Multi-stage support adopting inclined pedestal piles and construction method of multi-stage support

Through the combined technology of inclined bottom piles and diagonal braces, the problems of stability and environmental pollution of foundation pit support structures during the construction of high-rise buildings are solved, efficient anchor-free support effects are achieved, and construction costs and environmental impacts are reduced. .

CN118793068APending Publication Date: 2024-10-18THE SEVENTH ENGINEERING CO LTD OF CCCC FIRST HIGHWAY ENGINEERING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411175964.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing foundation pit support technology is difficult to effectively and stably control in the construction of high-rise buildings, especially when the surrounding environment is complex, anchor construction is difficult and there are problems with land use red lines and environmental pollution.

Method used

A multi-level support structure with inclined bottom piles is adopted. Through the inclined setting of the first-level and second-level support piles and the cooperation of diagonal braces, a cantilever support structure is formed, which reduces the dependence on anchor rods and uses prefabricated sections and The combination of cast-in-place sections and hydraulic cylinder adjustment improve the stability and construction efficiency of the supporting structure.

Benefits of technology

It improves the stability of the cantilever support structure without anchors, reduces construction costs, reduces foundation pit displacement, and the construction process is environmentally friendly and efficient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793068A_ABST
    Figure CN118793068A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of foundation pit support, in particular to a multi-stage support adopting inclined pedestal piles, which comprises a first-stage support pile, a second-stage support pile and inclined struts, the first-stage support pile and the second-stage support pile both comprise pile bodies and top beams fixed at the upper ends of the pile bodies, pile bodies of the first-stage supporting piles and pile bodies of the second-stage supporting piles are pedestal piles, the pile bodies of the first-stage supporting piles are arranged in a manner of inclining 15-20 degrees relative to the vertical direction, the pile bodies of the second-stage supporting piles are arranged in a manner of inclining 5-10 degrees relative to the vertical direction, one end of each inclined strut is fixed to a top beam of the corresponding second-stage supporting pile, and the other end of each inclined strut is fixed to a top beam of the corresponding second-stage supporting pile. A supporting platform is formed between the top of the second-stage supporting pile and the first-stage supporting pile in an excavation mode, and a foundation pit is formed on the side, away from the supporting platform, of the second-stage supporting pile in an excavation mode. The invention further relates to a construction method of the multi-stage support adopting the inclined pedestal pile. The method has the effect of improving the stability of the cantilever supporting structure under the condition of no anchor rod.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of foundation pit support, and in particular to a multi-stage support using inclined expanded bottom piles and a construction method thereof. Background Art

[0002] At present, with the development of society, there are more and more underground projects, and the large-scale construction of high-rise and super-high-rise buildings has put higher and higher requirements on the support technology of deep and large foundation pit projects. The existing excavation of foundation pits can even reach a depth of 30 meters, and the excavation area can exceed 40,000 square meters. Therefore, higher requirements for stability control and deformation control are put forward for the foundation pit support structure, which makes the application of cantilever support more difficult, and a large number of anchor rods have to be applied to reinforce the cantilever support.

[0003] A patent application document with application publication number CN108842791A discloses a multi-level support structure, including a frame staggered rod and a pile-anchor combination structure, the pile-anchor combination structure is composed of anchor rods, bored piles, unloading grouting bearing steel pipes and crown beams, the unloading grouting bearing steel pipes are composed of a first type of casing, a second type of casing and a circular steel plate, pressure grouting is performed between the interlayers formed by the first and second types of casings to form the unloading grouting bearing steel pipe, an enlarged head is cast at the bottom of the bored pile, and the top is used as a crown beam, one end of the unloading grouting bearing steel pipe is located in the stable soil body, and the other end is fixedly connected to the crown beam, one end of the anchor rod in the pile-anchor combination structure is anchored in the stable soil layer, and the other end passes through the second type of casing and is fixed to the crown beam by an anchor, and the bored pile is stabilized by the anchoring of the anchor rod.

[0004] However, anchor rods are difficult to construct in complex surrounding environments. The construction of anchor rods may also face the problem of land red lines. At the same time, anchor rods that cannot be recovered and buried underground will also cause certain pollution to the environment. Summary of the invention

[0005] In order to improve the stability of the cantilever support structure in the absence of anchor rods, the present application provides a multi-stage support using inclined expanded bottom piles and a construction method thereof.

[0006] The present application provides a multi-level support using inclined expanded bottom piles and a construction method thereof, which adopts the following technical solutions: A multi-level support using inclined enlarged-bottom piles comprises a first-level support pile, a second-level support pile and an inclined brace, wherein the first-level support pile and the second-level support pile both comprise a pile body and a crown beam fixed to the upper end of the pile body, the pile body of the first-level support pile and the pile body of the second-level support pile both adopt enlarged-bottom piles, the pile body of the first-level support pile is inclined 15-20 degrees to the vertical direction, the pile body of the second-level support pile is inclined 5-10 degrees to the vertical direction, one end of the inclined brace is fixed to the crown beam of the second-level support pile, and the other end is fixed to the cantilever part of the first-level support pile, a support platform is formed by excavating between the top of the second-level support pile and the first-level support pile, and a foundation pit is formed by excavating the second-level support pile away from the side of the support platform.

[0007] By adopting the above technical scheme, when in use, the pile bodies of the first-level supporting piles and the second-level supporting piles are inclined in the vertical direction, and the inclination angle of the first-level supporting piles is greater than the inclination angle of the second-level supporting piles. When a diagonal brace is arranged between the first-level supporting piles and the second-level supporting piles, the force of the diagonal brace is along the length direction of the first-level supporting piles and the second-level supporting piles on the one hand, and can be used to resist the torque of the first-level supporting piles and the second-level supporting piles tilting toward the foundation pit direction on the other hand, so that the first-level supporting piles and the second-level supporting piles can stabilize the cantilever support structure formed by the first-level supporting piles and the second-level supporting piles under the action of the diagonal brace, without the need for setting anchor rods. At the same time, the support platform between the first-level supporting piles and the second-level supporting piles can reduce the length of the first-level supporting piles, thereby reducing the construction cost under a safe condition.

[0008] Preferably, the width of the support platform is 0.5-0.75 times the total excavation depth of the foundation pit.

[0009] By adopting the above technical solution, the width of the support platform is 0.5-0.75 times the total excavation depth of the foundation pit, so that the earthwork below the support platform can provide soil compression on the side of the first-level support piles after being stabilized by the first-level support piles and the second-level support piles, thereby improving the stability of the soil layer on the side of the first-level support piles.

[0010] Preferably, the ratio of the height of the cantilever portion of the first-level retaining pile to the height of the cantilever portion of the second-level retaining pile is (2-1):1.

[0011] By adopting the above technical solution, the height of the cantilever part of the first-level supporting pile can be selected to be larger than the height of the cantilever part of the second-level supporting pile when the soil layer stability is poor, so as to make the second-level supporting pile more stable, and then support the first-level supporting pile by diagonal braces, so that the structure is more reasonable and the stability is better.

[0012] Preferably, the ratio of the height of the cantilever part of the first-level supporting pile to the height of the cantilever part of the second-level supporting pile is 2:1, and the connection part between the diagonal brace and the first-level supporting pile is located in the middle of the cantilever part of the first supporting pile.

[0013] By adopting the above technical scheme, the first-level supporting piles and the second-level supporting piles cooperate with the diagonal braces to control the position of the first-level supporting piles, which improves the stability of the supporting structure. In addition, the stress state of the diagonal braces is better, and the role of the diagonal braces is fully played.

[0014] Preferably, the diagonal brace includes a prefabricated section and a cast-in-place section, both ends of the cast-in-place section are respectively fixedly connected to one of the prefabricated sections, the ends of the prefabricated section away from the cast-in-place section are respectively connected to the first-level supporting piles and the second-level supporting piles, and the length of the cast-in-place section is adjusted according to the distance between the two cast-in-place sections.

[0015] By adopting the above technical solution, the prefabricated section can be reused with a fixed length, and the length of the cast-in-place section can be adjusted according to the distance between the two cast-in-place sections, thereby reducing the construction cost of the diagonal brace and being more environmentally friendly.

[0016] Preferably, the cast-in-place section includes a cylinder body 1 and a cylinder body 2, an inlet pipe is fixedly provided at one end of the cylinder body 1, an outlet pipe is fixedly provided at one end of the cylinder body 2, the outlet pipe is arranged higher than the inlet pipe, the cylinder body 1 and the cylinder body 2 are sleeved together, and a hydraulic cylinder for adjusting the distance between the cylinder body 1 and the cylinder body 2 is arranged between the cylinder body 1 and the cylinder body 2, the ends of the cylinder body 1 and the cylinder body 2 that are away from each other are respectively fixed at the ends of the two prefabricated sections, and the inlet pipe is used to inject concrete into the cylinder body 1 and the cylinder body 2.

[0017] By adopting the above technical solution, cylinder one and cylinder two are connected to each other, and a hydraulic cylinder is arranged between cylinder one and cylinder two. Before injecting concrete into the cast-in-place section, the length of the cast-in-place section is first extended by the hydraulic cylinder to generate a pre-tightening force for the cast-in-place section. Then, after the construction of the cast-in-place section is completed, a certain pre-tightening force can still be maintained, thereby reducing the displacement of the foundation pit and improving stability.

[0018] Preferably, the prefabricated section includes an outer steel pipe and an internal concrete column arranged in the outer steel pipe, one end of the outer steel pipe is fixedly provided with a flange for connecting to the cast-in-place section, the cylinder body one and the cylinder body two are divided into two halves along a plane passing through the axis of the cylinder body one and the cylinder body two, and the ends of the cylinder body one and the cylinder body two are fixedly provided with connecting plates for fixed connection to the flange.

[0019] By adopting the above technical solution, the prefabricated section includes an outer steel pipe, and flanges are arranged at both ends of the outer steel pipe, so that when the flanges connect the half-cylinder body 1 and the cylinder body 2, the cylinder body 1 and the cylinder body 2 can be formed into a whole, which is convenient for injecting concrete into the cylinder body 1 and the cylinder body 2, and after use, the cylinder body 1 and the cylinder body 2 can be disassembled and reused.

[0020] Preferably, the upper surface of the support platform is paved with a concrete pavement, ear plates are fixedly provided at both ends of the concrete pavement and the diagonal brace, and tensioning members are provided between the ear plates on the concrete pavement and the ear plates on the diagonal brace.

[0021] By adopting the above technical solution, a concrete pavement is laid on the upper surface of the support platform. When the foundation pit displacement corresponding to a certain diagonal brace is too large, the tensioning member between the diagonal brace and the concrete pavement can be shortened, and then the gravity of the concrete pavement is loaded onto the corresponding first-level support piles or second-level support piles, thereby increasing the force to resist the deformation of the foundation pit.

[0022] The present application also provides a construction method using multi-level support with inclined expanded bottom piles, which adopts the following technical solution: A construction method for multi-level support using inclined expanded bottom piles, including first completing the pile body construction of the first-level support piles, and then constructing the pile body of the second-level support piles; excavating the earth, excavating in layers and sections, cutting off the excess pile body of the second-level support piles when the earth excavation reaches the depth of the support platform, constructing the crown beams of the first-level support piles and the second-level support piles, completing the construction of the inclined braces at the same time, and excavating the earth on the side of the second-level support piles until the excavation reaches the bottom of the foundation pit.

[0023] By adopting the above technical scheme, the pile body construction of the first-level supporting piles is completed first, and then the pile body of the second-level supporting piles is constructed, so that the soil layer around the foundation pit is first stabilized by the pile body of the first-level supporting piles and the pile body of the second-level supporting piles, and then after excavating to the supporting platform, the diagonal brace is constructed. After the diagonal brace stabilizes the soil layer around the foundation pit, the earth on the side of the second-level supporting piles is excavated to reduce the instability of the foundation pit during the excavation process.

[0024] Preferably, when the earth excavation reaches the depth of the support platform, the grouting pipe is inserted vertically downward between the two pile bodies of the first-level support piles on the support platform, the lower end of the grouting pipe is configured to be tapered, and a grouting hole is opened on the tapered side wall of the lower end of the grouting pipe, the grouting hole is connected to the grouting pipe, and a protective cover is also provided at the lower end of the grouting pipe, the protective cover is also configured to be tapered, the protective cover is used to cover the end of the grouting pipe and cover the grouting hole, when the grouting pipe is inserted downward, the protective cover moves downward with the grouting pipe, when the grouting pipe reaches the predetermined depth, the grouting pipe is lifted up by 10-20 cm, the grouting equipment is connected to the upper end of the grouting pipe, cement slurry is added to the grouting pipe, the cement slurry flows out of the grouting hole and enters the surrounding soil layer, and the grouting pipe is pulled out after the grouting is completed.

[0025] By adopting the above technical solution, after the support platform is formed, the grouting pipe is inserted downward from the support platform. The protective cover arranged at the lower end of the grouting pipe can reduce the blockage of the grouting hole. Then, after the grouting pipe is inserted to a predetermined depth, it is lifted upward to expose the grouting hole, and cement slurry is injected to strengthen the soil structure at the bottom of the first-level support pile with the cement slurry, thereby improving the stability. The grouting pipe can still be reused after it is pulled out.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. When a diagonal brace is arranged between the first-level supporting pile and the second-level supporting pile, the force of the diagonal brace is along the length direction of the first-level supporting pile and the second-level supporting pile on the one hand, and can be used to resist the torque of the first-level supporting pile and the second-level supporting pile tilting toward the foundation pit on the other hand, so that the first-level supporting pile and the second-level supporting pile can stabilize the cantilever supporting structure formed by the first-level supporting pile and the second-level supporting pile under the action of the diagonal brace; 2. The position control of the first-level support piles by coordinating the first-level support piles with the second-level support piles has a significant effect, which improves the stability of the support structure, and the stress state of the diagonal brace is better, giving full play to the role of the diagonal brace; 3. Before injecting concrete into the cast-in-place section, the length of the cast-in-place section is first extended by a hydraulic cylinder to generate a pre-tightening force for the cast-in-place section. Then, after the construction of the cast-in-place section is completed, a certain pre-tightening force can still be maintained to reduce the displacement of the foundation pit and improve stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the present application; Figure 2 It is a schematic diagram of the overall structure of the second embodiment of the present application; Figure 3 It is a schematic diagram of the structure of the grouting pipe in the second embodiment of the present application; Figure 4It is a schematic diagram of the structure of the diagonal brace in the second embodiment of the present application; Figure 5 It is a structural schematic diagram of the cast-in-place section in Example 2 of the present application; Figure 6 It is a schematic diagram of the overall structure of Example 3 of the present application.

[0028] Explanation of the reference numerals in the accompanying drawings: 1. First-level supporting piles; 11. Pile body; 12. Crown beam; 2. Second-level supporting piles; 3. Diagonal brace; 31. Prefabricated section; 311. Outer steel pipe; 312. Internal concrete column; 313. Connecting ear; 314. Flange; 32. Cast-in-place section; 321. Cylinder body one; 322. Cylinder body two; 323. Connecting plate; 324. Inlet pipe; 325. Outlet pipe; 326. Ring body; 327. Hydraulic cylinder; 33. Base; 34. Pin; 4. Support platform; 5. Foundation pit; 6. Support seat; 7. Grouting pipe; 71. Grouting hole; 72. Protective cover; 8. Concrete pavement; 81. Ear plate; 9. Tension piece; 91. Steel bar screw; 92. Stud nut. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-6 This application is described in further detail.

[0030] Embodiment 1: The present application embodiment discloses a multi-level support using inclined expanded bottom piles, referring to Figure 1 , including a first-level support pile 1, a second-level support pile 2 and a diagonal brace 3. The first-level support pile 1 is set downward from the ground, and a support platform 4 is set on the side of the first-level support pile 1 facing the foundation pit 5. The distance from the support platform 4 to the ground is the cantilever part of the first-level support pile 1. The second-level support pile 2 is located on the side of the support platform 4 close to the foundation pit 5. The second-level support pile 2 is set downward from the support platform 4. The foundation pit 5 is excavated on the side of the second-level support pile 2 away from the support platform 4. The distance from the bottom surface of the foundation pit 5 to the support platform 4 is the cantilever part of the second-level support pile 2. One end of the diagonal brace 3 is connected to the second-level support pile 2, and the other end is connected to the first-level support pile 1 at an angle upward. The first-level support pile 1 and the second-level support pile 2 are connected through the diagonal brace 3.

[0031] The top of the first-level support pile 1 and the second-level support pile 2 both include a pile body 11 and a cap beam 12. The cap beam 12 is arranged at the upper end of the pile body 11. The pile body 11 of the first-level support pile 1 and the pile body 11 of the second-level support pile 2 both adopt expanded bottom piles. The width of the support platform 4 is selected to be 0.5-0.75 times of the total excavation depth of the foundation pit 5, for example, 0.5, 0.6, 0.75 times can be selected. The width of the support platform 4 can be selected to be a smaller width support platform 4 when the geological conditions are relatively stable. The pile body 11 of the first-level support pile 1 is inclined to the vertical direction, and the inclination angle is 15-20 degrees, and 15, 18, 20 degrees can be selected. The pile body 11 of the second-level supporting pile 2 is inclined with respect to the vertical direction, and the inclination angle of the pile body 11 of the second-level supporting pile 2 with respect to the vertical direction is smaller than the inclination angle of the pile body 11 of the first-level supporting pile 1 with respect to the vertical direction. The inclination angle of the pile body 11 of the second-level supporting pile 2 with respect to the vertical direction is 5-10 degrees, and can be selected as 5, 8, or 10 degrees. The inclination of the first-level supporting pile 1 and the second-level supporting pile 2 are both biased toward the center of the foundation pit 5.

[0032] The diameter of the pile body 11 of the first-level support pile 1 and the pile body 11 of the second-level support pile 2 is larger than the pile body diameter of the pile body 11, and the ratio of the diameter of the pile body 11 to the pile body diameter of the pile body 11 can be selected as 2-3, according to the geological conditions of the on-site construction. When the soil conditions of the on-site construction are relatively stable, the ratio of the diameter of the pile body 11 to the pile body diameter of the pile body 11 can be selected as a smaller value. The overall cross-section of the bottom of the pile body 11 is fan-shaped, and the sagittal height at the bottom is 0.1-0.5 times the pile end diameter.

[0033] The ratio of the height of the cantilever part of the first-level support pile 1 to the height of the cantilever part of the second-level support pile 2 is (2-1): 1; when the depth of the foundation pit 5 is greater than 15 meters, the ratio of the height of the cantilever part of the first-level support pile 1 to the height of the cantilever part of the second-level support pile 2 should be set to 1.5: 1 and 2: 1, so that the cantilever part of the first-level support pile 1 can bear more supporting effects, and the diagonal brace 3 is used to improve the stability of the first-level support pile 1. A support seat 6 is fixedly arranged on the side wall of the first-level support pile 1, and the diagonal brace 3 is connected to the support seat 6. The diagonal brace 3 can be hinged or integrally arranged with the support seat 6. The support seat 6 can be arranged in the middle position of the cantilever part of the first-level support pile 1, so that the force state of the diagonal brace 3 is better. The diagonal brace 3 can adopt a steel tube concrete structure to improve the compressive strength of the diagonal brace 3, and finally make the support structure meet the requirements of safety, economy and environmental protection.

[0034] This embodiment also discloses a construction method using multi-level support with inclined bottom-enlarged piles, comprising the following steps: First, the pile body 11 of the first-level support pile 1 is constructed, and then the pile body 11 of the second-level support pile 2 is constructed. The AM rotary excavation and bottom expansion process is used to construct the pile body 11 of the first-level support pile 1 and the pile body 11 of the second-level support pile 2. The earthwork excavation is carried out according to the principle of "deep first and shallow later", advancing from the deepest part of the foundation pit 5 to the edge, and excavating in layers and sections. When the earthwork excavation reaches the depth of the support platform 4, the excess pile body 11 of the second-level support pile 2 is cut off, and the crown beam 12 of the first-level support pile 1 and the second-level support pile 2 is constructed, and the construction of the diagonal brace 3 is completed at the same time. The earthwork excavation on the side of the second-level support pile 2 is carried out until the excavation reaches the bottom of the foundation pit 5 and the construction of the underground foundation structure is completed. After the construction of the foundation pit 5 and the underground structure is completed, the first-level support pile 1 and the second-level support pile 2 and the outer wall of the basement are backfilled with graded soil. The backfilling density must be ensured during backfilling, and the displacement of the pile body 11 of the first-level support pile 1 and the second-level support pile 2 must also be controlled.

[0035] The construction steps of AM rotary drilling and bottom expansion process are as follows: Pile position setting, after the pile position is set, it should be handled and protected in time, the cross should be made and protective measures should be taken, the rotary drilling rig should be in place and centered, and the angle should be adjusted. For deep steel casing, the rotary drilling rig should first drill a hole 5cm larger than the casing diameter and 50cm shallower than the casing, then the casing should be hoisted into the hole and pressed into the hole by the rotary drilling rig, and the surrounding area should be evenly backfilled with clay and compacted in layers. For equal diameter part hole formation, after the casing is buried, a stabilizing liquid is injected into the hole with a mud pump. The injection flow of the stabilizing liquid is 10 cubic meters per hour, and the loose stratum is controlled at 3 cubic meters per hour. The quality of the mud is strictly controlled. After the hole is formed to the designed depth, the first hole cleaning is carried out. For bottom expansion, after the equal diameter part is formed to the designed elevation, the bottom expansion bucket is replaced and the bottom expansion operation is carried out. After the bottom expansion is completed, the bottom cleaning bucket is used for the second hole cleaning. Lower the steel cage and the guide tube. The steel cage is hoisted with a crane to assist the lowering of the cage. It is hoisted in 4 to 5 sections so that the central axis of the upper and lower cages coincide. After the steel cage is put in place, the guide tube is lowered in time for the third hole cleaning. Concrete pouring, after the hole is cleaned, the concrete pouring is completed within half an hour.

[0036] Embodiment 2: This embodiment discloses a multi-level support using inclined expanded bottom piles. Figure 2 and Figure 3, which is different from the first embodiment in that the diagonal brace 3 includes a prefabricated section 31 and a cast-in-place section 32. The two ends of the cast-in-place section 32 are respectively connected to a prefabricated section 31. The length of the prefabricated section 31 is fixed. It is transported to the construction site for hoisting. The cast-in-place section 32 is set according to the on-site construction conditions, so that the size of the diagonal brace 3 can meet the requirements of the site and reduce the construction volume of the diagonal brace 3 on site. A reinforcement area is also set at the bottom of the first-level support pile 1. The reinforcement area is formed by injecting cement slurry under pressure into the lower end of the pile body 11 of the first-level support pile 1 by grouting with a grouting pipe 7. The stability of the first-level support pile 1 is improved by the reinforcement area, the geological conditions of the soft soil are improved, and the downward movement of the pile body 11 of the first-level support pile 1 caused by the setting of the diagonal brace 3 is reduced.

[0037] Construction process of the reinforcement area: When the earthwork is excavated to the depth of the support platform 4, the grouting pipe 7 is inserted vertically downward between the two pile bodies 11 of the first-level support pile 1 on the support platform 4. The lower end of the grouting pipe 7 is set to be conical, and a grouting hole 71 is opened on the conical side wall of the lower end of the grouting pipe 7. The grouting hole 71 is connected to the grouting pipe 7. At the same time, a protective cover 72 is also set at the lower end of the grouting pipe 7. The protective cover 72 is also set to be conical. The protective cover 72 is used to cover the grouting pipe 7. The end of the grouting hole 71 is covered. When the grouting pipe 7 is inserted downward, the protective cover 72 moves downward with the grouting pipe 7. When the grouting pipe 7 reaches the predetermined depth, the grouting pipe is lifted up by 10-20 cm, and the grouting equipment is connected to the upper end of the grouting pipe 7. Cement slurry is added to the grouting pipe 7. The cement slurry flows out of the grouting hole 71 and enters the surrounding soil layer. After the grouting is completed, the grouting pipe 7 is pulled out vertically upward, leaving the protective cover 72 in the soil layer, and then the reinforcement area construction at the next position is continued.

[0038] refer to Figure 4 and Figure 5 The prefabricated section 31 includes an outer steel pipe 311 and an inner concrete column 312. A connecting ear 313 is fixedly provided at one end of the outer steel pipe 311, and a flange 314 is provided at the other end. A base 33 is fixedly provided on the support seat 6 and the crown beam 12 of the second-level supporting pile 2. The base 33 is rotatably connected to the connecting ear 313 through a pin shaft 34. The inner concrete column 312 is located inside the outer steel pipe 311 to improve the strength and weight of the diagonal brace 3.

[0039] The cast-in-place section 32 includes a cylinder 1 321 and a cylinder 2 322, which are sleeved with each other, and the cylinder 1 321 and the cylinder 2 322 are divided into two halves from a plane passing through the axis of the cylinder 1 321 and the cylinder 2 322. A connecting plate 323 is provided at the ends of the cylinder 1 321 and the cylinder 2 322 that are away from each other. The connecting plate 323 is connected to the flange 314 by bolts, so that the cylinder 1 321 and the cylinder 2 322 are molded together. An inlet pipe 324 is fixedly provided on the side wall of one end of the cylinder 1 321, and an outlet pipe 325 is fixedly provided on the side wall of one end of the cylinder 2 322. When installed, the outlet pipe 325 is higher than the inlet pipe 32 4 is set, the inlet pipe 324 is used to pass concrete, and after the concrete flows out of the outlet pipe 325, the concrete inside the cast-in-place section 32 solidifies to improve the strength of the cast-in-place section 32. A ring body 326 is also set on the outside of the cylinder 1 321. The ring body 326 is used to be threadedly connected to the end of the cylinder 1 321 away from the connecting plate 323, so that the ring body 326 reinforces the cylinder 1 321. When disassembly is required, the ring body 326 is removed from the cylinder 1 321, and then the two halves of the cylinder 1 321 and the cylinder 2 322 are separated, so that the solidified concrete inside the cylinder 1 321 and the cylinder 2 322 can be disassembled so that the cast-in-place section 32 can be reused. A hydraulic cylinder 327 is also set between the two connecting plates 323, and two hydraulic cylinders 327 can be symmetrically arranged along the circumference of the cast-in-place section 32. When in use, after the cast-in-place section 32 is installed, the hydraulic cylinder 327 is placed between the two connecting plates 323. The hydraulic cylinder 327 applies a pre-tightening force to the two connecting sections to increase the length of the cast-in-place section 32 and maintain the abutment force. When the concrete inside the cast-in-place section 32 solidifies, the hydraulic cylinder 327 is depressurized and disassembled, so that the cast-in-place section 32 bears the pre-tightening force.

[0040] Embodiment three: This embodiment discloses a multi-level support using inclined expanded bottom piles. Figure 6 The difference from the second embodiment is that a concrete pavement 8 is constructed on the upper surface of the support platform 4, and the upper surface of the concrete pavement 8 can be used to place construction materials. At the same time, ear plates 81 are fixedly provided on the concrete pavement 8, and the ear plates 81 are arranged on both sides of the concrete pavement 8. Ear plates 81 are also fixedly provided on the side walls at both ends of the diagonal brace 3. A tensioning member 9 is connected between the two ear plates 81. The tensioning member 9 includes a steel bar screw 91 and a stud nut 92. One end of the steel bar screw 91 is threadedly connected to the stud nut 92, and the other end is arranged as a hook to hang on the ear plate 81. When it is necessary to increase the force on the first-level supporting piles 1 or the second-level supporting piles 2, the tensioning member 9 is connected to the corresponding ear plate 81 to load the gravity of the concrete pavement 8 onto the diagonal brace 3. Then, the first-level supporting piles 1 and the second-level supporting piles 2 are both inclined with respect to the vertical direction, so that the force applied by the diagonal brace 3 is used to resist the force on the first-level supporting piles 1 and the second-level supporting piles 2 in the direction of the foundation pit 5, thereby improving the support stability of the foundation pit 5.

[0041] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A multi-stage support using inclined expanded bottom piles, characterized in that: The invention comprises a first-level support pile (1), a second-level support pile (2) and a diagonal brace (3), wherein the first-level support pile (1) and the second-level support pile (2) both comprise a pile body (11) and a cap beam (12) fixed to the upper end of the pile body (11), the pile body (11) of the first-level support pile (1) and the pile body (11) of the second-level support pile (2) both adopt a bottom-enlarged pile, and the pile body (11) of the first-level support pile (1) is arranged to be inclined at 15-20 degrees with respect to the vertical direction. The pile body (11) of the second-level supporting pile (2) is arranged to be inclined at 5-10 degrees with respect to the vertical direction, one end of the diagonal brace (3) is fixed to the crown beam (12) of the second-level supporting pile (2), and the other end is fixed to the cantilever part of the first-level supporting pile (1), a supporting platform (4) is excavated between the top of the second-level supporting pile (2) and the first-level supporting pile (1), and a foundation pit (5) is excavated on a side of the second-level supporting pile (2) away from the supporting platform (4).

2. The multi-stage support using inclined expanded bottom piles according to claim 1, characterized in that: The width of the support platform (4) is 0.5-0.75 times the total excavation depth of the foundation pit (5).

3. The multi-stage support using inclined expanded bottom piles according to claim 1, characterized in that: The ratio of the height of the cantilever portion of the first-level supporting pile (1) to the height of the cantilever portion of the second-level supporting pile (2) is (2-1):

1.

4. The multi-stage support using inclined expanded bottom piles according to claim 1, characterized in that: The ratio of the height of the cantilever portion of the first-level supporting pile (1) to the height of the cantilever portion of the second-level supporting pile (2) is 2:1, and the connection portion between the diagonal brace (3) and the first-level supporting pile (1) is located in the middle of the cantilever portion of the first supporting pile.

5. The multi-stage support using inclined expanded bottom piles according to claim 1, characterized in that: The diagonal brace (3) comprises a prefabricated section (31) and a cast-in-place section (32), the two ends of the cast-in-place section (32) are respectively fixedly connected to one of the prefabricated sections (31), the ends of the prefabricated sections (31) away from the cast-in-place section (32) are respectively connected to the first-level support pile (1) and the second-level support pile (2), and the length of the cast-in-place section (32) is adjusted according to the distance between the two cast-in-place sections (32).

6. The multi-stage support using inclined base-enlarged piles according to claim 5, characterized in that: The cast-in-place section (32) comprises a cylinder body 1 (321) and a cylinder body 2 (322); an inlet pipe (324) is fixedly provided at one end of the cylinder body 1 (321); an outlet pipe (325) is fixedly provided at one end of the cylinder body 2 (322); the outlet pipe (325) is arranged higher than the inlet pipe (324); the cylinder body 1 (321) and the cylinder body 2 (322) are sleeved with each other; and a hydraulic cylinder (327) for adjusting the distance between the cylinder body 1 (321) and the cylinder body 2 (322) is arranged between the cylinder body 1 (321) and the cylinder body 2 (322); the ends of the cylinder body 1 (321) and the cylinder body 2 (322) that are away from each other are respectively fixed to the ends of the two prefabricated sections (31); and the inlet pipe (324) is used to inject concrete into the cylinder body 1 (321) and the cylinder body 2 (322).

7. The multi-stage support using inclined expanded bottom piles according to claim 6, characterized in that: The prefabricated section (31) comprises an outer steel pipe (311) and an inner concrete column (312) arranged in the outer steel pipe (311); a flange (314) for connecting to the cast-in-place section (32) is fixedly arranged at one end of the outer steel pipe (311); the cylinder body 1 (321) and the cylinder body 2 (322) are both divided into two halves along a plane passing through the axis of the cylinder body 1 (321) and the cylinder body 2 (322); and a connecting plate (323) for fixed connection to the flange (314) is fixedly arranged at the ends of the cylinder body 1 (321) and the cylinder body 2 (322).

8. The multi-stage support using inclined expanded bottom piles according to claim 1, characterized in that: The upper surface of the support platform (4) is paved with a concrete pavement (8), and ear plates (81) are fixedly provided at both ends of the concrete pavement (8) and the diagonal brace (3), and a tensioning member (9) is provided between the ear plates (81) on the concrete pavement (8) and the ear plates (81) on the diagonal brace (3).

9. A construction method for multi-level support using inclined base piles, used for constructing a multi-level support using inclined base piles as claimed in any one of claims 1 to 8, characterized in that: The method includes first completing the construction of the pile body (11) of the first-level supporting pile (1), and then constructing the pile body (11) of the second-level supporting pile (2); excavating the earthwork, excavating in layers and sections, cutting off the excess pile body (11) of the second-level supporting pile (2) when the earthwork is excavated to the depth of the supporting platform (4), constructing the crown beam (12) of the first-level supporting pile (1) and the second-level supporting pile (2), and completing the construction of the diagonal brace (3) at the same time, and excavating the earthwork on the side of the second-level supporting pile (2) until the excavation reaches the bottom of the foundation pit (5).

10. A construction method for multi-level support using inclined bottom-enlarged piles according to claim 9, characterized in that: The invention comprises the following steps: when the earthwork is excavated to the depth of the support platform (4), a grouting pipe (7) is inserted vertically downwards between two pile bodies (11) of the first-level support pile (1) on the support platform (4); the lower end of the grouting pipe (7) is configured to be conical, and a grouting hole (71) is provided on the conical side wall of the lower end of the grouting pipe (7); the grouting hole (71) is connected to the grouting pipe (7); and a protective cover (72) is provided at the lower end of the grouting pipe (7); the protective cover (72) is also configured to be conical. The protective cover (72) is used to cover the end of the grouting pipe (7) and cover the grouting hole (71). When the grouting pipe (7) is inserted downward, the protective cover (72) simultaneously moves downward along with the grouting pipe (7). When the grouting pipe (7) reaches a predetermined depth, the grouting pipe (7) is lifted upward by 10-20 cm, and a grouting device is connected to the upper end of the grouting pipe (7). Cement slurry is injected into the grouting pipe (7), and the cement slurry flows out of the grouting hole (71) and enters the surrounding soil layer. After grouting is completed, the grouting pipe (7) is pulled out.

Citation Information

Cited By

  • Deep foundation pit multi-stage collaborative supporting structure and construction method

    CN120250663A