Large-scale assembly type glass curtain wall installation method

By placing shock-absorbing components in the glass curtain wall components and using the tower crane installation method of hoisting components, combined with the reinforcement steps of the installation frame and stamping components, the problems of high loss rate and low efficiency during the installation of large-scale prefabricated glass curtain walls are solved, and a better solution is achieved. An efficient and more precise installation process improves the building's thermal and sound insulation performance.

CN118793208APending Publication Date: 2024-10-18CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411163892.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing large-scale prefabricated glass curtain walls have high loss rates and low installation efficiency during installation.

Method used

Specific glass curtain wall component design and installation methods are adopted, including placing shock-absorbing components inside the glass curtain wall components, using hoisting components to move to the installation position via tower cranes, and fixing and reinforcing them through installation frames and stamping components, and finally cleaning to complete the installation.

Benefits of technology

It reduces the loss of glass panels, improves installation efficiency and accuracy, ensures the sealing and aesthetics of the glass curtain wall, and improves the energy efficiency and comfort of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793208A_ABST
    Figure CN118793208A_ABST
Patent Text Reader

Abstract

The invention provides a large assembly type glass curtain wall installation method, and belongs to the technical field of assembly type glass curtain wall installing.The large assembly type glass curtain wall installation method comprises the steps that according to the structure of the installation position of a glass curtain wall and a design drawing of the glass curtain wall, a glass curtain wall assembly of the corresponding shape and size is produced; the multiple glass curtain wall assemblies are sequentially placed, and after damping assemblies are placed in the adjacent glass curtain wall assemblies, the glass curtain wall assemblies are moved to a construction site; the hoisting assembly is fixed to the surface of the glass curtain wall assembly and moved to a mounting position through a tower crane; a constructor fixes mounting frames on the edges of the mounting positions of the corresponding glass curtain wall assemblies, and the glass curtain wall assemblies are sequentially fixed into the corresponding mounting frames; a gap between the mounting frame and the glass curtain wall assembly is filled with a fixing agent in sequence through a stamping assembly; the problems that when an existing large assembly type glass curtain wall is installed, the loss rate is high, and the installation efficiency is low can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of assembled glass curtain wall installation, and in particular relates to a large-scale assembled glass curtain wall installation method. Background Art

[0002] Large-scale prefabricated glass curtain walls usually refer to exterior wall systems that are assembled with prefabricated glass panels and structural parts. They are favored for their beauty, light weight and good thermal insulation performance. Glass curtain walls mainly use tempered glass, laminated glass and low-e glass. Tempered glass has high impact resistance and safety, laminated glass can remain intact when broken, and low-e glass helps to improve the energy efficiency of buildings. The frame materials are aluminum alloy and stainless steel because of their light weight and good corrosion resistance. Aluminum alloy frames are commonly used in most modern buildings. Sealing materials such as silicone and polyurethane are used to ensure the sealing between glass and frames to prevent moisture and air penetration. The components of the glass curtain wall system are usually prefabricated in the factory. Factors such as building load, wind pressure, temperature difference, etc. need to be considered in the design stage. During the manufacturing process, the glass panels will be cut, tempered, and combined with aluminum alloy frames. Strict quality inspections are required during the prefabrication process, including glass strength testing, sealing testing, and frame corrosion resistance testing. Most prefabricated glass curtain wall systems are installed in a hanging panel or aluminum alloy frame style. The hanging plate type hangs the glass panel directly on the fixed frame, while the frame type supports and fixes the glass panel through the frame. Before installation, it is necessary to ensure the verticality and horizontality of the building structure. Fix the aluminum alloy or other frame materials. Use lifting equipment to install the glass panel on the frame and seal it. The curtain wall system needs to be connected to the main structure of the building through a support system, which usually includes anchors, support rods and connectors. These connections need to be able to withstand external forces such as wind loads and seismic loads. To improve energy efficiency, many glass curtain wall systems use double or triple glass designs and fill the middle layer with inert gas to enhance the insulation effect. Efficient glass curtain wall systems can effectively isolate external temperature changes and reduce the energy consumption of buildings. Since the exterior wall is exposed to the outside environment, it needs regular inspection and maintenance to ensure sealing and safety. Cleaning the glass surface is also part of routine maintenance.

[0003] The existing large-scale assembled glass curtain walls have a high loss rate and low installation efficiency during installation. Summary of the invention

[0004] In view of this, the present invention provides a large-scale assembled glass curtain wall installation method, which can solve the problems of high loss rate and low installation efficiency during the installation of existing non-planar large-scale assembled glass curtain walls.

[0005] The present invention is achieved in that:

[0006] The present invention provides a large-scale assembled glass curtain wall installation method, which includes the following specific steps:

[0007] S10: producing glass curtain wall components of corresponding shapes and sizes according to the structure of the installation position of the glass curtain wall and the design drawings of the glass curtain wall;

[0008] S20: placing a plurality of the glass curtain wall assemblies in sequence, placing a shock absorbing assembly inside an adjacent glass curtain wall assembly, and then moving to a construction site;

[0009] S30: fixing the hoisting assembly on the surface of the glass curtain wall assembly and moving it to an installation position by a tower crane;

[0010] S40: The construction personnel fix the installation frame at the edge of the installation position of the corresponding glass curtain wall assembly, and fix the glass curtain wall assembly in the corresponding installation frame in sequence;

[0011] S50: filling a fixing agent into the gap between the installation frame and the glass curtain wall assembly in sequence through a stamping assembly to reinforce the installation of the glass curtain wall assembly;

[0012] S60: Clean the installed glass curtain wall and complete the installation of large-scale prefabricated glass curtain wall.

[0013] On the basis of the above technical solution, a large-scale assembled glass curtain wall installation method of the present invention can also be improved as follows:

[0014] Wherein, the glass curtain wall assembly comprises a glass body and a fixed edge, wherein the fixed edge is integrally connected with the glass body and is arranged around the glass body; the shape of the fixed edge is an extension of the shape of the glass body in the same direction;

[0015] The fixed edge is a symmetrical stepped structure, including a first fixed edge and a second fixed edge, one side of the second fixed edge is integrally arranged with the glass body, and the first fixed edge is arranged on the side of the second fixed edge away from the glass body; the first fixed edge is a symmetrical slope structure, and the second fixed edge is a square structure; the angle between the side edge of the first fixed edge and the central axis of the fixed edge is 30-45°;

[0016] The glass body is a multi-layer structure, and a hollow layer is arranged inside the glass body. The hollow layer is used to improve the sound absorption effect of the glass curtain wall.

[0017] Furthermore, the shock absorbing assembly includes a fixed angle and a flexible plate. The fixed angle is a triangular structure, and an empty groove is provided at the hypotenuse position, which is used to fix the four corners of the glass curtain wall assembly inside the empty groove respectively; the corner of the fixed angle away from the glass curtain wall assembly is set as a rounded corner to avoid collision during transportation; the fixed angle is provided with connecting buckles at the upper and lower sides of the empty groove, and the four corners of the flexible plate are respectively provided with hanging ears, and the hanging ears are matched with the connecting buckles, and are used to fix the fixed angle and the flexible plate to the connecting buckles by fixing the hanging ears on the connecting buckles;

[0018] The flexible plate includes a three-layer structure, namely a friction layer, a foam layer and a frosted layer. The foam layer is arranged between the friction layer and the frosted layer. The four sides of the flexible plate composed of the friction layer, the foam layer and the frosted layer are connected as a whole; the friction layer is connected to the corresponding glass curtain wall component, and is used to connect the flexible plate and the glass curtain wall component through friction; the edge of the foam layer is provided with a vent hole, and the vent hole is used to connect with an air pump to increase the shock absorption effect of the flexible plate by inflating the inside of the foam layer; the frosted layer corresponds to the frosted layer of the flexible plate connected to the glass curtain wall component at the bottom of the glass curtain wall component, and the displacement between adjacent glass curtain wall components is reduced through the interaction between the two frosted layers;

[0019] The upper and lower corresponding fixed angles are connected and fixed by a connecting piece, and the connecting piece is a magnet, and the magnet is fixed inside the top and bottom of the fixed angle;

[0020] The surface of the friction layer in contact with the glass curtain wall assembly is provided with friction lines, which are uneven corrugated structures, and are used to increase friction while reducing the direct contact area between the flexible plate and the glass curtain wall assembly to disperse the applied pressure.

[0021] Furthermore, the specific steps of placing the plurality of glass curtain wall assemblies in sequence, placing a shock absorbing assembly inside an adjacent glass curtain wall assembly, and then moving the assembly to the construction site include:

[0022] The first step is to install the fixed corners at the four corners of the glass curtain wall assembly respectively, and fix the flexible board inside the four corresponding fixed corners by fixing the hanging ears at the four corners of the flexible board to the corresponding connecting buckles;

[0023] The second step is to arrange the glass curtain wall components in sequence according to different shapes so that the shapes of the glass curtain wall components in the vertical direction are similar, and reduce the shapes between adjacent glass curtain wall components by gravity so that the flexible plate fits the shapes of the glass curtain wall components;

[0024] The third step is to stack foam around the vertically arranged glass curtain wall components to limit the movement of the glass curtain wall components;

[0025] Step 4, inflating the vent holes at the edge of the foam layer in sequence, so that the flexible board fills up the gaps between the adjacent fixed corners and blocks the vent holes;

[0026] The fifth step is to move the glass curtain wall components to the construction site in sequence after loading them.

[0027] Further, the hanging assembly includes a suction cup group and a fixing assembly, the suction cup group includes 4, which are respectively fixed on the front and back sides of the four edges of the glass curtain wall assembly; the fixing angle includes two suction cups, and the two suction cups are respectively adsorbed at corresponding positions on the front and back sides of the glass curtain wall assembly; a magnet is arranged inside the suction cup, and the suction cup group is clamped on the glass curtain wall assembly by the adsorption of the corresponding magnet inside the suction cup; the corresponding two suction cups are connected and fixed on the side away from the glass curtain wall assembly by the fixing clip; the four suction cup groups are connected by the fixing assembly, and the fixing assembly is a cross-shaped structure, which is fixed to the four fixing clips by screws to reduce the risk of the suction cup group falling; a fold line portion is arranged inside the fixing assembly, and a fixing plate is arranged at the position where the fold line portion contacts the surface of the glass curtain wall assembly, the fold line portion is used to make the hanging assembly fit on the surface of the glass curtain wall assembly, and the fixing plate is used to fix the fixing assembly on the glass curtain wall assembly by squeezing out air;

[0028] A hoisting part is welded at the edge of the fixing clamp, and a hoisting rope passes through the hoisting part. The hoisting ropes of the four hoisting parts are combined into one and connected to the tower crane.

[0029] The specific steps of fixing the hoisting assembly on the surface of the glass curtain wall assembly and moving it to the installation position by a tower crane include:

[0030] The first step is to clamp and adsorb the four suction cup groups at corresponding positions of the glass curtain wall assembly respectively;

[0031] The second step is to stretch the fixing assembly so that the fixing assembly fits the surface curvature of the glass curtain wall assembly and then press the fixing plate onto the surface of the glass curtain wall assembly;

[0032] The third step is to exhaust the air in the fixed plate;

[0033] The fourth step is to connect the lifting rope and then lift the glass curtain wall assembly to the installation location by using a tower crane.

[0034] Furthermore, the installation frame includes a basic frame and a clamping frame arranged inside the four sides, the supporting frame includes left-right symmetrical clips and long magnets installed inside the clips and adsorbed to each other, and the width of the long magnets is the same as the length of the basic frame;

[0035] The transverse cross-sectional structure of the supporting frame is stepped, which is the same as the structure of the fixed edge;

[0036] A shock absorbing layer is arranged inside the reinforcing frame, and the shock absorbing layer is in contact with the glass curtain wall assembly.

[0037] Furthermore, the specific steps of the construction personnel fixing the installation frame at the edge of the installation position of the corresponding glass curtain wall assembly include:

[0038] The first step is to measure and mark the edge of the installation position of the corresponding glass curtain wall assembly, and use a level and a plumb line to confirm the accuracy of the mark;

[0039] The second step is to install the supporting structure at the marked position to ensure that the glass curtain wall assembly can be firmly fixed on the building structure;

[0040] The third step is to align the glass curtain wall assembly with the marked position and gradually fix it on the supporting structure;

[0041] Step 4: Use a level to ensure the frame is level and vertical to avoid deformation;

[0042] The fifth step is to securely mount the glass curtain wall assembly on the building structure using fixings.

[0043] Furthermore, the specific steps of fixing the glass curtain wall components in the corresponding installation frames in sequence include:

[0044] The first step is to pry open the clamping frame and place a support rod inside, wherein the width of the support rod is greater than the width of the glass curtain wall assembly;

[0045] The second step is to place one side of the glass curtain wall assembly into the clamping frame and then take out the support rod;

[0046] The third step is to clamp the glass curtain wall assembly inside the supporting frame and squeeze it inwards in turn to ensure that the installation frames on all four sides are fixed at the corresponding edge positions of the glass curtain wall assembly.

[0047] Furthermore, the stamping assembly includes a tank body, a feed port, a connecting pipe, a nozzle and a one-way valve. The tank body is made of a flexible material. The feed port is arranged at the side of the tank body, and the feed port is used to add a fixing agent into the interior of the tank body. The bottom of the tank body is connected to the connecting pipe, and the end of the connecting pipe away from the tank body is connected to a stamping pump, and the stamping pump is used to provide power. The nozzle is arranged at the end of the tank body away from the connecting pipe, and the nozzle corresponds to the top gap position of the mounting frame. The one-way valve is arranged inside the connecting pipe, and the opening direction of the one-way valve is toward the direction of the tank body, so as to prevent the fixing agent from entering the stamping pump.

[0048] A rubber ring is arranged at the middle position of the outer wall of the nozzle, and the rubber ring is used to seal the gap between the nozzle and the installation frame.

[0049] Furthermore, the specific steps of sequentially filling the fixing agent into the gap between the installation frame and the glass curtain wall assembly through the stamping assembly to reinforce the installation of the glass curtain wall assembly include:

[0050] The first step is to add a fixing agent into the interior of the tank through the feed port;

[0051] The second step is to connect the connecting pipe to the punching pump;

[0052] The third step is to insert the nozzle into the gap of the installation frame and press it toward the installation frame so that the nozzle is sealed and connected to the installation frame;

[0053] In the fourth step, a punching pump is used to provide power to squeeze the fixing agent inside the tank into each gap inside the installation frame to reinforce the installation of the glass curtain wall assembly.

[0054] Compared with the prior art, the beneficial effects of the large-scale assembled glass curtain wall installation method provided by the present invention are:

[0055] Site cleaning and measurement: Make sure the installation area is clean and flat, and make accurate measurements to ensure the installation accuracy of the glass curtain wall.

[0056] Equipment and material inspection: Ensure that all installation tools and materials meet the requirements to reduce problems during construction.

[0057] Support System: The installed frame provides the main support of the glass curtain wall. It needs to be installed precisely to ensure the safety and stability of the subsequent glass panels.

[0058] Docking and alignment: The frame needs to be aligned horizontally and vertically to ensure the installation flatness of the glass panel.

[0059] Protect the glass: Take appropriate measures during transportation and storage to prevent damage to the glass panel. Proper storage position helps prevent the panel from warping or cracking.

[0060] Precise positioning: The glass panels are precisely placed into the frame to ensure the sealing and beauty of the curtain wall.

[0061] Fixing and Adjustment: Fix the glass to the frame with clamps or supports and make fine adjustments to ensure consistent alignment and gaps for each piece of glass.

[0062] Waterproofing and insulation: Fill the gap between the glass and the frame with sealant to ensure the waterproof performance of the curtain wall and prevent air and moisture penetration.

[0063] Thermal and acoustic insulation: Sealing materials can also provide some thermal and acoustic insulation, improving the comfort and energy efficiency of buildings.

[0064] Visual effect: Clean the glass surface, remove the dirt and paint left during the construction process, and ensure the beautiful appearance of the curtain wall.

[0065] Quality inspection: Check all installation details to ensure that the structure and function of the curtain wall meet the design requirements and solve potential problems. BRIEF DESCRIPTION OF THE DRAWINGS

[0066] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.

[0067] Figure 1 The present invention is an operation flow chart of a large-scale assembled glass curtain wall installation method;

[0068] Figure 2 It is a structural schematic diagram of a glass curtain wall assembly;

[0069] Figure 3 is a schematic diagram of the top cross-sectional structure of the fixed edge;

[0070] Figure 4 It is a structural schematic diagram of the shock absorbing component;

[0071] Figure 5 is a schematic diagram of the cross-sectional structure of a fixed angle;

[0072] Figure 6 is a schematic diagram of the cross-sectional structure of a flexible board;

[0073] Figure 7 It is a structural schematic diagram of the hoisting assembly;

[0074] Figure 8 is a schematic diagram of the cross-sectional structure of the suction cup assembly;

[0075] Fig. 9 It is a schematic diagram of the top cross-sectional structure of the installation frame;

[0076] Fig.10 It is a structural schematic diagram of a stamping component;

[0077] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0078] 10. Glass curtain wall assembly; 11. Glass body; 12. Fixed edge; 121. First fixed edge; 122. Second fixed edge; 20. Shock-absorbing assembly; 21. Fixed angle; 22. Flexible plate; 221. Friction layer; 222. Foam layer; 223. Frosted layer; 23. Connector; 30. Lifting assembly; 31. Suction cup group; 311. Suction cup; 312. Fixing clip; 32. Fixing assembly; 33. Lifting part; 40. Mounting frame; 50. Stamping assembly; 51. Tank body; 52. Feed port; 53. Connecting pipe; 54. Nozzle; 55. One-way valve. DETAILED DESCRIPTION

[0079] In order to make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0080] like Figure 1 FIG. 1 is an operation flow chart of a large-scale assembled glass curtain wall installation method provided by the present invention, and includes the following specific steps:

[0081] S10: producing a glass curtain wall assembly 10 of corresponding shape and size according to the structure of the installation position of the glass curtain wall and the design drawing of the glass curtain wall;

[0082] S20: placing a plurality of glass curtain wall assemblies 10 in sequence, placing a shock absorbing assembly 20 inside an adjacent glass curtain wall assembly 10, and then moving to a construction site;

[0083] S30: Fix the hoisting assembly 30 on the surface of the glass curtain wall assembly 10 and move it to the installation position by a tower crane;

[0084] S40: The construction personnel fix the installation frame 40 at the edge of the installation position of the corresponding glass curtain wall assembly 10, and fix the glass curtain wall assembly 10 in the corresponding installation frame 40 in sequence;

[0085] S50: filling the fixing agent into the gap between the installation frame 40 and the glass curtain wall assembly 10 in sequence through the stamping assembly 50 to reinforce the installation of the glass curtain wall assembly 10;

[0086] S60: Clean the installed glass curtain wall and complete the installation of large-scale prefabricated glass curtain wall.

[0087] The device for cleaning the installed glass curtain wall usually has a silicone plate installed at the contact position. The main function of the silicone plate is to protect the glass surface from scratches or other damage. The silicone plate provides a soft contact surface, which can effectively reduce the direct friction of the cleaning tool on the glass, and also helps to absorb detergent or dirt to improve the cleaning effect.

[0088] like Figure 2-3 As shown, in the above technical solution, the glass curtain wall assembly 10 includes a glass body 11 and a fixed edge 12, the fixed edge 12 is integrally connected with the glass body 11, and the fixed edge 12 is arranged around the glass body 11; the shape of the fixed edge 12 is an extension of the shape of the glass body 11 in the same direction;

[0089] The fixed edge 12 is a symmetrical stepped structure, including a first fixed edge 121 and a second fixed edge 122. One side of the second fixed edge 122 is integrally arranged with the glass body 11, and the first fixed edge 121 is arranged on the side of the second fixed edge 122 away from the glass body 11; the first fixed edge 121 is a symmetrical slope structure, and the second fixed edge 122 is a square structure; the angle between the side of the first fixed edge 121 and the central axis of the fixed edge 12 is 30-45°;

[0090] The glass body 11 is a multi-layer structure, and a hollow layer is arranged inside the glass body 11, and the hollow layer is used to improve the sound absorption effect of the glass curtain wall.

[0091] like Figure 4-6 As shown, further, in the above technical solution, the shock absorbing assembly 20 includes a fixed angle 21 and a flexible plate 22. The fixed angle 21 is a triangular structure, and an empty groove is opened at the hypotenuse position, which is used to fix the four corners of the glass curtain wall assembly 10 in the empty groove respectively; the corner of the fixed angle 21 away from the glass curtain wall assembly 10 is set as a rounded corner to avoid collision during transportation; the fixed angle 21 is provided with connecting buckles at the upper and lower sides of the empty groove, and the four corners of the flexible plate 22 are respectively provided with hanging ears, which are matched with the connecting buckle, and are used to fix the fixed angle 21 and the flexible plate 22 to be fixedly connected by fixing the hanging ears on the connecting buckle;

[0092] The flexible plate 22 includes a three-layer structure, namely a friction layer 221, a foam layer 222 and a frosted layer 223. The foam layer 222 is arranged between the friction layer 221 and the frosted layer 223. The friction layer 221, the foam layer 222 and the frosted layer 223 are integrally connected around the flexible plate 22; the friction layer 221 is connected to the corresponding glass curtain wall assembly 10, and is used to connect the flexible plate 22 and the glass curtain wall assembly 10 through friction; the edge of the foam layer 222 is provided with a vent hole, and the vent hole is used to connect with an air pump to increase the shock absorption effect of the flexible plate 22 by inflating the inside of the foam layer 222; the frosted layer 223 corresponds to the frosted layer 223 of the flexible plate 22 connected to the glass curtain wall assembly 10 at the bottom of the glass curtain wall assembly 10, and the displacement between adjacent glass curtain wall assemblies 10 is reduced through the interaction between the two layers of frosted layers 223;

[0093] The upper and lower corresponding fixed angles 21 are connected and fixed by a connecting member 23, and the connecting member 23 is a magnet, and the magnet is fixed inside the top and bottom of the fixed angle 21;

[0094] The surface of the friction layer 221 in contact with the glass curtain wall assembly 10 is provided with friction lines, which are uneven corrugated structures, and are used to increase friction while reducing the direct contact area between the flexible plate 22 and the glass curtain wall assembly 10 to disperse the applied pressure.

[0095] Furthermore, in the above technical solution, after placing a plurality of glass curtain wall assemblies 10 in sequence and placing a shock absorbing assembly 20 inside an adjacent glass curtain wall assembly 10, the specific steps of moving the glass curtain wall assemblies to the construction site include:

[0096] In the first step, the fixed corners 21 are respectively installed on the four corners of the glass curtain wall assembly 10, and the flexible board 22 is fixed inside the four corresponding fixed corners 21 by fixing the hanging ears on the four corners of the flexible board 22 to the corresponding connecting buckles;

[0097] The second step is to arrange the glass curtain wall assemblies 10 in sequence according to different shapes so that the shapes of the glass curtain wall assemblies 10 in the vertical direction are similar, and the shapes between adjacent glass curtain wall assemblies 10 are reduced by gravity so that the flexible plate 22 fits the shape of the glass curtain wall assemblies 10;

[0098] The third step is to pile foam around the vertically arranged glass curtain wall assemblies 10 to restrict the movement of the glass curtain wall assemblies 10;

[0099] Step 4: Inflate the vent holes at the edge of the foam layer 222 in sequence, so that the flexible board 22 fills the gaps between the adjacent fixed corners 21 and blocks the vent holes;

[0100] Step 5: After the glass curtain wall components 10 are loaded onto a vehicle, they are moved to the construction site in sequence.

[0101] like Figure 7-8 As shown, further, in the above technical solution, the hanging assembly 30 includes a suction cup group 31 and a fixing assembly 32, the suction cup group 31 includes 4, which are respectively fixed at the front and back sides of the four edges of the glass curtain wall assembly 10; the fixing angle 21 includes two suction cups 311, and the two suction cups 311 are respectively adsorbed at corresponding positions on the front and back sides of the glass curtain wall assembly 10; a magnet is arranged inside the suction cup 311, and the suction cup group 31 is clamped on the glass curtain wall assembly 10 through the adsorption of the magnet inside the corresponding suction cup 311; the corresponding two suction cups 311 are away from the glass curtain wall assembly One side of the component 10 is connected and fixed by a fixing clip 312; the four suction cup groups 31 are connected by a fixing assembly 32, and the fixing assembly 32 is a cross-shaped structure, which is fixed to the four fixing clips 312 by screws to reduce the risk of the suction cup group 31 falling; a fold line portion is provided inside the fixing assembly 32, and a fixing plate is provided at a position where the fold line portion contacts the surface of the glass curtain wall component 10, the fold line portion is used to make the hoisting component 30 fit on the surface of the glass curtain wall component 10, and the fixing plate is used to fix the fixing assembly 32 on the glass curtain wall component 10 by squeezing out air;

[0102] A hoisting portion 33 is welded at the edge of the fixing clamp 312, and a hoisting rope passes through the hoisting portion 33. The hoisting ropes of the four hoisting portions 33 are combined into one and connected to the tower crane.

[0103] The specific steps of fixing the hoisting assembly 30 on the surface of the glass curtain wall assembly 10 and moving it to the installation position by a tower crane include:

[0104] The first step is to clamp and adsorb the four suction cup groups 31 at corresponding positions of the glass curtain wall assembly 10 respectively;

[0105] The second step is to stretch the fixing assembly 32 so that the fixing assembly 32 fits the surface curvature of the glass curtain wall assembly 10 and then press the fixing plate onto the surface of the glass curtain wall assembly 10;

[0106] The third step is to exhaust the air in the fixed plate;

[0107] The fourth step is to connect the hoisting rope and then hoist the glass curtain wall assembly 10 to the installation location by using a tower crane.

[0108] Further, in the above technical solution, the installation frame 40 includes a basic frame and a clamping frame arranged inside the four sides, and the clamping frame includes left-right symmetrical clips and long magnets installed inside the clips and adsorbed to each other, and the width of the long magnets is the same as the length of the basic frame;

[0109] The transverse cross-sectional structure of the supporting frame is stepped, which is the same as the structure of the fixed edge 12;

[0110] A shock absorbing layer is arranged inside the reinforced frame, and the shock absorbing layer is in contact with the glass curtain wall assembly 10 .

[0111] like Fig. 9 As shown, further, in the above technical solution, the specific steps for the construction personnel to fix the installation frame 40 at the edge of the installation position of the corresponding glass curtain wall assembly 10 include:

[0112] The first step is to measure and mark the edge of the installation position of the corresponding glass curtain wall assembly 10, and use a level and a plumb line to confirm the accuracy of the mark;

[0113] The second step is to install the support structure at the marked position to ensure that the glass curtain wall assembly 10 can be firmly fixed on the building structure;

[0114] The third step is to align the glass curtain wall assembly 10 with the marked position and gradually fix it on the supporting structure;

[0115] Step 4: Use a level to ensure the frame is level and vertical to avoid deformation;

[0116] The fifth step is to securely mount the glass curtain wall assembly 10 on the building structure using fixings.

[0117] Furthermore, in the above technical solution, the specific steps of fixing the glass curtain wall assembly 10 in the corresponding installation frame 40 in sequence include:

[0118] The first step is to open the clamping frame and place a support rod inside, wherein the width of the support rod is greater than the width of the glass curtain wall assembly 10;

[0119] The second step is to place one side of the glass curtain wall assembly 10 into the interior of the clamping frame and then remove the support rod;

[0120] In the third step, the glass curtain wall assembly 10 is clamped inside the supporting frame and pressed inwards in sequence to ensure that the surrounding mounting frames 40 are fixed at the corresponding edge positions of the glass curtain wall assembly 10 .

[0121] like Fig.10As shown, further, in the above technical solution, the stamping assembly 50 includes a tank body 51, a feed port 52, a connecting pipe 53, a nozzle 54 and a one-way valve 55. The tank body 51 is made of a flexible material. The side of the tank body 51 is provided with a feed port 52, and the feed port 52 is used to add a fixing agent into the inside of the tank body 51; the bottom of the tank body 51 is connected with the connecting pipe 53, and the end of the connecting pipe 53 away from the tank body 51 is connected to the stamping pump, and the stamping pump is used to provide power; the end of the tank body 51 away from the connecting pipe 53 is provided with a nozzle 54, and the nozzle 54 corresponds to the top gap position of the mounting frame 40; the inside of the connecting pipe 53 is provided with a one-way valve 55, and the opening direction of the one-way valve 55 is toward the direction of the tank body 51, which is used to prevent the fixing agent from entering the stamping pump;

[0122] A rubber ring is provided in the middle of the outer wall of the nozzle 54 , and the rubber ring is used to seal the gap between the nozzle 54 and the mounting frame 40 .

[0123] The fixing agents used to fill the interior of the glass curtain wall and the frame are usually the following:

[0124] Silicone: Widely used in sealing and fixing glass curtain walls, with excellent elasticity, weather resistance and durability.

[0125] Polyurethane: It has good adhesion and wear resistance, and is suitable for sealing between different building materials.

[0126] Butyl rubber: used to provide waterproofing and sealing functions, usually used in the initial construction of building curtain walls.

[0127] Epoxy resin: Used in certain applications with high strength requirements, it has good adhesion and mechanical strength.

[0128] Furthermore, in the above technical solution, the fixing agent is sequentially filled into the gap between the installation frame 40 and the glass curtain wall assembly 10 by the stamping assembly 50, and the specific steps of reinforcing the installation of the glass curtain wall assembly 10 include:

[0129] The first step is to add a fixing agent into the interior of the tank 51 through the feed port 52;

[0130] The second step is to connect the connecting pipe 53 to the punching pump;

[0131] The third step is to insert the nozzle 54 into the gap of the mounting frame 40 and press it toward the mounting frame 40 so that the nozzle 54 and the mounting frame 40 are sealed and connected;

[0132] In the fourth step, the fixing agent in the tank 51 is squeezed into the gaps in the installation frame 40 by using the power provided by the punching pump, so as to reinforce the installation of the glass curtain wall assembly 10 .

[0133] Example:

[0134] 1. Site Preparation

[0135] Site cleaning: Clear away debris in the installation area and ensure the ground is flat and free of obstacles.

[0136] Measurement: Use a laser rangefinder and level to accurately measure the installation area to ensure that the location of the mounting frame complies with the design drawings.

[0137] Check equipment and materials: Confirm that glass panels, frames, sealants, and installation tools are intact, and have spare materials ready.

[0138] Ensure the smooth progress of subsequent installation work and reduce construction delays caused by on-site problems.

[0139] 2. Structural frame installation

[0140] Frame assembly: Assemble the aluminum alloy frame components on the ground into a predetermined structural form.

[0141] Lifting the frame: The assembled frame is carefully lifted to the building facade using a crane and fixed in its preliminary position with temporary supports.

[0142] Docking and correction: Adjust the horizontality and verticality of the frame to ensure that it is accurately docked with the main structure of the building.

[0143] Provides a sturdy support system to ensure that subsequent glass panels can be installed safely and stably.

[0144] 3. Glass panel transportation and storage

[0145] Transportation: Specialized glass transport vehicles are used to transport the panels from the manufacturing plant to the construction site.

[0146] Storage: Place the glass panels on horizontal supports on site, wrap the edges with protective material and keep them away from the operating area of ​​the construction area.

[0147] Prevent glass panels from being damaged during transportation and storage, ensuring their quality.

[0148] 4. Glass panel installation

[0149] Panel placement: Lift the glass panels using lifting equipment and place them precisely into the frame.

[0150] Fixing: Use professional clamps and supports to fix the glass panels in the frame. Make sure the gaps between the panels are even.

[0151] Adjustment: Make fine adjustments to the glass panels to ensure they are aligned both vertically and horizontally.

[0152] Ensure that the appearance of the glass curtain wall is neat and beautiful while maintaining the stability of the structure.

[0153] 5. Sealing treatment

[0154] Filling sealant: Fill the gap between the glass and the frame with high-quality sealant to ensure sealing.

[0155] Check the seal: Use special tools to check the uniformity and integrity of the sealant to ensure there are no gaps or voids.

[0156] Improve waterproof, windproof and soundproof performance, and enhance the energy efficiency and comfort of buildings.

[0157] 6. Cleaning and inspection

[0158] Clean the glass: Use a non-scratch cleaner and tools to clean the glass panels to remove any dirt left over from the construction process.

[0159] Quality inspection: Check all installation details, including glass alignment, sealant filling and frame fixing, to ensure compliance with design specifications.

[0160] Improve the visual effect of curtain walls and confirm that they meet quality standards and resolve any issues that may arise.

[0161] 7. Maintenance and care

[0162] Develop a maintenance plan: Develop a plan for regular inspection and cleaning, and arrange for professionals to perform curtain wall maintenance.

[0163] Perform maintenance: Perform planned maintenance work, including checking seals, cleaning glass and inspecting frame structure.

[0164] Ensure the long-term stability and functionality of the curtain wall system and avoid performance degradation or damage due to insufficient maintenance.

[0165] Specifically, the principle of the present invention is: when in use, a glass curtain wall assembly 10 of corresponding shape and size is produced according to the structure of the installation position of the glass curtain wall and the design drawings of the glass curtain wall; a plurality of the glass curtain wall assemblies 10 are placed in sequence, and after the shock absorbing assembly 20 is placed inside the adjacent glass curtain wall assemblies 10, they are moved to the construction site; the hoisting assembly 30 is fixed on the surface of the glass curtain wall assembly 10, and is moved to the installation position by a tower crane; the construction personnel fix the installation frame 40 at the edge of the installation position of the corresponding glass curtain wall assembly 10, and fix the glass curtain wall assembly 10 in the corresponding installation frame 40 in sequence; the fixing agent is filled into the gap between the installation frame 40 and the glass curtain wall assembly 10 in sequence by the stamping assembly 50, and the installation of the glass curtain wall assembly 10 is reinforced; the installed glass curtain wall is cleaned to complete the installation of the large-scale assembled glass curtain wall.

Claims

1. A method for installing a large assembled glass curtain wall, characterized in that: The specific steps include: S10: producing a glass curtain wall assembly (10) of corresponding shape and size according to the structure of the installation position of the glass curtain wall and the design drawing of the glass curtain wall; S20: placing a plurality of the glass curtain wall assemblies (10) in sequence, placing a shock absorbing assembly (20) inside an adjacent glass curtain wall assembly (10), and then moving to a construction site; S30: fixing the hoisting assembly (30) on the surface of the glass curtain wall assembly (10), and moving it to an installation position by means of a tower crane; S40: The construction personnel fix the installation frame (40) at the edge of the installation position of the corresponding glass curtain wall assembly (10), and fix the glass curtain wall assembly (10) in the corresponding installation frame (40) in sequence; S50: filling the fixing agent into the gap between the installation frame (40) and the glass curtain wall assembly (10) in sequence through the punching assembly (50), so as to reinforce the installation of the glass curtain wall assembly (10); S60: Clean the installed glass curtain wall and complete the installation of large-scale prefabricated glass curtain wall.

2. A large-scale assembled glass curtain wall installation method according to claim 1, characterized in that: The glass curtain wall assembly (10) comprises a glass body (11) and a fixed edge (12); the fixed edge (12) is integrally connected to the glass body (11); the fixed edge (12) is arranged around the glass body (11); the shape of the fixed edge (12) is an extension of the shape of the glass body (11) in the same direction; The fixed edge (12) is a symmetrical stepped structure, comprising a first fixed edge (121) and a second fixed edge (122); one side of the second fixed edge (122) is integrally arranged with the glass body (11); the first fixed edge (121) is arranged on a side of the second fixed edge (122) away from the glass body (11); the first fixed edge (121) is a symmetrical slope structure, and the second fixed edge (122) is a square structure; the angle between the side edge of the first fixed edge (121) and the central axis of the fixed edge (12) is 30-45°; The glass body (11) is a multi-layer structure, with a hollow layer arranged inside, and the hollow layer is used to improve the sound absorption effect of the glass curtain wall.

3. A large-scale assembled glass curtain wall installation method according to claim 2, characterized in that: The shock absorbing assembly (20) comprises a fixed angle (21) and a flexible plate (22); the fixed angle (21) is a triangular structure, and a hollow groove is provided at the hypotenuse position, for fixing the four corners of the glass curtain wall assembly (10) inside the hollow groove respectively; the corner of the fixed angle (21) away from the glass curtain wall assembly (10) is set as a rounded corner, for avoiding collision during transportation; the fixed angle (21) is provided with connecting buckles at both upper and lower sides of the hollow groove, and the four corners of the flexible plate (22) are respectively provided with hanging ears, and the hanging ears are matched with the connecting buckles, and are used to fix the fixed angle (21) and the flexible plate (22) to be fixedly connected by fixing the hanging ears on the connecting buckles; The flexible plate (22) comprises a three-layer structure, namely a friction layer (221), a foam layer (222) and a frosted layer (223); the foam layer (222) is arranged between the friction layer (221) and the frosted layer (223); the friction layer (221), the foam layer (222) and the frosted layer (223) form a flexible plate (22) which is integrally connected on all sides; the friction layer (221) is connected to the corresponding glass curtain wall assembly (10) to enable the flexible plate (22) to be connected to the glass curtain wall assembly through friction. The foam layer (222) is connected to the glass curtain wall components (10); an air vent is provided at the edge of the foam layer (222), and the air vent is used to connect to an air pump to increase the shock absorption effect of the flexible plate (22) by inflating the foam layer (222); the frosted layer (223) corresponds to the frosted layer (223) of the flexible plate (22) connected to the glass curtain wall component (10) at the bottom of the glass curtain wall component (10), and the displacement between adjacent glass curtain wall components (10) is reduced through the interaction between the two layers of the frosted layer (223); The upper and lower corresponding fixed angles (21) are connected and fixed by a connecting piece (23), and the connecting piece (23) is a magnet, and the magnet is fixed inside the top and bottom of the fixed angle (21); The surface of the friction layer (221) in contact with the glass curtain wall assembly (10) is provided with friction lines, and the friction lines are uneven corrugated structures, which are used to increase friction force while reducing the direct contact area between the flexible plate (22) and the glass curtain wall assembly (10) to disperse the applied pressure.

4. A large-scale assembled glass curtain wall installation method according to claim 3, characterized in that: The specific steps of placing a plurality of the glass curtain wall assemblies (10) in sequence, placing a shock absorbing assembly (20) inside an adjacent glass curtain wall assembly (10), and then moving the assembly to the construction site include: The first step is to respectively install the fixed corners (21) on the four corners of the glass curtain wall assembly (10), and fix the flexible board (22) inside the four corresponding fixed corners (21) by fixing the hanging ears on the four corners of the flexible board (22) to the corresponding connecting buckles; The second step is to arrange the glass curtain wall assemblies (10) in sequence according to different shapes so that the shapes of the glass curtain wall assemblies (10) in the vertical direction are similar, and to reduce the shapes between adjacent glass curtain wall assemblies (10) by gravity so that the flexible plate (22) fits the shape of the glass curtain wall assemblies (10); The third step is to pile up foam around the vertically arranged glass curtain wall assemblies (10) to restrict the movement of the glass curtain wall assemblies (10); The fourth step is to inflate the vent holes at the edge of the foam layer (222) in sequence, so that the flexible plate (22) fills up the gap between the adjacent fixed corners (21), and then the vent holes are blocked; The fifth step is to complete the loading of the glass curtain wall assembly (10) and move it to the construction site in sequence.

5. A large-scale assembled glass curtain wall installation method according to claim 4, characterized in that: The hoisting assembly (30) comprises a suction cup group (31) and a fixing assembly (32); the suction cup groups (31) comprise four and are respectively fixed to the front and back sides of four edges of the glass curtain wall assembly (10); the fixing angle (21) comprises two suction cups (311), and the two suction cups (311) are respectively adsorbed to corresponding positions on the front and back sides of the glass curtain wall assembly (10); magnets are arranged inside the suction cups (311), and the suction cup groups (311) are clamped on the glass curtain wall assembly (10) by adsorption of the magnets inside the corresponding suction cups (311); the two corresponding suction cups (311) are connected and fixed on the side away from the glass curtain wall assembly (10) by the fixing clamp (312); the four suction cup groups (31) are connected and fixed to each other by the fixing assembly (312). The fixing assembly (32) is connected to the glass curtain wall assembly (10), the fixing assembly (32) being a cross-shaped structure and being fixed to the four fixing clamps (312) by screws respectively, so as to reduce the risk of the suction cup assembly (31) falling off; a fold line portion is arranged inside the fixing assembly (32), a fixing plate is arranged at a position where the fold line portion contacts the surface of the glass curtain wall assembly (10), the fold line portion is used to make the hanging assembly (30) fit on the surface of the glass curtain wall assembly (10), and the fixing plate is used to fix the fixing assembly (32) on the glass curtain wall assembly (10) by squeezing out air; a hanging portion (33) is welded at the edge of the fixing clamp (312), a hanging rope passes through the hanging portion (33), and the hanging ropes of the four hanging portions (33) are combined into one and connected to the tower crane; The specific steps of fixing the hoisting assembly (30) on the surface of the glass curtain wall assembly (10) and moving it to the installation position by means of a tower crane include: The first step is to clamp and adsorb the four suction cup groups (31) at corresponding positions of the glass curtain wall assembly (10); The second step is to stretch the fixing component (32) so that the fixing component (32) fits the surface curvature of the glass curtain wall component (10) and then press the fixing plate onto the surface of the glass curtain wall component (10); The third step is to exhaust the air in the fixed plate; The fourth step is to connect the hoisting rope and then hoist the glass curtain wall assembly (10) to the installation position by using a tower crane.

6. A large-scale assembled glass curtain wall installation method according to claim 5, characterized in that: The installation frame (40) comprises a basic frame and a clamping frame arranged inside the four sides, the supporting frame comprises left-right symmetrical clips and long magnets installed inside the clips and adsorbed to each other, the width of the long magnets being the same as the length of the basic frame; the transverse cross-sectional structure of the supporting frame is stepped, which is the same as the structure of the fixed edge (12); a shock-absorbing layer is arranged inside the supporting frame, and the shock-absorbing layer is in contact with the glass curtain wall assembly (10).

7. A large-scale assembled glass curtain wall installation method according to claim 6, characterized in that: The specific steps of the construction personnel fixing the installation frame (40) at the edge of the installation position of the corresponding glass curtain wall assembly (10) include: The first step is to measure and mark the edge of the corresponding installation position of the glass curtain wall assembly (10), and use a level and a plumb line to confirm the accuracy of the mark; The second step is to install a support structure at the marked position to ensure that the glass curtain wall assembly (10) can be firmly fixed on the building structure; The third step is to align the glass curtain wall assembly (10) with the marked position and gradually fix it on the supporting structure; Step 4: Use a level to ensure the frame is level and vertical to avoid deformation; The fifth step is to securely mount the glass curtain wall assembly (10) on the building structure using fixings.

8. A large-scale assembled glass curtain wall installation method according to claim 7, characterized in that: The specific steps of fixing the glass curtain wall assembly (10) in the corresponding installation frame (40) in sequence include: The first step is to pry open the clamping frame and place a support rod inside, wherein the width of the support rod is greater than the width of the glass curtain wall assembly (10); The second step is to place one side of the glass curtain wall assembly (10) into the interior of the clamping frame and then take out the support rod; The third step is to clamp the glass curtain wall assembly (10) in turn inside the supporting frame and squeeze it inwards to ensure that the mounting frames (40) on all four sides are fixed at corresponding edge positions of the glass curtain wall assembly (10).

9. A large-scale assembled glass curtain wall installation method according to claim 8, characterized in that: The stamping assembly (50) comprises a tank body (51), a feed port (52), a connecting pipe (53), a nozzle (54) and a one-way valve (55); the tank body (51) is made of a flexible material; the feed port (52) is arranged on the side of the tank body (51); the feed port (52) is used to add a fixing agent into the interior of the tank body (51); the bottom of the tank body (51) is connected to the connecting pipe (53); the connecting pipe (53) is away from the tank body (51); One end of the tank body (51) is connected to a stamping pump, and the stamping pump is used to provide power; the nozzle (54) is provided at one end of the tank body (51) away from the connecting pipe (53), and the nozzle (54) corresponds to the top gap position of the installation frame (40); the one-way valve (55) is provided inside the connecting pipe (53), and the opening direction of the one-way valve (55) is toward the direction of the tank body (51), so as to prevent the fixing agent from entering the stamping pump; A rubber ring is provided in the middle of the outer wall of the nozzle (54), and the rubber ring is used to seal the gap between the nozzle (54) and the installation frame (40).

10. A large-scale assembled glass curtain wall installation method according to claim 9, characterized in that: The specific steps of sequentially filling the fixing agent into the gap between the installation frame (40) and the glass curtain wall assembly (10) by means of the punching assembly (50) to reinforce the installation of the glass curtain wall assembly (10) include: The first step is to add a fixing agent into the interior of the tank body (51) through the feed port (52); The second step is to connect the connecting pipe (53) to the punching pump; The third step is to insert the nozzle (54) into the gap of the installation frame (40) and press it in the direction of the installation frame (40) so that the nozzle (54) and the installation frame (40) are sealed and connected; In the fourth step, a punching pump is used to provide power to squeeze the fixing agent in the tank (51) into the various gaps in the installation frame (40), thereby reinforcing the installation of the glass curtain wall assembly (10).