mathematical model of the total heating supply borne by the air source heat pump based on the heat load duration time diagram and the air source heat pump heating energy efficiency ratio mathematical model, which specifically includes step S201 and step S202.

[0061] Step S201, determining the heat load, the heating time corresponding to the heat load, the total heating period, and the functional relationship between the heating heat load and the heating time according to the heat load time diagram.

[0062] In the present invention, this step can determine the heat load q according to the heat load duration diagram. b (q b It also represents the installed capacity of the air source heat pump), the heating time T corresponding to the heat load b , total duration of heating period T w And the functional relationship between heating load and heating duration q T =f2(T).

[0063] Step S202, based on the heat load, the heating time corresponding to the heat load, the total heating time, and the functional relationship between the heating heat load and the heating duration, a mathematical model of the total heating capacity borne by the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period is established.

[0064] In one embodiment of the present invention, the mathematical model of the total heating supply undertaken by the air source heat pump under the influence of the outdoor dry bulb temperature during the heating period is specifically:

[0065]

[0066] Among them, Q b It is the total heating capacity provided by the air source heat pump during the heating period.

[0067] like Figure 3 As shown, in one embodiment of the present invention, the above-mentioned step S103 establishes a mathematical model of the total power consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period and a mathematical model of the total heating supply borne by the air source heat pump based on the heat load duration time diagram and the air source heat pump heating energy efficiency ratio mathematical model, and specifically also includes steps S301 to S303.

[0068] Step S301, determining a functional relationship between outdoor dry-bulb temperature and duration according to the heat load duration diagram.

[0069] In the present invention, this step can determine the functional relationship between the outdoor dry-bulb temperature and the duration t=f3(T) according to the heat load duration diagram.

[0070] Step S302, determining an average heating energy efficiency ratio mathematical model of the air source heat pump during the heating period according to the functional relationship between the outdoor dry bulb temperature and the duration and the air source heat pump heating energy efficiency ratio mathematical model.

[0071] In one embodiment of the present invention, the mathematical model of the average heating energy efficiency ratio of the air source heat pump during the heating period can be:

[0072]

[0073] COP T =f1(f3(T))

[0074] in, is the average heating efficiency ratio of the air source heat pump during heating, COP T It is the heating energy efficiency ratio of the air source heat pump when the heat load duration is T.

[0075] Step S303, based on the mathematical model of the total heating amount undertaken by the air source heat pump and the mathematical model of the average heating energy efficiency ratio, a mathematical model of the total electricity consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period is established.

[0076] In one embodiment of the present invention, the mathematical model of the total power consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period can be:

[0077]

[0078] Among them, n e It is the total electricity consumption of the air source heat pump during the heating period.

[0079] In one embodiment of the present invention, the annual cost value of the heating system during the heating period under different installed capacities is determined according to the basic information in step S103. Specifically, the annual cost value of the heating system during the heating period under different installed capacities can be calculated using the following formula:

[0080] M=[D1+D2+(d e n e +w1+d L n L +w2)(P / A,i0,N)](A / P,i0,N)

[0081]

[0082] Among them, M is the annual cost value of the air source heat pump and gas boiler coupled heating system, D1 and D2 are the initial investments of the air source heat pump and gas boiler respectively, m1 and m2 are the installed capacity unit prices of the air source heat pump and gas boiler respectively, w1 and w2 are the average annual maintenance costs of the air source heat pump and gas boiler respectively, (P / A,i0,N) is the annuity present value coefficient, (A / P,i0,N) is the capital recovery coefficient, i0 is the benchmark rate of return, and N is the operating life of the equipment.

[0083] In one embodiment of the present invention, the carbon emissions of the heating system during the heating period under different installed capacities are determined according to the gas consumption mathematical model of the gas boiler and the total power consumption mathematical model of the air source heat pump in step S103. Specifically, the carbon emissions of the heating system during the heating period under different installed capacities can be calculated using the following formula:

[0084] C=C1+C2

[0085] C1=n e g1

[0086] C2=n L g2

[0087] Among them, C is the carbon emission of the air source heat pump and gas boiler coupled heating system during the operation phase, C1 and C2 are the carbon emissions of the air source heat pump and gas boiler during the operation phase, g1 and g2 are the average emission factor of the power grid and the carbon dioxide emission coefficient of natural gas, respectively, n e is the total power consumption of the air source heat pump during the heating period, n L Gas consumption of gas boiler.

[0088] like Figure 4 As shown, in one embodiment of the present invention, the above-mentioned step S103 determines the operating energy consumption of the heating system during the heating period under different installed capacities based on the heat load duration time diagram and the mathematical model of the total heating amount borne by the air source heat pump, specifically including steps S401 to S403.

[0089] Step S401, determining the installed capacity of the gas boiler, the range of the heating duration, the heating duration corresponding to the heat load, and the functional relationship between the heating heat load and the heating duration according to the heat load duration diagram.

[0090] In the present invention, this step can determine the installed capacity (q max -q b ), Heating duration range 120≤T≤T w , Heating time corresponding to heat load T b And the functional relationship between heating load and heating duration q T =f2(T).

[0091] Step S402, determining a mathematical model of the heating amount borne by the gas boiler according to the installed capacity of the gas boiler, the range of the heating duration, the heating duration corresponding to the heat load, and the functional relationship between the heating heat load and the heating duration.

[0092] In one embodiment of the present invention, the mathematical model of the heat supply borne by the gas boiler can be:

[0093]

[0094] Among them, Q L The heating capacity is provided by the gas boiler.

[0095] Step S403, determining the operating energy consumption of the heating system during the heating period under different installed capacities according to the mathematical model of the heating amount borne by the gas boiler and the mathematical model of the total heating amount borne by the air source heat pump.

[0096] In one embodiment of the present invention, the operating energy consumption of the heating system during the operation phase of the heating period under different installed capacities can be calculated by the following formula:

[0097] E=E1+E2

[0098]

[0099] Among them, E is the energy consumption of the air source heat pump and gas boiler coupled heating system in terms of standard coal, E1 and E2 are the energy consumption of the air source heat pump and gas boiler in terms of standard coal, H C is the lower calorific value of standard coal, η1 and η2 are the grid efficiency and power plant efficiency respectively, Q L The heat supply of the gas boiler, Q b It is the total heating capacity provided by the air source heat pump during the heating period.

[0100] In one embodiment of the present invention, the multi-objective optimization model for the installed capacity of the heat source equipment of the air source heat pump and gas boiler coupled heating system established in step S103 can be expressed as:

[0101]

[0102] Among them, G1, G2, and G3 are the economic indicators, carbon emission indicators, and energy consumption indicators of the air source heat pump and gas boiler coupled heating system, respectively.

[0103] In one embodiment of the present invention, in the above step S104, according to user preferences, the weights of the economic index, carbon emission index and energy consumption index are input into the multi-objective optimization model of the installed capacity of the heat source equipment of the air source heat pump and gas boiler coupled heating system, and the particle swarm algorithm is used to solve the optimal installed capacity of the air source heat pump and gas boiler that meets the user's preferences.

[0104] In one embodiment of the present invention, the user's preference for the two objective functions will ultimately determine the selection of the decision variable. In order to obtain the final decision variable according to the user's preference, each objective function is normalized and then weighted:

[0105]

[0106] in, is the calculated value of the weighted sum of the objectives under different schemes, For each objective function, and is the maximum and minimum value of each objective function, λ i is the weight of the corresponding indicator set according to user preference.

[0107] The following is a detailed description of the installed capacity planning method of the air source heat pump and gas boiler coupled heat source equipment of the present invention in conjunction with a specific calculation example:

[0108] In step S101 of this example, it is determined that the area where the air source heat pump and gas boiler coupling heating system is located is in a certain city, with a heating area of ​​315,000 m 2 The average electricity price is 0.6 yuan / kwh, and the natural gas price is 2.3 yuan / Nm 3 The policy requires that the installed capacity of air source heat pumps account for the proportion of the total installed capacity of the coupled heating system.

[0109] θ min ≤θ≤θ max

[0110] Among them, θ is the proportion of air source heat pump installed capacity in the total installed capacity of the coupled heating system, θ min and θ max Take 0.5 and 1 respectively.

[0111] In step S102 of this example, the air source heat pump thermal efficiency ratio COP is obtained by fitting the operating data of the equipment manufacturer. t The mathematical model of (t) and outdoor dry-bulb temperature t is:

[0112] COP t (t) = 2 × 10 -6 t 4 +10 -4 t 3 +2.4×10 -3 t 2 +5.3×10 -2 t+2.9

[0113] In step S102 of this example, the mathematical model of gas consumption of the gas boiler is:

[0114] n L =Q L / (q L ×η b ×η c )

[0115] Among them, nL is the gas consumption of the gas boiler, Q L Supply heat to gas boiler, natural gas calorific value q L Take 9.883kwh / m3, the gas boiler's own efficiency η b Take 92% as the heat transfer efficiency of the plate heat exchanger η c Take 85%.

[0116] In step S103 of this example, a heat load duration diagram of the project location is drawn, such as Figure 5 As shown, the installed capacity of the air source heat pump is q b , the installed capacity of the gas boiler is (q max -q b ), heat load q b The corresponding heating time is T b , heat load q b The corresponding outdoor dry-bulb temperature is t b .

[0117] In step S103 of this example, the maximum heat load borne by the air source heat pump and gas boiler coupled heating system is obtained through the heat load duration diagram to be 11.22MW, the calculated outdoor temperature for winter heating is 5°C, and the total duration of the heating period is 2938h.

[0118] In step S103 of this example, the heating heat load q T The functional relationship between the outdoor temperature t and the heating duration T is:

[0119]

[0120] t=0.0043T-7.345

[0121] In step S103 of this example, under the comprehensive influence of outdoor dry-bulb temperature, the mathematical model of the total power consumption of the air source heat pump during the heating period is:

[0122]

[0123] COP T =COP t (0.0043T-7.345)

[0124] Among them, n e is the total power consumption of the air source heat pump during the heating period, Q b is the total heat supply of the air source heat pump during the heating period. is the average heating efficiency ratio of the air source heat pump during heating, COP T It is the heating energy efficiency ratio of the air source heat pump when the heat load duration is T.

[0125] In step S103 of this example, the heating capacity of the gas boiler is:

[0126]

[0127] The annual cost of the air source heat pump and gas boiler coupling heating system during the heating period is:

[0128] M=[D1+D2+(d e n e +w1+d L n L +w2)(P / A,i0,N)](A / P,i0,N)

[0129]

[0130] Wherein, M is the annual cost value of the air source heat pump and gas boiler coupled heating system, D1 and D2 are the initial investments of the air source heat pump and gas boiler respectively, the installed capacity unit prices m1 and m2 of the air source heat pump and gas boiler are 1,400 yuan / kWh and 350 yuan / kWh respectively, w1 and w2 are the average annual maintenance costs of the air source heat pump and gas boiler, which are taken as 1% of the annual operating cost respectively; (P / A,i0,N) is the annuity present value coefficient, (A / P,i0,N) is the capital recovery coefficient, the benchmark rate of return i0 is 10%, and the equipment operating life N is 10 years.

[0131] In step S103 of this example, the carbon emissions during the operation of the air source heat pump and gas boiler coupled heating system during the heating period are:

[0132] C=C1+C2

[0133] C1=n e g1

[0134] C2=n L g2

[0135] Among them, C is the carbon emission of the air source heat pump and gas boiler coupled heating system in the operation stage, C1 and C2 are the carbon emissions of the air source heat pump and gas boiler in the operation stage, g1 and g2 are the average emission factor of the power grid and the carbon dioxide emission coefficient of natural gas, respectively. g1 and g2 are 0.5703tco2 / MWh and 4.28kg / Nm 3 .

[0136] In step S103 of this example, the operating energy consumption of the air source heat pump and gas boiler coupled heating system during the heating period is:

[0137] E=E1+E2

[0138] E1=n e g1

[0139]

[0140] Among them, E is the energy consumption of the air source heat pump and gas boiler coupled heating system in standard coal equivalent, E1 and E2 are the energy consumption of the air source heat pump and gas boiler in standard coal equivalent, h1 is the standard coal conversion coefficient of electricity, which is 0.414kgce / kwh, H C is the low calorific value of standard coal, and the efficiency of the gas boiler itself is b Take 92% as the heat transfer efficiency of the plate heat exchanger η c Take 85%.

[0141] In step S103 of this example, the multi-objective optimization model for the installed capacity of the heat source equipment of the air source heat pump and gas boiler coupled heating system is:

[0142]

[0143] 11.22×θ min ≤q b ≤11.22×θ max

[0144] Among them, G1, G2, and G3 are the economic indicators, carbon emission indicators, and energy consumption indicators of the air source heat pump and gas boiler coupled heating system, respectively.

[0145] In this example, according to step S104, assuming four groups of different user preferences, the weights of the four different groups of economic indicators, carbon emission indicators and energy consumption indicators are (0.2, 0.4, 0.4), (0.4, 0.3, 0.3), (0.6, 0.2, 0.2), and (0.5, 0.2, 0.3), respectively.

[0146] In this example, according to step S104, the weights of the economic index, the carbon emission index and the energy consumption index are input into the multi-objective optimization model of the installed capacity of the heat source equipment of the air source heat pump and gas boiler coupled heating system:

[0147] Combination 1:

[0148]

[0149] 11.22×θ min ≤q b ≤11.22×θ max

[0150] Combination 2:

[0151]

[0152] 11.22×θ min ≤q b≤11.22×θ max

[0153] Combination 3:

[0154]

[0155] 11.22×θ min ≤q b ≤11.22×θ max

[0156] Combination 4:

[0157]

[0158] 11.22×θ min ≤q b ≤11.22×θ max

[0159] Among them, F1(q b )、F2(q b )、F3(q b )、F4(q b ) is the calculated value of the weighted sum of the objectives under different schemes, M max and M min is the maximum and minimum value of the economic index, C max and C min is the maximum and minimum value of carbon emission index, E max and E min are the maximum and minimum values ​​of the energy consumption index.

[0160] In this example, according to step S104, when using the particle swarm algorithm to solve, the maximum number of iterations is set to 50 and the population size is 20. The installed capacity of the heat source equipment of the air source heat pump and gas boiler coupled heating system that meets the user's preference is solved as follows:

[0161] The installed capacity of the air source heat pump under the combination 1 preference is 9.84MW, and the installed capacity of the gas boiler is 1.38MW.

[0162] The installed capacity of the air source heat pump under combination 2 preference is 8.84MW, and the installed capacity of the gas boiler is 2.38MW.

[0163] The installed capacity of the air source heat pump under combination 3 preference is 8.13MW, and the installed capacity of the gas boiler is 3.09MW.

[0164] The installed capacity of the air source heat pump under combination 4 preference is 8.46MW, and the installed capacity of the gas boiler is 2.76MW.

[0165] In order to demonstrate the effect gain of the present invention, the annual cost value when all gas boilers are used in this example, the CO2 emissions during the heating period and the operating energy consumption during the heating period converted into standard coal are used as reference objects. Figure 6 The figure is a comparison of the annual cost value of the example under the present invention and the reference object, Figure 7 The following is a comparison chart of CO2 emissions during heating under the present invention and the reference object. Figure 8 The figure is a comparison of the operating energy consumption in standard coal equivalent during the heating period of the example under the present invention and the reference object. It is calculated that when the installed capacity of the air source heat pump in this example is 0MW and the installed capacity of the gas boiler is 11.22MW, the annual cost of the system is 9.396 million yuan, the CO2 emissions during the heating period are 18517.6t, and the operating energy consumption in standard coal equivalent during the heating period is 4419tce.

[0166] Compared with the complete use of gas boilers for heating, the economy of this example has been significantly improved under different installed capacities of air source heat pumps and gas boilers. The annual cost of the heating system under combination 1, combination 2, combination 3, and combination 4 increased by 10.4%, 11.4%, 11.8%, and 11.7%, respectively. The improvement effect changes with the weight of the economic target, that is, the greater the proportion of economic preference, the greater the improvement in system economy.

[0167] Compared with the complete use of gas boilers for heating, the environmental protection performance of this example has been greatly optimized under different installed capacities of air source heat pumps and gas boilers. The CO2 emissions during the heating period of the heating system under combination 1, combination 2, combination 3, and combination 4 increased by 68.5%, 66.3%, 64.1% and 65.2% respectively, and the improvement effect follows the change of the weight of the environmental protection target, that is, the greater the proportion of environmental protection preference, the more obvious the improvement effect of the system's environmental protection.

[0168] Compared with the complete use of gas boilers for heating, the energy saving performance of this example is significantly improved under different installed capacities of air source heat pumps and gas boilers. The operating energy consumption of the heating system during the heating period under combination 1, combination 2, combination 3, and combination 4 is improved by 10.0%, 9.6%, 9.3%, and 9.5% in terms of standard coal, respectively. The improvement effect follows the change of the weight of the energy-saving target, that is, the greater the proportion of energy-saving preference, the more obvious the improvement effect of system energy saving.

[0169] To sum up, the method for planning the installed capacity of heat source equipment in a heating system coupled with an air source heat pump and a gas boiler proposed in the present invention can comprehensively improve the economy, environmental protection and energy saving of the heating system. The present invention can comprehensively consider the ambient temperature in actual projects, and reasonably balance the system energy consumption, environmental protection benefits and economy while meeting user preferences, thereby solving the key problem of installed capacity planning of heat source equipment in a heating system coupled with an air source heat pump and a gas boiler to a great extent.

[0170] It can be seen from the above embodiments that the installed capacity planning method of the air source heat pump and gas boiler coupled heat source equipment of the present invention has at least the following advantages:

[0171] 1. When planning the installed capacity of heat source equipment for coupled heating of air source heat pumps and gas boilers, the economy, environmental protection and energy efficiency of the coupled system are not comprehensively considered. The heat standby ratio scheme obtained by conventional methods can only meet the best of one aspect, and it is difficult to take into account the economy, environmental protection and energy efficiency. This method completes the planning task of the installed capacity scheme of heat source equipment with the best economy, environmental protection and energy efficiency under the personalized needs of users by establishing a mathematical model of heat source equipment, a multi-objective optimization model and proposing user preferences.

[0172] 2. Using genetic algorithm as a solution to the target optimization problem of installed capacity of heat source equipment improves the speed and accuracy of solution, making it easier to find the optimal ratio of installed capacity of heat source equipment.

[0173] 3. By establishing a mathematical model of the air source heat pump and using a heat load delay diagram to express the impact of outdoor ambient temperature on the efficiency of the air source heat pump, the problem of calculating the COP of the air source heat pump as a constant in the conventional method is improved, which is more in line with reality and improves the accuracy of the planning scheme.

[0174] Some terms that appear in the present invention are explained below:

[0175] Air source heat pump: An energy-saving device that uses high-level energy to make heat flow from a low-level heat source to a high-level heat source. It is a form of heat pump and its working efficiency is greatly affected by the outdoor temperature.

[0176] Gas boiler: A boiler that uses gas as fuel, which has high thermal efficiency, high working efficiency and is less affected by weather, but the fuel price is higher.

[0177] Planning of installed capacity of heat source equipment: Different types of heat sources require different installed capacities according to their own characteristics, and reasonable installed capacity planning can fully tap the flexibility resource potential of the system, meet the energy supply and demand balance on different time scales, and realize the economy, environmental protection and energy saving of the heating system.

[0178] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0179] Based on the same inventive concept, an embodiment of the present invention also provides a device for planning the installed capacity of a heat source device, which can be used to implement the method for planning the installed capacity of a heat source device described in the above embodiment, as described in the following embodiment. Since the principle of solving the problem by the device for planning the installed capacity of a heat source device is similar to that of the method for planning the installed capacity of a heat source device, the embodiment of the device for planning the installed capacity of a heat source device can refer to the embodiment of the method for planning the installed capacity of a heat source device, and the repeated parts will not be repeated. As used below, the term "unit" or "module" can be a combination of software and / or hardware that implements a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.

[0180] Fig. 9 : is a structural block diagram of a device for planning installed capacity of heat source equipment according to an embodiment of the present invention. Fig. 9 As shown, in one embodiment of the present invention, the heat source equipment installed capacity planning device of the present invention includes:

[0181] The basic information acquisition unit 1 is used to acquire the basic information required for the installed capacity planning of the heat source equipment, wherein the basic information includes: the location of the air source heat pump and gas boiler coupled heating system, the electricity price of the location, the natural gas price of the location, and the requirements of the location for the proportion of the installed capacity of the air source heat pump in the total installed capacity of the coupled heating system;

[0182] Mathematical model building unit 2, used to build a mathematical model of air source heat pump heating energy efficiency ratio and a mathematical model of gas consumption of gas boiler;

[0183] The multi-objective optimization model establishment unit 3 is used to draw a heat load duration diagram of the location; according to the heat load duration diagram and the mathematical model of the air source heat pump heating energy efficiency ratio, a mathematical model of the total power consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period and a mathematical model of the total heat supply undertaken by the air source heat pump are established; according to the basic information, the annual cost value of the heating system during the heating period under different installed capacities is determined; according to the mathematical model of gas consumption of the gas boiler and the mathematical model of the total power consumption of the air source heat pump, the carbon emissions during the operation stage of the heating system during the heating period under different installed capacities are determined; according to the heat load duration diagram and the mathematical model of the total heat supply undertaken by the air source heat pump, the operating energy consumption of the heating system during the heating period under different installed capacities is determined; and according to the annual cost value, the carbon emissions and the operating energy consumption, a multi-objective optimization model of the installed capacity of the heat source equipment of the heating system is established;

[0184] The installed capacity determination unit 4 is used to input the weights of the economic index, carbon emission index and energy consumption index preset by the user into the multi-objective optimization model, and use the particle swarm algorithm to solve and obtain the installed capacity of the air source heat pump and gas boiler of the heating system that meets the user's preset weights.

[0185] In one embodiment of the present invention, the multi-objective optimization model building unit 3 specifically includes:

[0186] A first determination module is used to determine the heat load, the heating time corresponding to the heat load, the total heating period, and the functional relationship between the heating heat load and the heating time according to the heat load time diagram;

[0187] The module for establishing the mathematical model of the total heating supply borne by the air source heat pump is used to establish the mathematical model of the total heating supply borne by the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period based on the heat load, the heating time corresponding to the heat load, the total heating period duration, and the functional relationship between the heating heat load and the heating duration.

[0188] In one embodiment of the present invention, the multi-objective optimization model building unit 3 specifically further includes:

[0189] A second determination module is used to determine the functional relationship between the outdoor dry-bulb temperature and the duration according to the heat load duration diagram;

[0190] The module for establishing the mathematical model of the average heating energy efficiency ratio of the air source heat pump is used to determine the mathematical model of the average heating energy efficiency ratio of the air source heat pump during the heating period according to the functional relationship between the outdoor dry-bulb temperature and the duration and the mathematical model of the heating energy efficiency ratio of the air source heat pump;

[0191] The module for establishing the mathematical model of the total electricity consumption of the air source heat pump is used to establish the mathematical model of the total electricity consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period according to the mathematical model of the total heating amount undertaken by the air source heat pump and the mathematical model of the average heating energy efficiency ratio.

[0192] In one embodiment of the present invention, the multi-objective optimization model building unit 3 specifically further includes:

[0193] A third determination module is used to determine the installed capacity of the gas boiler, the range of the heating duration, the heating duration corresponding to the heat load, and the functional relationship between the heating heat load and the heating duration according to the heat load duration diagram;

[0194] A module for establishing a mathematical model of the heat supply undertaken by a gas boiler is used to determine the mathematical model of the heat supply undertaken by the gas boiler according to the installed capacity of the gas boiler, the range of the heating duration, the heating duration corresponding to the heat load, and the functional relationship between the heating heat load and the heating duration;

[0195] The operating energy consumption determination module is used to determine the operating energy consumption of the heating system during the heating period under different installed capacities according to the mathematical model of the heating amount borne by the gas boiler and the mathematical model of the total heating amount borne by the air source heat pump.

[0196] In order to achieve the above object, according to another aspect of the present application, a computer device is also provided. Fig.10 As shown, the computer device includes a memory, a processor, a communication interface and a communication bus. A computer program that can be executed on the processor is stored in the memory. When the processor executes the computer program, the steps in the above-mentioned embodiment method are implemented.

[0197] The processor may be a central processing unit (CPU). The processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.

[0198] The memory, as a non-transitory computer-readable storage medium, can be used to store non-transitory software programs, non-transitory computer executable programs and units, such as the corresponding program units in the above method embodiments of the present invention. The processor executes various functional applications of the processor and works data processing by running the non-transitory software programs, instructions and modules stored in the memory, that is, implementing the method in the above method embodiments.

[0199] The memory may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created by the processor, etc. In addition, the memory may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory may optionally include a memory remotely arranged relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0200] The one or more units are stored in the memory, and when executed by the processor, the method in the above embodiment is performed.

[0201] The specific details of the above-mentioned computer device can be understood by referring to the corresponding related descriptions and effects in the above-mentioned embodiments, and will not be repeated here.

[0202] In order to achieve the above-mentioned purpose, according to another aspect of the present application, a computer-readable storage medium is also provided, wherein the computer-readable storage medium stores a computer program, and the computer program implements the steps in the above-mentioned method for planning the installed capacity of the heat source equipment when executed in a computer processor. Those skilled in the art can understand that the implementation of all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and the program can include the processes of the embodiments of the above-mentioned methods when executed. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only memory (ROM), a random access memory (RAM), a flash memory (Flash Memory), a hard disk (Hard Disk Drive, abbreviated as: HDD) or a solid-state drive (SSD), etc.; the storage medium can also include a combination of the above-mentioned types of memory.

[0203] In order to achieve the above-mentioned purpose, according to another aspect of the present application, a computer program product is also provided, including a computer program / instruction, which implements the steps of the above-mentioned method for planning installed capacity of heat source equipment when executed by a processor.

[0204] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, and optionally, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.

[0205] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for planning installed capacity of heat source equipment, characterized in that: include: Obtain the basic information required for planning the installed capacity of the heat source equipment, wherein the basic information includes: the location of the air source heat pump and gas boiler coupled heating system, the electricity price of the location, the natural gas price of the location, and the requirements for the proportion of the installed capacity of the air source heat pump in the total installed capacity of the coupled heating system at the location; Construct a mathematical model of the energy efficiency ratio of air source heat pumps and a mathematical model of gas consumption of gas boilers; Draw a heat load duration diagram for the location; establish a mathematical model of the total electricity consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period and a mathematical model of the total heat supply borne by the air source heat pump based on the heat load duration diagram and the mathematical model of the air source heat pump heating energy efficiency ratio; determine the annual cost value of the heating system during the heating period under different installed capacities based on the basic information; determine the carbon emissions during the operation stage of the heating system during the heating period under different installed capacities based on the mathematical model of gas consumption of the gas boiler and the mathematical model of the total electricity consumption of the air source heat pump; determine the operating energy consumption during the operation stage of the heating system during the heating period under different installed capacities based on the heat load duration diagram and the mathematical model of the total heat supply borne by the air source heat pump; and establish a multi-objective optimization model for the installed capacity of the heat source equipment of the heating system based on the annual cost value, the carbon emissions and the operating energy consumption; The weights of the economic indicators, carbon emission indicators and energy consumption indicators preset by the user are input into the multi-objective optimization model, and the particle swarm algorithm is used to solve the installed capacity of the air source heat pump and gas boiler of the heating system that meets the user's preset weights.

2. The method for planning installed capacity of heat source equipment according to claim 1, characterized in that: According to the heat load duration diagram and the air source heat pump heating energy efficiency ratio mathematical model, a mathematical model of the total power consumption of the air source heat pump under the influence of the outdoor dry bulb temperature during the heating period and a mathematical model of the total heating amount undertaken by the air source heat pump are established, specifically including: Determine the heat load, the heating duration corresponding to the heat load, the total duration of the heating period, and the functional relationship between the heating heat load and the heating duration according to the heat load duration diagram; According to the heat load, the heating time corresponding to the heat load, the total duration of the heating period, and the functional relationship between the heating heat load and the heating duration, a mathematical model of the total heating supply borne by the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period is established.

3. The method for planning installed capacity of heat source equipment according to claim 2, characterized in that: According to the heat load duration diagram and the air source heat pump heating energy efficiency ratio mathematical model, a mathematical model of the total power consumption of the air source heat pump under the influence of the outdoor dry bulb temperature during the heating period and a mathematical model of the total heating amount undertaken by the air source heat pump are established, which specifically includes: Determining the functional relationship between the outdoor dry-bulb temperature and the duration according to the heat load duration diagram; Determine the average heating energy efficiency ratio mathematical model of the air source heat pump during the heating period according to the functional relationship between the outdoor dry bulb temperature and the duration and the air source heat pump heating energy efficiency ratio mathematical model; According to the mathematical model of the total heating amount undertaken by the air source heat pump and the mathematical model of the average heating energy efficiency ratio, a mathematical model of the total electricity consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period is established.

4. The method for planning installed capacity of heat source equipment according to claim 1, characterized in that: According to the heat load duration diagram and the mathematical model of the total heat supply undertaken by the air source heat pump, the operating energy consumption of the heating system during the heating period under different installed capacities is determined, specifically including: Determine the installed capacity of the gas boiler, the range of the heating duration, the heating duration corresponding to the heat load, and the functional relationship between the heating heat load and the heating duration according to the heat load duration diagram; According to the installed capacity of the gas boiler, the range of heating duration, the heating duration corresponding to the heat load, and the functional relationship between the heating heat load and the heating duration, the mathematical model of the heat supply borne by the gas boiler is determined; According to the mathematical model of the heating capacity undertaken by the gas boiler and the mathematical model of the total heating capacity undertaken by the air source heat pump, the operating energy consumption of the heating system during the operation phase of the heating period under different installed capacities is determined.

5. A heat source equipment installed capacity planning device, characterized in that: include: A basic information acquisition unit is used to acquire basic information required for planning the installed capacity of heat source equipment, wherein the basic information includes: the location of the air source heat pump and gas boiler coupled heating system, the electricity price of the location, the natural gas price of the location, and the requirements of the location for the proportion of the installed capacity of the air source heat pump in the total installed capacity of the coupled heating system; A mathematical model building unit, used to build a mathematical model of air source heat pump heating energy efficiency ratio and a mathematical model of gas consumption of gas boiler; A multi-objective optimization model establishment unit is used to draw a heat load duration diagram of the location; according to the heat load duration diagram and the mathematical model of the air source heat pump heating energy efficiency ratio, a mathematical model of the total power consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period and a mathematical model of the total heat supply undertaken by the air source heat pump are established; according to the basic information, the annual cost value of the heating system during the heating period under different installed capacities is determined; according to the mathematical model of gas consumption of the gas boiler and the mathematical model of the total power consumption of the air source heat pump, the carbon emissions during the operation stage of the heating system during the heating period under different installed capacities are determined; according to the heat load duration diagram and the mathematical model of the total heat supply undertaken by the air source heat pump, the operating energy consumption of the heating system during the heating period under different installed capacities is determined; and according to the annual cost value, the carbon emissions and the operating energy consumption, a multi-objective optimization model of the installed capacity of the heat source equipment of the heating system is established; The installed capacity determination unit is used to input the weights of the economic index, carbon emission index and energy consumption index preset by the user into the multi-objective optimization model, and use the particle swarm algorithm to solve and obtain the installed capacity of the air source heat pump and gas boiler of the heating system that meets the user's preset weights.

6. The heat source equipment installed capacity planning device according to claim 5, characterized in that: The multi-objective optimization model establishment unit specifically includes: A first determination module is used to determine the heat load, the heating time corresponding to the heat load, the total heating period, and the functional relationship between the heating heat load and the heating time according to the heat load time diagram; The module for establishing the mathematical model of the total heating supply borne by the air source heat pump is used to establish the mathematical model of the total heating supply borne by the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period based on the heat load, the heating time corresponding to the heat load, the total heating period duration, and the functional relationship between the heating heat load and the heating duration.

7. The heat source equipment installed capacity planning device according to claim 6, characterized in that: The multi-objective optimization model establishment unit specifically includes: A second determination module is used to determine the functional relationship between the outdoor dry-bulb temperature and the duration according to the heat load duration diagram; The module for establishing the mathematical model of the average heating energy efficiency ratio of the air source heat pump is used to determine the mathematical model of the average heating energy efficiency ratio of the air source heat pump during the heating period according to the functional relationship between the outdoor dry-bulb temperature and the duration and the mathematical model of the heating energy efficiency ratio of the air source heat pump; The module for establishing the mathematical model of the total electricity consumption of the air source heat pump is used to establish the mathematical model of the total electricity consumption of the air source heat pump under the influence of the outdoor dry-bulb temperature during the heating period according to the mathematical model of the total heating amount undertaken by the air source heat pump and the mathematical model of the average heating energy efficiency ratio.

8. The heat source equipment installed capacity planning device according to claim 5, characterized in that: The multi-objective optimization model establishment unit specifically includes: A third determination module is used to determine the installed capacity of the gas boiler, the range of the heating duration, the heating duration corresponding to the heat load, and the functional relationship between the heating heat load and the heating duration according to the heat load duration diagram; A module for establishing a mathematical model of the heat supply undertaken by a gas boiler is used to determine the mathematical model of the heat supply undertaken by the gas boiler according to the installed capacity of the gas boiler, the range of the heating duration, the heating duration corresponding to the heat load, and the functional relationship between the heating heat load and the heating duration; The operating energy consumption determination module is used to determine the operating energy consumption of the heating system during the heating period under different installed capacities according to the mathematical model of the heating amount borne by the gas boiler and the mathematical model of the total heating amount borne by the air source heat pump.

9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 4 are implemented.

10. A computer-readable storage medium having a computer program / instruction stored thereon, characterized in that: When the computer program / instructions are executed by a processor, the steps of the method according to any one of claims 1 to 4 are implemented.

Citation Information

Cited By

  • Ground source heat pump and gas boiler operation simulation system in severe cold areas

    CN120542278B

  • Double-heat-source heating system and construction method thereof

    CN121089118A