Risk level assessment method for reservoirs downstream of barrier lakes
By establishing a risk level evaluation method for reservoir downstream of the damstor lake, using time, frequency, flow and reservoir capacity factors to evaluate the threat of damstor lake collapse to downstream reservoirs, solving the problem of difficulty in quantitatively evaluating the risk of damstor lake collapse in the existing technology, providing Reasonable dispatch measures were implemented to ensure the safety of the reservoir.
Patent Information
- Application Number
- CN202411252902.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-09-09
AI Technical Summary
The existing technology is difficult to quantitatively evaluate the threat of floods in the landslide lake to downstream reservoirs, and it is impossible to effectively determine their risk levels, making it difficult to take reasonable dispatch measures to reduce the safety threats of floods in the reservoirs and buildings.
By establishing a risk level evaluation method for reservoir downstream of the landslide lake, including time factor, frequency factor, flow factor and storage capacity factor, the corresponding risk level function is constructed, the reservoir risk level is quantitatively evaluated, and reasonable scheduling measures are determined based on the evaluation results.
A quantitative assessment of the risk of the downstream reservoir in the landslide lake was achieved, a low-risk, medium-risk and high-risk level was provided, and reasonable scheduling measures were guided to ensure safe and risk aversion of downstream reservoirs.
Smart Images

Figure QLYQS_1 
Figure QLYQS_2 
Figure QLYQS_3
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of risk disposal of barrier lakes, and particularly relates to a method for evaluating the risk level of a reservoir downstream of a barrier lake. Background Art
[0002] According to incomplete statistics, the upper reaches of the Yangtze River and the rivers in the southwest of China are areas where barrier lakes frequently occur, accounting for about 85% of the total number of barrier lakes in the country. At the same time, these areas are regions with highly developed hydropower in China, with a large number of reservoirs distributed. Once a barrier lake forms upstream of a reservoir, the flood from the breach will pose a threat to the safety of the downstream reservoir and buildings. Especially for high-risk barrier lakes, once they breach, the peak flow of the flood from the breach often exceeds the design peak flow of the downstream reservoir, and even exceeds the check flood peak flow. How to quantitatively evaluate the threat of the flood from the breach of a barrier lake to the downstream reservoir and determine its risk level is the key to reducing the threat of the flood from the breach to the safety of the downstream reservoir and buildings. Based on this, this patent proposes a method for evaluating the risk level of a reservoir downstream of a barrier lake, and engineers can adopt the most reasonable scheduling measures according to the different risk levels of the reservoir, providing a method guidance for the safety of the downstream reservoir to avoid risks. Summary of the Invention
[0003] To overcome the defects existing in the prior art, the present invention proposes a method for evaluating the risk level of a reservoir downstream of a barrier lake. By quantifying the risk level of the reservoir downstream of the barrier lake, engineers can adopt the most reasonable scheduling measures according to the different risk levels of the reservoir, providing a method guidance for the safety of the downstream reservoir to avoid risks.
[0004] To solve the above technical problems, the present invention is realized through the following technical solutions:
[0005] A method for evaluating the risk level of a reservoir downstream of a barrier lake includes the following steps:
[0006] S1. Establish a set D of evaluation factors for the risk level of a reservoir downstream of a barrier lake, including a time factor t, a frequency factor p, a flow factor q, and a storage capacity factor v;
[0007] S2. Establish a functional relationship f1 between the time factor t and the risk level of the downstream reservoir. When t ≤ 5h, the return value of the function f1 is high risk; when 5h < t ≤ 50h, the return value of the function f1 is medium risk; when t > 50h, the return value of the function f1 is low risk;
[0008] S3. Establish a functional relationship f2 between the frequency factor p and the risk level of the downstream reservoir. When p ≤ 0.1%, the return value of the function f2 is high risk; when 0.1% < p ≤ 1%, the return value of the function f2 is medium risk; when p > 1%, the return value of the function f2 is low risk;
[0009] S4. Establish a functional relationship f3 between the flow factor q and the risk level of the downstream reservoir. When q≥the maximum discharge capacity Q of the downstream reservoir, the function f3 returns a high risk value; when 0.75Q≤q<the maximum discharge capacity Q of the downstream reservoir, the function f3 returns a medium risk value; when q<0.75Q, the maximum discharge capacity of the downstream reservoir, the function f3 returns a low risk value;
[0010] S5. Establish a functional relationship f4 between the reservoir capacity factor v and the risk level of the downstream reservoir. When the total reservoir capacity of the barrier lake is ≥ the maximum vacable reservoir capacity of the downstream reservoir, the return value of function f4 is high risk; when 0.5 times the maximum vacable reservoir capacity of the downstream reservoir is ≤ the total reservoir capacity of the barrier lake < the maximum vacable reservoir capacity of the downstream reservoir, the return value of function f4 is medium risk; when the total reservoir capacity of the barrier lake is < 0.5 times the maximum vacable reservoir capacity of the downstream reservoir, the return value of function f4 is low risk;
[0011] S6. Based on the return values of f1, f2, f3, and f4 obtained in S2-S5, establish a risk level evaluation function F for the reservoir downstream of the barrier lake. When at least one of the return values of f1, f2, f3, and f4 is high risk, the risk level of the downstream reservoir is high risk; when at least one of the return values of f1, f2, f3, and f4 is medium risk and none of them is high risk, the risk level of the downstream reservoir is medium risk; when the return values of f1, f2, f3, and f4 are neither high risk nor medium risk, the risk level of the downstream reservoir is low risk.
[0012] Preferably, in step S1, the risk level evaluation factor set D of the reservoir downstream of the barrier lake is as shown in formula (1):
[0013] (1);
[0014] In formula (1), D is the risk level evaluation factor set of the reservoir downstream of the barrier lake; d1 is the time factor t, that is, the time when the flood peak reaches the downstream reservoir after the barrier lake bursts; d2 is the frequency factor p, that is, the frequency of the burst flood; d3 is the flow factor q, that is, the relationship between the peak flow of the burst flood and the maximum discharge of the downstream reservoir; d4 is the storage capacity factor v, that is, the relationship between the storage capacity of the barrier lake and the available storage capacity of the downstream reservoir.
[0015] Preferably, in step S2, the functional relationship f1 between the time factor t and the risk level of the downstream reservoir refers to the mapping relationship between the time when the flood peak reaches the downstream reservoir after the barrier lake bursts and the risk level of the downstream reservoir, as shown in formula (2):
[0016] (2);
[0017] In formula (2), t is the time when the flood peak reaches the downstream reservoir after the barrier lake breaks, and the unit is h.
[0018] Preferably, in step S3, the functional relationship f2 between the frequency factor p and the risk level of the downstream reservoir refers to the mapping relationship between the flood frequency corresponding to the peak flood of the dammed lake reaching the location of the downstream reservoir and the risk level of the downstream reservoir, as shown in Equation (3):
[0019] (3);
[0020] In Equation (3), p is the frequency of the dam-break flood; p ≤ 0.1% is the frequency that the peak flood of the dammed lake reaching the location of the downstream reservoir exceeds the once-in-a-thousand-year flood peak; 0.1% < p ≤ 1% is the frequency that the peak flood of the dammed lake reaching the location of the downstream reservoir exceeds the once-in-a-hundred-year flood peak and does not exceed the once-in-a-thousand-year flood peak; p > 1% is the frequency that the peak flood of the dammed lake reaching the location of the downstream reservoir does not exceed the once-in-a-hundred-year flood peak.
[0021] Preferably, in step S4, the functional relationship f3 between the flow factor q and the risk level of the downstream reservoir refers to the mapping relationship between the peak flow of the dam-break flood of the dammed lake and the risk level of the downstream reservoir, as shown in Equation (4):
[0022] (4);
[0023] In Equation (4), q is the peak flow of the dam-break flood of the dammed lake, with the unit of m 3 / s; Q is the maximum discharge capacity of the downstream reservoir, with the unit of m 3 / s.
[0024] Preferably, in step S5, the functional relationship f4 between the storage factor v and the risk level of the downstream reservoir refers to the mapping relationship between the storage capacity of the dammed lake and the risk level of the downstream reservoir, as shown in Equation (5):
[0025] (5);
[0026] In Equation (5), V 堰塞湖 is the total storage capacity of the dammed lake, with the unit of m 3 ; V 水库总 is the total storage capacity of the downstream reservoir, with the unit of m 3 ; V 水库死 is the dead storage capacity of the downstream reservoir, with the unit of m 3 ; V 水库总 -V 水库死 is the maximum available storage capacity of the downstream reservoir, with the unit of m 3 .
[0027] Preferably, in step S6, the risk level evaluation function F of the downstream reservoir of the dammed lake is as shown in Equation (6):
[0028] (6).
[0029] Preferably, after step S6, a reasonable scheduling principle can be determined according to the risk level of the reservoir, specifically: when the risk level of the downstream reservoir is evaluated as high risk, the reservoir water level should be quickly lowered to the dead water level according to the possible maximum discharge capacity under the premise of ensuring the safety of the dam, to ensure that the reservoir has the maximum capacity to absorb the outburst flood peak of the barrier lake; when the risk level of the downstream reservoir is evaluated as medium risk, a certain storage capacity can be reserved for absorbing the outburst flood peak of the barrier lake based on the ratio of the total storage capacity of the barrier lake to the maximum vacant storage capacity of the downstream reservoir; when the risk level of the downstream reservoir is evaluated as low risk, it can be operated according to normal conditions.
[0030] The risk level assessment method for the reservoir downstream of the barrier lake of the present invention has the following advantages and beneficial effects:
[0031] (1) A quantitative assessment of the risk level of reservoirs downstream of the barrier lake is achieved, and the downstream reservoirs are quantified into three levels: low risk, medium risk, and high risk. The risk assessment of downstream reservoirs has shifted from qualitative to quantitative.
[0032] (2) Reasonable dispatching measures for downstream reservoirs can be determined according to different risk levels of reservoirs, providing guidance for the safety and risk avoidance of downstream reservoirs. For example, when the risk level of downstream reservoirs is assessed as high risk, the water level of the reservoir should be quickly lowered to the dead water level according to the maximum possible discharge capacity under the premise of ensuring the safety of the dam, so as to ensure that the reservoir can absorb the flood peak of the barrier lake to the maximum extent possible. When the risk level of downstream reservoirs is assessed as medium risk, the V 堰塞湖 The maximum available storage capacity of the downstream reservoir (V 水库总 -V 水库死 ), a certain storage capacity is reserved to absorb the flood peak of the barrier lake outburst; when the risk level of the downstream reservoir is assessed as low risk, it can operate under normal circumstances.
[0033] (3) The method of the present invention has good applicability and is suitable for the risk level assessment of all downstream reservoirs of barrier lakes. DETAILED DESCRIPTION
[0034] The specific implementation modes of the present invention are described below to facilitate those skilled in the art to understand the present invention. Obviously, the present invention is not limited to the scope of the specific implementation modes.
[0035] The present invention provides a method for evaluating the risk level of a reservoir downstream of a barrier lake, which mainly includes:
[0036] 1) Establish a risk level evaluation factor set D for reservoirs downstream of the barrier lake
[0037] The risk level evaluation factor set D of the reservoir downstream of the barrier lake includes four factors, namely, time factor t, frequency factor p, flow factor q and reservoir capacity factor v. As shown in formula (1):
[0038] (1)
[0039] In formula (1): D is the set of evaluation factors for the risk level of the reservoir downstream of the barrier lake. d1: is the time factor t, that is, the time when the flood peak reaches the downstream reservoir after the barrier lake breaks; d2: is the frequency factor p, that is, the frequency of the break flood; d3: is the flow factor, that is, the relationship between the peak flow of the break flood and the maximum discharge of the downstream reservoir; d4: is the storage capacity factor, that is, the relationship between the storage capacity of the barrier lake and the available storage capacity of the downstream reservoir;
[0040] 2) Establish the functional relationship f1 between the time factor and the risk level of the downstream reservoir
[0041] The functional relationship f1 between the time factor t and the risk level of the downstream reservoir refers to the mapping relationship between the time t when the flood peak reaches the downstream reservoir after the barrier lake breaks and the risk level of the downstream reservoir, as specifically shown in formula (2):
[0042] (2)
[0043] In formula (2): t can be calculated by the real-time rolling high-precision forecasting method for extremely abnormal floods at the thousand-kilometer level, with the unit of h. That is: when the calculated time t when the flood peak reaches the downstream reservoir after the barrier lake breaks is t ≤ 5h, the return value of function f1 is high risk; when the calculated time 5h < t ≤ 50h when the flood peak reaches the downstream reservoir after the barrier lake breaks, the return value of function f1 is medium risk; when the calculated time t when the flood peak reaches the downstream reservoir after the barrier lake breaks is t > 50h, the return value of function f1 is low risk.
[0044] 3) Establish the functional relationship f2 between the frequency factor and the risk level of the downstream reservoir
[0045] The functional relationship f2 between the frequency factor p and the risk level of the downstream reservoir refers to the mapping relationship between the flood frequency corresponding to the location where the flood peak of the barrier lake break reaches the downstream reservoir and the risk level of the downstream reservoir, as specifically shown in formula (3):
[0046] (3)
[0047] In formula (1): p can calculate the break flood peak through the Saint-Venant formula, the formula of the former Liaoning Provincial Hydrological General Station, and the formula of Xie Renzhi. That is: when the calculated flood peak of the barrier lake break reaching the location of the downstream reservoir exceeds once in a thousand years (p ≤ 0.1%), the return value of function f2 is high risk; that is: when the calculated flood peak of the barrier lake break reaching the location of the downstream reservoir exceeds once in a hundred years and does not exceed once in a thousand years (0.1% < p ≤ 1%), the return value of function f2 is medium risk; that is: when the calculated flood peak of the barrier lake break reaching the location of the downstream reservoir does not exceed once in a hundred years (p < 1%), the return value of function f2 is low risk.
[0048] 4) Establish the functional relationship f3 between the flow factor and the risk level of the downstream reservoir
[0049] The functional relationship f3 between the flow factor q and the risk level of the downstream reservoir refers to the mapping relationship between the peak flow of the barrier lake outburst flood and the risk level of the downstream reservoir, as shown in formula (4):
[0050] (4)
[0051] In formula (4), q is the peak flow of the barrier lake outburst flood, unit: m 3 / s, which can be obtained by calculating the peak outburst flow; Q is the maximum discharge capacity of the downstream reservoir, in m 3 / s, which can be calculated based on the discharge capacity curve of the downstream reservoir. When the peak flow rate of the barrier lake outburst flood q≥ the maximum discharge capacity of the downstream reservoir Q, the function f3 returns a high risk value; when the peak flow rate of the barrier lake outburst flood q<the maximum discharge capacity of the downstream reservoir Q and q≥0.75Q, the function f3 returns a medium risk value; when the peak flow rate of the barrier lake outburst flood q<the maximum discharge capacity of the downstream reservoir 0.75Q, the function f3 returns a low risk value.
[0052] 5) Establish the functional relationship between the reservoir capacity factor and the risk level of the downstream reservoir f4
[0053] The functional relationship f4 between the reservoir capacity factor v and the risk level of the downstream reservoir refers to the mapping relationship between the reservoir capacity of the barrier lake and the risk level of the downstream reservoir, as shown in formula (5):
[0054] (5)
[0055] In formula (5): V 堰塞湖 is the total storage capacity of the barrier lake, unit: m 3 , can be calculated through the terrain and the water level elevation of the barrier lake; V 水库总 is the total storage capacity of the downstream reservoir, in m 3 , V 水库死 is the dead storage capacity of the downstream reservoir, unit: m 3 , both of which can be obtained through the downstream reservoir design data query. 堰塞湖 ≥ Maximum available storage capacity of downstream reservoir (V 水库总 -V 水库死 ), function f4 returns a high risk value; when the total reservoir capacity of the barrier lake V 堰塞湖 <Maximum available storage capacity of downstream reservoir(V 水库总 -V 水库死 ) and V 堰塞湖 ≥0.5(V 水库总 -V 水库死 ), function f4 returns a value of medium risk; when the total reservoir capacity of the barrier lake V 堰塞湖 <0.5(V 水库总 -V 水库死 ), function f4 returns a value of low risk.
[0056] 6) Establish the risk level evaluation function F for the reservoir downstream of the barrier lake
[0057] (Formula 6)
[0058] Function F can be used to quantitatively evaluate the risk level of the reservoir downstream of the barrier lake. When at least one of the return values of f1, f2, f3, and f4 is high risk, the risk level of the downstream reservoir is high risk. When at least one of the return values of f1, f2, f3, and f4 is medium risk and none of them is high risk, the risk level of the downstream reservoir is medium risk. When the return values of f1, f2, f3, and f4 are neither high risk nor medium risk, the risk level of the downstream reservoir is low risk.
[0059] 7) Determine reasonable dispatching principles based on reservoir risk levels
[0060] When the risk level of the downstream reservoir is assessed as high risk, the reservoir water level should be quickly lowered to the dead water level according to the maximum possible discharge capacity under the premise of ensuring the safety of the dam, to ensure that the reservoir can absorb the flood peak of the barrier lake at its maximum capacity; when the risk level of the downstream reservoir is assessed as medium risk, the reservoir water level can be quickly lowered to the dead water level according to the maximum possible discharge capacity under the premise of ensuring the safety of the dam, to ensure that the reservoir can absorb the flood peak of the barrier lake at its maximum capacity; 堰塞湖 The maximum available storage capacity of the downstream reservoir (V 水库总 -V 水库死 ) ratio, a certain storage capacity is reserved to absorb the flood peak of the barrier lake outburst; when the risk level of the downstream reservoir is assessed as low risk, it can operate under normal circumstances.
[0061] The present invention takes a reservoir downstream of a barrier lake as an example to explain in detail a risk level evaluation method for a reservoir downstream of a barrier lake of the present invention.
[0062] Through the real-time rolling high-precision forecasting method of the thousand-mile abnormal flood, it is calculated that the time t for the outburst flood of the barrier lake to reach the reservoir is 6 hours, that is, t>5 hours and ≤50 hours. According to formula (2), the function f 1 The return value is medium risk.
[0063] The outburst flood peak is calculated by using the Saint-Venant formula, the original Liaoning Provincial Hydrological Station formula, and the Xie Renzhi formula. It is calculated that the outburst flood peak of the barrier lake reaches the flood peak at the downstream reservoir location that exceeds the thousand-year peak, p≤0.1%. According to formula (3), the function f 2 The return value is high risk.
[0064] By calculating the outburst peak flow, the outburst peak flow of the barrier lake to the reservoir flow q=20000m 3 / s, the maximum discharge capacity of the reservoir is 10500m 3 / s, q / Q=1.9>1, according to formula (4), we can get the function f 3 The return value is high risk.
[0065] The reservoir capacity of the barrier lake is calculated by calculating the topography and the water level of the barrier lake. V 堰塞湖 =524 million cubic meters, total reservoir capacity V 水库总 =158 million, V 水库死 = 25 million, V 堰塞湖 / ( V 水库总 - V 水库死 )=3.94>1, according to formula (5), we can get the function f 4 The return value is high risk.
[0066] According to the risk rating function F (Formula 6), it can be obtained that the risk level of the water reservoir downstream of the barrier lake is high risk.
[0067] Through the above steps, the implementation of the risk level assessment method for the reservoir downstream of the barrier lake of the present invention is completed.
[0068] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
[0069] The contents not described in detail in the specification of the present invention belong to the prior art known to the professional and technical personnel in this field.
Claims
1. A method for evaluating the risk level of a reservoir downstream of a barrier lake, characterized in that, it includes the following steps: S1. Establish a set D of risk level evaluation factors for the reservoir downstream of the barrier lake, including a time factor t, a frequency factor p, a flow factor q, and a storage capacity factor v; S2. Establish the functional relationship between the time factor t and the risk level of the downstream reservoir f 1 , when t≤5h, function f 1 The return value is high risk; when 5h<t≤50h, function f 1 The return value is medium risk; when t>50h, function f 1 The return value is low risk; S3. Establish the functional relationship f between the frequency factor p and the risk level of the downstream reservoir 2 , when p ≤ 0.1%, the function f 2 returns a high risk; when 0.1% < p ≤ 1%, the function f 2 returns a medium risk; when p < 1%, the function f 2 returns a low risk; S4. Establish the functional relationship between the flow factor q and the risk level of the downstream reservoir f 3 , when q ≥ the maximum discharge capacity Q of the downstream reservoir, the function f 3 The return value is high risk; when 0.75Q≤q<the maximum discharge capacity Q of the downstream reservoir, function f 3 The return value is medium risk; when q < the maximum discharge capacity of the downstream reservoir 0.75Q, function f 3 The return value is low risk; S5. Establish the functional relationship between the reservoir capacity factor v and the risk level of the downstream reservoir f 4 , when the total storage capacity of the barrier lake ≥ the maximum storage capacity of the downstream reservoir, the function f 4 The return value is high risk; when 0.5 times the maximum vacant storage capacity of the downstream reservoir ≤ the total storage capacity of the barrier lake < the maximum vacant storage capacity of the downstream reservoir, function f 4 The return value is medium risk; when the total storage capacity of the barrier lake is less than 0.5 times the maximum storage capacity of the downstream reservoir, function f 4 The return value is low risk; S6, f obtained based on S2-S5 1 、f 2 、f 3 、f 4 Return value, establish the risk level evaluation function F of the reservoir downstream of the barrier lake, when f 1 、f 2 、f 3 、f 4 When at least one of the returned values is high risk, the risk level of the downstream reservoir is high risk; when f 1 、f 2 、f 3 、f 4 When at least one of the returned values is medium risk and none of them is high risk, the risk level of the downstream reservoir is medium risk; when f 1 、f 2 、f 3 、f 4 When the returned values are neither high risk nor medium risk, the risk level of the downstream reservoir is low risk; In step S1, the set D of risk level evaluation factors for the reservoir downstream of the barrier lake is as shown in formula (1): (1); In formula (1), D is the risk level evaluation factor set of the reservoir downstream of the barrier lake; d 1 is the time factor t, i.e. the time it takes for the flood peak to reach the downstream reservoir after the barrier lake bursts; d 2 is the frequency factor p, i.e. the frequency of flood outburst; d 3 is the flow factor q, i.e. the relationship between the peak flow of the outburst flood and the maximum discharge of the downstream reservoir; d 4 is the storage capacity factor v, i.e. the relationship between the storage capacity of the barrier lake and the available storage capacity of the downstream reservoir; In step S6, the risk level evaluation function F for the reservoir downstream of the barrier lake is as shown in formula (6): (6)。 2. The method for evaluating the risk level of a reservoir downstream of a barrier lake according to claim 1, characterized in that, In step S2, the functional relationship between the time factor t and the risk level of the downstream reservoir is f 1 , refers to the mapping relationship between the time when the flood peak reaches the downstream reservoir after the barrier lake breaks and the risk level of the downstream reservoir, as shown in formula (2): (2); In formula (2), t is the time when the flood peak reaches the downstream reservoir after the barrier lake breaks, and the unit is h.
3. The method for evaluating the risk level of a reservoir downstream of a barrier lake according to claim 1, characterized in that, In step S3, the functional relationship between the frequency factor p and the risk level of the downstream reservoir is 2 , refers to the mapping relationship between the flood frequency corresponding to the location of the outburst flood peak of the barrier lake reaching the downstream reservoir and the risk level of the downstream reservoir, as shown in formula (3): (3); In formula (3), p is the frequency of the breached flood; p ≤ 0.1% is the frequency that the flood peak of the barrier lake breach reaches a flood peak exceeding once in a thousand years at the location of the downstream reservoir; 0.1% < p ≤ 1% is the frequency that the flood peak of the barrier lake breach reaches a flood peak exceeding once in a hundred years and not exceeding once in a thousand years at the location of the downstream reservoir; p < 1% is the frequency that the flood peak of the barrier lake breach does not reach a flood peak exceeding once in a hundred years at the location of the downstream reservoir.
4. The method for evaluating the risk level of a reservoir downstream of a barrier lake according to claim 1, characterized in that, In step S4, the functional relationship between the flow factor q and the risk level of the downstream reservoir is 3 , refers to the mapping relationship between the peak flow of the barrier lake outburst flood and the risk level of the downstream reservoir, as shown in formula (4): (4); In formula (4), q is the peak flow of the barrier lake outburst flood, unit: m 3 / s; Q is the maximum discharge capacity of the downstream reservoir, unit: m 3 / s.
5. The method for evaluating the risk level of a reservoir downstream of a barrier lake according to claim 1, characterized in that, In step S5, the functional relationship between the reservoir capacity factor v and the risk level of the downstream reservoir is 4 , refers to the mapping relationship between the reservoir capacity of the barrier lake and the risk level of the downstream reservoir, as shown in formula (5): (5); In formula (5), V 堰塞湖 is the total storage capacity of the barrier lake, unit: m 3 ; V 水库总 is the total storage capacity of the downstream reservoir, in m 3 ; V 水库死 is the dead storage capacity of the downstream reservoir, unit: m 3 ; V 水库总 -V 水库死 is the maximum available storage capacity of the downstream reservoir, in m 3 .
6. The method for evaluating the risk level of a reservoir downstream of a barrier lake according to claim 1, characterized in that, After step S6, reasonable dispatching principles can be determined according to the risk level of the reservoir. Specifically: when the risk level evaluation of the downstream reservoir is high risk, on the premise of ensuring the safety of the dam, the reservoir water level should be quickly reduced to the dead water level according to the possible maximum discharge capacity to ensure that the reservoir can absorb the flood peak of the barrier lake breach with the maximum capacity; when the risk level evaluation of the downstream reservoir is medium risk, according to the ratio relationship between the total storage capacity of the barrier lake and the maximum available storage capacity of the downstream reservoir, a certain storage capacity can be reserved to absorb the flood peak of the barrier lake breach; when the risk level evaluation of the downstream reservoir is low risk, it can operate under normal conditions.