Masonry arch bridge support-free reinforcement and effect evaluation method based on closed corrugated steel

By using a bracket-less reinforcement method that combines closed-end corrugated steel with corbel brackets on the masonry arch bridge, the problem of insufficient bearing capacity of the arch bridge structure is solved, the evaluation of the reinforcement effect and the improvement of structural performance are achieved, the construction process is simplified, and the cost is reduced cost.

CN118792976APending Publication Date: 2024-10-18GUANGXI SHUANGXIANG GEOTECHNICAL ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411064054.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

The existing arch bridge structure has been damaged after long-term use and cannot meet the load requirements of modern traffic. Moreover, the cost of demolition and reconstruction is high. An effective reinforcement method is needed to increase the structural bearing capacity.

Method used

A bracket-free reinforcement method for masonry arch bridges based on closed corrugated steel is adopted, including setting corbel brackets on the arch bridge abutment, implanting L-shaped steel bars, installing a lifting system and grouting. Through the close combination of closed corrugated steel and arch ribs, A reinforced structure is formed, and the reinforcement effect is evaluated through stress analysis.

Benefits of technology

It realizes the evaluation of construction convenience and reinforcement effect, improves the structural service life of the old masonry arch bridge, reduces construction costs, improves structural stability and overall performance, and simplifies the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118792976A_ABST
    Figure CN118792976A_ABST
Patent Text Reader

Abstract

The invention provides a masonry arch bridge support-free reinforcement and effect evaluation method based on closed corrugated steel, and belongs to the technical field of masonry arch bridge reinforcement and maintaining.The method comprises the following steps that a bracket bracket device is arranged on an arch bridge abutment, a closed corrugated steel reinforcement structure is arranged at the bottom of an arch bridge, and a pocket hanging system is installed on the closed corrugated steel reinforcement structure; and grouting is conducted in the closed corrugated steel reinforced structure, reinforcement is completed, stress analysis is conducted on the section of the arch bridge before reinforcement, stress analysis is conducted on the section of the arch bridge after reinforcement, stress before reinforcement and stress after reinforcement are compared, and evaluation is completed. According to the method, the closed corrugated steel-concrete steel-concrete composite structure is adopted to reinforce the dangerous and old masonry arch bridge, a support does not need to be erected in the whole construction process, a large number of formworks do not need to be erected, and the construction cost is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of masonry arch bridge reinforcement and maintenance, and in particular to a support-free reinforcement and effect evaluation method of a masonry arch bridge based on closed corrugated steel. Background Art

[0002] In the last century, my country built a large number of arch bridges. With the long-term operation and use, the original structures have been damaged to varying degrees, and reinforcement and repair are needed to ensure the safety of the structure. In addition, with the continuous development of the economy and the continuous increase in traffic volume, the original design load of the arch bridge can no longer meet the current use requirements. If the old arch bridge is dismantled and rebuilt, it will cost a high price. Therefore, an effective arch bridge reinforcement method is also needed to improve the bearing capacity of the old arch bridge structure. Therefore, it is necessary to design a support-free reinforcement and effect evaluation method for masonry arch bridges based on closed corrugated steel. Summary of the invention

[0003] The purpose of the present invention is to provide a method for strengthening and evaluating the effect of a masonry arch bridge without a support based on closed corrugated steel, so as to solve the technical problems mentioned in the background technology. It can not only realize the convenience of construction, but also effectively realize the reinforcement and maintenance of the arch bridge and the evaluation of the maintenance effect, thereby improving the service life of the old masonry arch bridge structure.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0005] A method for strengthening a masonry arch bridge without support and evaluating its effect based on closed corrugated steel comprises the following steps:

[0006] Step 1: Install a corbel bracket device on the arch bridge abutment;

[0007] Step 2: Set up a closed corrugated steel reinforcement structure at the bottom of the arch bridge;

[0008] Step 3: Install the hanging system on the closed corrugated steel reinforcement structure;

[0009] Step 4: Grouting is performed into the closed corrugated steel reinforcement structure to complete the reinforcement;

[0010] Step 5: Perform stress analysis on the arch bridge section before reinforcement;

[0011] Step 6: Perform stress analysis on the reinforced arch bridge section, compare the stress before and after reinforcement, and complete the evaluation.

[0012] Furthermore, the specific process of step 1 is:

[0013] According to the design dimensions of the reinforced bridge, the corbel bracket is made and pre-buried on the arch bridge abutment. Then, shear studs of different lengths are welded on the bracket according to the height change between the bracket and the arch rib.

[0014] Furthermore, the specific process of step 2 is:

[0015] L-shaped steel bars are implanted at the bottom of the beam, and inverted L-shaped steel bars are installed on the closed corrugated steel by drilling holes and then bolting. The contact points between the drill holes and the bolts are sealed with rubber pads to prevent leakage during subsequent grouting construction. The spacing and diameter of the L-shaped steel bars at the bottom of the beam should be determined according to the force between the new and old joint surfaces. The inverted L-shaped steel bars on the closed corrugated steel and the L-shaped steel bars at the bottom of the beam should be kept in a corresponding position and have the same size.

[0016] When the stress distribution of the reinforced section is uneven, shear force will be formed between the new and old joint surfaces. At this time, L-shaped steel bars need to be implanted at the bottom of the beam to transfer internal force so that the cross section can be stressed synergistically. Considering the extreme stress conditions, the old section is compressed as a whole and is at the ultimate compressive strength, and the new reinforced section is tensile as a whole. The total shear force between the new and old joint surfaces is F:

[0017] F=σ c ·A 0

[0018] Among them, σ c is the ultimate compressive strength of the old structure, A 0 is the cross-sectional area of ​​the old structure, σ s is the ultimate tensile strength of closed corrugated steel material, A s is the cross-sectional area of ​​closed corrugated steel 401;

[0019] The number of troughs in the same section of closed corrugated steel determines the number of transverse rows of embedded reinforcement at the bottom of the beam. If the number of troughs is N, then the number of embedded reinforcement at the bottom of the beam is N rows in the transverse direction. If the cross-sectional area of ​​the L-shaped embedded reinforcement at the bottom of the beam is A s1 , the ultimate shear strength is τ s1 , then the number M of L-shaped embedded bars 403 at the bottom of each row of beams in the longitudinal bridge upward direction is:

[0020]

[0021] In order to ensure the anchoring performance between the L-shaped anchor bar at the bottom of the beam and the high-strength grouting material, the cross-sectional area A of the L-shaped anchor bar should be s1 Limit and reduce the cross-sectional area A of the L-shaped reinforcement s1 , the number M of L-shaped anchor bars on the longitudinal bridge can be increased, making the anchor bars more densely distributed, which is more conducive to the integrity of the new and old joint surfaces. The diameter D of the L-shaped anchor bars 403 at the bottom of the beam is specified as follows:

[0022]

[0023] Where L is the trough width of corrugated steel 401, and D should also be greater than the thickness of the closed corrugated steel. If the thickness of the closed corrugated steel is greater than When D is used, the closed corrugated steel thickness is 401.

[0024] Furthermore, the specific process of step 3 is:

[0025] The prefabricated closed corrugated steel is hoisted to the bottom of the beam by the hoisting system in the form of integral hoisting or on-site assembly. The rubber stop strip is filled between each contact surface of the corrugated steel and the arch rib. The two ends of the closed corrugated steel are placed on the bracket. The closed part of the closed corrugated steel is processed in one go in the factory by welding or by bolting steel plates, so as to reduce stress concentration and fatigue cracking problems.

[0026] The keel of the hanging system passes through the keel limit groove, and by connecting the lower anchor point of the hanger to the prestressed hanger, the closed corrugated steel is hoisted to the bottom of the beam, and the L-shaped steel bars at the bottom of the beam are roughly in contact and matched with the inverted L-shaped steel bars on the closed corrugated steel. Then the prestressed hangers are tensioned one by one. After the prestressed hangers are tensioned, the anchor points on the hangers are installed, and the hanging system is anchored to the bridge deck through the prestressed hangers, so that the closed corrugated steel and the arch rib are squeezed tightly, and the contact surface is sealed by squeezing the rubber grouting strip to facilitate the subsequent injection of high-strength grouting material into the closed corrugated steel.

[0027] Furthermore, the specific process of step 4 is:

[0028] Grout high-strength grouting material from the arch foot through the grouting port into the closed corrugated steel. Grouting should be carried out symmetrically on both sides of the arch foot. After the grouting material flows out of the vent hole, stop grouting, seal the grouting port and vent hole respectively, and cut off the grouting port and vent hole after the high-strength grouting material solidifies;

[0029] Set up the formwork on the corbel bracket, pour high-performance fiber concrete, wrap the studs, and form the arch foot reinforcement system;

[0030] After the high-strength grouting material and high-performance fiber concrete in the closed corrugated steel solidify and reach the design strength, remove the formwork, loosen the upper anchor points in turn, remove the lower anchor points of the hanger, and then remove the prestressed hanger and keel respectively.

[0031] Furthermore, the specific process of step 5 is:

[0032] When the cross section is subjected to the deadweight of the old structure, the axial force on the cross section is N 1 , the bending moment is M 1 , then the compressive strain on the upper edge of the cross section under the self-weight of the old structure is:

[0033]

[0034] Among them, A 0 is the cross-sectional area of ​​the old structure before reinforcement, I 0is the bending inertia moment of the old structure section before reinforcement, y 0 is the distance between the upper edge of the old structure section and the neutral axis before reinforcement, E c is the elastic modulus of the old structural material;

[0035] When the old structure is subjected to external load axial force N and bending moment M, the upper edge of the section reaches the ultimate strain ε c The cross-sectional forces are:

[0036]

[0037] Since the masonry arch bridge needs to control the tensile stress at the lower edge of the section, it is necessary to limit the bending moment M, that is,

[0038]

[0039] Among them, σ′ 0 is the compressive stress at the lower edge of the section under the deadweight of the old structure, y′ 0 is the distance between the lower edge of the old structure section and the neutral axis;

[0040] but Functions and The area of ​​the graph enclosed by the function can represent the ability of the original structure to withstand live loads before reinforcement.

[0041] Furthermore, the specific process of step 6 is:

[0042] Due to the use of the suspender construction technology, the old structure is simultaneously subjected to the deadweight of the new and old structures, that is, the cross section is subjected to an axial force of N 1 +N 2 , the bending moment is M 1 +M 2 , where N 2 The section axial force generated by the self-weight of the new structure, M 2 The section bending moment is generated by the self-weight of the new structure, so the strain of the upper edge of the structure before being subjected to external load after reinforcement is ε 1 :

[0043]

[0044] When the reinforced section is subjected to the external axial force N′ and bending moment M′, the upper edge of the section reaches the ultimate strain ε c The cross-sectional forces are:

[0045]

[0046] Among them, A 1 is the area of ​​the entire cross section after reinforcement, I 1 is the moment of inertia of the entire section after reinforcement, y 1 It is the distance between the upper edge of the overall section and the neutral axis after reinforcement;

[0047]

[0048] Since the present invention adopts closed corrugated steel for reinforcement, the lower edge of the section after reinforcement can withstand tensile stress, but the tensile stress should not exceed the limit stress σ of the closed corrugated steel. s , that is:

[0049]

[0050] Among them, y′ 1 The distance between the lower edge of the reinforced section and the neutral axis;

[0051]

[0052] Functions and The area of ​​the graph enclosed by the function can represent the ability of the reinforced structure to withstand live loads, determine the changes in the structural bearing capacity before and after reinforcement, and thus evaluate the reinforcement effect.

[0053] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0054] The present invention uses a closed corrugated steel-concrete steel-concrete composite structure to reinforce the dangerous and old masonry arch bridge. During the entire construction process, there is no need to set up a support or a large number of formworks, and the construction cost is low. The use of closed corrugated steel effectively improves the stability of the steel structure, making the structure more convenient in the lifting operation and construction, and the construction safety performance is higher. By cooperating with the hoisting system and the rubber stop grouting belt, the closed corrugated steel is closely combined with the arch rib of the old bridge, which effectively enhances the integrity of the reinforced structure and the old structure, and facilitates further grouting construction in the closed corrugated steel, and the operation is relatively simple. The corrugated bracket is embedded at the arch foot abutment, and shear nails of different heights are welded on the corrugated bracket. By pouring high-strength steel fiber concrete, the bracket and the closed corrugated steel are integrated to form an arch foot reinforcement system, which helps to improve the structural performance of the weak area of ​​the arch foot, thereby improving the overall performance of the structure in the later operation stage. Since hangers are used for construction, most of the deadweight of the new structure is borne by the old arch ribs, so the vertical bearing capacity requirements at the arch foot are relatively low. The use of pre-embedded corbel brackets at the arch foot can meet the vertical bearing requirements, making the structural construction simpler and the construction more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 It is a schematic diagram of the reinforcement structure of the masonry arch bridge of the present invention;

[0056] Figure 2 It is a schematic diagram of the installation structure of the sling system and the closed corrugated steel reinforcement structure of the present invention;

[0057] Figure 3It is a schematic diagram of the structure of the arch foot reinforcement system of the present invention;

[0058] Figure 4 is a schematic diagram of the architecture of the bridge structure after reinforcement according to the present invention;

[0059] Figure 5 It is a graph of the ability of the original structure to withstand live loads before reinforcement by the present invention;

[0060] Figure 6 It is a graph of the ability of the structure to withstand live load after reinforcement according to the present invention;

[0061] In the attached figure, 1 is the arch bridge abutment, 2 is the arch rib, 3 is the hanging system, 4 is the closed corrugated steel reinforcement structure, 5 is the bridge deck, 6 is the anchor point on the hanger, 7 is the prestressed hanger, 8 is the high-performance fiber concrete, 9 is the arch foot reinforcement system, 10 is the exhaust hole, and 11 is the grouting port. 301 is the keel limit groove, 302 is the keel, 303 is the lower anchor point of the hanger, 401 is the closed corrugated steel, 402 is the high-strength grouting material, 403 is the L-shaped steel bar embedded in the bottom of the beam, 404 is the inverted L-shaped steel bar on the closed corrugated steel, 405 is the rubber grouting strip, 901 is the bracket, and 902 is the shear nail. DETAILED DESCRIPTION

[0062] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and preferred embodiments. However, it should be noted that many details listed in the specification are only for the purpose of enabling the reader to have a thorough understanding of one or more aspects of the present invention, and these aspects of the present invention can be implemented even without these specific details.

[0063] like Figure 1-6 As shown, a method for strengthening a masonry arch bridge without a support and evaluating the effect based on closed corrugated steel includes the following steps:

[0064] Step 1: Set up the corbel bracket device on the arch bridge abutment.

[0065] like Figure 1-Figure 3 As shown, 1 is the arch bridge abutment, 2 is the arch rib, 3 is the hanging system, 4 is the closed corrugated steel reinforcement structure, 5 is the bridge deck, 6 is the anchor point on the hanger, 7 is the prestressed hanger, 8 is the high-performance fiber concrete, 9 is the arch foot reinforcement system, 10 is the exhaust hole, and 11 is the grouting port. 301 is the keel limit groove, 302 is the keel, 303 is the lower anchor point of the hanger, 401 is the closed corrugated steel, 402 is the high-strength grouting material, 403 is the L-shaped steel bar embedded in the bottom of the beam, 404 is the inverted L-shaped steel bar on the closed corrugated steel, 405 is the rubber grouting strip, 901 is the bracket, and 902 is the shear nail.

[0066] According to the design size of the reinforced bridge, a corbel bracket 901 is manufactured and pre-buried on the arch bridge abutment 1, and then shear studs 902 of different lengths are welded on the corbel bracket 901 according to the height variation between the bracket and the arch rib.

[0067] Step 2: Set up a closed corrugated steel reinforcement structure at the bottom of the arch bridge.

[0068] L-shaped steel bars 403 are implanted at the bottom of the beam, and inverted L-shaped steel bars 404 are installed on the closed corrugated steel 401 by drilling holes and then bolting. It should be noted that the contact points between the drilled holes and the bolts are sealed with rubber pads to prevent leakage during subsequent grouting construction. The spacing and diameter of the L-shaped steel bars 403 at the bottom of the beam should be determined according to the force between the new and old joint surfaces. The inverted L-shaped steel bars 404 on the closed corrugated steel 401 and the L-shaped steel bars 403 at the bottom of the beam are kept in a corresponding position and have the same size.

[0069] When the stress distribution of the reinforced section is uneven, shear force will be formed between the new and old joint surfaces. At this time, L-shaped steel bars 403 need to be implanted at the bottom of the beam to transfer internal force so that the section can be stressed in a coordinated manner. Considering the extreme stress conditions, the old section is compressed as a whole and is at the ultimate compressive strength, and the newly reinforced section is tensile as a whole. The total shear force between the new and old joint surfaces is F:

[0070] F=σ c ·A 0

[0071] Among them, σ c is the ultimate compressive strength of the old structure, A 0 is the cross-sectional area of ​​the old structure; σ s is the ultimate tensile strength of closed corrugated steel 401 material, A s It is the cross-sectional area of ​​closed corrugated steel 401.

[0072] The number of troughs of closed corrugated steel 401 in the same section determines the number of horizontal rows of embedded reinforcement at the bottom of the beam. If the number of troughs is N, then the number of horizontal rows of embedded reinforcement at the bottom of the beam is N. If the cross-sectional area of ​​L-shaped embedded reinforcement 403 at the bottom of the beam is A s1 , the ultimate shear strength is τ s1 , then the number M of L-shaped embedded bars 403 at the bottom of each row of beams in the longitudinal direction is:

[0073]

[0074] In order to ensure the anchoring performance between the L-shaped anchor bar 403 at the bottom of the beam and the high-strength grouting material 402, the cross-sectional area A of the L-shaped anchor bar 403 should be s1 At the same time, reduce the cross-sectional area A of the L-shaped anchor bar 403 s1, the number M of L-shaped anchor bars 403 in the longitudinal direction of the bridge can be increased, making the anchor bars more densely distributed, which is more conducive to the integrity of the new and old joint surfaces. Therefore, the diameter D of the L-shaped anchor bars 403 at the bottom of the beam is specified as follows:

[0075]

[0076] Where L is the trough width of the corrugated steel 401, and D should also be greater than the thickness of the closed corrugated steel 401. If the thickness of the closed 401 corrugated steel is greater than When D is used, the closed corrugated steel thickness is 401.

[0077] Step 3: Install the hanging system on the closed corrugated steel reinforcement structure.

[0078] The prefabricated closed corrugated steel 401 is hoisted to the bottom of the beam by the hoisting system 3 in the form of integral hoisting or on-site assembly, wherein the rubber stop grouting tape 405 is filled between each contact surface of the corrugated steel 401 and the arch rib 2, and the two ends of the closed corrugated steel 401 are placed on the 901 bracket. It should be noted that the closed part of the closed corrugated steel 401 can be processed in one go by welding in the factory, or it can be made by bolting and adding steel plates, so as to reduce stress concentration and fatigue cracking problems.

[0079] Among them, the keel 302 of the hanging system 3 passes through the keel limit groove 301, and by connecting the lower anchor point 303 of the hanger to the prestressed hanger 7, the closed corrugated steel 401 is hung on the bottom of the beam, and the L-shaped steel bar 403 at the bottom of the beam is roughly in contact with the inverted L-shaped steel bar 404 on the closed corrugated steel. Then the prestressed hanger 7 is tensioned one by one. After the prestressed hanger 7 is tensioned, the upper anchor point 6 of the hanger is installed, and the hanging system 3 is anchored on the bridge deck 5 through the prestressed hanger 7, so that the closed corrugated steel 401 is squeezed tightly with the arch rib 2, and the contact surface is sealed by squeezing the rubber grouting tape 404, so as to facilitate the subsequent injection of high-strength grouting material 402 into the closed corrugated steel 401.

[0080] Step 4: Inject grout into the closed corrugated steel reinforcement structure to complete the reinforcement.

[0081] Then, high-strength grouting material 402 is grouted from the arch foot through the grouting port 11 into the closed corrugated steel 401. Grouting should be performed symmetrically on both sides of the arch foot. After the grouting material 402 flows out of the vent hole 10, the grouting is stopped, and the grouting port 11 and the vent hole 10 are blocked respectively. After the high-strength grouting material 402 solidifies, the grouting port 11 and the vent hole 10 are cut off.

[0082] A formwork is erected on the corbel bracket 901 , high-performance fiber concrete 8 is poured, and the studs 902 are wrapped to form an arch foot reinforcement system 9 .

[0083] After the high-strength grouting material and high-performance fiber concrete 8 in the closed corrugated steel 401 solidify and reach the design strength, the formwork is removed, the upper anchor point 6 is loosened in turn, and the lower anchor point 303 of the hanger is removed, and then the prestressed hanger 7 and the keel 302 are removed respectively.

[0084] The final formation is Figure 4 The reinforced bridge structure system is shown.

[0085] Step 5: The design of masonry arch bridges usually takes the deadweight pressure line of the structure as the arch axis as much as possible, so that the arch ring is in an approximate axial compression state. After the closed corrugated steel-concrete steel-concrete composite structure is used for reinforcement, the arch bridge section is still in an approximate axial compression or small eccentric compression state under the action of deadweight, and the ultimate bearing capacity is controlled by the crushing of the upper edge of the section. Although the cross section of the arch bridge is enhanced after the reinforcement of the present invention, due to the hanger construction method adopted by the present invention, the old structure of the arch bridge not only bears its own weight, but also bears the weight of the new structure. Therefore, it is necessary to evaluate the bearing capacity of the reinforced structure to determine whether its ability to withstand live loads is improved, so as to assist in deciding whether the old bridge is suitable for reinforcement and reconstruction using the method of the present invention.

[0086] The stress analysis of the arch bridge section before reinforcement is carried out.

[0087] When the cross section is subjected to the deadweight of the old structure, the axial force on the cross section is N 1 , the bending moment is M 1 At this time, the compressive strain on the upper edge of the cross section under the self-weight of the old structure is:

[0088]

[0089] Among them, A 0 is the cross-sectional area of ​​the old structure before reinforcement, I 0 is the bending inertia moment of the old structure section before reinforcement, y 0 is the distance between the upper edge of the old structure section and the neutral axis before reinforcement, E c is the elastic modulus of the old structural material.

[0090] When the old structure is subjected to external load axial force N and bending moment M, the upper edge of the section reaches the ultimate strain ε c The cross-sectional forces are:

[0091]

[0092] Since the masonry arch bridge needs to control the tensile stress at the lower edge of the section, it is necessary to limit the bending moment M, that is,

[0093]

[0094] Among them, σ′ 0is the compressive stress at the lower edge of the section under the deadweight of the old structure, y′ 0 It is the distance between the lower edge of the old structure section and the neutral axis.

[0095] Then the area of ​​the figure enclosed by the above functions (such as Figure 5 The shaded part shown in the figure can represent the ability of the original structure to withstand live loads before reinforcement.

[0096] Step 6: Perform stress analysis on the reinforced arch bridge section, compare the stress before and after reinforcement, and complete the evaluation.

[0097] Due to the use of the suspender construction technology, the old structure is simultaneously subjected to the deadweight of the new and old structures, that is, the cross section is subjected to an axial force of N 1 +N 2 , the bending moment is M 1 +M 2 , where N 2 The section axial force generated by the self-weight of the new structure, M 2 The section bending moment is generated by the self-weight of the new structure. Then the strain of the upper edge of the structure before being subjected to external load after reinforcement is ε 1 :

[0098]

[0099] When the reinforced section is subjected to the external axial force N′ and bending moment M′, the upper edge of the section reaches the ultimate strain ε c The cross-sectional forces are:

[0100]

[0101] Among them, A 1 is the area of ​​the entire cross section after reinforcement, I 1 is the moment of inertia of the entire section after reinforcement, y 1 It is the distance between the upper edge of the overall section and the neutral axis after reinforcement.

[0102]

[0103] Since the present invention adopts closed corrugated steel for reinforcement, the lower edge of the section after reinforcement can withstand tensile stress, but the tensile stress should not exceed the limit stress σ of the closed corrugated steel. s , that is:

[0104]

[0105] Among them, y′ 1 It is the distance between the lower edge of the reinforced section and the neutral axis.

[0106]

[0107] Then the area of ​​the figure enclosed by the above functions (such as Figure 6 The shaded area shown in the figure can represent the ability of the reinforced structure to withstand live loads. Figure 5 and Figure 6 The change in structural bearing capacity before and after reinforcement can be determined, thereby evaluating the reinforcement effect.

[0108] The present invention uses a closed corrugated steel-concrete steel-concrete composite structure to reinforce the dangerous and old masonry arch bridge. During the entire construction process, there is no need to set up a support or a large number of formworks, and the construction cost is low. The use of closed corrugated steel effectively improves the stability of the steel structure, making the structure more convenient in the hoisting operation and construction, and the construction safety performance is higher. By cooperating with the hoisting system and high-strength structural adhesive, the closed corrugated steel is closely combined with the arch rib of the old bridge, which effectively enhances the integrity of the reinforced structure and the old structure, and facilitates further grouting construction in the closed corrugated steel. No additional grouting strips need to be installed, and the operation is relatively simple. The corbel bracket is embedded at the arch foot abutment, and shear nails of different heights are welded on the corbel bracket. By pouring high-strength steel fiber concrete, the bracket and the closed corrugated steel are integrated to form an arch foot reinforcement system, which helps to improve the structural performance of the weak area of ​​the arch foot, thereby improving the overall performance of the structure in the later operation stage. Since hangers are used for construction, most of the deadweight of the new structure is borne by the old arch ribs, so the vertical bearing capacity requirements at the arch foot are relatively low. The use of pre-embedded corbel brackets at the arch foot can meet the vertical bearing requirements, making the structural construction simpler and the construction more convenient.

[0109] In addition, the reinforcement effect evaluation method of the present invention can intuitively determine the change in the bearing capacity of the structure before and after the application of the reinforcement method, thereby determining the effectiveness of the reinforcement, and providing decision-making guidance on whether to adopt the reinforcement method of the present invention for an old bridge.

[0110] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for strengthening a masonry arch bridge without support and evaluating its effect based on closed corrugated steel, characterized in that: The method comprises the following steps: Step 1: Install a corbel bracket device on the arch bridge abutment; Step 2: Set up a closed corrugated steel reinforcement structure at the bottom of the arch bridge; Step 3: Install the hanging system on the closed corrugated steel reinforcement structure; Step 4: Grouting is performed into the closed corrugated steel reinforcement structure to complete the reinforcement; Step 5: Perform stress analysis on the arch bridge section before reinforcement; Step 6: Perform stress analysis on the reinforced arch bridge section, compare the stress before and after reinforcement, and complete the evaluation.

2. The method for strengthening and evaluating the effect of a masonry arch bridge without support based on closed corrugated steel according to claim 1 is characterized in that: The specific process of step 1 is: According to the design dimensions of the reinforced bridge, the corbel bracket is made and pre-buried on the arch bridge abutment. Then, shear studs of different lengths are welded on the bracket according to the height change between the bracket and the arch rib.

3. The method for strengthening and evaluating the effect of a masonry arch bridge without support based on closed corrugated steel according to claim 1 is characterized in that: The specific process of step 2 is: L-shaped steel bars are implanted at the bottom of the beam, and inverted L-shaped steel bars are installed on the closed corrugated steel by drilling holes and then bolting. The contact points between the drill holes and the bolts are sealed with rubber pads to prevent leakage during subsequent grouting construction. The spacing and diameter of the L-shaped steel bars at the bottom of the beam should be determined according to the force between the new and old joint surfaces. The inverted L-shaped steel bars on the closed corrugated steel and the L-shaped steel bars at the bottom of the beam should be kept in a corresponding position and have the same size. When the stress distribution of the reinforced section is uneven, shear force will be formed between the new and old joint surfaces. At this time, L-shaped steel bars need to be implanted at the bottom of the beam to transfer internal force so that the cross section can be stressed synergistically. Considering the extreme stress conditions, the old section is compressed as a whole and is at the ultimate compressive strength, and the new reinforced section is tensile as a whole. The total shear force between the new and old joint surfaces is F: F=σ c ·A0 Among them, σ c is the ultimate compressive strength of the old structure, A0 is the cross-sectional area of ​​the old structure, σ s is the ultimate tensile strength of closed corrugated steel material, A s is the cross-sectional area of ​​closed corrugated steel; The number of troughs in the same section of closed corrugated steel determines the number of transverse rows of embedded reinforcement at the bottom of the beam. If the number of troughs is N, then the number of embedded reinforcement at the bottom of the beam is N rows in the transverse direction. If the cross-sectional area of ​​the L-shaped embedded reinforcement at the bottom of the beam is A s1 , the ultimate shear strength is τ s1 , then the number M of L-shaped embedded bars 403 at the bottom of each row of beams in the longitudinal bridge upward direction is: In order to ensure the anchoring performance between the L-shaped anchor bar at the bottom of the beam and the high-strength grouting material, the cross-sectional area A of the L-shaped anchor bar should be s1 Limit and reduce the cross-sectional area A of the L-shaped reinforcement s1 , the number M of L-shaped anchor bars on the longitudinal bridge can be increased, making the anchor bars more densely distributed, which is more conducive to the integrity of the new and old joint surfaces. The diameter D of the L-shaped anchor bars 403 at the bottom of the beam is specified as follows: Where L is the trough width of corrugated steel 401, and D should also be greater than the thickness of the closed corrugated steel. If the thickness of the closed corrugated steel is greater than When D is used, the closed corrugated steel thickness is taken.

4. The method for strengthening and evaluating the effect of a masonry arch bridge without support based on closed corrugated steel according to claim 1 is characterized in that: The specific process of step 3 is: The prefabricated closed corrugated steel is hoisted to the bottom of the beam by the hoisting system in the form of integral hoisting or on-site assembly. The rubber stop strip is filled between each contact surface of the corrugated steel and the arch rib. The two ends of the closed corrugated steel are placed on the bracket. The closed part of the closed corrugated steel is made in the factory by bolting and adding steel plates, so as to reduce stress concentration and fatigue cracking problems. The keel of the hanging system passes through the keel limit groove, and by connecting the lower anchor point of the hanger to the prestressed hanger, the closed corrugated steel is hoisted to the bottom of the beam, and the L-shaped steel bars at the bottom of the beam are roughly in contact and matched with the inverted L-shaped steel bars on the closed corrugated steel. Then the prestressed hangers are tensioned one by one. After the prestressed hangers are tensioned, the anchor points on the hangers are installed, and the hanging system is anchored to the bridge deck through the prestressed hangers, so that the closed corrugated steel and the arch rib are squeezed tightly, and the contact surface is sealed by squeezing the rubber grouting strip to facilitate the subsequent injection of high-strength grouting material into the closed corrugated steel.

5. The method for strengthening and evaluating the effect of a masonry arch bridge without support based on closed corrugated steel according to claim 1 is characterized in that: The specific process of step 4 is: Grout high-strength grouting material from the arch foot through the grouting port into the closed corrugated steel. Grouting should be carried out symmetrically on both sides of the arch foot. After the grouting material flows out of the vent hole, stop grouting, seal the grouting port and vent hole respectively, and cut off the grouting port and vent hole after the high-strength grouting material solidifies; Set up the formwork on the corbel bracket, pour high-performance fiber concrete, wrap the studs, and form the arch foot reinforcement system; After the high-strength grouting material and high-performance fiber concrete in the closed corrugated steel solidify and reach the design strength, remove the formwork, loosen the upper anchor points in turn, remove the lower anchor points of the hanger, and then remove the prestressed hanger and keel respectively.

6. The method for strengthening and evaluating the effect of a masonry arch bridge without support based on closed corrugated steel according to claim 1 is characterized in that: The specific process of step 5 is: When the section is subjected to the deadweight of the old structure, the axial force on the section is N1, and the bending moment on the section is M1. At this time, the compressive strain on the upper edge of the section under the deadweight of the old structure is: Among them, A0 is the cross-sectional area of ​​the old structure before reinforcement, I0 is the bending inertia moment of the old structure before reinforcement, y0 is the distance between the upper edge of the old structure before reinforcement and the neutral axis, E c is the elastic modulus of the old structural material; When the old structure is subjected to external load axial force N and bending moment M, the upper edge of the section reaches the ultimate strain ε c The cross-sectional forces are: Since the masonry arch bridge needs to control the tensile stress at the lower edge of the section, it is necessary to limit the bending moment M, that is, Among them, σ0 is the compressive stress at the lower edge of the section under the deadweight of the old structure, and y′0 is the distance between the lower edge of the section of the old structure and the neutral axis; but Functions and The area of ​​the graph enclosed by the function can represent the ability of the original structure to withstand live loads before reinforcement.

7. The method for strengthening and evaluating the effect of a masonry arch bridge without support based on closed corrugated steel according to claim 1 is characterized in that: The specific process of step 6 is: Due to the use of the hanger construction technology, the old structure is simultaneously subjected to the deadweight of the new and old structures, that is, the cross section is subjected to an axial force of N1+N2 and a bending moment of M1+M2, where N2 is the cross section axial force generated by the deadweight of the new structure, and M2 is the cross section bending moment generated by the deadweight of the new structure. The strain of the upper edge of the structure before being subjected to external loads after reinforcement is ε1: Then when the reinforced section is subjected to the external load axial force N′ and bending moment M′, the force on the section when the upper edge of the section reaches the limit strain εc is: Among them, A1 is the area of ​​the overall cross section after reinforcement, I1 is the moment of inertia of the overall cross section after reinforcement, and y1 is the distance between the upper edge of the overall cross section after reinforcement and the neutral axis; Since the present invention adopts closed corrugated steel for reinforcement, the lower edge of the section after reinforcement can withstand tensile stress, but the tensile stress should not exceed the limit stress σ of the closed corrugated steel. s , that is: Among them, y′1 is the distance between the lower edge of the section and the neutral axis after reinforcement; Functions and The area of ​​the graph enclosed by the function can represent the ability of the reinforced structure to withstand live loads, determine the changes in the structural bearing capacity before and after reinforcement, and thus evaluate the reinforcement effect.