Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

576results about How to "Reduce potential risk" patented technology

Large container crane intelligent early warning system based on personnel behavior analysis

The invention discloses a large container crane intelligent early warning system based on personnel behavior analysis, and the system comprises the following steps: collecting operator behaviors, equipment operation states and environment parameters in real time through a multi-mode sensor network, constructing a dynamic data set, extracting behavior characteristics through a time difference embedding algorithm, and carrying out the early warning of the operator behaviors, the equipment operation states and the environment parameters; a multi-level spatial-temporal characteristic matrix is generated in combination with dynamic scene influence factors, regional risk factors are dynamically calculated by using a Bayesian inference model, comprehensive risk values are generated through an adaptive multi-objective optimization algorithm, risk levels are divided into low, medium and high classes, and a system triggers graded early warning responses according to the risk levels. And an optimized behavior adjustment suggestion is generated in combination with a quantum probability behavior prediction algorithm, and a feature extraction rule and risk assessment logic are dynamically optimized through a progressive learning algorithm to form a closed-loop optimization process. According to the invention, intelligent analysis and real-time early warning of personnel behaviors are realized, and the safety and adaptability of the crane in an operation environment are improved.
Owner:BEIJING GUOXINZHIKE TECH DEV CO LTD

Coal mine ventilation optimization and air quality regulation and control method based on adaptive learning

The invention discloses a coal mine ventilation optimization and air quality regulation and control method based on adaptive learning, and relates to the technical field of coal mine ventilation optimization, and the method comprises the following steps: arranging a plurality of sensors in a mine, carrying out the real-time collection and monitoring of key environment parameters, and uploading the collected data to a central control system; and comparing the collected real-time data with historical data, and dividing the collected real-time data into conventional working condition data and abnormal working condition data according to environment states. Through real-time monitoring of various sensors and a deep learning algorithm, accurate ventilation control is achieved, a problem area is rapidly positioned in an emergency, airflow is dynamically adjusted, and safety of miners is guaranteed. According to the system, an LSTM model is adopted to predict an event trend in advance, preventive regulation and control measures are taken in time, real-time adjustment is supported, and the strain capacity is improved. Through a multi-stage ventilation mode, the system optimizes energy consumption and equipment operation efficiency, reduces unnecessary energy waste and maintenance cost, and realizes balance between safety and economy.
Owner:HUATING COAL GRP CO LTD +1

Full-automatic storage bin and control method thereof

The invention provides a full-automatic storage bin and a control method thereof, and relates to the technical field of automation, the full-automatic storage bin comprises a hardware system and a software system, the hardware system comprises an intelligent transfer robot and an environment control module, and the software system comprises a central control system, a path planning module, a task scheduling module and a visual management module; the central control system controls the intelligent transfer robot to execute the access instruction according to the optimal path and the cooperative control strategy, monitors the state and position information of the intelligent transfer robot in real time, and dynamically adjusts task allocation and path planning; and the central control system predicts and adjusts the optimally stored environmental parameters through an environmental parameter prediction model according to historical data and a current state, and issues an environmental parameter instruction to the environmental control module.
Owner:ZHEJIANG UNITE SCI INSTR

Substation inspection robot management method based on company Internet of Things platform

The invention discloses a transformer substation patrol robot management method based on a company Internet of Things platform, and the method comprises the steps: collecting multi-modal data in a transformer substation, carrying out the fusion and analysis of the collected multi-modal data, and generating equipment state information based on a deep learning algorithm; according to the equipment state information and the routing inspection task priority, task allocation is performed on the routing inspection robot through a dynamic scheduling algorithm, according to a task allocation result, an optimal routing inspection path for the robot to execute tasks is formulated by using a path planning algorithm, and the path is adjusted through real-time data; constructing an equipment health management model, and predicting an equipment operation state based on the time sequence data and a machine learning algorithm; real-time monitoring is carried out through an Internet of Things platform, and data is stored in a centralized database. According to the invention, the inspection efficiency and accuracy of the transformer substation can be obviously improved, the potential risk caused by equipment failure or inspection omission is reduced, and the operation maintenance mode of the unattended transformer substation is optimized.
Owner:GUIZHOU POWER GRID CO LTD

Precast beam yard layout optimization system based on BIM and parameterized database integration

The invention discloses a precast beam field layout optimization system based on BIM and parameterized database integration, and relates to the technical field of computer aided design, the system comprises a BIM data acquisition and processing unit used for extracting a geometric feature tensor, a material feature tensor and a section feature tensor of a precast beam from a BIM parameterized database, constructing a multi-scale feature tensor of the precast beam; the model building unit is used for building a site multi-physical field coupling model based on the multi-scale tensor and the site parameters; calculating dynamic bearing capacity distribution based on a multi-physics field coupling model; calculating a dynamic feasibility index; and the layout optimization unit is used for converting the optimization problem into a continuous space-time Markov decision process, finding an instruction matrix of the crane corresponding to the optimal strategy function, and taking the instruction matrix as a final execution scheme so as to complete the optimized layout of the precast beam field. According to the method, the safety and stability of the layout scheme in a complex construction environment are ensured, the construction efficiency is maximized, and the risk is reduced.
Owner:中国建设基础设施有限公司 +3

Multi-round reasoning and feedback optimization method and system for industrial software codes

The invention belongs to but is not limited to the technical field of software development, and particularly relates to a multi-round reasoning and feedback optimization method and system for industrial software codes, and the method comprises the steps: S1, vector code library establishment: the establishment of a vector code library is composed of three parts of feedback establishment, vector database establishment and format summarization; s2, code reasoning optimization: the code reasoning optimization mainly comprises four aspects: control flow graph analysis, multi-query generation and reciprocal ranking fusion retrieval, reasoning generation subtask and code chain submodule generation, and code combination completion; and S3, feedback optimization: the feedback optimization is composed of score feedback optimization and log feedback optimization. According to the method, an automatic verification mechanism is introduced, logic consistency check and performance evaluation are carried out on the generated and optimized codes, and the correctness and execution efficiency of the codes are ensured. The verification mechanism can find and correct errors in real time in each stage of generation, so that the cost of manual verification is reduced, and the development efficiency is improved.
Owner:GUANGDONG UNIV OF PETROCHEMICAL TECH

Dynamic power grid investment benefit evaluation and consultation platform

The invention relates to the technical field of power grid investment management and decision support systems, in particular to a dynamic power grid investment benefit evaluation and consultation platform which comprises a cross-domain data fusion module, a real-time intelligent analysis module, a comprehensive evaluation index generation module, an investment decision support module, a strategy dynamic updating module and a user interaction module. Wherein the cross-domain data fusion module is used for collecting heterogeneous data in multiple aspects; the real-time intelligent analysis module is used for carrying out dynamic analysis and generating intermediate data containing power grid investment benefit evaluation; the comprehensive evaluation index generation module is used for generating a comprehensive power grid investment benefit index; the investment decision support module is used for generating optimized investment strategy suggestions; and the strategy dynamic updating module dynamically adjusts the power grid investment strategy. According to the invention, by integrating multi-source data in real time and providing an interaction function, the adaptability, the accuracy and the participation degree of power grid investment decision making are remarkably improved, so that the return on investment is optimized and the risk is reduced.
Owner:国网宁夏电力有限公司固原供电公司

Legal service management system based on block chain

The invention relates to the field of legal service management, and discloses a legal service management system based on a block chain, and the system comprises the following modules: a block chain network, an intelligent contract module, a data storage module, a user interface module, a feedback and monitoring module and a user management module, the non-tampering property and the transparency are ensured; the intelligent contract module automatically executes contract terms and supports intelligent management; the data storage module adopts a hierarchical structure, and on-chain data and off-chain data are stored in a distinguished manner, so that the storage and access efficiency is optimized; and the user interface module provides user-friendly operation experience through a visual tool. By using the block chain technology, all contract execution and compliance audit data are encrypted and stored in a distributed mode, it is ensured that tampering is avoided and whole-course traceability is achieved, and a user and related mechanisms can verify the authenticity and integrity of the contract data at any time.
Owner:BEIJING POWER LAW INTELLIGENT TECH CO LTD

Intelligent construction fire safety monitoring method, system, equipment and medium

The invention relates to an intelligent construction fire safety monitoring method, system and device and a medium, and belongs to the technical field of fire operation monitoring, and the monitoring method comprises the steps: obtaining corresponding fire operation element information according to a current fire operation task; determining a corresponding initial safety radius according to the fire operation level; acquiring a fire hazard level and a real-time environment parameter of the fire operation position, and calculating to obtain an environment risk index; dynamically adjusting the initial safety radius according to the environmental risk index to obtain a fire operation safety radius, determining a safety operation area with the fire operation position as the center, and sending a safety isolation instruction; according to the real-time position information, whether the fire operator, the fire viewer and the fire extinguishing equipment are all located in a safe operation area or not is judged in real time; if yes, opening the use permission of the fire-operating person to the fire-operating equipment; and if not, carrying out power-off control on the live equipment and sending an early warning signal to the management terminal. The safety management level of the construction site can be improved.
Owner:DECORATION CO LTD OF CHINA CONSTR 3RD ENG BUREAU

Underground anchor rod anchoring strength prediction method and system based on support vector machine method

The invention belongs to the technical field of anchoring strength detection, and discloses an underground anchor rod anchoring strength prediction method and system based on a support vector machine method. The method comprises the steps of cleaning data, processing missing values and standardizing features; using correlation analysis or other feature selection methods to select features with high correlation with anchoring strength; performing model training by using a support vector machine method SVM, and optimizing hyper-parameters by using grid search; completing the construction of a support vector machine model; and carrying out model evaluation and result visualization. Key parameters in the mixing process are monitored in real time through the sensor network, the system can obtain anchoring strength data in real time, the detection period is greatly shortened, and the construction efficiency is improved. The support vector machine algorithm is adopted to analyze and predict the collected data, personal errors can be eliminated to a greater extent, and the accuracy and reliability of anchoring strength detection are improved.
Owner:SHANDONG UNIV OF SCI & TECH

Electric quantity detection method and device of energy storage system

The invention relates to an electric quantity detection method and device for an energy storage system, and the method comprises the steps: obtaining the electric energy data and temperature data of the energy storage system, and carrying out the real-time measurement processing, and obtaining a corresponding real-time measurement result; based on the real-time measurement result, accumulated electric quantity calculation and correction processing are carried out, and corrected electric quantity data are obtained; acquiring open-circuit voltage data of the energy storage system, and performing table look-up estimation on the open-circuit voltage data based on a preset voltage SOC corresponding relation to obtain a corresponding SOC estimated value; comprehensively analyzing the corrected electric quantity data and the SOC estimated value to obtain corresponding electric quantity display information; carrying out data recording on the electric quantity display information and the real-time measurement result to obtain corresponding comprehensive record data; and performing safety comprehensive detection on the comprehensive record data based on a preset safety threshold to obtain a corresponding comprehensive detection result, and generating a corresponding system state early warning report according to the comprehensive detection result. According to the method, the actual capacity and the use condition of the energy storage system can be accurately grasped.
Owner:SHENZHEN SOUTHKING TECH CO LTD

Environmental pollutant toxicity detection and evaluation method

The invention discloses an environmental pollutant toxicity detection and evaluation method, which comprises the following steps: deploying a multi-parameter sensor array in a target monitoring environment, and obtaining initial monitoring data; performing deep mining and pollutant toxicity feature extraction on the initial monitoring data to generate a pollutant feature data set; forming a customized evaluation model framework according to the target environment monitoring requirement, the preset monitoring parameters and the configuration of the evaluation model; inputting the generated pollutant characteristic data set into a preset customized evaluation model, and performing toxicity evaluation on the environmental pollutants to obtain a preliminary evaluation result; and automatically adjusting parameters of the customized evaluation model based on the obtained preliminary evaluation result by adopting an adaptive learning algorithm to obtain an optimized evaluation model, carrying out toxicity evaluation again to obtain an optimized evaluation result, and the like. The method adapts to monitoring requirements under different environmental conditions, and comprehensively evaluates the toxicity risk of pollutants.
Owner:CNOOC TOTAL ENERGY CONSERVATION & EMISSION REDUCTION MONITORING CENT CO LTD

Multi-source data fusion high-altitude falling object detection system and high-altitude falling object detection method

The invention provides a multi-source data fusion high-altitude falling object detection system and a high-altitude falling object detection method. The system comprises an acceleration sensor, a sound sensor, a processor and an alarm module. The acceleration sensor monitors the acceleration change of the target falling object and preliminarily judges an object falling event; when the sound sensor preliminarily judges that an object falling event occurs, a sound signal generated by a target falling object is monitored, and sound source positioning is achieved; the processor receives data of the sensor and verifies an object falling event again through a data fusion algorithm, so that misjudgment is avoided. In addition, the alarm module further generates alarm information including the falling time, the object type and the falling position to give an alarm. The system solves the problem that in the prior art, the accuracy of object falling detection through a single-type sensor is low.
Owner:GUANGDONG POWER GRID CO LTD +1

Device and method for preparing phosphorus trifluoride

The invention belongs to the technical field of preparation of phosphorus trichloride, and particularly relates to a preparation device and method of phosphorus trifluoride. The device comprises a reactor, a cold trap and a collector, the upper part of the reactor is provided with a phosphorus trichloride dropping device and a zinc fluoride feeding port, the upper end of the reactor is provided with a stirring paddle, the stirring paddle extends to the bottom of the reactor, the upper end of the reactor is communicated with the cold trap through a first pipeline, the pipeline is provided with a condensation pipe, and the condensation pipe is communicated with the cold trap through a second pipeline. The bottom of the cold trap is communicated with the reactor through a second pipeline; and the upper end of the cold trap is communicated with the collector through a third pipeline. The method comprises the following steps: dropwise adding phosphorus trichloride into anhydrous zinc fluoride powder in a nitrogen atmosphere, and stirring for reaction; and collecting a reaction product, and recovering phosphorus trichloride. By adding the stirring paddle into the reactor and adopting a two-stage condensation method, the conversion rate of the raw materials is increased, the production cost is reduced, and the operation process is simple.
Owner:PERIC SPECIAL GASES CO LTD

Multi-source data-based breach rapid situation awareness method and system

The invention relates to the technical field of breach image processing, in particular to a breach rapid situation awareness method and system based on multi-source data. The method comprises the following steps: acquiring dam monitoring station data; performing hydrological sensor network setting on the dam monitoring station data to obtain dam hydrological sensor network data; performing ultrasonic water level change trend analysis on the dam hydrological sensor network data to generate an ultrasonic water level change trend chart; performing breach node sensing on the dam hydrological sensor network data according to the ultrasonic water level change trend chart to generate breach node data and breach prediction node data; and according to the breach node data, macroscopic disaster risk analysis is carried out on the breach area, and a breach area macroscopic disaster risk schematic diagram is generated. According to the invention, through real-time data integration, comprehensive risk assessment, unmanned aerial vehicle monitoring, dynamic prediction model and multi-party cooperative response, the accuracy and response speed of breach rapid situation awareness are improved.
Owner:YANGTZE RIVER WATER CONSERVANCY COMMISSION HYDROLOGY MIDDLE YANGTZE RIVER HYDROLOGY & WATER RESOURCES SURVEY BUREAU (YANGTZE RIVER WATER CONSERVANCY COMMISSION HYDROLOGY MIDDLE YANGTZE RIVER WATER ENVIRONMENT MONITORING CENT)

Hydraulic engineering management method and system based on digital twinning

The invention relates to the technical field of hydraulic engineering management, in particular to a hydraulic engineering management method and system based on digital twinning. The method comprises the following steps of obtaining hydraulic engineering design data, hydraulic engineering operation data and hydraulic engineering environment data, and performing digital twin space modeling on the corresponding hydraulic engineering to obtain a hydraulic engineering digital twin space model; performing operation condition virtual simulation analysis and water flow distribution change analysis on the hydraulic engineering digital twin space model, and performing engineering structure stress load analysis and engineering operation risk assessment to obtain hydraulic engineering simulation operation process risk data under different operation and environment change conditions; and performing risk decision management processing on the corresponding water conservancy project to generate a water conservancy project operation process risk management decision so as to execute corresponding water conservancy project operation risk management adjustment work. According to the invention, the management effect and response capability of the hydraulic engineering can be greatly improved.
Owner:CHUANLANG IND (DALIAN) CO LTD

Water conservancy project operation trend prediction method and system

The invention relates to the technical field of hydraulic engineering operation prediction, in particular to a hydraulic engineering operation trend prediction method and system. The method comprises the following steps: acquiring multi-source hydraulic engineering data, and generating a hydraulic engineering three-dimensional model through multi-source space fusion processing and three-dimensional model simulation; performing geometric complexity identification and stress path analysis on the three-dimensional model to determine key nodes in the water conservancy project; historical water conservancy data are obtained, time sequence conversion and potential mode mining are carried out, and potential modes related to engineering are obtained; performing stress superposition comparison on the key nodes of the water conservancy project and the potential mode to generate stress superposition comparison data, and iteratively adjusting the key nodes according to a result to obtain adjusted stress nodes; constructing a prediction model based on the adjusted stress node and the potential mode, performing operation trend prediction, and generating an operation trend prediction result of the water conservancy project; the high-precision and high-adaptability water conservancy project operation trend prediction method is realized.
Owner:JIANGSU SENMAI NEW ENERGY TECH CO LTD

Hydraulic engineering flood prevention gate, method and system

The invention belongs to the technical field of water conservancy gates, and discloses a water conservancy project flood prevention gate, method and system.The water conservancy project flood prevention gate comprises two barrier gate cement foundations, an anti-blocking mechanism and a cleaning mechanism are arranged on the two barrier gate cement foundations, and the anti-blocking mechanism comprises door bodies arranged on the sides, close to each other, of the two barrier gate cement foundations; an electric gate is slidably mounted on the inner wall of the front face of the gate body, anti-blocking assemblies are arranged at the tops of the two barrier gate cement foundations correspondingly, the electric gate is driven by a motor to ascend and descend, and automatic reciprocating motion of a cleaning strip on a sliding frame is achieved through meshing transmission of a tooth groove and a gear and the combined design of a connecting rod mechanism; according to the filter screen cleaning device, impurities attached to the filter screen are effectively removed, the filter screen is prevented from being blocked, the cleaning efficiency and the automation degree are greatly improved, frequent manual intervention is not needed, the labor intensity is reduced, meanwhile, potential risks caused by blocking of the filter screen are reduced, and it is guaranteed that water flows smoothly.
Owner:中交(苏州)城市开发建设有限公司 +2

Rapid test method and system for MOSFET device

The invention relates to the technical field of transistor detection, in particular to a quick test method and system for an MOSFET device. The method comprises the following steps: acquiring and integrating multi-source parallel data of the MOSFET device to obtain real-time I-V characteristic data of the device; performing MOSFET device performance prediction based on the real-time device I-V characteristic data to obtain MOSFET device performance prediction data; screening according to the performance prediction data of the MOSFET device to obtain performance data of a primarily screened qualified device; performing adjustment based on the performance data of the preliminarily screened qualified device to obtain an MOSFET device test scheme; acquiring real-time test data of the MOSFET device, and screening qualified devices to obtain performance data of re-screened qualified devices; and performing device test summarization based on the performance data of the primarily screened qualified device and the performance data of the secondarily screened qualified device to obtain an MOSFET device test report. According to the invention, the test period can be shortened.
Owner:SHENZHEN XINDIANYUAN TECH CO LTD

Tower crane installation path planning method and system, terminal and medium

The invention discloses a tower crane installation path planning method and system, a terminal and a medium, and the method comprises the following steps: collecting and preprocessing three-dimensional point cloud data and visual information in a tower crane installation area, fusing the point cloud data with image data, and generating a fused three-dimensional point cloud image which comprises distance and color information; a deep learning model is adopted to carry out obstacle detection on the fused three-dimensional point cloud image; an RRT algorithm is adopted, and a safety path is planned according to the obstacle detection result and the requirement of the hoisting task; and controlling the movement of the hoisting equipment according to the obtained safe path, and executing ascending, descending, horizontal moving and rotating actions of a lifting hook according to a path planning result. The method has the advantages that the safety and the efficiency in the hoisting operation of the power transmission tower are improved, and the quality and the reliability of power transmission line construction are improved.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD NANJING POWER SUPPLY COMPANY

Swivel measurement and control system for swivel bridge

The invention provides a swivel measurement and control system for a swivel bridge. The method comprises the following steps: establishing a multi-parameter monitoring model in a bridge swivel process; the multi-parameter monitoring model is a monitoring model which is based on N times of sampling and comprises p sensor parameters; establishing a control model of swivel measurement and control of the swivel bridge; for the control model, establishing an adaptive adjustment algorithm under a multi-parameter monitoring model; and performing swivel measurement and control on the swivel bridge through a self-adaptive adjustment algorithm. According to the invention, accurate monitoring and control of the bridge swivel process can be realized, the safety and accuracy of swivel operation are ensured, good adaptability and real-time performance are achieved, and the efficiency and quality of bridge swivel engineering can be effectively improved.
Owner:CHINA HUAXI ENG DESIGN CONSTR CO LTD

Engine tightening fault type classification method based on improved random forest

The invention belongs to the technical field of industrial automation and machine learning application, and particularly relates to an engine tightening fault type classification method based on an improved random forest, which is characterized by comprising the following specific operation steps: 1) attaching a label to tightening curve data; 2) preprocessing data, removing noise points, and completing extraction of main curve segments; 3) feature extraction; and 4) training the improved random forest model to complete classification. Compared with the prior art, the method has the beneficial effects that the defect data can be classified based on the defect data classification algorithm of the improved random forest, the defect data of the new type can be effectively detected, the data of the existing defect type can be classified, the fault data of the new type can be effectively identified, and the fault detection accuracy is improved. The potential risk is reduced, and remarkable technical and economic application values are realized.
Owner:WUXI UNIV

Seabed multifunctional freely-adjustable crawler belt

The invention belongs to ocean engineering, and discloses a seabed multifunctional freely-adjustable crawler belt which comprises a main frame, at least one pair of telescopic oil cylinders, at least one pair of outer supporting legs, at least one pair of inner supporting legs, at least one connecting rod, at least one overturning oil cylinder and at least one overturning oil cylinder connecting weldment. Wherein the main frame is hinged with the telescopic oil cylinder, the outer supporting leg and the inner supporting leg through pin shafts; the connecting rod is provided with at least three reamed holes which are respectively connected with the crawler belt assembly, the outer supporting leg and the inner supporting leg through bolts; the overturning oil cylinder is mounted on the crawler beam through the overturning oil cylinder connecting weldment and is connected with the connecting rod through the bolt; according to the invention, flexible adjustment of the crawler belt in multiple directions is realized. Particularly, due to the synergistic effect of the telescopic oil cylinder and the overturning oil cylinder, the width and height of the crawler belt can be adjusted under different terrain conditions, obstacles can be overcome through the rotating action, meanwhile, the equipment can better adapt to the complex and changeable seabed environment, and the operation efficiency and safety are improved.
Owner:DEEP SEA HOMO SAPIENS (GUANGZHOU) TECH CO LTD

Shield forming tunnel form data processing system and method

The invention discloses a shield forming tunnel form data processing system and method, and relates to the technical field of tunnel data processing. The shield forming tunnel form data processing method specifically comprises the following steps: S1, collecting and preprocessing data of a plurality of sections in a shield forming tunnel; s2, calculating the offset of the center of each segment; s3, continuously measuring and analyzing a deformation trend; s4, predicting offset change by using a linear regression model; s5, predicting the final offset of the duct piece by using the trained model; the removed abnormal values are recorded and analyzed, so that abnormal factors of segments in the tunnel can be screened, potential problems can be found and solved in time, further deterioration of the problems is prevented, and safety and stability of the tunnel are ensured; the deformation is calculated and the deformation trend is analyzed by using a time sequence, so that the deformation trend can be found in time, a subsequent detection plan can be formulated, the deformation problem can be found and processed in time through continuous monitoring, and the stability and the safety of the tunnel are ensured.
Owner:CHINA RAILWAY SEVENTH BUREAU GRP XIAN RAILWAY ENG CO LTD +2

Navigation communication method and system applied to AGV remote control interruption

The invention relates to the technical field of AGV navigation communication, in particular to a navigation communication method and system applied to AGV remote control interruption, and the method is applied to local control after an AGV remote control center breaks down to interrupt control. The method comprises the following steps: generating local navigation activation request information when the AGV detects that the communication quality with a remote control center is reduced to a preset quality level, and sending the local navigation activation request information to a local communication node which is pre-loaded into a scene map; the local communication node receives local navigation activation request information, analyzes and extracts key parameters, and obtains an AGV behavior feature set; the AGV behavior feature set comprises an identity authentication number, a destination coordinate and a real-time position coordinate of the AGV; the path conflict is effectively avoided, the collision risk between the AGVs is reduced, and the safety and stability of the system are improved.
Owner:CHANGZHOU OBILI INTELLIGENT TECH CO LTD

Machine room temperature automatic control system and method based on Internet of Things

The invention relates to the field of machine room temperature control, in particular to a machine room temperature automatic control system and method based on the Internet of Things, and the method comprises the steps: obtaining related data information of a machine room through a deployed sensor in the machine room, dividing the interior of the machine room into different regions, and building a multi-element space; marking each area according to the computer room temperature data information of different areas to obtain an integrated related influence degree weight set of the temperatures of different areas of the computer room; according to the integrated related influence degree weight feature set of the temperatures of the different areas of the machine room and in combination with related data information of the machine room, setting a priority level so as to formulate a machine room temperature regulation and control strategy optimization method; when second-time regulation and control are carried out, a machine room temperature correction coefficient is obtained according to the energy consumption condition of machine room temperature regulation equipment, the first-time regulation and control effect and the temperature change trend; and according to the adjusted temperature of the machine room, the system response time and the related data information in the machine room, establishing a machine room equipment working state monitoring model for regulation and control monitoring.
Owner:SHANDONG TONGWEI INFORMATION ENG CO LTD

Multi-ship anchoring scheduling path planning method based on improved RRT algorithm

The invention relates to a multi-ship anchoring scheduling path planning method based on an improved RRT algorithm. The method comprises the following steps: S1, constructing a multi-ship anchoring scheduling destination selection mechanism; s2, constructing a multi-ship anchoring scheduling evaluation index selection mechanism; s3, calculating ship scheduling priorities according to the multi-ship anchoring scheduling evaluation indexes; s4, constructing a multi-ship anchoring scheduling collision avoidance decision-making mechanism; and S5, calculating a multi-ship anchoring scheduling path planning result. The method can be used for coping with the situation that multiple ships need to be moored and dispatched at the same time, the berthing sequence and the sailing path of the ships are optimized, and therefore the ship anchoring dispatching waiting time is minimized, the sailing distance of all dispatched ships is reduced as much as possible, and the berth utilization rate is increased; the method is of great significance in the aspects of multi-ship scheduling in complex water areas, ship emergency evacuation, comprehensive management of water transportation hubs and the like.
Owner:CCCC SECOND HARBOR CONSULTANTS CO LTD +1

Wide-range greenhouse gas underway detection method suitable for leakage detection of gas company

The invention relates to the technical field of greenhouse gas underway detection, and discloses a large-range greenhouse gas underway detection method suitable for leakage detection of a gas company, and the method comprises the following steps: S1, early-stage preparation; s2, performing field deployment; s3, underway monitoring is carried out; s4, data analysis; s5, confirming and repairing a leakage source; and S6, follow-up monitoring and rechecking are performed, rapid coverage of a large-range to-be-detected area is realized by adopting underway detection, so that a large amount of data is efficiently collected, the problem of non-uniform surface station distribution of a traditional detection method is solved, the concentration data of leaked gas is accurately detected through a mass spectrum underway monitoring system, and the detection accuracy is improved through continuous monitoring. The change trend of the leaked gas concentration along with time lapse can be displayed, and the accuracy of leaked gas detection is improved; and a repair scheme for the leakage source is formulated, the leakage source is repaired and registered in time, subsequent continuous monitoring is performed, and continuous and stable operation of the gas equipment is guaranteed.
Owner:浙江省生态环境监测中心(浙江省生态环境信息中心)

Intelligent subject evaluation method and device based on multi-dimensional data

The invention relates to the technical field of medical treatment, and discloses an intelligent subject evaluation method based on multi-dimensional data, which comprises the following steps: acquiring the multi-dimensional data corresponding to a subject, inputting the multi-dimensional data into a pre-trained evaluation model, and acquiring an analysis report of the subject participating in clinical research, the multi-dimensional data comprises clinical symptoms, traditional Chinese and western medicine diagnosis, medication information and social background of the subject, and the analysis report comprises accuracy, compliance and risk; based on the analysis report, determining a corresponding group-entering suggestion and a treatment research scheme for each subject, the treatment research scheme including drug selection, dose adjustment and a follow-up plan; in the clinical research process, the latest research data are continuously obtained, and the analysis report and the treatment research scheme of the subject are adjusted based on the latest research data. The quality and effectiveness of clinical research can be improved.
Owner:SMART MEDICAL TECH (SHANGHAI) CO LTD

Intelligent vehicle auditing method and system based on big data edge computing device

The invention discloses an intelligent vehicle auditing method and system based on a big data edge computing device, and relates to the technical field of intelligent vehicles, and the method comprises the steps: collecting environment information and vehicle operation state data through a sensor on an intelligent vehicle, and carrying out the preprocessing of the data; based on the identified situation features, the fog node cooperates with a cloud database to generate an auditing strategy for a specific situation; the audit strategy instruction set is sent back to the intelligent vehicle, and the vehicle carries out strategy adjustment and feeds back effect data; and the fog node receives the feedback data to evaluate the strategy performance, optimizes the existing auditing strategy based on the evaluation result, and sends the optimized strategy to the intelligent vehicle. According to the method, the edge calculation and the cloud database are fused, the personalized strategy of the intelligent vehicle is optimized, the environmental adaptability, the driving safety and the decision-making efficiency are greatly improved, the risk is reduced, the innovation promotes the road safety and optimizes the traffic, the far-reaching positive influence on the economy and the environmental protection is achieved, and a new era of intelligent travel is led.
Owner:DELIAN EASY CONTROL TECH (BEIJING) CO LTD