Prefabricated bearing platform type anchor rod foundation
The prefabricated platform-type anchor foundation solves the problems of economy, environmental protection and construction difficulty of infrastructure in the construction of photovoltaic power stations in mountainous areas, and enables efficient, safe and low-cost photovoltaic bracket installation to adapt to complex terrain and environmental protection needs.
Patent Information
- Application Number
- CN202411033024.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-18
AI Technical Summary
In the construction of photovoltaic power stations in mountainous areas, the existing photovoltaic support infrastructure is uneconomical and unenvironmentally friendly, has high installation and manufacturing costs, and is difficult to construct, especially in areas with steep slope terrain and water and soil erosion.
Use prefabricated cap-type anchor foundations, including prefabricated cap platforms, anchor foundations, embedded bolts and brackets. Through factory-prefabricated concrete caps and anchor foundations, on-site construction can be reduced, large-scale machinery transportation and road construction can be avoided, and construction can be improved. Safety and efficiency.
It achieves photovoltaic support infrastructure with convenient transportation, safe construction, short construction period and low cost, reduces construction risks and environmental damage, adapts to various terrains, and improves installation accuracy and overall stability.
Smart Images

Figure CN118793083A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of photovoltaic brackets, and in particular to a prefabricated bearing platform type anchor foundation. Background Art
[0002] The demand for land for photovoltaic power stations is large. Due to the tight land supply, large-scale ground photovoltaic power stations tend to shift from plains to mountains. However, with the rapid increase in the number of photovoltaic power station construction, it has become difficult to find mountains with good terrain. The terrain conditions for site selection of power stations are getting worse and worse, and the construction difficulty is increasing.
[0003] In the related technologies, the foundation setting of photovoltaic brackets suitable for mountainous areas is not economical, not environmentally friendly, and has high installation and production costs. Summary of the invention
[0004] The present invention is based on the inventor's discovery and understanding of the following facts and problems:
[0005] The foundation of photovoltaic brackets in mountainous areas generally adopts pile foundation, and the pile diameter is about 250-400mm. If large-scale construction machinery is used for construction, the pile-driving machinery cannot go up to the steep mountainous area, and the freight cableway cannot transport large-scale machinery and equipment, which makes it difficult to carry out construction; if manual excavation is used, the construction period will be very long and face high construction safety risks; if blasting construction is used, there will be problems with explosive control and safety risks in different regions; if the machinery needs to go up the mountain after the road is built, a large area of square cutting and mountain opening will be required for road construction; if all cast-in-place reinforced concrete is used, the entire construction period will be increased. In the face of pressures such as large-scale soil erosion, environmental protection, and construction period, the construction cost will be very high, resulting in poor economic efficiency.
[0006] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.
[0007] To this end, an embodiment of the present invention provides a prefabricated cap-type anchor foundation that is convenient to transport, safe to construct, and has a short construction period.
[0008] According to an embodiment of the present invention, a prefabricated pedestal anchor foundation includes: a prefabricated pedestal, wherein the prefabricated pedestal is provided with a mounting hole that penetrates the prefabricated pedestal in an up-and-down direction; an anchor foundation, wherein the anchor foundation includes a first anchor bar and a base, wherein the first anchor bar is suitable for being inserted into the anchor hole and the upper end of the first anchor bar is located in the mounting hole of the prefabricated pedestal, the base is made of concrete cast in the anchor hole and the mounting hole, and the first anchor bar is arranged in the base; embedded bolts, wherein the embedded bolts are embedded in the base, and the upper end of the embedded bolts protrudes out of the base; a bracket, wherein the bracket is arranged on the base and connected to the embedded bolts, so that the bracket is installed on the base through the embedded bolts, and the bracket is suitable for being connected to a photovoltaic bracket.
[0009] The prefabricated pedestal anchor foundation of the embodiment of the present invention is provided with a prefabricated pedestal, an anchor foundation, embedded bolts and brackets. It does not need to adopt large-scale construction machinery for construction, eliminates the transportation of pile-driving machinery, and does not need to build roads to allow pile foundation construction machinery to go up the mountain, thereby reducing transportation costs, shortening the construction period, and having high construction safety performance and low installation and production costs.
[0010] In some embodiments, the mounting holes include a first mounting hole, a second mounting hole, and a third mounting hole, and the first mounting hole, the second mounting hole, and the third mounting hole are spaced apart along the length direction of the prefabricated pedestal, and the anchor rod foundation includes a first anchor rod foundation, a second anchor rod foundation, and a third anchor rod foundation, and the upper ends of the first anchor rod foundation, the second anchor rod foundation, and the third anchor rod foundation are respectively passed through the first mounting hole, the second mounting hole, and the third mounting hole.
[0011] In some embodiments, the embedded bolts include a first embedded bolt and a second embedded bolt, the first embedded bolt is embedded in the first anchor rod foundation and extends out of the upper end of the first anchor rod foundation, the second embedded bolt is embedded in the third anchor rod foundation and extends out of the upper end of the third anchor rod foundation, the bracket includes a first bracket and a second bracket, the first bracket is installed on the first anchor rod foundation through the first embedded bolt, and the second bracket is installed on the second anchor rod foundation through the second embedded bolt.
[0012] In some embodiments, the base of the first anchor foundation and the base of the third anchor foundation both include a first section, a second section, and a third section connected in sequence along the up-down direction, the first section is located in the mounting hole, the second section and the third section are located in the anchor hole, the cross-sectional area of the first section gradually decreases from top to bottom, the cross-sectional area of the second section and the third section is constant from top to bottom, in a projection plane orthogonal to the up-down direction, the projection of the second section is located in the first section, the projection of the third section is located in the first section, the embedded bolts are penetrated in the first section and the second section, the base of the second anchor foundation includes a fourth section and a fifth section connected in sequence along the up-down direction, the fourth section is located in the mounting hole, the fifth section is located in the anchor hole, the cross-sectional area of the fifth section gradually decreases from top to bottom, the cross-sectional area of the fifth section is constant from top to bottom, in a projection plane orthogonal to the up-down direction, the projection of the fifth section is located in the fourth section.
[0013] In some embodiments, the anchor foundation further includes a concrete flange, which is disposed on the outer circumferential surface of the base and is located in the anchor hole.
[0014] In some embodiments, the anchor rod foundation also includes a plurality of second anchor bars, each of which is welded to the upper end of the first anchor bar, and each of which is spaced circumferentially along the first anchor bar. The plurality of second anchor bars are arranged in the base and located in the mounting hole.
[0015] In some embodiments, the anchor rod foundation also includes positioning steel bars, which are arranged between the first anchor bar and the anchor hole and respectively abut against the outer circumference of the first anchor bar and the inner circumference of the anchor hole, so that the positioning steel bars position the first anchor bar.
[0016] In some embodiments, the embedded bolts include a plurality of bolts, the plurality of embedded bolts are arranged in the base body at intervals along the circumference of the base body, and the upper end of the anchor rod is located between the plurality of embedded bolts.
[0017] In some embodiments, the bracket includes: a sleeve, the photovoltaic bracket can be inserted into the sleeve, and the outer peripheral surface of the sleeve is provided with a through hole that radially penetrates the sleeve, and the through hole is suitable for installing bolts; a mounting plate, the mounting plate is arranged on the lower end of the sleeve and extends radially along the sleeve, and the embedded bolt passes through the mounting plate and is connected to the mounting plate through a nut. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of a prefabricated cap-type anchor foundation according to an embodiment of the present invention.
[0019] Figure 2 It is a top view of a prefabricated cap of a prefabricated cap type anchor foundation according to an embodiment of the present invention.
[0020] Figure 3 It is a schematic diagram of the installation of the first anchor bar and the second anchor bar of the prefabricated platform anchor foundation according to an embodiment of the present invention.
[0021] Figure 4 yes Figure 3 Sectional view of AA.
[0022] Figure 5 It is a structural schematic diagram of the first anchor bar and the positioning steel bar of the prefabricated pedestal anchor foundation in an embodiment of the present invention.
[0023] Figure 6 It is a cross-sectional view of the first anchor bar and the positioning steel bar of the prefabricated cap type anchor foundation according to an embodiment of the present invention.
[0024] Prefabricated cap type anchor foundation 100;
[0025] Prefabricated foundation 1;
[0026] Anchor foundation 2; first anchor bar 21; base 22; first anchor foundation 23; first section 231; second section 232; third section 233; second anchor foundation 24; fourth section 241; fifth section 242; third anchor foundation 25; concrete flange 26; second anchor bar 27; positioning steel bar 28;
[0027] Embedded bolt 3; first embedded bolt 31; second embedded bolt 32;
[0028] Bracket 4; first bracket 41; second bracket 42; sleeve 43; mounting plate 44. DETAILED DESCRIPTION
[0029] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0030] The following describes a prefabricated cap type anchor foundation 100 according to an embodiment of the present invention with reference to the accompanying drawings.
[0031] like Figure 1-6 As shown, the prefabricated cap type anchor foundation 100 according to an embodiment of the present invention includes a prefabricated cap 1, an anchor foundation 2, embedded bolts 3 and a bracket 4.
[0032] The prefabricated support 1 is provided with a mounting hole that penetrates the prefabricated support 1 in the up-down direction. Figure 1As shown, the precast cap 1 is a cap pre-customized with concrete in the factory. The precast cap 1 is provided with mounting holes which penetrate the precast cap 1 in the up and down directions. Therefore, the precast cap 1 can greatly improve the production efficiency and the quality control level, making the on-site installation faster and avoiding the concrete mixing, pouring, maintenance, steel bar binding, formwork and other cycles of the conventional cap, reducing the waiting time and labor cost for on-site pouring of concrete, and the prefabrication processing in the factory can avoid the errors, quality problems and safety risks caused by on-site construction to the greatest extent, thereby ensuring the installation efficiency of the precast cap type anchor foundation 100.
[0033] The anchor foundation 2 includes a first anchor bar 21 and a base 22. The first anchor bar 21 is suitable for being inserted into the anchor hole and the upper end of the first anchor bar 21 is located in the mounting hole of the prefabricated cap 1. The base 22 is made of concrete poured into the anchor hole and the mounting hole. The first anchor bar 21 is arranged in the base 22. Specifically, Figure 1 As shown, the anchor hole is a hole pre-drilled or punched for fixing anchor bars or other anchoring pieces. The first anchor bar 21 is made of high-strength material and is implanted in the preset anchor hole through precise drilling technology. The upper end of the first anchor bar 21 passes through the anchor hole and is located in the installation hole, thereby forming a continuous support system from the ground to the underground. The anchor rod foundation 2 greatly enhances the pull-out resistance and lateral force resistance of the entire photovoltaic bracket 4. The matrix 22 is a matrix 22 formed by pouring concrete in the anchor hole. The matrix 22 not only tightly wraps the first anchor bar 21 to strengthen the anchoring effect, but also effectively closes the anchor hole to prevent moisture and soil erosion, thereby extending the service life of the first anchor bar 21.
[0034] The embedded bolt 3 is embedded in the base 22, and the upper end of the embedded bolt 3 extends out of the base 22. The bracket 4 is arranged on the base 22 and connected with the embedded bolt 3, so that the bracket 4 is installed on the base 22 through the embedded bolt 3. The bracket 4 is suitable for being connected with the photovoltaic bracket 4. Specifically, Figure 1 As shown, the embedded bolts 3 extend in the up and down directions. The embedded bolts 3 can be arranged in the base 22, and the upper end of the embedded bolts 3 extends out of the base 22 and is connected to the bracket 4. The bracket 4 can be a steel pipe (square steel pipe, round steel pipe) or a steel section (angle steel, channel steel, I-beam, etc.). The heights of the two can be adjusted according to actual needs. Therefore, the bracket 4 is detachably mounted on the base 22 by the embedded bolts 3, which reduces on-site drilling operations, shortens the construction period, reduces construction costs, and improves the installation accuracy of the photovoltaic bracket 4.
[0035] The pedestal anchor foundation 100 of the embodiment of the present invention first drills the anchor hole required for the first anchor bar 21 on site, installs the first anchor bar 21 in the anchor hole, and then pours the first anchor bar 21 with concrete to form a base 22. Then the prefabricated pedestal 1 is installed at a preset position, and the upper end of the first anchor bar 21 is passed through the installation hole. After the prefabricated pedestal 1 is installed, concrete is poured into the installation hole. At the same time, the embedded bolts 3 are embedded in the installation hole. After the concrete solidifies, the bracket 4 is connected to the embedded bolts 3.
[0036] The prefabricated pedestal anchor foundation 100 of the embodiment of the present invention is provided with a prefabricated pedestal 1, an anchor foundation 2, embedded bolts 3 and a bracket 4. It only needs to transport the anchors, the prefabricated pedestal 1, the embedded bolts 3 and the bracket 4, as well as the equipment for excavating anchor holes. Compared with the use of pile foundation related technologies, there is no need to use large-scale construction machinery for construction, and the transportation of piling machinery is eliminated. There is no need to build roads to allow the machinery to go up the mountain, which reduces the transportation cost. Secondly, the prefabricated pedestal 1 can eliminate the processing and manufacturing time of the pedestal, and the diameter of the anchor hole required for the anchor foundation 231 is relatively small, and only an anchor drilling rig is required for drilling. Compared with the manual excavation or blasting construction method, the construction period is short, the construction safety performance is high, and the installation and manufacturing cost is low.
[0037] In some embodiments, the mounting holes include a first mounting hole, a second mounting hole, and a third mounting hole, which are arranged at intervals along the length direction of the prefabricated cap 1, and the anchor rod foundation 2 includes a first anchor rod foundation 23, a second anchor rod foundation 24, and a third anchor rod foundation 25, and the upper ends of the first anchor rod foundation 23, the second anchor rod foundation 24, and the third anchor rod foundation 25 are sequentially passed through the first mounting hole, the second mounting hole, and the third mounting hole. Specifically, as Figure 1 and Figure 2 As shown, there are three mounting holes (such as Figure 1 The three holes shown in the figure are respectively the first mounting hole, the second mounting hole and the third mounting hole, which are arranged at equal intervals along the left-right direction on the prefabricated platform 1, and the first anchor rod foundation 23, the second anchor rod foundation 24 and the third anchor rod foundation 25 are respectively penetrated into the first mounting hole, the second mounting hole and the third mounting hole, thereby dispersing the weight on the prefabricated platform 1 through the first anchor rod foundation 23, the second anchor rod foundation 24 and the third anchor rod foundation 25, and also making it convenient for the anchor rod foundation 2 to adapt to the undulating changes in the terrain.
[0038] In some embodiments, the embedded bolt 3 includes a first embedded bolt 31 and a second embedded bolt 32, the first embedded bolt 31 is embedded in the first anchor foundation 23 and extends out of the upper end of the first anchor foundation 23, the second embedded bolt 32 is embedded in the third anchor foundation 25 and extends out of the upper end of the third anchor foundation 25, the bracket 4 includes a first bracket 41 and a second bracket 42, the first bracket 41 is installed on the first anchor foundation 23 through the first embedded bolt 31, and the second bracket 42 is installed on the second anchor foundation 24 through the second embedded bolt 32. Specifically, as Figure 1 As shown, there can be multiple first embedded bolts 31, and multiple first embedded bolts 31 can be arranged at equal intervals around the circumference of the first bracket 41 in the base 22 of the first anchor foundation 23, and the upper ends of the multiple first embedded bolts 31 are all connected to the first bracket 41. There can be multiple second embedded bolts 32, and multiple second embedded bolts 32 can be arranged at equal intervals around the circumference of the second bracket 42 in the base 22 of the third anchor foundation 25, and the upper ends of the multiple second embedded bolts 32 are all connected to the second bracket 42. Therefore, the first embedded bolts 31 and the second embedded bolts 32 provide an installation foundation for the first bracket 41 and the second bracket 42, thereby ensuring the installation strength of the first bracket 41 and the second bracket 42.
[0039] In some embodiments, the base 22 of the first anchor rod foundation 23 and the base 22 of the third anchor rod foundation 25 both include a first section 231, a second section 232 and a third section 233 connected in sequence along the up-down direction, the first section 231 is located in the mounting hole, the second section 232 and the third section 233 are located in the anchor hole, the cross-sectional area of the first section 231 gradually decreases from top to bottom, the cross-sectional area of the second section 232 and the third section 233 is constant from top to bottom, in the projection plane orthogonal to the up-down direction, the projection of the second section 232 is located in the first section 231, the projection of the third section 233 is located in the first section 231, and the embedded bolts 3 are penetrated in the first section 231 and the second section 232.
[0040] Specifically, Figure 1As shown, the first section 231 may be truncated cone-shaped and the large end of the first section 231 is located above the small end of the first section 231, the second section 232 and the third section 233 are both cylindrical with a constant cross-sectional area, and the cross-sectional area of the small end of the first section 231 is equal to the cross-sectional area of the second section 232, the cross-sectional area of the second section 232 is greater than the cross-sectional area of the third section 233, the first section 231 is formed in the mounting hole, the second section 232 and the third section 233 are formed in the anchor hole, and the lower end of the embedded bolt 233 is penetrated in the first section 23 1 and the second section 232, the upper end of the embedded bolt 3 extends above the first section 231, thereby, the arrangement of the first section 231 can increase the contact area between the precast foundation 1 and the cast-in-place first section 231, so that the connection between the first section 231 and the precast foundation 1 is more secure, and the arrangement of the second section 232 can provide an installation basis for the embedded bolt 3, preventing the embedded bolt 3 from passing through the base 22 of the anchor foundation 2, thereby making the arrangement of the base 22 of the first anchor foundation 23 and the base 22 of the third anchor foundation 25 more reasonable.
[0041] In some embodiments, the base 22 of the second anchor foundation 24 includes a fourth section 241 and a fifth section 242 connected in sequence along the up-down direction, the fourth section 241 is located in the mounting hole, the fifth section 242 is located in the anchor hole, the cross-sectional area of the fifth section 242 gradually decreases from top to bottom, the cross-sectional area of the fifth section 242 is constant from top to bottom, and in the projection plane orthogonal to the up-down direction, the projection of the fifth section 242 is located in the fourth section 241. Specifically, as Figure 1 As shown, the fourth section 241 can be a truncated cone and the large end of the fourth section 241 is located above the small end of the fourth section 241, and the fifth section 242 is a cylinder with a constant cross-sectional area, and the cross-sectional area of the small end of the fourth section 241 is equal to the cross-sectional area of the fifth section 242. Therefore, the contact area between the precast base 1 and the cast-in-place fifth section 242 can be increased by the setting of the fifth section 242, so that the connection between the fifth section 242 and the precast base 1 is more firmly established. Since there is no need to install embedded bolts 3 on the second anchor foundation 24, it is only necessary to set the fifth section 242, and the fifth section 242 is wrapped around the outer peripheral surface of the anchor.
[0042] In some embodiments, the anchor foundation 2 further includes a concrete flange 26, which is disposed on the outer peripheral surface of the base 22 and is located in the anchor hole. Figure 1 As shown, the anchor hole has a first part and a second part which are connected to each other, the hole diameter of the first part is larger than the hole diameter of the second part, and the first part is located below the second part. After the anchor rod is inserted into the first part and the second part, concrete is poured opposite to the first part and the second part. The concrete flange 26 is a variable diameter part and is formed in the first part, and the third section 233 or the fifth section 242 is formed in the second part. Thus, the pull-out and compressive bearing capacities of the anchor rod foundation 2 are improved through the concrete flange 26.
[0043] In some embodiments, the anchor foundation 2 further includes a plurality of second anchor bars 27, which are welded to the upper end of the first anchor bar 21, and are arranged at intervals along the circumference of the first anchor bar 21. The plurality of second anchor bars 27 are arranged in the base 22 and in the mounting hole. Specifically, Figure 3 and Figure 4 As shown, a plurality of second anchor bars 27 are welded on the outer peripheral surface of the first anchor bar 21 at equal intervals along the circumference of the first anchor bar 21 and are located in the mounting hole, and concrete is poured on the outer peripheral surface of the second anchor bars 27. Thus, the bearing capacity of the anchor foundation 2 is enhanced by the plurality of second anchor bars 27. While ensuring the bearing capacity of the anchor foundation 2, the height of the prefabricated pedestal 1 will be reduced, and the interval arrangement of the plurality of second anchor bars 27 is also conducive to the sufficient pouring of concrete, thereby ensuring the close combination between the concrete and the anchor, and improving the durability of the anchoring area.
[0044] In some embodiments, the anchor foundation 2 further includes a positioning steel bar 28, which is disposed between the first anchor bar 21 and the anchor hole and abuts against the outer circumference of the first anchor bar 21 and the inner circumference of the anchor hole, respectively, so that the positioning steel bar 28 positions the first anchor bar 21. Specifically, Figure 1 , Figure 5 and Figure 6 As shown, the positioning steel bar 28 is an arc-shaped smooth round positioning bar. The positioning steel bar 28 is sleeved on the first anchor bar 21 and is arranged in the anchor hole. The outer circumference of the positioning steel bar 28 and the inner circumference of the anchor hole are against each other. Therefore, the positioning steel bar 28 positions the first anchor bar 21 to ensure that the position of the first anchor bar 21 will not deviate during the concrete pouring process, and ensure that the anchor rod maintains a vertical or predetermined angle during the installation process, avoiding uneven force or structural safety hazards caused by installation deviation. In addition, the positioning steel bar 28 can be two (such as Figure 1 As shown in the figure, one positioning steel bar 28 is arranged adjacent to the upper end of the first anchor bar 21, and the other positioning steel bar 28 is arranged adjacent to the lower end of the first anchor bar 21. Therefore, by arranging the positioning steel bars 28 at different heights of the first anchor bar 21, it is not only ensured that the first anchor bar 21 remains in a vertical state during concrete pouring to avoid deflection, thereby improving the vertical bearing capacity and stability of the entire foundation structure, but also can better disperse the load applied to the first anchor bar 21, avoid local stress concentration, reduce the risk of bending of the first anchor bar 21 during the force-bearing process, and enhance its tensile and shear resistance.
[0045] In some embodiments, the embedded bolts 3 include a plurality of embedded bolts 3, which are arranged in the base 22 at intervals along the circumference of the base 22, and the upper end of the anchor rod is located between the plurality of embedded bolts 3. Specifically, Figure 1 and Figure 2As shown, a plurality of embedded bolts 3 surround the bracket 4 and are arranged at equal intervals along the circumference of the base 22, and the lower ends of the plurality of embedded bolts 3 are embedded in the base 22, and the upper ends of the plurality of embedded bolts 3 extend out of the base 22 and are all connected to the bracket 4, thereby making the bracket 4 more firmly mounted on the base 22, enhancing the overall stability and load-bearing capacity of the structure, reducing the stress concentration phenomenon in the local area, and improving the durability and safety of the entire system.
[0046] In some embodiments, the bracket 4 includes a sleeve 43 and a mounting plate 44 .
[0047] The photovoltaic bracket 4 can be inserted into the sleeve 43. The outer peripheral surface of the sleeve 43 is provided with a through hole that penetrates the sleeve 43 in the radial direction of the sleeve 43. The through hole is suitable for installing bolts. The mounting plate 44 is provided at the lower end of the sleeve 43 and extends in the radial direction of the sleeve 43. The embedded bolts 3 pass through the mounting plate 44 and are connected to the mounting plate 44 through nuts. Specifically, Figure 1 As shown, the sleeve 43 is a circular sleeve 43 or a square sleeve 43 extending in the up-down direction, and the upper end portion of the sleeve 43 is provided with a plurality of through holes penetrating the sleeve 43 in the inward-outward direction, and the photovoltaic bracket 4 can be inserted into the sleeve 43 and the bolts pass through the through holes and are connected to the bracket 4, thereby, the bolts fix the photovoltaic bracket 4 on the sleeve 43, and the mounting plate 44 can be a rigid flange or a ground plate and is arranged on the outer peripheral surface of the lower end surface of the sleeve 43, and the mounting plate 44 is provided with bolt holes penetrating the mounting plate 44 in the up-down direction, and the embedded bolts 3 pass through the bolt holes and are connected to the mounting plate 44 by nuts, thereby, making the setting of the bracket 4 more reasonable.
[0048] The prefabricated pedestal anchor foundation 100 of the embodiment of the present invention can be used for the support foundation construction of photovoltaic power stations in mountainous areas, can be used for foundations with a thin upper covering layer and underlying weathered rocks, and can be used for the support foundation construction of photovoltaic power stations with high requirements for environmental and water conservation and high construction period.
[0049] Specifically, the prefabricated cap-type anchor foundation 100 of the embodiment of the present invention is mainly used for the foundation tower position of the photovoltaic power station with a soil layer of a certain thickness on the upper surface and weathered rock on the lower surface. It can be applied to various terrains such as flat land, hills, and mountains, but the advantages in mountainous areas are greater. Photovoltaic power stations located in mountainous areas generally have no thin soil layer on the upper surface and weathered rock on the lower surface, or are basically in a state of exposed bedrock. The terrain conditions are generally steep, mostly in the range of 20-35 degrees. From the perspective of construction period and construction safety, mechanized operation will greatly shorten the construction period, thereby reducing construction risks. Canceling the main column can save construction period (eliminating the processes of steel bar binding, formwork, pouring, and maintenance of the main column). Setting up factory-prefabricated concrete caps can significantly reduce construction period and safety risks. From the perspective of environmental and water conservation, the damage to the surrounding environment should be reduced as much as possible, and soil and water loss should be reduced. The original soil foundation should be considered. At the same time, the inclination of the cap minimizes the excavation of the foundation pit and reduces the damage to environmental and water conservation. From the perspective of economic benefits, the characteristics of rock or original soil itself should be fully utilized to reduce the amount of foundation engineering. At the same time, the elimination of concrete main columns can achieve a significant optimization of the amount of engineering. From the perspective of adapting to terrain and light, the inclination of the cap and the high and low combinations of embedded parts can be set to achieve coordination with the terrain and light angles. From the perspective of reducing construction errors, setting anchor bar positioning steel bars and factory prefabrication can significantly reduce construction errors. In this way, a prefabricated cap-type anchor foundation can comprehensively cover the above-mentioned problems or problems and achieve all the benefits of safety, economy, and environmental protection.
[0050] The prefabricated cap type anchor foundation 100 of the embodiment of the present invention has the following advantages:
[0051] (1) The prefabricated pedestal anchor foundation 100 of the embodiment of the present invention can make full use of the mechanical properties of the rock itself and reduce the amount of material of the foundation itself, so as to minimize the size of the foundation, thereby achieving all-round advantages such as reduced operation risk, shortened construction period, and high economic benefits.
[0052] (2) The prefabricated cap-type anchor foundation 100 of the embodiment of the present invention can fully realize mechanized construction, because the construction equipment is "miniaturized" and "lightweight", which can greatly improve the construction efficiency and reduce the construction risk when carrying out construction in mountainous areas;
[0053] (3) The size of the prefabricated cap 1 of the prefabricated cap type anchor foundation 100 of the embodiment of the present invention is small, which also effectively reduces the excavation area of the rock / soil body, and "using rock instead of formwork" effectively reduces the use of casting formwork; the middle and bottom of each anchor are spaced apart with "enlarged heads" to increase the overall pull-out bearing capacity of the anchor and the foundation, which has a significant effect on reducing the amount of foundation materials;
[0054] (4) The prefabricated cap 1 of the prefabricated cap type anchor foundation 100 of the embodiment of the present invention can be tilted to fully adapt to various terrains, and the light angle can be adjusted in combination with the high and low steel structures pre-buried in the cap;
[0055] (5) The prefabricated cap-type anchor foundation 100 of the embodiment of the present invention can replace the main foundation column in the related art with the anchor foundation 2, which significantly reduces the amount of foundation materials, and at the same time shortens the construction period and improves the construction efficiency;
[0056] (6) The prefabricated cap 1 of the prefabricated cap type anchor foundation 100 of the embodiment of the present invention is small in size, which also effectively reduces the excavation area of the rock / soil body; the middle and bottom of each anchor are provided with an "enlarged head" (concrete flange 26) at intervals, which can increase the overall pull-out bearing capacity of the anchor foundation 1 and the foundation, and has a significant effect on reducing the amount of foundation materials. At the same time, the "enlarged head" can be set to a square, spherical, ellipsoidal or other shapes according to the requirements of the construction equipment;
[0057] (7) The anchor rod of the prefabricated cap-type anchor rod foundation 100 of the embodiment of the present invention is provided with a "funnel-shaped" enlarged portion (the first section 231 and the fourth section 241) at the top. The main purpose is to increase the contact surface between the cast-in-place part and the prefabricated part, so that the two form a stable and reliable connection. At the same time, the thickness of the cap can be reduced (relative to the vertical contact surface), thereby reducing the amount of cap material. The top of the anchor rod anchor bar is provided with a "helper bar welding" (the second anchor bar 27), which effectively enhances the anchoring effect of the first anchor bar and the prefabricated cap 1. At the same time, the thickness of the cap can be reduced, thereby reducing the amount of cap material.
[0058] (8) A positioning steel bar 28 is provided in the first anchor bar 21 of the prefabricated pedestal anchor foundation 100 of the embodiment of the present invention. The size of the positioning steel bar 28 can be adjusted according to the size of the hole diameter of the first anchor bar 21 so that the outer diameter surrounded by the positioning steel bar 28 is the same as the hole diameter of the anchor bar. In this way, construction errors caused by anchor bar positioning deviation, anchor bar offset during concrete pouring and vibration, etc. can be avoided.
[0059] (9) The first bracket 41 and the second bracket 42 of the prefabricated cap-type anchor foundation 100 of the embodiment of the present invention can be set as two brackets of high and low steel structures, which can fully adapt to various terrains, that is, flat land, hills, mountains and other terrains are applicable, but the advantages in mountainous areas will be greater;
[0060] (10) The bracket 4 of the prefabricated pedestal anchor foundation 100 of the embodiment of the present invention is connected to the embedded bolts 3 embedded in the foundation, and the bracket 4 can be installed together with the photovoltaic components, etc. at a later time. At the same time, the bracket 4 can be set as a rigid flange (generally used for steel pipes) or a foundation plate (generally used for angle steel, channel steel, etc.) according to actual needs, which increases the convenience for design and construction.
[0061] (11) The prefabricated cap type anchor foundation 100 of the embodiment of the present invention not only has the advantages of a conventional rock anchor foundation, but also greatly shortens the on-site construction period by using the prefabricated cap 1 (avoiding the period of concrete mixing, pouring, maintenance, steel bar binding, formwork support, etc. of the conventional cap);
[0062] (12) The prefabricated cap 1 of the prefabricated cap type anchor foundation 100 of the embodiment of the present invention can be prefabricated in the factory to avoid errors, quality problems and safety risks caused by on-site construction to the greatest extent.
[0063] In summary, the prefabricated cap-type anchor foundation 100 of the embodiment of the present invention can significantly shorten the construction period, reduce the project investment cost, reduce the construction risk, is suitable for mechanized construction, and is beneficial to soil and water conservation and environmental protection.
[0064] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0065] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0066] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0067] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0068] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0069] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A prefabricated cap type anchor foundation, characterized in that: include: A prefabricated foundation, wherein the prefabricated foundation is provided with a mounting hole that penetrates the prefabricated foundation in an up-and-down direction; an anchor foundation, wherein the anchor foundation comprises a first anchor bar and a base, wherein the first anchor bar is suitable for being inserted into the anchor hole and the upper end of the first anchor bar is located in the mounting hole of the prefabricated foundation, and the base is made of fine stone concrete or an anchoring agent cast in the anchor hole and the mounting hole, and the first anchor bar is arranged in the base; embedded bolts, wherein the embedded bolts are embedded in the base, and the upper end of the embedded bolts protrudes out of the base; a bracket, wherein the bracket is arranged on the base and connected to the embedded bolts, so that the bracket is installed on the base through the embedded bolts, and the bracket is suitable for being connected to a photovoltaic bracket.
2. The prefabricated cap type anchor foundation according to claim 1, characterized in that: The mounting holes include a first mounting hole, a second mounting hole and a third mounting hole, and the first mounting hole, the second mounting hole and the third mounting hole are spaced apart along the length direction of the prefabricated foundation, and the anchor rod foundation includes a first anchor rod foundation, a second anchor rod foundation and a third anchor rod foundation, and the upper ends of the first anchor rod foundation, the second anchor rod foundation and the third anchor rod foundation are respectively passed through the first mounting hole, the second mounting hole and the third mounting hole.
3. The prefabricated cap type anchor foundation according to claim 2, characterized in that: The embedded bolts include a first embedded bolt and a second embedded bolt, the first embedded bolt is embedded in the first anchor rod foundation and extends out of the upper end of the first anchor rod foundation, the second embedded bolt is embedded in the third anchor rod foundation and extends out of the upper end of the third anchor rod foundation, the bracket includes a first bracket and a second bracket, the first bracket is installed on the first anchor rod foundation through the first embedded bolt, and the second bracket is installed on the second anchor rod foundation through the second embedded bolt.
4. The prefabricated cap type anchor foundation according to claim 2, characterized in that: The base of the first anchor bolt foundation and the base of the third anchor bolt foundation each include a first section, a second section and a third section connected in sequence along the up-down direction, the first section is located in the mounting hole, the second section and the third section are located in the anchor hole, the cross-sectional area of the first section gradually decreases from top to bottom, the cross-sectional areas of the second section and the third section are constant from top to bottom, in a projection plane orthogonal to the up-down direction, the projection of the second section is located in the first section, the projection of the third section is located in the first section, the embedded bolts are penetrated in the first section and the second section, The base of the second anchor rod foundation includes a fourth section and a fifth section which are sequentially connected in the up-down direction, the fourth section is located in the mounting hole, the fifth section is located in the anchor hole, the cross-sectional area of the fifth section gradually decreases from top to bottom, the cross-sectional area of the fifth section is constant from top to bottom, and in the projection plane orthogonal to the up-down direction, the projection of the fifth section is located in the fourth section.
5. The prefabricated cap type anchor foundation according to claim 1, characterized in that: The anchor foundation further includes a concrete flange, which is arranged on the outer peripheral surface of the base and located in the anchor hole.
6. The prefabricated cap type anchor foundation according to claim 1, characterized in that: The anchor rod foundation also includes a plurality of second anchor bars, which are welded to the upper end of the first anchor bar, are arranged at intervals along the circumference of the first anchor bar, and are arranged in the base and located in the mounting hole.
7. The prefabricated cap type anchor foundation according to claim 1, characterized in that: The anchor foundation also includes a positioning steel bar, which is arranged between the first anchor bar and the anchor hole and respectively abuts against the outer circumference of the first anchor bar and the inner circumference of the anchor hole, so that the positioning steel bar positions the first anchor bar.
8. The prefabricated cap type anchor foundation according to claim 1, characterized in that: The embedded bolts include a plurality of bolts, which are arranged in the base body at intervals along the circumferential direction of the base body, and the upper end of the anchor rod is located between the plurality of embedded bolts.
9. The prefabricated cap type anchor foundation according to claim 1, characterized in that: The support comprises: A sleeve, wherein the photovoltaic bracket can be inserted into the sleeve, and a through hole is provided on the outer circumference of the sleeve and penetrates the sleeve in a radial direction, and the through hole is suitable for installing a bolt; The mounting plate is arranged on the lower end of the sleeve and extends radially along the sleeve. The embedded bolts pass through the mounting plate and are connected to the mounting plate through nuts.