A method for optimizing the operation of multi-reservoir group water supply based on flood operation period division and combined peak-shifting operation

By dividing the scheduling periods in the reservoir group and using the POA algorithm, the 'dimensional disaster' problem in flood scheduling of the reservoir group is solved, the calculation speed and optimization capabilities are improved, and an efficient solution for multi-store joint peak staggered optimization scheduling is realized.

CN118798599BActive Publication Date: 2024-11-22DALIAN UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411276873.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-22
Estimated Expiration
2044-09-12

AI Technical Summary

Technical Problem

The existing technology has a 'dimensional disaster' problem in flood scheduling of reservoir groups, which leads to large calculations and easy local convergence of optimization results, making it difficult to effectively solve the problem of multi-store joint peak staggered optimization scheduling.

Method used

The dimensionality reduction joint peak staggered optimization scheduling method based on the flood scheduling period is adopted. By analyzing the flood control tasks of each reservoir, the scheduling period is divided, and the POA algorithm is used to generate an optimized scheduling scheme that meets flood control safety. The peak staggered period is selected as During the critical period of scheduling, regular scheduling and POA optimization algorithm iteratively search for optimization.

Benefits of technology

It significantly improves the calculation speed of the optimization scheduling solution, improves optimization capabilities, ensures the solution accuracy of critical periods, and provides an effective solution for multi-store joint peak staggered optimization scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798599B_ABST
    Figure CN118798599B_ABST
Patent Text Reader

Abstract

A dimensionality reduction joint peak-shifting optimization scheduling method for a multi-reservoir group based on flood scheduling period division belongs to the field of reservoir group flood control optimization scheduling. In the first stage, multiple scheduling periods are divided by analyzing the different flood control tasks of each reservoir in each time period in the basin, and the peak-shifting period is used as the scheduling key period; in the second stage, the initial solution is generated according to the regulation scheduling, and the multi-reservoir joint peak-shifting optimization scheduling scheme that meets flood control safety is quickly generated through the POA algorithm. The present invention considers various water inflow conditions in the upstream and interval to determine the objective function. In the POA algorithm, for various complex constraints, based on the differences in the importance of peak-shifting requirements for downstream flood control control points in different flood periods, a dimensionality reduction method of "dividing the flood scheduling period and optimizing only the peak-shifting key period during optimization scheduling" is proposed to overcome the problems of "dimensionality disaster" and low solution efficiency, improve solution efficiency, enhance practicality, and can be widely used in joint flood control scheduling of various series and parallel reservoirs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of joint flood control optimization scheduling of reservoir groups, and relates to a dimensionality reduction joint peak-shifting optimization scheduling method for a multi-reservoir reservoir group based on flood scheduling period division. Background Art

[0002] Floods are one of the most frequent, harmful and loss-making natural disasters. Flood control is not only related to the safety of people's lives and property. Reservoirs are important engineering measures for flood control. Reservoir flood control dispatching is an important part of water conservancy dispatching. It aims to ensure the safety of reservoir dam projects, and scientifically and rationally control and use existing water conservancy projects to intercept and store floods and reduce peak water flow according to the upstream and downstream water conditions. It has important practical significance for downstream flood control and disaster reduction.

[0003] Tang Qianbai et al. [Tang Qianbai, Cao Xiyao, Three-stage reservoir optimization dispatching technology [J], Hunan Electric Power, 2017, 37(3): 47-51] proposed a three-stage optimization dispatching method before, during and after rain based on the dispatching objectives and strategies of reservoirs at different stages, realizing the organic connection between short-term and medium-term forecast dispatching and long-term optimization dispatching of reservoirs. Li Wanxu [Li Wanxu, Risk dispatching method of reservoir flood period [J], Dams and Safety, 2003(1): 18-21] divided the flood period into three stages according to the flood period dispatching process, mainly targeting the rising water stage and the receding water stage, and established a flood dispatching method mainly for obtaining benefits. Most of the research focuses on the medium- and long-term optimization dispatching considering the power generation benefits, and the research on the optimization dispatching scheme of medium-sized reservoirs during the flood period is relatively small.

[0004] The traditional solution method in optimization scheduling is dynamic programming and its improved algorithm. However, when the number of variables increases, the actual calculation of dynamic programming will encounter "dimensionality barrier", which makes the calculation too large. In addition, dynamic programming requires that the state variables meet the non-aftereffect property. When encountering flood routing, this algorithm cannot be used. The POA algorithm decomposes the multi-stage decision-making problem into a series of two-stage sub-problems for solution, which can alleviate the "dimensionality disaster" to a certain extent. However, for complex flood control systems with a large number of variables to solve, complex hydrological and hydraulic connections, and many constraints, the use of the POA algorithm alone has problems such as low computational efficiency and easy local convergence of optimization results. Jiang Zhiqiang et al. [Jiang Zhiqiang, Ji Changming, Sun Ping et al., Comparative Analysis of Three Parallel Modes of Multidimensional Dynamic Programming [J], China Rural Water Conservancy and Hydropower, 2015 (3): 168-173, 176] parallelized the multidimensional dynamic programming algorithm and constructed parallel algorithms between time periods, within time periods, and a mixture of the two, which alleviated the "dimensionality disaster" problem to a certain extent. Therefore, exploring reasonable and effective dimensionality reduction methods and applying relevant theoretical methods to actual production are of great significance and practical value for theoretical guidance of practice.

[0005] Qin Hui et al. [Qin Hui, Liu Yongqi, Zhang Zhendong et al., A multi-objective hierarchical flood control dispatching method for reservoirs [P], Hubei Province: CN201811573140.2, 2019-04-16] classified the water level in front of the dam and the inflow into the reservoir to form a hierarchical flood control dispatching rule, and then established an optimization model based on a multi-objective evolutionary algorithm. The classification rule adopted by this method does not take into account the differences in flood characteristics of different events. At the same time, the optimization algorithm used has a slow convergence speed and complex parameter adjustment. Xiao Jing et al. [Xiao Jing, Dong Zengchuan, A reservoir flood control dispatching method based on the POA algorithm [P], Jiangsu: CN201810465280.1, 2018-10-26] improved the POA algorithm through the segmented compensation method, but the judgment conditions of flood control operations are relatively complex and are only suitable for the generation of single reservoir optimization dispatching plans. Summary of the invention

[0006] In view of the shortcomings of the prior art, the present invention considers the number of periods for flood optimization and provides a method for dimensionality reduction and joint peak-shifting optimization scheduling of multi-reservoir groups based on flood scheduling period division. It can reduce the impact of dimensionality disaster while ensuring the accuracy of solving key periods, thus providing a new idea for solving the problem of multi-reservoir joint peak-shifting optimization scheduling.

[0007] In order to solve the above technical problems, the technical solution of the present invention is:

[0008] A multi-reservoir group dimensionality reduction joint peak-shifting optimization scheduling method based on flood scheduling period division, the multi-reservoir group dimensionality reduction joint peak-shifting optimization scheduling method includes two stages: scheduling key period selection and optimization scheduling. The first stage divides multiple scheduling periods by analyzing the different flood control tasks of each reservoir in the basin at different time periods, and takes the peak-shifting period as the scheduling key period; the second stage generates an initial solution according to the regulation scheduling, and quickly generates a multi-reservoir joint peak-shifting optimization scheduling plan that meets flood control safety through the POA algorithm. Follow the following steps (1) to (10) to complete the output of the optimized scheduling plan:

[0009] Step (1) Based on the flood forecast information, the natural flow process of the downstream flood control section is obtained when all reservoirs are not regulating water.

[0010] Step (2) According to the warning flow and guaranteed flow, the scheduling period of each reservoir is divided into the flooding period and the peak period ( ), dam protection period and water withdrawal period. Wherein T is the total time consumption of flood dispatching. The method of the present invention sets the total time consumption of flood dispatching of each reservoir to be the same. Combined with the set optimization step length, the total time consumption of flood dispatching is divided into a certain number of time periods, and the time period sequence number is sorted from 0. The peak shift period is selected as the key dispatching period.

[0011] The specific scheduling period is divided as follows:

[0012] (1) The starting time of the flood season is the starting time of the flood dispatch, i.e. 0h.

[0013] (2) The end time of the flood season is the period before the start time of the off-peak season, that is, h.

[0014] (3) The start time of the off-peak period is h. The method of the present invention provides h is the start time of the natural flow of the downstream flood control section (the reservoir is not regulated, and the outflow is equal to the inflow) exceeding the warning flow h, minus the time required for the reservoir outflow to evolve to the downstream flood control section h, that is .when At h, the inflow flow is greater than the downstream safety flow. h needs to be advanced to the time when the inflow flow is less than or equal to the end time of the downstream safety flow.

[0015] (4) The end time of the off-peak period is h. The method of the present invention provides h is the end time of the natural flow in the downstream flood control section exceeding the guaranteed flow h, minus the reservoir outflow evolution time h. Due to the error and the fact that the peak time of the downstream flood control section may be delayed after the reservoir peak is staggered, flood control risks may be brought about. For safety reasons, a peak delay should be added. ,Right now .

[0016] (5) The starting time of the dam protection period is the next period after the end of the peak-shifting period, that is, h. The flood peak of the downstream flood control section has passed and the flow is lower than the guaranteed flow, but the reservoir is still operating at a high water level, which endangers its own flood control safety. The discharge flow should be increased to quickly lower the reservoir water level, but the duration should not be too long. After the reservoir water level is lowered, the discharge flow should be reduced.

[0017] (6) End time of the dam protection period. The method of the present invention classifies the time from the start of the dam protection period to the end of the flood dispatch as the water retreat period. ,Right now h.

[0018] (7) The start time of the water withdrawal period is the next period after the end of the dam protection period, that is, h.

[0019] (8) The end time of the water withdrawal period is the end time of the flood dispatch, that is, h.

[0020] Step (3) During the flood season, each reservoir adopts regular scheduling, or uses one-third of the safe discharge volume of the reservoir downstream as a fixed discharge volume;

[0021] Furthermore, in step (3), the rule-based scheduling specifically refers to the corresponding rule-based scheduling methods already existing in each reservoir.

[0022] Step (4) Optimize scheduling during the off-peak period (critical scheduling period).

[0023] 4.1) First, all reservoirs are regularly dispatched to respond to flood events.

[0024] The "rule-based scheduling" mentioned here refers to the corresponding rule-based scheduling methods already in place for each reservoir.

[0025] 4.2) According to the dispatching results of rule 4.1, the corresponding part of the dispatching key period is used as the initial discharge trajectory of the POA optimization algorithm for the dispatching key period of each reservoir in step (4).

[0026] The initial discharge trajectory line is determined by directly using the regular dispatching results of the key dispatching period of each reservoir involved in the dispatching.

[0027] 4.3) Schedule the total time period of the critical period The optimization step is divided into a certain number of time periods according to the set optimization step. From this step, the POA algorithm iterative optimization is performed.

[0028] The algorithm involves parameters that need to be set in advance, including: optimization time step, number of optimization iterations, convergence accuracy, etc.

[0029] Algorithm-related settings include: the number of flood scheduling periods, the minimum water level allowed for each reservoir, the maximum water level allowed for each reservoir, the final water level of each reservoir, etc.

[0030] It refers to the objective function value of the i-th period during the j-th iteration when the POA algorithm performs optimal scheduling for hotspot reservoirs.

[0031] Refers to the objective function corresponding to the complete scheduling process after the nth optimization, that is, the algorithm optimizes each time period The objective function of the scheduling process generated under the optimal condition is calculated. Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation.

[0032] 4.3.1) The corresponding part of the critical dispatching period in the initial discharge trajectory of each reservoir is divided into this period, and the period number is sorted starting from 0.

[0033] Fixed reservoirs , Discharge flow during the period. It indicates the starting time of the off-peak period of the a-th reservoir in the first iterative calculation.

[0034] 4.3.2) Discretize each reservoir according to the algorithm The flood discharge during the time period, that is, , The flood discharge between time periods is segmented with 1 m 3 / s as the scale value, and the flood discharge of each reservoir during the time period is adjusted.

[0035] Step (5) Determine the objective function according to the characteristics of the inflow of the flood event, and calculate the objective function . Make the , objective function value of the time period the smallest, optimal, that is, the objective function value of the , time period is the smallest in the first optimization calculation of the algorithm. The refers to the objective function value of the i-th time period in the j-th iteration process of the algorithm.

[0036] Furthermore, in the step (5), the characteristics of the flood inflow refer to: in the composition of the flood source, the proportion of the inflow from the upstream reservoir to the inflow from the interval. Define the ratio P of the inflow from the upstream reservoir to the inflow from the interval:

[0037] When P > P1, the objective function selects the maximum flood control safety guarantee criterion;

[0038] When P < P2, the objective function selects the maximum peak shaving criterion, where P1 > P2.

[0039] When P2 < P < P1, the objective function selects the combined weight criterion of the maximum peak shaving criterion and the maximum flood control safety guarantee criterion.

[0040] The P1 is 7:3, and the P2 is 3:7.

[0041] In the step (5), the objective function is specifically:

[0042] 5.1) Take the maximum flood control safety guarantee criterion as the flood control optimization criterion, that is, the objective function is that the flood control storage capacity occupied by each reservoir is the largest and the smallest: F = my ∑ i = 1 N [max( V i , 1 , V i , 2 , ⋯ , V i , t , ⋯ , V i , T )] ;

[0043] 5.2) Represent the flood control optimization objective function with the maximum peak shaving criterion: = my ∑ t = 1 T ∑ i = 1 N [ Q seconds _ i , t + Q down _ i , t ] 2 ;

[0044] 5.3) The combined weight criterion of the maximum peak shaving criterion and the maximum flood control safety guarantee criterion, and its objective function can be expressed as: F = α 1 my ∑ t = 1 T ∑ i = 1 N [ Q seconds _ i , t + Q down _ i , t ] 2 + α 2 my ∑ i = 1 N [max( V i , 1 , V i , 2 , ⋯ , V i , t , ⋯ , V i , T )] .

[0045] Step (6) Optimize one by one for each time period and advance to The optimal objective function value for this off-peak period is obtained. When , one round of algorithm iteration calculation is completed;

[0046] Step (7) During the dam protection period, the discharge volume is increased in stages according to the dispatching rules until the maximum discharge capacity is reached;

[0047] Step (8) The water discharge section first discharges at the maximum discharge capacity. When the forecast information indicates that there will be no rain in the later period, the discharge flow is reduced in stages to ensure the flood control safety of the downstream.

[0048] Step (9) corresponds the optimized complete scheduling process to the objective function The objective function under all reservoir regulation is Compare and judge the optimized objective function Whether the accuracy requirement is met or the objective function is no longer improved. If both of the above judgment conditions are not met, return to step (4) to start a new round of optimization, or reach the set number of optimization iterations, the iteration stops, and the optimal solution is obtained. Refers to the objective function corresponding to the complete scheduling process after the nth optimization. Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation.

[0049] Furthermore, in step (9), the accuracy requirement specifically refers to: the convergence accuracy is 0.0001.

[0050] The “objective function no longer improves” here means that the difference between two objective function values ​​is less than 0.0001.

[0051] The “return to step (4) to start a new round of optimization” here means: updating the critical period of the scheduling in the complete scheduling process of each reservoir after this optimization to the initial discharge trajectory line, and the other parameter settings remain unchanged.

[0052] Step (10) outputs a flood control optimization scheduling plan based on the optimal solution obtained in step (9).

[0053] The beneficial effects of the present invention are:

[0054] The present invention can effectively overcome the "curse of dimensionality" and significantly improve the calculation speed of generating an optimized scheduling solution, enhance the optimization capability, and thus more effectively exert the benefits of flood control. The present invention can reduce the impact of the curse of dimensionality while ensuring the accuracy of the solution in the critical period, thereby providing a new idea for solving the problem of multi-repository joint peak-shifting optimization scheduling. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 It is a flow chart of the combined peak-shifting optimization dispatching of a multi-reservoir group based on flood dispatching period division according to the present invention;

[0056] Figure 2 Schematic diagram of reservoir scheduling process. DETAILED DESCRIPTION

[0057] Based on typical flood data, this paper establishes a dimensionality reduction joint peak-shifting optimization scheduling model for series-parallel reservoirs. On the premise of ensuring the flood control safety of the basin, it seeks a multi-reservoir joint flood control optimization scheduling scheme with high solution efficiency and strong practicality. The specific process is detailed in Figure 1 .

[0058] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0059] The present invention consists of two parts: the division of the critical scheduling period and the solution of the optimal scheduling scheme. In the first stage, multiple scheduling periods are divided by analyzing the different flood control tasks of each reservoir in the basin at different time periods, and the peak shift period is used as the critical scheduling period; in the second stage, the initial solution is generated according to the regulation scheduling, and the multi-reservoir joint peak shift optimization scheduling scheme that meets flood control safety is quickly generated through the POA algorithm.

[0060] 1. Selection of critical scheduling period;

[0061] The reservoir flood control scheduling process has multiple scheduling periods due to the different flood control tasks in different time periods. It can be roughly divided into the following four periods: rising water period, peak shifting period, dam protection period, and water receding period.

[0062] (1) Flood stage: refers to the stage when floods begin to rise. At this time, the inflow into the reservoir is small and lower than the safe discharge flow, the outflow from the reservoir is equal to the inflow, and the reservoir water level is maintained at the flood limit water level. The purpose is to have sufficient flood control storage capacity to reduce the peak of the downstream flood control section before the flood peak arrives.

[0063] (2) Peak shifting period: refers to the time period when the reservoir is responsible for downstream flood control and the reservoir discharge flow plus the interval flow exceeds the guaranteed flow of the downstream flood control section. The reservoir reduces the discharge flow to reduce the impact of floods on the downstream areas.

[0064] (3) Dam protection period: refers to the period after the peak shifting period when the reservoir water level reaches the maximum allowable water level. It is necessary to increase the reservoir discharge flow to lower the reservoir water level to avoid the reservoir exceeding the maximum carrying capacity and endangering the reservoir's own safety. If the flood standard is judged to be lower than the downstream flood control standard at the end of the peak shifting period, there will be no dam protection period and the water withdrawal period will be entered directly.

[0065] (4) Water drawdown period: refers to the period after the dam protection period when the reservoir is safe and the discharge flow is reduced to prepare for the next flood. The reservoir water level gradually drops to the final water level. The final water level can be reduced to the upper limit of the dynamic control range of the flood limit water level based on rainfall forecast information. If there is heavy rainfall in the future, it can be reduced to the lower limit of the dynamic control range of the flood limit water level or the flood limit water level.

[0066] When reservoirs carry out flood control optimization scheduling, they ensure the flood control safety of the basin by reducing the peak flow of the downstream flood control section. The scheduling period when the reservoir can play a peak-cutting role in the peak flow of the downstream flood control section is the peak-shifting period, which is determined as the key scheduling period.

[0067] The specific scheduling period is divided as follows:

[0068] (1) The starting time of the flood season is the starting time of the flood dispatch, i.e. 0h.

[0069] (2) The end time of the flood season is the period before the start time of the off-peak season, that is, h.

[0070] (3) The start time of the off-peak period is h. The method of the present invention provides h is the start time of the natural flow of the downstream flood control section (the reservoir is not regulated, and the outflow is equal to the inflow) exceeding the warning flow h, minus the time required for the reservoir outflow to evolve to the downstream flood control section h, that is .when At h, the inflow flow is greater than the downstream safety flow. h needs to be advanced to the time when the inflow flow is less than or equal to the end time of the downstream safety flow.

[0071] (4) The end time of the off-peak period is h. The method of the present invention provides h is the end time of the natural flow in the downstream flood control section exceeding the guaranteed flow h, minus the reservoir outflow evolution time h. Due to the error and the fact that the peak time of the downstream flood control section may be delayed after the reservoir peak is staggered, flood control risks may be brought about. For safety reasons, a peak delay should be added. ,Right now .

[0072] (5) The starting time of the dam protection period is the next period after the end of the peak-shifting period, that is, h. The flood peak of the downstream flood control section has passed and the flow is lower than the guaranteed flow, but the reservoir is still operating at a high water level, which endangers its own flood control safety. The discharge flow should be increased to quickly lower the reservoir water level, but the duration should not be too long. After the reservoir water level is lowered, the discharge flow should be reduced.

[0073] (6) End time of the dam protection period. The method of the present invention classifies the time from the start of the dam protection period to the end of the flood dispatch as the water retreat period. ,Right now h.

[0074] (7) The start time of the water withdrawal period is the next period after the end of the dam protection period, that is, h.

[0075] (8) The end time of the water withdrawal period is the end time of the flood dispatch, that is, h.

[0076] The flooding period is scheduled regularly or with fixed outflow, the peak-shifting period is determined as the key period for optimized scheduling, and the dam protection period is graded according to the scheduling rules to increase the discharge until the maximum discharge capacity is reached. 2. During the water withdrawal period, the maximum discharge capacity is first discharged, and the discharge flow is graded and reduced in combination with forecast information, so as to meet the subsequent storage and discharge requirements under the premise of ensuring the safety of downstream flood control. In this way, the model can reduce decision variables and achieve dimensionality reduction while ensuring the flood control effect.

[0077] 2. Solve the optimization scheduling plan;

[0078] As the number of reservoirs increases and the calculation period lengthens, the scale of the problem will rise sharply, and the dynamic programming method will face a serious "curse of dimensionality" problem. The method of the present invention uses a stepwise optimization algorithm as a solution strategy based on the characteristics of the problem. Starting from an initial feasible solution, the method iteratively optimizes the size of the discharge flow in each period during the entire scheduling process until it converges to the global optimal solution. The solution process includes the following two main parts:

[0079] (1) Determine the initial feasible solution. The rule dispatch result is used as the initial feasible solution in which the discharge of each reservoir is relatively stable and meets the reservoir discharge constraint conditions.

[0080] (2) Based on the initial feasible solution obtained in the first step, the discharge flow in each time period is readjusted according to the rule of optimizing the time periods in sequence to optimize the overall objective function until all time periods reach the optimal state.

[0081] Different floods have different sources. For upstream reservoirs with smaller inflows than interval water, the smaller the peak flow of the downstream flood control section, the better, provided that the maximum water level of the reservoir does not exceed the maximum allowable water level. This method uses the maximum peak reduction criterion to represent the flood control optimization target, as shown in the following formula:

[0082] = my ∑ t = 1 T ∑ i = 1 N [ Q seconds _ i , t + Q down _ i , t ] 2 ;

[0083] Where: F is the objective function value; T is the total time period; N is the total number of reservoirs; i is the reservoir number; t is the time period number; is the interval inflow of reservoir i in period t, m 3 / s; is the discharge flow of reservoir i at period t, evolving through Muskingum to the downstream flood control section, m 3 / s; , is the flow calculation coefficient; is the discharge flow of reservoir i in period t, m 3 / s.

[0084] When the water inflow to the upstream reservoir is larger than that to the interval, the flood control storage capacity of each reservoir should be used as little as possible, under the premise of meeting the safety of the downstream flood control section, in order to prepare for the subsequent possible major floods. This method uses the maximum flood control safety guarantee criterion as the flood control optimization criterion, that is, the maximum and minimum flood control storage capacity occupied by each reservoir is taken as the objective function:

[0085] F = my ∑ i = 1 N [max( V i , 1 , V i , 2 , ⋯ , V i , t , ⋯ , V i , T )] ;

[0086] Where: is the water storage capacity of reservoir i in period t, m 3 .

[0087] In the case of large inflows from upstream reservoirs and intervals, under the premise of ensuring the safety of the downstream flood control section and the maximum water level of the reservoir not exceeding the maximum allowable water level, it is necessary to minimize both the peak flow of the downstream flood control section and the utilization of the flood control capacity of each reservoir. The flood control optimization criterion of this method is a combined weighted criterion of the maximum peak reduction criterion and the maximum flood control safety guarantee criterion, and its objective function can be expressed as:

[0088] F = α 1 my ∑ t = 1 T ∑ i = 1 N [ Q seconds _ i , t + Q down _ i , t ] 2 + α 2 my ∑ i = 1 N [max( V i , 1 , V i , 2 , ⋯ , V i , t , ⋯ , V i , T )] ;

[0089] Where: is the weight coefficient of the maximum peak shaving criterion objective function; is the weight coefficient of the objective function of the maximum flood control safety guarantee criterion.

[0090] The constraint expressions that need to be satisfied to solve the flood control optimization scheduling problem of reservoir groups are as follows:

[0091] (1) Water balance constraints:

[0092] ;

[0093] Where: is the water storage capacity of reservoir i at the tth and t+1th periods, m 3 ; is the inflow to reservoir i in period t, m 3 / s; is the outflow of reservoir i in period t, m 3 / s; To calculate the long period, 3600s is taken.

[0094] (2) Water level constraint:

[0095] ;

[0096] Where: represents the water level of reservoir i in time period t, m; are the upper and lower limits of the water level allowed during operation of reservoir i, m.

[0097] (3) Final water level constraint:

[0098] ;

[0099] Where: is the water level of reservoir i in period T, m; is the final water level of reservoir i, m.

[0100] (4) Discharge capacity constraints:

[0101] ;

[0102] Where: is the discharge capacity of reservoir i at period t, m 3 / s.

[0103] (5) Constraints on safe discharge volume of reservoir discharge:

[0104] ;

[0105] Where: is the safe discharge flow of reservoir i, m 3 / s.

[0106] (6) Discharge flow rate fluctuation constraints:

[0107] ;

[0108] In the formula, is the maximum outflow amplitude of reservoir i, m 3 / s.

[0109] (7) Downstream flood control safety constraints:

[0110] ;

[0111] Where: is the maximum flow allowed in the downstream flood control section, m 3 / s.

[0112] (8) Flood peak constraints for discharge into the reservoir:

[0113] ;

[0114] Where: is the flood peak in reservoir i, m 3 / s.

[0115] Based on the above ideas, a complete optimization scheduling process is implemented according to the following steps (1)-(10):

[0116] (1) Based on the flood forecast information, the natural flow process of the downstream flood control section is obtained when all reservoirs are not regulating water;

[0117] (2) According to the warning flow and guaranteed flow, the reservoir operation period is divided into the flooding period and the peak period ( ), dam protection period and water withdrawal period. Among them, T is the total time of flood dispatch. Combined with the set optimization step, the total time of flood dispatch is divided into a certain number of time periods, and the time period sequence starts from 0. The peak period is selected as the key period for dispatch. The details are shown in Table 1:

[0118] Table 1 Results of the operation period division for each reservoir

[0119]

[0120] The optimization step size is set to 1h.

[0121] (3) During the flood season, each reservoir adopts regular dispatching, or uses one-third of the safe discharge volume downstream of the reservoir as a fixed discharge volume. In this embodiment, each reservoir is dispatched regularly.

[0122] (4) Optimize scheduling during off-peak periods.

[0123] 4.1) First, all reservoirs are regularly dispatched to respond to flood events.

[0124] The "rule-based scheduling" mentioned here refers to the corresponding rule-based scheduling methods already in place for each reservoir.

[0125] 4.2) According to the dispatching results of rule 4.1, the corresponding part of the dispatching key period will be used as the initial discharge trajectory of the POA optimization algorithm for the dispatching key period of each reservoir in step (4).

[0126] The initial discharge trajectory line is determined by directly using the regular dispatching results of the key dispatching period of each reservoir involved in the dispatching.

[0127] 4.3) Schedule the total time period of the critical period The optimization step is divided into a certain number of time periods according to the set optimization step. From this step, the POA algorithm is iterated to find the optimal solution. In this embodiment, the relevant settings are as follows:

[0128] The algorithm parameters that need to be set in advance include: optimization time step of 1h, number of optimization iterations of 50 times, convergence accuracy of 0.0001, etc.

[0129] The algorithm-related settings include: the total time for flood dispatching of each reservoir is 137 hours, the minimum allowable water level of each reservoir is the corresponding flood limit water level of each reservoir, the maximum allowable water level of each reservoir is the corresponding flood control high water level of each reservoir, and the final water level of each reservoir is the corresponding flood limit water level of each reservoir.

[0130] When the POA algorithm optimizes the operation of hotspot reservoirs, the objective function value of the i-th period in the j-th iteration process is .

[0131] The complete scheduling process after the nth optimization corresponds to the objective function, that is, the algorithm optimizes each time period The objective function of the scheduling process calculated by the optimal situation is .

[0132] 4.3.1) The corresponding part of the critical dispatching period in the initial discharge trajectory of each reservoir is divided into this period, and the period number is sorted starting from 0.

[0133] Fixed reservoirs , Discharge flow during the period. It indicates the starting time of the off-peak period of the a-th reservoir in the first iterative calculation.

[0134] 4.3.2) Discretize each reservoir according to the algorithm The period of leakage flow is about to , The leakage flow between time periods is 1 m 3 / s is the division value for division, and each reservoir is adjusted Discharge flow during the period.

[0135] In a specific example, taking Jindou Reservoir as an example, the discharge flow in the 0th period of the peak period is 82m 3 / s, the discharge flow in the second period is 90 m 3 / s, the discrete leakage flow in the first period is 82, 83, , 90 m 3 / s.

[0136] (5) Determine the objective function based on the flood water characteristics and calculate the objective function . Make the , The objective function value of the period is the smallest. The best, that is, the first optimization calculation of the algorithm , The objective function value of the time period is the minimum. Refers to the objective function value of the i-th period during the j-th iteration of the algorithm.

[0137] The flood water characteristics refer to the proportion of upstream reservoir water and interval water in the source composition of the flood. Upstream reservoir water: interval water>7:3, the objective function selects the maximum flood control safety guarantee criterion; upstream reservoir water: interval water<3:7, the objective function selects the maximum peak reduction criterion; the ratio of upstream reservoir water: interval water P, 3:7<P<7:3, the objective function selects the combined weight criterion of the maximum peak reduction criterion and the maximum flood control safety guarantee criterion.

[0138] The typical flood corresponding to the embodiment is: the water flow in the upstream reservoir is small and the water flow in the interval is large. Therefore, the flood control optimization criterion is the maximum peak reduction criterion. Under the premise that the maximum water level of the reservoir does not exceed the maximum allowable water level, the smaller the peak flow of the downstream flood control section, the better. Its objective function is to minimize the combined flow of the downstream flood control section: F = my ∑ t = 1 T ∑ i = 1 N [ Q down _ i , t + Q sec_i,t ] 2 .

[0139] (6) Search for the best solution in each time period and advance to The time period (the end of the off-peak period) is adjusted according to the principle of optimizing the time periods in sequence to optimize the overall objective function, until all time periods reach the optimal value, that is, the new optimal objective function value for this off-peak period is obtained. When , one round of algorithm iteration calculation is completed;

[0140] (7) During the dam protection period, the discharge volume is increased in stages according to the dispatching rules until the maximum discharge capacity is reached;

[0141] (8) The water discharge section will first discharge at the maximum discharge capacity. When the forecast information indicates that there will be no rain in the future, the discharge flow will be reduced in stages to ensure the safety of downstream flood control;

[0142] (9) The optimized complete scheduling process corresponds to the objective function The objective function under all reservoir regulation is Compare and judge the optimized objective function Whether the accuracy requirement is met or the objective function is no longer improved. If both of the above judgment conditions are not met, return to step (4) to start a new round of optimization, or reach the set number of optimization iterations, the iteration stops, and the optimal solution is obtained. Refers to the objective function corresponding to the complete scheduling process after the nth optimization. Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation.

[0143] The “objective function no longer improves” here means that the difference between two objective function values ​​is less than 0.0001.

[0144] The accuracy requirement is: the convergence accuracy is 0.0001.

[0145] The “number of optimization iterations” mentioned above means that the number of optimization iterations set by the POA algorithm is 50 times.

[0146] The “return to step (4) to start a new round of optimization” here means: updating the critical period of the scheduling in the complete scheduling process of each reservoir after this optimization to the initial discharge trajectory line, and the other parameter settings remain unchanged.

[0147] (10) Output optimized flood control scheduling plan.

[0148] This example uses seven large and medium-sized reservoirs in the Dawen River Basin from Beiwang to Dawenkou as the research object, and adopts the method of the present invention to carry out joint flood control optimization peak shifting scheduling. When the flood control effect of each reservoir is relatively obvious and the flood lasts for a long time, in the face of complex and changeable flood situations, optimization scheduling can be carried out according to the flood forecast results. The number of time periods for flood optimization can be reduced to establish a joint flood control optimization scheduling model for reservoir groups based on the scheduling key period. While effectively overcoming the "dimensionality disaster", the calculation speed of generating the optimized scheduling plan is significantly improved, and the optimization ability is enhanced, so as to more effectively play the flood control benefits.

[0149] The optimization scheduling of the whole process of the reservoir is compared with the optimization scheduling scheme of the method of the present invention. Among them, the Tiancun Reservoir has no gate control and only performs regular scheduling, and does not participate in the optimization of this method. By comparison, it can be seen that: when the whole process of the reservoir is optimized and scheduled, there are as many as 822 decision variables, the optimization calculation time is about 15 minutes, and there is a problem of low utilization rate of some flood control storage capacity; the method of the present invention can reduce the decision variables to 120, and the optimization calculation time is shortened to about 2 minutes. At the same time, according to different scheduling rules in different scheduling periods, the discharge flow is smaller when the flood peak in the reservoir comes, and the optimization effect is better. It effectively avoids the downstream flood control hidden dangers caused by the sudden increase of the discharge flow during the dam protection period and the water withdrawal period, and the optimization effect is obvious. Therefore, the method of the present invention is used to carry out the joint peak-shifting optimization scheduling of the series-parallel reservoir group, which can significantly improve the calculation speed of the optimization scheduling scheme and improve the optimization ability.

[0150] Table 2

[0151]

[0152] Table 3

[0153]

[0154] The above-described embodiments merely express the implementation methods of the present invention, but they cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A method for optimizing the flood control period based on the dimensionality reduction and peak shifting of multiple reservoirs, characterized in that: The multi-reservoir group dimensionality reduction joint peak shifting optimal operation method described above includes two major stages: the selection of the scheduling critical period and the optimal operation. In the first stage, by analyzing the different flood control tasks of each reservoir in the basin at each time period, multiple scheduling periods are divided, and the peak shifting period is used as the scheduling critical period; In the second stage, the initial solution is generated according to the regulation scheduling, and a multi-reservoir joint peak shifting optimal operation plan that meets flood control safety is quickly generated through the POA algorithm; the multi-reservoir group dimensionality reduction joint peak shifting optimal operation method completes the output of the optimal operation plan by adopting steps 1 - 10: Step 1: Based on the flood forecast information of each flood event, the natural flow process of the downstream flood control section is obtained without any regulation by all reservoirs; Step 2: According to the magnitudes of the warning flow and the guaranteed flow, the scheduling periods of each reservoir are divided, including: the rising water period, the peak shifting period, the dam safety guarantee period, and the falling water period; where T is the total scheduling duration of each flood event, and it is set in this method that the total scheduling duration of each flood event for each reservoir is the same; the total scheduling duration of each flood event is divided into a certain number of time periods in combination with the set optimization step size, and the time period serial numbers are sorted starting from 0; the peak shifting period is selected as the scheduling critical period; Step 3: During the rising water period, each reservoir adopts the regular scheduling, or one-third of the safe discharge downstream of the reservoir is used as the fixed discharge; Step 4: Optimal operation is carried out during the peak shifting period; Step 4.1: First, all reservoirs perform regular scheduling for each flood event; Step 4.2: According to the regular scheduling result in Step 4.1, the corresponding part of its scheduling critical period is used as the initial discharge trajectory line for the POA optimization algorithm for the scheduling critical period of each reservoir in Step 4; Step 4.3: Schedule the total time period of the critical period According to the set optimization step length, it is divided into a certain number of time periods, and the POA algorithm iterative optimization is started; definition: Refers to the objective function value of the i-th period in the j-th iteration process when the POA algorithm performs optimal scheduling for hotspot reservoirs; Refers to the objective function corresponding to the complete scheduling process after the nth optimization, that is, the algorithm optimizes each time period The objective function of the scheduling process generated under the optimal condition is calculated; Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation; Step 5: Determine the objective function based on the flood water characteristics and calculate the objective function ; , The objective function value of the period is the smallest. The best, that is, the first optimization calculation of the algorithm , The objective function value of the time period is the smallest; Refers to the objective function value of the i-th period during the j-th iteration of the algorithm; Step 6: Optimize each time period accordingly until The period, that is, the off-peak period ends, and the new optimal objective function value of this off-peak period is obtained; when the period is adjusted in step 4 When , one round of algorithm iteration calculation is completed; Step 7: During the dam safety guarantee period, the discharge is increased in grades according to the scheduling rules until the maximum discharge capacity; Step 8: During the falling water section, the discharge is first carried out at the maximum discharge capacity. When the forecast information indicates that there is no rain in the later period, the downstream discharge is reduced in grades to ensure the flood control safety of the downstream; Step 9: Correspond the optimized complete scheduling process to the objective function The objective function under all reservoir regulation is For comparison: If the optimized objective function If the accuracy requirement is met or the objective function is no longer improved, the optimization is completed and the optimal solution is obtained; if the optimized objective function If the accuracy requirement is not met or the objective function is not improved, return to step 4 to start a new round of optimization. At this time, if the set number of optimization iterations is reached, the iteration stops and the optimal solution is obtained; Refers to the objective function corresponding to the complete scheduling process after the nth optimization. Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation; Step 10: Output the flood control optimal operation plan according to the optimal solution obtained in Step 9.

2. The method for optimizing the multi-reservoir group water flow by reducing dimension and optimizing the peak shifting operation based on the flood operation period division according to claim 1 is characterized in that: In Step 2 described above, the reservoir scheduling period is divided as follows: The starting time of the rising water period is the starting time of the flood event scheduling, that is, 0h; The end time of the flood season is the period before the start time of the off-peak season, that is, h; The peak period starts at h; regulations h is the starting time when the natural flow of the downstream flood control section exceeds the warning flow h, minus the time required for the reservoir outflow to evolve to the downstream flood control section h, that is ;when At h, the inflow flow is greater than the downstream safety flow. h needs to be advanced to the time when the inflow flow is less than or equal to the end time of the downstream safety flow; The peak period ends at h; regulations h is the end time of the natural flow in the downstream flood control section exceeding the guaranteed flow h, minus the reservoir outflow evolution time h; Due to the error and the fact that the peak time of the downstream flood control section may be delayed after the reservoir peak is staggered, flood control risks may be brought about. For safety reasons, a peak delay should be added. ,Right now ; The starting time of the dam protection period is the next period after the end of the peak-shifting period, that is, h; The flood peak of the downstream flood control section has passed and the flow is lower than the guaranteed flow, but the reservoir is still operating at a high water level, which threatens its own flood control safety. The downstream flow should be increased to quickly lower the reservoir water level, but the duration should not be too long. After the reservoir water level is lowered, the downstream flow should be reduced; End time of the dam protection period; 1 / 5 of the time from the start of the dam protection period to the end of the flood dispatch is classified as the water retreat period ,Right now h; The starting time of the water withdrawal period is the next period after the end of the dam protection period, that is, h; The end time of the water retreat period is the end time of the flood dispatch, that is, h.

3. The method for optimizing the multi-reservoir group water flow by reducing dimension and optimizing the peak shifting operation based on the flood operation period division according to claim 1 is characterized in that: In Step 4.2, the determination method of the initial discharge trajectory line is: directly use the regular scheduling results of the scheduling critical periods of each reservoir participating in the scheduling.

4. The method for optimizing the multi-reservoir group water flow by reducing dimension and optimizing the peak shifting operation based on the flood operation period division according to claim 1 is characterized in that: In Step 4.3 described above: The parameters preset for the iterative optimization of the POA algorithm include: the optimization time step, the optimization iteration times, and the convergence accuracy; the relevant settings of the POA algorithm include: the number of time periods for the flood event scheduling, the allowable minimum water level of each reservoir, the allowable maximum water level of each reservoir, and the final water level of each reservoir; Step 4.3.1: Divide the corresponding part of the scheduling critical period in the initial discharge trajectory line of each reservoir according to this time period, and the time period serial numbers are sorted starting from 0; Fixed reservoirs , Discharge flow rate during period; It represents the starting time of the peak-shifting period of the ath reservoir in the first iterative calculation; Step 4.3.2: Discretize each reservoir according to the algorithm The period of leakage flow is about to , The leakage flow between time periods is 1 m 3 / s is the division value for division, and each reservoir is adjusted Discharge flow during the period.

5. The method for optimizing the multi-reservoir group water flow by reducing dimension and optimizing the peak shifting operation based on the flood operation period division according to claim 1 is characterized in that: In Step 5 described above, the flood event inflow characteristics refer to: in the composition of the flood source, the proportion of the inflow from the upstream reservoir and the inflow from the river reach between two adjacent reservoirs; define the ratio P of the inflow from the upstream reservoir to the inflow from the river reach between two adjacent reservoirs: When P > P1, the objective function selects the maximum flood control safety guarantee criterion; where P1 is 7 / 3 and P2 is 3 / 7; When P < P2, the objective function selects the maximum peak shaving criterion, and P1 > P2; When P2 < P < P1, the objective function selects the combined weight criterion of the maximum peak shaving criterion and the maximum flood control safety guarantee criterion.

6. The method for optimizing the multi-reservoir group water flow by reducing dimension and optimizing the peak shifting operation based on the flood operation period division according to claim 1 is characterized in that: In step 5, the objective function is specifically: Step 5.1: Take the maximum flood control safety guarantee criterion as the flood control optimization criterion, that is, the maximum and minimum flood control storage capacity occupied by each reservoir is taken as the objective function: ; Where: F is the objective function value; T is the total time of flood dispatch; N is the total number of reservoirs; i is the reservoir number; t is the time period number; is the water storage capacity of reservoir i in period t, m 3 ; Step 5.2: Express the flood control optimization objective function using the maximum peak reduction criterion: ; Where: is the interval inflow of reservoir i in period t, m 3 / s; is the discharge flow of reservoir i at period t, evolving through Muskingum to the downstream flood control section, m 3 / s; Step 5.3: The combined weight criterion of the maximum peak shaving criterion and the maximum flood control safety guarantee criterion, the objective function of which can be expressed as: ; Where: is the weight coefficient of the maximum peak shaving criterion objective function; is the weight coefficient of the objective function of the maximum flood control safety guarantee criterion.

7. The method for optimizing the multi-reservoir group water flow by reducing dimension and optimizing the peak shifting operation based on the flood operation period division according to claim 1 is characterized in that: In step 9: The "accuracy requirement" mentioned above means: the convergence accuracy is 0.0001; The "objective function no longer improves" means: the difference between two objective function values ​​is less than 0.0001; The "return to step 4 to start a new round of optimization" means: updating the critical period of the scheduling in the complete scheduling process of each reservoir after this optimization to the initial discharge trajectory line, and the other parameter settings remain unchanged.