Direct current magnetic bias dynamic optimization method for new energy grid connection

By constructing a multi-objective DC bias dynamic optimization model and formulating governance strategies, the problem of deviation in DC bias optimization results in new energy grid-connected systems is solved, and the effect of new energy grid-connected operations and system stability are improved.

CN118783518APending Publication Date: 2024-10-15STATE GRID ZHEJIANG ELECTRIC POWER CO LTD SHAOXING POWER SUPPLY CO +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410754904.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing new energy grid-connected DC bias magnet dynamic optimization methods fail to fully consider the actual operating parameters of the new energy grid-connected system, resulting in a large deviation between the optimization results and the actual situation, affecting the effect of new energy grid-connected operations.

Method used

By obtaining the actual operating parameter information of the new energy substation, a multi-objective DC bias dynamic optimization model is constructed to obtain the Pareto optimal solution set, and a DC bias dynamic management strategy is formulated based on the optimal solution set to optimize the system.

Benefits of technology

It significantly improves the effect of new energy grid-connected operation, reduces the impact of DC bias phenomenon on stable operation, reduces the number of DC bias currents and treatment devices, and improves the reliability and stability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118783518A_ABST
    Figure CN118783518A_ABST
Patent Text Reader

Abstract

The invention discloses a new energy grid-connected direct current magnetic bias dynamic optimization method, which belongs to the technical field of power direct current magnetic bias, and comprises the following steps: determining decision variable information of a new energy grid-connected operation system based on actual operation parameter information of a plurality of new energy transformer substation grids; constructing a direct current magnetic bias dynamic optimization model based on the multi-target direct current magnetic bias dynamic optimization information and the decision variable information; the direct current magnetic bias dynamic optimization model is solved, and a corresponding Pareto optimal solution set is obtained; and obtaining an optimal direct current magnetic bias dynamic treatment strategy based on the Pareto optimal solution set, and performing direct current magnetic bias dynamic optimization on the new energy grid-connected operation system according to the optimal direct current magnetic bias dynamic treatment strategy. According to the method, the direct current magnetic bias dynamic optimization can be more accurately performed on the new energy grid-connected operation system according to the actual operation parameter information of the new energy transformer substation grid connection, the influence of the direct current magnetic bias phenomenon on the new energy grid-connected stable operation is effectively reduced, and the effect of the new energy grid-connected operation is remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric direct current biasing technology, and in particular to a direct current biasing dynamic optimization method for new energy grid connection. Background Art

[0002] As the world's reliance on renewable energy increases, large-scale grid-connected new energy sources such as wind power and solar energy have become an important part of the power system. More and more new energy substations are connected to the grid, causing changes in the grid topology and thus leading to dynamic changes in the distribution of DC bias current. The DC bias problem, that is, the magnetic field offset caused by DC current in equipment such as transformers, may cause equipment performance degradation, increased losses, and even damage; in the new energy grid-connected system, the DC bias problem is particularly prominent due to the volatility, intermittency and uncertainty of new energy power stations. The existing DC bias dynamic optimization method fails to fully consider the impact of actual operating parameters in the new energy grid-connected system. Therefore, there is a large deviation between the DC bias optimization results and the actual situation, resulting in poor operation of new energy grid-connected.

[0003] In a Chinese patent publication number CN107947187A, published on April 20, 2018, entitled A coordinated control method for multiple substations in response to reactive power shortage caused by DC bias, a coordinated control method for multiple substations in response to reactive power shortage caused by DC bias is disclosed, comprising the following steps: S1, determining whether any converter station in a DC dense point area has entered a single pole operation state; if so, executing S2, if not, executing S3; S2, using a WAMS system to coordinately control the reactive power of each substation in a DC dense point area by a delay method until any converter station in the DC dense point area enters a single pole operation state. All substations exit the single pole operation state, exit the coordinated control of the WAMS system, and execute S3; S3, coordinate the reactive power of the corresponding substation through the local reactive power regulation control system of each substation in the DC dense landing area; although this method can accelerate the voltage stabilization process of each substation after the DC bias occurs, prevent the repeated switching of the substation SVC, and improve the safe and stable operation level of the multi-substation power system in the DC dense landing area, but the shortcoming is that there is a lack of dynamic optimization of the DC bias of the new energy grid-connected operation system according to the actual operation parameter information of the new energy substation grid-connected, resulting in poor effect of the new energy grid-connected operation. Summary of the invention

[0004] The purpose of the present invention is to provide a new energy grid-connected DC bias dynamic optimization method to address the problem that the existing new energy grid-connected DC bias dynamic optimization method lacks the DC bias dynamic optimization of the new energy grid-connected operation system according to the actual operation parameter information of the new energy substation grid-connected, resulting in poor new energy grid-connected operation effect. The present invention provides a new energy grid-connected DC bias dynamic optimization method, which determines the decision variable information of the new energy grid-connected operation system through the actual operation parameter information of several new energy substation grid-connected, and then fully combines the multi-objective DC bias dynamic optimization information to construct a DC bias dynamic optimization model and solves it to obtain the corresponding Pareto optimal solution set, and dynamically optimizes the DC bias of the new energy grid-connected operation system according to the optimal DC bias dynamic management strategy obtained from the Pareto optimal solution set. The DC bias can be more accurately dynamically optimized for the new energy grid-connected operation system according to the actual operation parameter information of the new energy substation grid-connected, effectively reducing the influence of the DC bias phenomenon on the stable operation of the new energy grid, and significantly improving the effect of the new energy grid-connected operation.

[0005] The purpose of the present invention is achieved through the following technical solutions: A method for dynamically optimizing direct current bias magnetic field for new energy grid connection comprises the following steps: S1. Determine the decision variable information of the new energy grid-connected operation system based on the actual operation parameter information of several new energy substations connected to the grid; S2. Constructing a DC bias magnetic dynamic optimization model based on multi-objective DC bias magnetic dynamic optimization information and decision variable information; S3, solving the DC bias magnetic dynamic optimization model to obtain the corresponding Pareto optimal solution set; S4. Based on the Pareto optimal solution set, the optimal DC bias dynamic management strategy is obtained, and the DC bias dynamic optimization of the new energy grid-connected operation system is performed according to the optimal DC bias dynamic management strategy.

[0006] In this scheme, the decision variable information of the new energy grid-connected operation system is determined through the actual operating parameter information of several new energy substations connected to the grid, and then the DC bias dynamic optimization model is constructed and solved in combination with the multi-objective DC bias dynamic optimization information to obtain the corresponding Pareto optimal solution set, and the DC bias dynamic optimization of the new energy grid-connected operation system is performed according to the optimal DC bias dynamic management strategy obtained from the Pareto optimal solution set. The DC bias dynamic optimization of the new energy grid-connected operation system can be performed more accurately according to the actual operating parameter information of the new energy substation connected to the grid, effectively reducing the influence of the DC bias phenomenon on the stable operation of the new energy grid, and significantly improving the effect of the new energy grid-connected operation.

[0007] Furthermore, the S1 comprises the following sub-steps: S11, obtaining actual operation parameter information of several new energy substations connected to the grid and preprocessing the information to obtain key actual operation parameter information; S12, obtaining historical operating parameter information of the new energy grid-connected operation system and performing multi-factor characteristic analysis on it, and constructing a multi-dimensional constraint condition indicator system based on the multi-factor characteristic analysis results; S13. Analyze the key actual operating parameter information based on the multi-dimensional constraint condition indicator system to obtain the decision variable information of the new energy grid-connected operation system.

[0008] In this scheme, by preprocessing the actual operating parameter information of several new energy substations connected to the grid, the key actual operating parameter information of the new energy grid-connected operation system can be extracted, and the operating status of the new energy grid-connected operation system can be understood in real time; the historical operating parameter information of the new energy grid-connected operation system is obtained, and a multi-factor characteristic analysis is performed on it, so that the operating law of the new energy grid-connected operation system under different working conditions can be obtained; the key actual operating parameter information is analyzed through a multi-dimensional constraint condition indicator system, and the new energy grid-connected operation system can be optimized in a targeted manner through decision variable information.

[0009] Furthermore, the S2 comprises the following sub-steps: S21, obtaining multi-objective DC bias magnetic dynamic optimization information of the new energy grid-connected operation system and performing feature extraction on the information to obtain multi-objective DC bias magnetic dynamic optimization feature information; S22. Based on the multi-objective DC bias dynamic optimization characteristic information, an objective function is established with the DC bias treatment scheme of each new energy substation as the optimization variable, and with the minimum regional total DC bias current of the new energy grid-connected operation system and the minimum total number of DC bias treatment devices of the new energy grid-connected operation system as the goal; S23, obtaining actual DC bias magnetic data of each new energy substation and analyzing the data to obtain corresponding key actual DC bias magnetic data; S24. Constructing a DC bias magnetic dynamic optimization model according to the objective function and the key actual DC bias magnetic data.

[0010] In this scheme, by acquiring and extracting multi-objective DC bias magnetic dynamic optimization characteristic information, an objective function with the minimum regional total DC bias magnetic current of the new energy grid-connected operation system and the minimum total number of DC bias magnetic treatment devices of the new energy grid-connected operation system as the optimization objectives can be obtained, ensuring that the best balance point is found between multiple key performance indicators; a DC bias magnetic dynamic optimization model is constructed by using the objective function and the key actual DC bias magnetic data, which can reduce equipment damage and new energy grid-connected operation system failures caused by DC bias magnetic problems, thereby improving the reliability and stability of the new energy grid-connected operation system.

[0011] Further, in S22, the mathematical expression of the objective function is: In the formula, x i ∈[0,1] n ,i∈[1,n],x i represents the DC bias magnetic treatment scheme of the i-th renewable energy substation, x represents the column vector of the DC bias magnetic treatment schemes of n renewable energy substations; M(x) represents the total number function of DC bias magnetic treatment devices in the renewable energy grid-connected operation system; n represents the total number of renewable energy substations; I i Represents the regional DC bias current of the i-th new energy substation; I(x) represents the regional total DC bias current function of the new energy grid-connected operation system; G represents the admittance matrix of the resistor network in the new energy grid-connected operation system; G(x) represents the admittance matrix function of the resistor network in the new energy grid-connected operation system after the treatment according to the treatment plan; g represents the conductance column vector of the new energy grid-connected operation system substation; g(x) represents the conductance column vector function of the new energy grid-connected operation system substation after the treatment according to the treatment plan; V represents the voltage column vector of the reference node of the new energy substation.

[0012] In this scheme, by constructing an objective function with the goal of minimizing the total regional DC bias current of the new energy grid-connected operation system and minimizing the total number of DC bias control devices in the new energy grid-connected operation system, the DC bias dynamic optimization process can be made more efficient and accurate.

[0013] Furthermore, S3 includes the following sub-steps: S31, determining a multi-objective optimization algorithm according to the characteristic requirement information of the DC bias magnetic dynamic optimization model and the multi-objective DC bias magnetic dynamic optimization information; S32. Obtain the Pareto solution set populations corresponding to the several new energy substations before and after the grid connection according to the multi-objective optimization algorithm, the regional power grid topology model corresponding to the several new energy substations before and after the grid connection, and the DC bias magnetic treatment plan of each new energy substation, and perform clustering operations on the Pareto solution set populations to obtain the solution environment information corresponding to the several new energy substations before and after the grid connection; wherein the clustering operation includes taking the center points of the Pareto solution set populations corresponding to the several new energy substations before and after the grid connection and the minimum value of the objective function as the corresponding clustering centers, dividing the Pareto solution set populations corresponding to the several new energy substations before and after the grid connection into corresponding multiple sub-populations, and calculating the center points of each sub-population corresponding to the several new energy substations before and after the grid connection; the solution environment information includes the optimization variables and center points of each sub-population corresponding to the several new energy substations before and after the grid connection; S33. According to the Wilcoxon signed rank test method, the difference test of the corresponding solution environment information before and after the grid connection of several new energy substations is carried out to obtain the corresponding Pareto optimal solution set.

[0014] In this scheme, the multi-objective optimization algorithm is determined according to the characteristic requirements of the DC bias magnetic dynamic optimization model and the multi-objective DC bias magnetic dynamic optimization information, which can ensure that the selected algorithm is highly matched with the actual situation, thereby improving the accuracy and practicality of the optimization results; the Pareto solution set population is divided and the center point is calculated by clustering operation, and the solution environment information such as the optimization variables and center point of each subpopulation can be obtained, which can more comprehensively reflect the system state and optimization space corresponding to the new energy substation before and after the grid connection; the Wilcoxon signed rank test method is used to perform a difference test on the solution environment information, which can quantitatively evaluate the degree of difference between the solution sets corresponding to the new energy substation before and after the grid connection, which is helpful to screen out the Pareto optimal solution set that better meets the actual needs and improve the quality and reliability of the optimization results.

[0015] Furthermore, the S4 comprises the following sub-steps: S41. Based on the Pareto optimal solution set and the location information of the center point of each subpopulation corresponding to several new energy substations before and after the grid connection, the evolution direction and evolution step of the center point of each subpopulation after the grid connection of several new energy substations are calculated; S42. According to the evolutionary direction and evolutionary step of the center point of each subpopulation after several new energy substations are connected to the grid, the full-dimensional evolutionary direction and step-length difference ratio between the subpopulations in the Pareto solution set are calculated to obtain the difference information of the evolutionary direction and evolutionary step length between the subpopulations during the process of several new energy substations being connected to the grid; S43. According to the changes in the topological structure of the power grid before and after the connection of several new energy substations to the grid, a criterion for the change type of the Pareto solution set is constructed; S44. According to the difference information of the distribution change of the Pareto solution set before and after the connection of several new energy substations to the grid, and the difference information of the evolutionary direction and the difference information of the evolutionary step length between subpopulations during the connection of several new energy substations to the grid, the Pareto optimal solution set is analyzed in combination with the criterion for the change type of the Pareto solution set, and the change type of the Pareto optimal solution set is obtained; S45. Determine the optimal DC bias dynamic management strategy based on the change type of the Pareto solution set, and perform DC bias dynamic optimization on the new energy grid-connected operation system according to the optimal DC bias dynamic management strategy.

[0016] In this scheme, by combining the position information of the sub-population center point, calculating the evolution direction and evolution step, the change trend and speed of each sub-population after the new energy substation is connected to the grid can be accurately evaluated; by calculating the full-dimensional evolution direction and step difference ratio between sub-populations, the differences in evolution direction and evolution step between sub-populations during the grid connection of new energy substations can be obtained; the Pareto solution set change type criterion constructed based on the changes in the power grid topology before and after the new energy substation is connected to the grid can more accurately judge the change type of the Pareto optimal solution set, which is helpful to quickly respond to changes in the power grid structure and adjust the optimization strategy; the optimal DC bias dynamic management strategy determined based on the change type of the Pareto optimal solution set can perform DC bias dynamic optimization according to the actual situation of the new energy grid-connected operation system, which can significantly reduce the DC bias current, reduce the number of DC bias management devices, and improve the operation efficiency and stability of the new energy grid-connected operation system.

[0017] Furthermore, in S41, the mathematical expression of the evolution direction and evolution step of the center point of each subpopulation after the plurality of new energy substations are connected to the grid is: In the formula, C t-1 represents the center point of each subpopulation of the Pareto solution set at time t-1 before several renewable energy substations are connected to the grid, C t represents the center point of each subpopulation of the Pareto solution set at time t after several renewable energy substations are connected to the grid, S t represents the evolutionary step length of the center point of each subpopulation from time t-1 before the grid connection of several renewable energy substations to time t after the grid connection of several renewable energy substations, D t It represents the evolution direction of the center point of each subpopulation from time t-1 before several renewable energy substations are connected to the grid to time t after several renewable energy substations are connected to the grid; S represents the distance between the center point of each subpopulation of the Pareto solution set before several renewable energy substations are connected to the grid and the center point of each subpopulation of the Pareto solution set after several renewable energy substations are connected to the grid.

[0018] In this scheme, through the mathematical expression of the evolutionary direction and evolutionary step of the center point of each sub-population after several new energy substations are connected to the grid, the evolutionary direction and evolutionary step of the center point of each sub-population can be quantitatively described, and the evolutionary direction and evolutionary step of the center point of each sub-population can be intuitively displayed, so as to quickly understand the overall dynamics of the grid-connected process of several new energy substations.

[0019] Furthermore, in the S42, the mathematical expression of the difference information of the evolutionary direction and the difference information of the evolutionary step length among the sub-populations during the grid connection process of the several new energy substations is: Where D A represents the evolution direction of the center point of the Pareto solution subpopulation A, D B represents the evolution direction of the center point of the Pareto solution subpopulation B, F DD The full-dimensional evolution direction of the vector between the evolution direction of the center point of the Pareto solution set subpopulation A and the evolution direction of the center point of the Pareto solution set subpopulation B, represents the maximum evolutionary step length of the Pareto solution set subpopulation, represents the minimum evolutionary step length of the Pareto solution set subpopulation, S GR It represents the ratio between the difference between the maximum evolutionary step of the Pareto solution set subpopulation and the minimum evolutionary step of the Pareto solution set subpopulation and the maximum evolutionary step of the Pareto solution set subpopulation.

[0020] In this scheme, through the mathematical expressions of the difference information of evolutionary directions and evolutionary steps between sub-populations during the grid-connection of several new energy substations, the differences in evolutionary directions and step sizes between different sub-populations can be quantitatively described; by identifying and adjusting the differences in evolutionary directions and step sizes between sub-populations, the coordination and consistency of various parts in the new energy grid-connection process can be ensured, thereby enhancing the stability and reliability of the new energy grid-connected operation system.

[0021] Furthermore, the S43 includes the following sub-steps: S431. Define the change type of the Pareto solution set according to the change of the power grid topology before and after several new energy substations are connected to the grid; S432. Construct the change type criterion of the Pareto solution set according to the change type of the Pareto solution set and the multi-objective DC bias magnetic dynamic optimization information.

[0022] In this scheme, by defining the change type of the Pareto solution set, the impact of the change in the grid topology before and after the new energy substation is connected to the grid on the Pareto solution set can be accurately reflected, which helps to accurately reflect the changes in the new energy grid-connected operation system during the optimization process and improve the accuracy of the optimization results; by constructing the Pareto solution set change type criterion, the optimal DC bias magnetic dynamic management strategy can make corresponding adjustments to different types of grid topology changes.

[0023] Furthermore, the Pareto solution set change type criterion includes: For the n-dimensional decision variable, when the first similarity between the Pareto solution set population before the grid connection of the several new energy substations and the Pareto solution set population after the grid connection of the several new energy substations is greater than or equal to the first preset similarity threshold, it is judged that the Pareto solution set population before the grid connection of the several new energy substations is a Pareto solution set state-invariant type; For n-dimensional decision variables, when the first similarity between the Pareto solution set population before the grid connection of several new energy substations and the Pareto solution set population after the grid connection of several new energy substations is less than the first preset similarity threshold, the full-dimensional evolution directions between the Pareto solution set subpopulations are the same, and the second similarity of the evolutionary step lengths between the Pareto solution set subpopulations is greater than or equal to the second preset similarity threshold, then it is judged that the Pareto solution set population before the grid connection of several new energy substations is a type of Pareto solution set translation; For n-dimensional decision variables, when the first similarity between the Pareto solution set population before the connection of several new energy substations to the grid and the Pareto solution set population after the connection of several new energy substations to the grid is less than the first preset similarity threshold, the full-dimensional evolution directions between the Pareto solution set subpopulations are different, or the second similarity of the evolutionary step lengths between the Pareto solution set subpopulations is less than the second preset similarity threshold, then it is judged that the Pareto solution set population before the connection of several new energy substations to the grid is a Pareto solution set rotation type.

[0024] In this scheme, the Pareto solution set change type criterion can provide clear classification guidance for the changes in the Pareto solution set population before and after the grid-connected renewable energy substation, quickly determine the change type of the Pareto solution set population, and thus improve the efficiency and accuracy of the optimization decision; for different types of Pareto solution set changes, taking corresponding optimization measures will help enhance the stability of the renewable energy grid-connected operation system.

[0025] The beneficial effects of the present invention are as follows: the decision variable information of the new energy grid-connected operation system is determined by the actual operation parameter information of several new energy substations connected to the grid, and then the DC bias dynamic optimization model is constructed by fully combining the multi-objective DC bias dynamic optimization information and solving it to obtain the corresponding Pareto optimal solution set, and the DC bias dynamic optimization of the new energy grid-connected operation system is performed according to the optimal DC bias dynamic management strategy obtained from the Pareto optimal solution set. The DC bias dynamic optimization of the new energy grid-connected operation system can be performed more accurately according to the actual operation parameter information of the new energy substation connected to the grid, effectively reducing the influence of the DC bias phenomenon on the stable operation of the new energy grid, and significantly improving the effect of the new energy grid-connected operation. By combining the location information of the sub-population center point, calculating the evolution direction and evolution step, the change trend and speed of each sub-population after the new energy substation is connected to the grid can be accurately evaluated; by calculating the full-dimensional evolution direction and step difference ratio between sub-populations, the differences in evolution direction and evolution step between sub-populations during the grid connection of new energy substations can be obtained; the Pareto solution set change type criterion constructed based on the changes in the power grid topology before and after the new energy substation is connected to the grid can more accurately judge the change type of the Pareto optimal solution set, which is helpful to quickly respond to changes in the power grid structure and adjust the optimization strategy; the optimal DC bias dynamic management strategy determined based on the change type of the Pareto optimal solution set can perform DC bias dynamic optimization according to the actual situation of the new energy grid-connected operation system, which can significantly reduce the DC bias current, reduce the number of DC bias management devices, and improve the operation efficiency and stability of the new energy grid-connected operation system. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a flowchart of a method for dynamic optimization of DC bias magnetic field for grid-connected renewable energy according to an embodiment of the present invention; Figure 2 Graph 1 is a result of non-dominated solution sets of two governance strategies according to an embodiment of the present invention. DETAILED DESCRIPTION

[0027] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0028] Embodiment: A DC bias magnetic dynamic optimization method for renewable energy grid connection, such as Figure 1 As shown, the following steps are included: S1. Determine the decision variable information of the new energy grid-connected operation system based on the actual operation parameter information of several new energy substations connected to the grid; S2. Constructing a DC bias magnetic dynamic optimization model based on multi-objective DC bias magnetic dynamic optimization information and decision variable information; S3, solving the DC bias magnetic dynamic optimization model to obtain the corresponding Pareto optimal solution set; S4. Based on the Pareto optimal solution set, the optimal DC bias dynamic management strategy is obtained, and the DC bias dynamic optimization of the new energy grid-connected operation system is performed according to the optimal DC bias dynamic management strategy.

[0029] Specifically, S1 includes the following sub-steps: S11, obtaining actual operation parameter information of several new energy substations connected to the grid and preprocessing the information to obtain key actual operation parameter information; S12, obtaining historical operating parameter information of the new energy grid-connected operation system and performing multi-factor characteristic analysis on it, and constructing a multi-dimensional constraint condition indicator system based on the multi-factor characteristic analysis results; S13. Analyze the key actual operating parameter information based on the multi-dimensional constraint condition indicator system to obtain the decision variable information of the new energy grid-connected operation system.

[0030] Furthermore, the actual operating parameter information of the grid-connected new energy substation, such as voltage, current, power factor, frequency, etc., can be collected in real time using devices such as sensor networks, supervisory control and data acquisition systems (SCADA) or remote terminal units (RTUs). The collected data is transmitted to a data center or analysis platform through a wired or wireless communication network (such as Ethernet, 4G / 5G network). The collected raw data is preprocessed by cleaning, denoising, missing value processing, outlier detection and other preprocessing operations to ensure the accuracy and reliability of the data. According to the analysis needs, key actual operating parameter information, such as maximum / minimum voltage, average current, total power, etc., is extracted from the preprocessed data.

[0031] Obtain historical operating parameter information of the new energy grid-connected operation system from the historical database, including past operating status, fault records, environmental data, etc. Use data analysis techniques (such as statistical analysis, machine learning, data mining, etc.) to perform multi-factor feature analysis on historical data to identify key factors and patterns that affect system performance. Based on the results of multi-factor feature analysis, build a multi-dimensional constraint condition indicator system. These indicators can include safety indicators (such as voltage stability, frequency deviation), economic indicators (such as operating costs, energy efficiency ratio), technical indicators (such as equipment health status, maintenance requirements), etc.

[0032] Match the key actual operating parameter information with the multi-dimensional constraint condition indicator system to determine the corresponding relationship between the current system state and the indicator system; where the multi-dimensional constraint condition indicator system refers to the indicator system constructed based on the results of these analyses by conducting multi-factor feature analysis on historical operating parameter information in the new energy grid-connected operation system, identifying the key factors and patterns that affect system performance. Based on the matching results and the indicator system, conduct decision analysis, including the application of optimization algorithms (such as genetic algorithms, particle swarm optimization algorithms, etc.) to find the optimal solution or feasible solution that meets the constraints. Decision variable information is extracted from the results of the decision analysis. These variables may include control parameter settings, equipment scheduling strategies, operation and maintenance plans, etc. The decision variable information can be output in the form of reports, charts or instructions.

[0033] Specifically, S2 includes the following sub-steps: S21, obtaining multi-objective DC bias magnetic dynamic optimization information of the new energy grid-connected operation system and performing feature extraction on the information to obtain multi-objective DC bias magnetic dynamic optimization feature information; S22. Based on the multi-objective DC bias dynamic optimization characteristic information, an objective function is established with the DC bias treatment scheme of each new energy substation as the optimization variable, and with the minimum regional total DC bias current of the new energy grid-connected operation system and the minimum total number of DC bias treatment devices of the new energy grid-connected operation system as the goal; S23, obtaining actual DC bias magnetic data of each new energy substation and analyzing the data to obtain corresponding key actual DC bias magnetic data; S24. Construct a DC bias magnetic dynamic optimization model based on the objective function and key actual DC bias magnetic data.

[0034] Furthermore, sensor networks and monitoring systems can be used to collect DC bias data in the new energy grid-connected operation system in real time, including parameters such as voltage, current, and power. The data is transmitted to the data center or processing unit through a wired or wireless communication network, and the data is cleaned, denoised, and missing value processed to ensure data quality. Data analysis tools (such as machine learning libraries) can be used to extract features from the data to extract key features that reflect the dynamic characteristics of DC bias, such as the fluctuation frequency and amplitude of the bias current. The DC bias control plan for each new energy substation is clearly defined as an optimization variable, and two main goals are determined: minimizing the regional total DC bias current of the new energy grid-connected operation system and minimizing the total number of DC bias control devices.

[0035] According to the optimization variables and objectives, a mathematical expression is constructed as the objective function. The dynamic characteristics of the system can be modeled and constraints can be set. The DC bias data is monitored in real time through sensors installed in the new energy substation. The real-time data is transmitted to the data center or processing unit. Use data analysis tools to perform statistical analysis on the real-time data to identify key actual DC bias data, such as maximum value, average value, fluctuation range, etc. Combined with the objective function and key actual DC bias data, an optimization algorithm (such as multi-objective optimization algorithm, genetic algorithm, particle swarm optimization algorithm, etc.) is used in combination with the field-circuit indirect coupling method to construct a DC bias dynamic optimization model. This model can reflect the dynamic characteristics of the new energy grid-connected operation system and find a DC bias control solution that optimizes the objective function while satisfying the constraints.

[0036] Specifically, in S22, the mathematical expression of the objective function is: In the formula, x i ∈[0,1] n ,i∈[1,n],x i represents the DC bias magnetic treatment scheme of the i-th renewable energy substation, x represents the column vector of the DC bias magnetic treatment schemes of n renewable energy substations; M(x) represents the total number function of DC bias magnetic treatment devices in the renewable energy grid-connected operation system; n represents the total number of renewable energy substations; I i Represents the regional DC bias current of the i-th new energy substation; I(x) represents the regional total DC bias current function of the new energy grid-connected operation system; G represents the admittance matrix of the resistor network in the new energy grid-connected operation system; G(x) represents the admittance matrix function of the resistor network in the new energy grid-connected operation system after the treatment according to the treatment plan; g represents the conductance column vector of the new energy grid-connected operation system substation; g(x) represents the conductance column vector function of the new energy grid-connected operation system substation after the treatment according to the treatment plan; V represents the voltage column vector of the reference node of the new energy substation.

[0037] Further, E = UV; Among them, the DC bias magnetic treatment solution x for the i-th new energy substation i There are 3 categories, x i ∈[0,0.33] means that the DC bias magnetic treatment device is not installed, x i ∈[0.34,0.66] indicates the installation of a capacitor DC isolation device, x i∈[0.67,1] indicates the installation of a 3-ohm resistor current limiting treatment device; G indicates the admittance matrix of the resistor network in the renewable energy grid-connected operation system; g indicates the conductance column vector of the substation in the renewable energy grid-connected operation system; G and g are affected by the DC bias magnetic treatment scheme corresponding to each renewable energy substation. When the i-th renewable energy substation is not equipped with a DC bias magnetic treatment device, G(i) and g(i) are initial values; when the i-th renewable energy substation is equipped with a capacitor DC isolation treatment device, the grounding resistance of each node is infinite, then g(i) is 0, and G(i,i) is the sum of the overhead line conductance; when the i-th renewable energy substation is equipped with a 3-ohm resistor current limiting treatment device, the grounding resistance increases by 3 ohms, g(i) is the inverse of the grounding resistance after connection, and G(i,i) is the sum of the overhead line conductance and the substation conductance; U is the voltage column vector of each renewable energy substation node, V indicates the voltage column vector of the reference node of the renewable energy substation, and E is the potential difference column vector of the conductance of the renewable energy substation.

[0038] Specifically, S3 includes the following sub-steps: S31, determining a multi-objective optimization algorithm according to the characteristic requirement information of the DC bias magnetic dynamic optimization model and the multi-objective DC bias magnetic dynamic optimization information; S32. Obtain the Pareto solution set populations corresponding to the several new energy substations before and after the grid connection according to the multi-objective optimization algorithm, the regional power grid topology model corresponding to the several new energy substations before and after the grid connection, and the DC bias magnetic treatment plan of each new energy substation, and perform clustering operations on the Pareto solution set populations to obtain the solution environment information corresponding to the several new energy substations before and after the grid connection; wherein the clustering operation includes taking the center points of the Pareto solution set populations corresponding to the several new energy substations before and after the grid connection and the minimum value of the objective function as the corresponding clustering centers, dividing the Pareto solution set populations corresponding to the several new energy substations before and after the grid connection into corresponding multiple sub-populations, and calculating the center points of each sub-population corresponding to the several new energy substations before and after the grid connection; the solution environment information includes the optimization variables and center points of each sub-population corresponding to the several new energy substations before and after the grid connection; S33. According to the Wilcoxon signed rank test method, the difference test of the corresponding solution environment information before and after the grid connection of several new energy substations is carried out to obtain the corresponding Pareto optimal solution set.

[0039] Specifically, S4 includes the following sub-steps: S41. Based on the Pareto optimal solution set and the location information of the center point of each subpopulation corresponding to several new energy substations before and after the grid connection, the evolution direction and evolution step of the center point of each subpopulation after the grid connection of several new energy substations are calculated; S42. According to the evolutionary direction and evolutionary step of the center point of each subpopulation after several new energy substations are connected to the grid, the full-dimensional evolutionary direction and step-length difference ratio between the subpopulations in the Pareto solution set are calculated to obtain the difference information of the evolutionary direction and evolutionary step length between the subpopulations during the process of several new energy substations being connected to the grid; S43. According to the changes in the topological structure of the power grid before and after the connection of several new energy substations to the grid, a criterion for the change type of the Pareto solution set is constructed; S44. According to the difference information of the distribution change of the Pareto solution set before and after the connection of several new energy substations to the grid, and the difference information of the evolutionary direction and the difference information of the evolutionary step length between subpopulations during the connection of several new energy substations to the grid, the Pareto optimal solution set is analyzed in combination with the criterion for the change type of the Pareto solution set, and the change type of the Pareto optimal solution set is obtained; S45. Determine the optimal DC bias dynamic management strategy based on the change type of the Pareto solution set, and perform DC bias dynamic optimization on the new energy grid-connected operation system according to the optimal DC bias dynamic management strategy.

[0040] Specifically, in S41, the mathematical expressions of the evolution direction and evolution step length of the center point of each subpopulation after several new energy substations are connected to the grid are: In the formula, C t-1 represents the center point of each subpopulation of the Pareto solution set at time t-1 before several renewable energy substations are connected to the grid, C t represents the center point of each subpopulation of the Pareto solution set at time t after several renewable energy substations are connected to the grid, S t represents the evolutionary step length of the center point of each subpopulation from time t-1 before the grid connection of several renewable energy substations to time t after the grid connection of several renewable energy substations, D t It represents the evolution direction of the center point of each subpopulation from time t-1 before several renewable energy substations are connected to the grid to time t after several renewable energy substations are connected to the grid; S represents the distance between the center point of each subpopulation of the Pareto solution set before several renewable energy substations are connected to the grid and the center point of each subpopulation of the Pareto solution set after several renewable energy substations are connected to the grid.

[0041] Specifically, in S42, the mathematical expressions of the difference information of the evolutionary directions and the difference information of the evolutionary steps among the sub-populations during the grid connection of several new energy substations are as follows: Where D A represents the evolution direction of the center point of the Pareto solution subpopulation A, D B represents the evolution direction of the center point of the Pareto solution subpopulation B, F DDThe full-dimensional evolution direction of the vector between the evolution direction of the center point of the Pareto solution set subpopulation A and the evolution direction of the center point of the Pareto solution set subpopulation B, represents the maximum evolutionary step length of the Pareto solution set subpopulation, represents the minimum evolutionary step length of the Pareto solution set subpopulation, S GR It represents the ratio between the difference between the maximum evolutionary step of the Pareto solution set subpopulation and the minimum evolutionary step of the Pareto solution set subpopulation and the maximum evolutionary step of the Pareto solution set subpopulation.

[0042] Specifically, the method includes the following sub-steps: S431. Define the change type of the Pareto solution set according to the change of the power grid topology before and after several new energy substations are connected to the grid; S432. Construct the change type criterion of the Pareto solution set according to the change type of the Pareto solution set and the multi-objective DC bias magnetic dynamic optimization information.

[0043] Specifically, the Pareto solution set change type criteria include: For the n-dimensional decision variable, when the first similarity between the Pareto solution set population before the grid connection of the several new energy substations and the Pareto solution set population after the grid connection of the several new energy substations is greater than or equal to the first preset similarity threshold, it is judged that the Pareto solution set population before the grid connection of the several new energy substations is a Pareto solution set state-invariant type; For n-dimensional decision variables, when the first similarity between the Pareto solution set population before the grid connection of several new energy substations and the Pareto solution set population after the grid connection of several new energy substations is less than the first preset similarity threshold, the full-dimensional evolution directions between the Pareto solution set subpopulations are the same, and the second similarity of the evolutionary step lengths between the Pareto solution set subpopulations is greater than or equal to the second preset similarity threshold, then it is judged that the Pareto solution set population before the grid connection of several new energy substations is a type of Pareto solution set translation; For n-dimensional decision variables, when the first similarity between the Pareto solution set population before the connection of several new energy substations to the grid and the Pareto solution set population after the connection of several new energy substations to the grid is less than the first preset similarity threshold, the full-dimensional evolution directions between the Pareto solution set subpopulations are different, or the second similarity of the evolutionary step lengths between the Pareto solution set subpopulations is less than the second preset similarity threshold, then it is judged that the Pareto solution set population before the connection of several new energy substations to the grid is a Pareto solution set rotation type.

[0044] According to the difference information of the distribution change of Pareto solution sets before and after the grid connection of several renewable energy substations, as well as the difference information of the evolutionary direction and evolutionary step length among subpopulations during the grid connection of several renewable energy substations, the Pareto optimal solution set is analyzed in combination with the criterion of the change type of Pareto solution set, and the change type of the Pareto optimal solution set is obtained.

[0045] Based on the above analysis, this application selects 10 renewable energy substations to connect to the power grid system for illustration. The Pareto solution set at time t-1 before the connection of several renewable energy substations to the grid is defined as PS t-1 , the Pareto solution set of several renewable energy substations at time t after grid connection is PS t ; Set the Pareto solution set to PS.

[0046] Furthermore, the content defining the change type of the Pareto solution set includes: when the objective function value of the Pareto solution set population changes from time t-1 to time t, and the state of the Pareto solution set remains unchanged, it is defined as the Pareto solution set state unchanged type; when the objective function value of the Pareto solution set population changes from time t-1 to time t, and the Pareto solution set population at time t-1 moves the same distance in the same direction and is transformed into the Pareto solution set population at time t through translation, it is defined as the Pareto solution set translation type; when the objective function value of the Pareto solution set population changes from time t-1 to time t, and the Pareto solution set population at time t-1 moves different distances in different directions and is transformed into the Pareto solution set population at time t through non-standard rotation or rotation around a certain point, it is defined as the Pareto solution set rotation type.

[0047] The initial population, G and g are determined according to the multi-objective optimization algorithm and the corresponding regional power grid topology model before several new energy substations are connected to the grid. G and g are modified according to the values ​​of each DC bias control scheme, and the corresponding regional DC bias current is calculated. The initial population is iterated to solve the environmental selection operation and select the non-dominated individual set.

[0048] Before the solution environment t changes, cluster the PS population to obtain the initial solution environment PS t-1 Information. Taking the center point of the PS population and the minimum point of the objective function as the cluster center, the PS population is clustered into sub-populations. Calculate each PS t-1 Subpopulation center point C t -1 , the subpopulation PS t-1 The optimization variables and the center point C of the PS subpopulation t-1 As the initial solution environment PS t-1Information is saved. When 10 new substations are connected at time t, G and g are determined according to the regional power grid topology model at time t. i Modify the values ​​of G and g, calculate the DC bias current, perform the solution environment selection operation and clustering operation again, and group the subpopulation PS t Optimization variables and PS t Subpopulation center point C t As a new solution environment PS t Information preservation. The Wilcoxon signed rank test is used to compare the PS of subpopulations in different solution environments. t-1 and PS t Distribution difference test, different solution environment PS t-1 and PS t The distribution test table is shown in Table 1; Table 1 PS of different solution environments t-1 and PS t Distribution Test Table According to the content of Table 1, when the new energy substation is connected to the power grid system, when the p value of the decision variable is less than 0.05, it represents the subpopulation PS t-1 and PS t There are significant differences in distribution.

[0049] Furthermore, the evolution direction and evolution step length of the center point of the PS subpopulation from time t-1 to time t are shown in Table 2; Table 2 Evolution direction and evolution step length of the center point of the PS subpopulation from time t-1 to time t According to the contents of Table 2, the evolutionary step lengths of the center points of various populations from time t-1 to time t are listed. The evolutionary step length represents the amount of change in the position of the center point of the population from one time point to the next time point. The larger the value, the greater the change or the faster the evolution. The evolutionary direction shows the direction of change of the center points of various populations in each dimension from time t-1 to time t. Only 5 dimensions out of 99 dimensions are shown here as an example. The positive or negative value indicates the direction. For example, in the PS cluster population, the change in the first dimension is 0.1900 (positive), while the change in the second dimension is -0.1019 (negative). By observing the evolutionary directions of different cluster populations, it can be inferred whether they tend to be similar or different directions in each dimension.

[0050] The results of the difference in the evolution direction and evolution step length of different parts of PS when the environment changes after calculating the embodiment are shown in Table 3; Table 3. Test table of evolutionary direction and step length differences among subpopulation centers According to the contents of Table 3, when solving the environmental change, the evolutionary directions of the PS sub-populations are inconsistent, and there are significant differences in the evolutionary step lengths between the PS sub-populations. GR When the value is greater than 20%, it is considered that there are significant differences in the evolutionary step lengths between subpopulations. GR When the value is less than 20%, it is considered that there is no significant difference in the evolutionary step length between subpopulations.

[0051] It is further found that there are significant differences in the PS distribution of sub-populations before and after the environmental change. The evolutionary directions of the sub-populations are consistent during the environmental change process, and there is no significant difference in the evolutionary step length. It is judged that the PS change type is the translation type of the Pareto solution set.

[0052] A DC bias dynamic governance strategy suitable for the type of Pareto solution set translation is designed. The design is as follows: when the solution environment changes, the newly added new energy substation adopts a reinitialization strategy, and other new energy substations evolve in the evolutionary direction and step size of the center point of the entire population. The DC bias dynamic governance strategy with PS translation change is now analyzed with the static optimization of the original new energy substation. The DC bias static strategy without a governance solution for the newly added new energy substation is analyzed. When the new energy substation is connected to the power grid system, the non-dominated solution set results of the two governance strategies are shown in the figure below. Figure 2 As shown in the figure, when a new renewable energy substation is connected to the grid system, the grid topology changes; when the DC bias distribution changes dynamically, the regional total DC bias current and the total number of DC bias management devices under the DC bias dynamic management strategy are better than those under the static management strategy.

[0053] The above embodiment is only a preferred solution of the present invention and does not limit the present invention in any form. There are other variations and modifications without exceeding the technical solution described in the claims.

Claims

1. A DC bias magnetic dynamic optimization method for renewable energy grid connection, It is characterized in that The following steps are involved: S1. Determine the decision variable information of the new energy grid-connected operation system based on the actual operation parameter information of several new energy substations connected to the grid; S2. Constructing a DC bias magnetic dynamic optimization model based on multi-objective DC bias magnetic dynamic optimization information and decision variable information; S3, solving the DC bias magnetic dynamic optimization model to obtain the corresponding Pareto optimal solution set; S4. Based on the Pareto optimal solution set, the optimal DC bias dynamic management strategy is obtained, and the DC bias dynamic optimization of the new energy grid-connected operation system is performed according to the optimal DC bias dynamic management strategy.

2. According to claim 1, a DC bias magnetic dynamic optimization method for new energy grid connection, It is characterized in that The S1 comprises the following sub-steps: S11, obtaining actual operation parameter information of several new energy substations connected to the grid and preprocessing the information to obtain key actual operation parameter information; S12, obtaining historical operating parameter information of the new energy grid-connected operation system and performing multi-factor characteristic analysis on it, and constructing a multi-dimensional constraint condition indicator system based on the multi-factor characteristic analysis results; S13. Analyze the key actual operating parameter information based on the multi-dimensional constraint condition indicator system to obtain the decision variable information of the new energy grid-connected operation system.

3. According to claim 1, a DC bias magnetic dynamic optimization method for new energy grid connection, It is characterized in that The S2 comprises the following sub-steps: S21, obtaining multi-objective DC bias magnetic dynamic optimization information of the new energy grid-connected operation system and performing feature extraction on the information to obtain multi-objective DC bias magnetic dynamic optimization feature information; S22. Based on the multi-objective DC bias dynamic optimization characteristic information, an objective function is established with the DC bias treatment scheme of each new energy substation as the optimization variable, and with the minimum regional total DC bias current of the new energy grid-connected operation system and the minimum total number of DC bias treatment devices of the new energy grid-connected operation system as the goal; S23, obtaining actual DC bias magnetic data of each new energy substation and analyzing the data to obtain corresponding key actual DC bias magnetic data; S24. Constructing a DC bias magnetic dynamic optimization model according to the objective function and the key actual DC bias magnetic data.

4. A DC bias magnetic dynamic optimization method for new energy grid connection according to claim 3, It is characterized in that In S22, the mathematical expression of the objective function is: In the formula, x i ∈[0,1] n ,i∈[1,n],x i represents the DC bias magnetic treatment scheme of the i-th renewable energy substation, x represents the column vector of the DC bias magnetic treatment schemes of n renewable energy substations; M(x) represents the total number function of DC bias magnetic treatment devices in the renewable energy grid-connected operation system; n represents the total number of renewable energy substations; I i Represents the regional DC bias current of the i-th new energy substation; I(x) represents the regional total DC bias current function of the new energy grid-connected operation system; G represents the admittance matrix of the resistor network in the new energy grid-connected operation system; G(x) represents the admittance matrix function of the resistor network in the new energy grid-connected operation system after the treatment according to the treatment plan; g represents the conductance column vector of the new energy grid-connected operation system substation; g(x) represents the conductance column vector function of the new energy grid-connected operation system substation after the treatment according to the treatment plan; V represents the voltage column vector of the reference node of the new energy substation.

5. The DC bias magnetic dynamic optimization method for new energy grid connection according to claim 3, It is characterized in that The S3 comprises the following sub-steps: S31, determining a multi-objective optimization algorithm according to the characteristic requirement information of the DC bias magnetic dynamic optimization model and the multi-objective DC bias magnetic dynamic optimization information; S32. Obtain the Pareto solution set populations corresponding to the several new energy substations before and after the grid connection according to the multi-objective optimization algorithm, the regional power grid topology model corresponding to the several new energy substations before and after the grid connection, and the DC bias magnetic treatment plan of each new energy substation, and perform clustering operations on the Pareto solution set populations to obtain the solution environment information corresponding to the several new energy substations before and after the grid connection; wherein the clustering operation includes taking the center points of the Pareto solution set populations corresponding to the several new energy substations before and after the grid connection and the minimum value of the objective function as the corresponding clustering centers, dividing the Pareto solution set populations corresponding to the several new energy substations before and after the grid connection into corresponding multiple sub-populations, and calculating the center points of each sub-population corresponding to the several new energy substations before and after the grid connection; the solution environment information includes the optimization variables and center points of each sub-population corresponding to the several new energy substations before and after the grid connection; S33. According to the Wilcoxon signed rank test method, the difference test of the corresponding solution environment information before and after the grid connection of several new energy substations is carried out to obtain the corresponding Pareto optimal solution set.

6. A DC bias magnetic dynamic optimization method for new energy grid connection according to claim 5, It is characterized in that The S4 comprises the following sub-steps: S41. Based on the Pareto optimal solution set and the location information of the center point of each subpopulation corresponding to several new energy substations before and after the grid connection, the evolution direction and evolution step of the center point of each subpopulation after the grid connection of several new energy substations are calculated; S42. According to the evolutionary direction and evolutionary step of the center point of each subpopulation after several new energy substations are connected to the grid, the full-dimensional evolutionary direction and step-length difference ratio between the subpopulations in the Pareto solution set are calculated to obtain the difference information of the evolutionary direction and evolutionary step length between the subpopulations during the process of several new energy substations being connected to the grid; S43. Construct the Pareto solution set change type criterion based on the changes in the power grid topology before and after the connection of several new energy substations to the grid; S44, according to the difference information of the distribution change of the Pareto solution set before and after the grid connection of several new energy substations, and the difference information of the evolutionary direction and the difference information of the evolutionary step length between the subpopulations during the grid connection of several new energy substations, combined with the Pareto solution set change type criterion, the Pareto optimal solution set is analyzed to obtain the change type of the Pareto optimal solution set; S45. Determine the optimal DC bias dynamic management strategy based on the change type of the Pareto solution set, and perform DC bias dynamic optimization on the new energy grid-connected operation system according to the optimal DC bias dynamic management strategy.

7. A DC bias magnetic dynamic optimization method for new energy grid connection according to claim 6, It is characterized in that In S41, the mathematical expression of the evolution direction and evolution step of the center point of each sub-population after the plurality of new energy substations are connected to the grid is: In the formula, C t-1 represents the center point of each subpopulation of the Pareto solution set at time t-1 before several renewable energy substations are connected to the grid, C t represents the center point of each subpopulation of the Pareto solution set at time t after several renewable energy substations are connected to the grid, S t represents the evolutionary step length of the center point of each subpopulation from time t-1 before the grid connection of several renewable energy substations to time t after the grid connection of several renewable energy substations, D t It represents the evolution direction of the center point of each subpopulation from time t-1 before several renewable energy substations are connected to the grid to time t after several renewable energy substations are connected to the grid; S represents the distance between the center point of each subpopulation of the Pareto solution set before several renewable energy substations are connected to the grid and the center point of each subpopulation of the Pareto solution set after several renewable energy substations are connected to the grid.

8. A DC bias magnetic dynamic optimization method for new energy grid connection according to claim 6, It is characterized in that In S42, the mathematical expressions of the difference information of evolutionary directions and evolutionary step lengths among subpopulations during the grid connection process of the plurality of new energy substations are: Where D A represents the evolution direction of the center point of the Pareto solution subpopulation A, D B represents the evolution direction of the center point of the Pareto solution subpopulation B, F DD The full-dimensional evolution direction of the vector between the evolution direction of the center point of the Pareto solution set subpopulation A and the evolution direction of the center point of the Pareto solution set subpopulation B, represents the maximum evolutionary step length of the Pareto solution set subpopulation, represents the minimum evolutionary step length of the Pareto solution set subpopulation, S GR It represents the ratio between the difference between the maximum evolutionary step of the Pareto solution set subpopulation and the minimum evolutionary step of the Pareto solution set subpopulation and the maximum evolutionary step of the Pareto solution set subpopulation.

9. The method for dynamic optimization of DC bias magnetic field for grid-connected renewable energy according to claim 6, It is characterized in that The S43 comprises the following sub-steps: S431. Define the change type of the Pareto solution set according to the change of the power grid topology before and after the connection of several new energy substations to the grid; S432. Construct a criterion for the change type of the Pareto solution set according to the change type of the Pareto solution set and the multi-objective DC bias magnetic dynamic optimization information.

10. A DC bias magnetic dynamic optimization method for new energy grid connection according to claim 9, It is characterized in that The Pareto solution set change type criteria include: For the n-dimensional decision variable, when the first similarity between the Pareto solution set population before the grid connection of the several new energy substations and the Pareto solution set population after the grid connection of the several new energy substations is greater than or equal to the first preset similarity threshold, it is judged that the Pareto solution set population before the grid connection of the several new energy substations is a Pareto solution set state-invariant type; For n-dimensional decision variables, when the first similarity between the Pareto solution set population before the grid connection of several new energy substations and the Pareto solution set population after the grid connection of several new energy substations is less than the first preset similarity threshold, the full-dimensional evolution directions between the Pareto solution set subpopulations are the same, and the second similarity of the evolutionary step lengths between the Pareto solution set subpopulations is greater than or equal to the second preset similarity threshold, then it is judged that the Pareto solution set population before the grid connection of several new energy substations is a type of Pareto solution set translation; For n-dimensional decision variables, when the first similarity between the Pareto solution set population before the connection of several new energy substations to the grid and the Pareto solution set population after the connection of several new energy substations to the grid is less than the first preset similarity threshold, the full-dimensional evolution directions between the Pareto solution set subpopulations are different, or the second similarity of the evolutionary step lengths between the Pareto solution set subpopulations is less than the second preset similarity threshold, then it is judged that the Pareto solution set population before the connection of several new energy substations to the grid is a Pareto solution set rotation type.

Citation Information

Cited By

  • Configuration optimization method of direct current magnetic biasing device

    CN120657830A

  • Dynamic risk assessment method for transformer DC magnetic bias caused by subway stray current

    CN122159230A