An intelligent auxiliary scheduling method for mine production planning

Through intelligent auxiliary schedule method, accurate three-dimensional model of mining area is constructed and equipment status is monitored in real time, which solves the problem of insufficient scientificity and rationality of the formulation of traditional mine production plans, and improves the optimization of production efficiency and resource allocation.

CN118780783BActive Publication Date: 2024-12-03ZIJIN ZHIXIN (XIAMEN) TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411262760.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-12-03
Estimated Expiration
2044-09-10

AI Technical Summary

Technical Problem

The formulation of traditional mine production plans relies on experience and rough estimates, resulting in insufficient scientificity and rationality, inaccurate reflection of the terrain and mineral distribution of mining areas, insufficient monitoring of equipment operation status, resulting in untimely equipment maintenance and mismatch of production.

Method used

Using intelligent auxiliary schedule method, by building an accurate three-dimensional mining area model, integrating information from mining areas, transportation channels and ore dressing plants, monitoring equipment operating status in real time, analyzing equipment efficiency and fault prediction, rationally formulating production plans, and optimizing equipment use and scheduling .

Benefits of technology

A comprehensive understanding of the mining production system has been achieved, production efficiency has been improved, equipment idleness and failures have been reduced, maintenance costs have been reduced, production plans have been ensured, and resource allocation has been optimized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780783B_ABST
    Figure CN118780783B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of mine production planning, and in particular to an intelligent auxiliary scheduling method for mine production planning. The present invention can comprehensively and intuitively understand the operating status of the entire mine production system by constructing an accurate three-dimensional model of the mining area, integrating the information of the working face of the mining area, the transportation channel and the ore dressing plant, and provide an accurate basis for scientifically and rationally formulating a production plan. The accurate analysis of the working efficiency of equipment in each link can optimize the use and scheduling of equipment in a targeted manner, reduce the idle and inefficient operation time of equipment, further improve production efficiency, monitor the operating status of equipment in real time and evaluate the health status, and formulate a maintenance plan to avoid production interruptions and high maintenance costs caused by sudden equipment failures, count the average maintenance time intervals of various types of equipment, reasonably arrange production plans, integrate equipment maintenance time into the production plan time axis, reduce the impact of equipment maintenance on production, and reduce operating costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of mine production planning, and in particular to an intelligent auxiliary scheduling method for mine production planning. Background Art

[0002] In traditional mining production, the formulation of production plans often relies on experience and rough estimates; the acquisition of information such as mining area terrain features, mineral location and reserves is not accurate and comprehensive enough, resulting in insufficient scientificity and rationality of production plans;

[0003] First, when constructing a 3D model of a mining area, traditional methods may rely only on limited measurement data and manual drawing, which makes it difficult to accurately reflect the complex topography and mineral distribution of the mining area. This makes it impossible to accurately assess the difficulty of mining and resource availability when formulating mining plans.

[0004] Secondly, in terms of equipment management, there is a lack of real-time monitoring and data analysis of the operating status of mining equipment, transportation equipment and mineral processing equipment; it is impossible to accurately understand the working efficiency, health status and possible failures of the equipment, resulting in untimely equipment maintenance, affecting production progress and increasing maintenance costs;

[0005] Furthermore, traditional production planning often fails to fully consider the synergy between various links; mining, transportation and mineral processing links formulate plans independently, which easily leads to production mismatch, such as excessive mining volume and insufficient transportation capacity, or mineral processing equipment cannot process the transported ore in time, resulting in waste of resources and low production efficiency. Therefore, a method for intelligent auxiliary scheduling of mine production plan is proposed to address the above problems. Summary of the invention

[0006] The purpose of the present invention is to provide a method for intelligent auxiliary scheduling of mine production plans to solve the problems raised in the above-mentioned background technology.

[0007] To achieve the above object, the present invention provides the following technical solutions:

[0008] A method for intelligent auxiliary scheduling of mine production plan, comprising the following steps:

[0009] Step S1, data collection and processing:

[0010] Collect the topographic features of the mining area, build a three-dimensional model of the mining area according to the topographic features of the mining area, the location of the mineral resources, the reserves and the design drawings of the mining area, regularly collect the laser radar data, image data and mineral quality data of the working face of the mining area, collect the mineral transportation volume and transportation equipment layout images of the transportation channel, collect the mineral processing equipment layout images, mineral processing equipment maintenance records and mineral processing equipment output, and build the three-dimensional models of the working face of the mining area, transportation channel and mineral processing plant according to the laser radar data, image data, transportation equipment layout images and mineral processing equipment layout images of the working face of the mining area, and integrate the three-dimensional models of the working face of the mining area, transportation channel and mineral processing plant into the three-dimensional model of the mining area to obtain the mining area production model;

[0011] Monitor the operation of ore dressing equipment, mining equipment and transportation equipment at the working face of the mining area, and obtain the operation data and equipment health status of the corresponding ore dressing equipment, mining equipment and transportation equipment at the working face of the mining area;

[0012] Step S2: Intelligent analysis:

[0013] Receive the mining area production model, and analyze the mining progress of the working face in the mining area in combination with the mineral reserves; analyze the working efficiency of each mining equipment based on the mining progress of the working face in the mining area;

[0014] Receive the daily ore transport volume of transport equipment, and analyze the working efficiency of each transport equipment based on the operation data of the transport equipment;

[0015] Receive the daily output of mineral processing equipment, and analyze the working efficiency of mineral processing equipment by combining the operation data corresponding to the output of mineral processing equipment and the ore quality data;

[0016] Record the working hours and health status of mineral processing equipment, mining equipment and transportation equipment in the mining area, collect maintenance data for each equipment, evaluate the operating efficiency of the equipment, predict possible equipment failures, and formulate maintenance plans for each equipment in advance;

[0017] Step S3: Plan formulation and adjustment:

[0018] Clarify the current ore reserves, the working efficiency of each piece of equipment, the average time consumed for equipment maintenance, and the time required for the deployment of protective facilities in the mining area, conduct a detailed assessment of the mining progress of the working face in the mining area, determine the ratio between the current mined volume and the remaining mineable volume, determine the initial daily mining volume based on the working efficiency of each mining equipment, each transportation equipment, and the working efficiency of the ore dressing equipment, and formulate an initial mining production plan based on the remaining mineable volume in the mining area;

[0019] According to the equipment's operating data and maintenance records, calculate the average maintenance time interval for each type of equipment;

[0020] Plan the time for laying out protective facilities in the mining area according to the changes in the current mining progress;

[0021] Determine the average maintenance time interval of mining equipment and the time for laying out protective facilities in the mining area, establish a production plan timeline based on the initial mining production plan, integrate the average maintenance time interval of mining equipment and the time for laying out protective facilities in the mining area into the production plan timeline, obtain the mining plan for the mining area, and formulate a matching transportation plan and mineral processing plan based on the mining plan for the mining area.

[0022] As a preferred solution, when constructing a three-dimensional model of the mining area based on the mining area's terrain features, mineral locations, reserves and mining area design drawings, the mining area's terrain features are collected using satellite remote sensing images, and the digital elevation model of the mining area is first extracted from the satellite remote sensing images using interferometric synthetic aperture radar technology. The terrain features of the mining area are analyzed based on the generated DEM, and the terrain feature data extracted from the satellite remote sensing images are used in the same coordinate system as the mineral location, reserves and mining area design drawings. The extracted terrain feature data are integrated with the mineral location, reserves and mining area design drawings to construct a three-dimensional model of the mining area.

[0023] As a preferred solution, when constructing a three-dimensional model of the working surface of the mining area, the laser radar data is denoised to remove abnormal points caused by environmental factors or equipment errors, and the processed laser radar data is converted into point cloud data, each point represents a position in a three-dimensional space, and the features of the working surface of the mining area are extracted from the point cloud data. The three-dimensional model of the working surface of the mining area is constructed based on the extracted features, and the corrected image data is mapped to the three-dimensional model to complete the construction of the three-dimensional model of the working surface of the mining area;

[0024] When constructing the three-dimensional model of the transport channel, the transport equipment arrangement image is analyzed to identify the position, width and height of the transport channel. Based on the results of the image analysis, the actual dimensions of the transport channel, including length, width and height, are measured, and the three-dimensional model of the transport channel is constructed based on the measured dimensions.

[0025] When constructing the three-dimensional model of the ore dressing plant, the layout image of the ore dressing equipment is interpreted to identify the layout, equipment location, and equipment information of the ore dressing plant. Based on the results of the image interpretation, the ore dressing equipment is modeled to complete the construction of the three-dimensional model of the ore dressing plant.

[0026] As a preferred solution, when analyzing the mining progress of the working face of the mining area, data collection and organization are first carried out, and the mining area production model is received to extract the three-dimensional model information about the location of the mineral, the reserve volume and the working face of the mining area; then the mining volume is calculated, and the shape changes of the three-dimensional model of the working face of the mining area in the mining area production model are recorded with time as the axis, and the mineral mining volume is calculated according to the shape changes. The mineral mining volume of the working face of the mining area is recorded every day and summarized into a mineral mining volume statistical table. The mineral mining volume statistical table is statistically analyzed, and the mineral mining volume of the mining area is calculated according to the mineral density. The mineral mining volume of the mining area is compared with the reserve volume in the mining area to calculate the mineral mining progress.

[0027] As a preferred solution, when analyzing the work efficiency of each mining equipment, the start time and end time of the mineral material mining volume statistics table are determined, the mineral material transportation volume recorded in the transportation channel within the time interval corresponding to the start time and the end time is determined, the mineral material mining volume of the mining area is compared with the mineral material transportation volume, and the error is determined as transportation loss; the operating time, downtime, and maintenance time of the mining equipment are determined, and combined with the mining progress data, the actual workload of each mining equipment in a time period is determined; for each mining equipment, the mining volume per unit time is calculated to obtain the work efficiency of each mining equipment.

[0028] As a preferred solution, when analyzing the working efficiency of each transportation equipment, the operating data of the transportation equipment is analyzed to determine the operating time, driving speed, loading and unloading time, and downtime. The effective working time of the transportation equipment is determined, and the daily transportation volume is accumulated to obtain the total amount of mineral materials transported by the transportation equipment. The average transportation speed of each transportation equipment is calculated, and the total transportation volume is divided by the effective working time to obtain the amount of mineral materials transported by each transportation equipment per unit time, thereby obtaining the working efficiency of each transportation equipment.

[0029] As a preferred solution, when analyzing the working efficiency of the mineral processing equipment, the finished product ratio of the mineral processing equipment for mineral materials of different qualities is analyzed according to the mineral material quality data, and the unit time output of the mineral processing equipment when processing mineral materials of different qualities is calculated.

[0030] As a preferred solution, it also includes step S4, data display:

[0031] Establish a data display platform, receive the mining area production model, display the proportional relationship between the mined volume and the total reserves in the mining area of ​​the mining area production model, display the transportation efficiency and transportation volume on the transportation channel of the mining area production model, and display the amount of mineral processing products and mineral processing efficiency on the mineral processing plant of the mining area production model.

[0032] It can be seen from the technical solution provided by the present invention that the intelligent auxiliary scheduling method for mine production plan provided by the present invention has the following beneficial effects: by constructing an accurate three-dimensional model of the mining area and integrating the information of the working face, transportation channel and ore dressing plant in the mining area, it is possible to fully and intuitively understand the operating status of the entire mine production system, provide an accurate basis for the scientific and reasonable formulation of production plans, and accurately analyze the working efficiency of equipment in each link, including mining equipment, transportation equipment and ore dressing equipment, so as to optimize the use and scheduling of equipment in a targeted manner, give full play to the maximum efficiency of each equipment, reduce the idle and inefficient operation time of equipment, further improve production efficiency, and monitor and improve the operation status of equipment in real time. Health status assessment can predict possible equipment failures in advance and formulate maintenance plans to avoid production interruptions and high repair costs caused by sudden equipment failures. It can also calculate the average maintenance time intervals of various types of equipment, reasonably arrange production plans, integrate equipment maintenance time into the production plan timeline, reduce the impact of equipment maintenance on production, reduce operating costs, clarify key information such as current mineral reserves, equipment work efficiency, and average equipment maintenance time, accurately evaluate the mining progress of the mining face, determine the initial daily mining volume, formulate a scientific and reasonable mining production plan, and formulate matching transportation plans and mineral processing plans based on the mining plan to achieve optimal resource allocation. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 The present invention is a flowchart of an intelligent auxiliary scheduling method for mine production planning. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0035] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0036] like Figure 1 As shown, an embodiment of the present invention provides a method for intelligent auxiliary scheduling of mine production plan, comprising the following steps:

[0037] Step S1, data collection and processing:

[0038] Collect the topographic features of the mining area, build a three-dimensional model of the mining area according to the topographic features of the mining area, the location of the mineral resources, the reserves and the design drawings of the mining area, regularly collect the laser radar data, image data and mineral quality data of the working face of the mining area, collect the mineral transportation volume and transportation equipment layout images of the transportation channel, collect the mineral processing equipment layout images, mineral processing equipment maintenance records and mineral processing equipment output, and build the three-dimensional models of the working face of the mining area, transportation channel and mineral processing plant according to the laser radar data, image data, transportation equipment layout images and mineral processing equipment layout images of the working face of the mining area, and integrate the three-dimensional models of the working face of the mining area, transportation channel and mineral processing plant into the three-dimensional model of the mining area to obtain the mining area production model;

[0039] Monitor the operation of ore dressing equipment, mining equipment and transportation equipment at the working face of the mining area, and obtain the operation data and equipment health status of the corresponding ore dressing equipment, mining equipment and transportation equipment at the working face of the mining area;

[0040] Step S2: Intelligent analysis:

[0041] Receive the mining area production model, and analyze the mining progress of the working face in the mining area in combination with the mineral reserves; analyze the working efficiency of each mining equipment based on the mining progress of the working face in the mining area;

[0042] Receive the daily ore transport volume of transport equipment, and analyze the working efficiency of each transport equipment based on the operation data of the transport equipment;

[0043] Receive the daily output of mineral processing equipment, and analyze the working efficiency of mineral processing equipment by combining the operation data corresponding to the output of mineral processing equipment and the ore quality data;

[0044] Record the working hours and health status of mineral processing equipment, mining equipment and transportation equipment in the mining area, collect maintenance data for each equipment, evaluate the operating efficiency of the equipment, predict possible equipment failures, and formulate maintenance plans for each equipment in advance;

[0045] Step S3: Plan formulation and adjustment:

[0046] Clarify the current ore reserves, the working efficiency of each piece of equipment, the average time consumed for equipment maintenance, and the time required for the deployment of protective facilities in the mining area, conduct a detailed assessment of the mining progress of the working face in the mining area, determine the ratio between the current mined volume and the remaining mineable volume, determine the initial daily mining volume based on the working efficiency of each mining equipment, each transportation equipment, and the working efficiency of the ore dressing equipment, and formulate an initial mining production plan based on the remaining mineable volume in the mining area;

[0047] According to the equipment's operating data and maintenance records, calculate the average maintenance time interval for each type of equipment;

[0048] Plan the time for laying out protective facilities in the mining area according to the changes in the current mining progress;

[0049] Determine the average maintenance time interval of mining equipment and the time for laying out protective facilities in the mining area, establish a production plan time axis based on the initial mining production plan, integrate the average maintenance time interval of mining equipment and the time for laying out protective facilities in the mining area into the production plan time axis, obtain the mining plan for the mining area, and formulate a matching transportation plan and mineral processing plan based on the mining plan for the mining area;

[0050] Step S4: data display:

[0051] Establish a data display platform, receive the mining area production model, display the proportional relationship between the mined volume and the total reserves in the mining area of ​​the mining area production model, display the transportation efficiency and transportation volume on the transportation channel of the mining area production model, and display the amount of mineral processing products and mineral processing efficiency on the mineral processing plant of the mining area production model.

[0052] In this embodiment, when constructing a three-dimensional model of a mining area according to the terrain features, mineral location, reserve and mining area design drawings of the mining area, the terrain features of the mining area are collected using satellite remote sensing images, and the digital elevation model of the mining area is first extracted from the satellite remote sensing images using interferometric synthetic aperture radar technology. The terrain features of the mining area are analyzed based on the generated DEM, and the terrain feature data extracted from the satellite remote sensing image and the mineral location, reserve and mining area design drawings use the same coordinate system, and the extracted terrain feature data are integrated with the mineral location, reserve and mining area design drawings to construct a three-dimensional model of the mining area; the specific operation steps are as follows:

[0053] 1. Data Preparation

[0054] Collect satellite remote sensing images: Obtain high-resolution images of the mining area through satellite remote sensing platforms to ensure that the images cover the entire mining area and have clear terrain features;

[0055] Prepare mining area design drawings: including the planning layout of the mining area, mineral location marking and other information;

[0056] Determine the mineral reserve data: accurate mineral reserve data obtained through geological exploration and other means;

[0057] 2. Extracting Digital Elevation Model (DEM)

[0058] Using interferometric synthetic aperture radar technology to process satellite remote sensing images:

[0059] Register multiple satellite remote sensing images to ensure accurate spatial correspondence between images;

[0060] Through the principle of interferometry, the phase difference of pixels in the image is calculated;

[0061] According to the phase difference information, the ground elevation information is inverted to generate the digital elevation model (DEM) of the mining area;

[0062] 3. Analysis of topographical characteristics of the mining area

[0063] Perform terrain analysis based on the generated DEM:

[0064] Calculate terrain slope: Determine the slope of different areas in the mining area by calculating the elevation changes of adjacent pixels;

[0065] Analyze terrain relief: Count the difference between the maximum and minimum elevations within a certain range to assess the terrain relief of the mining area;

[0066] Identify the type of terrain and landforms: According to the characteristics of elevation, slope and undulation, the terrain and landforms of the mining area are divided into mountainous areas, hilly areas, plains, etc.;

[0067] 4. Unification of data coordinate system

[0068] Determine the coordinate system: select a suitable geographic coordinate system, such as WGS84 coordinate system;

[0069] Convert terrain feature data coordinates: convert terrain feature data extracted from satellite remote sensing images into the selected coordinate system;

[0070] Convert the coordinates of mineral location and reserve data: Also convert the mineral location and reserve data to the same coordinate system;

[0071] Convert the coordinates of the mine design drawings: Convert the coordinates of the mine design drawings so that they use the same coordinate system as other data;

[0072] 5. Data fusion and construction of 3D model of mining area

[0073] Data Fusion:

[0074] Merge terrain feature data with mineral location data to ensure that the location of the mineral in the 3D model accurately corresponds to the terrain;

[0075] Combine the fusion results with the reserve data to add attribute information to the mineral resources in the 3D model;

[0076] Finally, the planning and layout information in the mine design drawings was integrated into the model to make the 3D model more complete;

[0077] Constructing a 3D model of the mining area:

[0078] Use professional 3D modeling software to import the integrated terrain features, mineral locations, reserves and design drawing data;

[0079] Generate a terrain surface model of the mining area based on the data, which can be expressed in the form of a triangulated network or a grid;

[0080] On the terrain surface, add a three-dimensional model of the mineral resources, such as a block model or a voxel model, based on the mineral location and reserve data;

[0081] Add models of buildings, roads, facilities, etc. in the mining area according to the design drawings;

[0082] Texture mapping is performed on 3D models, using satellite remote sensing images or other texture resources to enhance the realism of the model.

[0083] In this embodiment, when constructing a three-dimensional model of the working surface of the mining area, the laser radar data is denoised to remove abnormal points caused by environmental factors or equipment errors, and the processed laser radar data is converted into point cloud data, each point represents a position in a three-dimensional space, and the features of the working surface of the mining area are extracted from the point cloud data. The three-dimensional model of the working surface of the mining area is constructed based on the extracted features, and the corrected image data is mapped to the three-dimensional model to complete the construction of the three-dimensional model of the working surface of the mining area; the specific operation steps are as follows:

[0084] 1. LiDAR Data Collection

[0085] Use laser radar equipment to scan the working surface of the mining area to obtain a large amount of 3D point data; ensure that the scanning covers the entire working surface of the mining area to obtain comprehensive terrain information;

[0086] 2. LiDAR Data Denoising

[0087] Identify outliers:

[0088] Analyze the point cloud density distribution in the LiDAR data and conduct focused inspections on areas that are significantly deviated from the normal density range;

[0089] Check the elevation distribution of the point cloud. Abnormally high or low elevation points may be caused by environmental factors (such as flying birds, fog interference, etc.) or equipment errors.

[0090] Observe the reflection intensity values ​​of the point cloud. Abnormal reflection intensity may also indicate erroneous data points.

[0091] Remove outliers:

[0092] Methods based on statistical analysis, such as setting a threshold range for elevation, density, or reflection intensity, marking points outside the range as outliers and removing them;

[0093] Use filtering algorithms, such as median filtering and Gaussian filtering, to smooth the lidar data and remove noise points;

[0094] 3. Convert LiDAR data into point cloud data

[0095] Data format conversion:

[0096] Convert the processed LiDAR data from raw format to common point cloud data formats, such as PLY, OBJ, etc.

[0097] Make sure each point contains three-dimensional coordinate information (X, Y, Z), as well as possible reflection intensity, color and other attributes;

[0098] Point cloud data structure construction:

[0099] Establish a storage structure for point cloud data, using arrays, linked lists, or a specialized point cloud data structure library;

[0100] Assign a unique identifier to each point to facilitate subsequent processing and operation;

[0101] 4. Extracting the working face features of the mining area

[0102] Point cloud segmentation:

[0103] According to the properties such as elevation and reflection intensity, the point cloud data is divided into different areas to preliminarily distinguish the working surface of the mining area and the surrounding environment;

[0104] You can use threshold-based segmentation methods, region growing algorithms, etc.

[0105] Feature extraction:

[0106] Calculate the geometric features of the point cloud, such as the normal vector and curvature of the point cloud; these features can reflect the shape and texture information of the working surface of the mining area;

[0107] Extract statistical features of point clouds, such as the mean, variance, covariance, etc. of point clouds; these features can be used to describe the distribution of point clouds;

[0108] Identify feature points in the point cloud, such as corner points, edge points, etc. These feature points can be used as key nodes for building a 3D model;

[0109] 5. Constructing a 3D model of the working face in the mining area

[0110] Surface reconstruction:

[0111] According to the extracted feature points and geometric features, a surface reconstruction algorithm is used to construct a three-dimensional model of the working surface of the mining area; commonly used surface reconstruction algorithms include Poisson reconstruction and moving least squares method;

[0112] Determine the topological structure of the surface, connect adjacent points to form a triangular mesh or a quadrilateral mesh, and construct a continuous surface model;

[0113] Model optimization:

[0114] Optimize the constructed 3D model, remove unnecessary details and noise, and improve the quality of the model;

[0115] The model can be processed by using simplified algorithms, smoothing algorithms, etc.

[0116] 6. Image Data Correction and Mapping

[0117] Image data acquisition:

[0118] Use cameras or other image acquisition devices to obtain image data of the working face of the mining area; multiple images can be taken from different angles and positions to obtain more comprehensive visual information;

[0119] Image Correction:

[0120] Perform geometric correction on the collected images to eliminate image deformation caused by camera lens distortion, shooting angle and other factors;

[0121] Camera calibration technology can be used to obtain the camera's intrinsic and extrinsic parameters, and then the image can be corrected based on these parameters;

[0122] Mapping images to 3D models:

[0123] Map the corrected image data onto the constructed three-dimensional model of the mining area working surface; texture mapping technology can be used to paste the color information of the image as a texture onto the surface of the three-dimensional model;

[0124] Determining the correspondence between the image and the 3D model can be achieved through methods such as feature matching and manual annotation;

[0125] When constructing the three-dimensional model of the transport channel, the image of the transport equipment arrangement is analyzed to identify the position, width and height of the transport channel. According to the results of the image analysis, the actual dimensions of the transport channel, including length, width and height, are measured, and the three-dimensional model of the transport channel is constructed according to the measured dimensions. The specific operation includes the following steps:

[0126] 1. Image acquisition

[0127] Use high-resolution cameras or other image acquisition devices to shoot the transport channel from multiple angles to ensure that the overall picture of the transport channel and the arrangement of the transport equipment can be clearly captured; shoot from different positions and heights to obtain more comprehensive image information;

[0128] 2. Image Analysis

[0129] Location Identification:

[0130] Using image recognition technology, the collected images are processed to identify the location of the transport channel in the entire mining area; the relative position of the transport channel can be determined by comparing the overall layout map of the mining area or other reference marks;

[0131] Use feature extraction algorithms, such as edge detection and corner point detection, to extract edge features of the transport channel, thereby determining its approximate location range;

[0132] Width and height identification:

[0133] For width recognition, the actual width value can be obtained by measuring the pixel distance between the edges of the transport channel on both sides in the image and then converting it according to the camera parameters and shooting distance;

[0134] For height recognition, the vertical features in the image, such as the pixel distance between the top edge and the bottom edge of the transport channel, can be used to convert the camera parameters to determine the height of the transport channel;

[0135] 3. Actual size measurement

[0136] Length measurement:

[0137] Traditional measuring tools, such as tape measures and distance meters, can be used to measure along the actual path of the transport channel to obtain its length value;

[0138] If the transport channel is long or difficult to measure directly, the segmented measurement method can be adopted, and then the length of each segment is added to obtain the total length;

[0139] Precise measurement of width and height:

[0140] Use professional surveying equipment, such as laser rangefinders, total stations, etc., to accurately measure the width and height of the transport corridor; make sure to measure at multiple locations to obtain a more accurate average value;

[0141] For height measurement, multiple measurement points can be selected at different locations of the transport corridor to take into account possible height changes;

[0142] 4. Build a 3D model

[0143] Data preparation:

[0144] Organize the measured length, width, height and other dimensional data of the transport channel into a structured format for input into the 3D modeling software;

[0145] Different properties, such as material, color, etc., can be assigned to different parts of the transport channel as needed;

[0146] 3D Modeling:

[0147] Use professional 3D modeling software, such as 3dsMax, Blender, etc., to create a 3D model of the transport channel;

[0148] First, based on the length, width and height data, create a cuboid or other suitable geometric shape as the basic framework of the transport channel;

[0149] Then, refine and optimize the model, adding details such as wall texture and ground material to make the model more realistic;

[0150] According to the actual situation, a simplified model of transportation equipment can be added to the model to better demonstrate the use of the transportation channel;

[0151] When constructing the 3D model of the ore dressing plant, the layout image of the ore dressing equipment is interpreted to identify the layout, equipment location, and equipment information of the ore dressing plant. Based on the results of the image interpretation, the ore dressing equipment is modeled to complete the construction of the 3D model of the ore dressing plant. The specific operations include the following steps:

[0152] 1. Image acquisition

[0153] Use high-resolution cameras or drones to take multi-angle and all-round photos of the ore dressing plant to ensure that the overall layout of the ore dressing plant and the details of each ore dressing equipment can be clearly captured;

[0154] Shooting can be done at different times to obtain images under different lighting conditions, which helps to better identify equipment and layout;

[0155] 2. Image Interpretation

[0156] Layout recognition:

[0157] The collected images are processed using image recognition software, and the overall boundaries of the ore dressing plant and the division of each area are identified through edge detection, contour extraction and other technologies;

[0158] Analyze the features of buildings, roads, etc. in the image to determine the main layout structure of the mineral processing plant, such as the location relationship of the production area, storage area, office area, etc.;

[0159] Device location identification:

[0160] For each image, the object detection algorithm is used to identify the mineral processing equipment in it; different types of mineral processing equipment, such as crushers, ball mills, flotation machines, etc., can be identified by training a special equipment detection model;

[0161] According to the position and proportion of the equipment in the image, its relative position coordinates in the actual ore dressing plant are determined; the position accuracy can be improved by comparing multiple images and triangulating the measurement method;

[0162] Device information identification:

[0163] Analyze the appearance features of the device, such as shape, color, logo, etc., and determine the specific device model and specifications based on known device type information;

[0164] Read the identification plate, nameplate and other information on the equipment to obtain detailed information such as the equipment number, manufacturer, technical parameters, etc.

[0165] 3. Modeling of mineral processing equipment

[0166] Geometry Modeling:

[0167] Based on the identified equipment information, use 3D modeling software (such as 3DMax, Blender, etc.) to create 3D models of each mineral processing equipment;

[0168] For equipment with simple shapes, the model can be constructed by combining and deforming basic geometric bodies. For example, for a cylindrical tank, it can be created using a cylinder primitive, and then the parameters can be adjusted to match the size of the actual equipment.

[0169] For equipment with complex shapes, polygon modeling or surface modeling technology can be used to gradually build out the details of the equipment; for example, for a flotation machine with complex surfaces, surface modeling tools can be used to create the shape of its shell;

[0170] Materials and Texture Mapping:

[0171] According to the material characteristics of the actual equipment, the corresponding material properties are assigned to the 3D model; for example, for metal equipment, the reflectivity, roughness and other parameters of the metal material can be set;

[0172] Process the collected device images to extract the device's texture information, such as color, pattern, etc.; then map these textures onto the 3D model to make the model more realistic;

[0173] Device animation and interaction:

[0174] If necessary, you can add animation effects to the mineral processing equipment model to simulate the operating status of the equipment; for example, add rotating gear animation to the crusher, add moving material animation to the conveyor belt, etc.

[0175] Add interactive functions to the 3D model so that users can view different angles of the equipment, zoom in and out, etc. through mouse and keyboard operations; virtual reality (VR) or augmented reality (AR) technology can be used to allow users to experience the 3D model of the mineral processing plant more intuitively;

[0176] 4. Complete the construction of the 3D model of the ore dressing plant

[0177] Scene integration:

[0178] Place the built models of various mineral processing equipment in the three-dimensional scene of the mineral processing plant according to the identified positional relationships;

[0179] Add other elements such as buildings, roads, pipelines, etc. to improve the overall environment of the mineral processing plant;

[0180] In this embodiment, when analyzing the mining progress of the working face of the mining area, data collection and sorting are first performed, and the mining area production model is received, from which the three-dimensional model information about the location of the mineral, the reserve volume and the working face of the mining area is extracted; then the mining volume is calculated, and the shape change of the three-dimensional model of the working face of the mining area in the mining area production model is recorded with time as the axis, and the ore mining volume is calculated according to the shape change, and the ore mining volume of the working face of the mining area is recorded every day and summarized into a ore mining volume statistical table, and the ore mining volume statistical table is statistically analyzed, and the ore mining volume of the mining area is calculated according to the ore density, and the ore mining volume of the mining area is compared with the reserve volume of the mining area to calculate the ore mining progress;

[0181] Specifically, the following steps are included:

[0182] 1. Data collection and organization

[0183] Receiving mine production model:

[0184] Ensure that a complete mining area production model is accurately received from the data acquisition system or storage device; this model should include information such as the topographic features of the mining area, the location of the mineral deposits, the reserves, and the three-dimensional model of the working face of the mining area;

[0185] Extract key information:

[0186] From the mining area production model, use data analysis tools or specific software functions to extract the coordinate data of the mineral location and clarify the specific distribution of the mineral in the mining area;

[0187] Obtain reserve data, including total reserves and reserve information for different types of minerals;

[0188] Extract the 3D model data of the working face of the mining area, including the geometric shape, size and other information of the model;

[0189] 2. Calculate the mining volume

[0190] Record shape changes over time:

[0191] Set fixed time intervals, such as daily, weekly or monthly, to observe and record the three-dimensional model of the working face of the mining area in the mine production model;

[0192] Compare the shapes of the 3D models at different points in time to identify changes in shape due to mining activities; 3D model comparison software or algorithms can be used to automatically detect differences in shape;

[0193] Calculate the amount of mineral material mined based on shape changes:

[0194] For cases where the shape changes are relatively regular, the amount of mineral material mined can be determined by calculating the volume difference before and after the shape change; for example, if the mining area is a rectangular parallelepiped, the volume change can be calculated based on the changes in length, width and height;

[0195] For complex shapes, the discretization method can be used to divide the mining area into multiple small units, calculate the volume change of each unit separately, and then accumulate to get the total amount of mineral material mined;

[0196] Record the volume of mineral material mined and summarize the statistics:

[0197] Measure and record the volume of material mined from the working face of the mining area every day; volume data can be obtained using laser scanning equipment, measuring instruments or software tools;

[0198] Summarize the daily mining volume data into the mineral mining volume statistics table, including date, mining volume and other information;

[0199] Calculate the amount of mineral material mined in the mining area based on the mineral material density:

[0200] Determine the density of the mineral material, which can be obtained through laboratory testing or reference to relevant geological data;

[0201] Multiply the daily mining volume by the density of the ore to get the daily mining volume (usually in tons or cubic meters);

[0202] The amount of mineral material mined within a period of time is accumulated to obtain the cumulative amount of mining;

[0203] 3. Calculate the progress of mineral mining

[0204] Comparison of mining volume and reserve volume:

[0205] Compare the calculated amount of mineral material mined in the mining area with the initial reserve amount;

[0206] Ensure that the units of production and reserves are consistent to allow accurate comparisons;

[0207] Calculate the progress of mineral mining:

[0208] Divide the cumulative mining volume by the total reserve volume to get a ratio value, which is the mining progress of the mineral material;

[0209] The mining progress can be expressed as a percentage, for example, 30% of the total reserves have been mined.

[0210] In this embodiment, when analyzing the work efficiency of each mining equipment, the start time and the end time of the ore mining volume statistics table are determined, the ore transportation volume recorded in the transportation channel within the time interval corresponding to the start time and the end time is determined, the ore mining volume of the mining area is compared with the ore transportation volume, and the error is determined as the transportation loss; the operation time, downtime, and maintenance time of the mining equipment are determined, and the actual workload of each mining equipment in a time period is determined in combination with the mining progress data; for each mining equipment, the mining volume per unit time is calculated to obtain the work efficiency of each mining equipment;

[0211] Specifically, the following steps are included:

[0212] 1. Determine the time interval and relevant data

[0213] Determine the start and end time of the mineral mining volume statistics table:

[0214] Select appropriate start and end time points based on the analysis requirements and time period; for example, you can select a month, a quarter, or a year as the time range for analysis;

[0215] Ensure that the start time and end time have corresponding record data in the mineral mining volume statistics table;

[0216] Determine the amount of ore transported recorded by the transport channel within the time interval:

[0217] Check the monitoring system or record files of the transport channel to obtain the total amount of mineral materials transported within the selected start and end time interval;

[0218] Ensure the accuracy and completeness of transportation volume data, including separate records of transportation volumes of different types of mineral materials;

[0219] 2. Calculate transportation loss

[0220] Compare the amount of material extracted from the mining area with the amount of material transported:

[0221] Extract the mining volume data of the mining area within the start time and end time interval from the mining volume statistics table;

[0222] By comparing the amount mined with the amount transported, the amount of error can be determined by calculating the difference between the two;

[0223] Determine the error as shipping loss:

[0224] Analyze the causes of errors, which may include spillage, loss during transportation, measurement errors, etc.

[0225] Mark the determined error amount as transportation loss and record it for subsequent analysis and improvement;

[0226] 3. Determine the parameters such as the operating time of mining equipment

[0227] Determine the operating time of the mining equipment:

[0228] Obtain the operating time of each mining equipment within the start time and end time interval through the equipment monitoring system or manual records;

[0229] Running time can include the time when the equipment is operating normally and the time when it is operating at low load;

[0230] Determine downtime:

[0231] Record the downtime of each mining equipment within the time interval, including planned downtime (such as maintenance and upkeep) and unplanned downtime (such as failure, power outage, etc.);

[0232] Determine the maintenance time:

[0233] Statistics on the maintenance time of each mining equipment within the time interval, including the start time, end time and specific content of the maintenance;

[0234] 4. Determine the actual workload

[0235] Combined with mining progress data:

[0236] Refer to the mining progress data of the working face in the mining area to understand the progress of the work in the entire mining area within the time interval;

[0237] Determine the contribution of each mining equipment to the mining progress;

[0238] Determine the actual workload of each mining rig over a period of time:

[0239] According to the equipment's operating time, downtime, maintenance time and mining progress data, the actual workload of each mining equipment in the time interval is comprehensively calculated;

[0240] The actual workload can be expressed in terms of volume or weight of ore mined;

[0241] 5. Calculate work efficiency

[0242] For each mining device, calculate its mining volume per unit time:

[0243] Divide the actual workload of each mining equipment by its operating time (including low-load operating time, but excluding downtime and maintenance time) to get the mining volume per unit time;

[0244] The unit time can be hours, days or other appropriate time units;

[0245] Get the working efficiency of each mining equipment:

[0246] The amount of mining per unit time is the working efficiency of each mining equipment;

[0247] The working efficiency can be compared and analyzed to find out the equipment with higher and lower efficiency so as to take corresponding improvement measures.

[0248] In this embodiment, when analyzing the working efficiency of each transportation equipment, the operating data of the transportation equipment is analyzed to determine the operating time, driving speed, loading and unloading time, and downtime, and the effective working time of the transportation equipment is determined. The daily transportation volume is accumulated to obtain the total amount of mineral materials transported by the transportation equipment, and the average transportation speed of each transportation equipment is calculated. The total transportation volume is divided by the effective working time to obtain the amount of mineral materials transported by each transportation equipment per unit time, and the working efficiency of each transportation equipment is obtained.

[0249] In this embodiment, when analyzing the working efficiency of the ore dressing equipment, the finished product ratio of the ore dressing equipment for ores of different qualities is analyzed according to the ore quality data, and the unit time output of the ore dressing equipment when processing ores of different qualities is calculated.

[0250] The planning and adjustment process includes the following steps:

[0251] 1. Clarify key information and assess mining progress

[0252] Identify key information:

[0253] Determine the current amount of mineral reserves: By consulting geological exploration reports, inventory records, etc., accurately grasp the remaining mineral reserves in the mining area;

[0254] Determine the working efficiency of each equipment: including the working efficiency of mining equipment, transportation equipment and mineral processing equipment, which can be obtained based on the previous analysis results;

[0255] Determine the average time consumed for equipment maintenance: collect historical equipment maintenance records and calculate the average time required for maintenance of various types of equipment;

[0256] Determine the time required to deploy protective facilities in the mining area: Based on previous experience or project evaluation, determine the time required to deploy protective facilities;

[0257] Evaluating mining progress:

[0258] Determine the current amount of mining: Combined with the data such as the mining volume statistics table, determine the amount of mineral materials mined from the beginning of mining to the present;

[0259] Calculate the remaining recoverable volume: subtract the current recovered volume from the total reserves to get the remaining recoverable volume;

[0260] Determine the ratio between the current mined volume and the remaining recoverable volume: compare the current mined volume with the total reserves, calculate the mined ratio, and then determine the ratio with the remaining recoverable volume;

[0261] 2. Determine the initial daily mining volume and formulate the initial mining production plan

[0262] Determine the initial daily mining volume:

[0263] According to the working efficiency of each mining equipment: considering the mining volume of different mining equipment per unit time, the total mining capacity of all mining equipment is calculated comprehensively;

[0264] Combine the working efficiency of each transport equipment: ensure that the transport capacity can match the output of the mining equipment to avoid the backlog of mineral materials;

[0265] Consider the working efficiency of the mineral processing equipment: the mined ore can be processed in time to improve the overall production efficiency;

[0266] Taking all the above factors into consideration, determine an initial daily mining volume that can fully utilize the equipment capacity and ensure smooth production process;

[0267] Develop initial mining production plan:

[0268] Combined with the remaining mineable volume in the mining area: Calculate the estimated number of mining days based on the remaining ore volume and the initial daily mining volume;

[0269] Reasonable scheduling of mining operations taking into account factors such as operating time, downtime and maintenance time of mining equipment;

[0270] Determine the sequence and priority of mining in different mining areas to improve resource utilization and production efficiency;

[0271] 3. Statistical equipment average maintenance interval

[0272] According to the equipment's operating data and maintenance records:

[0273] Collect data on the operating time, failure time, maintenance time, etc. of various equipment;

[0274] Analyze maintenance records to determine the reason, duration, and content of each maintenance;

[0275] Calculate the average maintenance time interval for each type of equipment:

[0276] For each type of equipment, calculate the time interval between two consecutive maintenance;

[0277] Average all time intervals to get the average maintenance time interval for this type of equipment;

[0278] 4. Planning the time for laying out protective facilities in the mining area

[0279] According to the changes in the current mining progress:

[0280] Monitor the mining progress. When mining reaches a certain level, consider deploying protective facilities to ensure safety.

[0281] Determine the urgency of deploying protective facilities based on factors such as the depth and area of ​​mining;

[0282] Planned time for laying out protective facilities in mining areas:

[0283] Determine the specific time point for the deployment of protective facilities based on the project progress and the arrangement of human and material resources;

[0284] Consider coordination with mining operations to minimize impact on production;

[0285] 5. Formulate a mining plan for the mining area and a matching transportation and mineral processing plan

[0286] Determine the average maintenance interval for mining equipment and the time to deploy protective facilities in the mining area:

[0287] The statistically obtained average maintenance time interval and the planned protective facility deployment time are regarded as important time nodes;

[0288] Establish a production plan timeline based on the initial mining production plan:

[0289] Taking time as the axis, mark the tasks and time arrangements in the initial mining production plan on the axis;

[0290] Integrate the average maintenance interval of mining equipment and the deployment time of protective facilities in the mining area into the production plan timeline:

[0291] Insert time nodes for equipment maintenance and protective facility deployment on the timeline and adjust related mining operation arrangements;

[0292] Ensure that during equipment maintenance and the deployment of protective facilities, the production arrangements of other equipment can be reasonably adjusted to reduce the impact on overall production;

[0293] Get the mining plan for the mining area:

[0294] The adjusted and improved production plan timeline is the mining plan for the mining area, which clarifies the mining tasks, equipment maintenance, and protective facility layout at each time point;

[0295] Formulate matching transportation plan and mineral processing plan according to the mining plan of the mining area:

[0296] Transportation plan: Determine the number of transportation equipment, transportation routes and transportation time according to the output and time schedule of the ore in the mining plan; ensure that the transportation capacity can deliver the mined ore to the ore dressing plant in time to avoid ore backlog;

[0297] Ore dressing plan: Combine the mining plan and transportation plan to determine the operating time, processing capacity and ore dressing process of the ore dressing equipment; ensure that the ore dressing equipment can process the transported ore in time to improve the ore dressing efficiency and product quality.

[0298] The specific steps for data display are:

[0299] 1. Establish a data display platform

[0300] Select Platform Technology:

[0301] You can choose to use professional geographic information system (GIS) software platforms, such as ArcGIS, QGIS, etc., or develop a customized visualization platform;

[0302] Consider the stability, scalability and data processing capabilities of the platform to meet the display needs of mine production data;

[0303] Data interface design:

[0304] Design data interfaces to receive data from the mine production model; use standardized data formats such as JSON, XML, etc., or connect to specific database systems;

[0305] Ensure that the data interface can update data in real time to reflect the dynamic changes in mine production;

[0306] Platform architecture construction:

[0307] Build the architecture of the data display platform based on the selected technology and designed interface; you can use a client-server architecture or a cloud computing-based architecture;

[0308] Ensure the security and reliability of the platform to prevent data leakage and system failure;

[0309] 2. Receiving the production model of the mining area

[0310] Data transmission:

[0311] Through the data interface, the data of the mining area production model is transferred from the data source to the data display platform; network transmission, file transmission and other methods can be used;

[0312] Ensure the stability and integrity of data transmission and avoid data loss or damage;

[0313] Data analysis:

[0314] On the data display platform, the received mining area production model data is parsed; the parsing process includes extracting key information, such as relevant data of mining areas, transportation channels and concentrators;

[0315] Store the parsed data in the platform’s database or data structure for subsequent display and analysis;

[0316] 3. Display the ratio of mined volume to total reserves in the mining area

[0317] Data acquisition:

[0318] From the analyzed mining area production model data, obtain the data of mined volume and total reserves;

[0319] This data can be obtained by querying a database or data structure, or by using specific data analysis functions;

[0320] Proportional calculation:

[0321] Calculate the ratio of mined volume to total reserves; you can use simple division to divide mined volume by total reserves to get the ratio.

[0322] Convert the ratio value into percentage for more intuitive display;

[0323] Visual display:

[0324] In the mining area part of the mine production model, choose an appropriate visualization method to show the proportional relationship; this can be in the form of digital labels, progress bars, charts, etc.

[0325] Ensure that the displayed proportional relationships are accurate, clear and easy to understand;

[0326] 4. Display transportation efficiency and transportation volume on the transportation channel

[0327] Data acquisition:

[0328] From the mining area production model data, obtain relevant data of the transportation channel, including transportation volume and transportation time;

[0329] This data can be obtained by querying a database or data structure, or by using specific data analysis functions;

[0330] Transportation efficiency calculation:

[0331] Calculate the transportation efficiency based on the transportation volume and transportation time. The transportation efficiency can be expressed by the transportation volume per unit time, such as tons / hour, cubic meters / day, etc.

[0332] Ensure that the calculation of transport efficiency is accurate and reasonable and can reflect the actual operation of the transport corridor;

[0333] Visual display:

[0334] In the transportation channel part of the mine production model, choose an appropriate visualization method to display the transportation efficiency and transportation volume; digital labels, charts, dynamic icons, etc. can be used;

[0335] Ensure that the displayed transportation efficiency and transportation volume are accurate, clear and can be updated in real time;

[0336] 5. Display the finished product quantity and efficiency of mineral processing in the mineral processing plant

[0337] Data acquisition:

[0338] From the mining area production model data, obtain the relevant data of the ore dressing plant, including the amount of finished ore dressing products and ore dressing time, etc.;

[0339] This data can be obtained by querying a database or data structure, or by using specific data analysis functions;

[0340] Calculation of ore dressing efficiency:

[0341] Calculate the ore dressing efficiency based on the amount of finished ore dressing products and the ore dressing time; the ore dressing efficiency can be expressed by the amount of finished ore dressing products per unit time, such as tons / hour, cubic meters / day, etc.

[0342] Ensure that the calculation of mineral processing efficiency is accurate and reasonable, and can reflect the actual operation of the mineral processing plant;

[0343] Visual display:

[0344] In the concentrator part of the mine production model, choose a suitable visualization method to display the finished product volume and efficiency of the concentrator. Digital labels, charts, dynamic icons, etc. can be used.

[0345] Ensure that the displayed mineral processing product quantity and mineral processing efficiency are accurate, clear and can be updated in real time.

[0346] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for intelligent auxiliary scheduling of mine production plan, characterized by: The following steps are involved: Step S1, data collection and processing: Collect the topographic features of the mining area, build a three-dimensional model of the mining area according to the topographic features of the mining area, the location of the mineral resources, the reserves and the design drawings of the mining area, regularly collect the laser radar data, image data and mineral quality data of the working face of the mining area, collect the mineral transportation volume and transportation equipment layout images of the transportation channel, collect the mineral processing equipment layout images, mineral processing equipment maintenance records and mineral processing equipment output, and build the three-dimensional models of the working face of the mining area, transportation channel and mineral processing plant according to the laser radar data, image data, transportation equipment layout images and mineral processing equipment layout images of the working face of the mining area, and integrate the three-dimensional models of the working face of the mining area, transportation channel and mineral processing plant into the three-dimensional model of the mining area to obtain the mining area production model; When constructing a three-dimensional model of a mining area based on the topographic features, mineral location, reserves and mining area design drawings of the mining area, the topographic features of the mining area are collected using satellite remote sensing images. The digital elevation model of the mining area is first extracted from the satellite remote sensing images using interferometric synthetic aperture radar technology. The topographic features of the mining area are analyzed based on the generated DEM. The topographic feature data extracted from the satellite remote sensing images and the mineral location, reserves and mining area design drawings use the same coordinate system. The extracted topographic feature data are integrated with the mineral location, reserves and mining area design drawings to construct a three-dimensional model of the mining area. Monitor the operation of ore dressing equipment, mining equipment and transportation equipment at the working face of the mining area, and obtain the operation data and equipment health status of the corresponding ore dressing equipment, mining equipment and transportation equipment at the working face of the mining area; Step S2: Intelligent analysis: Receive the mining area production model, and analyze the mining progress of the working face in the mining area in combination with the mineral reserves; analyze the working efficiency of each mining equipment based on the mining progress of the working face in the mining area; Receive the daily ore transport volume of transport equipment, and analyze the working efficiency of each transport equipment based on the operation data of the transport equipment; Receive the daily output of mineral processing equipment, and analyze the working efficiency of mineral processing equipment by combining the operation data corresponding to the output of mineral processing equipment and the ore quality data; Record the working hours and health status of mineral processing equipment, mining equipment and transportation equipment in the mining area, collect maintenance data for each equipment, evaluate the operating efficiency of the equipment, predict possible equipment failures, and formulate maintenance plans for each equipment in advance; Step S3: Plan formulation and adjustment: Clarify the current ore reserves, the working efficiency of each piece of equipment, the average time consumed for equipment maintenance, and the time required for the deployment of protective facilities in the mining area, conduct a detailed assessment of the mining progress of the working face in the mining area, determine the ratio between the current mined volume and the remaining mineable volume, determine the initial daily mining volume based on the working efficiency of each mining equipment, each transportation equipment, and the working efficiency of the ore dressing equipment, and formulate an initial mining production plan based on the remaining mineable volume in the mining area; According to the equipment's operating data and maintenance records, calculate the average maintenance time interval for each type of equipment; Plan the time for laying out protective facilities in the mining area according to the changes in the current mining progress; Determine the average maintenance time interval of mining equipment and the time for laying out protective facilities in the mining area, establish a production plan time axis based on the initial mining production plan, integrate the average maintenance time interval of mining equipment and the time for laying out protective facilities in the mining area into the production plan time axis, obtain the mining plan for the mining area, and formulate a matching transportation plan and mineral processing plan based on the mining plan for the mining area; When constructing the three-dimensional model of the working surface of the mining area, the laser radar data is denoised to remove abnormal points caused by environmental factors or equipment errors, and the processed laser radar data is converted into point cloud data, each point represents a position in a three-dimensional space, and the features of the working surface of the mining area are extracted from the point cloud data. The three-dimensional model of the working surface of the mining area is constructed based on the extracted features, and the corrected image data is mapped to the three-dimensional model to complete the construction of the three-dimensional model of the working surface of the mining area; When constructing the three-dimensional model of the transport channel, the transport equipment arrangement image is analyzed to identify the position, width and height of the transport channel. Based on the results of the image analysis, the actual dimensions of the transport channel, including length, width and height, are measured, and the three-dimensional model of the transport channel is constructed based on the measured dimensions. When constructing the 3D model of the ore dressing plant, the layout image of the ore dressing equipment is interpreted to identify the layout, equipment location, and equipment information of the ore dressing plant. Based on the results of the image interpretation, the ore dressing equipment is modeled to complete the construction of the 3D model of the ore dressing plant. When analyzing the mining progress of the working face of the mining area, first collect and organize data, receive the mining area production model, and extract the three-dimensional model information about the location of the mineral, the reserve volume and the working face of the mining area; then calculate the mining volume, record the shape changes of the three-dimensional model of the working face of the mining area in the mining area production model with time as the axis, calculate the ore mining volume according to the shape changes, record the ore mining volume of the working face of the mining area every day, summarize it into a ore mining volume statistics table, and perform statistics on the ore mining volume statistics table. The ore mining volume of the mining area is calculated according to the ore density, and the ore mining volume of the mining area is compared with the reserve volume of the mining area to calculate the ore mining progress; When analyzing the work efficiency of each mining equipment, determine the start and end time of the ore mining volume statistics table, determine the ore transportation volume recorded in the transportation channel within the time interval corresponding to the start and end time, compare the ore mining volume of the mining area with the ore transportation volume, and determine the error as transportation loss; determine the operation time, downtime, and maintenance time of the mining equipment, and combine the mining progress data to determine the actual workload of each mining equipment in a time period; for each mining equipment, calculate its mining volume per unit time to obtain the work efficiency of each mining equipment; When analyzing the working efficiency of each transport equipment, the operating data of the transport equipment is analyzed to determine the operating time, driving speed, loading and unloading time, and downtime, and the effective working time of the transport equipment is determined. The daily transportation volume is accumulated to obtain the total amount of mineral materials transported by the transport equipment, and the average transportation speed of each transport equipment is calculated. The total transportation volume is divided by the effective working time to obtain the amount of mineral materials transported by each transport equipment per unit time, and the working efficiency of each transport equipment is obtained; When analyzing the working efficiency of the ore dressing equipment, the finished product ratio of the ore dressing equipment for different qualities of ore materials is analyzed according to the ore quality data, and the unit time output of the ore dressing equipment when processing different qualities of ore materials is calculated; The step S4 also includes data display: Establish a data display platform, receive the mining area production model, display the proportional relationship between the mined volume and the total reserves in the mining area of ​​the mining area production model, display the transportation efficiency and transportation volume on the transportation channel of the mining area production model, and display the amount of mineral processing products and mineral processing efficiency on the mineral processing plant of the mining area production model.