Linear control method and control system for prefabricated assembled beam through short line method
Through three-dimensional coordinate linear control and automatic adjustment, the problems of large measurement errors and low efficiency in the short-line method segmental beam prefabrication are solved, high-precision and efficient beam linear control is achieved, and construction costs are reduced.
Patent Information
- Application Number
- CN202411293899.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-09-14
AI Technical Summary
During the prefabrication process of segmental beams using the short-line method, measurement errors are large and efficiency is low, resulting in high construction costs and low calculation efficiency.
The three-dimensional coordinate linear control method is used to calculate the theoretical installation position of the control measuring points of the segmental beam in the overall coordinate system by establishing a local coordinate system and a transition coordinate system. The measurement robot and the intelligent base mold trolley are used to realize automatic adjustment and reduce manual labor. errors and computational complexity.
It improves the accuracy of line control, simplifies the calculation process, reduces manual investment, achieves efficient on-site production and intelligent control, and reduces construction costs.
Smart Images

Figure CN118792971A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge control, and in particular relates to a linear control method and a control system for a short-line prefabricated assembled beam. Background Art
[0002] Segmental prefabricated and assembled bridges generally refer to a construction method in which the bridge structure is divided into several stages. After the segmental prefabrication is completed in the beam field, it is transported to the bridge site, and prestressed for segmental assembly, that is, first "breaking the whole into parts" and then "breaking the parts into the whole". The entire construction process involves three different geometric lines: designed bridge line shape, manufacturing line shape and assembly line shape. Among them, the designed bridge line shape is the ideal design line shape state; the manufacturing line shape refers to the line shape of the segment in the stress-free state obtained by prefabrication in the beam field; the assembly line shape refers to the line shape formed after the segment prefabrication is completed and transported to the bridge site, and the segments are connected, assembled and erected in sequence. By controlling the manufacturing line shape and the assembly line shape, the actual line shape is brought closer to the designed bridge line shape. It is worth noting that for segmental prefabricated and assembled bridges, when all segments are prefabricated, the bridge line shape is basically determined. Therefore, the geometric line shape control of segmental prefabricated and assembled bridges mainly depends on the manufacturing line shape obtained by segment prefabrication.
[0003] There are two methods for controlling the linear shape of the main beam segment prefabrication: the long-line method and the short-line method. The long-line method casts the entire span or half a span at a time, which requires a large prefabrication site and transportation space. In addition, the bottom form is generally not adjusted after installation, and the prefabrication linear shape is fixed. Therefore, it is only suitable for straight bridges and has been gradually eliminated in large projects. The short-line method divides a span structure into several shorter segments, and only casts one segment at a time. The segment after casting serves as the movable end form for the next segment to be cast, and is moved to the matching position, and this cycle continues until all segments are prefabricated. The control of the position coordinates of the matching segments during the prefabrication process directly affects the geometric linear shape of the bridge. The control of the geometric linear shape of the short-line method segment prefabricated beam is mainly achieved by adjusting the position and posture of the matching segments.
[0004] At present, in the geometric line control of prefabricated segmental beams in mass production, the six-point control method based on total station measurement is popular both at home and abroad to determine the three-dimensional spatial position of the beam body, that is, the plane position of the segmental beam is controlled by two measuring points FH and BH on the center line of the segmental beam, and the elevation position and posture of the segmental beam are controlled by two measuring points on the left and right web top plates (left: FL, BL, right: FR, BR). A small number of project projects use electronic levels, leveling rods, etc. to measure elevations, and some of them set 10 control points on large-size segments. The on-site manual measurement error is large, and the measurement workload is huge, resulting in labor and time intensive, low efficiency, and a large amount of manpower and financial resources, resulting in high construction costs. The relevant linear control calculation usually adopts the method of first estimating the linear shape and then correcting the various errors of the predicted linear shape in the subsequent beam segment production. This method will lead to large cumulative errors and low calculation efficiency. Summary of the invention
[0005] The present invention provides a linear control method and a control system for prefabricated assembled beams using a short-line method, so as to solve the technical problems of large measurement error and low efficiency in the current short-line method segmental beam prefabrication process.
[0006] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:
[0007] A method for controlling the linear shape of a short-line prefabricated assembled beam, comprising:
[0008] Step 1: Establish a local coordinate system at the fixed end mold;
[0009] Step 2: Determine the first segment beam to be produced and cast it, measure the beam length of the first segment beam and the cast-in-place position of its control measuring point in the local coordinate system;
[0010] Step 3: Establish the transition coordinate system of the first segment beam, and use the positional relationship between the transition coordinate system and the local coordinate system of the first segment beam, as well as the beam length of the first segment beam and the cast-in-place position of its control measuring point in the local coordinate system to calculate the theoretical installation position of the control measuring point of the first segment beam in the global coordinate system and the theoretical matching position of the first segment beam in the local coordinate system when it is used as a matching end form;
[0011] Step 4: Cast the remaining segment beams except the first segment beam and measure the cast-in-place positions of the control points in sequence; when casting each segment:
[0012] Move the previous segment beam to its control measuring point to reach the theoretical matching position, which serves as the matching end form for casting the current segment beam;
[0013] If the current segmental beam is not the last segmental beam, then: establish the transition coordinate system of the current segmental beam, construct the transformation matrix between the local coordinate system, the transition coordinate system and the global coordinate system, and use the transformation matrix and the cast-in-place position of the control measuring point to calculate the theoretical installation position of the control measuring point of the current segmental beam in the global coordinate system and the theoretical matching position of the current segmental beam in the local coordinate system when it is used as a matching end mold.
[0014] Furthermore, the local coordinate system takes the intersection of the fixed end mold and the beam body and the center line of the beam top surface as the origin of the coordinate system, and the direction along the center line of the beam top surface pointing to the matching end mold is Axis positive direction, upward Positive direction, determined by the right-hand rule Positive axis direction.
[0015] Furthermore, during the casting process of the first segment beam, the center line of the top surface of the cast-in-place segment beam is always kept perpendicular to the fixed end form and the matching end form.
[0016] Furthermore, in step 3, the theoretical installation position of the control measuring point of the first segment beam in the global coordinate system is calculated, which specifically includes:
[0017] S301: Establish the transition coordinate system of the first segment beam , with the intersection of the matching end mold and the beam body and the center line of the top surface of the beam as the origin, and the direction along the center line of the top surface pointing to the fixed end mold as Axis positive direction, upward Positive direction of the axis, determined by the right-hand rule Axis positive direction;
[0018] S302: Use the beam length of the first segment beam , the control measuring points of the first section beam In the local coordinate system Coordinates of the cast-in-place position , converted to its transition coordinate system The transition coordinates in :
[0019]
[0020] In the formula, ,
[0021] S303: The control measuring points of the first segment beam In the transition coordinate system The transition coordinates in , converted to its global coordinate system Theoretical installation position under ;
[0022] S30301: According to the theoretical installation position of the nodes at both ends of the first segment beam in the global coordinate system, that is, node 1 and node 2 , calculate the transition coordinate system of the first segment beam Each coordinate axis in the global coordinate system The direction vector in :
[0023]
[0024]
[0025]
[0026] The nodes of the segmental beam are defined as follows: for any segmental beam n, the intersection points of the center line of the beam surface and the cross sections on both sides are node n and node n+1 respectively;
[0027] S30302: Establish the transition coordinate system of the first segment beam and the global coordinate system The transformation matrix between :
[0028]
[0029] S30303: Calculation base point based on coordinate transformation , each control point In the transition coordinate system The transition coordinates in Convert to its global coordinate system Theoretical installation position under :
[0030]
[0031] In the formula, the first segment beam Base point , take the origin of the transition coordinate system .
[0032] Furthermore, in step 3, after calculating the theoretical installation position of the control measuring point of the first segment beam in the global coordinate system, the theoretical matching position of the first segment beam in the local coordinate system when used as the matching end mold is further calculated, specifically including:
[0033] S304: Theoretical installation position of node 2 in the global coordinate system Make corrections to get the actual installation location of node 2 :
[0034]
[0035] In the formula, The length of the first segment beam, The transformation matrix of the first segment beam The first line of
[0036] S305: Calculate the target position coordinates of the first segment beam from the cast-in-place position to the matching position, that is, calculate its various control measurement points In the global coordinate system Theoretical installation position under Convert to its local coordinate system Theoretical matching position under ;
[0037] S30501: According to the coordinates of node 3 in the global coordinate system , the actual installation location of node 2 , calculate the overall coordinate system on the first segment beam Each coordinate axis is in the local coordinate system The direction vector in :
[0038]
[0039]
[0040]
[0041] S30502: Establish the transformation matrix between the global coordinate system and the local coordinate system :
[0042]
[0043] S30503: Set the measuring point on the first section beam In the global coordinate system Theoretical installation location in Convert to local coordinate system Theoretical matching position under :
[0044]
[0045] In the formula, is the coordinate of node 3 in the design line in the global coordinate system.
[0046] Furthermore, in step 4, the theoretical installation position of the control measuring point of the current segment beam in the global coordinate system is calculated, specifically:
[0047] step401: Establish Transition coordinate system of segmental beam: Control points on segmental beams As the origin, with vector Direction Axis positive direction, upward Positive direction of the axis, determined by the right-hand rule Axis positive direction;
[0048] step402: Segmental beam in local coordinate system Coordinates of the cast-in-place position Convert to its transition coordinate system The transition coordinates in .
[0049] First calculate the transition coordinate system Each coordinate axis is in the local coordinate system The direction vector in , , , establish the transformation matrix between the local coordinate system and the transition coordinate system :
[0050]
[0051]
[0052]
[0053]
[0054] In the formula, , , express Measuring points on segment beam In the local coordinate system The actual matching position under ;
[0055] Then the measuring point In the local coordinate system Cast-in-place location Convert to its transition coordinate system The transition coordinates in :
[0056]
[0057] In the formula, , , for Measuring points on segment beam In the local coordinate system The actual matching position in ;
[0058] step403: Control points on segmental beams In the transition coordinate system The transition coordinates in Convert to its global coordinate system Theoretical installation position under .
[0059] step40301: Calculation Transition coordinate system on segmental beam Each coordinate axis in the global coordinate system The direction vector in :
[0060]
[0061]
[0062]
[0063] step40302: Establish the transformation matrix between the transition coordinate system and the global coordinate system :
[0064]
[0065] step40303: Calculate the base point based on coordinate transformation , the transition coordinate system The transition coordinates in Convert to global coordinate system Theoretical installation coordinates under :
[0066]
[0067] In the formula for Measuring points on segment beam Theoretical installation coordinates .
[0068] Furthermore, after calculating the theoretical installation position of the control measuring point of the current segment beam in the global coordinate system, step 4 further calculates the theoretical matching position of the current segment beam in the local coordinate system when it is used as a matching end mold, specifically including:
[0069] step404: for nodes Correct the coordinates in the global coordinate system:
[0070]
[0071]
[0072] In the formula, For Node In the transition coordinate system The transition coordinates in for Control points on segment beams In the local coordinate system The actual matching position in ; node Corrected coordinates in the global coordinate system;
[0073] step405: calculation Each control point of the segment Theoretical installation position in the global coordinate system Convert to local coordinate system Theoretical matching position under :
[0074] step40501: According to the node Theoretical installation coordinates in the global coordinate system ,node Corrected coordinates ,calculate Global coordinate system on segment Each coordinate axis is in the local coordinate system The direction vector in :
[0075]
[0076]
[0077]
[0078] step40502: Establish the transformation matrix between the global coordinate system and the local coordinate system :
[0079]
[0080] step40503: Measuring point on segment In the global coordinate system Theoretical installation location in Convert to local coordinate system Theoretical matching position under :
[0081]
[0082] In the formula, To design the linear midpoint Coordinates in global coordinates.
[0083] Furthermore, Control points on segment beams In the local coordinate system The actual matching position in , step 4 is to In the process of moving the segment beam to its control measuring point and reaching the theoretical matching position, the segment beam is repeatedly moved and measured. The actual matching position of the control measuring point on the segment beam is controlled until the deviation between the actual matching position of the control measuring point and the theoretical matching position is controlled within the allowable deviation range.
[0084] A short-line method prefabricated assembly beam linear control system, comprising: a measuring robot, an intelligent bottom mold trolley and a short-line method prefabricated assembly beam linear control device;
[0085] The measuring robot is used to collect and obtain the control points of the fixed end mold and the control measuring points on each segment beam. Cast-in-place position in local coordinate system and the actual matching position ;
[0086] The intelligent bottom mold trolley is used to: carry the segmental beam and receive control to move the carried segmental beam to a target position;
[0087] The short-line method prefabricated assembly beam linear control device is combined with a measuring robot and an intelligent bottom mold trolley to realize the short-line method prefabricated assembly beam linear control method described in any of the above technical solutions.
[0088] Compared with the prior art, the linear control method of the short-line method of the present invention for prefabricated assembled beams has the advantages of: using three-dimensional coordinate linear control, high linear control accuracy, introducing a transition coordinate system in the calculation process, directly calculating the required coordinate data, and not generating various errors such as the angle error and beam length error generated by first predicting and then correcting the deviation in the traditional control method. The calculation principle is relatively simple, and it is easy to compile into a computer program to improve the calculation efficiency. At the same time, the present invention can effectively reduce labor input, realize the integration of unmanned or unmanned intelligent control in the prefabricated beam field, thereby reducing the measurement and matching errors caused by manual labor and improving on-site production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0089] Figure 1 A schematic diagram of a method step flow chart of an embodiment of the present invention;
[0090] Figure 2 A schematic diagram of a geometric linear control method according to an embodiment of the present invention;
[0091] Figure 3 A schematic diagram of establishing the global coordinate system and the local coordinate system and arranging the measuring points according to an embodiment of the present invention;
[0092] Figure 4 A schematic diagram of a segment shape according to an embodiment of the present invention;
[0093] Figure 5 This is a schematic diagram of the position of the transition coordinate system of the first segment of an embodiment of the present invention;
[0094] Figure 6 It is a schematic diagram of the position of a common segment transition coordinate system according to an embodiment of the present invention.
[0095] Figure numerals: 1 - fixed end form, 2 - cast-in-place segmental beam, 3 - matching end form, 4 - segmental beam after matching end form is completed, 5 - wet joint, 0 - first segmental beam. DETAILED DESCRIPTION
[0096] The following is a detailed description of an embodiment of the present invention. This embodiment is based on the technical solution of the present invention, and provides a detailed implementation method and a specific operation process to further explain the technical solution of the present invention.
[0097] This embodiment provides a method for controlling the linear shape of a short-line prefabricated assembled beam. Figure 1-6 As shown, the following steps are included:
[0098] S1: Establish a local coordinate system at the fixed end mold and set control points on the left, middle and right sides respectively , , .
[0099] Establishing a local coordinate system The origin of the coordinate system is the intersection of the fixed end mold and the beam body and the center line of the top surface of the beam. The direction along the center line of the top surface of the beam pointing to the matching end mold is Axis positive direction, upward Positive direction, determined by the right-hand rule Positive axis direction.
[0100] Take the origin of the coordinate system as the intermediate control point , from the origin to Take points equidistant on both sides of the axis in the positive and negative directions as control points on the left and right sides , , three o'clock , , Constructing a local coordinate system Before each subsequent measurement, the coordinates of these three control points on the fixed end mold must be checked to ensure that the position of the local coordinate system and the measuring tower remain unchanged.
[0101] S2: Determine the first segment beam to be produced and cast it, and embed 6 bolts on the top surface of the first segment beam as control measuring points.
[0102] The first segmental beam cast in each joint can be a segmental beam at any position in the mid-span or end, which is determined according to the construction technology and site conditions. 6 control points on the top surface of the segmental beam They are: , , , , , .in, , It is a horizontal control point, arranged on the center line of the segment beam to control the linear shape of the segment beam. , coordinate; , , , The elevation control points are arranged on the webs on the left and right sides of the segment beam to control the line shape. Coordinates and segmental beam posture. Once the alignment and posture of all segmental beams are determined, the overall bridge geometry is also determined.
[0103] In the first segment beam (i.e. During the casting process of the segmental beam, the center line of the top surface of the cast-in-place segmental beam is always kept perpendicular to the fixed end form and the matching end form. Therefore, the top surface of the first segmental beam is always rectangular. If it is a straight bridge, the remaining segmental beams are also rectangular. If it is a curved bridge, the remaining segmental beams are wedge-shaped.
[0104] After the first segment beam is cast and cured, measure the length of the segment beam. And the cast-in-place position coordinates of each control measuring point in the local coordinate system , where , , , , , .
[0105] S3: Establish the transition coordinate system of the first section beam, and calculate the measuring points of the first section beam through the transformation of the transition coordinates. The theoretical installation position in the global coordinate system and its theoretical matching position in the local coordinate system when used as a matching end mold.
[0106] S301: Establishing transition coordinate system , with the intersection of the matching end mold and the beam body and the center line of the top surface of the beam as the origin, and the direction along the center line of the top surface pointing to the fixed end mold as Axis positive direction, upward Positive direction of the axis, determined by the right-hand rule Positive axis direction.
[0107] S302: Use the beam length of the first segment beam , the control measuring points of the first section beam In the local coordinate system Coordinates of the cast-in-place position , converted to its transition coordinate system The transition coordinates in :
[0108]
[0109] S303: The control measuring points of the first segment beam In the transition coordinate system The transition coordinates in , converted to its global coordinate system Theoretical installation position under .
[0110] S30301: For the first segment beam, according to the theoretical installation position of the two end nodes in the global coordinate system, that is, node 1 and node 2 , calculate the transition coordinate system of the first segment beam Each coordinate axis in the global coordinate system The direction vector in :
[0111]
[0112]
[0113]
[0114] The definition of the node is: for any segment beam n, the intersection points of the center line of the beam surface and the cross sections on both sides are node n and node n+1 respectively.
[0115] S30302: Establish the transition coordinate system of the first segment beam and the global coordinate system The transformation matrix between :
[0116]
[0117] S30303: Calculation base point based on coordinate transformation , each control point In the transition coordinate system The transition coordinates in Convert to its global coordinate system Theoretical installation position coordinates under :
[0118]
[0119] In the formula, the first segment beam Base point , take the origin of the transition coordinate system .
[0120] S304: Theoretical installation position of node 2 in the global coordinate system Make corrections to get the actual installation location of node 2 :
[0121]
[0122] In the formula, The length of the first segment beam, The transformation matrix of the first segment beam The first line of .
[0123] The transformation matrix of the first segment beam The first line of , according to the calculation method of step S30302, can be understood as the unit vector of the u-axis of the transition coordinate system in the three methods of the global coordinate system, namely:
[0124]
[0125] It is known that node 1 is The origin of the coordinate system, node 2 is located in the positive direction of the u axis, and the overall coordinates of node 1 are , Centerline beam length , thus:
[0126]
[0127]
[0128]
[0129] S305: Calculate the target position coordinates of the first segment beam from the cast-in-place position to the matching position, that is, calculate its various control measurement points In the global coordinate system Theoretical installation position under Convert to its local coordinate system Theoretical matching position under .
[0130] S30501: According to the coordinates of node 3 in the global coordinate system , the actual installation location of node 2 , calculate the overall coordinate system on the first segment beam Each coordinate axis is in the local coordinate system The direction vector in :
[0131]
[0132]
[0133]
[0134] S30502: Establish the transformation matrix between the global coordinate system and the local coordinate system (Discrete Matrix):
[0135]
[0136] S30503: Set the measuring point on the first section beam In the global coordinate system Theoretical installation location in Convert to local coordinate system Theoretical matching position under .
[0137]
[0138] In the formula, is the coordinate of node 3 in the design line in the global coordinate system.
[0139] S4: For the rest of the beam except the first segment Segmental beam (i.e. Segmental beams), the previously cast and cured The segment beam moves to the theoretical matching position , as a pouring Matching end forms for segmental beams, continue Casting of segmental beams and embedding of measuring points.
[0140] Specific to The segmental beam is cast, and 6 bolts are embedded on the top surface of the segmental beam as control measuring points, which are: , , , , , , which has the same function as the control point in step S2. After the segmental beam maintenance is completed, measure the control points of the segmental beam ( , , , , , , the same below) in the local coordinate system Cast-in-place position , and also measure Measuring points on segment beam The actual matching position .
[0141] Will Each measuring point on the segment According to its theoretical matching position Repeated movement and observation are performed until the deviation between the actual matching position of the measuring point and the theoretical matching position is controlled within the allowable deviation range.
[0142] S5: Complete the first step through S4 Segmental beam ( ) After pouring and curing, a transition coordinate system is established. By transforming the transition coordinate system, the calculation Segmental beam measuring points The theoretical installation position in the global coordinate system and the theoretical matching position in the local coordinate system when it is used as a matching end mold. Specifically:
[0143] S501: Establishment Segmental beam( ) to match the end mode ( Control measuring points on segment beam As the origin, with vector Direction Axis positive direction, upward Positive direction of the axis, determined by the right-hand rule Positive axis direction.
[0144] S502: Segmental beam( ) in the local coordinate system Coordinates of the cast-in-place position Convert to its transition coordinate system The transition coordinates in .
[0145] First calculate the transition coordinate system Each coordinate axis is in the local coordinate system The direction vector in , , , establish the transformation matrix between the local coordinate system and the transition coordinate system :
[0146]
[0147]
[0148]
[0149]
[0150] In the formula, , , express Measuring points on segment beam In the local coordinate system The actual matching position below.
[0151] Then the measuring point In the local coordinate system Cast-in-place location Convert to its transition coordinate system The transition coordinates in :
[0152]
[0153] In the formula, , , for Measuring points on segment beam In the local coordinate system The actual matching position in .
[0154] S503: Segmental beam( ) on each control point In the transition coordinate system The transition coordinates in Convert to its global coordinate system Theoretical installation position under .
[0155] S50301: Calculation Transition coordinate system on segmental beam Each coordinate axis in the global coordinate system The direction vector in :
[0156]
[0157]
[0158]
[0159] S50302: Establish the transformation matrix between the transition coordinate system and the global coordinate system (Assembly matrix):
[0160]
[0161] S50303: Calculation base point based on coordinate transformation , the transition coordinate system The transition coordinates in Convert to global coordinate system Theoretical installation coordinates under :
[0162]
[0163] In the formula for Measuring points on segment beam Theoretical installation coordinates .
[0164] S504: When After the segmental beam is cast, there is a deviation between its actual shape and the designed shape, which causes the overall coordinates of the nodes on the subsequent segmental beam to be different from the overall coordinates in the original design line shape. To make corrections:
[0165]
[0166]
[0167] In the formula, For Node In the transition coordinate system The transition coordinates in for Measuring points on segment beam In the local coordinate system The actual matching position in .
[0168] S505: Calculation The target position coordinates of the segment beam moving from the cast-in-place position to the matching position, that is, calculating the control measurement points In the global coordinate system Theoretical installation position under Convert to its local coordinate system Theoretical matching position under .
[0169] S50501: Based on the node Coordinates in the global coordinate system , the corrected node coordinate ,calculate Global coordinate system on segmental beam Each coordinate axis is in the local coordinate system The direction vector in :
[0170]
[0171]
[0172]
[0173] S50502: Establish the transformation matrix between the global coordinate system and the local coordinate system (Discrete Matrix):
[0174]
[0175] S50503: Measuring points on segment beam In the global coordinate system Theoretical installation location in Convert to local coordinate system Theoretical matching position under .
[0176]
[0177] In the formula, To design the linear midpoint The coordinates of the nodes in the global coordinate system Theoretical installation position.
[0178] S6: Repeat steps S4 and S5 until all segment beams are prefabricated.
[0179] S7: Using the advanced programming language Python, the linear control calculation method in the above steps is compiled into geometric linear control software, and an interface is reserved to link it with the measuring robot and the intelligent bottom mold trolley for data transmission, so as to realize the intelligent integration of closed-loop control of spatial three-dimensional coordinate acquisition and measurement, geometric linear calculation, and trolley posture intelligent adjustment.
[0180] Among them, the measuring robot is used to automatically collect and obtain the end mold control points , , The coordinates of the control points on each segment beam Cast-in-place position in local coordinate system and the actual matching position The linear control software is used to analyze and calculate the linear control of the three-dimensional coordinate data collected by the measuring robot, and give corresponding instructions, namely: control measuring points on each segment beam Theoretical matching position in local coordinate system and the theoretical installation position in the global coordinate system The intelligent bottom formwork trolley carrying the segmental beam automatically adjusts to the target position by executing the instructions provided by the wire control software.
[0181] The above embodiments are preferred embodiments of the present application. Ordinary technicians in this field can also make various changes or improvements on this basis. Without departing from the overall concept of the present application, these changes or improvements should fall within the scope of protection required by the present application.
Claims
1. A method for controlling the linear shape of a short-line prefabricated assembled beam, characterized in that: include: Step 1: Establish a local coordinate system at the fixed end mold; Step 2: Determine the first segment beam to be produced and cast it, measure the beam length of the first segment beam and the cast-in-place position of its control measuring point in the local coordinate system; Step 3: Establish the transition coordinate system of the first segment beam, and use the positional relationship between the transition coordinate system and the local coordinate system of the first segment beam, as well as the beam length of the first segment beam and the cast-in-place position of its control measuring point in the local coordinate system to calculate the theoretical installation position of the control measuring point of the first segment beam in the global coordinate system and the theoretical matching position of the first segment beam in the local coordinate system when it is used as a matching end form; Step 4: Cast the remaining segment beams except the first segment beam and measure the cast-in-place positions of the control points in sequence; when casting each segment: Move the previous segment beam to its control measuring point to reach the theoretical matching position, which serves as the matching end form for casting the current segment beam; If the current segmental beam is not the last segmental beam, then: establish the transition coordinate system of the current segmental beam, construct the transformation matrix between the local coordinate system, the transition coordinate system and the global coordinate system, and use the transformation matrix and the cast-in-place position of the control measuring point to calculate the theoretical installation position of the control measuring point of the current segmental beam in the global coordinate system and the theoretical matching position of the current segmental beam in the local coordinate system when it is used as a matching end mold.
2. The method for controlling the linear shape of prefabricated assembled beams by the short-line method according to claim 1 is characterized in that: The local coordinate system takes the intersection of the fixed end mold and the beam body and the center line of the beam top surface as the origin of the coordinate system, and the direction along the center line of the beam top surface pointing to the matching end mold is Axis positive direction, upward Positive direction, determined by the right-hand rule Positive axis direction.
3. The method for controlling the linear shape of short-line prefabricated assembled beams according to claim 2 is characterized in that: During the casting process of the first segment beam, the center line of the top surface of the cast-in-place segment beam is always kept perpendicular to both the fixed end form and the matching end form.
4. The method for controlling the linear shape of short-line prefabricated assembled beams according to claim 3 is characterized in that: In step 3, the theoretical installation position of the control measuring point of the first segment beam in the global coordinate system is calculated, which specifically includes: S301: Establish the transition coordinate system of the first segment beam , with the intersection of the matching end mold and the beam body and the center line of the top surface of the beam as the origin, and the direction along the center line of the top surface pointing to the fixed end mold as Axis positive direction, upward Positive direction of the axis, determined by the right-hand rule Axis positive direction; S302: Use the beam length of the first segment beam , the control measuring points of the first section beam In the local coordinate system Coordinates of the cast-in-place position , converted to its transition coordinate system The transition coordinates in : ; In the formula, , S303: The control measuring points of the first segment beam In the transition coordinate system The transition coordinates in , converted to its global coordinate system Theoretical installation position under ; S30301: According to the theoretical installation position of the nodes at both ends of the first segment beam in the global coordinate system, that is, node 1 and node 2 , calculate the transition coordinate system of the first segment beam Each coordinate axis in the global coordinate system The direction vector in : ; ; ; The nodes of the segmental beam are defined as follows: for any segmental beam n, the intersection points of the center line of the beam surface and the cross sections on both sides are node n and node n+1 respectively; S30302: Establish the transition coordinate system of the first segment beam and the global coordinate system The transformation matrix between : ; S30303: Calculation base point based on coordinate transformation , each control point In the transition coordinate system The transition coordinates in Convert to its global coordinate system Theoretical installation position under : ; In the formula, the first segment beam Base point , take the origin of the transition coordinate system .
5. The method for controlling the linear shape of prefabricated assembled beams by the short-line method according to claim 4 is characterized in that: After calculating the theoretical installation position of the control measuring point of the first segment beam in the global coordinate system in step 3, further calculate the theoretical matching position of the first segment beam in the local coordinate system when it is used as the matching end mold, specifically including: S304: Theoretical installation position of node 2 in the global coordinate system Make corrections to get the actual installation location of node 2 : ; In the formula, The length of the first segment beam, The transformation matrix of the first segment beam The first line of S305: Calculate the target position coordinates of the first segment beam from the cast-in-place position to the matching position, that is, calculate its various control measurement points In the global coordinate system Theoretical installation position under Convert to its local coordinate system Theoretical matching position under ; S30501: According to the coordinates of node 3 in the global coordinate system , the actual installation location of node 2 , calculate the overall coordinate system on the first segment beam Each coordinate axis is in the local coordinate system The direction vector in : ; ; ; S30502: Establish the transformation matrix between the global coordinate system and the local coordinate system : ; S30503: Set the measuring point on the first section beam In the global coordinate system Theoretical installation location in Convert to local coordinate system Theoretical matching position under : ; In the formula, is the coordinate of node 3 in the design line in the global coordinate system.
6. The method for controlling the linear shape of short-line prefabricated assembled beams according to claim 3 is characterized in that: In step 4, the theoretical installation position of the control measuring point of the current segment beam in the global coordinate system is calculated, specifically: step401: Establish Transition coordinate system of segmental beam: Control points on segmental beams As the origin, with vector Direction Axis positive direction, upward Positive direction of the axis, determined by the right-hand rule Axis positive direction; step402: Segmental beam in local coordinate system Coordinates of the cast-in-place position Convert to its transition coordinate system The transition coordinates in ; First calculate the transition coordinate system Each coordinate axis is in the local coordinate system The direction vector in , , , establish the transformation matrix between the local coordinate system and the transition coordinate system : ; ; ; ; In the formula, , , express Measuring points on segment beam In the local coordinate system The actual matching position under ; Then the measuring point In the local coordinate system Cast-in-place location Convert to its transition coordinate system The transition coordinates in : ; In the formula, , , for Measuring points on segment beam In the local coordinate system The actual matching position in ; step403: Control points on segmental beams In the transition coordinate system The transition coordinates in Convert to its global coordinate system Theoretical installation position under ; step40301: Calculation Transition coordinate system on segmental beam Each coordinate axis in the global coordinate system The direction vector in : ; ; step40302: Establish the transformation matrix between the transition coordinate system and the global coordinate system : ; step40303: Calculate the base point based on coordinate transformation , the transition coordinate system The transition coordinates in Convert to global coordinate system Theoretical installation coordinates under : ; In the formula for Measuring points on segment beam Theoretical installation coordinates .
7. The method for controlling the linear shape of short-line prefabricated assembled beams according to claim 6, characterized in that: Step 4: After calculating the theoretical installation position of the control measuring point of the current segment beam in the global coordinate system, further calculate the theoretical matching position of the current segment beam in the local coordinate system when it is used as the matching end mold, specifically including: step404: for nodes Correct the coordinates in the global coordinate system: ; ; In the formula, For Node In the transition coordinate system The transition coordinates in for Control points on segment beams In the local coordinate system The actual matching position in ; node Corrected coordinates in the global coordinate system; step405: Calculation Each control point of the segment Theoretical installation position in the global coordinate system Convert to local coordinate system Theoretical matching position under : step40501: According to the node Theoretical installation coordinates in the global coordinate system ,node Corrected coordinates ,calculate Global coordinate system on segment Each coordinate axis is in the local coordinate system The direction vector in : ; ; ; step40502: Establish the transformation matrix between the global coordinate system and the local coordinate system : ; step40503: Measuring point on segment In the global coordinate system Theoretical installation location in Convert to local coordinate system Theoretical matching position under : ; In the formula, To design the linear midpoint Coordinates in global coordinates.
8. The method for controlling the linear shape of short-line prefabricated assembled beams according to claim 7 is characterized in that: Control points on segment beams In the local coordinate system The actual matching position in , step 4 is to In the process of moving the segment beam to its control measuring point and reaching the theoretical matching position, the segment beam is repeatedly moved and measured. The actual matching position of the control measuring point on the segment beam is controlled until the deviation between the actual matching position of the control measuring point and the theoretical matching position is controlled within the allowable deviation range.
9. A short-line prefabricated assembly beam linear control system, characterized in that: include: Measuring robots, intelligent bottom formwork trolleys and short-line prefabricated assembly beam linear control devices; The measuring robot is used to collect and obtain the control points of the fixed end mold and the control measuring points on each segment beam. Cast-in-place position in local coordinate system and the actual matching position ; The intelligent bottom mold trolley is used to: carry the segmental beam and receive control to move the carried segmental beam to a target position; The short-line method prefabricated assembly beam linear control device is combined with a measuring robot and an intelligent bottom mold trolley to realize the short-line method prefabricated assembly beam linear control method described in any one of claims 1-8.
Citation Information
Patent Citations
Line shape control method for short line method segment prefabrication construction
CN102733311A
Deviation correcting method for line-shape monitoring of bridge with beam sections
CN106223201A
Beam section matching method for bridge short-line-method prefabricated construction
CN115659479A
Face shape measuring device and face shape measuring method
JP2004325143A
Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR1020140120481A
Cited By
UHPC segmental beam precise prefabricating method based on end face matching control
CN121211559A