Method and system for grouting, reinforcing and lifting building foundation on hillside
By arranging slope top curtain walls, anti-sliding pile foundations and slope foot curtain walls at the foundations of buildings on the hillside, and performing transverse grouting reinforcement and lifting, the problems of foundation settlement and slippage on the hillside are solved, and the stability of the building foundations is improved. and slip resistance.
Patent Information
- Application Number
- CN202411193196.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-10-22
AI Technical Summary
The existing grouting reinforcement and lifting methods are mainly aimed at flat buildings, and are difficult to effectively solve the settlement and slippage problems of building foundations on hillside. There is a lack of reinforcement and lifting methods for hillside foundations.
Arrange top-of-slope curtain walls, anti-sliding pile foundations and slope-foot curtain walls on the hillside, and arrange reinforcement and lifting holes at even intervals under the raft foundation of the building. A reinforcement and lifting layer is formed through transverse drilling and grouting to prevent groundwater flow and Increase foundation stability and anti-skid strength.
It effectively prevents groundwater from infiltrating the building foundation, increases foundation stability and anti-sliding force, avoids settlement and slipping, and realizes foundation reinforcement and uplift of buildings on hillside.
Smart Images

Figure CN118814756A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building foundation lifting and reinforcement, and in particular to a method and system for grouting reinforcement and lifting of a building foundation on a hillside. Background Art
[0002] With the rise of the land development boom, the number of development projects in some mountainous areas is increasing. It is difficult to have flat land in mountainous areas. The foundations of buildings on hillsides are often formed by filling and cutting. At the same time, the precipitation in mountainous areas is abundant, and the foundations of hillsides are prone to slide along the slope, and settlement of building foundations often occurs. The existing methods of grouting reinforcement and lifting of building foundations are all aimed at buildings on flat ground, and rarely involve the reinforcement and lifting of the foundations of buildings on hillsides. Therefore, a method for reinforcing and lifting buildings on hillsides is urgently needed. Summary of the invention
[0003] The purpose of the present invention is to solve at least one technical problem in the background technology and to provide a method and system for grouting reinforcement and lifting of the foundation of a building on a hillside.
[0004] To achieve the above object, the present invention provides a method for grouting reinforcement and lifting of a building foundation on a hillside, comprising:
[0005] The slope top curtain wall is arranged on the side of the building raft foundation close to the top of the hill at the top of the upslope;
[0006] Arrange anti-sliding pile foundations perpendicular to the slope on the hillside;
[0007] Arrange a foot curtain wall at the foot of the slope close to the slope surface;
[0008] Reinforcement and lifting holes for reinforcing and lifting the building are evenly arranged at intervals on the hillside below the raft foundation of the building;
[0009] Carry out transverse drilling and grouting according to the reinforcement and lifting hole positions to reinforce and lift the buildings.
[0010] According to one aspect of the present invention, the slope top curtain wall is arranged on the side of the building raft foundation at the top of the uphill slope close to the top of the mountain:
[0011] On the side of the raft foundation of the building close to the top of the mountain, holes are drilled vertically downwards to the rock layer to form multiple spaced curtain holes, and then grouting is injected into the curtain holes. The grouting ranges of two adjacent curtain holes interlock and overlap with each other to form a slope top curtain wall.
[0012] According to one aspect of the present invention, the anti-sliding pile foundation arranged vertically on the slope surface of the hillside is:
[0013] The pile foundation holes are arranged in an array on the slope surface, and then holes are drilled perpendicular to the slope surface based on the pile foundation hole positions. Each hole is made to penetrate into the rock layer to a certain depth, and then grouting is injected into each hole to reinforce the slope soil to form an anti-slip pile foundation.
[0014] According to one aspect of the present invention, the step of arranging a foot curtain wall at the side of the foot of the slope close to the slope surface comprises:
[0015] On one side of the foot of the slope close to the slope surface, holes are drilled vertically downwards to the rock layer to form multiple curtain holes at intervals, and grouting is injected into the curtain holes. The grouting ranges of two adjacent curtain holes overlap with each other to form a curtain wall at the foot of the slope.
[0016] According to one aspect of the present invention, the reinforcement and lifting holes for reinforcing and lifting the building are evenly arranged at intervals on the hillside below the raft foundation of the building, comprising:
[0017] A plurality of exploration points are set at both ends and the center of the edge of the raft foundation close to the slope surface of the hillside;
[0018] Measure the vertical depth of each exploration point down to the rock layer and determine the maximum depth;
[0019] Extending horizontally toward the hillside surface according to the maximum depth to obtain an intersection point with the hillside surface, the intersection point being used as the reinforcement lifting hole position at the bottom of the uphill surface;
[0020] Measure the straight-line distance between the intersection point and the top edge of the uphill slope;
[0021] The number of reinforcement and lifting hole positions and the position of each reinforcement and lifting hole position in the X-axis direction of the slope surface are calculated according to the intersection point and the straight-line distance;
[0022] Draw multiple straight lines parallel to the top edge of the slope through each reinforcement lifting hole in the X-axis direction of the slope surface toward the Y-axis direction of the slope surface;
[0023] The positions corresponding to the exploration points are marked on each straight line as the reinforcement and lifting hole positions in the Y-axis direction, thereby completing the reinforcement and lifting hole position arrangement.
[0024] According to one aspect of the present invention, the number n of the reinforcement and lifting holes is: n=L / 5, wherein L is the straight-line distance between the intersection point and the top edge of the uphill slope.
[0025] According to one aspect of the present invention, the transverse drilling and grouting is performed according to each reinforcement and lifting hole position to reinforce and lift the building:
[0026] Drill holes in the horizontal direction at each reinforcement and lifting hole position, and after drilling to the edge of the rock layer and / or the slope top curtain wall, grouting is performed through the drilling holes to form a reinforcement and lifting layer under the raft foundation, thereby realizing a reinforced and lifted building.
[0027] According to one aspect of the present invention, along the Y-axis direction of the hillside, the edges of the slope foot curtain wall and the anti-slide pile foundation are aligned, and the width of the slope foot curtain wall and the anti-slide pile foundation is greater than the width of the building raft foundation, and the center line of the building raft foundation is aligned with the center line of the slope foot curtain wall and the anti-slide pile foundation.
[0028] According to one aspect of the present invention, the width of the slope foot curtain wall and the anti-sliding pile foundation and the width of the building raft foundation satisfy the following formula: c=2a+b, wherein c is the width of the slope foot curtain wall and the anti-sliding pile foundation, b is the width of the raft foundation, a is the width difference between one side and the other side of the raft foundation and the slope foot curtain wall and the anti-sliding pile foundation respectively, and a=0.5b-1b.
[0029] To achieve the above object, the present invention also provides a grouting reinforcement and lifting system for building foundation on a hillside, comprising:
[0030] The slope top curtain wall arrangement module is to arrange the slope top curtain wall on the side of the building raft foundation close to the top of the hill at the top of the uphill slope;
[0031] Anti-slide pile foundation arrangement module, arranging anti-slide pile foundations vertical to the slope surface on the hillside;
[0032] The slope foot curtain wall arrangement module arranges the slope foot curtain wall on the side of the slope foot close to the slope surface;
[0033] A reinforcement and lifting hole arrangement module is used to evenly arrange reinforcement and lifting holes for reinforcing and lifting the building on the hillside below the raft foundation of the building;
[0034] The grouting reinforcement and lifting module performs horizontal drilling and grouting according to each reinforcement and lifting hole position to reinforce and lift the building.
[0035] According to the solution of the present invention, the present invention forms a slope-top curtain wall through grouting, which blocks the downward flow of groundwater at high altitudes and changes the path of groundwater to flow away from both sides of the curtain wall, thereby preventing groundwater from directly infiltrating the foundation slope of the building and avoiding settlement of the building after foundation damage.
[0036] The present invention achieves the purpose of strengthening the foot and waist by arranging anti-slip pile foundations and slope foot curtain walls, thereby increasing the stability of the building slope foundation. The anti-slip pile foundation produces a bonding effect with the soil around the pile foundation, increasing the friction between the interfaces, and improving the bearing capacity and anti-slip force of the slope foundation. The slope foot curtain wall can increase the strength of the soil layer at the slope foot, stabilize the slope foot, prevent large-scale sliding of the building slope foundation, and also increase the anti-slip force of the slope, making the slope foundation more stable.
[0037] The present invention reinforces and elevates the building by horizontal grouting on the slope, thereby solving the problem that drilling and grouting cannot be performed indoors in the building. Meanwhile, the horizontal grouting can better control the range of grouting and better achieve the purpose of lifting. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 A flow chart schematically showing a method for reinforcing and lifting a foundation of a building on a hillside by grouting according to an embodiment of the present invention;
[0039] Figure 2 This is a cross-sectional view of the grouting reinforcement of the building foundation in Example 1;
[0040] Figure 3 A top view of the grouting reinforcement of the building foundation in Example 1;
[0041] Figure 4 A top view of the lifting hole position for grouting reinforcement of the building foundation in Example 1;
[0042] Figure 5 This is a side view of the lifting hole position for grouting reinforcement of the building foundation in Example 1;
[0043] Figure 6 This is a schematic diagram of the grouting reinforcement and lifting of the building foundation in Example 1;
[0044] Figure 7a-7c This is a schematic diagram of the segmented forward grouting of Example 1. DETAILED DESCRIPTION
[0045] The present invention will now be discussed with reference to exemplary embodiments. It should be understood that the embodiments discussed are only to enable those skilled in the art to better understand and thus implement the present invention, rather than implying any limitation on the scope of the present invention.
[0046] As used herein, the term “including” and variations thereof are to be interpreted as open-ended terms meaning “including, but not limited to.” The term “based on” is to be interpreted as “based, at least in part, on.” The terms “one embodiment” and “an embodiment” are to be interpreted as “at least one embodiment.”
[0047] Figure 1The flowchart schematically shows a method for reinforcing and lifting the foundation of a building on a hillside by grouting according to one embodiment of the present invention. Figure 1 As shown, in this embodiment, the method for grouting reinforcement and lifting of the foundation of a building on a hillside includes:
[0048] The slope top curtain wall is arranged on the side of the building raft foundation close to the top of the hill at the top of the upslope;
[0049] Arrange anti-sliding pile foundations perpendicular to the slope on the hillside;
[0050] Arrange a foot curtain wall at the foot of the slope close to the slope surface;
[0051] Reinforcement and lifting holes for reinforcing and lifting the building are evenly arranged at intervals on the hillside below the raft foundation of the building;
[0052] Carry out transverse drilling and grouting according to the reinforcement and lifting hole positions to reinforce and lift the buildings.
[0053] Further, according to an embodiment of the present invention, a slope top curtain wall is arranged on the side of the building raft foundation at the top of the uphill slope close to the top of the mountain:
[0054] On the side of the raft foundation of the building close to the top of the mountain, vertical holes are drilled downwards to the rock layer to form multiple curtain holes at intervals, and then grouting is injected into the curtain holes. The grouting ranges of two adjacent curtain holes overlap each other to form a slope top curtain wall. In this way, the slope top curtain wall can block the downward flow of groundwater at high altitudes, and change the path of groundwater to flow away from both sides of the slope top curtain wall, preventing groundwater from directly infiltrating the slope of the building's raft foundation and avoiding the settlement of the building caused by foundation damage.
[0055] Further, according to an embodiment of the present invention, the anti-sliding pile foundation vertical to the slope is arranged on the slope surface as follows:
[0056] The pile foundation holes are arranged in an array on the slope surface, and then holes are drilled perpendicular to the slope surface based on the pile foundation holes, and each hole is drilled into the rock layer to a certain depth, and then grouting is injected into each hole to reinforce the slope soil to form an anti-slip pile foundation. This arrangement can make the anti-slip pile foundation bond with the soil around the pile foundation, increase the friction between the interfaces, and thus improve the bearing capacity and anti-slip force of the slope foundation.
[0057] Further, according to an embodiment of the present invention, a foot curtain wall is arranged at the side of the foot of the slope close to the slope surface as follows:
[0058] Drill holes vertically downwards to the rock layer at the foot of the slope near the slope surface to form multiple curtain holes at intervals, inject grout into the curtain holes, and overlap the injection ranges of two adjacent curtain holes to form a curtain wall at the foot of the slope. This arrangement can increase the strength of the soil layer at the foot of the slope, stabilize the foot of the slope, prevent large-scale sliding of the building's slope foundation, and also increase the anti-slip force of the slope, making the slope more stable.
[0059] Further, according to an embodiment of the present invention, reinforcement and lifting holes for reinforcing and lifting the building are evenly arranged at intervals on the hillside below the raft foundation of the building, including:
[0060] A plurality of exploration points are set at both ends and the center of the edge of the raft foundation close to the slope surface of the hillside;
[0061] Measure the vertical depth of each exploration point down to the rock layer and determine the maximum depth;
[0062] Extending horizontally toward the hillside surface according to the maximum depth to obtain an intersection point with the hillside surface, the intersection point being used as the reinforcement lifting hole position at the bottom of the uphill surface;
[0063] Measure the straight-line distance between the intersection point and the top edge of the uphill slope;
[0064] The number of reinforcement and lifting hole positions and the position of each reinforcement and lifting hole position in the X-axis direction of the slope surface are calculated according to the intersection point and the straight-line distance;
[0065] Draw multiple straight lines parallel to the top edge of the slope through each reinforcement lifting hole in the X-axis direction of the slope surface toward the Y-axis direction of the slope surface;
[0066] Mark the positions corresponding to the exploration points on each straight line as the reinforcement and lifting holes in the Y-axis direction, so as to complete the arrangement of the reinforcement and lifting holes. This arrangement allows the reinforcement and lifting holes to cover the soil below the raft foundation of the building, ensuring that there are no dead corners when grouting the reinforcement and lifting holes, and can form a uniform and stable lifting reinforcement, ensuring the reinforcement and lifting effect after drilling and grouting through each reinforcement and lifting hole. Not only that, each reinforcement and lifting hole is arranged on the slope of the hillside, so it is more convenient and quick to drill and grout through each reinforcement and lifting hole, and it will not affect the building itself, making the reinforcement and lifting process more efficient, and can obtain a more stable and reliable reinforcement and lifting effect, avoiding secondary settlement.
[0067] Further, according to an embodiment of the present invention, the number of reinforcement and lifting holes n is: n = L / 5, where L is the straight-line distance between the intersection point and the top edge of the uphill slope. In this way, because the flow radius of the grouting slurry is 2.5-3 meters under normal conditions, the ratio of the above straight-line distance to 5 can ensure that after grouting through each reinforcement and lifting hole, the slurry can overlap, thereby ensuring the integrity of the grouting reinforcement and the reinforcement and lifting effect.
[0068] Further, according to an embodiment of the present invention, transverse drilling and grouting are performed according to each reinforcement and lifting hole position, and the reinforcement and lifting building is:
[0069] Drill holes horizontally at each reinforcement and lifting hole position, and after drilling to the edge of the rock layer and / or the slope top curtain wall, grouting is performed through the holes to form a reinforcement and lifting layer under the raft foundation to achieve reinforcement and lifting of the building. This arrangement can ensure that the raft foundation of the building is not affected or damaged when reinforcing and lifting the building, ensuring the lifting and reinforcement speed and efficiency.
[0070] Furthermore, along the Y-axis direction of the hillside, the edges of the slope foot curtain wall and the anti-slide pile foundation are aligned, and the width of the slope foot curtain wall and the anti-slide pile foundation is greater than the width of the building raft foundation, and the center line of the building raft foundation is aligned with the center line of the slope foot curtain wall and the anti-slide pile foundation.
[0071] In this embodiment, the width of the slope foot curtain wall and the anti-sliding pile foundation and the width of the building raft foundation satisfy the following formula: c=2a+b, where c is the width of the slope foot curtain wall and the anti-sliding pile foundation, b is the width of the raft foundation, and a is the width difference between one side and the other side of the raft foundation and the slope foot curtain wall and the anti-sliding pile foundation, respectively, and a=0.5b-1b. This arrangement can make the soil around the building raft foundation firm, and the slope foot curtain wall and the anti-sliding pile foundation can effectively reinforce the soil around the building raft foundation, ensure that the building raft foundation at the top of the slope is stable and reliable, and effectively avoid secondary settlement caused by the looseness of the surrounding soil.
[0072] According to the above scheme of the present invention, the present invention forms a slope-top curtain wall through grouting, which blocks the downward flow of groundwater at high altitudes and changes the path of groundwater to flow away from both sides of the curtain wall, thereby preventing groundwater from directly infiltrating the foundation slope of the building and avoiding settlement of the building after foundation damage.
[0073] The present invention achieves the purpose of strengthening the foot and waist by arranging anti-slip pile foundations and slope foot curtain walls, thereby increasing the stability of the building slope foundation. The anti-slip pile foundation produces a bonding effect with the soil around the pile foundation, increasing the friction between the interfaces, and improving the bearing capacity and anti-slip force of the slope foundation. The slope foot curtain wall can increase the strength of the soil layer at the slope foot, stabilize the slope foot, prevent large-scale sliding of the building slope foundation, and also increase the anti-slip force of the slope, making the slope foundation more stable.
[0074] The present invention reinforces and elevates the building by horizontal grouting on the slope, thereby solving the problem that drilling and grouting cannot be performed indoors in the building. Meanwhile, the horizontal grouting can better control the range of grouting and better achieve the purpose of lifting.
[0075] Furthermore, to achieve the above-mentioned purpose, the present invention also provides a grouting reinforcement and lifting system for building foundation on a hillside, comprising:
[0076] The slope top curtain wall arrangement module is to arrange the slope top curtain wall on the side of the building raft foundation close to the top of the hill at the top of the uphill slope;
[0077] Anti-slide pile foundation arrangement module, arranging anti-slide pile foundations vertical to the slope surface on the hillside;
[0078] The slope foot curtain wall arrangement module arranges the slope foot curtain wall on the side of the slope foot close to the slope surface;
[0079] A reinforcement and lifting hole arrangement module is used to evenly arrange reinforcement and lifting holes for reinforcing and lifting the building on the hillside below the raft foundation of the building;
[0080] The grouting reinforcement and lifting module performs horizontal drilling and grouting according to each reinforcement and lifting hole position to reinforce and lift the building.
[0081] The grouting reinforcement and lifting system for the foundation of a building on a hillside of the present invention can implement the above-mentioned grouting reinforcement and lifting method for the foundation of a building on a hillside. The specific implementation steps are as described above and will not be repeated here.
[0082] Furthermore, based on the above-mentioned solution of the present invention, the technical solution of the present invention is described in detail in the form of a specific embodiment in combination with the accompanying drawings.
[0083] Example 1
[0084] There is a circular winery building on a hillside, with a diameter of 10m and a raft foundation. Currently, the building is tilted towards the foot of the slope. At present, the tank (circular winery building) is not filled with wine, and the hardened ground in the tank area is cracked. After investigation, it was found that the tank foundation is plain fill without any treatment. According to the on-site survey and combined with the analysis of drilling data, the soil layer has a phenomenon of sinking under the scouring and soaking of surface water and the load of the tank. Since the site is on a steep slope, the height difference is about 22.0m. There is no support at the front edge of the tank area, and there is a shear outlet on the slope. The soil may slide out of the shear outlet along the slope, resulting in instability of the tank foundation and settlement and tilting of the tank building.
[0085] The above-mentioned method of grouting reinforcement and lifting of the building foundation on the hillside is used for reinforcement and lifting correction in this project, including the following steps:
[0086] Step 1: Arrange the slope top curtain wall. On the side of the raft foundation 2 of the building 1 close to the top of the mountain, drill holes vertically downward until the rock layer to form multiple curtain holes at intervals, inject grout into the curtain holes, and the injection ranges of two adjacent curtain holes overlap each other to form the slope top curtain wall 3. The slope top curtain wall can block the downward flow of groundwater at high altitudes and change the path of groundwater to flow away from both sides of the curtain wall, preventing groundwater from directly infiltrating the foundation slope of the building and avoiding the settlement of the building caused by foundation damage. Figure 2 and Figure 3 shown.
[0087] Step 2: Arrange the anti-sliding pile foundation on the slope surface. Arrange the pile foundation holes in an array on the slope surface (for example, in a plum blossom shape). Then, drill grouting holes perpendicular to the slope surface and penetrate into the rock layer to a certain thickness. Grouting is used to reinforce the slope soil to form an anti-sliding pile foundation 4. Figure 2 , Figure 3 The anti-sliding pile foundation produces a bonding effect with the soil around the pile foundation, increasing the friction between the interfaces, thereby improving the bearing capacity and anti-sliding force of the slope foundation.
[0088] Step 3: Arrange the slope foot curtain wall. Drill holes vertically downward at the slope foot until the rock layer is reached to form multiple curtain holes. Grout is injected into the curtain holes. The grouting ranges of two adjacent curtain holes overlap with each other to form the slope foot curtain wall 5. Figure 2 , Figure 3 The slope foot curtain wall can increase the strength of the soil layer at the slope foot, stabilize the slope foot, prevent large-scale sliding of the building slope foundation, and also increase the anti-slip force of the slope, making the slope more stable.
[0089] Step 4: Arrange the reinforcement lifting holes and select J at the edge of the raft close to the slope. 左 , J 中 and J 右 There are three exploration points, located at the end point and the center point respectively. Figure 4As shown. From J 左 , J 中 , J 右 The point extends vertically downward to the rock layer. At this time, the vertical depths to the rock layer are h 左 =3.5m,h 中 =4.6m,h 右 = 5.3m. At the vertical depth h = 5.3m, continue to extend horizontally and intersect the slope surface at point K1. The vertical distance from point K1 to the top edge of the slope is L = h / sinθ = 5.3 / sin38° = 8.6m. Figure 5 shown.
[0090] In this embodiment, if Figure 4 As shown, the width of the slope foot curtain wall and the anti-sliding pile foundation and the width of the building raft foundation satisfy the following formula: c=2a+b, wherein c is the width of the slope foot curtain wall and the anti-sliding pile foundation, b is the width of the raft foundation, a is the width difference between one side and the other side of the raft foundation and the slope foot curtain wall and the anti-sliding pile foundation, and a=0.5b-1b.
[0091] The number of grouting holes arranged in the X-axis direction of the slope surface is n = L / 5 = 8.6 / 5 = 2, and the grouting hole positions are K1, K2...Kn, such as Figure 5 and Figure 6 shown.
[0092] Draw straight lines m1, m2,...mn in the Y-axis direction of the slope surface parallel to the slope top edge line, and mark the lines corresponding to J on the straight lines m1 and m2. 左 , J 中 , J 右 The grouting holes corresponding to the points are K1 left, K1 center, K1 right, K2 left, K2 center, K2 right, such as Figure 4 shown.
[0093] Step 5: Reinforce and elevate the building by transverse grouting. Drill holes horizontally at the reinforcement and elevation holes until they reach the edge of the sloped top curtain wall. Then start grouting to form a reinforcement and elevation layer under the foundation.
[0094] In this embodiment, there are two principles for the grouting sequence:
[0095] (1) Grouting from bottom to top, that is, first grouting the K1 left, K1 center, and K1 right grouting holes, then grouting the K2 left, K2 center, and K2 right grouting holes, and so on.
[0096] (2) Perform progressive grouting from the outside to the inside. When the grouting pressure suddenly decreases and the slurry cannot be injected, stop grouting, indicating that the rock layer has been reached. Figure 7a-7cAs shown. According to the terrain, the settlement of the building close to the slope is greater. Determining the grouting section according to the settlement size at different locations can more conveniently adjust the grouting range, which can better ensure the uniformity of grouting lifting.
[0097] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. A method for reinforcing and lifting the foundation of a building on a hillside by grouting, characterized in that: include: The slope top curtain wall is arranged on the side of the building raft foundation close to the top of the hill at the top of the upslope; Arrange anti-sliding pile foundations perpendicular to the slope on the hillside; Arrange a foot curtain wall at the foot of the slope close to the slope surface; Reinforcement and lifting holes for reinforcing and lifting the building are evenly arranged at intervals on the hillside below the raft foundation of the building; Carry out transverse drilling and grouting according to the reinforcement and lifting hole positions to reinforce and lift the buildings.
2. The method for grouting reinforcement and lifting of building foundation on a hillside according to claim 1 is characterized in that: The slope top curtain wall is arranged on the side of the building raft foundation near the top of the uphill slope: On the side of the raft foundation of the building close to the top of the mountain, holes are drilled vertically downwards to the rock layer to form multiple spaced curtain holes, and then grouting is injected into the curtain holes. The grouting ranges of two adjacent curtain holes interlock and overlap with each other to form a slope top curtain wall.
3. The method for grouting reinforcement and lifting of building foundation on a hillside according to claim 1 is characterized in that: The anti-sliding pile foundation arranged vertically on the slope surface is: The pile foundation holes are arranged in an array on the slope surface, and then holes are drilled perpendicular to the slope surface based on the pile foundation hole positions. Each hole is made to penetrate into the rock layer to a certain depth, and then grouting is injected into each hole to reinforce the slope soil to form an anti-slip pile foundation.
4. The method for grouting reinforcement and lifting of building foundation on a hillside according to claim 1 is characterized in that: The method of arranging the foot curtain wall at the side of the foot of the slope close to the slope surface is as follows: On one side of the foot of the slope close to the slope surface, holes are drilled vertically downwards to the rock layer to form multiple curtain holes at intervals, and grouting is injected into the curtain holes. The grouting ranges of two adjacent curtain holes overlap with each other to form a curtain wall at the foot of the slope.
5. The method for grouting reinforcement and lifting of building foundation on a hillside according to claim 1 is characterized in that: The method of evenly arranging reinforcement and lifting holes for reinforcing and lifting the building on the hillside below the raft foundation of the building at intervals comprises: A plurality of exploration points are set at both ends and the center of the edge of the raft foundation close to the slope surface of the hillside; Measure the vertical depth of each exploration point down to the rock layer and determine the maximum depth; Extending horizontally toward the hillside surface according to the maximum depth to obtain an intersection point with the hillside surface, the intersection point being used as the reinforcement lifting hole position at the bottom of the uphill surface; Measure the straight-line distance between the intersection point and the top edge of the uphill slope; The number of reinforcement and lifting hole positions and the position of each reinforcement and lifting hole position in the X-axis direction of the slope surface are calculated according to the intersection point and the straight-line distance; Draw multiple straight lines parallel to the top edge of the slope through each reinforcement lifting hole in the X-axis direction of the slope surface toward the Y-axis direction of the slope surface; The positions corresponding to the exploration points are marked on each straight line as the reinforcement and lifting hole positions in the Y-axis direction, thereby completing the reinforcement and lifting hole position arrangement.
6. The method for grouting reinforcement and lifting of building foundation on a hillside according to claim 1, characterized in that: The number n of the reinforcement and lifting holes is: n=L / 5, wherein L is the straight-line distance between the intersection point and the top edge of the uphill slope.
7. The method for grouting reinforcement and lifting of building foundation on a hillside according to claim 1, characterized in that: The said transverse drilling and grouting is carried out according to each reinforcement and lifting hole position to reinforce and lift the building: Drill holes in the horizontal direction at each reinforcement and lifting hole position, and after drilling to the edge of the rock layer and / or the slope top curtain wall, grouting is performed through the drilling holes to form a reinforcement and lifting layer under the raft foundation, thereby realizing a reinforced and lifted building.
8. The method for reinforcing and lifting the foundation of a building on a hillside by grouting according to any one of claims 1 to 7, characterized in that: Along the Y-axis direction of the hillside, the edges of the slope foot curtain wall and the anti-slide pile foundation are aligned, and the width of the slope foot curtain wall and the anti-slide pile foundation is greater than the width of the building raft foundation, and the center line of the building raft foundation is aligned with the center line of the slope foot curtain wall and the anti-slide pile foundation.
9. The method for grouting reinforcement and lifting of building foundation on a hillside according to claim 8, characterized in that: The width of the slope foot curtain wall and the anti-sliding pile foundation and the width of the building raft foundation satisfy the following formula: c=2a+b, wherein c is the width of the slope foot curtain wall and the anti-sliding pile foundation, b is the width of the raft foundation, a is the width difference between one side and the other side of the raft foundation and the slope foot curtain wall and the anti-sliding pile foundation respectively, and a=0.5b-1b.
10. Grouting reinforcement and lifting system for building foundation on hillside, characterized in that: include: The slope top curtain wall arrangement module is to arrange the slope top curtain wall on the side of the building raft foundation close to the top of the hill at the top of the uphill slope; Anti-slide pile foundation arrangement module, arranging anti-slide pile foundations vertical to the slope surface on the hillside; The slope foot curtain wall arrangement module arranges the slope foot curtain wall on the side of the slope foot close to the slope surface; A reinforcement and lifting hole arrangement module is used to evenly arrange reinforcement and lifting holes for reinforcing and lifting the building on the hillside below the raft foundation of the building; The grouting reinforcement and lifting module performs horizontal drilling and grouting according to each reinforcement and lifting hole position to reinforce and lift the building.