Pump station unit combination optimization method based on AHP-PSO algorithm
The pumping station unit combination optimization method using the AHP-PSO algorithm solves the problem of ignoring unit performance differences in pumping station dispatching, achieves a more scientific operating status assessment and optimized dispatching plan, and improves the safety and economy of the pumping station.
Patent Information
- Application Number
- CN202311561977.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-22
- Publication Date
- 2024-10-15
AI Technical Summary
Existing pump stations ignore the actual performance differences between units when dispatching, resulting in unscientific dispatch plans and difficulty in achieving safe and economical operation.
The pumping station unit combination optimization method based on the AHP-PSO algorithm is used to construct an operating status evaluation system, quantify each indicator, determine the indicator weight, and use the PSO algorithm to optimize the judgment matrix to determine the order in which the units are put into operation.
It achieves a more accurate assessment of the operating status of pumping station units, formulates scientific and reasonable operation plans, improves the safety and economy of dispatch, and enhances flexibility and scalability.
Smart Images

Figure CN118780656A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of optimization scheduling of large water pumping stations, and in particular relates to a pump station unit combination optimization method based on an AHP-PSO algorithm. Background Art
[0002] As one of the most important control buildings in inter-basin water diversion projects, pump stations often have the characteristics of multiple units, large flow, high energy consumption, and long operation. In recent years, pump stations are gradually changing from traditional manual experience scheduling to intelligent scheduling. How to measure the actual operating status of each unit, determine the order of unit input, and provide decision support for the formulation of unit operation plans is of great significance to the safe, optimized, and intelligent operation of pump stations.
[0003] At present, in real projects, most pump stations use the same model of units when designing and selecting. When formulating scheduling plans, the performance curves of the units are assumed to be consistent, which conceals the differences in the actual conditions of the units. However, in actual projects, the pump units in the pump station are affected by the installation location, operating time and health status of the units, resulting in differences in the actual performance of the units. Summary of the invention
[0004] The technical problem to be solved by the present invention is: to overcome the disadvantages of the above-mentioned technologies and to provide a method for optimizing the combination of pump station units with comprehensive consideration of the differences between pump station units and with safety and economy.
[0005] In order to solve the above technical problems, the technical solution proposed in the present invention is: a method for optimizing the combination of pump station units based on the AHP-PSO algorithm, comprising the following steps:
[0006] (1) Determination and quantification of evaluation indicators: Based on the actual operation of the project, a pump station unit operation status evaluation system is constructed and each indicator is quantified into digital form;
[0007] (2) Determination of indicator weights: Based on the pump station unit operation status evaluation system, the corresponding judgment matrix is constructed using the hierarchical analysis method to preliminarily determine the weights of each indicator;
[0008] (3) Calibration of weights of various indicators: Combined with historical monitoring data, the PSO algorithm is used to calibrate the judgment matrix, thereby achieving calibration of weights of various indicators;
[0009] (4) Determine the order in which the units are put into operation; determine the current pump unit operating status score based on the obtained indicator quantification value and weight, and further determine the order in which the pump units are put into operation.
[0010] The above scheme is further improved in that: the various indicators of the pump station unit operation status evaluation system in step (1) include: energy unit consumption indicator, flow deviation indicator, pump unit installation position indicator, cumulative start-up time indicator, and continuous operation time indicator;
[0011] The energy consumption index is quantified by subtracting the difference between the energy consumption of the evaluated pump group and the minimum energy consumption of the pump group in the pump station from 100: In the formula, UEC is the energy consumption index, e is the energy consumption of the evaluation object pump group, and e min is the minimum energy consumption of the pump group in the pump station, W is the total energy consumed by the pump group, Q is the flow rate of the pump group under evaluation; H is the head; t is the water lifting period; ρ is the density of water;
[0012] The flow deviation index is quantified as 100 minus the ratio of the absolute value of the difference between the measured flow rate and the target flow rate of the evaluation object pump group to the target flow rate: In the formula, FO is the flow deviation index; AO is the actual flow of the evaluation object pump group; PO is the target flow of the evaluation object pump group;
[0013] The quantification method of the pump installation location index is as follows: the pump located in the middle of the river is assigned a value of 100, and the farther away from the middle of the river, the lower the value;
[0014] The quantification method of the cumulative machine start-up time indicator is: In the formula, ABT is the cumulative operating time index, AT is the actual cumulative operating time of the evaluation object pump group, and AT max The maximum cumulative start-up time of each pump group in the pump station;
[0015] The continuous operation time indicator is quantified as follows: In the formula, COT is the continuous operation time indicator, is the historical average continuous operation time of the evaluation object pump group; T is the actual continuous operation time of the evaluation object pump group.
[0016] The above scheme is further improved in that: the step (2) is specifically:
[0017] (21) Construct a hierarchical evaluation model; establish a hierarchical structure analysis model, in which the desired goal is at the highest level of the model and each indicator is placed at the criterion level;
[0018] (22) Construct a judgment matrix; compare the criteria layer indicators pairwise and express them in the form of a judgment matrix; the judgment matrix is:
[0019]
[0020] The element P in the matrix ij Indicates P i With Pj valuation of the relative importance of comparisons;
[0021] (23) Hierarchical single sorting and consistency test; the calculation steps are:
[0022] 1) Calculate the product of each row element in the judgment matrix:
[0023] 2) Calculate M i The nth root of:
[0024] 3) For W i Perform normalization: Get the weight vector of each indicator.
[0025] The above scheme is further improved in that: the step (23) further includes performing a consistency check on the judgment matrix; this is accomplished by calculating a consistency index CI and a random consistency ratio CR;
[0026] The calculation formula of CI is: When CI < 0.1, the judgment matrix is considered consistent, otherwise it is considered inconsistent; the calculation formula of CR is: RI is a coefficient called the average random consistency index; when CR<0.1, the judgment matrix is considered to have acceptable and satisfactory consistency, otherwise the judgment matrix needs to be adjusted and corrected to satisfy CR<0.1.
[0027] A further improvement of the above scheme is that the step (3) is to use the PSO algorithm to continuously adjust the values of each element in the judgment matrix until the model output result and the long sequence historical startup decision result have the highest degree of consistency, that is, to calibrate the judgment matrix, thereby achieving the calibration of the weights of each indicator.
[0028] A further improvement of the above scheme is that: the step (4) specifically uses the weight of each indicator, multiplies the score corresponding to each indicator of a unit and sums them up to obtain the final score of the operating status of the unit, and sorts the units from large to small according to the final score to determine the order in which the units are put into operation, thereby achieving unit order optimization; at the same time, the pump group shutdown order is determined in reverse according to the pump group operation order.
[0029] A further improvement of the above scheme is that: in the step (1), it also includes an equipment health index; the equipment health index is determined by a corresponding equipment safety evaluation model.
[0030] The beneficial effects of the present invention are:
[0031] The pump station unit combination optimization method based on the AHP-PSO algorithm provided by the present invention constructs a relatively streamlined and efficient pump station unit operation status evaluation system. According to the actual situation, a few comprehensive indicators are selected to replace the original numerous influencing factor indicators, which is used to solve the problem that the pump station unit operation status evaluation indicators are complicated and difficult to quantify. This method introduces the AHP method into the pump station startup combination decision-making, provides a systematic and structured method to deal with complex decision-making problems, helps decision makers to more accurately grasp the real-time operation status of the pump unit, and formulates a scientific and reasonable unit combination operation plan. This method uses the PSO optimization algorithm and combines the long-sequence historical startup decision data to calibrate the judgment matrix, thereby realizing the calibration of each indicator weight. On the basis of the original weight, the weight system is further improved to make the result closer to the actual decision-making ideas of local personnel. This method can change the number of units and the indicator system according to the actual situation of the project, and calibrate the indicator weight according to historical data, and has strong flexibility and scalability. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 is a principle flow chart of the model building method in an embodiment of the present invention;
[0033] Figure 2 It is a comparison chart between the startup plan output by the model after the indicator weights are calibrated and the actual decision-making plan on site. DETAILED DESCRIPTION
[0034] The pump station unit combination optimization method based on the AHP-PSO algorithm of this embodiment has the following implementation steps: Figure 1 As shown:
[0035] S1, data collection and preprocessing;
[0036] According to the actual project scheduling and operation conditions at different time scales, relevant data such as water conditions and engineering conditions are statistically summarized, and data cleaning methods are used to eliminate null values and outliers.
[0037] S2. Determination and quantification of evaluation indicators;
[0038] Based on the actual operation of the project, a pump station unit operation status evaluation system is constructed, and reasonable quantification methods are used to convert indicators into quantifiable digital form.
[0039] S3, indicator weight coefficient determination;
[0040] Based on the previously determined unit operation status evaluation system, the analytic hierarchy process (AHP) was used to construct the corresponding judgment matrix and preliminarily determine the weight coefficient of each evaluation index.
[0041] S4. Determination of weights of various indicators;
[0042] Combined with historical monitoring data, the PSO algorithm is used to calibrate the judgment matrix, thereby achieving the calibration of the weights of each indicator.
[0043] S5. Determine the order in which the units are put into operation;
[0044] Based on the obtained quantitative values and weights of the indicators, the current pump group operating status score is determined, and the order in which the pump groups are put into operation is further determined.
[0045] Step S1 is specifically as follows:
[0046] According to the actual project scheduling and operation conditions at different time scales, the water conditions, work conditions and other related data are statistically summarized. It mainly includes water / work conditions data such as unit installation location, unit flow, pump station downstream water level, pump station upstream water level, unit cumulative operation hours, unit continuous operation time, unit energy consumption, unit operation efficiency, equipment health, etc. And the overall data quality is improved by eliminating null values and abnormal values.
[0047] Step S2 is specifically as follows:
[0048] S21. Based on the actual operation of the project, a pump station unit operation status evaluation system is constructed to determine the evaluation indicators of the macro-reflection pump station unit operation characteristics. The indicators include three aspects:
[0049] 1) Safety indicators, including: equipment health;
[0050] 2) Economic indicators, including: flow deviation, energy consumption per unit;
[0051] 3) Other indicators of the pump group, including: pump group installation location, continuous operation time, and accumulated operating hours.
[0052] S22. Quantify the above-mentioned indicators in different dimensions into percentages. The indicators include the following:
[0053] 1) Equipment health;
[0054] The health of the pump group equipment is a safety indicator and one of the guarantees for the safe operation of the pump group. The factors affecting the health of the equipment mainly include the vibration of the upper frame, the vibration of the pump casing, the temperature of the stator winding, the temperature of each phase of the excitation transformer, the temperature of the thrust bearing, the temperature of the upper and lower sliding rings, the temperature of the upper and lower cylinders, and the pipeline oil pressure and other state indicators. The equipment health index is determined by the corresponding equipment safety evaluation model. The pump group equipment health meeting the requirements is a prerequisite for the pump group to start up. The pump group that does not meet the conditions will not participate in the final decision sorting.
[0055] 2) Energy consumption per unit;
[0056] Energy consumption is the real-time energy consumption of the Hongze pump group, which can be directly read from the historical data provided. From an economic point of view, the energy consumption of the pump group reflects the operating efficiency of the pump group and is an important indicator for assessing the operating performance of the equipment. The energy consumption index UEC is scored by subtracting the difference between the energy consumption of the evaluation object and the minimum energy consumption of the pump group in the pump station from 100. The calculation method is as follows:
[0057]
[0058] In the formula, UEC is the energy consumption index; e is the energy consumption of the pump unit, kW·h / (kt·m); e min is the minimum energy consumption of the pump group in the pump station, kW·h / (kt·m); W is the total energy consumed by the pump group, kW·h; Q is the flow rate of the pump group, m 3 / s; H is the head, m; t is the water lifting period, h; ρ is the water density, kg / m 3 ; g is the acceleration due to gravity (take 9.81), m / s 2 ^. The closer the UEC value is to 100, the lower the energy consumption per unit and the higher the score of this indicator.
[0059] 3) Flow deviation;
[0060] Since the flow deviation has positive and reverse deviations, the scoring method uses 100 minus the ratio of the absolute value of the difference between the measured flow of the pump group and the target flow to the target flow. The specific calculation method is as follows:
[0061]
[0062] In the formula, FO is the flow deviation evaluation index; AO is the actual flow of the evaluation pump group; PO is the target flow of the evaluation pump group. The target flow refers to the theoretical flow value calculated by each unit through the real-time blade angle head data during the scheduling process. When FO is closer to 100, it means that in the actual operation process, the flow deviation of the pump group is less, and its score is higher.
[0063] For units that are not started, data from historical similar operating conditions are used for filling calculations to ensure the credibility and accuracy of the final decision sequence.
[0064] 4) Installation location of the pump unit;
[0065] The water flow pattern of the unit close to the middle of the river is the best. The closer to the two banks, the worse the flow rate and flow pattern. Based on this, the middle unit is assigned a value of 100, and the values assigned to the units close to both sides are relatively lower than those of the adjacent units in the middle of the river.
[0066] 5) Cumulative machine operation time;
[0067] The scoring method for cumulative machine startup is as follows:
[0068] Where ABT is the cumulative operating time indicator, AT is the actual cumulative operating time of the pump group, and AT max It is the maximum cumulative operating time of each pump group in the pump station. The closer the ABT is to 100 points, the smaller the cumulative operating time of the evaluated pump group is, and the higher the score is.
[0069] 6) Continuous operation time;
[0070] The continuous running time is scored as follows:
[0071] In the formula, COT is the continuous operation time indicator, is the average continuous operation time of the pump group in history, in hours; T is the actual continuous operation time of the evaluated pump group, in hours. When the continuous operation time of the pump group exceeds the historical average level, COT begins to decrease. The longer the continuous operation time of the evaluated pump group, the lower the score. When COT<0, the value is 0.
[0072] Step S3 is specifically as follows:
[0073] S31. Construct a hierarchical evaluation model;
[0074] A hierarchical analysis model is established, in which the desired goal is located at the highest level of the model, and each evaluation indicator is placed at the criterion level. Multiple levels and multiple indicators can be set according to actual conditions.
[0075] S32, constructing a judgment matrix;
[0076] Compare the criteria layer indicators pairwise and express them in the form of a judgment matrix. Generally, a judgment matrix can be constructed in the following form:
[0077]
[0078]
[0079] The element P in the matrix ij Indicates P i With P j The relative importance of the comparison is estimated by introducing a suitable scale and performing P i With P j The analytic hierarchy process uses a scaling method to give a numerical scale for the comparison of different situations:
[0080] S33, Hierarchical Single Sorting and Consistency Check
[0081] The so-called single ranking of the level means that the relative importance of each element in this level to an element in the previous level is calculated by the judgment matrix. Usually, the square root method can be used for calculation. The calculation steps are:
[0082] 1) Calculate the product of each row element in the judgment matrix:
[0083]
[0084] 2) Calculate M i The nth root of:
[0085]
[0086] 3) For W i Perform normalization:
[0087]
[0088] Each row vector is geometrically averaged (square root method) and normalized to obtain the weight of each evaluation index.
[0089] In order to avoid conflicts among the set weight coefficients, it is necessary to perform consistency check on the judgment matrix. This is mainly done by calculating the consistency index CI and the random consistency ratio CR. The calculation formula of CI is:
[0090]
[0091] When CI < 0.1, the judgment matrix is considered to be basically consistent, otherwise it is considered inconsistent.
[0092] The calculation formula of CR is:
[0093]
[0094] RI is a coefficient called the average random consistency index.
[0095] Step S4 is specifically as follows:
[0096] After completing the ranking of indicator importance and preliminarily determining the judgment matrix, the PSO algorithm is used to continuously adjust the values of each element in the judgment matrix until the model output results are consistent with the long-sequence historical startup decision results to the highest degree, that is, the judgment matrix is calibrated, thereby realizing the calibration of the weights of each indicator.
[0097] Step S5 is specifically as follows:
[0098] By multiplying the weight of each evaluation index by the score corresponding to each index of a unit and summing them up, we can get the final score of the unit's operating status. According to the final score, the units are sorted from large to small to determine the order in which the units are put into operation, so as to achieve the optimal order of the units. At the same time, the shutdown order of the pump groups is determined in reverse according to the operating order of the pump groups.
[0099] In order to better illustrate the execution process of the method of the present invention, this embodiment takes the East Line Hongze Pumping Station as an example:
[0100] S1, data collection and preprocessing;
[0101] Collect and summarize relevant data on water conditions, working conditions, etc. during the dispatch period of Hongze Pumping Station from March 21, 2022 to April 6, 2023, and use data cleaning methods to remove null values and abnormal values;
[0102] S2. Determination and quantification of evaluation indicators
[0103] Combined with the actual operation of Hongze Pumping Station, an evaluation system for the operation status of Hongze Pumping Station units was established. The evaluation indicators include three aspects:
[0104] 1) Safety indicators, including: equipment health;
[0105] 2) Economic indicators, including: flow deviation, energy consumption per unit;
[0106] 3) Other indicators of the pump group, including: pump group installation location, continuous operation time, and accumulated operating hours.
[0107] And the quantitative method in the invention content is used to convert the indicators into a percentage digital form.
[0108] S3. Determination of index weight coefficient
[0109] Based on the previously determined unit operation status evaluation system and after multiple communications with local personnel, the analytic hierarchy process (AHP) was used to preliminarily construct the corresponding evaluation index judgment matrix as follows:
[0110]
[0111] S4. Determination of weights of various indicators
[0112] After completing the ranking of indicator importance and preliminarily determining the judgment matrix, the PSO algorithm is used to continuously adjust the values of each element in the judgment matrix until the model output results are consistent with the results of more than 20 historical power on / off decisions in the selected period. That is, the judgment matrix is calibrated to achieve the weight calibration of each indicator.
[0113] The evaluation index judgment matrix after calibration is as follows:
[0114]
[0115] Substitute the calibrated weights into the model, input the real-time monitoring data under historical conditions, and then output the solution. Compare the consistency between the output solution and the historical power-on / off decision-making situation. Figure 2 As shown in the figure, the calculation method of the scheme consistency index is as follows:
[0116]
[0117] The final matching index can reach 80.36%, which proves that the decision model of the present invention has high accuracy.
[0118] S5. Determine the order in which the units will be put into operation
[0119] Based on the obtained quantitative values and weights of the indicators, the current pump group operating status score is determined, and the order in which the pump groups are put into operation is further determined.
[0120] The present invention is not limited to the above embodiments. Any technical solution formed by equivalent replacement falls within the protection scope required by the present invention.
Claims
1. A pump station unit combination optimization method based on AHP-PSO algorithm, It is characterized in that The steps include: (1) Determination and quantification of evaluation indicators: Based on the actual operation of the project, a pump station unit operation status evaluation system is constructed and each indicator is quantified into digital form; (2) Determination of indicator weights: Based on the pump station unit operation status evaluation system, the corresponding judgment matrix is constructed using the hierarchical analysis method to preliminarily determine the weights of each indicator; (3) Calibration of weights of various indicators: Combined with historical monitoring data, the PSO algorithm is used to calibrate the judgment matrix, thereby achieving calibration of weights of various indicators; (4) Determine the order in which the units are put into operation; determine the current pump unit operating status score based on the obtained indicator quantification value and weight, and further determine the order in which the pump units are put into operation.
2. The pump station unit combination optimization method based on the AHP-PSO algorithm according to claim 1, It is characterized in that The various indicators of the pump station unit operation status evaluation system in step (1) include: energy consumption index, flow deviation index, pump unit installation position index, cumulative start-up time index, and continuous operation time index; The energy consumption index is quantified by subtracting the difference between the energy consumption of the evaluated pump group and the minimum energy consumption of the pump group in the pump station from 100: In the formula, UEC is the energy consumption index, e is the energy consumption of the evaluation object pump group, and e min is the minimum energy consumption of the pump group in the pump station, W is the total energy consumed by the pump group, Q is the flow rate of the pump group under evaluation; H is the head; t is the water lifting period; ρ is the density of water; The flow deviation index is quantified as 100 minus the ratio of the absolute value of the difference between the measured flow rate and the target flow rate of the evaluation object pump group to the target flow rate: In the formula, FO is the flow deviation index; AO is the actual flow of the evaluation object pump group; PO is the target flow of the evaluation object pump group; The quantification method of the pump installation location index is as follows: the pump located in the middle of the river is assigned a value of 100, and the farther away from the middle of the river, the lower the value; The quantification method of the cumulative machine start-up time indicator is: In the formula, ABT is the cumulative operating time index, AT is the actual cumulative operating time of the evaluation object pump group, and AT max The maximum cumulative start-up time of each pump group in the pump station; The continuous operation time indicator is quantified as follows: In the formula, COT is the continuous operation time indicator, is the historical average continuous operation time of the evaluation object pump group; T is the actual continuous operation time of the evaluation object pump group.
3. The pump station unit combination optimization method based on the AHP-PSO algorithm according to claim 2, It is characterized in that The step (2) is specifically: (21) Construct a hierarchical evaluation model; establish a hierarchical structure analysis model, in which the desired goal is at the highest level of the model and each indicator is placed at the criterion level; (22) Construct a judgment matrix; compare the criteria layer indicators pairwise and express them in the form of a judgment matrix; the judgment matrix is: The element P in the matrix ij Indicates P i With P j valuation of the relative importance of comparisons; (23) Hierarchical single sorting and consistency testing; The calculation steps are: 1) Calculate the product of the elements in each row of the judgment matrix: 2) Calculate M i The nth root of: 3) For W i Perform normalization: Get the weight vector of each indicator.
4. The pump station unit combination optimization method based on the AHP-PSO algorithm according to claim 3, It is characterized in that The step (23) also includes performing a consistency check on the judgment matrix; this is accomplished by calculating a consistency index CI and a random consistency ratio CR; The calculation formula of CI is: When CI < 0.1, the judgment matrix is considered consistent, otherwise it is considered inconsistent; the calculation formula of CR is: RI is a coefficient called the average random consistency index; when CR<0.1, the judgment matrix is considered to have acceptable and satisfactory consistency, otherwise the judgment matrix needs to be adjusted and corrected to satisfy CR<0.
1.
5. The pump station unit combination optimization method based on the AHP-PSO algorithm according to claim 3, It is characterized in that The step (3) specifically comprises using the PSO algorithm to continuously adjust the values of each element in the judgment matrix until the model output result and the long sequence historical startup decision result have the highest degree of consistency, that is, to calibrate the judgment matrix, thereby achieving the calibration of each indicator weight.
6. The pump station unit combination optimization method based on the AHP-PSO algorithm according to claim 5, It is characterized in that The step (4) specifically comprises the following steps: multiplying the weight of each indicator by the score corresponding to each indicator of a unit and summing the scores to obtain the final score of the operating status of the unit; sorting the units from large to small according to the final score to determine the order in which the units are put into operation, thereby achieving the optimal order of the units; and at the same time, determining the shutdown order of the pump units in reverse according to the operating order of the pump units.
7. The pump station unit combination optimization method based on the AHP-PSO algorithm according to claim 2, It is characterized in that The step (1) also includes an equipment health index; the equipment health index is determined by a corresponding equipment safety evaluation model.
