End-to-end-based supply chain logistics management platform
By choosing appropriate warehousing and transportation methods based on an end-to-end supply chain logistics management platform, we solve the problems of insufficient warehouse processing capacity and uneven revenue distribution in the existing technology, achieve efficient logistics planning and cost reduction, and improve supply efficiency. chain stability and customer satisfaction.
Patent Information
- Application Number
- CN202411281450.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing technology, logistics supply chain resource collaboration often selects warehouses with similar geographical locations, resulting in insufficient warehouse processing capacity, order delays, reduced customer satisfaction, and uneven distribution of income, affecting the stable operation of the supply chain alliance.
Design an end-to-end supply chain logistics management platform. Through the data acquisition module, data analysis module, plan generation module and result generation module, obtain the order information of the target enterprise, calculate the estimated shipping cycle and transportation cost of the candidate warehousing, and select transportation Logistics planning route with the lowest cost, select appropriate warehousing for logistics planning, ensure transportation is completed within a reasonable time and reduce operating costs.
It achieves efficient supply chain management and logistics planning, avoids distribution overtime problems caused by low warehouse efficiency, reduces transportation costs, and improves supply chain collaboration efficiency and fairness of revenue distribution.
Smart Images

Figure CN118798783A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of logistics management, and in particular to an end-to-end supply chain logistics management platform. Background Art
[0002] Supply chain refers to a complete supply chain formed by integrating multiple logistics around a core logistics enterprise. Simply put, it is a supply chain structure that connects suppliers, manufacturers, distributors and end users, starting from matching parts, making intermediate products and final products, and finally delivering products to consumers through sales networks. As an organic logistics chain, it is a chain formed by all logistics activities involved in economic activities within the time range from the market demand for products or services to the satisfaction of demand.
[0003] Supply chain resource collaboration is achieved through collaboration at the organizational level, that is, each enterprise clearly defines the division of labor and responsibilities, and integrates on the basis of cooperation; it also includes collaboration at the business process level, that is, breaking the boundaries of enterprises and integrating processes around meeting the needs of end customers; and collaboration at the information level is achieved through Internet technology to integrate information systems between supply chain partners and share operational and market data in real time. Only by achieving collaboration at these three levels can the entire supply chain respond to market demand more quickly, jointly resist risks, and provide the best quality products and services at the lowest cost.
[0004] In the prior art, logistics supply chain resource collaboration often chooses warehouses with similar geographical locations to establish. The original intention of this approach is to improve the supply efficiency of the entire logistics chain by reducing the distance and duration of logistics transportation. However, this ignores the actual processing capacity of the warehouse to a certain extent. It may happen that a warehouse has limited processing capacity. When the amount of goods is large, the warehouse cannot handle a large amount of goods in time, which may lead to order delays, affect customer satisfaction, and lead to uneven distribution among warehouses. At the same time, a warehouse may be overused due to its superior geographical location, while some warehouses may be neglected due to their inferior geographical location, resulting in unreasonable distribution of benefits among warehouses in supply chain resource collaboration. In supply chain resource collaboration, it is not only required to solve the problem of matching the task requirements of each link of the supply chain with enterprise resources, but also to ensure the balance of interests of warehouses of each part of the enterprise. Whether the distribution of benefits between warehouses operating in collaboration in the supply chain alliance is reasonable will directly affect the stable operation of the supply chain alliance. Therefore, how to reduce operating costs while ensuring the stability of supply chain collaboration is an urgent problem to be solved in this field. Summary of the invention
[0005] The purpose of the present invention is to provide an end-to-end supply chain logistics management platform to solve the following technical problems: In the prior art, logistics supply chain resource collaboration often chooses warehouses with similar geographical locations to establish. The original intention of this approach is to improve the supply efficiency of the entire logistics chain by reducing the distance and duration of logistics transportation. However, this ignores the actual processing capacity of the warehouse to a certain extent. It may happen that a warehouse has limited processing capacity. When the amount of goods is large, the warehouse cannot handle a large amount of goods in time, which may lead to order delays, affect customer satisfaction, and lead to uneven distribution among warehouses. At the same time, a warehouse may be overused due to its superior geographical location, while some warehouses may be neglected due to their inferior geographical location, resulting in unreasonable distribution of benefits among warehouses in supply chain resource collaboration. In supply chain resource collaboration, it is not only required to solve the problem of matching the task requirements of each link of the supply chain with enterprise resources, but also to ensure the balance of interests of warehouses of each part of the enterprise. Whether the distribution of benefits between warehouses operating in collaboration in the supply chain alliance is reasonable will directly affect the stable operation of the supply chain alliance. Therefore, how to reduce operating costs while ensuring the stability of supply chain collaboration is an urgent problem to be solved in this field.
[0006] The purpose of the present invention can be achieved through the following technical solutions: An end-to-end supply chain logistics management platform, including: A data acquisition module is used to acquire the purchase and / or sales order of the target enterprise and perform available inventory analysis on the purchase and / or sales order to obtain the purchase and / or sales order item information, order time limit and target address of the target enterprise; the order item information includes item type and item quantity; A data analysis module is used to search a preset supply warehouse list according to the order item information to obtain a number of candidate warehouses, obtain the location information and order information of any candidate warehouse, the order information includes the current order demand and warehouse delivery efficiency, and calculate the expected delivery cycle of any candidate warehouse according to the order demand and warehouse delivery efficiency; the warehouse delivery efficiency is the average rate at which the candidate warehouse is fully shipped within the supply cycle; The plan generation module is used to select any candidate warehouse and obtain the location information of the candidate warehouse, perform multimodal transport route planning according to the location information and the target address, obtain several planned routes and mark them as D1, D2, ..., Dn, calculate the transportation time of all planned routes in turn and mark them as t1, t2, ..., tn, if there is any planned route whose transportation time ti is less than or equal to (HT), where H is the order time limit and T is the expected delivery cycle of the candidate warehouse, then the planned route is retained; if there is any planned route whose transportation time ti is greater than (HT), then the planned route is eliminated; obtain all reserved planned routes and mark them as D1, D2, ..., Dm, calculate the transportation costs of all reserved planned routes in turn, select the reserved planned route with the smallest transportation cost from all reserved planned routes as the logistics planning route of the candidate warehouse, and obtain the logistics planning routes corresponding to all candidate warehouses; The result generation module is used to obtain the transportation costs of all candidate warehouses corresponding to the logistics planning routes, select the candidate warehouse corresponding to the logistics planning route with the lowest transportation cost as the target warehouse, and establish a supply chain contract between the target warehouse and the target enterprise.
[0007] As a further solution of the present invention: In the data analysis module, the specific process of obtaining the estimated delivery cycle of the candidate warehouse is as follows: Get the current order volume M of the candidate warehouse and the number of items in the target enterprise's purchase or sales order N, and calculate the expected delivery cycle T of the candidate warehouse according to the calculation formula T=(M+N) / V, where V is the delivery efficiency of the candidate warehouse.
[0008] As a further solution of the present invention: the plan generation module also includes adopting multimodal transport to plan logistics routes, wherein the multimodal transport includes sea and land transport, air transport, road transport, rail transport and inland waterway transport.
[0009] As a further solution of the present invention: the specific calculation process of multimodal transport route planning is: Construct a virtual network state graph \(G=(A, E, W)\), where the set of transportation modes \(A = \{A_{iW}|1\leq i\leq u, 1\leq W\leq w\}\) represents the set of all transportation modes that the goods can choose at node \(i\). Here, \(i\) represents the node number, \(u\) represents the total number of nodes, \(W\) represents the transportation mode number, and \(w\) represents the total number of transportation modes. The edge set \(E=\{(A_{iW},A_{jW})(A_{iL},A_{jK})|1\leq i < j\leq u, 1\leq w\neq l\neq k\leq w\}\) represents the set of edges through which the goods can be transported between node \(i\) and node \(j\). Among them, \((A_{iW},A_{jW})\) represents a transportation arc, and \((A_{iL},A_{jK})\) represents a conversion arc. \(L\) is the transportation mode number of the goods at node \(i\), and \(K\) is the transportation mode number of the goods at node \(j\). Use the DFS algorithm to calculate all reachable paths from the location of the candidate warehouse to the target address in the virtual network state graph \(G=(A, E, W)\).
[0010] As a further solution of the present invention: in the plan generation module, if there are two or more reserved planning routes with the same corresponding transportation cost in any candidate warehouse, then select the reserved planning route with the shortest transportation time as the logistics planning route of the candidate warehouse As a further solution of the present invention: in the result generation module, if there are two or more logistics planning routes with the same corresponding transportation cost, then select the candidate warehouse corresponding to the logistics planning route with the shortest transportation time as the target warehouse, and establish a logistics supply chain between the target warehouse and the target enterprise.
[0011] As a further solution of the present invention: in the plan generation module, it also includes that if the transportation time \(t_i\) of all planning routes of any candidate warehouse is greater than \((H - T)\), then mark this candidate warehouse as a risk warehouse, and select the planning route with the shortest transportation time as the logistics planning route of the risk warehouse.
[0012] As a further solution of the present invention: if the transportation time \(t_i\) of the planning routes corresponding to all candidate warehouses is greater than \((H - T)\), then select the risk warehouse corresponding to the logistics planning route with the shortest transportation time as the target warehouse.
[0013] The beneficial effects of the present invention: The present invention first obtains order item information according to the purchase or sales order of the target enterprise, searches the preset supply warehouse list according to the order item information, and obtains several candidate warehouses. It can be understood that the several candidate warehouses are the goods warehouses of the enterprises corresponding to all upstream nodes of the target enterprise, obtains the location information and order information of any candidate warehouse, and calculates the expected delivery cycle of any candidate warehouse according to the order quantity and delivery efficiency; it can be understood that in any warehouse, there are often existing orders that have not been shipped before the target enterprise places an order, so the target enterprise can be calculated according to the order quantity, order item information and warehouse delivery efficiency. The shipping cycle of the goods is estimated after the enterprise places an order, and the logistics transportation route of any candidate warehouse is planned according to the estimated shipping cycle and the order time limit, and the logistics planning routes corresponding to all candidate warehouses are obtained. The transportation costs of the logistics planning routes corresponding to all candidate warehouses are obtained, and the candidate warehouse corresponding to the logistics planning route with the lowest transportation cost is selected as the target warehouse, and a logistics supply chain between the target warehouse and the target enterprise is established. It can be understood that by calculating and comparing the logistics costs of different candidate warehouses under consideration of the shipping cycle and the transportation cycle, the overall optimal warehouse and logistics are selected, thereby achieving efficient supply chain management and logistics planning. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The present invention will be further described below in conjunction with the accompanying drawings.
[0015] Figure 1 It is a schematic diagram of a flow chart of an end-to-end supply chain logistics management platform of the present invention. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] See also Figure 1 As shown, the present invention is an end-to-end supply chain logistics management platform, comprising: A data acquisition module is used to acquire the purchase and / or sales order of the target enterprise and perform available inventory analysis on the purchase and / or sales order to obtain the purchase and / or sales order item information, order time limit and target address of the target enterprise; the order item information includes item type and item quantity; A data analysis module is used to search a preset supply warehouse list according to the order item information to obtain a number of candidate warehouses, obtain the location information and order information of any candidate warehouse, the order information includes the current order demand and warehouse delivery efficiency, and calculate the expected delivery cycle of any candidate warehouse according to the order demand and warehouse delivery efficiency; the warehouse delivery efficiency is the average rate at which the candidate warehouse is fully shipped within the supply cycle; The plan generation module is used to select any candidate warehouse and obtain the location information of the candidate warehouse, perform multimodal transport route planning according to the location information and the target address, obtain several planned routes and mark them as D1, D2, ..., Dn, calculate the transportation time of all planned routes in turn and mark them as t1, t2, ..., tn, if there is any planned route whose transportation time ti is less than or equal to (HT), where H is the order time limit and T is the expected delivery cycle of the candidate warehouse, then the planned route is retained; if there is any planned route whose transportation time ti is greater than (HT), then the planned route is eliminated; obtain all reserved planned routes and mark them as D1, D2, ..., Dm, calculate the transportation costs of all reserved planned routes in turn, select the reserved planned route with the smallest transportation cost from all reserved planned routes as the logistics planning route of the candidate warehouse, and obtain the logistics planning routes corresponding to all candidate warehouses; The result generation module is used to obtain the transportation costs of all candidate warehouses corresponding to the logistics planning routes, select the candidate warehouse corresponding to the logistics planning route with the lowest transportation cost as the target warehouse, and establish a supply chain contract between the target warehouse and the target enterprise.
[0018] The present invention first obtains order item information according to the purchase or sales order of the target enterprise, searches the preset supply warehouse list according to the order item information, and obtains several candidate warehouses. It can be understood that the several candidate warehouses are the goods warehouses of the enterprises corresponding to all upstream nodes of the target enterprise or the goods warehouses operated by the target enterprise itself, obtains the location information and order information of any candidate warehouse, and the order information includes the current order quantity and warehouse dispatch efficiency. The estimated delivery cycle of any candidate warehouse is calculated according to the order quantity and dispatch efficiency; it can be understood that in any warehouse, there are often existing orders that have not been dispatched before the target enterprise places an order, so according to the order quantity, order items, etc. The information and warehouse dispatch efficiency can calculate the expected delivery cycle of goods after the target enterprise places an order, and plan the logistics transportation route of any candidate warehouse according to the expected delivery cycle and order time limit, and obtain the logistics planning routes corresponding to all candidate warehouses, obtain the transportation costs of the logistics planning routes corresponding to all candidate warehouses, select the candidate warehouse corresponding to the logistics planning route with the lowest transportation cost as the target warehouse, and establish a logistics supply chain between the target warehouse and the target enterprise. It can be understood that by calculating and comparing the logistics costs of different candidate warehouses under the consideration of the delivery cycle and transportation cycle, the warehouse and logistics with higher overall efficiency are selected, thereby realizing efficient supply chain management and logistics planning.
[0019] It is worth noting that the purchase and / or sales order information from the target enterprise is obtained, so as to know the order item content and the order delivery address corresponding to the order. The order target address usually has more supply warehouses for the corresponding items. In the prior art, at this step, a sourcing strategy is adopted and the nearest warehouse with inventory is directly selected as the supply end of the logistics chain. It can be understood that the nearest warehouse with inventory is used as the supply end, which theoretically has the advantages of the shortest logistics transportation time and the lowest transportation cost, but the current order volume of the warehouse is not taken into account. It can be understood that there are often existing orders that have not been issued in any warehouse before the target enterprise places an order. If the supply is regularized by adopting a sourcing strategy alone, there may be a large number of orders in the current warehouse, resulting in delayed shipment of goods and reduced customer satisfaction, which affects the credibility of the supply chain collaboration platform. In this application, all warehouses with the inventory are obtained to obtain the current order volume and the number of orders issued in their shared warehouses. Efficiency can be used to judge the time it takes for the warehouse to ship the order. At the same time, several logistics routes are generated according to the location of the warehouse and the target address. It is judged that each logistics route selects the warehouse with the lowest transportation cost as the target warehouse without timeout. This can effectively avoid the problem of delivery timeout due to low warehouse efficiency or the problem of increased transportation cost due to changing the mode of transportation due to delivery timeout. It can be understood that in the coordination of supply chain resources, it is required not only to solve the problem of matching the task requirements of each link of the supply chain with the resources of the enterprise, but also to ensure the balance of interests of each part of the enterprise. Whether the profit distribution between the collaborative enterprises in the supply chain alliance is reasonable will directly affect the stable operation of the supply chain alliance. Therefore, the present invention considers the actual order volume in all warehouses and jointly regulates the supply chain through routing strategies and sourcing strategies, which not only realizes the reasonable allocation of orders between enterprises, but also reduces the operating cost of the supply chain and improves the operating efficiency.
[0020] In the present invention, multimodal transport route planning is adopted. Multimodal transport is also called multimodal transport or composite transport. It is a method of moving goods from the starting point to the end point using two or more different modes of transport (such as sea, land, rail, road and air transport). This mode of transport is designed to improve transportation efficiency, reduce costs and provide more flexibility. Therefore, in the present invention, the transportation time of all planned routes is first calculated in sequence and marked as t1, t2, ..., tn, and the planned routes are screened according to (HT). The planned route with the lowest transportation cost after screening is selected as the logistics transportation route of the warehouse. Through strict screening of the transportation time, it is ensured that all selected routes can be completed within the delivery time required by the customer. Under the premise of meeting the time constraint, the selection of the lowest cost transportation route can significantly reduce the logistics cost. For example, by avoiding emergency transportation methods (such as air transportation), a more economical transportation method (such as sea, land or rail) is adopted without affecting the delivery time, so as to improve the supply chain coordination efficiency and reduce the logistics transportation cost.
[0021] In another preferred situation of this embodiment, in the data analysis module, the specific process of obtaining the estimated delivery cycle of the candidate warehouse is: Get the current order volume M of the candidate warehouse and the number of items in the target enterprise's purchase or sales order N, and calculate the expected delivery cycle T of the candidate warehouse according to the calculation formula T=(M+N) / V, where V is the delivery efficiency of the candidate warehouse.
[0022] It is understandable that in any warehouse there are often existing orders that have not been shipped before the target enterprise places an order. Therefore, when the target enterprise places an order with any warehouse, it is necessary to consider the target warehouse's shipping efficiency and order volume to make a selection. It is understandable that when any warehouse is determined, the warehouse's shipping time can be estimated based on the warehouse's order volume and the target enterprise's order volume divided by the warehouse's shipping efficiency.
[0023] In another preferred situation of this embodiment, the plan generation module also includes adopting multimodal transport to plan logistics routes, wherein the multimodal transport includes sea and land transport, air transport, road transport, rail transport and inland waterway transport.
[0024] In another preferred embodiment of the present invention, the specific calculation process of multimodal transport route planning is as follows: Construct a virtual network state graph \(G=(A, E, W)\), where the set of transportation modes \(A = \{A_{iW}|1\leq i\leq u, 1\leq W\leq w\}\) represents the set of all transportation modes that the goods can choose at node \(i\). Here, \(i\) represents the node number, \(u\) represents the total number of nodes, \(W\) represents the transportation mode number, and \(w\) represents the total number of transportation modes. The edge set \(E=\{(A_{iW},A_{jW})(A_{iL},A_{jK})|1\leq i\lt j\leq u, 1\leq w\neq l\neq k\leq w\}\) represents the set of edges through which the goods can be transported between node \(i\) and node \(j\). Among them, \((A_{iW},A_{jW})\) represents a transportation arc, and \((A_{iL},A_{jK})\) represents a conversion arc. \(L\) is the transportation mode number of the goods at node \(i\), and \(K\) is the transportation mode number of the goods at node \(j\). Use the DFS algorithm to calculate all reachable paths from the location of the candidate warehouse to the target address in the virtual network state graph \(G=(A, E, W)\).
[0025] In another preferred case of this embodiment, in the plan generation module, if the transportation costs corresponding to two or more reserved planning routes in any candidate warehouse are the same, then select the reserved planning route with the shortest transportation time as the logistics planning route of this candidate warehouse.
[0026] In another preferred case of this embodiment, in the result generation module, if the transportation costs corresponding to two or more logistics planning routes are the same, then select the candidate warehouse corresponding to the logistics planning route with the shortest transportation time as the target warehouse, and establish a logistics supply chain between the target warehouse and the target enterprise.
[0027] In another preferred case of this embodiment, in the plan generation module, it also includes that if the transportation time \(t_i\) of all planning routes of any candidate warehouse is greater than \((H - T)\), then mark this candidate warehouse as a risk warehouse, and select the planning route with the shortest transportation time as the logistics planning route of the risk warehouse.
[0028] In another preferred case of this embodiment, if the transportation time \(t_i\) of the planning routes corresponding to all candidate warehouses is greater than \((H - T)\), then select the candidate warehouse corresponding to the logistics planning route with the shortest transportation time as the target warehouse.
[0029] The above has described an embodiment of the present invention in detail, but the content is only a preferred embodiment of the present invention and cannot be considered as limiting the scope of implementation of the present invention. All equivalent changes and improvements made according to the scope of the present invention application should still fall within the patent coverage scope of the present invention.
Claims
1. An end-to-end supply chain logistics management platform, characterized by: include: A data acquisition module is used to acquire the purchase and / or sales order of the target enterprise and perform available inventory analysis on the purchase and / or sales order to obtain the purchase and / or sales order item information, order time limit and target address of the target enterprise; the order item information includes item type and item quantity; A data analysis module is used to search a preset supply warehouse list according to the order item information to obtain a number of candidate warehouses, obtain the location information and order information of any candidate warehouse, the order information includes the current order demand and warehouse delivery efficiency, and calculate the expected delivery cycle of any candidate warehouse according to the order demand and warehouse delivery efficiency; the warehouse delivery efficiency is the average rate at which the candidate warehouse is fully shipped within the supply cycle; The plan generation module is used to select any candidate warehouse and obtain the location information of the candidate warehouse, perform multimodal transport route planning according to the location information and the target address, obtain several planned routes and mark them as D1, D2, ..., Dn, calculate the transportation time of all planned routes in turn and mark them as t1, t2, ..., tn, if there is any planned route whose transportation time ti is less than or equal to (HT), where H is the order time limit and T is the expected delivery cycle of the candidate warehouse, then the planned route is retained; if there is any planned route whose transportation time ti is greater than (HT), then the planned route is eliminated; obtain all reserved planned routes and mark them as D1, D2, ..., Dm, calculate the transportation costs of all reserved planned routes in turn, select the reserved planned route with the smallest transportation cost from all reserved planned routes as the logistics planning route of the candidate warehouse, and obtain the logistics planning routes corresponding to all candidate warehouses; The result generation module is used to obtain the transportation costs of all candidate warehouses corresponding to the logistics planning routes, select the candidate warehouse corresponding to the logistics planning route with the lowest transportation cost as the target warehouse, and establish a supply chain contract between the target warehouse and the target enterprise.
2. The end-to-end supply chain logistics management platform according to claim 1, characterized in that: In the data analysis module, the specific calculation process of the delivery cycle is: Get the current order volume M of the candidate warehouse and the number of items in the target enterprise's purchase or sales order N, and calculate the expected delivery cycle T of the candidate warehouse according to the calculation formula T=(M+N) / V, where V is the delivery efficiency of the candidate warehouse.
3. The end-to-end supply chain logistics management platform according to claim 1, characterized in that: The plan generation module also includes adopting multimodal transport to plan logistics routes, wherein the multimodal transport includes sea and land transport, air transport, road transport, rail transport and inland waterway transport.
4. The end-to-end supply chain logistics management platform according to claim 1, characterized in that: The specific calculation process of multimodal transport route planning is as follows: Construct a virtual network state graph \(G=(A, E, W)\), where the set of transportation modes \(A = \{A_{iW}|1\leq i\leq u, 1\leq W\leq w\}\) represents the set of all transportation modes that the goods can choose at node \(i\), \(i\) represents the node number, \(u\) represents the total number of nodes, \(W\) represents the transportation mode number, and \(w\) represents the total number of transportation modes; the edge set \(E=\{(A_{iW}, A_{jW})(A_{iL}, A_{jK})|1\leq i < j\leq u, 1\leq w\neq l\neq k\leq w\}\) represents the set of edges through which the goods can be transported between node \(i\) and node \(j\), where \((A_{iW}, A_{jW})\) represents a transportation arc and \((A_{iL}, A_{jK})\) represents a conversion arc, \(L\) is the transportation mode number of the goods at node \(i\), and \(K\) is the transportation mode number of the goods at node \(j\); use the DFS algorithm to calculate all reachable paths from the location of the candidate warehouse to the target address in the virtual network state graph \(G=(A, E, W)\).
5. The end-to-end supply chain logistics management platform according to claim 1, characterized in that: In the said plan generation module, if there are two or more reserved planned routes in any candidate warehouse with the same corresponding transportation cost, then select the reserved planned route with the shortest transportation time as the logistics planned route of this candidate warehouse.
6. The end-to-end supply chain logistics management platform according to claim 1, characterized in that: In the said result generation module, if there are two or more logistics planned routes with the same corresponding transportation cost, then select the candidate warehouse corresponding to the logistics planned route with the shortest transportation time as the target warehouse, and establish a logistics supply chain between the target warehouse and the target enterprise.
7. The end-to-end supply chain logistics management platform according to claim 1, characterized in that: In the said plan generation module, it also includes that if the transportation time \(t_i\) of all planned routes of any candidate warehouse is greater than \((H - T)\), then mark this candidate warehouse as a risky warehouse, and select the planned route with the shortest transportation time as the logistics planned route of the risky warehouse.
8. The end-to-end supply chain logistics management platform according to claim 1, characterized in that: If the transportation time \(t_i\) of the planned routes corresponding to all candidate warehouses is greater than \((H - T)\), then select the risky warehouse corresponding to the logistics planned route with the shortest transportation time as the target warehouse.
Citation Information
Patent Citations
Calculation method of multimodal transport scheme
CN110490391A
Transaction method and system based on supply chain information collaborative sharing
CN115423217A
Electric power material storage and distribution method based on Internet of Things
CN116258430A
System and method for operation management of logistics center
US20090089150A1
Cited By
Logistics distribution optimization method and system based on multi-source data
CN120562671A
